SCHOOL OF ARCHITECTURE, BUILDING AND DESIGN
Cent re f or Modern Archit ect ure St udies in Sout heast Asia
Bachelor of Quantity Surveying (Honours)
MEASUREMENT 1 [QSB 10604]
____________________________________________________________
Assignment Title: No.2 (Group Project)
% of Assessment: 20%
Assignment date: 27 May 2014
Submission date: 4 July 2014
___________________________________________________________________
Assessment brief
Based on the drawings provided, you are required to prepare a COMPLETE TAKING-OFF for the following structural
elements for the chosen building.
 Pilecaps including excavations from reduce level
 Work below ground floor level including site clearance and excavation, ground floor slab, ground beams and
apron slab.
 First floor slab and beams
 Roof slab and roof beams
 Columns stumps, columns and stiffeners.
Notes:
 Excavate topsoil 50 mm deep to be disposed off site.
Assessment Criteria
Refer to matrix attached.
Teaching Objectives
 To demonstrate a knowledge and understanding of measurement techniques and their application.
 To develop an awareness of the nature, content, and significance of tendering and contractual documentation.
 To have sufficient knowledge and understanding of the Standard Method of Measurement in taking-off quantities.
 To develop an understanding of the principles of measurement in preparing the Bills of Quantities and
Specification writing.
Learning Outcomes
Upon successful completion of the module, students will be able to:
1. Explain and able to interpret clauses in the Standard Method of Measurement (SMM) for the various trades in
relation to sub-structure and reinforced concrete frame works.
2. Distinguish and illustrate differences in writing-up descriptions in accordance to design changes for sub-structure
and reinforced concrete frame works.
3. Evaluate the relationship between Specifications, Drawings and Bill of Quantities in Tender Documents for sub-
structure and reinforced concrete frame works.
4. Adopt a systematic approach to take-off quantities from drawings for the preparation of Bills of Quantities for
sub-structure and reinforced concrete frame works.
5. Generate a conceptual understanding of and the ability to competently carry out the preparation of the Bills of
Quantities for sub-structure and reinforced concrete frame works.
Submission
Each student is to submit in the following sequence:
 Taking off list
 Query list
 Dimension sheets
 Billing (in own handwriting)
 Appropriate front cover with the names of group members.
The Leader of each group is to collect from everyone in the group and attach the front cover page and arrange it in
the following sequence.
 Pilecaps including excavations from reduce level.
 Work below ground floor level including site clearance and excavation, ground floor slab, ground beams and
apron slab.
 First floor slab and beams
 Roof slab and roof beams
 Columns and stiffeners.

More Related Content

What's hot

Estimation and costing practical norm and thumb rules
Estimation and costing practical norm and thumb rulesEstimation and costing practical norm and thumb rules
Estimation and costing practical norm and thumb rulesAkshayKamble94
 
Estimation And Costing Of A Building
Estimation And Costing Of A Building Estimation And Costing Of A Building
Estimation And Costing Of A Building shahidibn hussain
 
Seminar 1 - Question 1
Seminar 1 - Question 1Seminar 1 - Question 1
Seminar 1 - Question 1Kai Yun Pang
 
Assignment - Cost Plan
Assignment - Cost PlanAssignment - Cost Plan
Assignment - Cost PlanKai Yun Pang
 
Introduction to estimating & costing
Introduction to estimating & costingIntroduction to estimating & costing
Introduction to estimating & costingJanak Mehta
 
Estimating part 2
Estimating part 2Estimating part 2
Estimating part 2ArunRavi43
 
Bill of quantities
Bill of quantitiesBill of quantities
Bill of quantitiesSAUD ALBAKER
 
Assignment - Financial Analysis
Assignment - Financial AnalysisAssignment - Financial Analysis
Assignment - Financial AnalysisKai Yun Pang
 
Estimation and Evaluation of G+3 Residential Building
Estimation and Evaluation of G+3 Residential BuildingEstimation and Evaluation of G+3 Residential Building
Estimation and Evaluation of G+3 Residential Buildingvivatechijri
 
Crotti final reports_prousall
Crotti final reports_prousallCrotti final reports_prousall
Crotti final reports_prousallEmiliano Crotti
 
Construction report (boq, wbs, reports, evm)
Construction report (boq, wbs, reports, evm)Construction report (boq, wbs, reports, evm)
Construction report (boq, wbs, reports, evm)Hamza Waheed
 

What's hot (13)

Estimation and costing practical norm and thumb rules
Estimation and costing practical norm and thumb rulesEstimation and costing practical norm and thumb rules
Estimation and costing practical norm and thumb rules
 
Estimation And Costing Of A Building
Estimation And Costing Of A Building Estimation And Costing Of A Building
Estimation And Costing Of A Building
 
Seminar 1 - Question 1
Seminar 1 - Question 1Seminar 1 - Question 1
Seminar 1 - Question 1
 
Assignment - Cost Plan
Assignment - Cost PlanAssignment - Cost Plan
Assignment - Cost Plan
 
Taking off qs
Taking off qsTaking off qs
Taking off qs
 
Introduction to estimating & costing
Introduction to estimating & costingIntroduction to estimating & costing
Introduction to estimating & costing
 
Estimating part 2
Estimating part 2Estimating part 2
Estimating part 2
 
Bill of quantities
Bill of quantitiesBill of quantities
Bill of quantities
 
Assignment - Financial Analysis
Assignment - Financial AnalysisAssignment - Financial Analysis
Assignment - Financial Analysis
 
Scope of work
Scope of workScope of work
Scope of work
 
Estimation and Evaluation of G+3 Residential Building
Estimation and Evaluation of G+3 Residential BuildingEstimation and Evaluation of G+3 Residential Building
Estimation and Evaluation of G+3 Residential Building
 
Crotti final reports_prousall
Crotti final reports_prousallCrotti final reports_prousall
Crotti final reports_prousall
 
Construction report (boq, wbs, reports, evm)
Construction report (boq, wbs, reports, evm)Construction report (boq, wbs, reports, evm)
Construction report (boq, wbs, reports, evm)
 

Viewers also liked

Measurement 4 Assignment Presentation
Measurement 4 Assignment PresentationMeasurement 4 Assignment Presentation
Measurement 4 Assignment PresentationHaziq1511
 
Measurement III:Doors & Windows
Measurement III:Doors & WindowsMeasurement III:Doors & Windows
Measurement III:Doors & Windows마 이환
 
Sgp4813 measurement of quantities
Sgp4813 measurement of quantitiesSgp4813 measurement of quantities
Sgp4813 measurement of quantitiesalanchong88
 
Measurement and layout tools
Measurement and layout toolsMeasurement and layout tools
Measurement and layout toolsdmaher1974
 
Software application:assignment
Software application:assignmentSoftware application:assignment
Software application:assignment마 이환
 
Software Application Group Assignment
Software Application Group AssignmentSoftware Application Group Assignment
Software Application Group AssignmentHaziq1511
 
Bill of Quantities ( Door and Window )
Bill of Quantities ( Door and Window )Bill of Quantities ( Door and Window )
Bill of Quantities ( Door and Window )Lee Pei Gie
 
Assignment on Entrepreneurship development( stories of a successful entrepren...
Assignment on Entrepreneurship development( stories of a successful entrepren...Assignment on Entrepreneurship development( stories of a successful entrepren...
Assignment on Entrepreneurship development( stories of a successful entrepren...Md. Sourav Hossain
 
SMM7 Bill of Quantities
SMM7 Bill of QuantitiesSMM7 Bill of Quantities
SMM7 Bill of QuantitiesNatalie Reid
 
Construction productivity
Construction productivityConstruction productivity
Construction productivitySunil Manjeri
 
construction site safety and management
construction site safety and managementconstruction site safety and management
construction site safety and managementAnchal Gupta
 
Standard bill of quantities
Standard bill of quantitiesStandard bill of quantities
Standard bill of quantitiesBt Lee
 
Construction site safety
Construction site safetyConstruction site safety
Construction site safetyDebajit Roy
 
Acknowledgement
AcknowledgementAcknowledgement
Acknowledgementferdzzz
 
Acknowledgement For Assignment
Acknowledgement For AssignmentAcknowledgement For Assignment
Acknowledgement For AssignmentThomas Mon
 

Viewers also liked (19)

Measurement 4 Assignment Presentation
Measurement 4 Assignment PresentationMeasurement 4 Assignment Presentation
Measurement 4 Assignment Presentation
 
Measurement III:Doors & Windows
Measurement III:Doors & WindowsMeasurement III:Doors & Windows
Measurement III:Doors & Windows
 
Sgp4813 measurement of quantities
Sgp4813 measurement of quantitiesSgp4813 measurement of quantities
Sgp4813 measurement of quantities
 
Measurement and layout tools
Measurement and layout toolsMeasurement and layout tools
Measurement and layout tools
 
Software application:assignment
Software application:assignmentSoftware application:assignment
Software application:assignment
 
Software Application Group Assignment
Software Application Group AssignmentSoftware Application Group Assignment
Software Application Group Assignment
 
Bill of Quantities ( Door and Window )
Bill of Quantities ( Door and Window )Bill of Quantities ( Door and Window )
Bill of Quantities ( Door and Window )
 
Assignment on Entrepreneurship development( stories of a successful entrepren...
Assignment on Entrepreneurship development( stories of a successful entrepren...Assignment on Entrepreneurship development( stories of a successful entrepren...
Assignment on Entrepreneurship development( stories of a successful entrepren...
 
SMM7 Bill of Quantities
SMM7 Bill of QuantitiesSMM7 Bill of Quantities
SMM7 Bill of Quantities
 
Acknowledgements
AcknowledgementsAcknowledgements
Acknowledgements
 
Construction productivity
Construction productivityConstruction productivity
Construction productivity
 
construction site safety and management
construction site safety and managementconstruction site safety and management
construction site safety and management
 
Standard bill of quantities
Standard bill of quantitiesStandard bill of quantities
Standard bill of quantities
 
Example of acknowledgment
Example of acknowledgmentExample of acknowledgment
Example of acknowledgment
 
Construction site safety
Construction site safetyConstruction site safety
Construction site safety
 
Acknowledgement
AcknowledgementAcknowledgement
Acknowledgement
 
Boq sample
Boq sampleBoq sample
Boq sample
 
Formwork
FormworkFormwork
Formwork
 
Acknowledgement For Assignment
Acknowledgement For AssignmentAcknowledgement For Assignment
Acknowledgement For Assignment
 

Similar to Measurement assignment 2 (group)

Group Assignment: Bill Quantities
Group Assignment: Bill Quantities Group Assignment: Bill Quantities
Group Assignment: Bill Quantities Lin Hui
 
asAssignment no.2
asAssignment no.2asAssignment no.2
asAssignment no.2Pui San
 
Assignment no.2
Assignment no.2 Assignment no.2
Assignment no.2 Jıa Yıı
 
bqs Assignment no.2
bqs Assignment no.2 bqs Assignment no.2
bqs Assignment no.2 Felix Vong
 
BQS bq assignment
BQS bq assignmentBQS bq assignment
BQS bq assignmentFelix Vong
 
Assignment 2 - Measurement
Assignment 2 - MeasurementAssignment 2 - Measurement
Assignment 2 - MeasurementKai Yun Pang
 
M1 ASSIGNMENT 2 (GROUP) BRIEF
M1 ASSIGNMENT 2 (GROUP) BRIEFM1 ASSIGNMENT 2 (GROUP) BRIEF
M1 ASSIGNMENT 2 (GROUP) BRIEFLillian June
 
Assignment no.2 brief m1 sem1 degree
Assignment no.2  brief m1 sem1 degreeAssignment no.2  brief m1 sem1 degree
Assignment no.2 brief m1 sem1 degreeLam Wee
 
Assignment - software application for qs
Assignment - software application for qs Assignment - software application for qs
Assignment - software application for qs Lin Hui
 
7th_8th_SEM_SYLLABUS.pdf
7th_8th_SEM_SYLLABUS.pdf7th_8th_SEM_SYLLABUS.pdf
7th_8th_SEM_SYLLABUS.pdfPranayManwar
 
CE6704_uw.pdf
CE6704_uw.pdfCE6704_uw.pdf
CE6704_uw.pdfhitusp
 
SEMESTER 3 : PROJECT 2 BRIEF BCON 2
SEMESTER 3 : PROJECT 2 BRIEF BCON 2SEMESTER 3 : PROJECT 2 BRIEF BCON 2
SEMESTER 3 : PROJECT 2 BRIEF BCON 2Darshiini Vig
 
Project brief 2 b construction 2 march 2016 1
Project brief 2 b construction 2 march 2016 1Project brief 2 b construction 2 march 2016 1
Project brief 2 b construction 2 march 2016 1Chow Hong Da
 
Quantity Surveying & valuation.ppt
Quantity Surveying & valuation.pptQuantity Surveying & valuation.ppt
Quantity Surveying & valuation.pptTauheedKhan45
 
Aiet e&c lecture_notes
Aiet  e&c lecture_notesAiet  e&c lecture_notes
Aiet e&c lecture_notesDr.K.Mohan Das
 
Project brief 2 b construction 2 march 2016 (new)
Project brief 2 b construction 2 march 2016 (new)Project brief 2 b construction 2 march 2016 (new)
Project brief 2 b construction 2 march 2016 (new)Arvindhan Balasingam
 
1 IA Swinburne Faculty of Engineering, Science and Techn.docx
1 IA Swinburne Faculty of Engineering, Science and Techn.docx1 IA Swinburne Faculty of Engineering, Science and Techn.docx
1 IA Swinburne Faculty of Engineering, Science and Techn.docxjeremylockett77
 

Similar to Measurement assignment 2 (group) (20)

Assignment no.2
Assignment no.2 Assignment no.2
Assignment no.2
 
Group Assignment: Bill Quantities
Group Assignment: Bill Quantities Group Assignment: Bill Quantities
Group Assignment: Bill Quantities
 
asAssignment no.2
asAssignment no.2asAssignment no.2
asAssignment no.2
 
Assignment no.2
Assignment no.2 Assignment no.2
Assignment no.2
 
bqs Assignment no.2
bqs Assignment no.2 bqs Assignment no.2
bqs Assignment no.2
 
BQS bq assignment
BQS bq assignmentBQS bq assignment
BQS bq assignment
 
Assignment 2 - Measurement
Assignment 2 - MeasurementAssignment 2 - Measurement
Assignment 2 - Measurement
 
Assignment no.2
Assignment no.2 Assignment no.2
Assignment no.2
 
M1 ASSIGNMENT 2 (GROUP) BRIEF
M1 ASSIGNMENT 2 (GROUP) BRIEFM1 ASSIGNMENT 2 (GROUP) BRIEF
M1 ASSIGNMENT 2 (GROUP) BRIEF
 
Assignment no.2 brief m1 sem1 degree
Assignment no.2  brief m1 sem1 degreeAssignment no.2  brief m1 sem1 degree
Assignment no.2 brief m1 sem1 degree
 
Assignment
Assignment  Assignment
Assignment
 
Assignment - software application for qs
Assignment - software application for qs Assignment - software application for qs
Assignment - software application for qs
 
7th_8th_SEM_SYLLABUS.pdf
7th_8th_SEM_SYLLABUS.pdf7th_8th_SEM_SYLLABUS.pdf
7th_8th_SEM_SYLLABUS.pdf
 
CE6704_uw.pdf
CE6704_uw.pdfCE6704_uw.pdf
CE6704_uw.pdf
 
SEMESTER 3 : PROJECT 2 BRIEF BCON 2
SEMESTER 3 : PROJECT 2 BRIEF BCON 2SEMESTER 3 : PROJECT 2 BRIEF BCON 2
SEMESTER 3 : PROJECT 2 BRIEF BCON 2
 
Project brief 2 b construction 2 march 2016 1
Project brief 2 b construction 2 march 2016 1Project brief 2 b construction 2 march 2016 1
Project brief 2 b construction 2 march 2016 1
 
Quantity Surveying & valuation.ppt
Quantity Surveying & valuation.pptQuantity Surveying & valuation.ppt
Quantity Surveying & valuation.ppt
 
Aiet e&c lecture_notes
Aiet  e&c lecture_notesAiet  e&c lecture_notes
Aiet e&c lecture_notes
 
Project brief 2 b construction 2 march 2016 (new)
Project brief 2 b construction 2 march 2016 (new)Project brief 2 b construction 2 march 2016 (new)
Project brief 2 b construction 2 march 2016 (new)
 
1 IA Swinburne Faculty of Engineering, Science and Techn.docx
1 IA Swinburne Faculty of Engineering, Science and Techn.docx1 IA Swinburne Faculty of Engineering, Science and Techn.docx
1 IA Swinburne Faculty of Engineering, Science and Techn.docx
 

More from Syafiq Zariful

Conference paper-11-9-2017
Conference paper-11-9-2017Conference paper-11-9-2017
Conference paper-11-9-2017Syafiq Zariful
 
Finalized dissertation (print 80 gram hardcover)
Finalized dissertation (print 80 gram hardcover)Finalized dissertation (print 80 gram hardcover)
Finalized dissertation (print 80 gram hardcover)Syafiq Zariful
 
07 cl-assignment-syafiq-qy-macy-huiyong-deric
07 cl-assignment-syafiq-qy-macy-huiyong-deric07 cl-assignment-syafiq-qy-macy-huiyong-deric
07 cl-assignment-syafiq-qy-macy-huiyong-dericSyafiq Zariful
 
Vm report-most-updated-2
Vm report-most-updated-2Vm report-most-updated-2
Vm report-most-updated-2Syafiq Zariful
 
Research proposal final draft
Research proposal final draftResearch proposal final draft
Research proposal final draftSyafiq Zariful
 
Software applications-presentation
Software applications-presentationSoftware applications-presentation
Software applications-presentationSyafiq Zariful
 
Community service-report-syafiq-2
Community service-report-syafiq-2Community service-report-syafiq-2
Community service-report-syafiq-2Syafiq Zariful
 
1,2 & 3,4 ratio analysis updated
1,2 & 3,4 ratio analysis updated1,2 & 3,4 ratio analysis updated
1,2 & 3,4 ratio analysis updatedSyafiq Zariful
 
Financial management assignment (f) summarized 4
Financial management assignment (f) summarized 4Financial management assignment (f) summarized 4
Financial management assignment (f) summarized 4Syafiq Zariful
 
Building economics presentation 3 2
Building economics presentation 3 2Building economics presentation 3 2
Building economics presentation 3 2Syafiq Zariful
 
Compiled fm assignment (complete)
Compiled fm assignment (complete)Compiled fm assignment (complete)
Compiled fm assignment (complete)Syafiq Zariful
 
Estimating presentation
Estimating presentationEstimating presentation
Estimating presentationSyafiq Zariful
 
Software application finalized group report
Software application finalized group reportSoftware application finalized group report
Software application finalized group reportSyafiq Zariful
 
Presentation measurement part 2
Presentation measurement part 2Presentation measurement part 2
Presentation measurement part 2Syafiq Zariful
 
Bs 2 assignment presentation1
Bs 2 assignment presentation1Bs 2 assignment presentation1
Bs 2 assignment presentation1Syafiq Zariful
 

More from Syafiq Zariful (20)

Conference paper-11-9-2017
Conference paper-11-9-2017Conference paper-11-9-2017
Conference paper-11-9-2017
 
De assignment compile
De assignment compileDe assignment compile
De assignment compile
 
Pm group-compileddd
Pm group-compiledddPm group-compileddd
Pm group-compileddd
 
Finalized dissertation (print 80 gram hardcover)
Finalized dissertation (print 80 gram hardcover)Finalized dissertation (print 80 gram hardcover)
Finalized dissertation (print 80 gram hardcover)
 
07 cl-assignment-syafiq-qy-macy-huiyong-deric
07 cl-assignment-syafiq-qy-macy-huiyong-deric07 cl-assignment-syafiq-qy-macy-huiyong-deric
07 cl-assignment-syafiq-qy-macy-huiyong-deric
 
Vm report-most-updated-2
Vm report-most-updated-2Vm report-most-updated-2
Vm report-most-updated-2
 
Pp2 seminar
Pp2 seminarPp2 seminar
Pp2 seminar
 
Research proposal final draft
Research proposal final draftResearch proposal final draft
Research proposal final draft
 
Software assignment
Software assignmentSoftware assignment
Software assignment
 
Software applications-presentation
Software applications-presentationSoftware applications-presentation
Software applications-presentation
 
Community service-report-syafiq-2
Community service-report-syafiq-2Community service-report-syafiq-2
Community service-report-syafiq-2
 
1,2 & 3,4 ratio analysis updated
1,2 & 3,4 ratio analysis updated1,2 & 3,4 ratio analysis updated
1,2 & 3,4 ratio analysis updated
 
Financial management assignment (f) summarized 4
Financial management assignment (f) summarized 4Financial management assignment (f) summarized 4
Financial management assignment (f) summarized 4
 
Building economics presentation 3 2
Building economics presentation 3 2Building economics presentation 3 2
Building economics presentation 3 2
 
Fm presentation final
Fm presentation finalFm presentation final
Fm presentation final
 
Compiled fm assignment (complete)
Compiled fm assignment (complete)Compiled fm assignment (complete)
Compiled fm assignment (complete)
 
Estimating presentation
Estimating presentationEstimating presentation
Estimating presentation
 
Software application finalized group report
Software application finalized group reportSoftware application finalized group report
Software application finalized group report
 
Presentation measurement part 2
Presentation measurement part 2Presentation measurement part 2
Presentation measurement part 2
 
Bs 2 assignment presentation1
Bs 2 assignment presentation1Bs 2 assignment presentation1
Bs 2 assignment presentation1
 

Recently uploaded

HARMONY IN THE HUMAN BEING - Unit-II UHV-2
HARMONY IN THE HUMAN BEING - Unit-II UHV-2HARMONY IN THE HUMAN BEING - Unit-II UHV-2
HARMONY IN THE HUMAN BEING - Unit-II UHV-2RajaP95
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Dr.Costas Sachpazis
 
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...Soham Mondal
 
chaitra-1.pptx fake news detection using machine learning
chaitra-1.pptx  fake news detection using machine learningchaitra-1.pptx  fake news detection using machine learning
chaitra-1.pptx fake news detection using machine learningmisbanausheenparvam
 
What are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxWhat are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxwendy cai
 
Biology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptxBiology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptxDeepakSakkari2
 
Past, Present and Future of Generative AI
Past, Present and Future of Generative AIPast, Present and Future of Generative AI
Past, Present and Future of Generative AIabhishek36461
 
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...srsj9000
 
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube ExchangerStudy on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube ExchangerAnamika Sarkar
 
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVHARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVRajaP95
 
Heart Disease Prediction using machine learning.pptx
Heart Disease Prediction using machine learning.pptxHeart Disease Prediction using machine learning.pptx
Heart Disease Prediction using machine learning.pptxPoojaBan
 
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝soniya singh
 
ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...
ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...
ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...ZTE
 
Call Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call GirlsCall Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call Girlsssuser7cb4ff
 
Sachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective IntroductionSachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective IntroductionDr.Costas Sachpazis
 
Current Transformer Drawing and GTP for MSETCL
Current Transformer Drawing and GTP for MSETCLCurrent Transformer Drawing and GTP for MSETCL
Current Transformer Drawing and GTP for MSETCLDeelipZope
 

Recently uploaded (20)

HARMONY IN THE HUMAN BEING - Unit-II UHV-2
HARMONY IN THE HUMAN BEING - Unit-II UHV-2HARMONY IN THE HUMAN BEING - Unit-II UHV-2
HARMONY IN THE HUMAN BEING - Unit-II UHV-2
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
 
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCRCall Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
 
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
 
chaitra-1.pptx fake news detection using machine learning
chaitra-1.pptx  fake news detection using machine learningchaitra-1.pptx  fake news detection using machine learning
chaitra-1.pptx fake news detection using machine learning
 
What are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxWhat are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptx
 
Biology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptxBiology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptx
 
young call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Service
young call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Serviceyoung call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Service
young call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Service
 
Past, Present and Future of Generative AI
Past, Present and Future of Generative AIPast, Present and Future of Generative AI
Past, Present and Future of Generative AI
 
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
 
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
 
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube ExchangerStudy on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
 
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVHARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
 
Heart Disease Prediction using machine learning.pptx
Heart Disease Prediction using machine learning.pptxHeart Disease Prediction using machine learning.pptx
Heart Disease Prediction using machine learning.pptx
 
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
 
ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...
ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...
ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...
 
Call Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call GirlsCall Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call Girls
 
Sachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective IntroductionSachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
 
Current Transformer Drawing and GTP for MSETCL
Current Transformer Drawing and GTP for MSETCLCurrent Transformer Drawing and GTP for MSETCL
Current Transformer Drawing and GTP for MSETCL
 

Measurement assignment 2 (group)

  • 1. SCHOOL OF ARCHITECTURE, BUILDING AND DESIGN Cent re f or Modern Archit ect ure St udies in Sout heast Asia Bachelor of Quantity Surveying (Honours) MEASUREMENT 1 [QSB 10604] ____________________________________________________________ Assignment Title: No.2 (Group Project) % of Assessment: 20% Assignment date: 27 May 2014 Submission date: 4 July 2014 ___________________________________________________________________ Assessment brief Based on the drawings provided, you are required to prepare a COMPLETE TAKING-OFF for the following structural elements for the chosen building.  Pilecaps including excavations from reduce level  Work below ground floor level including site clearance and excavation, ground floor slab, ground beams and apron slab.  First floor slab and beams  Roof slab and roof beams  Columns stumps, columns and stiffeners. Notes:  Excavate topsoil 50 mm deep to be disposed off site. Assessment Criteria Refer to matrix attached.
  • 2. Teaching Objectives  To demonstrate a knowledge and understanding of measurement techniques and their application.  To develop an awareness of the nature, content, and significance of tendering and contractual documentation.  To have sufficient knowledge and understanding of the Standard Method of Measurement in taking-off quantities.  To develop an understanding of the principles of measurement in preparing the Bills of Quantities and Specification writing. Learning Outcomes Upon successful completion of the module, students will be able to: 1. Explain and able to interpret clauses in the Standard Method of Measurement (SMM) for the various trades in relation to sub-structure and reinforced concrete frame works. 2. Distinguish and illustrate differences in writing-up descriptions in accordance to design changes for sub-structure and reinforced concrete frame works. 3. Evaluate the relationship between Specifications, Drawings and Bill of Quantities in Tender Documents for sub- structure and reinforced concrete frame works. 4. Adopt a systematic approach to take-off quantities from drawings for the preparation of Bills of Quantities for sub-structure and reinforced concrete frame works. 5. Generate a conceptual understanding of and the ability to competently carry out the preparation of the Bills of Quantities for sub-structure and reinforced concrete frame works. Submission Each student is to submit in the following sequence:  Taking off list  Query list  Dimension sheets  Billing (in own handwriting)  Appropriate front cover with the names of group members. The Leader of each group is to collect from everyone in the group and attach the front cover page and arrange it in the following sequence.  Pilecaps including excavations from reduce level.  Work below ground floor level including site clearance and excavation, ground floor slab, ground beams and apron slab.  First floor slab and beams  Roof slab and roof beams  Columns and stiffeners.