ABSTRACT
In effect, concrete is broadly used as a development fabric due to the factofits
high strength-cost ratio in many applications. Concrete constructions are
usually expected to provide bother free service all throughits intendeddesign
life. However, these expectations are now not realized in many constructions
because of structural deficiency, fabric deterioration, unanticipated over
loadings or physical damage and accordingly civil structures like buildings,
dams, bridges and so forth are subjected to non-stop deterioration over the
years. This extent of injury or deterioration appreciably relies upon on the
quality of materials and workmanship at every the building stage. The
deterioration of structures can be a resultofa number elementswhichinclude
hearth damage, frost action, chemical attack, corrosion of steel and so on at
some point of the lifestyles span of the structure. The investigation of
soundness is therefore vital for discovering the existing serviceability of the
structure and its scope for future developments or for the trade in its
utilization.
Such an investigation can be carried outusingthefollowingmethods: a)Visual
examination b) Non Destructive Testing c) Partial Destructive Testing.
Besides, it turns into fundamental for structures hit by means of an
earthquake, a bomb blast or any other calamity. In general, Soundness
estimation to be finished for buildings which are crossed over 15 years ofage.
How to cite this paper: K. Ajithkumar | P.
Deepan "Assessment of Contractors
Project Management
Maturity" Published
in International
Journal of Trend in
Scientific Research
and Development
(ijtsrd), ISSN: 2456-
6470, Volume-4 |
Issue-4, June 2020, pp.231-235, URL:
www.ijtsrd.com/papers/ijtsrd30936.pdf
Copyright © 2020 by author(s) and
International Journal ofTrendinScientific
Research and Development Journal. This
is an Open Access article distributed
under the terms of
the Creative
Commons Attribution
License (CC BY 4.0)
(http://creativecommons.org/licenses/by
/4.0)
1. INTRODUCTION
The development industry playssizeableroleinthefinancial
system of developing countries. For example, in many
creating countries, essential buildingthingstodoaccountfor
about 80% of the total capital assets,10percent oftheirGDP,
and extra than 50% of the wealth invested in fixed assets. In
addition, the enterprise provides excessive employment
opportunity, probable subsequent after agriculture. Despite
the construction industry’s huge contribution to the
economy of developing nations and the indispensable
function it plays in those international locations
development, the performance of the industry still stays
commonly low. As (Idoko, 2008)noted, “…many tasks in
creating countries stumble upon significant time and cost
overruns, fail to recognize their intended benefit or even
totally terminated and abandoned earlier than or after their
completion”
1.1. Project and Project Management:
Definition
A challenge has a defined scope, is limited by way of
restricted resource, involves many humans with
extraordinary ability and, commonly steadily elaborated in
the course of its life cycle. [(Stanleigh,2007),(Cleland&
Ireland, 2002), (Wheatley)] .Similar to the case for project,
many and specific definitions have been given for mission
management. Summarizing these definitions this lookup
defines Project administration as: Theutilityand integration
of current administration and mission management
knowledge, skills, equipment and techniques to the normal
planning, directing , coordinating,monitoring and manageof
all dimensions of a assignment from its inception to
completion, and the motivation of all those involved to
produce the product ,service or result of the task on time,
inside licensed cost, and to the required pleasant and
requirement, and to the pleasureofparticipants.[(Chartered
Institute of Building , 2002), (Fewings, 2005), (Carmichael,
2004)].Project administration deals in the main with
coordinating resources and managing people and change.
Generally “Managing a undertaking includes: Identifying
requirements, Establishing clear and attainable objectives,
Balancing the competing needs for quality, scope, time and
cost; Adapting specifications, plans, and strategy to the one
of a kind concerns and expectations of the various
stakeholders” (Project Management Institute (PMI), 2004).
Further, Pareto’s 80-20 rule (the regulation of the necessary
few), is pretty applicable in managingprojects,consequently
efforts want be focused on few and important or necessary
objects (Carmichael, 2004).Nine core information areas of
challenge administration are identified in PMBOK.
2. RESEARCH METHODOLOGY
Literature study and the study of several references were
done in order to get the parameters related to project
management in construction.
The flow chart below represents the methodology adopted
for the study.
IJTSRD30936
International Journal of Trend in Scientific Research and Development (IJTSRD) @ www.ijtsrd.com eISSN: 2456-6470
@ IJTSRD | Unique Paper ID – IJTSRD30936 | Volume – 4 | Issue – 4 | May-June 2020 Page 232
Fig 2.1 Methodology
3. KEY FACTORS IN PROJECT MANAGEMENT
PMBOK recognises 5 basic process groups and10knowledge
areas typical of almost all projects. The basic concepts are
applicable to projects, programmes and operations. Thefive
basic process groups are:
 Initiating
 Planning
 Executing
 Monitoring and Controlling
 Closing
The following are the ten knowledge areas:
 Project Integration Management
 Project Scope Management
 Project Time Management
 Project Cost Management
 Project Quality Management
 Project Human Resource
 Management
 Project Communications
 Management
 Project Risk Management
 Project Procurement Management
 Project Stakeholder Management (added in the 5th
edition)
4. QUESTIONNAIRE DESIGN
This research is descriptive lookup as it tries to describe the
current status of PM practice in the building enterprise of
India. This survey solicits opinion from practitioners as to
the relative importance of the practices recognized through
literature evaluation forthe 12buildingPM knowledgeareas
included in the research.
The questionnaire has two parts. Part-I asks biographical
information such as stage of PM training, years worked as
PM, Part-II asks respondents to price the PM practices
beneath each of the 12 expertise areas as very high, high,
average, low, very low based totally on their perceived
importance to the attainment of goals of each of the
understanding areas.
5. SCORING MODEL FOR PROJECT MANAGEMENT MATURITY
The overall PM practice is determined by calculating the average maturity score determined for the 12 knowledge areas. In
determining the overall maturity the weight (contribution) ofthe12knowledgeareas is assumed tobeequal.Todeterminethe
average maturity, information obtained from the questionnaire survey is analysed.
Table 5.1 Scoring Model
SCORE LEVEL GENERAL DESCRIPTIONS MAIN CHARACTERISTICS
0-1
Level 1
Common
Language
Organizations recognize the importance of
project management and the need for a good
understanding of the basic knowledge of PM
and its language/terminology.
None or sporadic use of project management.
No Executive-level support.
No investment or support for project
management training.
1-2
Level 2
Common
Processes
Organizations recognize the need for common
processes
Recognition of benefits of PM.
Organizational
6. QUESTIONNAIRE SURVEY
A survey is a data gathering method that is utilized to collect, analyze and interpret the views ofa groupofpeoplefroma target
population. Surveys have been used in various fields of research, such as sociology, marketing research, politics and
psychology. The survey methodology is guided by principles of statistics from the moment of creating a sample, or a group of
people to represent a population, up to the time of the survey results' analysis and interpretation.Fromsimplepolls regarding
political beliefs, to opinions regarding a new product versus another, the survey method is proven to be an effectivetechnique
to gather necessary information for the advancement of science and technology.
International Journal of Trend in Scientific Research and Development (IJTSRD) @ www.ijtsrd.com eISSN: 2456-6470
@ IJTSRD | Unique Paper ID – IJTSRD30936 | Volume – 4 | Issue – 4 | May-June 2020 Page 233
7. QUESTIONNAIRE ANALYSIS
7.1. DESCRIPTIVE STATISTICS
Table7.1 Descriptive Statistics
GENERA L1 GENERA L2 GENERA L3 GENERA L4 GENERAL5
N
Valid 44 44 44 44 44
Missing 0 0 0 0 0
Mean 2.4583 2.1667 2.2083 2.2500 2.1667
Std. Error of Mean .22505 .17720 .14719 .20189 .20560
Median 2.0000 2.0000 2.0000 2.0000 2.0000
Mode 2.00 2.00 2.00 2.00 2.00
Std. Deviation 1.10253 .86811 .72106 .98907 1.00722
Variance 1.216 .754 .520 .978 1.014
Skewness .433 .524 .419 .331 .474
Std. Error of Skewness .472 .472 .472 .472 .472
Range 4.00 3.00 3.00 3.00 3.00
Percentile s
25 2.0000 2.0000 2.0000 1.2500 1.0000
50 2.0000 2.0000 2.0000 2.0000 2.0000
75 3.0000 3.0000 3.0000 3.0000 3.0000
7.2. RELIABILITY STATISTICS
Statistical reliability is wished in order to ensure the validity and precision of the statisticalanalysis.Itrefers tothepotential to
reproduce the results once more and again as required. This is quintessential as it builds trust in the statistical evaluation and
the outcomes obtained. There are many techniques available to scientists to decide and enhance the reliability of their
experiment. For example, positive surveys might establish their reliability with the aid of asking the participants of the learn
about the same or comparable questions at two specific times underneath comparable conditions.
Table 7.2 Cronbach Alpha Consistancy
Cronbach's alpha Internal consistency
α ≥ 0.9 Excellent (High-Stakes testing)
0.7 ≤ α < 0.9 Good (Low-Stakes testing)
0.6 ≤ α < 0.7 Acceptable
0.5 ≤ α < 0.6 Poor
α < 0.5 Unacceptable
Table 7.3 Reliability Statistics Output from SPSS
Reliability Statistics
Cronbach's Alpha Cronbach's Alpha Based on Standardized Items N of Items
.9190 .9191 44
8. RESULT AND DISCUSSIONS
8.1. Maturity Across Pm Knowledge Areas
Fig 8.1 Maturity of Project Scope Management
8.2. Maturity of Project Time Management
Fig 8.2 Maturity of Project Time Management
International Journal of Trend in Scientific Research and Development (IJTSRD) @ www.ijtsrd.com eISSN: 2456-6470
@ IJTSRD | Unique Paper ID – IJTSRD30936 | Volume – 4 | Issue – 4 | May-June 2020 Page 234
8.3. Maturity of Project Cost Management
Fig 8.3 Maturity of Project Cost Management
8.4. Maturity of Project Financial Management
Fig 8.4 Maturity of Project Financial Management
8.5. Maturity of Project Quality Management
Fig 8.5 Maturity of Project Quality Management
8.6. Maturity of Project Human ResourseManagement
Fig8.6 Maturity of Project Human Resourse
Management
8.7. Maturity of Project Procurement Management
Fig 8.7 Maturity of Project Procurement Management
8.8. DEMOGRAPHICS OF PARTICIPATING
CONTRACTORS
Contractor’s
Category
Number of contractors in the
category
Based on Ownership
Private 44
Public -----
Based on the contractor’s major work
General Contractors 9
Building Contractors 20
Road Contractors 10
Specialized
Contractors
5
Based on Participation in Capacity Building Program
Capacity Building
Program Participant
25
Non-Capacity
Building Program
Participant
9
Based on ISO-Certification
ISO Certified 12
In process of getting
ISO
4
NO 28
8.9. PM MATURITY ACROSS CATAEGORIES
Fig 8.9 ISO Vs. Non-ISO Contractor’s PM Maturity
8.10. Capacity Building Program (CBP) Vs (Non-CBP)
Contractors PM Maturity
The maturity assessment result shows that, contractors
which participate in capacity building program have shown
consistently higher maturity in all knowledge areas of
construction management except for that of material
management.
International Journal of Trend in Scientific Research and Development (IJTSRD) @ www.ijtsrd.com eISSN: 2456-6470
@ IJTSRD | Unique Paper ID – IJTSRD30936 | Volume – 4 | Issue – 4 | May-June 2020 Page 235
Fig 8.11 CBP Vs. Non-CBP Contractor’s PM Maturity 8.11. Road Contractors vs. Building Contractors PM
Maturity
Fig 8.12 Road Vs. Building Contractor’s PM Maturity
9. CONCLUSION
This research had tried to assess the extent of use (maturity) of project management techniques and practices in the
development enterprise of India. Further, the lookup has provided bench mark information on the contemporarystatus ofPM
practice in the enterprise for use in non-stop assessment of future improvement efforts. The low degree of construction PM
maturity discovered on the Contractors shows how bad the PM practice in the enterprise standard is. Thus, enchantment
efforts need be below taken to enhance the cutting-edge condition.
10. QUESTIONNAIRE
Project Management Practice Maturity Questions
10.1. Project Management Process-General
Sl.
no
Description
Very
high
High Avg. Low
Very
low
1.
Recognized of needs and benefits Project Management by your
Organization
2. Management support for Project management development
3. Standard Project Management processes and methodologies
4.
Project Management training for its
Project Management team
5. Solid knowledge base of Project managers
6.
Application of Project Management processes, methodologies and
procedures in managing projects in your Organization
References
[1] Ahern, D. M., Clouse, A., & Turner, R. (2008). ‘CMMI
distilled: A practical introduction tointegratedprocess
improvement (3rd ed.)’. Upper Saddle River, NJ:
Addison-Wesley Professional.
[2] Alutu, O. E., &Udhawuve, M. L. (2009, January).
‘Unethical practices in Nigerianengineeringindustries:
Complications for project management’.
[3] Andersen, S. W. (2008). ‘Can project management
support poverty reduction in Africa’. PMI Global
Congress 2008 Proceedings. (R. Akiri, Ed.) Project
Management Institute (PMI).
Artech House, Inc.
[4] Bourne, L. M. (2008, May 19-21). ‘SRMM: Stakeholder
relationship maturity model’. PMI Global Congress
2008. St. Julian’s: Retrieved March17,2010 ,from
http://www.stakeholdermapping.com/PDFs/SRMM_P
aper.pdf.

More Related Content

What's hot

Current Trends in Product Development during COVID-19
Current Trends in Product Development during COVID-19Current Trends in Product Development during COVID-19
Current Trends in Product Development during COVID-19
vivatechijri
 
Impact of education on innovation performance: evidence from Azerbaijan const...
Impact of education on innovation performance: evidence from Azerbaijan const...Impact of education on innovation performance: evidence from Azerbaijan const...
Impact of education on innovation performance: evidence from Azerbaijan const...
iosrjce
 
FACTORS AFFECTING ODA PROJECT PERFORMANCE
FACTORS AFFECTING ODA PROJECT PERFORMANCEFACTORS AFFECTING ODA PROJECT PERFORMANCE
FACTORS AFFECTING ODA PROJECT PERFORMANCE
Nghiên Cứu Định Lượng
 
ANALYSIS OF RISK CATEGORIES AND FACTORS FOR PPP PROJECTS USING ANALYTIC HIERA...
ANALYSIS OF RISK CATEGORIES AND FACTORS FOR PPP PROJECTS USING ANALYTIC HIERA...ANALYSIS OF RISK CATEGORIES AND FACTORS FOR PPP PROJECTS USING ANALYTIC HIERA...
ANALYSIS OF RISK CATEGORIES AND FACTORS FOR PPP PROJECTS USING ANALYTIC HIERA...
A Makwana
 
The key successes of incubators in developed countries comparative study
The key successes of incubators in developed countries  comparative studyThe key successes of incubators in developed countries  comparative study
The key successes of incubators in developed countries comparative study
Alexander Decker
 
Investment analysis of TATA STEEL
Investment analysis of TATA STEELInvestment analysis of TATA STEEL
Investment analysis of TATA STEEL
Pradeep Kumar
 
Strategic innovation and performance of public universities in kenya
Strategic innovation and performance of public universities in kenyaStrategic innovation and performance of public universities in kenya
Strategic innovation and performance of public universities in kenya
Alexander Decker
 
International Climate Technology Strategies
International Climate Technology StrategiesInternational Climate Technology Strategies
International Climate Technology StrategiesGlenn Klith Andersen
 
Construction industry in kuwait – an analysis on e procurement-2
Construction industry in kuwait – an analysis on e procurement-2Construction industry in kuwait – an analysis on e procurement-2
Construction industry in kuwait – an analysis on e procurement-2prjpublications
 
A kaleidoscopic look at danish competitiveness and productivity (ISBN 87-9120...
A kaleidoscopic look at danish competitiveness and productivity (ISBN 87-9120...A kaleidoscopic look at danish competitiveness and productivity (ISBN 87-9120...
A kaleidoscopic look at danish competitiveness and productivity (ISBN 87-9120...
Claus Rothmann
 
AN INNOVATIVE TOOL SELECTION METHOD FOR CONSTRUCTION PROJECTS IN NEW ZEALAND
AN INNOVATIVE TOOL SELECTION METHOD FOR CONSTRUCTION PROJECTS IN NEW ZEALANDAN INNOVATIVE TOOL SELECTION METHOD FOR CONSTRUCTION PROJECTS IN NEW ZEALAND
AN INNOVATIVE TOOL SELECTION METHOD FOR CONSTRUCTION PROJECTS IN NEW ZEALAND
Toan Nguyen
 

What's hot (12)

Current Trends in Product Development during COVID-19
Current Trends in Product Development during COVID-19Current Trends in Product Development during COVID-19
Current Trends in Product Development during COVID-19
 
Impact of education on innovation performance: evidence from Azerbaijan const...
Impact of education on innovation performance: evidence from Azerbaijan const...Impact of education on innovation performance: evidence from Azerbaijan const...
Impact of education on innovation performance: evidence from Azerbaijan const...
 
FACTORS AFFECTING ODA PROJECT PERFORMANCE
FACTORS AFFECTING ODA PROJECT PERFORMANCEFACTORS AFFECTING ODA PROJECT PERFORMANCE
FACTORS AFFECTING ODA PROJECT PERFORMANCE
 
ANALYSIS OF RISK CATEGORIES AND FACTORS FOR PPP PROJECTS USING ANALYTIC HIERA...
ANALYSIS OF RISK CATEGORIES AND FACTORS FOR PPP PROJECTS USING ANALYTIC HIERA...ANALYSIS OF RISK CATEGORIES AND FACTORS FOR PPP PROJECTS USING ANALYTIC HIERA...
ANALYSIS OF RISK CATEGORIES AND FACTORS FOR PPP PROJECTS USING ANALYTIC HIERA...
 
The key successes of incubators in developed countries comparative study
The key successes of incubators in developed countries  comparative studyThe key successes of incubators in developed countries  comparative study
The key successes of incubators in developed countries comparative study
 
Sector pulse june 2013
Sector pulse  june 2013Sector pulse  june 2013
Sector pulse june 2013
 
Investment analysis of TATA STEEL
Investment analysis of TATA STEELInvestment analysis of TATA STEEL
Investment analysis of TATA STEEL
 
Strategic innovation and performance of public universities in kenya
Strategic innovation and performance of public universities in kenyaStrategic innovation and performance of public universities in kenya
Strategic innovation and performance of public universities in kenya
 
International Climate Technology Strategies
International Climate Technology StrategiesInternational Climate Technology Strategies
International Climate Technology Strategies
 
Construction industry in kuwait – an analysis on e procurement-2
Construction industry in kuwait – an analysis on e procurement-2Construction industry in kuwait – an analysis on e procurement-2
Construction industry in kuwait – an analysis on e procurement-2
 
A kaleidoscopic look at danish competitiveness and productivity (ISBN 87-9120...
A kaleidoscopic look at danish competitiveness and productivity (ISBN 87-9120...A kaleidoscopic look at danish competitiveness and productivity (ISBN 87-9120...
A kaleidoscopic look at danish competitiveness and productivity (ISBN 87-9120...
 
AN INNOVATIVE TOOL SELECTION METHOD FOR CONSTRUCTION PROJECTS IN NEW ZEALAND
AN INNOVATIVE TOOL SELECTION METHOD FOR CONSTRUCTION PROJECTS IN NEW ZEALANDAN INNOVATIVE TOOL SELECTION METHOD FOR CONSTRUCTION PROJECTS IN NEW ZEALAND
AN INNOVATIVE TOOL SELECTION METHOD FOR CONSTRUCTION PROJECTS IN NEW ZEALAND
 

Similar to Assessment of Contractors Project Management Maturity

An Analysis on Employee Turnover Problem in Construction Industry
An Analysis on Employee Turnover Problem in Construction IndustryAn Analysis on Employee Turnover Problem in Construction Industry
An Analysis on Employee Turnover Problem in Construction Industry
ijtsrd
 
Identifying Motivational and Demotivational Factors in Qatar Construction Pro...
Identifying Motivational and Demotivational Factors in Qatar Construction Pro...Identifying Motivational and Demotivational Factors in Qatar Construction Pro...
Identifying Motivational and Demotivational Factors in Qatar Construction Pro...
ijtsrd
 
TQM in Construction Management A Review
TQM in Construction Management A ReviewTQM in Construction Management A Review
TQM in Construction Management A Review
ijtsrd
 
Analysis of Rework and Rescheduling in Construction Project using SPSS Software
Analysis of Rework and Rescheduling in Construction Project using SPSS SoftwareAnalysis of Rework and Rescheduling in Construction Project using SPSS Software
Analysis of Rework and Rescheduling in Construction Project using SPSS Software
ijtsrd
 
Construction Equipment Monitoring By using Relative Important Indices RII Ana...
Construction Equipment Monitoring By using Relative Important Indices RII Ana...Construction Equipment Monitoring By using Relative Important Indices RII Ana...
Construction Equipment Monitoring By using Relative Important Indices RII Ana...
ijtsrd
 
IRJET - Forecasting and Management of Triple Constraints in Construction proj...
IRJET - Forecasting and Management of Triple Constraints in Construction proj...IRJET - Forecasting and Management of Triple Constraints in Construction proj...
IRJET - Forecasting and Management of Triple Constraints in Construction proj...
IRJET Journal
 
IRJET- Identification of Critical Factors Affecting Infrastructure Projec...
IRJET-  	  Identification of Critical Factors Affecting Infrastructure Projec...IRJET-  	  Identification of Critical Factors Affecting Infrastructure Projec...
IRJET- Identification of Critical Factors Affecting Infrastructure Projec...
IRJET Journal
 
Impact of Sustainable Construction on Business Decisions
Impact of Sustainable Construction on Business DecisionsImpact of Sustainable Construction on Business Decisions
Impact of Sustainable Construction on Business Decisions
IRJET Journal
 
Documentation and Process Challenges Faced at Works Department- Review
Documentation and Process Challenges Faced at Works Department- ReviewDocumentation and Process Challenges Faced at Works Department- Review
Documentation and Process Challenges Faced at Works Department- Review
IRJET Journal
 
IDENTIFICATION OF FACTORS CAUSING TIME AND COST OVERRUN IN CONSTRUCTION PROJE...
IDENTIFICATION OF FACTORS CAUSING TIME AND COST OVERRUN IN CONSTRUCTION PROJE...IDENTIFICATION OF FACTORS CAUSING TIME AND COST OVERRUN IN CONSTRUCTION PROJE...
IDENTIFICATION OF FACTORS CAUSING TIME AND COST OVERRUN IN CONSTRUCTION PROJE...
IRJET Journal
 
AN ANALYSIS OF STOCK MARKET PERFORMANCE AND FUNDAMENTALS OF INFRASTRUCTURE CO...
AN ANALYSIS OF STOCK MARKET PERFORMANCE AND FUNDAMENTALS OF INFRASTRUCTURE CO...AN ANALYSIS OF STOCK MARKET PERFORMANCE AND FUNDAMENTALS OF INFRASTRUCTURE CO...
AN ANALYSIS OF STOCK MARKET PERFORMANCE AND FUNDAMENTALS OF INFRASTRUCTURE CO...
Ashley Carter
 
USING LEAN TECHNIQUES TO REDUCE WASTE AND IMPROVE PERFORMANCE IN MUNICIPAL CO...
USING LEAN TECHNIQUES TO REDUCE WASTE AND IMPROVE PERFORMANCE IN MUNICIPAL CO...USING LEAN TECHNIQUES TO REDUCE WASTE AND IMPROVE PERFORMANCE IN MUNICIPAL CO...
USING LEAN TECHNIQUES TO REDUCE WASTE AND IMPROVE PERFORMANCE IN MUNICIPAL CO...
IRJET Journal
 
Stock Market Performance and Fundamentals of top Infrastructure Companies in ...
Stock Market Performance and Fundamentals of top Infrastructure Companies in ...Stock Market Performance and Fundamentals of top Infrastructure Companies in ...
Stock Market Performance and Fundamentals of top Infrastructure Companies in ...
SHASHANK SRIVASTAVA
 
Project+Management+Evolution+to+Improve+Economic+Success+of+Infrastructure+Pr...
Project+Management+Evolution+to+Improve+Economic+Success+of+Infrastructure+Pr...Project+Management+Evolution+to+Improve+Economic+Success+of+Infrastructure+Pr...
Project+Management+Evolution+to+Improve+Economic+Success+of+Infrastructure+Pr...
million22
 
Investigation of Readiness Indices for Embracing for Industry 5.0: The Road A...
Investigation of Readiness Indices for Embracing for Industry 5.0: The Road A...Investigation of Readiness Indices for Embracing for Industry 5.0: The Road A...
Investigation of Readiness Indices for Embracing for Industry 5.0: The Road A...
IRJET Journal
 
IRJET- Most Efficient Critical Success Factor for Construction
IRJET-  	  Most Efficient Critical Success Factor for ConstructionIRJET-  	  Most Efficient Critical Success Factor for Construction
IRJET- Most Efficient Critical Success Factor for Construction
IRJET Journal
 
Awareness of Lean Construction in Construction Industry through Questionnaire...
Awareness of Lean Construction in Construction Industry through Questionnaire...Awareness of Lean Construction in Construction Industry through Questionnaire...
Awareness of Lean Construction in Construction Industry through Questionnaire...
IRJET Journal
 
Element of Cost overrun and Delay in Construction: A Review
Element of Cost overrun and Delay in Construction: A ReviewElement of Cost overrun and Delay in Construction: A Review
Element of Cost overrun and Delay in Construction: A Review
IRJET Journal
 
Proposal .pdf
Proposal .pdfProposal .pdf
Proposal .pdf
Engr_Emad Khan
 
IRJET- Review: Factors Affecting Scheduling of Multiple Projects
IRJET- 	  Review: Factors Affecting Scheduling of Multiple ProjectsIRJET- 	  Review: Factors Affecting Scheduling of Multiple Projects
IRJET- Review: Factors Affecting Scheduling of Multiple Projects
IRJET Journal
 

Similar to Assessment of Contractors Project Management Maturity (20)

An Analysis on Employee Turnover Problem in Construction Industry
An Analysis on Employee Turnover Problem in Construction IndustryAn Analysis on Employee Turnover Problem in Construction Industry
An Analysis on Employee Turnover Problem in Construction Industry
 
Identifying Motivational and Demotivational Factors in Qatar Construction Pro...
Identifying Motivational and Demotivational Factors in Qatar Construction Pro...Identifying Motivational and Demotivational Factors in Qatar Construction Pro...
Identifying Motivational and Demotivational Factors in Qatar Construction Pro...
 
TQM in Construction Management A Review
TQM in Construction Management A ReviewTQM in Construction Management A Review
TQM in Construction Management A Review
 
Analysis of Rework and Rescheduling in Construction Project using SPSS Software
Analysis of Rework and Rescheduling in Construction Project using SPSS SoftwareAnalysis of Rework and Rescheduling in Construction Project using SPSS Software
Analysis of Rework and Rescheduling in Construction Project using SPSS Software
 
Construction Equipment Monitoring By using Relative Important Indices RII Ana...
Construction Equipment Monitoring By using Relative Important Indices RII Ana...Construction Equipment Monitoring By using Relative Important Indices RII Ana...
Construction Equipment Monitoring By using Relative Important Indices RII Ana...
 
IRJET - Forecasting and Management of Triple Constraints in Construction proj...
IRJET - Forecasting and Management of Triple Constraints in Construction proj...IRJET - Forecasting and Management of Triple Constraints in Construction proj...
IRJET - Forecasting and Management of Triple Constraints in Construction proj...
 
IRJET- Identification of Critical Factors Affecting Infrastructure Projec...
IRJET-  	  Identification of Critical Factors Affecting Infrastructure Projec...IRJET-  	  Identification of Critical Factors Affecting Infrastructure Projec...
IRJET- Identification of Critical Factors Affecting Infrastructure Projec...
 
Impact of Sustainable Construction on Business Decisions
Impact of Sustainable Construction on Business DecisionsImpact of Sustainable Construction on Business Decisions
Impact of Sustainable Construction on Business Decisions
 
Documentation and Process Challenges Faced at Works Department- Review
Documentation and Process Challenges Faced at Works Department- ReviewDocumentation and Process Challenges Faced at Works Department- Review
Documentation and Process Challenges Faced at Works Department- Review
 
IDENTIFICATION OF FACTORS CAUSING TIME AND COST OVERRUN IN CONSTRUCTION PROJE...
IDENTIFICATION OF FACTORS CAUSING TIME AND COST OVERRUN IN CONSTRUCTION PROJE...IDENTIFICATION OF FACTORS CAUSING TIME AND COST OVERRUN IN CONSTRUCTION PROJE...
IDENTIFICATION OF FACTORS CAUSING TIME AND COST OVERRUN IN CONSTRUCTION PROJE...
 
AN ANALYSIS OF STOCK MARKET PERFORMANCE AND FUNDAMENTALS OF INFRASTRUCTURE CO...
AN ANALYSIS OF STOCK MARKET PERFORMANCE AND FUNDAMENTALS OF INFRASTRUCTURE CO...AN ANALYSIS OF STOCK MARKET PERFORMANCE AND FUNDAMENTALS OF INFRASTRUCTURE CO...
AN ANALYSIS OF STOCK MARKET PERFORMANCE AND FUNDAMENTALS OF INFRASTRUCTURE CO...
 
USING LEAN TECHNIQUES TO REDUCE WASTE AND IMPROVE PERFORMANCE IN MUNICIPAL CO...
USING LEAN TECHNIQUES TO REDUCE WASTE AND IMPROVE PERFORMANCE IN MUNICIPAL CO...USING LEAN TECHNIQUES TO REDUCE WASTE AND IMPROVE PERFORMANCE IN MUNICIPAL CO...
USING LEAN TECHNIQUES TO REDUCE WASTE AND IMPROVE PERFORMANCE IN MUNICIPAL CO...
 
Stock Market Performance and Fundamentals of top Infrastructure Companies in ...
Stock Market Performance and Fundamentals of top Infrastructure Companies in ...Stock Market Performance and Fundamentals of top Infrastructure Companies in ...
Stock Market Performance and Fundamentals of top Infrastructure Companies in ...
 
Project+Management+Evolution+to+Improve+Economic+Success+of+Infrastructure+Pr...
Project+Management+Evolution+to+Improve+Economic+Success+of+Infrastructure+Pr...Project+Management+Evolution+to+Improve+Economic+Success+of+Infrastructure+Pr...
Project+Management+Evolution+to+Improve+Economic+Success+of+Infrastructure+Pr...
 
Investigation of Readiness Indices for Embracing for Industry 5.0: The Road A...
Investigation of Readiness Indices for Embracing for Industry 5.0: The Road A...Investigation of Readiness Indices for Embracing for Industry 5.0: The Road A...
Investigation of Readiness Indices for Embracing for Industry 5.0: The Road A...
 
IRJET- Most Efficient Critical Success Factor for Construction
IRJET-  	  Most Efficient Critical Success Factor for ConstructionIRJET-  	  Most Efficient Critical Success Factor for Construction
IRJET- Most Efficient Critical Success Factor for Construction
 
Awareness of Lean Construction in Construction Industry through Questionnaire...
Awareness of Lean Construction in Construction Industry through Questionnaire...Awareness of Lean Construction in Construction Industry through Questionnaire...
Awareness of Lean Construction in Construction Industry through Questionnaire...
 
Element of Cost overrun and Delay in Construction: A Review
Element of Cost overrun and Delay in Construction: A ReviewElement of Cost overrun and Delay in Construction: A Review
Element of Cost overrun and Delay in Construction: A Review
 
Proposal .pdf
Proposal .pdfProposal .pdf
Proposal .pdf
 
IRJET- Review: Factors Affecting Scheduling of Multiple Projects
IRJET- 	  Review: Factors Affecting Scheduling of Multiple ProjectsIRJET- 	  Review: Factors Affecting Scheduling of Multiple Projects
IRJET- Review: Factors Affecting Scheduling of Multiple Projects
 

More from ijtsrd

‘Six Sigma Technique’ A Journey Through its Implementation
‘Six Sigma Technique’ A Journey Through its Implementation‘Six Sigma Technique’ A Journey Through its Implementation
‘Six Sigma Technique’ A Journey Through its Implementation
ijtsrd
 
Edge Computing in Space Enhancing Data Processing and Communication for Space...
Edge Computing in Space Enhancing Data Processing and Communication for Space...Edge Computing in Space Enhancing Data Processing and Communication for Space...
Edge Computing in Space Enhancing Data Processing and Communication for Space...
ijtsrd
 
Dynamics of Communal Politics in 21st Century India Challenges and Prospects
Dynamics of Communal Politics in 21st Century India Challenges and ProspectsDynamics of Communal Politics in 21st Century India Challenges and Prospects
Dynamics of Communal Politics in 21st Century India Challenges and Prospects
ijtsrd
 
Assess Perspective and Knowledge of Healthcare Providers Towards Elehealth in...
Assess Perspective and Knowledge of Healthcare Providers Towards Elehealth in...Assess Perspective and Knowledge of Healthcare Providers Towards Elehealth in...
Assess Perspective and Knowledge of Healthcare Providers Towards Elehealth in...
ijtsrd
 
The Impact of Digital Media on the Decentralization of Power and the Erosion ...
The Impact of Digital Media on the Decentralization of Power and the Erosion ...The Impact of Digital Media on the Decentralization of Power and the Erosion ...
The Impact of Digital Media on the Decentralization of Power and the Erosion ...
ijtsrd
 
Online Voices, Offline Impact Ambedkars Ideals and Socio Political Inclusion ...
Online Voices, Offline Impact Ambedkars Ideals and Socio Political Inclusion ...Online Voices, Offline Impact Ambedkars Ideals and Socio Political Inclusion ...
Online Voices, Offline Impact Ambedkars Ideals and Socio Political Inclusion ...
ijtsrd
 
Problems and Challenges of Agro Entreprenurship A Study
Problems and Challenges of Agro Entreprenurship A StudyProblems and Challenges of Agro Entreprenurship A Study
Problems and Challenges of Agro Entreprenurship A Study
ijtsrd
 
Comparative Analysis of Total Corporate Disclosure of Selected IT Companies o...
Comparative Analysis of Total Corporate Disclosure of Selected IT Companies o...Comparative Analysis of Total Corporate Disclosure of Selected IT Companies o...
Comparative Analysis of Total Corporate Disclosure of Selected IT Companies o...
ijtsrd
 
The Impact of Educational Background and Professional Training on Human Right...
The Impact of Educational Background and Professional Training on Human Right...The Impact of Educational Background and Professional Training on Human Right...
The Impact of Educational Background and Professional Training on Human Right...
ijtsrd
 
A Study on the Effective Teaching Learning Process in English Curriculum at t...
A Study on the Effective Teaching Learning Process in English Curriculum at t...A Study on the Effective Teaching Learning Process in English Curriculum at t...
A Study on the Effective Teaching Learning Process in English Curriculum at t...
ijtsrd
 
The Role of Mentoring and Its Influence on the Effectiveness of the Teaching ...
The Role of Mentoring and Its Influence on the Effectiveness of the Teaching ...The Role of Mentoring and Its Influence on the Effectiveness of the Teaching ...
The Role of Mentoring and Its Influence on the Effectiveness of the Teaching ...
ijtsrd
 
Design Simulation and Hardware Construction of an Arduino Microcontroller Bas...
Design Simulation and Hardware Construction of an Arduino Microcontroller Bas...Design Simulation and Hardware Construction of an Arduino Microcontroller Bas...
Design Simulation and Hardware Construction of an Arduino Microcontroller Bas...
ijtsrd
 
Sustainable Energy by Paul A. Adekunte | Matthew N. O. Sadiku | Janet O. Sadiku
Sustainable Energy by Paul A. Adekunte | Matthew N. O. Sadiku | Janet O. SadikuSustainable Energy by Paul A. Adekunte | Matthew N. O. Sadiku | Janet O. Sadiku
Sustainable Energy by Paul A. Adekunte | Matthew N. O. Sadiku | Janet O. Sadiku
ijtsrd
 
Concepts for Sudan Survey Act Implementations Executive Regulations and Stand...
Concepts for Sudan Survey Act Implementations Executive Regulations and Stand...Concepts for Sudan Survey Act Implementations Executive Regulations and Stand...
Concepts for Sudan Survey Act Implementations Executive Regulations and Stand...
ijtsrd
 
Towards the Implementation of the Sudan Interpolated Geoid Model Khartoum Sta...
Towards the Implementation of the Sudan Interpolated Geoid Model Khartoum Sta...Towards the Implementation of the Sudan Interpolated Geoid Model Khartoum Sta...
Towards the Implementation of the Sudan Interpolated Geoid Model Khartoum Sta...
ijtsrd
 
Activating Geospatial Information for Sudans Sustainable Investment Map
Activating Geospatial Information for Sudans Sustainable Investment MapActivating Geospatial Information for Sudans Sustainable Investment Map
Activating Geospatial Information for Sudans Sustainable Investment Map
ijtsrd
 
Educational Unity Embracing Diversity for a Stronger Society
Educational Unity Embracing Diversity for a Stronger SocietyEducational Unity Embracing Diversity for a Stronger Society
Educational Unity Embracing Diversity for a Stronger Society
ijtsrd
 
Integration of Indian Indigenous Knowledge System in Management Prospects and...
Integration of Indian Indigenous Knowledge System in Management Prospects and...Integration of Indian Indigenous Knowledge System in Management Prospects and...
Integration of Indian Indigenous Knowledge System in Management Prospects and...
ijtsrd
 
DeepMask Transforming Face Mask Identification for Better Pandemic Control in...
DeepMask Transforming Face Mask Identification for Better Pandemic Control in...DeepMask Transforming Face Mask Identification for Better Pandemic Control in...
DeepMask Transforming Face Mask Identification for Better Pandemic Control in...
ijtsrd
 
Streamlining Data Collection eCRF Design and Machine Learning
Streamlining Data Collection eCRF Design and Machine LearningStreamlining Data Collection eCRF Design and Machine Learning
Streamlining Data Collection eCRF Design and Machine Learning
ijtsrd
 

More from ijtsrd (20)

‘Six Sigma Technique’ A Journey Through its Implementation
‘Six Sigma Technique’ A Journey Through its Implementation‘Six Sigma Technique’ A Journey Through its Implementation
‘Six Sigma Technique’ A Journey Through its Implementation
 
Edge Computing in Space Enhancing Data Processing and Communication for Space...
Edge Computing in Space Enhancing Data Processing and Communication for Space...Edge Computing in Space Enhancing Data Processing and Communication for Space...
Edge Computing in Space Enhancing Data Processing and Communication for Space...
 
Dynamics of Communal Politics in 21st Century India Challenges and Prospects
Dynamics of Communal Politics in 21st Century India Challenges and ProspectsDynamics of Communal Politics in 21st Century India Challenges and Prospects
Dynamics of Communal Politics in 21st Century India Challenges and Prospects
 
Assess Perspective and Knowledge of Healthcare Providers Towards Elehealth in...
Assess Perspective and Knowledge of Healthcare Providers Towards Elehealth in...Assess Perspective and Knowledge of Healthcare Providers Towards Elehealth in...
Assess Perspective and Knowledge of Healthcare Providers Towards Elehealth in...
 
The Impact of Digital Media on the Decentralization of Power and the Erosion ...
The Impact of Digital Media on the Decentralization of Power and the Erosion ...The Impact of Digital Media on the Decentralization of Power and the Erosion ...
The Impact of Digital Media on the Decentralization of Power and the Erosion ...
 
Online Voices, Offline Impact Ambedkars Ideals and Socio Political Inclusion ...
Online Voices, Offline Impact Ambedkars Ideals and Socio Political Inclusion ...Online Voices, Offline Impact Ambedkars Ideals and Socio Political Inclusion ...
Online Voices, Offline Impact Ambedkars Ideals and Socio Political Inclusion ...
 
Problems and Challenges of Agro Entreprenurship A Study
Problems and Challenges of Agro Entreprenurship A StudyProblems and Challenges of Agro Entreprenurship A Study
Problems and Challenges of Agro Entreprenurship A Study
 
Comparative Analysis of Total Corporate Disclosure of Selected IT Companies o...
Comparative Analysis of Total Corporate Disclosure of Selected IT Companies o...Comparative Analysis of Total Corporate Disclosure of Selected IT Companies o...
Comparative Analysis of Total Corporate Disclosure of Selected IT Companies o...
 
The Impact of Educational Background and Professional Training on Human Right...
The Impact of Educational Background and Professional Training on Human Right...The Impact of Educational Background and Professional Training on Human Right...
The Impact of Educational Background and Professional Training on Human Right...
 
A Study on the Effective Teaching Learning Process in English Curriculum at t...
A Study on the Effective Teaching Learning Process in English Curriculum at t...A Study on the Effective Teaching Learning Process in English Curriculum at t...
A Study on the Effective Teaching Learning Process in English Curriculum at t...
 
The Role of Mentoring and Its Influence on the Effectiveness of the Teaching ...
The Role of Mentoring and Its Influence on the Effectiveness of the Teaching ...The Role of Mentoring and Its Influence on the Effectiveness of the Teaching ...
The Role of Mentoring and Its Influence on the Effectiveness of the Teaching ...
 
Design Simulation and Hardware Construction of an Arduino Microcontroller Bas...
Design Simulation and Hardware Construction of an Arduino Microcontroller Bas...Design Simulation and Hardware Construction of an Arduino Microcontroller Bas...
Design Simulation and Hardware Construction of an Arduino Microcontroller Bas...
 
Sustainable Energy by Paul A. Adekunte | Matthew N. O. Sadiku | Janet O. Sadiku
Sustainable Energy by Paul A. Adekunte | Matthew N. O. Sadiku | Janet O. SadikuSustainable Energy by Paul A. Adekunte | Matthew N. O. Sadiku | Janet O. Sadiku
Sustainable Energy by Paul A. Adekunte | Matthew N. O. Sadiku | Janet O. Sadiku
 
Concepts for Sudan Survey Act Implementations Executive Regulations and Stand...
Concepts for Sudan Survey Act Implementations Executive Regulations and Stand...Concepts for Sudan Survey Act Implementations Executive Regulations and Stand...
Concepts for Sudan Survey Act Implementations Executive Regulations and Stand...
 
Towards the Implementation of the Sudan Interpolated Geoid Model Khartoum Sta...
Towards the Implementation of the Sudan Interpolated Geoid Model Khartoum Sta...Towards the Implementation of the Sudan Interpolated Geoid Model Khartoum Sta...
Towards the Implementation of the Sudan Interpolated Geoid Model Khartoum Sta...
 
Activating Geospatial Information for Sudans Sustainable Investment Map
Activating Geospatial Information for Sudans Sustainable Investment MapActivating Geospatial Information for Sudans Sustainable Investment Map
Activating Geospatial Information for Sudans Sustainable Investment Map
 
Educational Unity Embracing Diversity for a Stronger Society
Educational Unity Embracing Diversity for a Stronger SocietyEducational Unity Embracing Diversity for a Stronger Society
Educational Unity Embracing Diversity for a Stronger Society
 
Integration of Indian Indigenous Knowledge System in Management Prospects and...
Integration of Indian Indigenous Knowledge System in Management Prospects and...Integration of Indian Indigenous Knowledge System in Management Prospects and...
Integration of Indian Indigenous Knowledge System in Management Prospects and...
 
DeepMask Transforming Face Mask Identification for Better Pandemic Control in...
DeepMask Transforming Face Mask Identification for Better Pandemic Control in...DeepMask Transforming Face Mask Identification for Better Pandemic Control in...
DeepMask Transforming Face Mask Identification for Better Pandemic Control in...
 
Streamlining Data Collection eCRF Design and Machine Learning
Streamlining Data Collection eCRF Design and Machine LearningStreamlining Data Collection eCRF Design and Machine Learning
Streamlining Data Collection eCRF Design and Machine Learning
 

Recently uploaded

The basics of sentences session 5pptx.pptx
The basics of sentences session 5pptx.pptxThe basics of sentences session 5pptx.pptx
The basics of sentences session 5pptx.pptx
heathfieldcps1
 
Operation Blue Star - Saka Neela Tara
Operation Blue Star   -  Saka Neela TaraOperation Blue Star   -  Saka Neela Tara
Operation Blue Star - Saka Neela Tara
Balvir Singh
 
Thesis Statement for students diagnonsed withADHD.ppt
Thesis Statement for students diagnonsed withADHD.pptThesis Statement for students diagnonsed withADHD.ppt
Thesis Statement for students diagnonsed withADHD.ppt
EverAndrsGuerraGuerr
 
How libraries can support authors with open access requirements for UKRI fund...
How libraries can support authors with open access requirements for UKRI fund...How libraries can support authors with open access requirements for UKRI fund...
How libraries can support authors with open access requirements for UKRI fund...
Jisc
 
A Strategic Approach: GenAI in Education
A Strategic Approach: GenAI in EducationA Strategic Approach: GenAI in Education
A Strategic Approach: GenAI in Education
Peter Windle
 
A Survey of Techniques for Maximizing LLM Performance.pptx
A Survey of Techniques for Maximizing LLM Performance.pptxA Survey of Techniques for Maximizing LLM Performance.pptx
A Survey of Techniques for Maximizing LLM Performance.pptx
thanhdowork
 
Supporting (UKRI) OA monographs at Salford.pptx
Supporting (UKRI) OA monographs at Salford.pptxSupporting (UKRI) OA monographs at Salford.pptx
Supporting (UKRI) OA monographs at Salford.pptx
Jisc
 
June 3, 2024 Anti-Semitism Letter Sent to MIT President Kornbluth and MIT Cor...
June 3, 2024 Anti-Semitism Letter Sent to MIT President Kornbluth and MIT Cor...June 3, 2024 Anti-Semitism Letter Sent to MIT President Kornbluth and MIT Cor...
June 3, 2024 Anti-Semitism Letter Sent to MIT President Kornbluth and MIT Cor...
Levi Shapiro
 
Mule 4.6 & Java 17 Upgrade | MuleSoft Mysore Meetup #46
Mule 4.6 & Java 17 Upgrade | MuleSoft Mysore Meetup #46Mule 4.6 & Java 17 Upgrade | MuleSoft Mysore Meetup #46
Mule 4.6 & Java 17 Upgrade | MuleSoft Mysore Meetup #46
MysoreMuleSoftMeetup
 
Honest Reviews of Tim Han LMA Course Program.pptx
Honest Reviews of Tim Han LMA Course Program.pptxHonest Reviews of Tim Han LMA Course Program.pptx
Honest Reviews of Tim Han LMA Course Program.pptx
timhan337
 
Acetabularia Information For Class 9 .docx
Acetabularia Information For Class 9  .docxAcetabularia Information For Class 9  .docx
Acetabularia Information For Class 9 .docx
vaibhavrinwa19
 
Language Across the Curriculm LAC B.Ed.
Language Across the  Curriculm LAC B.Ed.Language Across the  Curriculm LAC B.Ed.
Language Across the Curriculm LAC B.Ed.
Atul Kumar Singh
 
Group Presentation 2 Economics.Ariana Buscigliopptx
Group Presentation 2 Economics.Ariana BuscigliopptxGroup Presentation 2 Economics.Ariana Buscigliopptx
Group Presentation 2 Economics.Ariana Buscigliopptx
ArianaBusciglio
 
The Challenger.pdf DNHS Official Publication
The Challenger.pdf DNHS Official PublicationThe Challenger.pdf DNHS Official Publication
The Challenger.pdf DNHS Official Publication
Delapenabediema
 
TESDA TM1 REVIEWER FOR NATIONAL ASSESSMENT WRITTEN AND ORAL QUESTIONS WITH A...
TESDA TM1 REVIEWER  FOR NATIONAL ASSESSMENT WRITTEN AND ORAL QUESTIONS WITH A...TESDA TM1 REVIEWER  FOR NATIONAL ASSESSMENT WRITTEN AND ORAL QUESTIONS WITH A...
TESDA TM1 REVIEWER FOR NATIONAL ASSESSMENT WRITTEN AND ORAL QUESTIONS WITH A...
EugeneSaldivar
 
1.4 modern child centered education - mahatma gandhi-2.pptx
1.4 modern child centered education - mahatma gandhi-2.pptx1.4 modern child centered education - mahatma gandhi-2.pptx
1.4 modern child centered education - mahatma gandhi-2.pptx
JosvitaDsouza2
 
Unit 8 - Information and Communication Technology (Paper I).pdf
Unit 8 - Information and Communication Technology (Paper I).pdfUnit 8 - Information and Communication Technology (Paper I).pdf
Unit 8 - Information and Communication Technology (Paper I).pdf
Thiyagu K
 
STRAND 3 HYGIENIC PRACTICES.pptx GRADE 7 CBC
STRAND 3 HYGIENIC PRACTICES.pptx GRADE 7 CBCSTRAND 3 HYGIENIC PRACTICES.pptx GRADE 7 CBC
STRAND 3 HYGIENIC PRACTICES.pptx GRADE 7 CBC
kimdan468
 
Model Attribute Check Company Auto Property
Model Attribute  Check Company Auto PropertyModel Attribute  Check Company Auto Property
Model Attribute Check Company Auto Property
Celine George
 
Guidance_and_Counselling.pdf B.Ed. 4th Semester
Guidance_and_Counselling.pdf B.Ed. 4th SemesterGuidance_and_Counselling.pdf B.Ed. 4th Semester
Guidance_and_Counselling.pdf B.Ed. 4th Semester
Atul Kumar Singh
 

Recently uploaded (20)

The basics of sentences session 5pptx.pptx
The basics of sentences session 5pptx.pptxThe basics of sentences session 5pptx.pptx
The basics of sentences session 5pptx.pptx
 
Operation Blue Star - Saka Neela Tara
Operation Blue Star   -  Saka Neela TaraOperation Blue Star   -  Saka Neela Tara
Operation Blue Star - Saka Neela Tara
 
Thesis Statement for students diagnonsed withADHD.ppt
Thesis Statement for students diagnonsed withADHD.pptThesis Statement for students diagnonsed withADHD.ppt
Thesis Statement for students diagnonsed withADHD.ppt
 
How libraries can support authors with open access requirements for UKRI fund...
How libraries can support authors with open access requirements for UKRI fund...How libraries can support authors with open access requirements for UKRI fund...
How libraries can support authors with open access requirements for UKRI fund...
 
A Strategic Approach: GenAI in Education
A Strategic Approach: GenAI in EducationA Strategic Approach: GenAI in Education
A Strategic Approach: GenAI in Education
 
A Survey of Techniques for Maximizing LLM Performance.pptx
A Survey of Techniques for Maximizing LLM Performance.pptxA Survey of Techniques for Maximizing LLM Performance.pptx
A Survey of Techniques for Maximizing LLM Performance.pptx
 
Supporting (UKRI) OA monographs at Salford.pptx
Supporting (UKRI) OA monographs at Salford.pptxSupporting (UKRI) OA monographs at Salford.pptx
Supporting (UKRI) OA monographs at Salford.pptx
 
June 3, 2024 Anti-Semitism Letter Sent to MIT President Kornbluth and MIT Cor...
June 3, 2024 Anti-Semitism Letter Sent to MIT President Kornbluth and MIT Cor...June 3, 2024 Anti-Semitism Letter Sent to MIT President Kornbluth and MIT Cor...
June 3, 2024 Anti-Semitism Letter Sent to MIT President Kornbluth and MIT Cor...
 
Mule 4.6 & Java 17 Upgrade | MuleSoft Mysore Meetup #46
Mule 4.6 & Java 17 Upgrade | MuleSoft Mysore Meetup #46Mule 4.6 & Java 17 Upgrade | MuleSoft Mysore Meetup #46
Mule 4.6 & Java 17 Upgrade | MuleSoft Mysore Meetup #46
 
Honest Reviews of Tim Han LMA Course Program.pptx
Honest Reviews of Tim Han LMA Course Program.pptxHonest Reviews of Tim Han LMA Course Program.pptx
Honest Reviews of Tim Han LMA Course Program.pptx
 
Acetabularia Information For Class 9 .docx
Acetabularia Information For Class 9  .docxAcetabularia Information For Class 9  .docx
Acetabularia Information For Class 9 .docx
 
Language Across the Curriculm LAC B.Ed.
Language Across the  Curriculm LAC B.Ed.Language Across the  Curriculm LAC B.Ed.
Language Across the Curriculm LAC B.Ed.
 
Group Presentation 2 Economics.Ariana Buscigliopptx
Group Presentation 2 Economics.Ariana BuscigliopptxGroup Presentation 2 Economics.Ariana Buscigliopptx
Group Presentation 2 Economics.Ariana Buscigliopptx
 
The Challenger.pdf DNHS Official Publication
The Challenger.pdf DNHS Official PublicationThe Challenger.pdf DNHS Official Publication
The Challenger.pdf DNHS Official Publication
 
TESDA TM1 REVIEWER FOR NATIONAL ASSESSMENT WRITTEN AND ORAL QUESTIONS WITH A...
TESDA TM1 REVIEWER  FOR NATIONAL ASSESSMENT WRITTEN AND ORAL QUESTIONS WITH A...TESDA TM1 REVIEWER  FOR NATIONAL ASSESSMENT WRITTEN AND ORAL QUESTIONS WITH A...
TESDA TM1 REVIEWER FOR NATIONAL ASSESSMENT WRITTEN AND ORAL QUESTIONS WITH A...
 
1.4 modern child centered education - mahatma gandhi-2.pptx
1.4 modern child centered education - mahatma gandhi-2.pptx1.4 modern child centered education - mahatma gandhi-2.pptx
1.4 modern child centered education - mahatma gandhi-2.pptx
 
Unit 8 - Information and Communication Technology (Paper I).pdf
Unit 8 - Information and Communication Technology (Paper I).pdfUnit 8 - Information and Communication Technology (Paper I).pdf
Unit 8 - Information and Communication Technology (Paper I).pdf
 
STRAND 3 HYGIENIC PRACTICES.pptx GRADE 7 CBC
STRAND 3 HYGIENIC PRACTICES.pptx GRADE 7 CBCSTRAND 3 HYGIENIC PRACTICES.pptx GRADE 7 CBC
STRAND 3 HYGIENIC PRACTICES.pptx GRADE 7 CBC
 
Model Attribute Check Company Auto Property
Model Attribute  Check Company Auto PropertyModel Attribute  Check Company Auto Property
Model Attribute Check Company Auto Property
 
Guidance_and_Counselling.pdf B.Ed. 4th Semester
Guidance_and_Counselling.pdf B.Ed. 4th SemesterGuidance_and_Counselling.pdf B.Ed. 4th Semester
Guidance_and_Counselling.pdf B.Ed. 4th Semester
 

Assessment of Contractors Project Management Maturity

  • 1. International Journal of Trend in Scientific Research and Development (IJTSRD) Volume 4 Issue 4, June 2020 Available Online: www.ijtsrd.com e-ISSN: 2456 – 6470 @ IJTSRD | Unique Paper ID – IJTSRD30936 | Volume – 4 | Issue – 4 | May-June 2020 Page 231 Assessment of Contractors Project Management Maturity K. Ajithkumar1, P. Deepan2 1P.G Student, 2Assistant Professor, 1,2Mahendra Engineering College, Namakkal, Tamil Nadu, India ABSTRACT In effect, concrete is broadly used as a development fabric due to the factofits high strength-cost ratio in many applications. Concrete constructions are usually expected to provide bother free service all throughits intendeddesign life. However, these expectations are now not realized in many constructions because of structural deficiency, fabric deterioration, unanticipated over loadings or physical damage and accordingly civil structures like buildings, dams, bridges and so forth are subjected to non-stop deterioration over the years. This extent of injury or deterioration appreciably relies upon on the quality of materials and workmanship at every the building stage. The deterioration of structures can be a resultofa number elementswhichinclude hearth damage, frost action, chemical attack, corrosion of steel and so on at some point of the lifestyles span of the structure. The investigation of soundness is therefore vital for discovering the existing serviceability of the structure and its scope for future developments or for the trade in its utilization. Such an investigation can be carried outusingthefollowingmethods: a)Visual examination b) Non Destructive Testing c) Partial Destructive Testing. Besides, it turns into fundamental for structures hit by means of an earthquake, a bomb blast or any other calamity. In general, Soundness estimation to be finished for buildings which are crossed over 15 years ofage. How to cite this paper: K. Ajithkumar | P. Deepan "Assessment of Contractors Project Management Maturity" Published in International Journal of Trend in Scientific Research and Development (ijtsrd), ISSN: 2456- 6470, Volume-4 | Issue-4, June 2020, pp.231-235, URL: www.ijtsrd.com/papers/ijtsrd30936.pdf Copyright © 2020 by author(s) and International Journal ofTrendinScientific Research and Development Journal. This is an Open Access article distributed under the terms of the Creative Commons Attribution License (CC BY 4.0) (http://creativecommons.org/licenses/by /4.0) 1. INTRODUCTION The development industry playssizeableroleinthefinancial system of developing countries. For example, in many creating countries, essential buildingthingstodoaccountfor about 80% of the total capital assets,10percent oftheirGDP, and extra than 50% of the wealth invested in fixed assets. In addition, the enterprise provides excessive employment opportunity, probable subsequent after agriculture. Despite the construction industry’s huge contribution to the economy of developing nations and the indispensable function it plays in those international locations development, the performance of the industry still stays commonly low. As (Idoko, 2008)noted, “…many tasks in creating countries stumble upon significant time and cost overruns, fail to recognize their intended benefit or even totally terminated and abandoned earlier than or after their completion” 1.1. Project and Project Management: Definition A challenge has a defined scope, is limited by way of restricted resource, involves many humans with extraordinary ability and, commonly steadily elaborated in the course of its life cycle. [(Stanleigh,2007),(Cleland&amp; Ireland, 2002), (Wheatley)] .Similar to the case for project, many and specific definitions have been given for mission management. Summarizing these definitions this lookup defines Project administration as: Theutilityand integration of current administration and mission management knowledge, skills, equipment and techniques to the normal planning, directing , coordinating,monitoring and manageof all dimensions of a assignment from its inception to completion, and the motivation of all those involved to produce the product ,service or result of the task on time, inside licensed cost, and to the required pleasant and requirement, and to the pleasureofparticipants.[(Chartered Institute of Building , 2002), (Fewings, 2005), (Carmichael, 2004)].Project administration deals in the main with coordinating resources and managing people and change. Generally “Managing a undertaking includes: Identifying requirements, Establishing clear and attainable objectives, Balancing the competing needs for quality, scope, time and cost; Adapting specifications, plans, and strategy to the one of a kind concerns and expectations of the various stakeholders” (Project Management Institute (PMI), 2004). Further, Pareto’s 80-20 rule (the regulation of the necessary few), is pretty applicable in managingprojects,consequently efforts want be focused on few and important or necessary objects (Carmichael, 2004).Nine core information areas of challenge administration are identified in PMBOK. 2. RESEARCH METHODOLOGY Literature study and the study of several references were done in order to get the parameters related to project management in construction. The flow chart below represents the methodology adopted for the study. IJTSRD30936
  • 2. International Journal of Trend in Scientific Research and Development (IJTSRD) @ www.ijtsrd.com eISSN: 2456-6470 @ IJTSRD | Unique Paper ID – IJTSRD30936 | Volume – 4 | Issue – 4 | May-June 2020 Page 232 Fig 2.1 Methodology 3. KEY FACTORS IN PROJECT MANAGEMENT PMBOK recognises 5 basic process groups and10knowledge areas typical of almost all projects. The basic concepts are applicable to projects, programmes and operations. Thefive basic process groups are:  Initiating  Planning  Executing  Monitoring and Controlling  Closing The following are the ten knowledge areas:  Project Integration Management  Project Scope Management  Project Time Management  Project Cost Management  Project Quality Management  Project Human Resource  Management  Project Communications  Management  Project Risk Management  Project Procurement Management  Project Stakeholder Management (added in the 5th edition) 4. QUESTIONNAIRE DESIGN This research is descriptive lookup as it tries to describe the current status of PM practice in the building enterprise of India. This survey solicits opinion from practitioners as to the relative importance of the practices recognized through literature evaluation forthe 12buildingPM knowledgeareas included in the research. The questionnaire has two parts. Part-I asks biographical information such as stage of PM training, years worked as PM, Part-II asks respondents to price the PM practices beneath each of the 12 expertise areas as very high, high, average, low, very low based totally on their perceived importance to the attainment of goals of each of the understanding areas. 5. SCORING MODEL FOR PROJECT MANAGEMENT MATURITY The overall PM practice is determined by calculating the average maturity score determined for the 12 knowledge areas. In determining the overall maturity the weight (contribution) ofthe12knowledgeareas is assumed tobeequal.Todeterminethe average maturity, information obtained from the questionnaire survey is analysed. Table 5.1 Scoring Model SCORE LEVEL GENERAL DESCRIPTIONS MAIN CHARACTERISTICS 0-1 Level 1 Common Language Organizations recognize the importance of project management and the need for a good understanding of the basic knowledge of PM and its language/terminology. None or sporadic use of project management. No Executive-level support. No investment or support for project management training. 1-2 Level 2 Common Processes Organizations recognize the need for common processes Recognition of benefits of PM. Organizational 6. QUESTIONNAIRE SURVEY A survey is a data gathering method that is utilized to collect, analyze and interpret the views ofa groupofpeoplefroma target population. Surveys have been used in various fields of research, such as sociology, marketing research, politics and psychology. The survey methodology is guided by principles of statistics from the moment of creating a sample, or a group of people to represent a population, up to the time of the survey results' analysis and interpretation.Fromsimplepolls regarding political beliefs, to opinions regarding a new product versus another, the survey method is proven to be an effectivetechnique to gather necessary information for the advancement of science and technology.
  • 3. International Journal of Trend in Scientific Research and Development (IJTSRD) @ www.ijtsrd.com eISSN: 2456-6470 @ IJTSRD | Unique Paper ID – IJTSRD30936 | Volume – 4 | Issue – 4 | May-June 2020 Page 233 7. QUESTIONNAIRE ANALYSIS 7.1. DESCRIPTIVE STATISTICS Table7.1 Descriptive Statistics GENERA L1 GENERA L2 GENERA L3 GENERA L4 GENERAL5 N Valid 44 44 44 44 44 Missing 0 0 0 0 0 Mean 2.4583 2.1667 2.2083 2.2500 2.1667 Std. Error of Mean .22505 .17720 .14719 .20189 .20560 Median 2.0000 2.0000 2.0000 2.0000 2.0000 Mode 2.00 2.00 2.00 2.00 2.00 Std. Deviation 1.10253 .86811 .72106 .98907 1.00722 Variance 1.216 .754 .520 .978 1.014 Skewness .433 .524 .419 .331 .474 Std. Error of Skewness .472 .472 .472 .472 .472 Range 4.00 3.00 3.00 3.00 3.00 Percentile s 25 2.0000 2.0000 2.0000 1.2500 1.0000 50 2.0000 2.0000 2.0000 2.0000 2.0000 75 3.0000 3.0000 3.0000 3.0000 3.0000 7.2. RELIABILITY STATISTICS Statistical reliability is wished in order to ensure the validity and precision of the statisticalanalysis.Itrefers tothepotential to reproduce the results once more and again as required. This is quintessential as it builds trust in the statistical evaluation and the outcomes obtained. There are many techniques available to scientists to decide and enhance the reliability of their experiment. For example, positive surveys might establish their reliability with the aid of asking the participants of the learn about the same or comparable questions at two specific times underneath comparable conditions. Table 7.2 Cronbach Alpha Consistancy Cronbach's alpha Internal consistency α ≥ 0.9 Excellent (High-Stakes testing) 0.7 ≤ α < 0.9 Good (Low-Stakes testing) 0.6 ≤ α < 0.7 Acceptable 0.5 ≤ α < 0.6 Poor α < 0.5 Unacceptable Table 7.3 Reliability Statistics Output from SPSS Reliability Statistics Cronbach's Alpha Cronbach's Alpha Based on Standardized Items N of Items .9190 .9191 44 8. RESULT AND DISCUSSIONS 8.1. Maturity Across Pm Knowledge Areas Fig 8.1 Maturity of Project Scope Management 8.2. Maturity of Project Time Management Fig 8.2 Maturity of Project Time Management
  • 4. International Journal of Trend in Scientific Research and Development (IJTSRD) @ www.ijtsrd.com eISSN: 2456-6470 @ IJTSRD | Unique Paper ID – IJTSRD30936 | Volume – 4 | Issue – 4 | May-June 2020 Page 234 8.3. Maturity of Project Cost Management Fig 8.3 Maturity of Project Cost Management 8.4. Maturity of Project Financial Management Fig 8.4 Maturity of Project Financial Management 8.5. Maturity of Project Quality Management Fig 8.5 Maturity of Project Quality Management 8.6. Maturity of Project Human ResourseManagement Fig8.6 Maturity of Project Human Resourse Management 8.7. Maturity of Project Procurement Management Fig 8.7 Maturity of Project Procurement Management 8.8. DEMOGRAPHICS OF PARTICIPATING CONTRACTORS Contractor’s Category Number of contractors in the category Based on Ownership Private 44 Public ----- Based on the contractor’s major work General Contractors 9 Building Contractors 20 Road Contractors 10 Specialized Contractors 5 Based on Participation in Capacity Building Program Capacity Building Program Participant 25 Non-Capacity Building Program Participant 9 Based on ISO-Certification ISO Certified 12 In process of getting ISO 4 NO 28 8.9. PM MATURITY ACROSS CATAEGORIES Fig 8.9 ISO Vs. Non-ISO Contractor’s PM Maturity 8.10. Capacity Building Program (CBP) Vs (Non-CBP) Contractors PM Maturity The maturity assessment result shows that, contractors which participate in capacity building program have shown consistently higher maturity in all knowledge areas of construction management except for that of material management.
  • 5. International Journal of Trend in Scientific Research and Development (IJTSRD) @ www.ijtsrd.com eISSN: 2456-6470 @ IJTSRD | Unique Paper ID – IJTSRD30936 | Volume – 4 | Issue – 4 | May-June 2020 Page 235 Fig 8.11 CBP Vs. Non-CBP Contractor’s PM Maturity 8.11. Road Contractors vs. Building Contractors PM Maturity Fig 8.12 Road Vs. Building Contractor’s PM Maturity 9. CONCLUSION This research had tried to assess the extent of use (maturity) of project management techniques and practices in the development enterprise of India. Further, the lookup has provided bench mark information on the contemporarystatus ofPM practice in the enterprise for use in non-stop assessment of future improvement efforts. The low degree of construction PM maturity discovered on the Contractors shows how bad the PM practice in the enterprise standard is. Thus, enchantment efforts need be below taken to enhance the cutting-edge condition. 10. QUESTIONNAIRE Project Management Practice Maturity Questions 10.1. Project Management Process-General Sl. no Description Very high High Avg. Low Very low 1. Recognized of needs and benefits Project Management by your Organization 2. Management support for Project management development 3. Standard Project Management processes and methodologies 4. Project Management training for its Project Management team 5. Solid knowledge base of Project managers 6. Application of Project Management processes, methodologies and procedures in managing projects in your Organization References [1] Ahern, D. M., Clouse, A., & Turner, R. (2008). ‘CMMI distilled: A practical introduction tointegratedprocess improvement (3rd ed.)’. Upper Saddle River, NJ: Addison-Wesley Professional. [2] Alutu, O. E., &Udhawuve, M. L. (2009, January). ‘Unethical practices in Nigerianengineeringindustries: Complications for project management’. [3] Andersen, S. W. (2008). ‘Can project management support poverty reduction in Africa’. PMI Global Congress 2008 Proceedings. (R. Akiri, Ed.) Project Management Institute (PMI). Artech House, Inc. [4] Bourne, L. M. (2008, May 19-21). ‘SRMM: Stakeholder relationship maturity model’. PMI Global Congress 2008. St. Julian’s: Retrieved March17,2010 ,from http://www.stakeholdermapping.com/PDFs/SRMM_P aper.pdf.