Analysis of Rework and Rescheduling in
Construction Project using SPSS Software
P. Haritha1, Dr. K. Vidhya2
1PG Student, 2Head of the Department,
1,2Mahendra Engineering College, Namakkal, Tamil Nadu, India
ABSTRACT
Rework is a primary contributor to time wastage and time table overruns
which eventually impact on cost, assets and quality. Rework is additionally
affecting the mission performance. So minimizing the transform is important
one. The goal of the questionnaire survey is to analyze the motives and have
an impact on of rework. Questionnaire survey has been carried out among a
variety of construction corporations and contractors in Salem District. The
questionnaire prepared based totally on motives and influence of rework.
Ranking analysis is completed by means of the use of the SPSS (Statistical
Package for the Social Sciences).In this analysis it helps to check the stability
and consistency of information accumulated from the questionnaire survey.
Finding the foremost reasons rescheduling will be done.
How to cite this paper: P. Haritha | Dr. K.
Vidhya "Analysis of Rework and
Rescheduling in Construction Project
using SPSS Software"
Published in
International Journal
of Trend in Scientific
Research and
Development(ijtsrd),
ISSN: 2456-6470,
Volume-4 | Issue-4,
June 2020, pp.169-173, URL:
www.ijtsrd.com/papers/ijtsrd30930.pdf
Copyright © 2020 by author(s) and
International Journal ofTrendinScientific
Research and Development Journal. This
is an Open Access article distributed
under the terms of
the Creative
Commons Attribution
License (CC BY 4.0)
(http://creativecommons.org/licenses/by
/4.0)
1. INTRODUCTION
Rework ability that an motion ought to be executed greater
than once in order to attain the designated objectives,which
consequences in the needless consumption of extra
resources in the form of labor, materials, and services past
what would have been used if the motion had been carried
out only once. In construction activities, in addition to
overruns in the agenda and price transform has the in
addition effect of inflicting workable risk with recognize to
quality and safety.
In the construction industry, rework is widely regarded as
an apparent issue that prevents enchantments in
productiveness though the hours and price for remodel
signify only a small component of the fieldworkas a whole,if
fieldwork is viewed to consist of the time and price
associated with direct work, support, rework, and delays.
However, a frequent faith is that a reduction in rework is a
least expensive method to enhancing productivity because
most rework may want to be mitigated via enhancing the
management of the procedure and growing human
performance, neither of which is as high priced as adopting
technical innovation in order to enhance productivity.
1.1. DEFINITION OF REWORK
Rework is described as ‘the pointless effort of re-doing a
procedure or undertaking that used to beincorrectlycarried
out at the first time’. Within the development industry,
transform has been identified as a vast factor that
contributes to value increases and time table delays on
projects.
Fig 1.1Causes of rework
IJTSRD30930
International Journal of Trend in Scientific Research and Development (IJTSRD) @ www.ijtsrd.com eISSN: 2456-6470
@ IJTSRD | Unique Paper ID – IJTSRD30930 | Volume – 4 | Issue – 4 | May-June 2020 Page 170
1.2. SOURCES OF REWORK
2. QUESTIONNAIRE SURVEY
In the questionnaire survey questions are taken from the
journal through literature survey. The questions are based
on the causes and impact of the reworks in construction
projects. The answer contains a three options (i.e.) agree,
neither agree nor disagree, disagree.
2.1. QUESTIONNAIRE MODEL
2.1.1. SECTION A: PROFILE OF RESPONDENT
1. Name of the respondent: ………………………
2. Name of the company: ………………………...
3. Which of the following best describes your company?
4. How long have you worked in the construction industry?
………………………………………
5. What is your current position in your organization?
………………………………………
6. How long have you been in your present position?
………………………………………
2.1.2. SECTION B: PROJECT CHARACTERISTICS
7. What was the project type?
8. What was the facility type that best describes the project?
9. How much was the original tender sum?
------------------------------------------------------
10. How much was the final contract sum?
11. What was the project’s original construction period?
12. What was the project’s actual construction period?
13. What type of procurement method was used for the
project?
14. What was the project’s gross floor area (m2)?
………………………………………………
15. How many floors did the project have?
.......................................................................
2.1.3. SECTION C: CAUSES OF REWORK
Table 2.1: Client Related Factor
Client related factors Agree Neither agree nor disagree Disagree
Lack of experience and knowledge of the design process
Lack of experience and knowledge of the construction process
Lack of funding allocated for site investigations
Lack of client involvement in the project
Insufficient time and money spent on the briefing process
Poor communication with design consultants
Poor contract execution
International Journal of Trend in Scientific Research and Development (IJTSRD) @ www.ijtsrd.com eISSN: 2456-6470
@ IJTSRD | Unique Paper ID – IJTSRD30930 | Volume – 4 | Issue – 4 | May-June 2020 Page 171
Table 2.2 Design Related Factors
Client related factors Agree Neither agree nor disagree Disagree
Lack of experience and knowledge of the design process
Lack of experience and knowledge of the construction process
Lack of funding allocated for site investigations
Lack of client involvement in the project
Insufficient time and money spent on the briefing process
Poor communication with design consultants
Poor contract execution
3. SPSS SOFTWARE
Its is developed by using Norman H. Nie and C. Hadlai Hullof
IBM Corporation in the yr 1968. It is compatible with
Windows, Linux, UNIX& Macoperatingsystems.SPSSis
amongst the most broadly used packages for statistical
analysis in social science.
SPSS is a comprehensive and flexible statistical evaluation
and data management solution. SPSS is a laptop software
used for survey authoring and deployment,statisticsmining,
text analytics, statistical analysis, and collaboration and
deployment SPSS can take records from nearly any type of
file and use them to generate tabulated reports, charts, and
plots of distributions and trends, descriptive statistics, and
behavior complicated statistical analyses. SPSS is amongst
the most extensively used packages for statisticalevaluation
in social science.
Used in Telecommunications, Banking, Finance, Insurance,
Healthcare, Manufacturing, Retail, Consumer packaged
goods, Higher education, Government, and Market research.
Features of SPSS: It is handy to analyze and use. It consists of
a full range of data. Management machine and enhancing
tools. It presents in-depth statistical capabilities. It offers
whole plotting, reporting and presentation features.
3.1. ENTERING DATA
Fig 3.1 Data View In SPSS Software
Fig 3.2 Variable View in SPSS Software
3.2. EDITING DATA
Fig 3.3 Pivot Table Editor in SPSS Software
Fig 3.4 Text Output Editor in SPSS Software
Fig 3.5 Get Your Data Into SPSS
4. RANKNG AND ANALYSIS
In statistics, "ranking" refers to the data transformation in
which numerical or ordinal values arereplacedbytheirrank
when the data are sorted. Ranking was done by SPSS
software. From that analysis major factors causing reworks
and impact of rework should be found.
International Journal of Trend in Scientific Research and Development (IJTSRD) @ www.ijtsrd.com eISSN: 2456-6470
@ IJTSRD | Unique Paper ID – IJTSRD30930 | Volume – 4 | Issue – 4 | May-June 2020 Page 172
4.1. Descriptive Statistics
Table 4.1 Descriptive Statistics
Descriptive Statistics
A. Factors N Mean Std. Deviation
Changes initiated by contractor to improve quality 10 4.60 1.265
Unclear instruction to workers 10 4.40 1.350
Changes in the method of construction to improve constructability 10 4.40 .966
Changes made by the contractor during construction 10 4.40 1.350
Changes made at the request of the client 10 4.40 1.350
Changes in the method of construction due to site condition 10 4.20 1.687
Failure to provide protection to constructed works 10 4.20 1.398
Incomplete design at the time of tender 10 4.20 1.398
Poor site condition such as water, electricity etc. 10 4.00 1.700
Poor communication with design consultants 10 4.00 1.700
Inadequate Supervisor 10 4.00 1.414
Lack of safety 10 4.00 1.700
Poor planning of workload 10 4.00 1.700
Poor coordination of design 10 4.00 1.414
Lack of client involvement in the project 10 3.80 1.932
Changes initiated by the municipality/regulatory bodies 10 3.40 1.838
Shortage of skilled supervisors 10 3.20 1.135
Schedule acceleration 10 3.20 1.476
Poor planning of resources 10 3.20 1.135
Shortage of skilled labour 10 3.00 1.333
Lack of funding allocated for site investigations 10 2.80 1.135
Poor communication between the workers in site 10 2.40 1.897
Damages caused by subcontractor 10 2.40 1.350
Low labour skill level 10 2.00 1.700
Adverse natural condition 10 2.00 1.700
Use of poor construction material 10 2.00 1.414
Lack of training and experience 10 2.00 1.414
Insufficient skill levels to complete the required task 10 2.00 1.414
Ineffective use of quality management practices 10 2.00 1.414
Omissions of items from the contract documentation 10 2.00 1.700
Errors due to inappropriate construction methods 10 1.80 1.398
Damage to other trades work due to carelessness 10 1.80 1.398
Ineffective use of quality management practices 10 1.80 1.398
Ineffective use of information technologies (e.g. CADD) 10 1.80 1.687
The contactor have a less skill 10 1.60 1.350
Ineffective use of construction standard 10 1.60 .966
Errors made in the contract documentation 10 1.60 .966
Incomplete drawings 10 1.60 .966
Insufficient time and money spent on the briefing process 10 1.60 .966
Poor supervision 10 1.40 .843
Lack of experience and knowledge of the design 10 1.40 1.265
Insufficient time to prepare contract documentation 10 1.20 .632
Poor contract execution 10 1.20 .632
Lack of experience and knowledge of the construction process 10 1.20 .632
Valid N (listwise) 10
4.2. CAUSES OF REWORK
Table 4.2 Reliability Statistics
Reliability Statistics
Cronbach's Alpha N of Items
.759 44
4.3. IMPACT OF REWORK
Table 4.3 Reliability Statistics
Reliability Statistics
Cronbach's Alpha N of Items
.775 10
International Journal of Trend in Scientific Research and Development (IJTSRD) @ www.ijtsrd.com eISSN: 2456-6470
@ IJTSRD | Unique Paper ID – IJTSRD30930 | Volume – 4 | Issue – 4 | May-June 2020 Page 173
5. CONCLUSION
In this task literature survey is conducted and studied about
the rework, causes of transformandimpactofrework.Based
on the literature surveyquestionnaireis organizedandgiven
to a variety of development companies. According to the
response from the organizations rating will be carried out
the usage of SPSS software and evaluation used to be
finished by way of statistical methods. From rating major
factors causing rework and have an effect on of transform
used to be found. Then reschedule used to be performed for
a proposed undertaking via Primavera software.
REFERENCES
[1] S.Raghuram, andR.Nagavinothini,“Investigationonthe
Causes and Adverse Effects of ReworksinConstruction
Projects and Developing A Rework ReductionModel to
Mitigate Time and Cost”,Journal of International
Journal of Innovative Research in Science, Engineering
and Technology (An ISO 3297: 2007 Certified
Organization) Vol. 5, Issue 4, April 2016.
[2] Maheshkumar Ramesh Shinde and Purva S Kulkarni
“Impact of Supervision on Rework in Construction
Industry” International Journal on Recent and
Innovation Trends in Computing and Communication
ISSN: 2321-8169 Volume: 4 Issue: 1 268 – 270.
[3] TarekHegazy, Mohamed Said and MoustafaKassab
“Incorporating rework into construction schedule
analysis” Journal of Automation in Construction 20
(2011) 1051–1059
[4] Bon-Gang Hwang,Stephen R. Thomas, M.ASCE, Carl T.
Haas, M.ASCE, and Carlos H. Caldas, M.ASCE
“Measuring the Impact of Rework onConstructionCost
Performance” JOURNAL OF CONSTRUCTION
ENGINEERING AND MANAGEMENT © ASCE / MARCH
2009 / 187.
[5] Peter E. D. Love, ZahirIrani, and David J. Edwards “A
Rework Reduction Model for Construction Projects”
Journal of IEEE TRANSACTIONS ON ENGINEERING
MANAGEMENT, VOL. 51, NO. 4, NOVEMBER 2004.
[6] L.O. Oyewobi, A.A. Oke, B.O. Ganiyu, A.A. Shittu, R.B. Isa
and L. Nwokobia, “The effect of project types on the
occurrence of rework in expanding economy”, Journal
of Civil Engineering and Construction Technology Vol.
2(6), pp. 119-124.
[7] Peter E. D. Love, Ph.D., Sc.D., David J. Edwards, Ph.D.
and Jim Smith, “Rework Causation: Emergent
Theoretical Insightsand Implications for Research”,
Ph.D. Journal of Construction Engineeringand
Management, © ASCE, ISSN 0733-9364.
[8] Peter E. D ,“Influence of Project Type and Procurement
Method on ReworkCosts in Building Construction
Projects” Journal of Construction Engineering and
Management,Vol. 128, No. 1, February 1,2002.©ASCE,
ISSN 0733-9364/2002/1-18–29/
[9] ManjulaDissanayake, Aminah Robinson Fayek, Hans
Wolf, Anthony Van Tol“Developing a Standard
Approach for Construction Field Rework Assessment”,
ASCE 2004 Construction Research 2003Construction
Research Congress.

More Related Content

What's hot

Example R&D Project Report
Example R&D Project ReportExample R&D Project Report
Example R&D Project Report
Thomas F. Kaplan and Associates
 
Delay Analysis in Construction of Redevelopment Residential Project
Delay Analysis in Construction of Redevelopment Residential ProjectDelay Analysis in Construction of Redevelopment Residential Project
Delay Analysis in Construction of Redevelopment Residential Project
IRJET Journal
 
A Review On Quantified Impacts Of Construction Labour Productivity Towards Pr...
A Review On Quantified Impacts Of Construction Labour Productivity Towards Pr...A Review On Quantified Impacts Of Construction Labour Productivity Towards Pr...
A Review On Quantified Impacts Of Construction Labour Productivity Towards Pr...
IRJET Journal
 
Risk Analysis and Strategic Evaluation of Procurement Process in Construction
Risk Analysis and Strategic Evaluation of Procurement Process in ConstructionRisk Analysis and Strategic Evaluation of Procurement Process in Construction
Risk Analysis and Strategic Evaluation of Procurement Process in Construction
IRJET Journal
 
SWAN_2015_AMBIKA_SAVITA_ASHISH
SWAN_2015_AMBIKA_SAVITA_ASHISHSWAN_2015_AMBIKA_SAVITA_ASHISH
SWAN_2015_AMBIKA_SAVITA_ASHISHAmbika Tripathi
 
Material Management Practices of “Foundation Silver Spring” Residential Build...
Material Management Practices of “Foundation Silver Spring” Residential Build...Material Management Practices of “Foundation Silver Spring” Residential Build...
Material Management Practices of “Foundation Silver Spring” Residential Build...
IRJET Journal
 
TIME AND COST OVERRUN IN DELIVERY OF GOVERNMENT BUILDINGS IN UTTAR PRADESH: T...
TIME AND COST OVERRUN IN DELIVERY OF GOVERNMENT BUILDINGS IN UTTAR PRADESH: T...TIME AND COST OVERRUN IN DELIVERY OF GOVERNMENT BUILDINGS IN UTTAR PRADESH: T...
TIME AND COST OVERRUN IN DELIVERY OF GOVERNMENT BUILDINGS IN UTTAR PRADESH: T...
IAEME Publication
 
Cis 599 Enthusiastic Study / snaptutorial.com
Cis 599 Enthusiastic Study / snaptutorial.comCis 599 Enthusiastic Study / snaptutorial.com
Cis 599 Enthusiastic Study / snaptutorial.com
Stephenson7
 
Ammar kamil thesis_final_workflow_modeling_tools_comparison
Ammar kamil thesis_final_workflow_modeling_tools_comparisonAmmar kamil thesis_final_workflow_modeling_tools_comparison
Ammar kamil thesis_final_workflow_modeling_tools_comparison
Eric Javier Espino Man
 
Cis 499 Enthusiastic Study / snaptutorial.com
Cis 499 Enthusiastic Study / snaptutorial.comCis 499 Enthusiastic Study / snaptutorial.com
Cis 499 Enthusiastic Study / snaptutorial.com
Stephenson05
 
Management For Construction Project:-Various Aspects Of Delay
Management For Construction Project:-Various Aspects Of DelayManagement For Construction Project:-Various Aspects Of Delay
Management For Construction Project:-Various Aspects Of Delay
IRJET Journal
 

What's hot (11)

Example R&D Project Report
Example R&D Project ReportExample R&D Project Report
Example R&D Project Report
 
Delay Analysis in Construction of Redevelopment Residential Project
Delay Analysis in Construction of Redevelopment Residential ProjectDelay Analysis in Construction of Redevelopment Residential Project
Delay Analysis in Construction of Redevelopment Residential Project
 
A Review On Quantified Impacts Of Construction Labour Productivity Towards Pr...
A Review On Quantified Impacts Of Construction Labour Productivity Towards Pr...A Review On Quantified Impacts Of Construction Labour Productivity Towards Pr...
A Review On Quantified Impacts Of Construction Labour Productivity Towards Pr...
 
Risk Analysis and Strategic Evaluation of Procurement Process in Construction
Risk Analysis and Strategic Evaluation of Procurement Process in ConstructionRisk Analysis and Strategic Evaluation of Procurement Process in Construction
Risk Analysis and Strategic Evaluation of Procurement Process in Construction
 
SWAN_2015_AMBIKA_SAVITA_ASHISH
SWAN_2015_AMBIKA_SAVITA_ASHISHSWAN_2015_AMBIKA_SAVITA_ASHISH
SWAN_2015_AMBIKA_SAVITA_ASHISH
 
Material Management Practices of “Foundation Silver Spring” Residential Build...
Material Management Practices of “Foundation Silver Spring” Residential Build...Material Management Practices of “Foundation Silver Spring” Residential Build...
Material Management Practices of “Foundation Silver Spring” Residential Build...
 
TIME AND COST OVERRUN IN DELIVERY OF GOVERNMENT BUILDINGS IN UTTAR PRADESH: T...
TIME AND COST OVERRUN IN DELIVERY OF GOVERNMENT BUILDINGS IN UTTAR PRADESH: T...TIME AND COST OVERRUN IN DELIVERY OF GOVERNMENT BUILDINGS IN UTTAR PRADESH: T...
TIME AND COST OVERRUN IN DELIVERY OF GOVERNMENT BUILDINGS IN UTTAR PRADESH: T...
 
Cis 599 Enthusiastic Study / snaptutorial.com
Cis 599 Enthusiastic Study / snaptutorial.comCis 599 Enthusiastic Study / snaptutorial.com
Cis 599 Enthusiastic Study / snaptutorial.com
 
Ammar kamil thesis_final_workflow_modeling_tools_comparison
Ammar kamil thesis_final_workflow_modeling_tools_comparisonAmmar kamil thesis_final_workflow_modeling_tools_comparison
Ammar kamil thesis_final_workflow_modeling_tools_comparison
 
Cis 499 Enthusiastic Study / snaptutorial.com
Cis 499 Enthusiastic Study / snaptutorial.comCis 499 Enthusiastic Study / snaptutorial.com
Cis 499 Enthusiastic Study / snaptutorial.com
 
Management For Construction Project:-Various Aspects Of Delay
Management For Construction Project:-Various Aspects Of DelayManagement For Construction Project:-Various Aspects Of Delay
Management For Construction Project:-Various Aspects Of Delay
 

Similar to Analysis of Rework and Rescheduling in Construction Project using SPSS Software

Construction Equipment Monitoring By using Relative Important Indices RII Ana...
Construction Equipment Monitoring By using Relative Important Indices RII Ana...Construction Equipment Monitoring By using Relative Important Indices RII Ana...
Construction Equipment Monitoring By using Relative Important Indices RII Ana...
ijtsrd
 
Evaluation of Factors Causing Conflicts & Dispute in Construction Projects by...
Evaluation of Factors Causing Conflicts & Dispute in Construction Projects by...Evaluation of Factors Causing Conflicts & Dispute in Construction Projects by...
Evaluation of Factors Causing Conflicts & Dispute in Construction Projects by...
IRJET Journal
 
Assessment of Contractors Project Management Maturity
Assessment of Contractors Project Management MaturityAssessment of Contractors Project Management Maturity
Assessment of Contractors Project Management Maturity
ijtsrd
 
Impact of Sustainable Construction on Business Decisions
Impact of Sustainable Construction on Business DecisionsImpact of Sustainable Construction on Business Decisions
Impact of Sustainable Construction on Business Decisions
IRJET Journal
 
Delay Analysis of Projects and Effects of Delays in the Mining/Manufacturing ...
Delay Analysis of Projects and Effects of Delays in the Mining/Manufacturing ...Delay Analysis of Projects and Effects of Delays in the Mining/Manufacturing ...
Delay Analysis of Projects and Effects of Delays in the Mining/Manufacturing ...
iosrjce
 
I012646171
I012646171I012646171
I012646171
IOSR Journals
 
I012646171
I012646171I012646171
I012646171
IOSR Journals
 
IRJET - Forecasting and Management of Triple Constraints in Construction proj...
IRJET - Forecasting and Management of Triple Constraints in Construction proj...IRJET - Forecasting and Management of Triple Constraints in Construction proj...
IRJET - Forecasting and Management of Triple Constraints in Construction proj...
IRJET Journal
 
Impact of delayness on construction projects
Impact of delayness on construction projectsImpact of delayness on construction projects
Impact of delayness on construction projects
IRJET Journal
 
An Analysis on Employee Turnover Problem in Construction Industry
An Analysis on Employee Turnover Problem in Construction IndustryAn Analysis on Employee Turnover Problem in Construction Industry
An Analysis on Employee Turnover Problem in Construction Industry
ijtsrd
 
IRJET- Planning and Scheduling Multi- Storeyed Residential Building using Mic...
IRJET- Planning and Scheduling Multi- Storeyed Residential Building using Mic...IRJET- Planning and Scheduling Multi- Storeyed Residential Building using Mic...
IRJET- Planning and Scheduling Multi- Storeyed Residential Building using Mic...
IRJET Journal
 
Fall Accidents Caused By Accidents
Fall Accidents Caused By AccidentsFall Accidents Caused By Accidents
Fall Accidents Caused By Accidents
Ann Johnson
 
IRJET- Identification of Constraints and there Impact on Construction Pro...
IRJET-  	  Identification of Constraints and there Impact on Construction Pro...IRJET-  	  Identification of Constraints and there Impact on Construction Pro...
IRJET- Identification of Constraints and there Impact on Construction Pro...
IRJET Journal
 
IRJET- Case Study on Budget and Schedule Overrun During the Construction Phas...
IRJET- Case Study on Budget and Schedule Overrun During the Construction Phas...IRJET- Case Study on Budget and Schedule Overrun During the Construction Phas...
IRJET- Case Study on Budget and Schedule Overrun During the Construction Phas...
IRJET Journal
 
IRJET- A Study of Supply Chain Management in Civil Engineering
IRJET-  	  A Study of Supply Chain Management in Civil EngineeringIRJET-  	  A Study of Supply Chain Management in Civil Engineering
IRJET- A Study of Supply Chain Management in Civil Engineering
IRJET Journal
 
journalsresaim,+IJRESM_V3_I7_70.pdf
journalsresaim,+IJRESM_V3_I7_70.pdfjournalsresaim,+IJRESM_V3_I7_70.pdf
journalsresaim,+IJRESM_V3_I7_70.pdf
KarthikeyanP288430
 
Iarjset n core tech 8
Iarjset n core tech 8Iarjset n core tech 8
Iarjset n core tech 8
17TUME122MITHUNM
 
Success factors enhancing business performance of engineering procurement
Success factors enhancing business performance of engineering procurementSuccess factors enhancing business performance of engineering procurement
Success factors enhancing business performance of engineering procurementIAEME Publication
 
Success factors enhancing business performance of engineering procurement c...
Success factors enhancing business performance of  engineering procurement  c...Success factors enhancing business performance of  engineering procurement  c...
Success factors enhancing business performance of engineering procurement c...IAEME Publication
 
IRJET-Analysis of Losses Due to Breakdown of Equipments in Construction.
IRJET-Analysis of Losses Due to Breakdown of Equipments in Construction.IRJET-Analysis of Losses Due to Breakdown of Equipments in Construction.
IRJET-Analysis of Losses Due to Breakdown of Equipments in Construction.
IRJET Journal
 

Similar to Analysis of Rework and Rescheduling in Construction Project using SPSS Software (20)

Construction Equipment Monitoring By using Relative Important Indices RII Ana...
Construction Equipment Monitoring By using Relative Important Indices RII Ana...Construction Equipment Monitoring By using Relative Important Indices RII Ana...
Construction Equipment Monitoring By using Relative Important Indices RII Ana...
 
Evaluation of Factors Causing Conflicts & Dispute in Construction Projects by...
Evaluation of Factors Causing Conflicts & Dispute in Construction Projects by...Evaluation of Factors Causing Conflicts & Dispute in Construction Projects by...
Evaluation of Factors Causing Conflicts & Dispute in Construction Projects by...
 
Assessment of Contractors Project Management Maturity
Assessment of Contractors Project Management MaturityAssessment of Contractors Project Management Maturity
Assessment of Contractors Project Management Maturity
 
Impact of Sustainable Construction on Business Decisions
Impact of Sustainable Construction on Business DecisionsImpact of Sustainable Construction on Business Decisions
Impact of Sustainable Construction on Business Decisions
 
Delay Analysis of Projects and Effects of Delays in the Mining/Manufacturing ...
Delay Analysis of Projects and Effects of Delays in the Mining/Manufacturing ...Delay Analysis of Projects and Effects of Delays in the Mining/Manufacturing ...
Delay Analysis of Projects and Effects of Delays in the Mining/Manufacturing ...
 
I012646171
I012646171I012646171
I012646171
 
I012646171
I012646171I012646171
I012646171
 
IRJET - Forecasting and Management of Triple Constraints in Construction proj...
IRJET - Forecasting and Management of Triple Constraints in Construction proj...IRJET - Forecasting and Management of Triple Constraints in Construction proj...
IRJET - Forecasting and Management of Triple Constraints in Construction proj...
 
Impact of delayness on construction projects
Impact of delayness on construction projectsImpact of delayness on construction projects
Impact of delayness on construction projects
 
An Analysis on Employee Turnover Problem in Construction Industry
An Analysis on Employee Turnover Problem in Construction IndustryAn Analysis on Employee Turnover Problem in Construction Industry
An Analysis on Employee Turnover Problem in Construction Industry
 
IRJET- Planning and Scheduling Multi- Storeyed Residential Building using Mic...
IRJET- Planning and Scheduling Multi- Storeyed Residential Building using Mic...IRJET- Planning and Scheduling Multi- Storeyed Residential Building using Mic...
IRJET- Planning and Scheduling Multi- Storeyed Residential Building using Mic...
 
Fall Accidents Caused By Accidents
Fall Accidents Caused By AccidentsFall Accidents Caused By Accidents
Fall Accidents Caused By Accidents
 
IRJET- Identification of Constraints and there Impact on Construction Pro...
IRJET-  	  Identification of Constraints and there Impact on Construction Pro...IRJET-  	  Identification of Constraints and there Impact on Construction Pro...
IRJET- Identification of Constraints and there Impact on Construction Pro...
 
IRJET- Case Study on Budget and Schedule Overrun During the Construction Phas...
IRJET- Case Study on Budget and Schedule Overrun During the Construction Phas...IRJET- Case Study on Budget and Schedule Overrun During the Construction Phas...
IRJET- Case Study on Budget and Schedule Overrun During the Construction Phas...
 
IRJET- A Study of Supply Chain Management in Civil Engineering
IRJET-  	  A Study of Supply Chain Management in Civil EngineeringIRJET-  	  A Study of Supply Chain Management in Civil Engineering
IRJET- A Study of Supply Chain Management in Civil Engineering
 
journalsresaim,+IJRESM_V3_I7_70.pdf
journalsresaim,+IJRESM_V3_I7_70.pdfjournalsresaim,+IJRESM_V3_I7_70.pdf
journalsresaim,+IJRESM_V3_I7_70.pdf
 
Iarjset n core tech 8
Iarjset n core tech 8Iarjset n core tech 8
Iarjset n core tech 8
 
Success factors enhancing business performance of engineering procurement
Success factors enhancing business performance of engineering procurementSuccess factors enhancing business performance of engineering procurement
Success factors enhancing business performance of engineering procurement
 
Success factors enhancing business performance of engineering procurement c...
Success factors enhancing business performance of  engineering procurement  c...Success factors enhancing business performance of  engineering procurement  c...
Success factors enhancing business performance of engineering procurement c...
 
IRJET-Analysis of Losses Due to Breakdown of Equipments in Construction.
IRJET-Analysis of Losses Due to Breakdown of Equipments in Construction.IRJET-Analysis of Losses Due to Breakdown of Equipments in Construction.
IRJET-Analysis of Losses Due to Breakdown of Equipments in Construction.
 

More from ijtsrd

‘Six Sigma Technique’ A Journey Through its Implementation
‘Six Sigma Technique’ A Journey Through its Implementation‘Six Sigma Technique’ A Journey Through its Implementation
‘Six Sigma Technique’ A Journey Through its Implementation
ijtsrd
 
Edge Computing in Space Enhancing Data Processing and Communication for Space...
Edge Computing in Space Enhancing Data Processing and Communication for Space...Edge Computing in Space Enhancing Data Processing and Communication for Space...
Edge Computing in Space Enhancing Data Processing and Communication for Space...
ijtsrd
 
Dynamics of Communal Politics in 21st Century India Challenges and Prospects
Dynamics of Communal Politics in 21st Century India Challenges and ProspectsDynamics of Communal Politics in 21st Century India Challenges and Prospects
Dynamics of Communal Politics in 21st Century India Challenges and Prospects
ijtsrd
 
Assess Perspective and Knowledge of Healthcare Providers Towards Elehealth in...
Assess Perspective and Knowledge of Healthcare Providers Towards Elehealth in...Assess Perspective and Knowledge of Healthcare Providers Towards Elehealth in...
Assess Perspective and Knowledge of Healthcare Providers Towards Elehealth in...
ijtsrd
 
The Impact of Digital Media on the Decentralization of Power and the Erosion ...
The Impact of Digital Media on the Decentralization of Power and the Erosion ...The Impact of Digital Media on the Decentralization of Power and the Erosion ...
The Impact of Digital Media on the Decentralization of Power and the Erosion ...
ijtsrd
 
Online Voices, Offline Impact Ambedkars Ideals and Socio Political Inclusion ...
Online Voices, Offline Impact Ambedkars Ideals and Socio Political Inclusion ...Online Voices, Offline Impact Ambedkars Ideals and Socio Political Inclusion ...
Online Voices, Offline Impact Ambedkars Ideals and Socio Political Inclusion ...
ijtsrd
 
Problems and Challenges of Agro Entreprenurship A Study
Problems and Challenges of Agro Entreprenurship A StudyProblems and Challenges of Agro Entreprenurship A Study
Problems and Challenges of Agro Entreprenurship A Study
ijtsrd
 
Comparative Analysis of Total Corporate Disclosure of Selected IT Companies o...
Comparative Analysis of Total Corporate Disclosure of Selected IT Companies o...Comparative Analysis of Total Corporate Disclosure of Selected IT Companies o...
Comparative Analysis of Total Corporate Disclosure of Selected IT Companies o...
ijtsrd
 
The Impact of Educational Background and Professional Training on Human Right...
The Impact of Educational Background and Professional Training on Human Right...The Impact of Educational Background and Professional Training on Human Right...
The Impact of Educational Background and Professional Training on Human Right...
ijtsrd
 
A Study on the Effective Teaching Learning Process in English Curriculum at t...
A Study on the Effective Teaching Learning Process in English Curriculum at t...A Study on the Effective Teaching Learning Process in English Curriculum at t...
A Study on the Effective Teaching Learning Process in English Curriculum at t...
ijtsrd
 
The Role of Mentoring and Its Influence on the Effectiveness of the Teaching ...
The Role of Mentoring and Its Influence on the Effectiveness of the Teaching ...The Role of Mentoring and Its Influence on the Effectiveness of the Teaching ...
The Role of Mentoring and Its Influence on the Effectiveness of the Teaching ...
ijtsrd
 
Design Simulation and Hardware Construction of an Arduino Microcontroller Bas...
Design Simulation and Hardware Construction of an Arduino Microcontroller Bas...Design Simulation and Hardware Construction of an Arduino Microcontroller Bas...
Design Simulation and Hardware Construction of an Arduino Microcontroller Bas...
ijtsrd
 
Sustainable Energy by Paul A. Adekunte | Matthew N. O. Sadiku | Janet O. Sadiku
Sustainable Energy by Paul A. Adekunte | Matthew N. O. Sadiku | Janet O. SadikuSustainable Energy by Paul A. Adekunte | Matthew N. O. Sadiku | Janet O. Sadiku
Sustainable Energy by Paul A. Adekunte | Matthew N. O. Sadiku | Janet O. Sadiku
ijtsrd
 
Concepts for Sudan Survey Act Implementations Executive Regulations and Stand...
Concepts for Sudan Survey Act Implementations Executive Regulations and Stand...Concepts for Sudan Survey Act Implementations Executive Regulations and Stand...
Concepts for Sudan Survey Act Implementations Executive Regulations and Stand...
ijtsrd
 
Towards the Implementation of the Sudan Interpolated Geoid Model Khartoum Sta...
Towards the Implementation of the Sudan Interpolated Geoid Model Khartoum Sta...Towards the Implementation of the Sudan Interpolated Geoid Model Khartoum Sta...
Towards the Implementation of the Sudan Interpolated Geoid Model Khartoum Sta...
ijtsrd
 
Activating Geospatial Information for Sudans Sustainable Investment Map
Activating Geospatial Information for Sudans Sustainable Investment MapActivating Geospatial Information for Sudans Sustainable Investment Map
Activating Geospatial Information for Sudans Sustainable Investment Map
ijtsrd
 
Educational Unity Embracing Diversity for a Stronger Society
Educational Unity Embracing Diversity for a Stronger SocietyEducational Unity Embracing Diversity for a Stronger Society
Educational Unity Embracing Diversity for a Stronger Society
ijtsrd
 
Integration of Indian Indigenous Knowledge System in Management Prospects and...
Integration of Indian Indigenous Knowledge System in Management Prospects and...Integration of Indian Indigenous Knowledge System in Management Prospects and...
Integration of Indian Indigenous Knowledge System in Management Prospects and...
ijtsrd
 
DeepMask Transforming Face Mask Identification for Better Pandemic Control in...
DeepMask Transforming Face Mask Identification for Better Pandemic Control in...DeepMask Transforming Face Mask Identification for Better Pandemic Control in...
DeepMask Transforming Face Mask Identification for Better Pandemic Control in...
ijtsrd
 
Streamlining Data Collection eCRF Design and Machine Learning
Streamlining Data Collection eCRF Design and Machine LearningStreamlining Data Collection eCRF Design and Machine Learning
Streamlining Data Collection eCRF Design and Machine Learning
ijtsrd
 

More from ijtsrd (20)

‘Six Sigma Technique’ A Journey Through its Implementation
‘Six Sigma Technique’ A Journey Through its Implementation‘Six Sigma Technique’ A Journey Through its Implementation
‘Six Sigma Technique’ A Journey Through its Implementation
 
Edge Computing in Space Enhancing Data Processing and Communication for Space...
Edge Computing in Space Enhancing Data Processing and Communication for Space...Edge Computing in Space Enhancing Data Processing and Communication for Space...
Edge Computing in Space Enhancing Data Processing and Communication for Space...
 
Dynamics of Communal Politics in 21st Century India Challenges and Prospects
Dynamics of Communal Politics in 21st Century India Challenges and ProspectsDynamics of Communal Politics in 21st Century India Challenges and Prospects
Dynamics of Communal Politics in 21st Century India Challenges and Prospects
 
Assess Perspective and Knowledge of Healthcare Providers Towards Elehealth in...
Assess Perspective and Knowledge of Healthcare Providers Towards Elehealth in...Assess Perspective and Knowledge of Healthcare Providers Towards Elehealth in...
Assess Perspective and Knowledge of Healthcare Providers Towards Elehealth in...
 
The Impact of Digital Media on the Decentralization of Power and the Erosion ...
The Impact of Digital Media on the Decentralization of Power and the Erosion ...The Impact of Digital Media on the Decentralization of Power and the Erosion ...
The Impact of Digital Media on the Decentralization of Power and the Erosion ...
 
Online Voices, Offline Impact Ambedkars Ideals and Socio Political Inclusion ...
Online Voices, Offline Impact Ambedkars Ideals and Socio Political Inclusion ...Online Voices, Offline Impact Ambedkars Ideals and Socio Political Inclusion ...
Online Voices, Offline Impact Ambedkars Ideals and Socio Political Inclusion ...
 
Problems and Challenges of Agro Entreprenurship A Study
Problems and Challenges of Agro Entreprenurship A StudyProblems and Challenges of Agro Entreprenurship A Study
Problems and Challenges of Agro Entreprenurship A Study
 
Comparative Analysis of Total Corporate Disclosure of Selected IT Companies o...
Comparative Analysis of Total Corporate Disclosure of Selected IT Companies o...Comparative Analysis of Total Corporate Disclosure of Selected IT Companies o...
Comparative Analysis of Total Corporate Disclosure of Selected IT Companies o...
 
The Impact of Educational Background and Professional Training on Human Right...
The Impact of Educational Background and Professional Training on Human Right...The Impact of Educational Background and Professional Training on Human Right...
The Impact of Educational Background and Professional Training on Human Right...
 
A Study on the Effective Teaching Learning Process in English Curriculum at t...
A Study on the Effective Teaching Learning Process in English Curriculum at t...A Study on the Effective Teaching Learning Process in English Curriculum at t...
A Study on the Effective Teaching Learning Process in English Curriculum at t...
 
The Role of Mentoring and Its Influence on the Effectiveness of the Teaching ...
The Role of Mentoring and Its Influence on the Effectiveness of the Teaching ...The Role of Mentoring and Its Influence on the Effectiveness of the Teaching ...
The Role of Mentoring and Its Influence on the Effectiveness of the Teaching ...
 
Design Simulation and Hardware Construction of an Arduino Microcontroller Bas...
Design Simulation and Hardware Construction of an Arduino Microcontroller Bas...Design Simulation and Hardware Construction of an Arduino Microcontroller Bas...
Design Simulation and Hardware Construction of an Arduino Microcontroller Bas...
 
Sustainable Energy by Paul A. Adekunte | Matthew N. O. Sadiku | Janet O. Sadiku
Sustainable Energy by Paul A. Adekunte | Matthew N. O. Sadiku | Janet O. SadikuSustainable Energy by Paul A. Adekunte | Matthew N. O. Sadiku | Janet O. Sadiku
Sustainable Energy by Paul A. Adekunte | Matthew N. O. Sadiku | Janet O. Sadiku
 
Concepts for Sudan Survey Act Implementations Executive Regulations and Stand...
Concepts for Sudan Survey Act Implementations Executive Regulations and Stand...Concepts for Sudan Survey Act Implementations Executive Regulations and Stand...
Concepts for Sudan Survey Act Implementations Executive Regulations and Stand...
 
Towards the Implementation of the Sudan Interpolated Geoid Model Khartoum Sta...
Towards the Implementation of the Sudan Interpolated Geoid Model Khartoum Sta...Towards the Implementation of the Sudan Interpolated Geoid Model Khartoum Sta...
Towards the Implementation of the Sudan Interpolated Geoid Model Khartoum Sta...
 
Activating Geospatial Information for Sudans Sustainable Investment Map
Activating Geospatial Information for Sudans Sustainable Investment MapActivating Geospatial Information for Sudans Sustainable Investment Map
Activating Geospatial Information for Sudans Sustainable Investment Map
 
Educational Unity Embracing Diversity for a Stronger Society
Educational Unity Embracing Diversity for a Stronger SocietyEducational Unity Embracing Diversity for a Stronger Society
Educational Unity Embracing Diversity for a Stronger Society
 
Integration of Indian Indigenous Knowledge System in Management Prospects and...
Integration of Indian Indigenous Knowledge System in Management Prospects and...Integration of Indian Indigenous Knowledge System in Management Prospects and...
Integration of Indian Indigenous Knowledge System in Management Prospects and...
 
DeepMask Transforming Face Mask Identification for Better Pandemic Control in...
DeepMask Transforming Face Mask Identification for Better Pandemic Control in...DeepMask Transforming Face Mask Identification for Better Pandemic Control in...
DeepMask Transforming Face Mask Identification for Better Pandemic Control in...
 
Streamlining Data Collection eCRF Design and Machine Learning
Streamlining Data Collection eCRF Design and Machine LearningStreamlining Data Collection eCRF Design and Machine Learning
Streamlining Data Collection eCRF Design and Machine Learning
 

Recently uploaded

Digital Artifact 2 - Investigating Pavilion Designs
Digital Artifact 2 - Investigating Pavilion DesignsDigital Artifact 2 - Investigating Pavilion Designs
Digital Artifact 2 - Investigating Pavilion Designs
chanes7
 
special B.ed 2nd year old paper_20240531.pdf
special B.ed 2nd year old paper_20240531.pdfspecial B.ed 2nd year old paper_20240531.pdf
special B.ed 2nd year old paper_20240531.pdf
Special education needs
 
How to Make a Field invisible in Odoo 17
How to Make a Field invisible in Odoo 17How to Make a Field invisible in Odoo 17
How to Make a Field invisible in Odoo 17
Celine George
 
Supporting (UKRI) OA monographs at Salford.pptx
Supporting (UKRI) OA monographs at Salford.pptxSupporting (UKRI) OA monographs at Salford.pptx
Supporting (UKRI) OA monographs at Salford.pptx
Jisc
 
Introduction to AI for Nonprofits with Tapp Network
Introduction to AI for Nonprofits with Tapp NetworkIntroduction to AI for Nonprofits with Tapp Network
Introduction to AI for Nonprofits with Tapp Network
TechSoup
 
Acetabularia Information For Class 9 .docx
Acetabularia Information For Class 9  .docxAcetabularia Information For Class 9  .docx
Acetabularia Information For Class 9 .docx
vaibhavrinwa19
 
JEE1_This_section_contains_FOUR_ questions
JEE1_This_section_contains_FOUR_ questionsJEE1_This_section_contains_FOUR_ questions
JEE1_This_section_contains_FOUR_ questions
ShivajiThube2
 
Unit 2- Research Aptitude (UGC NET Paper I).pdf
Unit 2- Research Aptitude (UGC NET Paper I).pdfUnit 2- Research Aptitude (UGC NET Paper I).pdf
Unit 2- Research Aptitude (UGC NET Paper I).pdf
Thiyagu K
 
Francesca Gottschalk - How can education support child empowerment.pptx
Francesca Gottschalk - How can education support child empowerment.pptxFrancesca Gottschalk - How can education support child empowerment.pptx
Francesca Gottschalk - How can education support child empowerment.pptx
EduSkills OECD
 
Chapter 4 - Islamic Financial Institutions in Malaysia.pptx
Chapter 4 - Islamic Financial Institutions in Malaysia.pptxChapter 4 - Islamic Financial Institutions in Malaysia.pptx
Chapter 4 - Islamic Financial Institutions in Malaysia.pptx
Mohd Adib Abd Muin, Senior Lecturer at Universiti Utara Malaysia
 
The Challenger.pdf DNHS Official Publication
The Challenger.pdf DNHS Official PublicationThe Challenger.pdf DNHS Official Publication
The Challenger.pdf DNHS Official Publication
Delapenabediema
 
Lapbook sobre os Regimes Totalitários.pdf
Lapbook sobre os Regimes Totalitários.pdfLapbook sobre os Regimes Totalitários.pdf
Lapbook sobre os Regimes Totalitários.pdf
Jean Carlos Nunes Paixão
 
A Strategic Approach: GenAI in Education
A Strategic Approach: GenAI in EducationA Strategic Approach: GenAI in Education
A Strategic Approach: GenAI in Education
Peter Windle
 
BÀI TẬP BỔ TRỢ TIẾNG ANH GLOBAL SUCCESS LỚP 3 - CẢ NĂM (CÓ FILE NGHE VÀ ĐÁP Á...
BÀI TẬP BỔ TRỢ TIẾNG ANH GLOBAL SUCCESS LỚP 3 - CẢ NĂM (CÓ FILE NGHE VÀ ĐÁP Á...BÀI TẬP BỔ TRỢ TIẾNG ANH GLOBAL SUCCESS LỚP 3 - CẢ NĂM (CÓ FILE NGHE VÀ ĐÁP Á...
BÀI TẬP BỔ TRỢ TIẾNG ANH GLOBAL SUCCESS LỚP 3 - CẢ NĂM (CÓ FILE NGHE VÀ ĐÁP Á...
Nguyen Thanh Tu Collection
 
Azure Interview Questions and Answers PDF By ScholarHat
Azure Interview Questions and Answers PDF By ScholarHatAzure Interview Questions and Answers PDF By ScholarHat
Azure Interview Questions and Answers PDF By ScholarHat
Scholarhat
 
The approach at University of Liverpool.pptx
The approach at University of Liverpool.pptxThe approach at University of Liverpool.pptx
The approach at University of Liverpool.pptx
Jisc
 
Pride Month Slides 2024 David Douglas School District
Pride Month Slides 2024 David Douglas School DistrictPride Month Slides 2024 David Douglas School District
Pride Month Slides 2024 David Douglas School District
David Douglas School District
 
Chapter 3 - Islamic Banking Products and Services.pptx
Chapter 3 - Islamic Banking Products and Services.pptxChapter 3 - Islamic Banking Products and Services.pptx
Chapter 3 - Islamic Banking Products and Services.pptx
Mohd Adib Abd Muin, Senior Lecturer at Universiti Utara Malaysia
 
STRAND 3 HYGIENIC PRACTICES.pptx GRADE 7 CBC
STRAND 3 HYGIENIC PRACTICES.pptx GRADE 7 CBCSTRAND 3 HYGIENIC PRACTICES.pptx GRADE 7 CBC
STRAND 3 HYGIENIC PRACTICES.pptx GRADE 7 CBC
kimdan468
 
June 3, 2024 Anti-Semitism Letter Sent to MIT President Kornbluth and MIT Cor...
June 3, 2024 Anti-Semitism Letter Sent to MIT President Kornbluth and MIT Cor...June 3, 2024 Anti-Semitism Letter Sent to MIT President Kornbluth and MIT Cor...
June 3, 2024 Anti-Semitism Letter Sent to MIT President Kornbluth and MIT Cor...
Levi Shapiro
 

Recently uploaded (20)

Digital Artifact 2 - Investigating Pavilion Designs
Digital Artifact 2 - Investigating Pavilion DesignsDigital Artifact 2 - Investigating Pavilion Designs
Digital Artifact 2 - Investigating Pavilion Designs
 
special B.ed 2nd year old paper_20240531.pdf
special B.ed 2nd year old paper_20240531.pdfspecial B.ed 2nd year old paper_20240531.pdf
special B.ed 2nd year old paper_20240531.pdf
 
How to Make a Field invisible in Odoo 17
How to Make a Field invisible in Odoo 17How to Make a Field invisible in Odoo 17
How to Make a Field invisible in Odoo 17
 
Supporting (UKRI) OA monographs at Salford.pptx
Supporting (UKRI) OA monographs at Salford.pptxSupporting (UKRI) OA monographs at Salford.pptx
Supporting (UKRI) OA monographs at Salford.pptx
 
Introduction to AI for Nonprofits with Tapp Network
Introduction to AI for Nonprofits with Tapp NetworkIntroduction to AI for Nonprofits with Tapp Network
Introduction to AI for Nonprofits with Tapp Network
 
Acetabularia Information For Class 9 .docx
Acetabularia Information For Class 9  .docxAcetabularia Information For Class 9  .docx
Acetabularia Information For Class 9 .docx
 
JEE1_This_section_contains_FOUR_ questions
JEE1_This_section_contains_FOUR_ questionsJEE1_This_section_contains_FOUR_ questions
JEE1_This_section_contains_FOUR_ questions
 
Unit 2- Research Aptitude (UGC NET Paper I).pdf
Unit 2- Research Aptitude (UGC NET Paper I).pdfUnit 2- Research Aptitude (UGC NET Paper I).pdf
Unit 2- Research Aptitude (UGC NET Paper I).pdf
 
Francesca Gottschalk - How can education support child empowerment.pptx
Francesca Gottschalk - How can education support child empowerment.pptxFrancesca Gottschalk - How can education support child empowerment.pptx
Francesca Gottschalk - How can education support child empowerment.pptx
 
Chapter 4 - Islamic Financial Institutions in Malaysia.pptx
Chapter 4 - Islamic Financial Institutions in Malaysia.pptxChapter 4 - Islamic Financial Institutions in Malaysia.pptx
Chapter 4 - Islamic Financial Institutions in Malaysia.pptx
 
The Challenger.pdf DNHS Official Publication
The Challenger.pdf DNHS Official PublicationThe Challenger.pdf DNHS Official Publication
The Challenger.pdf DNHS Official Publication
 
Lapbook sobre os Regimes Totalitários.pdf
Lapbook sobre os Regimes Totalitários.pdfLapbook sobre os Regimes Totalitários.pdf
Lapbook sobre os Regimes Totalitários.pdf
 
A Strategic Approach: GenAI in Education
A Strategic Approach: GenAI in EducationA Strategic Approach: GenAI in Education
A Strategic Approach: GenAI in Education
 
BÀI TẬP BỔ TRỢ TIẾNG ANH GLOBAL SUCCESS LỚP 3 - CẢ NĂM (CÓ FILE NGHE VÀ ĐÁP Á...
BÀI TẬP BỔ TRỢ TIẾNG ANH GLOBAL SUCCESS LỚP 3 - CẢ NĂM (CÓ FILE NGHE VÀ ĐÁP Á...BÀI TẬP BỔ TRỢ TIẾNG ANH GLOBAL SUCCESS LỚP 3 - CẢ NĂM (CÓ FILE NGHE VÀ ĐÁP Á...
BÀI TẬP BỔ TRỢ TIẾNG ANH GLOBAL SUCCESS LỚP 3 - CẢ NĂM (CÓ FILE NGHE VÀ ĐÁP Á...
 
Azure Interview Questions and Answers PDF By ScholarHat
Azure Interview Questions and Answers PDF By ScholarHatAzure Interview Questions and Answers PDF By ScholarHat
Azure Interview Questions and Answers PDF By ScholarHat
 
The approach at University of Liverpool.pptx
The approach at University of Liverpool.pptxThe approach at University of Liverpool.pptx
The approach at University of Liverpool.pptx
 
Pride Month Slides 2024 David Douglas School District
Pride Month Slides 2024 David Douglas School DistrictPride Month Slides 2024 David Douglas School District
Pride Month Slides 2024 David Douglas School District
 
Chapter 3 - Islamic Banking Products and Services.pptx
Chapter 3 - Islamic Banking Products and Services.pptxChapter 3 - Islamic Banking Products and Services.pptx
Chapter 3 - Islamic Banking Products and Services.pptx
 
STRAND 3 HYGIENIC PRACTICES.pptx GRADE 7 CBC
STRAND 3 HYGIENIC PRACTICES.pptx GRADE 7 CBCSTRAND 3 HYGIENIC PRACTICES.pptx GRADE 7 CBC
STRAND 3 HYGIENIC PRACTICES.pptx GRADE 7 CBC
 
June 3, 2024 Anti-Semitism Letter Sent to MIT President Kornbluth and MIT Cor...
June 3, 2024 Anti-Semitism Letter Sent to MIT President Kornbluth and MIT Cor...June 3, 2024 Anti-Semitism Letter Sent to MIT President Kornbluth and MIT Cor...
June 3, 2024 Anti-Semitism Letter Sent to MIT President Kornbluth and MIT Cor...
 

Analysis of Rework and Rescheduling in Construction Project using SPSS Software

  • 1. International Journal of Trend in Scientific Research and Development (IJTSRD) Volume 4 Issue 4, June 2020 Available Online: www.ijtsrd.com e-ISSN: 2456 – 6470 @ IJTSRD | Unique Paper ID – IJTSRD30930 | Volume – 4 | Issue – 4 | May-June 2020 Page 169 Analysis of Rework and Rescheduling in Construction Project using SPSS Software P. Haritha1, Dr. K. Vidhya2 1PG Student, 2Head of the Department, 1,2Mahendra Engineering College, Namakkal, Tamil Nadu, India ABSTRACT Rework is a primary contributor to time wastage and time table overruns which eventually impact on cost, assets and quality. Rework is additionally affecting the mission performance. So minimizing the transform is important one. The goal of the questionnaire survey is to analyze the motives and have an impact on of rework. Questionnaire survey has been carried out among a variety of construction corporations and contractors in Salem District. The questionnaire prepared based totally on motives and influence of rework. Ranking analysis is completed by means of the use of the SPSS (Statistical Package for the Social Sciences).In this analysis it helps to check the stability and consistency of information accumulated from the questionnaire survey. Finding the foremost reasons rescheduling will be done. How to cite this paper: P. Haritha | Dr. K. Vidhya "Analysis of Rework and Rescheduling in Construction Project using SPSS Software" Published in International Journal of Trend in Scientific Research and Development(ijtsrd), ISSN: 2456-6470, Volume-4 | Issue-4, June 2020, pp.169-173, URL: www.ijtsrd.com/papers/ijtsrd30930.pdf Copyright © 2020 by author(s) and International Journal ofTrendinScientific Research and Development Journal. This is an Open Access article distributed under the terms of the Creative Commons Attribution License (CC BY 4.0) (http://creativecommons.org/licenses/by /4.0) 1. INTRODUCTION Rework ability that an motion ought to be executed greater than once in order to attain the designated objectives,which consequences in the needless consumption of extra resources in the form of labor, materials, and services past what would have been used if the motion had been carried out only once. In construction activities, in addition to overruns in the agenda and price transform has the in addition effect of inflicting workable risk with recognize to quality and safety. In the construction industry, rework is widely regarded as an apparent issue that prevents enchantments in productiveness though the hours and price for remodel signify only a small component of the fieldworkas a whole,if fieldwork is viewed to consist of the time and price associated with direct work, support, rework, and delays. However, a frequent faith is that a reduction in rework is a least expensive method to enhancing productivity because most rework may want to be mitigated via enhancing the management of the procedure and growing human performance, neither of which is as high priced as adopting technical innovation in order to enhance productivity. 1.1. DEFINITION OF REWORK Rework is described as ‘the pointless effort of re-doing a procedure or undertaking that used to beincorrectlycarried out at the first time’. Within the development industry, transform has been identified as a vast factor that contributes to value increases and time table delays on projects. Fig 1.1Causes of rework IJTSRD30930
  • 2. International Journal of Trend in Scientific Research and Development (IJTSRD) @ www.ijtsrd.com eISSN: 2456-6470 @ IJTSRD | Unique Paper ID – IJTSRD30930 | Volume – 4 | Issue – 4 | May-June 2020 Page 170 1.2. SOURCES OF REWORK 2. QUESTIONNAIRE SURVEY In the questionnaire survey questions are taken from the journal through literature survey. The questions are based on the causes and impact of the reworks in construction projects. The answer contains a three options (i.e.) agree, neither agree nor disagree, disagree. 2.1. QUESTIONNAIRE MODEL 2.1.1. SECTION A: PROFILE OF RESPONDENT 1. Name of the respondent: ……………………… 2. Name of the company: ………………………... 3. Which of the following best describes your company? 4. How long have you worked in the construction industry? ……………………………………… 5. What is your current position in your organization? ……………………………………… 6. How long have you been in your present position? ……………………………………… 2.1.2. SECTION B: PROJECT CHARACTERISTICS 7. What was the project type? 8. What was the facility type that best describes the project? 9. How much was the original tender sum? ------------------------------------------------------ 10. How much was the final contract sum? 11. What was the project’s original construction period? 12. What was the project’s actual construction period? 13. What type of procurement method was used for the project? 14. What was the project’s gross floor area (m2)? ……………………………………………… 15. How many floors did the project have? ....................................................................... 2.1.3. SECTION C: CAUSES OF REWORK Table 2.1: Client Related Factor Client related factors Agree Neither agree nor disagree Disagree Lack of experience and knowledge of the design process Lack of experience and knowledge of the construction process Lack of funding allocated for site investigations Lack of client involvement in the project Insufficient time and money spent on the briefing process Poor communication with design consultants Poor contract execution
  • 3. International Journal of Trend in Scientific Research and Development (IJTSRD) @ www.ijtsrd.com eISSN: 2456-6470 @ IJTSRD | Unique Paper ID – IJTSRD30930 | Volume – 4 | Issue – 4 | May-June 2020 Page 171 Table 2.2 Design Related Factors Client related factors Agree Neither agree nor disagree Disagree Lack of experience and knowledge of the design process Lack of experience and knowledge of the construction process Lack of funding allocated for site investigations Lack of client involvement in the project Insufficient time and money spent on the briefing process Poor communication with design consultants Poor contract execution 3. SPSS SOFTWARE Its is developed by using Norman H. Nie and C. Hadlai Hullof IBM Corporation in the yr 1968. It is compatible with Windows, Linux, UNIX& Macoperatingsystems.SPSSis amongst the most broadly used packages for statistical analysis in social science. SPSS is a comprehensive and flexible statistical evaluation and data management solution. SPSS is a laptop software used for survey authoring and deployment,statisticsmining, text analytics, statistical analysis, and collaboration and deployment SPSS can take records from nearly any type of file and use them to generate tabulated reports, charts, and plots of distributions and trends, descriptive statistics, and behavior complicated statistical analyses. SPSS is amongst the most extensively used packages for statisticalevaluation in social science. Used in Telecommunications, Banking, Finance, Insurance, Healthcare, Manufacturing, Retail, Consumer packaged goods, Higher education, Government, and Market research. Features of SPSS: It is handy to analyze and use. It consists of a full range of data. Management machine and enhancing tools. It presents in-depth statistical capabilities. It offers whole plotting, reporting and presentation features. 3.1. ENTERING DATA Fig 3.1 Data View In SPSS Software Fig 3.2 Variable View in SPSS Software 3.2. EDITING DATA Fig 3.3 Pivot Table Editor in SPSS Software Fig 3.4 Text Output Editor in SPSS Software Fig 3.5 Get Your Data Into SPSS 4. RANKNG AND ANALYSIS In statistics, "ranking" refers to the data transformation in which numerical or ordinal values arereplacedbytheirrank when the data are sorted. Ranking was done by SPSS software. From that analysis major factors causing reworks and impact of rework should be found.
  • 4. International Journal of Trend in Scientific Research and Development (IJTSRD) @ www.ijtsrd.com eISSN: 2456-6470 @ IJTSRD | Unique Paper ID – IJTSRD30930 | Volume – 4 | Issue – 4 | May-June 2020 Page 172 4.1. Descriptive Statistics Table 4.1 Descriptive Statistics Descriptive Statistics A. Factors N Mean Std. Deviation Changes initiated by contractor to improve quality 10 4.60 1.265 Unclear instruction to workers 10 4.40 1.350 Changes in the method of construction to improve constructability 10 4.40 .966 Changes made by the contractor during construction 10 4.40 1.350 Changes made at the request of the client 10 4.40 1.350 Changes in the method of construction due to site condition 10 4.20 1.687 Failure to provide protection to constructed works 10 4.20 1.398 Incomplete design at the time of tender 10 4.20 1.398 Poor site condition such as water, electricity etc. 10 4.00 1.700 Poor communication with design consultants 10 4.00 1.700 Inadequate Supervisor 10 4.00 1.414 Lack of safety 10 4.00 1.700 Poor planning of workload 10 4.00 1.700 Poor coordination of design 10 4.00 1.414 Lack of client involvement in the project 10 3.80 1.932 Changes initiated by the municipality/regulatory bodies 10 3.40 1.838 Shortage of skilled supervisors 10 3.20 1.135 Schedule acceleration 10 3.20 1.476 Poor planning of resources 10 3.20 1.135 Shortage of skilled labour 10 3.00 1.333 Lack of funding allocated for site investigations 10 2.80 1.135 Poor communication between the workers in site 10 2.40 1.897 Damages caused by subcontractor 10 2.40 1.350 Low labour skill level 10 2.00 1.700 Adverse natural condition 10 2.00 1.700 Use of poor construction material 10 2.00 1.414 Lack of training and experience 10 2.00 1.414 Insufficient skill levels to complete the required task 10 2.00 1.414 Ineffective use of quality management practices 10 2.00 1.414 Omissions of items from the contract documentation 10 2.00 1.700 Errors due to inappropriate construction methods 10 1.80 1.398 Damage to other trades work due to carelessness 10 1.80 1.398 Ineffective use of quality management practices 10 1.80 1.398 Ineffective use of information technologies (e.g. CADD) 10 1.80 1.687 The contactor have a less skill 10 1.60 1.350 Ineffective use of construction standard 10 1.60 .966 Errors made in the contract documentation 10 1.60 .966 Incomplete drawings 10 1.60 .966 Insufficient time and money spent on the briefing process 10 1.60 .966 Poor supervision 10 1.40 .843 Lack of experience and knowledge of the design 10 1.40 1.265 Insufficient time to prepare contract documentation 10 1.20 .632 Poor contract execution 10 1.20 .632 Lack of experience and knowledge of the construction process 10 1.20 .632 Valid N (listwise) 10 4.2. CAUSES OF REWORK Table 4.2 Reliability Statistics Reliability Statistics Cronbach's Alpha N of Items .759 44 4.3. IMPACT OF REWORK Table 4.3 Reliability Statistics Reliability Statistics Cronbach's Alpha N of Items .775 10
  • 5. International Journal of Trend in Scientific Research and Development (IJTSRD) @ www.ijtsrd.com eISSN: 2456-6470 @ IJTSRD | Unique Paper ID – IJTSRD30930 | Volume – 4 | Issue – 4 | May-June 2020 Page 173 5. CONCLUSION In this task literature survey is conducted and studied about the rework, causes of transformandimpactofrework.Based on the literature surveyquestionnaireis organizedandgiven to a variety of development companies. According to the response from the organizations rating will be carried out the usage of SPSS software and evaluation used to be finished by way of statistical methods. From rating major factors causing rework and have an effect on of transform used to be found. Then reschedule used to be performed for a proposed undertaking via Primavera software. REFERENCES [1] S.Raghuram, andR.Nagavinothini,“Investigationonthe Causes and Adverse Effects of ReworksinConstruction Projects and Developing A Rework ReductionModel to Mitigate Time and Cost”,Journal of International Journal of Innovative Research in Science, Engineering and Technology (An ISO 3297: 2007 Certified Organization) Vol. 5, Issue 4, April 2016. [2] Maheshkumar Ramesh Shinde and Purva S Kulkarni “Impact of Supervision on Rework in Construction Industry” International Journal on Recent and Innovation Trends in Computing and Communication ISSN: 2321-8169 Volume: 4 Issue: 1 268 – 270. [3] TarekHegazy, Mohamed Said and MoustafaKassab “Incorporating rework into construction schedule analysis” Journal of Automation in Construction 20 (2011) 1051–1059 [4] Bon-Gang Hwang,Stephen R. Thomas, M.ASCE, Carl T. Haas, M.ASCE, and Carlos H. Caldas, M.ASCE “Measuring the Impact of Rework onConstructionCost Performance” JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT © ASCE / MARCH 2009 / 187. [5] Peter E. D. Love, ZahirIrani, and David J. Edwards “A Rework Reduction Model for Construction Projects” Journal of IEEE TRANSACTIONS ON ENGINEERING MANAGEMENT, VOL. 51, NO. 4, NOVEMBER 2004. [6] L.O. Oyewobi, A.A. Oke, B.O. Ganiyu, A.A. Shittu, R.B. Isa and L. Nwokobia, “The effect of project types on the occurrence of rework in expanding economy”, Journal of Civil Engineering and Construction Technology Vol. 2(6), pp. 119-124. [7] Peter E. D. Love, Ph.D., Sc.D., David J. Edwards, Ph.D. and Jim Smith, “Rework Causation: Emergent Theoretical Insightsand Implications for Research”, Ph.D. Journal of Construction Engineeringand Management, © ASCE, ISSN 0733-9364. [8] Peter E. D ,“Influence of Project Type and Procurement Method on ReworkCosts in Building Construction Projects” Journal of Construction Engineering and Management,Vol. 128, No. 1, February 1,2002.©ASCE, ISSN 0733-9364/2002/1-18–29/ [9] ManjulaDissanayake, Aminah Robinson Fayek, Hans Wolf, Anthony Van Tol“Developing a Standard Approach for Construction Field Rework Assessment”, ASCE 2004 Construction Research 2003Construction Research Congress.