Identifying Motivational and
Qatar Construction Project Management Practices
Hamza.1
, Deepak T. J.2
, Maria. Josephine
1
UEL Student - Faculty of Built Environment
2
Associate Professor, Dean Faculty of Engineering and Technology
3
Faculty of Business and Accounting,
ABSTRACT
Motivation is one of the factors that influence the
productivity of people. Project Managers, Engineers
and Laborers, play a vital role in the management of
projects in a Qatar Construction Industry
success of these projects relies profoundly on their
active participation and effective performance. Hence
it is important to assess the impact of motivation and
demotivation on the performance. The broad objective
of this work is to assess the impact of motivation and
demotivation in QCI. The specific objective of this
paper is identifying the key factors that cause
motivation and de-motivation in QCI. Literature
review, survey with expert opinion and semi
structured interviews were conducted to identify these
factors. Using these factors to conduct specific
motivational programmes will help in improving the
productivity of people on a project.
Keywords: Motivation, Demotivation, Project
Managers, Engineers, Loborers, QCI, Productivity.
1. INTRODUCTION
Project management has been in practice thousands of
years, though it has been evolving in the 20
Corresponding to the argument, be it Egyptians
pyramid or the great wall of china, the emperors
appointed civilians, soldiers and criminals to compete
the construction with the division and management of
different projects. The concept of projec
has been more critical during the Industrial revolution
and the introduction of the classical management
theories which paved way in the most extensive and
@ IJTSRD | Available Online @ www.ijtsrd.com | Special Issue Publication | November
ISSN No: 2456 - 6470 | www.ijtsrd.com | Special Issue
International Journal of Trend in Scientific
Research and Development (IJTSRD)
International Conference on Advanced Engineering
and Information Technology (ICAEIT-2017)
Identifying Motivational and Demotivational Factors in
Construction Project Management Practices
, Maria. Josephine3
, W., Parameswaran. S3
, Venishri. P
Faculty of Built Environment, Linton University College, Mantin, Negeri Sembilan, Malaysia
Faculty of Engineering and Technology,Linton University College,
Negeri Sembilan, Malaysia
Faculty of Business and Accounting, Linton University College, Mantin, Negeri Sembilan, Malaysia
Motivation is one of the factors that influence the
productivity of people. Project Managers, Engineers
play a vital role in the management of
projects in a Qatar Construction Industry (QCI). The
success of these projects relies profoundly on their
active participation and effective performance. Hence
it is important to assess the impact of motivation and
emotivation on the performance. The broad objective
of this work is to assess the impact of motivation and
demotivation in QCI. The specific objective of this
paper is identifying the key factors that cause
motivation in QCI. Literature
eview, survey with expert opinion and semi-
structured interviews were conducted to identify these
factors. Using these factors to conduct specific
motivational programmes will help in improving the
Motivation, Demotivation, Project
Managers, Engineers, Loborers, QCI, Productivity.
Project management has been in practice thousands of
years, though it has been evolving in the 20th
century.
Corresponding to the argument, be it Egyptians
pyramid or the great wall of china, the emperors
appointed civilians, soldiers and criminals to compete
the construction with the division and management of
different projects. The concept of project management
has been more critical during the Industrial revolution
and the introduction of the classical management
theories which paved way in the most extensive and
exclusive way of development of projects. The
industrial revolution has been a
history because of the emergence oil rich countries of
the East. The evolution has been tougher and complex
with the emergence of Globalization. The virtual and
current modernization in the Middle East construction
and built environment has evidenced a greater
recognition and growth in the management of
projects.
Its quite surprising to note that Qatar is a developing
country however, the country’s GDP is $143,788. The
country is an exceptional case when it counts with the
relationship with the developing country and GDP.
The reason for being an exception case is majority of
the citizens enjoy the luxuries of the developed world
with their elite lifestyles. The reason for being a
developing country is the gap between the extreme
poverty and extreme richness which had led to HDI of
0.85 pushing it to the category of developing country.
One of the reason behind is low index is its excess
expenditure on the Infrastructure projects. Thus,
brings the significance of the project management in
the country along with the recent announcement of
FIFA 2022 World Cup hosting rights. Therefore,
identifying the pertinent factors demotivating the
project management success in Qatar construction has
been taken as the main area of the study.
Therefore, the objective of this research is to identify,
motivational and demotivational factors in Qatar
construction project management practices.
November 2018 P - 34
Special Issue Publication
International Conference on Advanced Engineering
Demotivational Factors in
Construction Project Management Practices
, Venishri. P3
Negeri Sembilan, Malaysia
,Linton University College, Mantin,
Mantin, Negeri Sembilan, Malaysia
exclusive way of development of projects. The
industrial revolution has been a wider remark in the
history because of the emergence oil rich countries of
the East. The evolution has been tougher and complex
with the emergence of Globalization. The virtual and
current modernization in the Middle East construction
t has evidenced a greater
recognition and growth in the management of
Its quite surprising to note that Qatar is a developing
country however, the country’s GDP is $143,788. The
country is an exceptional case when it counts with the
with the developing country and GDP.
The reason for being an exception case is majority of
the citizens enjoy the luxuries of the developed world
with their elite lifestyles. The reason for being a
developing country is the gap between the extreme
and extreme richness which had led to HDI of
0.85 pushing it to the category of developing country.
One of the reason behind is low index is its excess
expenditure on the Infrastructure projects. Thus,
brings the significance of the project management in
the country along with the recent announcement of
FIFA 2022 World Cup hosting rights. Therefore,
identifying the pertinent factors demotivating the
project management success in Qatar construction has
been taken as the main area of the study.
he objective of this research is to identify,
motivational and demotivational factors in Qatar
construction project management practices.
International Journal of Trend in Scientific Research and Development (IJTSRD) | ISSN: 2456-647
@ IJTSRD | Available Online @ www.ijtsrd.com | Special Issue Publication | November 2018 P - 35
1.1. Global Context
According to a recent survey construction projects are
accepted as a prominent factor in many industrialized
countries which contributes to the economy of the
country (Proverbs & Olomolaiye, 1999). 10% of
national income in most of the developing countries
has been a contributed by construction industry
(Navon, 2005). Therefore, the contribution of
construction industry has been more significant in the
developing countries compared to the developed
countries. Thus, bringing the significance of project
management in construction industries in the
developing countries.
1.2. Project vs Project Management
According to Stanley E. Portny (2013), Projects have
been around for ages. For example, the ark built by
Noah, Mona Lisa painted by the famous Leonardo Da
Vinci, the Decline and Fall of the Roman Empire
written by Edward Gibbon, the polio vaccine
developed by Jonas Salk — all projects. These were
all huge projects and very successful ones. Laurie S.
Keller & Mike Field (1998) definition of Project is
that it is methodized task headed for a predefined
target which depends upon resources and effort, a
unique and risky venture containing a schedule and
budget.
Joan Knudson & Ira Bitz (1991) stated that a project
is a properly methodized product which advances
stage by stage having a beginning, end and a
deliverable like a ladder where every step is crucial.
PMI’s edition of PMBOK (2000) defines Project as a
temporary group activity designed to produce a
unique product, service or result. It has a definite
beginning and end in time, and therefore specified
scope and resources. The project is unique which
means that it is not a routine operation, but a specific
set of operations designed to accomplish a singular
goal. Therefore, project teams are made up of staffs
who are not even working all together – sometimes
from different organizations and across multiple
geographies.
Stanley E. Portny (2013) further states that a project is
a brief task implemented to create a unique service,
product, or result. The following three components
are part of every project:
 Schedule: timetable with dates stating the project
beginning and end
 Required Resources: the crucial elements such as
number of staff, investment and other resources
 Specific Scope: Desired result or product
 Larry (2002) describes project as short lives since
it has a beginning and an end.
 Five Main Characteristics of a Project
 A Defined Beginning, End, Schedule, and
Approach
 All resources are specifically allocated to the work
 Results have specified goals such as (cost, time,
performance/quality)
 A planned and organized approach is taken
 A group of people are involved
There is always a distinction between project and
project management. A project is a series of activities
established to achieve the specific objectives and
consumes resources over a period of time. A project
should be completed within a specified time and it has
a definite start and end period whereas, project
management is a concept where in a set of rules and
regulations has been applied to control the routine
operation of the company (Munns & Bjeirmi, 1996).
Jack J. Phillips, Wayne Brantley, and Patricia Pulliam
Phillips (2012) definition of Project management is
that it is not a new idea or concept. Project
Management is as ancient as the Egyptian pyramids.
The magnificent pyramids built by the Pharaohs in
ancient Egypt used procedures that remain in mystery
today.
John J. McKeon (2011) describes Project
management in his book “Becoming a Construction
Manager” as “applied to a construction project, the
use of integrated systems and procedures by the
project team to accomplish design and construction.
Project management is an integral function of
construction management.” Whereas, construction
management is defined as a professional management
practice towards construction projects, from project
initiation to completion, for the intention of
monitoring time, cost, scope and quality (John J.
McKeon 2011).
MPUG’s (2013) definition of Project management or
program management as it is sometimes called is that
it is the technique of arranging the elements of a
project, whether the project is improvement of a
recent brand, the establishment of a new operation, an
advertising campaign, or even a wedding. A project is
not a part of a daily routine. It’s designed once, it’s
brief, and it’s precise. A professional engineer
describes it as, “It has a beginning and an end.” A
International Journal of Trend in Scientific Research and Development (IJTSRD) | ISSN: 2456-647
@ IJTSRD | Available Online @ www.ijtsrd.com | Special Issue Publication | November 2018 P - 36
project uses up all the resources (such as materials,
personnel, funds or time), and it has investment
restrictions. (MPUG 2013).
PMI, which is known as world’s leading professional
society for project management, defines Project
Management, in their guide PMBOK (2000), then, as
the practice of linking techniques, skills and
knowledge to complete projects effectively and
efficiently. It’s an important approach for
organizations, which enables them to link project
outcomes to business goals which gives them the edge
in the business hub (PMBOK 2000).
Joan Knudson & Ira Bitz (1991) states that Project
management is required for the effective management
to produce results in an appropriate and goal specific
environment since it consists of a guideline with
principles, methods, tools and techniques. Techniques
such as good negotiation, communication and
analytical skills are crucial part of this approach.
In the world of today, project management is
becoming a crucial approach and if followed properly
it is one of the key elements for project success.
Project management enables managers to design and
handle vital decisions which create new gains in
expanding divisions of the market. Project
management serves as a guide tool which helps to
minimize time to market, control expenses, assure
quality in products, and increase revenues. Larry
(2002) suggests “Project management is one of the
most important management techniques for ensuring
the success of an organization.”
Gary Picariello (2013) says Project management is a
set of guidelines containing tools which allows
managers to guide a project from one point to another
and do so in an effective way that demonstrates
efficiency, cost-savings and plain ‘old ingenuity’.
(Gary Picariello 2013)
As mentioned before, project management has been
there as far as human existence goes. Before any
activity takes place, there is always a thought given to
how it will be carried out and whether it is being
carried out the correct way. This is called Planning
and is the initiative stage in project management.
Then, after a lot of thinking it is carried out, and this
is called execution. From simple concepts such as
making a cup of tea, to much more complex ideas like
skyscrapers, if a proper planning, management and
execution is not done, then it will be a project failure.
Just like a game of chess, one bad move and you lose!
This is why careful planning and proper scheming has
to be done in order to achieve the best results.
Gale & Fellows (1990); Ofori (1990) suggest that the
Construction industry in all countries faces many
difficulties and challenges. Brian Miller (2012) says
“The purpose of project management is to foresee or
predict as many dangers and problems as possible;
and to plan, organise and control activities so that the
project is completed as successfully as possible in
spite of all the risks.” His research concludes that an
ideal project is one in which three objectives are
successfully achieved: Performance and Quality,
Budget and Time Completion.
According to Gary Picariello (2011), he regards the
relationship between the project manager, client and
worker as very crucial to project success. He further
states that knowledge, skills, tools and techniques of
the three mentioned will deliver a successful project.
In line with the article written by Gary Picariello
(2011), the following are stated as the key advantages
of project management:
Improved Efficiency in Carrying Out the Project:
Project management serves as a guideline that is
easily followed and leads to project completion.
Customer Satisfaction has increased:
A customer is always glad and satisfied whenever a
project is carried out on time and within the available
budget. Intelligent project management provides the
guidelines and tools that enable the customer and
project manager relationship to flourish.
Improved Effectiveness in Delivering of Services:
The steps are approximately the same for every
project just the working environment and the situation
is altered.
Project Success brings in confidence, growth and
development within the team:
Positive results bring in respect and inspire the team
to continue to search for ways to perform more
efficiently.
A Competitive Edge in the Business Hub:
A successful and excellent performance is always
required to gain a fair share of the construction
market.
International Journal of Trend in Scientific Research and Deve
@ IJTSRD | Available Online @ www.ijtsrd.com
Chances to Grow the Company:
Successful projects always lead to new chances to
grow in the market.
More Elasticity in Approach is Available
Project Management has a wide scope and a lot of
approaches can be taken depending on the situation.
Risk Assessment Increases:
Project Management provides the necessary risk
assessment to be taken before project initiation as that
assists to avoid mistakes.
Quality is Raised and therefore there is Increase in
Quantity:
Effective Project Management means a raise in
quality work. Increase in quality is often the result of
better efficiency
Gary Picariello (2011) further states that
management strategies are put into action, the desired
goals are achieved and the best thing is that it is
within the specific time and cost perimeters. It
provides the most essential guidelines required for a
successful project.
Donald S. Barrie & Boyd C. Paulson (1992) refers to
Project Management as a modern-day tool which has
perfected the projects in construction industry
bringing in more organization and discipline and a
smoother flow of work. The following are the factors
which are vital to the success of project management
as researched by Hubbard, (1990); Jaselskis and
Ashley, (1991); Belout (1998); Chua et al. (1999);
Walker and Vines, (2000):
 Communication among the project team members
 Implementing an effective health and safety
program
 Control of sub-contractors works
 Overall managerial actions.
 Feedback capabilities
 Planning effort
 An appropriate organization structure
 Control Mechanism
As a host of FIFA world cup 2022, it is highly vital to
identify the demotivational factors in
industry in order to mark the success of the country.
With huge limitations of time constraints and the short
time burden, it becomes an increasing burden to the
host to mark for a quality project. Conjoint to this, the
literature has attempted to derive the factors identified
International Journal of Trend in Scientific Research and Development (IJTSRD)
@ IJTSRD | Available Online @ www.ijtsrd.com | Special Issue Publication | November
Successful projects always lead to new chances to
oach is Available:
Project Management has a wide scope and a lot of
approaches can be taken depending on the situation.
Project Management provides the necessary risk
assessment to be taken before project initiation as that
Quality is Raised and therefore there is Increase in
Effective Project Management means a raise in
quality work. Increase in quality is often the result of
Gary Picariello (2011) further states that when project
management strategies are put into action, the desired
goals are achieved and the best thing is that it is
within the specific time and cost perimeters. It
provides the most essential guidelines required for a
rrie & Boyd C. Paulson (1992) refers to
day tool which has
perfected the projects in construction industry
bringing in more organization and discipline and a
smoother flow of work. The following are the factors
l to the success of project management
as researched by Hubbard, (1990); Jaselskis and
Ashley, (1991); Belout (1998); Chua et al. (1999);
Communication among the project team members
Implementing an effective health and safety
An appropriate organization structure
As a host of FIFA world cup 2022, it is highly vital to
identify the demotivational factors in Construction
industry in order to mark the success of the country.
With huge limitations of time constraints and the short
time burden, it becomes an increasing burden to the
host to mark for a quality project. Conjoint to this, the
d to derive the factors identified
as demotivational factors that might be a hindrance
for success in project management of FIFA world cup
2022.
2. Research Method
This research is carried out in two phases: a)
Investigation phase and b) Survey phase. The details
of both these phases are explained below: in Figure
1 illustrates the details of the investigation phase.
Based on the literature survey and expert opinio
list of factors influencing motivation and de
motivation was prepared. Expert opinions were
sought from the senior engineers with 10 years of
field and administrative experience as well as the
faculty guiding research studies in human resource
management. Subsequently, semi
interviews were conducted to narrow down the list
and identify the key motivating and de
factors.
Figure1: Project Phase
2.1. Motivational Factors
Six key Motivational Factors were identified and are
listed below.
i. Achievement
ii. Proper Recognition and rewards
iii. Interesting work
iv. Involvement in Decision Making
v. Professional Advancement
vi. Adequate Training and Development
The study identified six key motivational factors. Out
of these, the four factors ‘achievement’, ‘
work’ ‘proper recognition and awards’ and
| ISSN: 2456-647
November 2018 P - 37
as demotivational factors that might be a hindrance
for success in project management of FIFA world cup
This research is carried out in two phases: a)
Investigation phase and b) Survey phase. The details
of both these phases are explained below: in Figure –
1 illustrates the details of the investigation phase.
Based on the literature survey and expert opinion, a
list of factors influencing motivation and de-
motivation was prepared. Expert opinions were
sought from the senior engineers with 10 years of
field and administrative experience as well as the
faculty guiding research studies in human resource
ment. Subsequently, semi-structured
interviews were conducted to narrow down the list
and identify the key motivating and de-motivating
Figure1: Project Phase
Six key Motivational Factors were identified and are
Proper Recognition and rewards
Involvement in Decision Making
Professional Advancement
Adequate Training and Development
The study identified six key motivational factors. Out
of these, the four factors ‘achievement’, ‘interesting
work’ ‘proper recognition and awards’ and
International Journal of Trend in Scientific Research and Development (IJTSRD) | ISSN: 2456-647
@ IJTSRD | Available Online @ www.ijtsrd.com | Special Issue Publication | November 2018 P - 38
‘advancement’ were selected from the Herzberg’s two
factor theory (1968). According to the experts’
suggestions, ‘growth’, ‘responsibility’ and
‘advancement’ were combined as a single factor
‘advancement’. The other two factors are
‘participation in decision making’ and ‘adequate
training and development’ were taken from literature
(Borcherding, 1977; Soura and Singh, 1998;
Ruthankoon and Ogunlana, 2003) and ratified by the
experts and field engineers. In the survey phase, these
factors were presented to 30 Engineers,15 Project
Managers and 30 Clients. As outlined in the
methodology, the respondents were met individually
and were asked to make pair-wise comparison for
importance between each set of key factors through
structured questionnaires.
2.2. Demotivational Factors
Eleven key Demotivational Factors were identified
and are listed below.
1. Poor Work Condition
2. Poor Administration Policy
3. Poor Work Relationship
4. Lack of Communication (English Language)
5. Lack of Appreciation
6. Comparing Colleagues over Benefits Received
7. Poor Labour Productivity
8. Lack of Materials at Site Area
9. Climate and Weather
10. Reworks and Variation of Orders
11. Leadership Styles and Strategies
Six key de-motivational factors such as ‘Poor work
condition’, ‘poor administrative policy’ and ‘Poor
work relationship’ were selected from the Herzberg’s
two factor theory (1968). The factor ‘Comparing
Colleagues over Benefits Received’ was obtained
from Adam’s equity theory (1965). ‘Lack of
communication’ and ‘lack of appreciation’ were
derived from other established studies (Borcherding,
1977; U.S business roundtable proceedings, 1982).
In context to the demotivational factors, English
language played a significant aspect in project
management. With regard to the arguments
concerning Qatar, the multinational task force has
faced a severe communication problem in terms of
English language. As communication can play a
major threat towards the success of a project and its
delay in the construction. There should be clearly
defined communication and clear explanation with
regard to the project management.
2.2.1. Poor Labour productivity
The core input to produce optimum output in a
construction industry is its labour. As labour is
considered to be the most efficient and value- driven
output in a construction industry (Hwand & Soh,
2013).
Jarkas, Kadri & Yoounes(2014) has identified
inappropriate recommendations and specific strategies
are the demotivational factors in project management.
However, there were still arguments that with the
advanced technological factors, construction industry
still remains as labour intensive (Jarkas,
Radosavljevic & Wuyi, 2014). According to a survey
in Qatar, 82% of the engineers opined that poor labour
productivity is one of the prime reason behind the
failure of the projects and excess expenditure on the
budget (Jarkas & Haupat, 2015).
Poor management of the workforce would result in
labour productivity. The construction engineers
should definitely focus on the strategies to improve
the labour productivity. The labour productivity has
several related factors that includes, long working
hours, job satisfaction, leadership, commitment
towards organization and work engagement (Jarkas &
Haupt, 2015; Jarkas, Radosavljevic, et al., 2014, Jurf
& Beheiry, 2012).
In order to organize the FIFA world cup, Qatar has a
long way to address the issues and identify the
demotivational factors in the project management.
2.2.2. Lack of materials
Lack of material is an interlinking factor that causes
low labour productivity that influence the
demotivation factors in project management in
construction industry. Lack of materials at the site
area causes delay in the work and makes the workers
to fall in the category of idle working hours
(Mahamid, 2013). There were multiple factors that
remains as an obstacle for the lack of materials in the
construction area, which includes the shortages of
materials, political triggers and monopolies in the
suppliers. Qatar is no exception to these aspects as it
may have a severe downfall in the situation relating to
lack of materials. Lack of materials is one of the
common obstacles in construction companies which
affects their competitiveness and productivity (El-
Gohary & Aziz, 2014). Jarkas, Radosavljevic & Wuyi
(2014) has also identified that shortage of raw
International Journal of Trend in Scientific Research and Development (IJTSRD) | ISSN: 2456-647
@ IJTSRD | Available Online @ www.ijtsrd.com | Special Issue Publication | November 2018 P - 39
materials has been main factor leading to a project
failure and delay (Deepak & Mommade, 2017).
2.2.3. Reworks and Variation of Orders
Frequent change orders and rework from the clients
also cause the delay in the productivity of the project
in the construction industry. The factors that includes
the reworks includes revised drawings in the design
and the layout plan which might lead to the project
delays as well as low productivity consequently
leading to project demotivational factors in the
construction industry. This leads to variation of order
in contracts. The Drawings quality and level of
rework has contributed to the project failure as it
consumes more time and consequently results in a
project failure (Jarkas, et al., 2014).
2.2.4. Climate and Weather conditions
Chinnadurai, Venugopal, Kumaravel and Para mesh
(2016) has argued that the temperature and weather
condition are significant issues that influences the
labour productivity. An increase in temperature has
negative effect on the productivity in the construction
industry. The speed of the work decreases with the
increase in temperature in cold and hot weather
(Moselhi& Khan, 2012).
2.2.5. Leadership styles and Strategies
Determination of leadership style for the success is
very challenging aspect concerned with the project
management. Conversely it influences the
productivity (Arshi Shakeel & Sameh Monir, 2006;
Enshassi et al., 2007b; Enshassi et al., 2009). Though,
in a project management the determination of the
leadership can be task oriented and relations-oriented.
However, it is very difficult to determine the best
leadership style in a project which suits the nature of
the project. As there are different arguments
concerning the authentic leadership styles and
authoritive leadership style and its impact on project
management. It is very difficult to determine the
strategies. There should be positive and motivative
leader to lead the team with high sense of ethic and
morality which can lead to the success of a project
management.
3. CONCLUSIONS
This study identified the key factors that motivate and
de-motivate the construction industry in Qatar. The
study shows the findings of Herzberg’s theory to be
relevant to the engineers in Qatar construction
Industry. Intrinsic motivators comparatively play a
vital role for many workers in any projects. The
interesting nature of the construction work has to be
properly utilized by the organization along with
providing achievable goals to improve the motivation
level. Similarly, the organization has to address the
poor administrative policies and the poor work
conditions to reduce de-motivation.
Further study about the key factors will help in
identifying the underlying reason for more detailed
analysis. These reasons should be used to evaluate the
root cause of the problem. Thus, the organization can
plan their motivational programs based on these
details with periodical assessment to induce
motivation and reduce de-motivation.
4. REFERENCES
1. Abdulaziz M. Jarkas, Milan Radosavljevic, Liu
Wuyi, (2014) "Prominent demotivational
Factors influencing the productivity of construction
project managers in Qatar", International Journal of
Productivity and Performance Management, 63(8),
pp.1070-1090, https://doi.org/10.1108/IJPPM-11-
2013-0187.
2. Chinnadurai, J., Vengugopal, V., Kumaravel, P.,
& Paramesh, R. (2016). Influence of occupational
heat stress on labour productivity – a case study
from Chennai, India. International Journal of
Productivity and Performance, 65, 245-255.
3. El-Gohary, K. M., & Aziz, R. F. (2014). Factors
influencing construction labor productivity in
Egypt. Journal of Management in Engineering,
30(1), 1-9.
4. Jarkas, A. M., & Haupt, T. C. (2015). Major
construction risk factors considered by general
Contractors in Qatar. Journal of Engineering,
Design and Technology, 13, 165-194.
doi:10.1108/JEDT-03-2014-0012
5. Jarkas, A. M., Kadri, C. Y., & Younes, J. H.
(2014). A survey of factors influencing the
Productivity of construction operatives in the State
of Qatar. International Journal of Construction
Management, 12(3), 1-23.
doi:10.1080/15623599.2012.10773
6. Jarkas, A. M., Radosavljevic, M., & Wuyi, L.
(2014). Prominent demotivational factors
influencing the productivity of construction
project managers in Qatar. International Journal of
Productivity and Performance Management, 63,
1070- 1090. Doi: 10.1108/IJPPM-11-2013-0187.
International Journal of Trend in Scientific Research and Development (IJTSRD) | ISSN: 2456-647
@ IJTSRD | Available Online @ www.ijtsrd.com | Special Issue Publication | November 2018 P - 40
7. Jurf, N. A., & Beheiry, S. (2012). Factors
affecting cost and schedule in Qatar’s residential
Compound projects. International Journal of
Engineering Management and Economics, 3, 117-
134. doi:10.150/IJEME.2012.048608
8. Mahamid, I. (2013). Contractors perspective
toward factors affecting labor productivity in
building construction. Engineering, Construction
and Architectural Management, 20, 446-460. Doi:
10.1108/ECAM-08-2011-0074.
9. Moselhi, O., & Khan, Z. (2012). Significance
ranking of parameters impacting construction
labor productivity. Construction Innovation, 12,
272-296. doi:10.1108/14714171211244541
10. Navon, R. (2005). Automated project performance
control of construction projects, Journal of
Automation in Construction 14, 467–476.
11. Proverbs, D. G.; Holt, G. D.; Olomolaiye, P. O.
(1999). Factors impacting construction project
duration: a comparison between France, Germany
and the U.K., Journal of Building and
Environment 34, 197–204.

More Related Content

Similar to Identifying Motivational and Demotivational Factors in Qatar Construction Project Management Practices

IRJET- Development of R&D Project Management Model in Indian Construction Ind...
IRJET- Development of R&D Project Management Model in Indian Construction Ind...IRJET- Development of R&D Project Management Model in Indian Construction Ind...
IRJET- Development of R&D Project Management Model in Indian Construction Ind...IRJET Journal
 
IRJET- Case Study on Budget and Schedule Overrun During the Construction Phas...
IRJET- Case Study on Budget and Schedule Overrun During the Construction Phas...IRJET- Case Study on Budget and Schedule Overrun During the Construction Phas...
IRJET- Case Study on Budget and Schedule Overrun During the Construction Phas...IRJET Journal
 
Infrastructural Development as a Means of Attracting Foreign Direct Investmen...
Infrastructural Development as a Means of Attracting Foreign Direct Investmen...Infrastructural Development as a Means of Attracting Foreign Direct Investmen...
Infrastructural Development as a Means of Attracting Foreign Direct Investmen...ijtsrd
 
Project and Change Management Success Factors from Malaysian Government Depar...
Project and Change Management Success Factors from Malaysian Government Depar...Project and Change Management Success Factors from Malaysian Government Depar...
Project and Change Management Success Factors from Malaysian Government Depar...IOSR Journals
 
Entrepreneurial Mindset for Engineering Undergraduates
Entrepreneurial Mindset for Engineering UndergraduatesEntrepreneurial Mindset for Engineering Undergraduates
Entrepreneurial Mindset for Engineering UndergraduatesEditorIJAERD
 
Effect of quality culture on building construction project in nigeria
Effect of quality culture on building construction project in nigeriaEffect of quality culture on building construction project in nigeria
Effect of quality culture on building construction project in nigeriaResearchWap
 
A Study of National Innovation Systems of GCC countries
A Study of National Innovation Systems of GCC countriesA Study of National Innovation Systems of GCC countries
A Study of National Innovation Systems of GCC countriesBrowne & Mohan
 
1661350983Unit 1 1050-V1 Introduction to Construction Management (1).pdf
1661350983Unit 1 1050-V1 Introduction to Construction Management (1).pdf1661350983Unit 1 1050-V1 Introduction to Construction Management (1).pdf
1661350983Unit 1 1050-V1 Introduction to Construction Management (1).pdfahsansaeed78
 
Element of Cost overrun and Delay in Construction: A Review
Element of Cost overrun and Delay in Construction: A ReviewElement of Cost overrun and Delay in Construction: A Review
Element of Cost overrun and Delay in Construction: A ReviewIRJET Journal
 
Why project management is hard
Why project management is hardWhy project management is hard
Why project management is hardPMILebanonChapter
 
IDENTIFICATION OF FACTORS CAUSING TIME AND COST OVERRUN IN CONSTRUCTION PROJE...
IDENTIFICATION OF FACTORS CAUSING TIME AND COST OVERRUN IN CONSTRUCTION PROJE...IDENTIFICATION OF FACTORS CAUSING TIME AND COST OVERRUN IN CONSTRUCTION PROJE...
IDENTIFICATION OF FACTORS CAUSING TIME AND COST OVERRUN IN CONSTRUCTION PROJE...IRJET Journal
 
Global Expert Mission Report “South Korea Smart Cities 2019”
Global Expert Mission Report “South Korea Smart Cities 2019”Global Expert Mission Report “South Korea Smart Cities 2019”
Global Expert Mission Report “South Korea Smart Cities 2019”KTN
 
2014 Rethinking Infrastructure
2014 Rethinking Infrastructure2014 Rethinking Infrastructure
2014 Rethinking InfrastructureNatalia Tinew
 
SymEx 2015 - Delivering Transformation in Infrastructure Portfolio/Business t...
SymEx 2015 - Delivering Transformation in Infrastructure Portfolio/Business t...SymEx 2015 - Delivering Transformation in Infrastructure Portfolio/Business t...
SymEx 2015 - Delivering Transformation in Infrastructure Portfolio/Business t...PMI Indonesia Chapter
 
THE INFLUENCE OF PROJECT MANAGEMENT PRACTICES ON THE PERFORMANCE OF ALCOHOL...
THE INFLUENCE OF PROJECT  MANAGEMENT PRACTICES ON THE  PERFORMANCE OF ALCOHOL...THE INFLUENCE OF PROJECT  MANAGEMENT PRACTICES ON THE  PERFORMANCE OF ALCOHOL...
THE INFLUENCE OF PROJECT MANAGEMENT PRACTICES ON THE PERFORMANCE OF ALCOHOL...Research Publish Journals (Publisher)
 
Project management essentials in developing and emerging markets by Ivo Arrey...
Project management essentials in developing and emerging markets by Ivo Arrey...Project management essentials in developing and emerging markets by Ivo Arrey...
Project management essentials in developing and emerging markets by Ivo Arrey...ivo arrey
 
TQM in Construction Management A Review
TQM in Construction Management A ReviewTQM in Construction Management A Review
TQM in Construction Management A Reviewijtsrd
 

Similar to Identifying Motivational and Demotivational Factors in Qatar Construction Project Management Practices (20)

IRJET- Development of R&D Project Management Model in Indian Construction Ind...
IRJET- Development of R&D Project Management Model in Indian Construction Ind...IRJET- Development of R&D Project Management Model in Indian Construction Ind...
IRJET- Development of R&D Project Management Model in Indian Construction Ind...
 
Proposal .pdf
Proposal .pdfProposal .pdf
Proposal .pdf
 
IRJET- Case Study on Budget and Schedule Overrun During the Construction Phas...
IRJET- Case Study on Budget and Schedule Overrun During the Construction Phas...IRJET- Case Study on Budget and Schedule Overrun During the Construction Phas...
IRJET- Case Study on Budget and Schedule Overrun During the Construction Phas...
 
Infrastructural Development as a Means of Attracting Foreign Direct Investmen...
Infrastructural Development as a Means of Attracting Foreign Direct Investmen...Infrastructural Development as a Means of Attracting Foreign Direct Investmen...
Infrastructural Development as a Means of Attracting Foreign Direct Investmen...
 
Project and Change Management Success Factors from Malaysian Government Depar...
Project and Change Management Success Factors from Malaysian Government Depar...Project and Change Management Success Factors from Malaysian Government Depar...
Project and Change Management Success Factors from Malaysian Government Depar...
 
Entrepreneurial Mindset for Engineering Undergraduates
Entrepreneurial Mindset for Engineering UndergraduatesEntrepreneurial Mindset for Engineering Undergraduates
Entrepreneurial Mindset for Engineering Undergraduates
 
Essay Construction
Essay ConstructionEssay Construction
Essay Construction
 
Effect of quality culture on building construction project in nigeria
Effect of quality culture on building construction project in nigeriaEffect of quality culture on building construction project in nigeria
Effect of quality culture on building construction project in nigeria
 
A Study of National Innovation Systems of GCC countries
A Study of National Innovation Systems of GCC countriesA Study of National Innovation Systems of GCC countries
A Study of National Innovation Systems of GCC countries
 
1661350983Unit 1 1050-V1 Introduction to Construction Management (1).pdf
1661350983Unit 1 1050-V1 Introduction to Construction Management (1).pdf1661350983Unit 1 1050-V1 Introduction to Construction Management (1).pdf
1661350983Unit 1 1050-V1 Introduction to Construction Management (1).pdf
 
Element of Cost overrun and Delay in Construction: A Review
Element of Cost overrun and Delay in Construction: A ReviewElement of Cost overrun and Delay in Construction: A Review
Element of Cost overrun and Delay in Construction: A Review
 
Why project management is hard
Why project management is hardWhy project management is hard
Why project management is hard
 
IDENTIFICATION OF FACTORS CAUSING TIME AND COST OVERRUN IN CONSTRUCTION PROJE...
IDENTIFICATION OF FACTORS CAUSING TIME AND COST OVERRUN IN CONSTRUCTION PROJE...IDENTIFICATION OF FACTORS CAUSING TIME AND COST OVERRUN IN CONSTRUCTION PROJE...
IDENTIFICATION OF FACTORS CAUSING TIME AND COST OVERRUN IN CONSTRUCTION PROJE...
 
Global Expert Mission Report “South Korea Smart Cities 2019”
Global Expert Mission Report “South Korea Smart Cities 2019”Global Expert Mission Report “South Korea Smart Cities 2019”
Global Expert Mission Report “South Korea Smart Cities 2019”
 
C1303032126
C1303032126C1303032126
C1303032126
 
2014 Rethinking Infrastructure
2014 Rethinking Infrastructure2014 Rethinking Infrastructure
2014 Rethinking Infrastructure
 
SymEx 2015 - Delivering Transformation in Infrastructure Portfolio/Business t...
SymEx 2015 - Delivering Transformation in Infrastructure Portfolio/Business t...SymEx 2015 - Delivering Transformation in Infrastructure Portfolio/Business t...
SymEx 2015 - Delivering Transformation in Infrastructure Portfolio/Business t...
 
THE INFLUENCE OF PROJECT MANAGEMENT PRACTICES ON THE PERFORMANCE OF ALCOHOL...
THE INFLUENCE OF PROJECT  MANAGEMENT PRACTICES ON THE  PERFORMANCE OF ALCOHOL...THE INFLUENCE OF PROJECT  MANAGEMENT PRACTICES ON THE  PERFORMANCE OF ALCOHOL...
THE INFLUENCE OF PROJECT MANAGEMENT PRACTICES ON THE PERFORMANCE OF ALCOHOL...
 
Project management essentials in developing and emerging markets by Ivo Arrey...
Project management essentials in developing and emerging markets by Ivo Arrey...Project management essentials in developing and emerging markets by Ivo Arrey...
Project management essentials in developing and emerging markets by Ivo Arrey...
 
TQM in Construction Management A Review
TQM in Construction Management A ReviewTQM in Construction Management A Review
TQM in Construction Management A Review
 

More from ijtsrd

‘Six Sigma Technique’ A Journey Through its Implementation
‘Six Sigma Technique’ A Journey Through its Implementation‘Six Sigma Technique’ A Journey Through its Implementation
‘Six Sigma Technique’ A Journey Through its Implementationijtsrd
 
Edge Computing in Space Enhancing Data Processing and Communication for Space...
Edge Computing in Space Enhancing Data Processing and Communication for Space...Edge Computing in Space Enhancing Data Processing and Communication for Space...
Edge Computing in Space Enhancing Data Processing and Communication for Space...ijtsrd
 
Dynamics of Communal Politics in 21st Century India Challenges and Prospects
Dynamics of Communal Politics in 21st Century India Challenges and ProspectsDynamics of Communal Politics in 21st Century India Challenges and Prospects
Dynamics of Communal Politics in 21st Century India Challenges and Prospectsijtsrd
 
Assess Perspective and Knowledge of Healthcare Providers Towards Elehealth in...
Assess Perspective and Knowledge of Healthcare Providers Towards Elehealth in...Assess Perspective and Knowledge of Healthcare Providers Towards Elehealth in...
Assess Perspective and Knowledge of Healthcare Providers Towards Elehealth in...ijtsrd
 
The Impact of Digital Media on the Decentralization of Power and the Erosion ...
The Impact of Digital Media on the Decentralization of Power and the Erosion ...The Impact of Digital Media on the Decentralization of Power and the Erosion ...
The Impact of Digital Media on the Decentralization of Power and the Erosion ...ijtsrd
 
Online Voices, Offline Impact Ambedkars Ideals and Socio Political Inclusion ...
Online Voices, Offline Impact Ambedkars Ideals and Socio Political Inclusion ...Online Voices, Offline Impact Ambedkars Ideals and Socio Political Inclusion ...
Online Voices, Offline Impact Ambedkars Ideals and Socio Political Inclusion ...ijtsrd
 
Problems and Challenges of Agro Entreprenurship A Study
Problems and Challenges of Agro Entreprenurship A StudyProblems and Challenges of Agro Entreprenurship A Study
Problems and Challenges of Agro Entreprenurship A Studyijtsrd
 
Comparative Analysis of Total Corporate Disclosure of Selected IT Companies o...
Comparative Analysis of Total Corporate Disclosure of Selected IT Companies o...Comparative Analysis of Total Corporate Disclosure of Selected IT Companies o...
Comparative Analysis of Total Corporate Disclosure of Selected IT Companies o...ijtsrd
 
The Impact of Educational Background and Professional Training on Human Right...
The Impact of Educational Background and Professional Training on Human Right...The Impact of Educational Background and Professional Training on Human Right...
The Impact of Educational Background and Professional Training on Human Right...ijtsrd
 
A Study on the Effective Teaching Learning Process in English Curriculum at t...
A Study on the Effective Teaching Learning Process in English Curriculum at t...A Study on the Effective Teaching Learning Process in English Curriculum at t...
A Study on the Effective Teaching Learning Process in English Curriculum at t...ijtsrd
 
The Role of Mentoring and Its Influence on the Effectiveness of the Teaching ...
The Role of Mentoring and Its Influence on the Effectiveness of the Teaching ...The Role of Mentoring and Its Influence on the Effectiveness of the Teaching ...
The Role of Mentoring and Its Influence on the Effectiveness of the Teaching ...ijtsrd
 
Design Simulation and Hardware Construction of an Arduino Microcontroller Bas...
Design Simulation and Hardware Construction of an Arduino Microcontroller Bas...Design Simulation and Hardware Construction of an Arduino Microcontroller Bas...
Design Simulation and Hardware Construction of an Arduino Microcontroller Bas...ijtsrd
 
Sustainable Energy by Paul A. Adekunte | Matthew N. O. Sadiku | Janet O. Sadiku
Sustainable Energy by Paul A. Adekunte | Matthew N. O. Sadiku | Janet O. SadikuSustainable Energy by Paul A. Adekunte | Matthew N. O. Sadiku | Janet O. Sadiku
Sustainable Energy by Paul A. Adekunte | Matthew N. O. Sadiku | Janet O. Sadikuijtsrd
 
Concepts for Sudan Survey Act Implementations Executive Regulations and Stand...
Concepts for Sudan Survey Act Implementations Executive Regulations and Stand...Concepts for Sudan Survey Act Implementations Executive Regulations and Stand...
Concepts for Sudan Survey Act Implementations Executive Regulations and Stand...ijtsrd
 
Towards the Implementation of the Sudan Interpolated Geoid Model Khartoum Sta...
Towards the Implementation of the Sudan Interpolated Geoid Model Khartoum Sta...Towards the Implementation of the Sudan Interpolated Geoid Model Khartoum Sta...
Towards the Implementation of the Sudan Interpolated Geoid Model Khartoum Sta...ijtsrd
 
Activating Geospatial Information for Sudans Sustainable Investment Map
Activating Geospatial Information for Sudans Sustainable Investment MapActivating Geospatial Information for Sudans Sustainable Investment Map
Activating Geospatial Information for Sudans Sustainable Investment Mapijtsrd
 
Educational Unity Embracing Diversity for a Stronger Society
Educational Unity Embracing Diversity for a Stronger SocietyEducational Unity Embracing Diversity for a Stronger Society
Educational Unity Embracing Diversity for a Stronger Societyijtsrd
 
Integration of Indian Indigenous Knowledge System in Management Prospects and...
Integration of Indian Indigenous Knowledge System in Management Prospects and...Integration of Indian Indigenous Knowledge System in Management Prospects and...
Integration of Indian Indigenous Knowledge System in Management Prospects and...ijtsrd
 
DeepMask Transforming Face Mask Identification for Better Pandemic Control in...
DeepMask Transforming Face Mask Identification for Better Pandemic Control in...DeepMask Transforming Face Mask Identification for Better Pandemic Control in...
DeepMask Transforming Face Mask Identification for Better Pandemic Control in...ijtsrd
 
Streamlining Data Collection eCRF Design and Machine Learning
Streamlining Data Collection eCRF Design and Machine LearningStreamlining Data Collection eCRF Design and Machine Learning
Streamlining Data Collection eCRF Design and Machine Learningijtsrd
 

More from ijtsrd (20)

‘Six Sigma Technique’ A Journey Through its Implementation
‘Six Sigma Technique’ A Journey Through its Implementation‘Six Sigma Technique’ A Journey Through its Implementation
‘Six Sigma Technique’ A Journey Through its Implementation
 
Edge Computing in Space Enhancing Data Processing and Communication for Space...
Edge Computing in Space Enhancing Data Processing and Communication for Space...Edge Computing in Space Enhancing Data Processing and Communication for Space...
Edge Computing in Space Enhancing Data Processing and Communication for Space...
 
Dynamics of Communal Politics in 21st Century India Challenges and Prospects
Dynamics of Communal Politics in 21st Century India Challenges and ProspectsDynamics of Communal Politics in 21st Century India Challenges and Prospects
Dynamics of Communal Politics in 21st Century India Challenges and Prospects
 
Assess Perspective and Knowledge of Healthcare Providers Towards Elehealth in...
Assess Perspective and Knowledge of Healthcare Providers Towards Elehealth in...Assess Perspective and Knowledge of Healthcare Providers Towards Elehealth in...
Assess Perspective and Knowledge of Healthcare Providers Towards Elehealth in...
 
The Impact of Digital Media on the Decentralization of Power and the Erosion ...
The Impact of Digital Media on the Decentralization of Power and the Erosion ...The Impact of Digital Media on the Decentralization of Power and the Erosion ...
The Impact of Digital Media on the Decentralization of Power and the Erosion ...
 
Online Voices, Offline Impact Ambedkars Ideals and Socio Political Inclusion ...
Online Voices, Offline Impact Ambedkars Ideals and Socio Political Inclusion ...Online Voices, Offline Impact Ambedkars Ideals and Socio Political Inclusion ...
Online Voices, Offline Impact Ambedkars Ideals and Socio Political Inclusion ...
 
Problems and Challenges of Agro Entreprenurship A Study
Problems and Challenges of Agro Entreprenurship A StudyProblems and Challenges of Agro Entreprenurship A Study
Problems and Challenges of Agro Entreprenurship A Study
 
Comparative Analysis of Total Corporate Disclosure of Selected IT Companies o...
Comparative Analysis of Total Corporate Disclosure of Selected IT Companies o...Comparative Analysis of Total Corporate Disclosure of Selected IT Companies o...
Comparative Analysis of Total Corporate Disclosure of Selected IT Companies o...
 
The Impact of Educational Background and Professional Training on Human Right...
The Impact of Educational Background and Professional Training on Human Right...The Impact of Educational Background and Professional Training on Human Right...
The Impact of Educational Background and Professional Training on Human Right...
 
A Study on the Effective Teaching Learning Process in English Curriculum at t...
A Study on the Effective Teaching Learning Process in English Curriculum at t...A Study on the Effective Teaching Learning Process in English Curriculum at t...
A Study on the Effective Teaching Learning Process in English Curriculum at t...
 
The Role of Mentoring and Its Influence on the Effectiveness of the Teaching ...
The Role of Mentoring and Its Influence on the Effectiveness of the Teaching ...The Role of Mentoring and Its Influence on the Effectiveness of the Teaching ...
The Role of Mentoring and Its Influence on the Effectiveness of the Teaching ...
 
Design Simulation and Hardware Construction of an Arduino Microcontroller Bas...
Design Simulation and Hardware Construction of an Arduino Microcontroller Bas...Design Simulation and Hardware Construction of an Arduino Microcontroller Bas...
Design Simulation and Hardware Construction of an Arduino Microcontroller Bas...
 
Sustainable Energy by Paul A. Adekunte | Matthew N. O. Sadiku | Janet O. Sadiku
Sustainable Energy by Paul A. Adekunte | Matthew N. O. Sadiku | Janet O. SadikuSustainable Energy by Paul A. Adekunte | Matthew N. O. Sadiku | Janet O. Sadiku
Sustainable Energy by Paul A. Adekunte | Matthew N. O. Sadiku | Janet O. Sadiku
 
Concepts for Sudan Survey Act Implementations Executive Regulations and Stand...
Concepts for Sudan Survey Act Implementations Executive Regulations and Stand...Concepts for Sudan Survey Act Implementations Executive Regulations and Stand...
Concepts for Sudan Survey Act Implementations Executive Regulations and Stand...
 
Towards the Implementation of the Sudan Interpolated Geoid Model Khartoum Sta...
Towards the Implementation of the Sudan Interpolated Geoid Model Khartoum Sta...Towards the Implementation of the Sudan Interpolated Geoid Model Khartoum Sta...
Towards the Implementation of the Sudan Interpolated Geoid Model Khartoum Sta...
 
Activating Geospatial Information for Sudans Sustainable Investment Map
Activating Geospatial Information for Sudans Sustainable Investment MapActivating Geospatial Information for Sudans Sustainable Investment Map
Activating Geospatial Information for Sudans Sustainable Investment Map
 
Educational Unity Embracing Diversity for a Stronger Society
Educational Unity Embracing Diversity for a Stronger SocietyEducational Unity Embracing Diversity for a Stronger Society
Educational Unity Embracing Diversity for a Stronger Society
 
Integration of Indian Indigenous Knowledge System in Management Prospects and...
Integration of Indian Indigenous Knowledge System in Management Prospects and...Integration of Indian Indigenous Knowledge System in Management Prospects and...
Integration of Indian Indigenous Knowledge System in Management Prospects and...
 
DeepMask Transforming Face Mask Identification for Better Pandemic Control in...
DeepMask Transforming Face Mask Identification for Better Pandemic Control in...DeepMask Transforming Face Mask Identification for Better Pandemic Control in...
DeepMask Transforming Face Mask Identification for Better Pandemic Control in...
 
Streamlining Data Collection eCRF Design and Machine Learning
Streamlining Data Collection eCRF Design and Machine LearningStreamlining Data Collection eCRF Design and Machine Learning
Streamlining Data Collection eCRF Design and Machine Learning
 

Recently uploaded

BASLIQ CURRENT LOOKBOOK LOOKBOOK(1) (1).pdf
BASLIQ CURRENT LOOKBOOK  LOOKBOOK(1) (1).pdfBASLIQ CURRENT LOOKBOOK  LOOKBOOK(1) (1).pdf
BASLIQ CURRENT LOOKBOOK LOOKBOOK(1) (1).pdfSoniaTolstoy
 
Concept of Vouching. B.Com(Hons) /B.Compdf
Concept of Vouching. B.Com(Hons) /B.CompdfConcept of Vouching. B.Com(Hons) /B.Compdf
Concept of Vouching. B.Com(Hons) /B.CompdfUmakantAnnand
 
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...Krashi Coaching
 
Science 7 - LAND and SEA BREEZE and its Characteristics
Science 7 - LAND and SEA BREEZE and its CharacteristicsScience 7 - LAND and SEA BREEZE and its Characteristics
Science 7 - LAND and SEA BREEZE and its CharacteristicsKarinaGenton
 
MENTAL STATUS EXAMINATION format.docx
MENTAL     STATUS EXAMINATION format.docxMENTAL     STATUS EXAMINATION format.docx
MENTAL STATUS EXAMINATION format.docxPoojaSen20
 
How to Make a Pirate ship Primary Education.pptx
How to Make a Pirate ship Primary Education.pptxHow to Make a Pirate ship Primary Education.pptx
How to Make a Pirate ship Primary Education.pptxmanuelaromero2013
 
Enzyme, Pharmaceutical Aids, Miscellaneous Last Part of Chapter no 5th.pdf
Enzyme, Pharmaceutical Aids, Miscellaneous Last Part of Chapter no 5th.pdfEnzyme, Pharmaceutical Aids, Miscellaneous Last Part of Chapter no 5th.pdf
Enzyme, Pharmaceutical Aids, Miscellaneous Last Part of Chapter no 5th.pdfSumit Tiwari
 
The Most Excellent Way | 1 Corinthians 13
The Most Excellent Way | 1 Corinthians 13The Most Excellent Way | 1 Corinthians 13
The Most Excellent Way | 1 Corinthians 13Steve Thomason
 
KSHARA STURA .pptx---KSHARA KARMA THERAPY (CAUSTIC THERAPY)————IMP.OF KSHARA ...
KSHARA STURA .pptx---KSHARA KARMA THERAPY (CAUSTIC THERAPY)————IMP.OF KSHARA ...KSHARA STURA .pptx---KSHARA KARMA THERAPY (CAUSTIC THERAPY)————IMP.OF KSHARA ...
KSHARA STURA .pptx---KSHARA KARMA THERAPY (CAUSTIC THERAPY)————IMP.OF KSHARA ...M56BOOKSTORE PRODUCT/SERVICE
 
URLs and Routing in the Odoo 17 Website App
URLs and Routing in the Odoo 17 Website AppURLs and Routing in the Odoo 17 Website App
URLs and Routing in the Odoo 17 Website AppCeline George
 
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...EduSkills OECD
 
Hybridoma Technology ( Production , Purification , and Application )
Hybridoma Technology  ( Production , Purification , and Application  ) Hybridoma Technology  ( Production , Purification , and Application  )
Hybridoma Technology ( Production , Purification , and Application ) Sakshi Ghasle
 
A Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy ReformA Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy ReformChameera Dedduwage
 
Paris 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activityParis 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activityGeoBlogs
 
Interactive Powerpoint_How to Master effective communication
Interactive Powerpoint_How to Master effective communicationInteractive Powerpoint_How to Master effective communication
Interactive Powerpoint_How to Master effective communicationnomboosow
 
Mastering the Unannounced Regulatory Inspection
Mastering the Unannounced Regulatory InspectionMastering the Unannounced Regulatory Inspection
Mastering the Unannounced Regulatory InspectionSafetyChain Software
 
Incoming and Outgoing Shipments in 1 STEP Using Odoo 17
Incoming and Outgoing Shipments in 1 STEP Using Odoo 17Incoming and Outgoing Shipments in 1 STEP Using Odoo 17
Incoming and Outgoing Shipments in 1 STEP Using Odoo 17Celine George
 
microwave assisted reaction. General introduction
microwave assisted reaction. General introductionmicrowave assisted reaction. General introduction
microwave assisted reaction. General introductionMaksud Ahmed
 
Alper Gobel In Media Res Media Component
Alper Gobel In Media Res Media ComponentAlper Gobel In Media Res Media Component
Alper Gobel In Media Res Media ComponentInMediaRes1
 

Recently uploaded (20)

BASLIQ CURRENT LOOKBOOK LOOKBOOK(1) (1).pdf
BASLIQ CURRENT LOOKBOOK  LOOKBOOK(1) (1).pdfBASLIQ CURRENT LOOKBOOK  LOOKBOOK(1) (1).pdf
BASLIQ CURRENT LOOKBOOK LOOKBOOK(1) (1).pdf
 
Concept of Vouching. B.Com(Hons) /B.Compdf
Concept of Vouching. B.Com(Hons) /B.CompdfConcept of Vouching. B.Com(Hons) /B.Compdf
Concept of Vouching. B.Com(Hons) /B.Compdf
 
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
 
Science 7 - LAND and SEA BREEZE and its Characteristics
Science 7 - LAND and SEA BREEZE and its CharacteristicsScience 7 - LAND and SEA BREEZE and its Characteristics
Science 7 - LAND and SEA BREEZE and its Characteristics
 
MENTAL STATUS EXAMINATION format.docx
MENTAL     STATUS EXAMINATION format.docxMENTAL     STATUS EXAMINATION format.docx
MENTAL STATUS EXAMINATION format.docx
 
TataKelola dan KamSiber Kecerdasan Buatan v022.pdf
TataKelola dan KamSiber Kecerdasan Buatan v022.pdfTataKelola dan KamSiber Kecerdasan Buatan v022.pdf
TataKelola dan KamSiber Kecerdasan Buatan v022.pdf
 
How to Make a Pirate ship Primary Education.pptx
How to Make a Pirate ship Primary Education.pptxHow to Make a Pirate ship Primary Education.pptx
How to Make a Pirate ship Primary Education.pptx
 
Enzyme, Pharmaceutical Aids, Miscellaneous Last Part of Chapter no 5th.pdf
Enzyme, Pharmaceutical Aids, Miscellaneous Last Part of Chapter no 5th.pdfEnzyme, Pharmaceutical Aids, Miscellaneous Last Part of Chapter no 5th.pdf
Enzyme, Pharmaceutical Aids, Miscellaneous Last Part of Chapter no 5th.pdf
 
The Most Excellent Way | 1 Corinthians 13
The Most Excellent Way | 1 Corinthians 13The Most Excellent Way | 1 Corinthians 13
The Most Excellent Way | 1 Corinthians 13
 
KSHARA STURA .pptx---KSHARA KARMA THERAPY (CAUSTIC THERAPY)————IMP.OF KSHARA ...
KSHARA STURA .pptx---KSHARA KARMA THERAPY (CAUSTIC THERAPY)————IMP.OF KSHARA ...KSHARA STURA .pptx---KSHARA KARMA THERAPY (CAUSTIC THERAPY)————IMP.OF KSHARA ...
KSHARA STURA .pptx---KSHARA KARMA THERAPY (CAUSTIC THERAPY)————IMP.OF KSHARA ...
 
URLs and Routing in the Odoo 17 Website App
URLs and Routing in the Odoo 17 Website AppURLs and Routing in the Odoo 17 Website App
URLs and Routing in the Odoo 17 Website App
 
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
 
Hybridoma Technology ( Production , Purification , and Application )
Hybridoma Technology  ( Production , Purification , and Application  ) Hybridoma Technology  ( Production , Purification , and Application  )
Hybridoma Technology ( Production , Purification , and Application )
 
A Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy ReformA Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy Reform
 
Paris 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activityParis 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activity
 
Interactive Powerpoint_How to Master effective communication
Interactive Powerpoint_How to Master effective communicationInteractive Powerpoint_How to Master effective communication
Interactive Powerpoint_How to Master effective communication
 
Mastering the Unannounced Regulatory Inspection
Mastering the Unannounced Regulatory InspectionMastering the Unannounced Regulatory Inspection
Mastering the Unannounced Regulatory Inspection
 
Incoming and Outgoing Shipments in 1 STEP Using Odoo 17
Incoming and Outgoing Shipments in 1 STEP Using Odoo 17Incoming and Outgoing Shipments in 1 STEP Using Odoo 17
Incoming and Outgoing Shipments in 1 STEP Using Odoo 17
 
microwave assisted reaction. General introduction
microwave assisted reaction. General introductionmicrowave assisted reaction. General introduction
microwave assisted reaction. General introduction
 
Alper Gobel In Media Res Media Component
Alper Gobel In Media Res Media ComponentAlper Gobel In Media Res Media Component
Alper Gobel In Media Res Media Component
 

Identifying Motivational and Demotivational Factors in Qatar Construction Project Management Practices

  • 1. @ IJTSRD | Available Online @ www.ijtsrd.com ISSN No: 2456 International Journal of Trend in Scientific Research and International Conference on Advanced Engineering and Information Technology Identifying Motivational and Qatar Construction Project Management Practices Hamza.1 , Deepak T. J.2 , Maria. Josephine 1 UEL Student - Faculty of Built Environment 2 Associate Professor, Dean Faculty of Engineering and Technology 3 Faculty of Business and Accounting, ABSTRACT Motivation is one of the factors that influence the productivity of people. Project Managers, Engineers and Laborers, play a vital role in the management of projects in a Qatar Construction Industry success of these projects relies profoundly on their active participation and effective performance. Hence it is important to assess the impact of motivation and demotivation on the performance. The broad objective of this work is to assess the impact of motivation and demotivation in QCI. The specific objective of this paper is identifying the key factors that cause motivation and de-motivation in QCI. Literature review, survey with expert opinion and semi structured interviews were conducted to identify these factors. Using these factors to conduct specific motivational programmes will help in improving the productivity of people on a project. Keywords: Motivation, Demotivation, Project Managers, Engineers, Loborers, QCI, Productivity. 1. INTRODUCTION Project management has been in practice thousands of years, though it has been evolving in the 20 Corresponding to the argument, be it Egyptians pyramid or the great wall of china, the emperors appointed civilians, soldiers and criminals to compete the construction with the division and management of different projects. The concept of projec has been more critical during the Industrial revolution and the introduction of the classical management theories which paved way in the most extensive and @ IJTSRD | Available Online @ www.ijtsrd.com | Special Issue Publication | November ISSN No: 2456 - 6470 | www.ijtsrd.com | Special Issue International Journal of Trend in Scientific Research and Development (IJTSRD) International Conference on Advanced Engineering and Information Technology (ICAEIT-2017) Identifying Motivational and Demotivational Factors in Construction Project Management Practices , Maria. Josephine3 , W., Parameswaran. S3 , Venishri. P Faculty of Built Environment, Linton University College, Mantin, Negeri Sembilan, Malaysia Faculty of Engineering and Technology,Linton University College, Negeri Sembilan, Malaysia Faculty of Business and Accounting, Linton University College, Mantin, Negeri Sembilan, Malaysia Motivation is one of the factors that influence the productivity of people. Project Managers, Engineers play a vital role in the management of projects in a Qatar Construction Industry (QCI). The success of these projects relies profoundly on their active participation and effective performance. Hence it is important to assess the impact of motivation and emotivation on the performance. The broad objective of this work is to assess the impact of motivation and demotivation in QCI. The specific objective of this paper is identifying the key factors that cause motivation in QCI. Literature eview, survey with expert opinion and semi- structured interviews were conducted to identify these factors. Using these factors to conduct specific motivational programmes will help in improving the Motivation, Demotivation, Project Managers, Engineers, Loborers, QCI, Productivity. Project management has been in practice thousands of years, though it has been evolving in the 20th century. Corresponding to the argument, be it Egyptians pyramid or the great wall of china, the emperors appointed civilians, soldiers and criminals to compete the construction with the division and management of different projects. The concept of project management has been more critical during the Industrial revolution and the introduction of the classical management theories which paved way in the most extensive and exclusive way of development of projects. The industrial revolution has been a history because of the emergence oil rich countries of the East. The evolution has been tougher and complex with the emergence of Globalization. The virtual and current modernization in the Middle East construction and built environment has evidenced a greater recognition and growth in the management of projects. Its quite surprising to note that Qatar is a developing country however, the country’s GDP is $143,788. The country is an exceptional case when it counts with the relationship with the developing country and GDP. The reason for being an exception case is majority of the citizens enjoy the luxuries of the developed world with their elite lifestyles. The reason for being a developing country is the gap between the extreme poverty and extreme richness which had led to HDI of 0.85 pushing it to the category of developing country. One of the reason behind is low index is its excess expenditure on the Infrastructure projects. Thus, brings the significance of the project management in the country along with the recent announcement of FIFA 2022 World Cup hosting rights. Therefore, identifying the pertinent factors demotivating the project management success in Qatar construction has been taken as the main area of the study. Therefore, the objective of this research is to identify, motivational and demotivational factors in Qatar construction project management practices. November 2018 P - 34 Special Issue Publication International Conference on Advanced Engineering Demotivational Factors in Construction Project Management Practices , Venishri. P3 Negeri Sembilan, Malaysia ,Linton University College, Mantin, Mantin, Negeri Sembilan, Malaysia exclusive way of development of projects. The industrial revolution has been a wider remark in the history because of the emergence oil rich countries of the East. The evolution has been tougher and complex with the emergence of Globalization. The virtual and current modernization in the Middle East construction t has evidenced a greater recognition and growth in the management of Its quite surprising to note that Qatar is a developing country however, the country’s GDP is $143,788. The country is an exceptional case when it counts with the with the developing country and GDP. The reason for being an exception case is majority of the citizens enjoy the luxuries of the developed world with their elite lifestyles. The reason for being a developing country is the gap between the extreme and extreme richness which had led to HDI of 0.85 pushing it to the category of developing country. One of the reason behind is low index is its excess expenditure on the Infrastructure projects. Thus, brings the significance of the project management in the country along with the recent announcement of FIFA 2022 World Cup hosting rights. Therefore, identifying the pertinent factors demotivating the project management success in Qatar construction has been taken as the main area of the study. he objective of this research is to identify, motivational and demotivational factors in Qatar construction project management practices.
  • 2. International Journal of Trend in Scientific Research and Development (IJTSRD) | ISSN: 2456-647 @ IJTSRD | Available Online @ www.ijtsrd.com | Special Issue Publication | November 2018 P - 35 1.1. Global Context According to a recent survey construction projects are accepted as a prominent factor in many industrialized countries which contributes to the economy of the country (Proverbs & Olomolaiye, 1999). 10% of national income in most of the developing countries has been a contributed by construction industry (Navon, 2005). Therefore, the contribution of construction industry has been more significant in the developing countries compared to the developed countries. Thus, bringing the significance of project management in construction industries in the developing countries. 1.2. Project vs Project Management According to Stanley E. Portny (2013), Projects have been around for ages. For example, the ark built by Noah, Mona Lisa painted by the famous Leonardo Da Vinci, the Decline and Fall of the Roman Empire written by Edward Gibbon, the polio vaccine developed by Jonas Salk — all projects. These were all huge projects and very successful ones. Laurie S. Keller & Mike Field (1998) definition of Project is that it is methodized task headed for a predefined target which depends upon resources and effort, a unique and risky venture containing a schedule and budget. Joan Knudson & Ira Bitz (1991) stated that a project is a properly methodized product which advances stage by stage having a beginning, end and a deliverable like a ladder where every step is crucial. PMI’s edition of PMBOK (2000) defines Project as a temporary group activity designed to produce a unique product, service or result. It has a definite beginning and end in time, and therefore specified scope and resources. The project is unique which means that it is not a routine operation, but a specific set of operations designed to accomplish a singular goal. Therefore, project teams are made up of staffs who are not even working all together – sometimes from different organizations and across multiple geographies. Stanley E. Portny (2013) further states that a project is a brief task implemented to create a unique service, product, or result. The following three components are part of every project:  Schedule: timetable with dates stating the project beginning and end  Required Resources: the crucial elements such as number of staff, investment and other resources  Specific Scope: Desired result or product  Larry (2002) describes project as short lives since it has a beginning and an end.  Five Main Characteristics of a Project  A Defined Beginning, End, Schedule, and Approach  All resources are specifically allocated to the work  Results have specified goals such as (cost, time, performance/quality)  A planned and organized approach is taken  A group of people are involved There is always a distinction between project and project management. A project is a series of activities established to achieve the specific objectives and consumes resources over a period of time. A project should be completed within a specified time and it has a definite start and end period whereas, project management is a concept where in a set of rules and regulations has been applied to control the routine operation of the company (Munns & Bjeirmi, 1996). Jack J. Phillips, Wayne Brantley, and Patricia Pulliam Phillips (2012) definition of Project management is that it is not a new idea or concept. Project Management is as ancient as the Egyptian pyramids. The magnificent pyramids built by the Pharaohs in ancient Egypt used procedures that remain in mystery today. John J. McKeon (2011) describes Project management in his book “Becoming a Construction Manager” as “applied to a construction project, the use of integrated systems and procedures by the project team to accomplish design and construction. Project management is an integral function of construction management.” Whereas, construction management is defined as a professional management practice towards construction projects, from project initiation to completion, for the intention of monitoring time, cost, scope and quality (John J. McKeon 2011). MPUG’s (2013) definition of Project management or program management as it is sometimes called is that it is the technique of arranging the elements of a project, whether the project is improvement of a recent brand, the establishment of a new operation, an advertising campaign, or even a wedding. A project is not a part of a daily routine. It’s designed once, it’s brief, and it’s precise. A professional engineer describes it as, “It has a beginning and an end.” A
  • 3. International Journal of Trend in Scientific Research and Development (IJTSRD) | ISSN: 2456-647 @ IJTSRD | Available Online @ www.ijtsrd.com | Special Issue Publication | November 2018 P - 36 project uses up all the resources (such as materials, personnel, funds or time), and it has investment restrictions. (MPUG 2013). PMI, which is known as world’s leading professional society for project management, defines Project Management, in their guide PMBOK (2000), then, as the practice of linking techniques, skills and knowledge to complete projects effectively and efficiently. It’s an important approach for organizations, which enables them to link project outcomes to business goals which gives them the edge in the business hub (PMBOK 2000). Joan Knudson & Ira Bitz (1991) states that Project management is required for the effective management to produce results in an appropriate and goal specific environment since it consists of a guideline with principles, methods, tools and techniques. Techniques such as good negotiation, communication and analytical skills are crucial part of this approach. In the world of today, project management is becoming a crucial approach and if followed properly it is one of the key elements for project success. Project management enables managers to design and handle vital decisions which create new gains in expanding divisions of the market. Project management serves as a guide tool which helps to minimize time to market, control expenses, assure quality in products, and increase revenues. Larry (2002) suggests “Project management is one of the most important management techniques for ensuring the success of an organization.” Gary Picariello (2013) says Project management is a set of guidelines containing tools which allows managers to guide a project from one point to another and do so in an effective way that demonstrates efficiency, cost-savings and plain ‘old ingenuity’. (Gary Picariello 2013) As mentioned before, project management has been there as far as human existence goes. Before any activity takes place, there is always a thought given to how it will be carried out and whether it is being carried out the correct way. This is called Planning and is the initiative stage in project management. Then, after a lot of thinking it is carried out, and this is called execution. From simple concepts such as making a cup of tea, to much more complex ideas like skyscrapers, if a proper planning, management and execution is not done, then it will be a project failure. Just like a game of chess, one bad move and you lose! This is why careful planning and proper scheming has to be done in order to achieve the best results. Gale & Fellows (1990); Ofori (1990) suggest that the Construction industry in all countries faces many difficulties and challenges. Brian Miller (2012) says “The purpose of project management is to foresee or predict as many dangers and problems as possible; and to plan, organise and control activities so that the project is completed as successfully as possible in spite of all the risks.” His research concludes that an ideal project is one in which three objectives are successfully achieved: Performance and Quality, Budget and Time Completion. According to Gary Picariello (2011), he regards the relationship between the project manager, client and worker as very crucial to project success. He further states that knowledge, skills, tools and techniques of the three mentioned will deliver a successful project. In line with the article written by Gary Picariello (2011), the following are stated as the key advantages of project management: Improved Efficiency in Carrying Out the Project: Project management serves as a guideline that is easily followed and leads to project completion. Customer Satisfaction has increased: A customer is always glad and satisfied whenever a project is carried out on time and within the available budget. Intelligent project management provides the guidelines and tools that enable the customer and project manager relationship to flourish. Improved Effectiveness in Delivering of Services: The steps are approximately the same for every project just the working environment and the situation is altered. Project Success brings in confidence, growth and development within the team: Positive results bring in respect and inspire the team to continue to search for ways to perform more efficiently. A Competitive Edge in the Business Hub: A successful and excellent performance is always required to gain a fair share of the construction market.
  • 4. International Journal of Trend in Scientific Research and Deve @ IJTSRD | Available Online @ www.ijtsrd.com Chances to Grow the Company: Successful projects always lead to new chances to grow in the market. More Elasticity in Approach is Available Project Management has a wide scope and a lot of approaches can be taken depending on the situation. Risk Assessment Increases: Project Management provides the necessary risk assessment to be taken before project initiation as that assists to avoid mistakes. Quality is Raised and therefore there is Increase in Quantity: Effective Project Management means a raise in quality work. Increase in quality is often the result of better efficiency Gary Picariello (2011) further states that management strategies are put into action, the desired goals are achieved and the best thing is that it is within the specific time and cost perimeters. It provides the most essential guidelines required for a successful project. Donald S. Barrie & Boyd C. Paulson (1992) refers to Project Management as a modern-day tool which has perfected the projects in construction industry bringing in more organization and discipline and a smoother flow of work. The following are the factors which are vital to the success of project management as researched by Hubbard, (1990); Jaselskis and Ashley, (1991); Belout (1998); Chua et al. (1999); Walker and Vines, (2000):  Communication among the project team members  Implementing an effective health and safety program  Control of sub-contractors works  Overall managerial actions.  Feedback capabilities  Planning effort  An appropriate organization structure  Control Mechanism As a host of FIFA world cup 2022, it is highly vital to identify the demotivational factors in industry in order to mark the success of the country. With huge limitations of time constraints and the short time burden, it becomes an increasing burden to the host to mark for a quality project. Conjoint to this, the literature has attempted to derive the factors identified International Journal of Trend in Scientific Research and Development (IJTSRD) @ IJTSRD | Available Online @ www.ijtsrd.com | Special Issue Publication | November Successful projects always lead to new chances to oach is Available: Project Management has a wide scope and a lot of approaches can be taken depending on the situation. Project Management provides the necessary risk assessment to be taken before project initiation as that Quality is Raised and therefore there is Increase in Effective Project Management means a raise in quality work. Increase in quality is often the result of Gary Picariello (2011) further states that when project management strategies are put into action, the desired goals are achieved and the best thing is that it is within the specific time and cost perimeters. It provides the most essential guidelines required for a rrie & Boyd C. Paulson (1992) refers to day tool which has perfected the projects in construction industry bringing in more organization and discipline and a smoother flow of work. The following are the factors l to the success of project management as researched by Hubbard, (1990); Jaselskis and Ashley, (1991); Belout (1998); Chua et al. (1999); Communication among the project team members Implementing an effective health and safety An appropriate organization structure As a host of FIFA world cup 2022, it is highly vital to identify the demotivational factors in Construction industry in order to mark the success of the country. With huge limitations of time constraints and the short time burden, it becomes an increasing burden to the host to mark for a quality project. Conjoint to this, the d to derive the factors identified as demotivational factors that might be a hindrance for success in project management of FIFA world cup 2022. 2. Research Method This research is carried out in two phases: a) Investigation phase and b) Survey phase. The details of both these phases are explained below: in Figure 1 illustrates the details of the investigation phase. Based on the literature survey and expert opinio list of factors influencing motivation and de motivation was prepared. Expert opinions were sought from the senior engineers with 10 years of field and administrative experience as well as the faculty guiding research studies in human resource management. Subsequently, semi interviews were conducted to narrow down the list and identify the key motivating and de factors. Figure1: Project Phase 2.1. Motivational Factors Six key Motivational Factors were identified and are listed below. i. Achievement ii. Proper Recognition and rewards iii. Interesting work iv. Involvement in Decision Making v. Professional Advancement vi. Adequate Training and Development The study identified six key motivational factors. Out of these, the four factors ‘achievement’, ‘ work’ ‘proper recognition and awards’ and | ISSN: 2456-647 November 2018 P - 37 as demotivational factors that might be a hindrance for success in project management of FIFA world cup This research is carried out in two phases: a) Investigation phase and b) Survey phase. The details of both these phases are explained below: in Figure – 1 illustrates the details of the investigation phase. Based on the literature survey and expert opinion, a list of factors influencing motivation and de- motivation was prepared. Expert opinions were sought from the senior engineers with 10 years of field and administrative experience as well as the faculty guiding research studies in human resource ment. Subsequently, semi-structured interviews were conducted to narrow down the list and identify the key motivating and de-motivating Figure1: Project Phase Six key Motivational Factors were identified and are Proper Recognition and rewards Involvement in Decision Making Professional Advancement Adequate Training and Development The study identified six key motivational factors. Out of these, the four factors ‘achievement’, ‘interesting work’ ‘proper recognition and awards’ and
  • 5. International Journal of Trend in Scientific Research and Development (IJTSRD) | ISSN: 2456-647 @ IJTSRD | Available Online @ www.ijtsrd.com | Special Issue Publication | November 2018 P - 38 ‘advancement’ were selected from the Herzberg’s two factor theory (1968). According to the experts’ suggestions, ‘growth’, ‘responsibility’ and ‘advancement’ were combined as a single factor ‘advancement’. The other two factors are ‘participation in decision making’ and ‘adequate training and development’ were taken from literature (Borcherding, 1977; Soura and Singh, 1998; Ruthankoon and Ogunlana, 2003) and ratified by the experts and field engineers. In the survey phase, these factors were presented to 30 Engineers,15 Project Managers and 30 Clients. As outlined in the methodology, the respondents were met individually and were asked to make pair-wise comparison for importance between each set of key factors through structured questionnaires. 2.2. Demotivational Factors Eleven key Demotivational Factors were identified and are listed below. 1. Poor Work Condition 2. Poor Administration Policy 3. Poor Work Relationship 4. Lack of Communication (English Language) 5. Lack of Appreciation 6. Comparing Colleagues over Benefits Received 7. Poor Labour Productivity 8. Lack of Materials at Site Area 9. Climate and Weather 10. Reworks and Variation of Orders 11. Leadership Styles and Strategies Six key de-motivational factors such as ‘Poor work condition’, ‘poor administrative policy’ and ‘Poor work relationship’ were selected from the Herzberg’s two factor theory (1968). The factor ‘Comparing Colleagues over Benefits Received’ was obtained from Adam’s equity theory (1965). ‘Lack of communication’ and ‘lack of appreciation’ were derived from other established studies (Borcherding, 1977; U.S business roundtable proceedings, 1982). In context to the demotivational factors, English language played a significant aspect in project management. With regard to the arguments concerning Qatar, the multinational task force has faced a severe communication problem in terms of English language. As communication can play a major threat towards the success of a project and its delay in the construction. There should be clearly defined communication and clear explanation with regard to the project management. 2.2.1. Poor Labour productivity The core input to produce optimum output in a construction industry is its labour. As labour is considered to be the most efficient and value- driven output in a construction industry (Hwand & Soh, 2013). Jarkas, Kadri & Yoounes(2014) has identified inappropriate recommendations and specific strategies are the demotivational factors in project management. However, there were still arguments that with the advanced technological factors, construction industry still remains as labour intensive (Jarkas, Radosavljevic & Wuyi, 2014). According to a survey in Qatar, 82% of the engineers opined that poor labour productivity is one of the prime reason behind the failure of the projects and excess expenditure on the budget (Jarkas & Haupat, 2015). Poor management of the workforce would result in labour productivity. The construction engineers should definitely focus on the strategies to improve the labour productivity. The labour productivity has several related factors that includes, long working hours, job satisfaction, leadership, commitment towards organization and work engagement (Jarkas & Haupt, 2015; Jarkas, Radosavljevic, et al., 2014, Jurf & Beheiry, 2012). In order to organize the FIFA world cup, Qatar has a long way to address the issues and identify the demotivational factors in the project management. 2.2.2. Lack of materials Lack of material is an interlinking factor that causes low labour productivity that influence the demotivation factors in project management in construction industry. Lack of materials at the site area causes delay in the work and makes the workers to fall in the category of idle working hours (Mahamid, 2013). There were multiple factors that remains as an obstacle for the lack of materials in the construction area, which includes the shortages of materials, political triggers and monopolies in the suppliers. Qatar is no exception to these aspects as it may have a severe downfall in the situation relating to lack of materials. Lack of materials is one of the common obstacles in construction companies which affects their competitiveness and productivity (El- Gohary & Aziz, 2014). Jarkas, Radosavljevic & Wuyi (2014) has also identified that shortage of raw
  • 6. International Journal of Trend in Scientific Research and Development (IJTSRD) | ISSN: 2456-647 @ IJTSRD | Available Online @ www.ijtsrd.com | Special Issue Publication | November 2018 P - 39 materials has been main factor leading to a project failure and delay (Deepak & Mommade, 2017). 2.2.3. Reworks and Variation of Orders Frequent change orders and rework from the clients also cause the delay in the productivity of the project in the construction industry. The factors that includes the reworks includes revised drawings in the design and the layout plan which might lead to the project delays as well as low productivity consequently leading to project demotivational factors in the construction industry. This leads to variation of order in contracts. The Drawings quality and level of rework has contributed to the project failure as it consumes more time and consequently results in a project failure (Jarkas, et al., 2014). 2.2.4. Climate and Weather conditions Chinnadurai, Venugopal, Kumaravel and Para mesh (2016) has argued that the temperature and weather condition are significant issues that influences the labour productivity. An increase in temperature has negative effect on the productivity in the construction industry. The speed of the work decreases with the increase in temperature in cold and hot weather (Moselhi& Khan, 2012). 2.2.5. Leadership styles and Strategies Determination of leadership style for the success is very challenging aspect concerned with the project management. Conversely it influences the productivity (Arshi Shakeel & Sameh Monir, 2006; Enshassi et al., 2007b; Enshassi et al., 2009). Though, in a project management the determination of the leadership can be task oriented and relations-oriented. However, it is very difficult to determine the best leadership style in a project which suits the nature of the project. As there are different arguments concerning the authentic leadership styles and authoritive leadership style and its impact on project management. It is very difficult to determine the strategies. There should be positive and motivative leader to lead the team with high sense of ethic and morality which can lead to the success of a project management. 3. CONCLUSIONS This study identified the key factors that motivate and de-motivate the construction industry in Qatar. The study shows the findings of Herzberg’s theory to be relevant to the engineers in Qatar construction Industry. Intrinsic motivators comparatively play a vital role for many workers in any projects. The interesting nature of the construction work has to be properly utilized by the organization along with providing achievable goals to improve the motivation level. Similarly, the organization has to address the poor administrative policies and the poor work conditions to reduce de-motivation. Further study about the key factors will help in identifying the underlying reason for more detailed analysis. These reasons should be used to evaluate the root cause of the problem. Thus, the organization can plan their motivational programs based on these details with periodical assessment to induce motivation and reduce de-motivation. 4. REFERENCES 1. Abdulaziz M. Jarkas, Milan Radosavljevic, Liu Wuyi, (2014) "Prominent demotivational Factors influencing the productivity of construction project managers in Qatar", International Journal of Productivity and Performance Management, 63(8), pp.1070-1090, https://doi.org/10.1108/IJPPM-11- 2013-0187. 2. Chinnadurai, J., Vengugopal, V., Kumaravel, P., & Paramesh, R. (2016). Influence of occupational heat stress on labour productivity – a case study from Chennai, India. International Journal of Productivity and Performance, 65, 245-255. 3. El-Gohary, K. M., & Aziz, R. F. (2014). Factors influencing construction labor productivity in Egypt. Journal of Management in Engineering, 30(1), 1-9. 4. Jarkas, A. M., & Haupt, T. C. (2015). Major construction risk factors considered by general Contractors in Qatar. Journal of Engineering, Design and Technology, 13, 165-194. doi:10.1108/JEDT-03-2014-0012 5. Jarkas, A. M., Kadri, C. Y., & Younes, J. H. (2014). A survey of factors influencing the Productivity of construction operatives in the State of Qatar. International Journal of Construction Management, 12(3), 1-23. doi:10.1080/15623599.2012.10773 6. Jarkas, A. M., Radosavljevic, M., & Wuyi, L. (2014). Prominent demotivational factors influencing the productivity of construction project managers in Qatar. International Journal of Productivity and Performance Management, 63, 1070- 1090. Doi: 10.1108/IJPPM-11-2013-0187.
  • 7. International Journal of Trend in Scientific Research and Development (IJTSRD) | ISSN: 2456-647 @ IJTSRD | Available Online @ www.ijtsrd.com | Special Issue Publication | November 2018 P - 40 7. Jurf, N. A., & Beheiry, S. (2012). Factors affecting cost and schedule in Qatar’s residential Compound projects. International Journal of Engineering Management and Economics, 3, 117- 134. doi:10.150/IJEME.2012.048608 8. Mahamid, I. (2013). Contractors perspective toward factors affecting labor productivity in building construction. Engineering, Construction and Architectural Management, 20, 446-460. Doi: 10.1108/ECAM-08-2011-0074. 9. Moselhi, O., & Khan, Z. (2012). Significance ranking of parameters impacting construction labor productivity. Construction Innovation, 12, 272-296. doi:10.1108/14714171211244541 10. Navon, R. (2005). Automated project performance control of construction projects, Journal of Automation in Construction 14, 467–476. 11. Proverbs, D. G.; Holt, G. D.; Olomolaiye, P. O. (1999). Factors impacting construction project duration: a comparison between France, Germany and the U.K., Journal of Building and Environment 34, 197–204.