Agenda
Process review
Process assessment model
Process reference model
Process
 A process is a logically related
series of activities intended to
contribute towards reaching a
defined objective
 Process Owner responsible for
process results
 Process Manager responsible
for realization and structure of
the process and reports to PO
 Process Operatives
responsible for defined
activities and reports to PM
 Standards = KPI
 Processes described using
procedures and work
instructions
Processes
Everything we do can be considered a
process or part of a process
Every process can be characterized by:
Average performance
Variation
Processes are performing optimally when
the result of the process is at the expected
value (meaning there is minimal variation)
Problems with Processes
 Customers complain that the process:
 Costs too much (they are not willing to pay for it)
 Takes too long
 Delivers a “Cadillac” solution or product when the customer wanted
something simpler, faster and cheaper
 Processes can contain “hidden factories” or costly sub-
processes put in long ago to fix a problem
 Processes contain waste in the eyes of the customer and need
to be leaned out
 Waste is something the customer is not willing to pay for
during a process
Process Capability
 Process limits (The “Voice of the Process” or The “Voice of
the Data”) - based on natural (common cause) variation
 Tolerance limits (The “Voice of the Customer”) – customer
requirements
 Process Capability – A measure of how “capable” the
process is to meet customer requirements; compares
process limits to tolerance limits
ISO/IEC 15504 a.k.a. SPICE1
1Software Process Improvement and Capability dEtermination
Process
Process
Assessment
Capability
Determination
Process
Improvement
Identifies capability and
risks of
Identifies changes to
Leads to
Is
examined
by
Leads to
What is a Process
Assessment Model?
Process Reference Model
 Domains and Scope
 Processes with Purposes and
Outcomes
CapabilityScale
Process entities
Measurement Framework
 Capability Levels
 Process Attributes
 Rating Scale
Process Assessment Model
INITIAL INPUT
• Purpose
• Scope
• Constraints
• Identities
• Approach
• Assessor
Competence Criteria
• Additional Information
Process Reference Model
• Domain and Scope
• Process Purpose
• Process Outcomes
Process
Assessment Model
• Scope
• Indicators
• Mapping
• Translation
Measurement Framework
• Capability Levels
• Process Attributes
• Rating Scale
OUTPUT
• Date
• Assessment Input
• Identification of
Evidence
• Assessment
Process Used
• Process Profiles
• Additional Information
Roles and Responsibilities
• Sponsor
• Competent Assessor
• Assessors
ASSESSMENT PROCESS
• Planning
• Data Collection
• Data Validation
• Process Attribute Rating
• Reporting
P
A
M
A
s
s
e
s
s
m
e
n
t
P
r
o
c
e
s
s
Sample Process Assessment Model
The PM Process Assessment Model
Process
Reference Model
(PRM)
Measurement
Framework
Assessment
Process
Process Reference Models
 COBIT 5: Process Assessment Model (PAM): Using COBIT 5
 ISO 21500: Project Management Capability Assessment
 ISO/IEC 33071: Process assessment — An integrated
process capability assessment model for Enterprise
processes
 ISO/IEC TS 33072: A process assessment model for
information security
 ISO 33081: An Integrated Organizational Maturity Model
for Software and Systems Engineering
 TIPA: Tudor ITSM Process Assessment
Process Reference Models
 COBIT 5: Process Assessment Model (PAM): Using COBIT 5
 ISO 21500: Project Management Capability Assessment
 ISO/IEC 33071: Process assessment — An integrated
process capability assessment model for Enterprise
processes
 ISO/IEC TS 33072: A process assessment model for
information security
 ISO 33081: An Integrated Organizational Maturity Model
for Software and Systems Engineering
 TIPA: Tudor ITSM Process Assessment
ISO 21500 PRM
Governance Process
Area Governance
Domain Establish
Process ID ES01
Process Name Define and manage the project management framework
Process Description Clarify and maintain the governance framework for project management. Implement and maintain
tools and techniques and authorities to manage projects in line with enterprise objectives.
Process Purpose
Statement
The purpose of Define the project management framework is to provide a consistent project
management approach to enable enterprise governance requirements to be met, covering project
management processes, organizational structures, roles and responsibilities, reliable and
repeatable activities, and skills and competencies.
Outcomes
Number Description
ES01-01 A project management framework is defined.
ES01-02 A project management framework is followed.
Governance Process
Base Practices (BPs)
Number Description Supports
ES01-BP1 Define a project management
framework for IT investments.
ES01-01
ES01-BP2 Establish and maintain an IT project
management framework
ES01-01
ES01-02
ES01-BP3 Establish Project Management Office ES01-01
Governance Process
Work Products
Inputs
Number Description Supports
From corporate governance Decision-making model ES01-01
ES01-02
ES03-WP1 Authority limits ES01-01
ES01-02
From corporate governance Enterprise governance guiding principles ES01-01
ES01-02
From corporate governance Process architecture model ES01-01
Governance Process
Outputs
Number Description Input to Supports
ES01-WP1 Project management guidelines All processes ES01-01
ES01-WP2 PMO Charter All processes ES01-01
ES01-WP3 Definition of organizational structure
and functions
All processes ES01-01
ES01-WP4 Definition of project-related roles and
responsibilities
All processes ES01-01
ES01-WP5 Process capability assessments All processes ES01-02
ES01-WP6 Performance goals and metrics of
process improvement tracking
All processes ES01-02
Governance Process
References
Document Section
COBIT 5 Framework APO01
ISO 21500:2012 3.4.2, 3.6
PMBOK 6th Edition 1.4
PRINCE2 6
…
Level
5
Level
4Level
3
Level 2
Level
1Level
0
Capability
Dimension
Innovating process (2 attributes)
Incomplete process
Performed process (1 attribute)
Managed process (2 attributes)
Established process (2 attributes)
Predictable process (2 attributes)
Based on ISO /IEC 33020
Process Assessment Model (PAM) Overview
Establish (ES) 3
Monitor (MO) 3
Initiate (IN) 3
Plan (PL) 16
Implement (IM) 7
Control (CO) 11
Close (CL) 2
45
…
Level
5
Level
4Level
3
Level 2
Level
1Level
0
Capability
Dimension
Establish (ES) 3
Monitor (MO) 3
Initiate (IN) 3
Plan (PL) 16
Implement (IM) 7
Control (CO) 11
Close (CL) 2
45
Process Assessment Model (PAM) Overview
Based on (Level 1 to 5)
Process Attribute
Indicators (PAI):
- GP : Generic Practice
- GWP: Generic Work
Product
Additional performance
indicators Level 1 based
on:
- BP : Base practices
- WP : Work products
PA5.2 Process innovation implementation
PA5.1 Process innovation
PA3.1 Process definition
PA2.1 Performance management
PA1.1 Process performance
PA4.1 Quantitative analysis
PA4.2 Quantitative process control
PA2.2 Work product management
PA3.2 Process deployment
ISO 33004
a. Appropriate data are
collected and analyzed as
a basis for understanding
the behaviour of the
process, to demonstrate
the suitability and
effectiveness of the
process, and to evaluate
where continual
improvement of the
process can be made.
GP3.2.6 Collect and analyze
data about performance of
the process to demonstrate
its suitability and
effectiveness. Data required
to monitor the suitability and
effectiveness of the process
across the organization are
defined, collected and
analyzed as a basis for
continual improvement.
GWP4.0 Quality records.
Should provide evidence of
reviews undertaken for each
instance of the process.
GWP9.0 Process performance
records. Should provide
evidence of reviews
undertaken for each instance
of the process.
PA 3.2 Process Deployment: This process attribute is a measure of the extent to which the
standard process is deployed as a defined process to achieve its process outcomes.
ISO 33004
© 2017 Peter Davis+Associates 23
b. Assignable causes of process
variation are determined through
analysis of the collected data.
GP4.2.2 Analyze measurement data of
the process to identify real and
potential variations in process
performance. Process performance
data are analyzed to identify variations
in process performance together with
the root cause of common process
performance issues.
GP4.2.3 Analyze process and product
measurement results to identify
variations in process performance. The
results of process control
measurements are analyzed to
GWP9.0 Process performance records.
Should provide details of
measurements collected and analyzed.
PA 4.2 Quantitative Process Control: This process attribute is a measure of the extent to
which objective data is used to manage process performance that is predictable.
ISO 33004
a. Corrective actions are
taken to address
special causes of
variation.
GP4.2.5 Identify and
implement corrective
actions to address
assignable causes.
Corrective action is taken
to address process
control concerns and
results are monitored and
evaluated.
GWP9.0 Process
performance records.
Should provide details of
measurements collected
and analyzed and
corrective action taken.
PA 4.2 Quantitative Process Control: This process attribute is a measure of the extent to
which objective data is used to manage process performance that is predictable.
Rating Scales
Rating Meaning Level of Achievement
P - Partially achieved - > 15 % to ≤ 32.5 %
P + Partially achieved + > 32.5 % to ≤ 50 %
L - Largely achieved - > 50 % to ≤ 67.5 %
L + Largely achieved + > 67.5 % to ≤ 85 %
Rating Meaning Level of Achievement
N Not achieved 0 % to ≤ 15 %
P Partially achieved > 15 % to ≤ 50 %
L Largely achieved > 50 % to ≤ 85 %
F Fully achieved > 85 % to ≤ 100 %
Assessment Process
Sponsor
Co-
ordinator
Assessors
Process Owner/s?
Process
Professional/s?
Lead
Assessor
Other Participants
Consequence of Capability Gaps
Capability level where
gap occurs
Nature of consequence Seriousness of
consequence
5 – Innovating process
Inability to achieve or evaluate process
requirements
Lowest
Highest
4 – Predictable process
Inability to quantify performance or
detect problems early
3 – Established process
Inconsistent process performance
across organization
2 – Managed process
Cost or time overruns; unpredictable
product quality
1 – Performed process
Missing work products; process
outcomes not achieved
Potential consequences of process attribute gaps
Gap/s in Process
attribute
Potential Consequences
 missing work products; process outcomes not achieved
 cost or time overruns; inefficient use of resources
 unclear responsibilities, uncontrolled decisions, and uncertainty
over whether time and cost objectives will be met
 unpredictable product quality and integrity, uncontrolled versions,
 increased support costs, integration problems and increased
rework costs identified best practice and lessons learned from previous projects
not defined, published and available within organization
 no foundation for organization-wide process improvement
 no quantitative understanding of how well process performance
objectives and defined business goals are being achieved
 no quantitative ability to detect performance problems early
 implemented process not incorporating identified best practice
and lessons learned from previous projects; inconsistent process
performance across organization
 lost opportunities to understand process and identify
improvements.
 process not capable and/or stable (predictable) within defined
limits
 quantitative performance objectives and defined business goals
not met
 inability to change process effectively to achieve relevant process
improvement objectives
 inability to evaluate effectiveness of process changes
 process improvement objectives not clearly defined
 opportunities for improvement not clearly identified
PA 1.1 Process
performance
PA 2.1 Performance
management
PA 2.2 Work product
management
PA 3.1 Process definition
PA 3.2 Process
deployment
PA 4.1 Quantitative
analysis
PA 4.2 Quantitative
process
controlPA 5.1 Process
innovation
PA 5.2 Process
innovation
implementation
Source: This figure is reproduced from ISO/IEC 15504-4. Copyright
remains with ISO/IEC.
Capability Gaps and Risk
Consequence indicated
by capability level
where gap occurs
Probability indicated by extent of capability level gap
Slight Significant Substantial
5 – Innovating process Low risk Low risk Low risk
4 – Predictable process Low risk Low risk Medium risk
3 – Established process Low risk Medium risk Medium risk
2 – Managed process Medium risk Medium risk High risk
1 – Performed process Medium risk High risk High risk
Review
Process review
Process assessment model
Process reference model
PECB
Training Courses
• Information Security
• Quality Management Systems
• Continuity, Resilience And Recovery
• IT Security
• Governance, Risk And Compliance
Exam and certification fees are included in the training price.
https://pecb.com/en/education-and-certification-for-individuals
www.pecb.com/events
THANK YOU
?
ptdavis@pdaconsulting.com
www.pdaconsulting.com
www.linkedin.com/in/pdaconsulting/
www.processcapabilityassessment.com

More Related Content

What's hot

On business capabilities, functions and application features
On business capabilities, functions and application featuresOn business capabilities, functions and application features
On business capabilities, functions and application features
Jörgen Dahlberg
 
establish an effective it steering committee
establish an effective it steering committeeestablish an effective it steering committee
establish an effective it steering committee
Info-Tech Research Group
 
PMBOK-5th ed: PMP- Flashcards Part1/5
PMBOK-5th ed: PMP- Flashcards Part1/5PMBOK-5th ed: PMP- Flashcards Part1/5
PMBOK-5th ed: PMP- Flashcards Part1/5
Anand Bobade
 
Captive 2.0 - The Next Generation
Captive 2.0 - The Next GenerationCaptive 2.0 - The Next Generation
Captive 2.0 - The Next Generation
Information Services Group (ISG)
 
Project Management Tools & Techniques | PMP® Training Videos | Project Manage...
Project Management Tools & Techniques | PMP® Training Videos | Project Manage...Project Management Tools & Techniques | PMP® Training Videos | Project Manage...
Project Management Tools & Techniques | PMP® Training Videos | Project Manage...
Edureka!
 
The Acord Framework - An Insurance Enterprise Architecture (2011).pdf
The Acord Framework - An Insurance Enterprise Architecture (2011).pdfThe Acord Framework - An Insurance Enterprise Architecture (2011).pdf
The Acord Framework - An Insurance Enterprise Architecture (2011).pdf
havoc2003
 
Chap 4.7 Project or Phase Close
Chap 4.7 Project or Phase CloseChap 4.7 Project or Phase Close
Chap 4.7 Project or Phase Close
Anand Bobade
 
Business Value Measurements and the Solution Design Framework
Business Value Measurements and the Solution Design FrameworkBusiness Value Measurements and the Solution Design Framework
Business Value Measurements and the Solution Design Framework
Leo Barella
 
Agile Technology Delivery Process Mr
Agile Technology Delivery Process   MrAgile Technology Delivery Process   Mr
Agile Technology Delivery Process Mr
Murray Robinson
 
Celonis Final PPT.pptx
Celonis Final PPT.pptxCelonis Final PPT.pptx
Celonis Final PPT.pptx
LaliSharma4
 
Different approaches for describing the concept of t shaped
Different approaches for describing the concept of t shapedDifferent approaches for describing the concept of t shaped
Different approaches for describing the concept of t shaped
SFIA User Forum
 
Information Technology Project Management
Information Technology Project ManagementInformation Technology Project Management
Information Technology Project Management
Goutama Bachtiar
 
Control and Audit Information System
Control and Audit Information SystemControl and Audit Information System
Control and Audit Information System
arif prasetyo
 
Sample PMP Exam Questions
Sample PMP Exam QuestionsSample PMP Exam Questions
Sample PMP Exam Questions
Resit Gulec, MBA, PMP®, ITIL®
 
Discovery Workshop Template
Discovery Workshop TemplateDiscovery Workshop Template
Discovery Workshop Template
designer DATA
 
Information Technology Project Management - part 02
Information Technology Project Management - part 02Information Technology Project Management - part 02
Information Technology Project Management - part 02
Rizwan Khurram
 
Chap 4.2 Develop Project Management plan
Chap 4.2 Develop Project Management planChap 4.2 Develop Project Management plan
Chap 4.2 Develop Project Management plan
Anand Bobade
 
Business Analysis: Key Concepts and Deliverables
Business Analysis: Key Concepts and DeliverablesBusiness Analysis: Key Concepts and Deliverables
Business Analysis: Key Concepts and Deliverables
Product School
 
An Introduction to IT Management with COBIT 2019
An Introduction to IT Management with COBIT 2019An Introduction to IT Management with COBIT 2019
An Introduction to IT Management with COBIT 2019
Gregor Polančič
 
Business analysis interview question and answers
Business analysis interview question and answersBusiness analysis interview question and answers
Business analysis interview question and answers
Garuda Trainings
 

What's hot (20)

On business capabilities, functions and application features
On business capabilities, functions and application featuresOn business capabilities, functions and application features
On business capabilities, functions and application features
 
establish an effective it steering committee
establish an effective it steering committeeestablish an effective it steering committee
establish an effective it steering committee
 
PMBOK-5th ed: PMP- Flashcards Part1/5
PMBOK-5th ed: PMP- Flashcards Part1/5PMBOK-5th ed: PMP- Flashcards Part1/5
PMBOK-5th ed: PMP- Flashcards Part1/5
 
Captive 2.0 - The Next Generation
Captive 2.0 - The Next GenerationCaptive 2.0 - The Next Generation
Captive 2.0 - The Next Generation
 
Project Management Tools & Techniques | PMP® Training Videos | Project Manage...
Project Management Tools & Techniques | PMP® Training Videos | Project Manage...Project Management Tools & Techniques | PMP® Training Videos | Project Manage...
Project Management Tools & Techniques | PMP® Training Videos | Project Manage...
 
The Acord Framework - An Insurance Enterprise Architecture (2011).pdf
The Acord Framework - An Insurance Enterprise Architecture (2011).pdfThe Acord Framework - An Insurance Enterprise Architecture (2011).pdf
The Acord Framework - An Insurance Enterprise Architecture (2011).pdf
 
Chap 4.7 Project or Phase Close
Chap 4.7 Project or Phase CloseChap 4.7 Project or Phase Close
Chap 4.7 Project or Phase Close
 
Business Value Measurements and the Solution Design Framework
Business Value Measurements and the Solution Design FrameworkBusiness Value Measurements and the Solution Design Framework
Business Value Measurements and the Solution Design Framework
 
Agile Technology Delivery Process Mr
Agile Technology Delivery Process   MrAgile Technology Delivery Process   Mr
Agile Technology Delivery Process Mr
 
Celonis Final PPT.pptx
Celonis Final PPT.pptxCelonis Final PPT.pptx
Celonis Final PPT.pptx
 
Different approaches for describing the concept of t shaped
Different approaches for describing the concept of t shapedDifferent approaches for describing the concept of t shaped
Different approaches for describing the concept of t shaped
 
Information Technology Project Management
Information Technology Project ManagementInformation Technology Project Management
Information Technology Project Management
 
Control and Audit Information System
Control and Audit Information SystemControl and Audit Information System
Control and Audit Information System
 
Sample PMP Exam Questions
Sample PMP Exam QuestionsSample PMP Exam Questions
Sample PMP Exam Questions
 
Discovery Workshop Template
Discovery Workshop TemplateDiscovery Workshop Template
Discovery Workshop Template
 
Information Technology Project Management - part 02
Information Technology Project Management - part 02Information Technology Project Management - part 02
Information Technology Project Management - part 02
 
Chap 4.2 Develop Project Management plan
Chap 4.2 Develop Project Management planChap 4.2 Develop Project Management plan
Chap 4.2 Develop Project Management plan
 
Business Analysis: Key Concepts and Deliverables
Business Analysis: Key Concepts and DeliverablesBusiness Analysis: Key Concepts and Deliverables
Business Analysis: Key Concepts and Deliverables
 
An Introduction to IT Management with COBIT 2019
An Introduction to IT Management with COBIT 2019An Introduction to IT Management with COBIT 2019
An Introduction to IT Management with COBIT 2019
 
Business analysis interview question and answers
Business analysis interview question and answersBusiness analysis interview question and answers
Business analysis interview question and answers
 

Similar to Assessing Your Processes using ISO Standards

Spice
SpiceSpice
Spice
Oana Feidi
 
Spice
SpiceSpice
Spice
Oana Feidi
 
Ch6 performinng to asessment
Ch6 performinng to asessmentCh6 performinng to asessment
Ch6 performinng to asessment
Kittitouch Suteeca
 
Ch 12(spi)cm mi scampi
Ch 12(spi)cm mi scampiCh 12(spi)cm mi scampi
Ch 12(spi)cm mi scampi
Kittitouch Suteeca
 
Process_Modeling
Process_ModelingProcess_Modeling
Process_Modeling
Ashok Kumar
 
Spice
SpiceSpice
Spice
Oana Feidi
 
Product quality management
Product quality managementProduct quality management
Product quality management
Sunil Meena
 
Quality management procedures
Quality management proceduresQuality management procedures
Quality management procedures
selinasimpson1201
 
CMMI.ppt
CMMI.pptCMMI.ppt
Project quality management
Project quality managementProject quality management
Project quality management
Mohammad Ashraf Khan, PMP
 
Process Audit --VDA
Process Audit --VDAProcess Audit --VDA
Process Audit --VDA
Bill Yan
 
Business Process Management Approach
Business Process Management Approach  Business Process Management Approach
Business Process Management Approach
Navitsumo Consulting Ltd.
 
Introduction to CMMI-DEV v1.3 - Day 4
Introduction to CMMI-DEV v1.3  - Day 4Introduction to CMMI-DEV v1.3  - Day 4
Introduction to CMMI-DEV v1.3 - Day 4
Sherif Salah, MBA, ITIL, CMMI, MCSA, TQM
 
Business Process Management 101 Training
Business Process Management 101 TrainingBusiness Process Management 101 Training
Business Process Management 101 Training
Franco Pang
 
Session 12 4th edition PMP
Session  12 4th edition PMPSession  12 4th edition PMP
Session 12 4th edition PMP
محمد عصمت عبد الرازق
 
DMAIC Components
DMAIC ComponentsDMAIC Components
DMAIC Components
Anand Subramaniam
 
Ch 7(spi)intro tocm-mi2013
Ch 7(spi)intro tocm-mi2013Ch 7(spi)intro tocm-mi2013
Ch 7(spi)intro tocm-mi2013
Kittitouch Suteeca
 
Six Sigma
Six SigmaSix Sigma
Six Sigma
Hassan Habib
 
PROJECT QUALITY MANAGEMENT for Project.ppt
PROJECT QUALITY MANAGEMENT for Project.pptPROJECT QUALITY MANAGEMENT for Project.ppt
PROJECT QUALITY MANAGEMENT for Project.ppt
AhtashamArshad4
 
CMMi level 3 presentation
CMMi level 3 presentationCMMi level 3 presentation
CMMi level 3 presentation
adinmani
 

Similar to Assessing Your Processes using ISO Standards (20)

Spice
SpiceSpice
Spice
 
Spice
SpiceSpice
Spice
 
Ch6 performinng to asessment
Ch6 performinng to asessmentCh6 performinng to asessment
Ch6 performinng to asessment
 
Ch 12(spi)cm mi scampi
Ch 12(spi)cm mi scampiCh 12(spi)cm mi scampi
Ch 12(spi)cm mi scampi
 
Process_Modeling
Process_ModelingProcess_Modeling
Process_Modeling
 
Spice
SpiceSpice
Spice
 
Product quality management
Product quality managementProduct quality management
Product quality management
 
Quality management procedures
Quality management proceduresQuality management procedures
Quality management procedures
 
CMMI.ppt
CMMI.pptCMMI.ppt
CMMI.ppt
 
Project quality management
Project quality managementProject quality management
Project quality management
 
Process Audit --VDA
Process Audit --VDAProcess Audit --VDA
Process Audit --VDA
 
Business Process Management Approach
Business Process Management Approach  Business Process Management Approach
Business Process Management Approach
 
Introduction to CMMI-DEV v1.3 - Day 4
Introduction to CMMI-DEV v1.3  - Day 4Introduction to CMMI-DEV v1.3  - Day 4
Introduction to CMMI-DEV v1.3 - Day 4
 
Business Process Management 101 Training
Business Process Management 101 TrainingBusiness Process Management 101 Training
Business Process Management 101 Training
 
Session 12 4th edition PMP
Session  12 4th edition PMPSession  12 4th edition PMP
Session 12 4th edition PMP
 
DMAIC Components
DMAIC ComponentsDMAIC Components
DMAIC Components
 
Ch 7(spi)intro tocm-mi2013
Ch 7(spi)intro tocm-mi2013Ch 7(spi)intro tocm-mi2013
Ch 7(spi)intro tocm-mi2013
 
Six Sigma
Six SigmaSix Sigma
Six Sigma
 
PROJECT QUALITY MANAGEMENT for Project.ppt
PROJECT QUALITY MANAGEMENT for Project.pptPROJECT QUALITY MANAGEMENT for Project.ppt
PROJECT QUALITY MANAGEMENT for Project.ppt
 
CMMi level 3 presentation
CMMi level 3 presentationCMMi level 3 presentation
CMMi level 3 presentation
 

More from PECB

ISO/IEC 27001, ISO/IEC 42001, and GDPR: Best Practices for Implementation and...
ISO/IEC 27001, ISO/IEC 42001, and GDPR: Best Practices for Implementation and...ISO/IEC 27001, ISO/IEC 42001, and GDPR: Best Practices for Implementation and...
ISO/IEC 27001, ISO/IEC 42001, and GDPR: Best Practices for Implementation and...
PECB
 
Beyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global ImpactBeyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global Impact
PECB
 
DORA, ISO/IEC 27005, and the Rise of AI: Securing the Future of Cybersecurity
DORA, ISO/IEC 27005, and the Rise of AI: Securing the Future of CybersecurityDORA, ISO/IEC 27005, and the Rise of AI: Securing the Future of Cybersecurity
DORA, ISO/IEC 27005, and the Rise of AI: Securing the Future of Cybersecurity
PECB
 
Securing the Future: ISO/IEC 27001, ISO/IEC 42001, and AI Governance
Securing the Future: ISO/IEC 27001, ISO/IEC 42001, and AI GovernanceSecuring the Future: ISO/IEC 27001, ISO/IEC 42001, and AI Governance
Securing the Future: ISO/IEC 27001, ISO/IEC 42001, and AI Governance
PECB
 
ISO/IEC 27032, ISO/IEC 27002, and CMMC Frameworks - Achieving Cybersecurity M...
ISO/IEC 27032, ISO/IEC 27002, and CMMC Frameworks - Achieving Cybersecurity M...ISO/IEC 27032, ISO/IEC 27002, and CMMC Frameworks - Achieving Cybersecurity M...
ISO/IEC 27032, ISO/IEC 27002, and CMMC Frameworks - Achieving Cybersecurity M...
PECB
 
ISO/IEC 27001 and ISO/IEC 27035: Building a Resilient Cybersecurity Strategy ...
ISO/IEC 27001 and ISO/IEC 27035: Building a Resilient Cybersecurity Strategy ...ISO/IEC 27001 and ISO/IEC 27035: Building a Resilient Cybersecurity Strategy ...
ISO/IEC 27001 and ISO/IEC 27035: Building a Resilient Cybersecurity Strategy ...
PECB
 
ISO/IEC 27001 and ISO/IEC 27005: Managing AI Risks Effectively
ISO/IEC 27001 and ISO/IEC 27005: Managing AI Risks EffectivelyISO/IEC 27001 and ISO/IEC 27005: Managing AI Risks Effectively
ISO/IEC 27001 and ISO/IEC 27005: Managing AI Risks Effectively
PECB
 
Aligning ISO/IEC 27032:2023 and ISO/IEC 27701: Strengthening Cybersecurity Re...
Aligning ISO/IEC 27032:2023 and ISO/IEC 27701: Strengthening Cybersecurity Re...Aligning ISO/IEC 27032:2023 and ISO/IEC 27701: Strengthening Cybersecurity Re...
Aligning ISO/IEC 27032:2023 and ISO/IEC 27701: Strengthening Cybersecurity Re...
PECB
 
ISO/IEC 27001 and ISO/IEC 27032:2023 - Safeguarding Your Digital Transformation
ISO/IEC 27001 and ISO/IEC 27032:2023 - Safeguarding Your Digital TransformationISO/IEC 27001 and ISO/IEC 27032:2023 - Safeguarding Your Digital Transformation
ISO/IEC 27001 and ISO/IEC 27032:2023 - Safeguarding Your Digital Transformation
PECB
 
Managing ISO 31000 Framework in AI Systems - The EU ACT and other regulations
Managing ISO 31000 Framework in AI Systems - The EU ACT and other regulationsManaging ISO 31000 Framework in AI Systems - The EU ACT and other regulations
Managing ISO 31000 Framework in AI Systems - The EU ACT and other regulations
PECB
 
Impact of Generative AI in Cybersecurity - How can ISO/IEC 27032 help?
Impact of Generative AI in Cybersecurity - How can ISO/IEC 27032 help?Impact of Generative AI in Cybersecurity - How can ISO/IEC 27032 help?
Impact of Generative AI in Cybersecurity - How can ISO/IEC 27032 help?
PECB
 
GDPR and Data Protection: Ensure compliance and minimize the risk of penaltie...
GDPR and Data Protection: Ensure compliance and minimize the risk of penaltie...GDPR and Data Protection: Ensure compliance and minimize the risk of penaltie...
GDPR and Data Protection: Ensure compliance and minimize the risk of penaltie...
PECB
 
How Can ISO/IEC 27001 Help Organizations Align With the EU Cybersecurity Regu...
How Can ISO/IEC 27001 Help Organizations Align With the EU Cybersecurity Regu...How Can ISO/IEC 27001 Help Organizations Align With the EU Cybersecurity Regu...
How Can ISO/IEC 27001 Help Organizations Align With the EU Cybersecurity Regu...
PECB
 
Student Information Session University KTMC
Student Information Session University KTMC Student Information Session University KTMC
Student Information Session University KTMC
PECB
 
ISO/IEC 27001 and ISO 22301 - How to ensure business survival against cyber a...
ISO/IEC 27001 and ISO 22301 - How to ensure business survival against cyber a...ISO/IEC 27001 and ISO 22301 - How to ensure business survival against cyber a...
ISO/IEC 27001 and ISO 22301 - How to ensure business survival against cyber a...
PECB
 
Integrating ISO/IEC 27001 and ISO 31000 for Effective Information Security an...
Integrating ISO/IEC 27001 and ISO 31000 for Effective Information Security an...Integrating ISO/IEC 27001 and ISO 31000 for Effective Information Security an...
Integrating ISO/IEC 27001 and ISO 31000 for Effective Information Security an...
PECB
 
Student Information Session University CREST ADVISORY AFRICA
Student Information Session University CREST ADVISORY AFRICA Student Information Session University CREST ADVISORY AFRICA
Student Information Session University CREST ADVISORY AFRICA
PECB
 
IT Governance and Information Security – How do they map?
IT Governance and Information Security – How do they map?IT Governance and Information Security – How do they map?
IT Governance and Information Security – How do they map?
PECB
 
Information Session University Egybyte.pptx
Information Session University Egybyte.pptxInformation Session University Egybyte.pptx
Information Session University Egybyte.pptx
PECB
 
Student Information Session University Digital Encode.pptx
Student Information Session University Digital Encode.pptxStudent Information Session University Digital Encode.pptx
Student Information Session University Digital Encode.pptx
PECB
 

More from PECB (20)

ISO/IEC 27001, ISO/IEC 42001, and GDPR: Best Practices for Implementation and...
ISO/IEC 27001, ISO/IEC 42001, and GDPR: Best Practices for Implementation and...ISO/IEC 27001, ISO/IEC 42001, and GDPR: Best Practices for Implementation and...
ISO/IEC 27001, ISO/IEC 42001, and GDPR: Best Practices for Implementation and...
 
Beyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global ImpactBeyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global Impact
 
DORA, ISO/IEC 27005, and the Rise of AI: Securing the Future of Cybersecurity
DORA, ISO/IEC 27005, and the Rise of AI: Securing the Future of CybersecurityDORA, ISO/IEC 27005, and the Rise of AI: Securing the Future of Cybersecurity
DORA, ISO/IEC 27005, and the Rise of AI: Securing the Future of Cybersecurity
 
Securing the Future: ISO/IEC 27001, ISO/IEC 42001, and AI Governance
Securing the Future: ISO/IEC 27001, ISO/IEC 42001, and AI GovernanceSecuring the Future: ISO/IEC 27001, ISO/IEC 42001, and AI Governance
Securing the Future: ISO/IEC 27001, ISO/IEC 42001, and AI Governance
 
ISO/IEC 27032, ISO/IEC 27002, and CMMC Frameworks - Achieving Cybersecurity M...
ISO/IEC 27032, ISO/IEC 27002, and CMMC Frameworks - Achieving Cybersecurity M...ISO/IEC 27032, ISO/IEC 27002, and CMMC Frameworks - Achieving Cybersecurity M...
ISO/IEC 27032, ISO/IEC 27002, and CMMC Frameworks - Achieving Cybersecurity M...
 
ISO/IEC 27001 and ISO/IEC 27035: Building a Resilient Cybersecurity Strategy ...
ISO/IEC 27001 and ISO/IEC 27035: Building a Resilient Cybersecurity Strategy ...ISO/IEC 27001 and ISO/IEC 27035: Building a Resilient Cybersecurity Strategy ...
ISO/IEC 27001 and ISO/IEC 27035: Building a Resilient Cybersecurity Strategy ...
 
ISO/IEC 27001 and ISO/IEC 27005: Managing AI Risks Effectively
ISO/IEC 27001 and ISO/IEC 27005: Managing AI Risks EffectivelyISO/IEC 27001 and ISO/IEC 27005: Managing AI Risks Effectively
ISO/IEC 27001 and ISO/IEC 27005: Managing AI Risks Effectively
 
Aligning ISO/IEC 27032:2023 and ISO/IEC 27701: Strengthening Cybersecurity Re...
Aligning ISO/IEC 27032:2023 and ISO/IEC 27701: Strengthening Cybersecurity Re...Aligning ISO/IEC 27032:2023 and ISO/IEC 27701: Strengthening Cybersecurity Re...
Aligning ISO/IEC 27032:2023 and ISO/IEC 27701: Strengthening Cybersecurity Re...
 
ISO/IEC 27001 and ISO/IEC 27032:2023 - Safeguarding Your Digital Transformation
ISO/IEC 27001 and ISO/IEC 27032:2023 - Safeguarding Your Digital TransformationISO/IEC 27001 and ISO/IEC 27032:2023 - Safeguarding Your Digital Transformation
ISO/IEC 27001 and ISO/IEC 27032:2023 - Safeguarding Your Digital Transformation
 
Managing ISO 31000 Framework in AI Systems - The EU ACT and other regulations
Managing ISO 31000 Framework in AI Systems - The EU ACT and other regulationsManaging ISO 31000 Framework in AI Systems - The EU ACT and other regulations
Managing ISO 31000 Framework in AI Systems - The EU ACT and other regulations
 
Impact of Generative AI in Cybersecurity - How can ISO/IEC 27032 help?
Impact of Generative AI in Cybersecurity - How can ISO/IEC 27032 help?Impact of Generative AI in Cybersecurity - How can ISO/IEC 27032 help?
Impact of Generative AI in Cybersecurity - How can ISO/IEC 27032 help?
 
GDPR and Data Protection: Ensure compliance and minimize the risk of penaltie...
GDPR and Data Protection: Ensure compliance and minimize the risk of penaltie...GDPR and Data Protection: Ensure compliance and minimize the risk of penaltie...
GDPR and Data Protection: Ensure compliance and minimize the risk of penaltie...
 
How Can ISO/IEC 27001 Help Organizations Align With the EU Cybersecurity Regu...
How Can ISO/IEC 27001 Help Organizations Align With the EU Cybersecurity Regu...How Can ISO/IEC 27001 Help Organizations Align With the EU Cybersecurity Regu...
How Can ISO/IEC 27001 Help Organizations Align With the EU Cybersecurity Regu...
 
Student Information Session University KTMC
Student Information Session University KTMC Student Information Session University KTMC
Student Information Session University KTMC
 
ISO/IEC 27001 and ISO 22301 - How to ensure business survival against cyber a...
ISO/IEC 27001 and ISO 22301 - How to ensure business survival against cyber a...ISO/IEC 27001 and ISO 22301 - How to ensure business survival against cyber a...
ISO/IEC 27001 and ISO 22301 - How to ensure business survival against cyber a...
 
Integrating ISO/IEC 27001 and ISO 31000 for Effective Information Security an...
Integrating ISO/IEC 27001 and ISO 31000 for Effective Information Security an...Integrating ISO/IEC 27001 and ISO 31000 for Effective Information Security an...
Integrating ISO/IEC 27001 and ISO 31000 for Effective Information Security an...
 
Student Information Session University CREST ADVISORY AFRICA
Student Information Session University CREST ADVISORY AFRICA Student Information Session University CREST ADVISORY AFRICA
Student Information Session University CREST ADVISORY AFRICA
 
IT Governance and Information Security – How do they map?
IT Governance and Information Security – How do they map?IT Governance and Information Security – How do they map?
IT Governance and Information Security – How do they map?
 
Information Session University Egybyte.pptx
Information Session University Egybyte.pptxInformation Session University Egybyte.pptx
Information Session University Egybyte.pptx
 
Student Information Session University Digital Encode.pptx
Student Information Session University Digital Encode.pptxStudent Information Session University Digital Encode.pptx
Student Information Session University Digital Encode.pptx
 

Recently uploaded

How to Setup Warehouse & Location in Odoo 17 Inventory
How to Setup Warehouse & Location in Odoo 17 InventoryHow to Setup Warehouse & Location in Odoo 17 Inventory
How to Setup Warehouse & Location in Odoo 17 Inventory
Celine George
 
Traditional Musical Instruments of Arunachal Pradesh and Uttar Pradesh - RAYH...
Traditional Musical Instruments of Arunachal Pradesh and Uttar Pradesh - RAYH...Traditional Musical Instruments of Arunachal Pradesh and Uttar Pradesh - RAYH...
Traditional Musical Instruments of Arunachal Pradesh and Uttar Pradesh - RAYH...
imrankhan141184
 
Beyond Degrees - Empowering the Workforce in the Context of Skills-First.pptx
Beyond Degrees - Empowering the Workforce in the Context of Skills-First.pptxBeyond Degrees - Empowering the Workforce in the Context of Skills-First.pptx
Beyond Degrees - Empowering the Workforce in the Context of Skills-First.pptx
EduSkills OECD
 
Philippine Edukasyong Pantahanan at Pangkabuhayan (EPP) Curriculum
Philippine Edukasyong Pantahanan at Pangkabuhayan (EPP) CurriculumPhilippine Edukasyong Pantahanan at Pangkabuhayan (EPP) Curriculum
Philippine Edukasyong Pantahanan at Pangkabuhayan (EPP) Curriculum
MJDuyan
 
IGCSE Biology Chapter 14- Reproduction in Plants.pdf
IGCSE Biology Chapter 14- Reproduction in Plants.pdfIGCSE Biology Chapter 14- Reproduction in Plants.pdf
IGCSE Biology Chapter 14- Reproduction in Plants.pdf
Amin Marwan
 
Film vocab for eal 3 students: Australia the movie
Film vocab for eal 3 students: Australia the movieFilm vocab for eal 3 students: Australia the movie
Film vocab for eal 3 students: Australia the movie
Nicholas Montgomery
 
Walmart Business+ and Spark Good for Nonprofits.pdf
Walmart Business+ and Spark Good for Nonprofits.pdfWalmart Business+ and Spark Good for Nonprofits.pdf
Walmart Business+ and Spark Good for Nonprofits.pdf
TechSoup
 
NEWSPAPERS - QUESTION 1 - REVISION POWERPOINT.pptx
NEWSPAPERS - QUESTION 1 - REVISION POWERPOINT.pptxNEWSPAPERS - QUESTION 1 - REVISION POWERPOINT.pptx
NEWSPAPERS - QUESTION 1 - REVISION POWERPOINT.pptx
iammrhaywood
 
Advanced Java[Extra Concepts, Not Difficult].docx
Advanced Java[Extra Concepts, Not Difficult].docxAdvanced Java[Extra Concepts, Not Difficult].docx
Advanced Java[Extra Concepts, Not Difficult].docx
adhitya5119
 
ZK on Polkadot zero knowledge proofs - sub0.pptx
ZK on Polkadot zero knowledge proofs - sub0.pptxZK on Polkadot zero knowledge proofs - sub0.pptx
ZK on Polkadot zero knowledge proofs - sub0.pptx
dot55audits
 
The basics of sentences session 6pptx.pptx
The basics of sentences session 6pptx.pptxThe basics of sentences session 6pptx.pptx
The basics of sentences session 6pptx.pptx
heathfieldcps1
 
Solutons Maths Escape Room Spatial .pptx
Solutons Maths Escape Room Spatial .pptxSolutons Maths Escape Room Spatial .pptx
Solutons Maths Escape Room Spatial .pptx
spdendr
 
Main Java[All of the Base Concepts}.docx
Main Java[All of the Base Concepts}.docxMain Java[All of the Base Concepts}.docx
Main Java[All of the Base Concepts}.docx
adhitya5119
 
C1 Rubenstein AP HuG xxxxxxxxxxxxxx.pptx
C1 Rubenstein AP HuG xxxxxxxxxxxxxx.pptxC1 Rubenstein AP HuG xxxxxxxxxxxxxx.pptx
C1 Rubenstein AP HuG xxxxxxxxxxxxxx.pptx
mulvey2
 
writing about opinions about Australia the movie
writing about opinions about Australia the moviewriting about opinions about Australia the movie
writing about opinions about Australia the movie
Nicholas Montgomery
 
BÀI TẬP BỔ TRỢ TIẾNG ANH 8 CẢ NĂM - GLOBAL SUCCESS - NĂM HỌC 2023-2024 (CÓ FI...
BÀI TẬP BỔ TRỢ TIẾNG ANH 8 CẢ NĂM - GLOBAL SUCCESS - NĂM HỌC 2023-2024 (CÓ FI...BÀI TẬP BỔ TRỢ TIẾNG ANH 8 CẢ NĂM - GLOBAL SUCCESS - NĂM HỌC 2023-2024 (CÓ FI...
BÀI TẬP BỔ TRỢ TIẾNG ANH 8 CẢ NĂM - GLOBAL SUCCESS - NĂM HỌC 2023-2024 (CÓ FI...
Nguyen Thanh Tu Collection
 
Your Skill Boost Masterclass: Strategies for Effective Upskilling
Your Skill Boost Masterclass: Strategies for Effective UpskillingYour Skill Boost Masterclass: Strategies for Effective Upskilling
Your Skill Boost Masterclass: Strategies for Effective Upskilling
Excellence Foundation for South Sudan
 
Gender and Mental Health - Counselling and Family Therapy Applications and In...
Gender and Mental Health - Counselling and Family Therapy Applications and In...Gender and Mental Health - Counselling and Family Therapy Applications and In...
Gender and Mental Health - Counselling and Family Therapy Applications and In...
PsychoTech Services
 
Wound healing PPT
Wound healing PPTWound healing PPT
Wound healing PPT
Jyoti Chand
 
BÀI TẬP BỔ TRỢ TIẾNG ANH LỚP 9 CẢ NĂM - GLOBAL SUCCESS - NĂM HỌC 2024-2025 - ...
BÀI TẬP BỔ TRỢ TIẾNG ANH LỚP 9 CẢ NĂM - GLOBAL SUCCESS - NĂM HỌC 2024-2025 - ...BÀI TẬP BỔ TRỢ TIẾNG ANH LỚP 9 CẢ NĂM - GLOBAL SUCCESS - NĂM HỌC 2024-2025 - ...
BÀI TẬP BỔ TRỢ TIẾNG ANH LỚP 9 CẢ NĂM - GLOBAL SUCCESS - NĂM HỌC 2024-2025 - ...
Nguyen Thanh Tu Collection
 

Recently uploaded (20)

How to Setup Warehouse & Location in Odoo 17 Inventory
How to Setup Warehouse & Location in Odoo 17 InventoryHow to Setup Warehouse & Location in Odoo 17 Inventory
How to Setup Warehouse & Location in Odoo 17 Inventory
 
Traditional Musical Instruments of Arunachal Pradesh and Uttar Pradesh - RAYH...
Traditional Musical Instruments of Arunachal Pradesh and Uttar Pradesh - RAYH...Traditional Musical Instruments of Arunachal Pradesh and Uttar Pradesh - RAYH...
Traditional Musical Instruments of Arunachal Pradesh and Uttar Pradesh - RAYH...
 
Beyond Degrees - Empowering the Workforce in the Context of Skills-First.pptx
Beyond Degrees - Empowering the Workforce in the Context of Skills-First.pptxBeyond Degrees - Empowering the Workforce in the Context of Skills-First.pptx
Beyond Degrees - Empowering the Workforce in the Context of Skills-First.pptx
 
Philippine Edukasyong Pantahanan at Pangkabuhayan (EPP) Curriculum
Philippine Edukasyong Pantahanan at Pangkabuhayan (EPP) CurriculumPhilippine Edukasyong Pantahanan at Pangkabuhayan (EPP) Curriculum
Philippine Edukasyong Pantahanan at Pangkabuhayan (EPP) Curriculum
 
IGCSE Biology Chapter 14- Reproduction in Plants.pdf
IGCSE Biology Chapter 14- Reproduction in Plants.pdfIGCSE Biology Chapter 14- Reproduction in Plants.pdf
IGCSE Biology Chapter 14- Reproduction in Plants.pdf
 
Film vocab for eal 3 students: Australia the movie
Film vocab for eal 3 students: Australia the movieFilm vocab for eal 3 students: Australia the movie
Film vocab for eal 3 students: Australia the movie
 
Walmart Business+ and Spark Good for Nonprofits.pdf
Walmart Business+ and Spark Good for Nonprofits.pdfWalmart Business+ and Spark Good for Nonprofits.pdf
Walmart Business+ and Spark Good for Nonprofits.pdf
 
NEWSPAPERS - QUESTION 1 - REVISION POWERPOINT.pptx
NEWSPAPERS - QUESTION 1 - REVISION POWERPOINT.pptxNEWSPAPERS - QUESTION 1 - REVISION POWERPOINT.pptx
NEWSPAPERS - QUESTION 1 - REVISION POWERPOINT.pptx
 
Advanced Java[Extra Concepts, Not Difficult].docx
Advanced Java[Extra Concepts, Not Difficult].docxAdvanced Java[Extra Concepts, Not Difficult].docx
Advanced Java[Extra Concepts, Not Difficult].docx
 
ZK on Polkadot zero knowledge proofs - sub0.pptx
ZK on Polkadot zero knowledge proofs - sub0.pptxZK on Polkadot zero knowledge proofs - sub0.pptx
ZK on Polkadot zero knowledge proofs - sub0.pptx
 
The basics of sentences session 6pptx.pptx
The basics of sentences session 6pptx.pptxThe basics of sentences session 6pptx.pptx
The basics of sentences session 6pptx.pptx
 
Solutons Maths Escape Room Spatial .pptx
Solutons Maths Escape Room Spatial .pptxSolutons Maths Escape Room Spatial .pptx
Solutons Maths Escape Room Spatial .pptx
 
Main Java[All of the Base Concepts}.docx
Main Java[All of the Base Concepts}.docxMain Java[All of the Base Concepts}.docx
Main Java[All of the Base Concepts}.docx
 
C1 Rubenstein AP HuG xxxxxxxxxxxxxx.pptx
C1 Rubenstein AP HuG xxxxxxxxxxxxxx.pptxC1 Rubenstein AP HuG xxxxxxxxxxxxxx.pptx
C1 Rubenstein AP HuG xxxxxxxxxxxxxx.pptx
 
writing about opinions about Australia the movie
writing about opinions about Australia the moviewriting about opinions about Australia the movie
writing about opinions about Australia the movie
 
BÀI TẬP BỔ TRỢ TIẾNG ANH 8 CẢ NĂM - GLOBAL SUCCESS - NĂM HỌC 2023-2024 (CÓ FI...
BÀI TẬP BỔ TRỢ TIẾNG ANH 8 CẢ NĂM - GLOBAL SUCCESS - NĂM HỌC 2023-2024 (CÓ FI...BÀI TẬP BỔ TRỢ TIẾNG ANH 8 CẢ NĂM - GLOBAL SUCCESS - NĂM HỌC 2023-2024 (CÓ FI...
BÀI TẬP BỔ TRỢ TIẾNG ANH 8 CẢ NĂM - GLOBAL SUCCESS - NĂM HỌC 2023-2024 (CÓ FI...
 
Your Skill Boost Masterclass: Strategies for Effective Upskilling
Your Skill Boost Masterclass: Strategies for Effective UpskillingYour Skill Boost Masterclass: Strategies for Effective Upskilling
Your Skill Boost Masterclass: Strategies for Effective Upskilling
 
Gender and Mental Health - Counselling and Family Therapy Applications and In...
Gender and Mental Health - Counselling and Family Therapy Applications and In...Gender and Mental Health - Counselling and Family Therapy Applications and In...
Gender and Mental Health - Counselling and Family Therapy Applications and In...
 
Wound healing PPT
Wound healing PPTWound healing PPT
Wound healing PPT
 
BÀI TẬP BỔ TRỢ TIẾNG ANH LỚP 9 CẢ NĂM - GLOBAL SUCCESS - NĂM HỌC 2024-2025 - ...
BÀI TẬP BỔ TRỢ TIẾNG ANH LỚP 9 CẢ NĂM - GLOBAL SUCCESS - NĂM HỌC 2024-2025 - ...BÀI TẬP BỔ TRỢ TIẾNG ANH LỚP 9 CẢ NĂM - GLOBAL SUCCESS - NĂM HỌC 2024-2025 - ...
BÀI TẬP BỔ TRỢ TIẾNG ANH LỚP 9 CẢ NĂM - GLOBAL SUCCESS - NĂM HỌC 2024-2025 - ...
 

Assessing Your Processes using ISO Standards

  • 1.
  • 2. Agenda Process review Process assessment model Process reference model
  • 3. Process  A process is a logically related series of activities intended to contribute towards reaching a defined objective  Process Owner responsible for process results  Process Manager responsible for realization and structure of the process and reports to PO  Process Operatives responsible for defined activities and reports to PM  Standards = KPI  Processes described using procedures and work instructions
  • 4. Processes Everything we do can be considered a process or part of a process Every process can be characterized by: Average performance Variation Processes are performing optimally when the result of the process is at the expected value (meaning there is minimal variation)
  • 5. Problems with Processes  Customers complain that the process:  Costs too much (they are not willing to pay for it)  Takes too long  Delivers a “Cadillac” solution or product when the customer wanted something simpler, faster and cheaper  Processes can contain “hidden factories” or costly sub- processes put in long ago to fix a problem  Processes contain waste in the eyes of the customer and need to be leaned out  Waste is something the customer is not willing to pay for during a process
  • 6. Process Capability  Process limits (The “Voice of the Process” or The “Voice of the Data”) - based on natural (common cause) variation  Tolerance limits (The “Voice of the Customer”) – customer requirements  Process Capability – A measure of how “capable” the process is to meet customer requirements; compares process limits to tolerance limits
  • 7. ISO/IEC 15504 a.k.a. SPICE1 1Software Process Improvement and Capability dEtermination Process Process Assessment Capability Determination Process Improvement Identifies capability and risks of Identifies changes to Leads to Is examined by Leads to
  • 8. What is a Process Assessment Model? Process Reference Model  Domains and Scope  Processes with Purposes and Outcomes CapabilityScale Process entities Measurement Framework  Capability Levels  Process Attributes  Rating Scale Process Assessment Model
  • 9. INITIAL INPUT • Purpose • Scope • Constraints • Identities • Approach • Assessor Competence Criteria • Additional Information Process Reference Model • Domain and Scope • Process Purpose • Process Outcomes Process Assessment Model • Scope • Indicators • Mapping • Translation Measurement Framework • Capability Levels • Process Attributes • Rating Scale OUTPUT • Date • Assessment Input • Identification of Evidence • Assessment Process Used • Process Profiles • Additional Information Roles and Responsibilities • Sponsor • Competent Assessor • Assessors ASSESSMENT PROCESS • Planning • Data Collection • Data Validation • Process Attribute Rating • Reporting P A M A s s e s s m e n t P r o c e s s
  • 11. The PM Process Assessment Model Process Reference Model (PRM) Measurement Framework Assessment Process
  • 12. Process Reference Models  COBIT 5: Process Assessment Model (PAM): Using COBIT 5  ISO 21500: Project Management Capability Assessment  ISO/IEC 33071: Process assessment — An integrated process capability assessment model for Enterprise processes  ISO/IEC TS 33072: A process assessment model for information security  ISO 33081: An Integrated Organizational Maturity Model for Software and Systems Engineering  TIPA: Tudor ITSM Process Assessment
  • 13. Process Reference Models  COBIT 5: Process Assessment Model (PAM): Using COBIT 5  ISO 21500: Project Management Capability Assessment  ISO/IEC 33071: Process assessment — An integrated process capability assessment model for Enterprise processes  ISO/IEC TS 33072: A process assessment model for information security  ISO 33081: An Integrated Organizational Maturity Model for Software and Systems Engineering  TIPA: Tudor ITSM Process Assessment
  • 15. Governance Process Area Governance Domain Establish Process ID ES01 Process Name Define and manage the project management framework Process Description Clarify and maintain the governance framework for project management. Implement and maintain tools and techniques and authorities to manage projects in line with enterprise objectives. Process Purpose Statement The purpose of Define the project management framework is to provide a consistent project management approach to enable enterprise governance requirements to be met, covering project management processes, organizational structures, roles and responsibilities, reliable and repeatable activities, and skills and competencies. Outcomes Number Description ES01-01 A project management framework is defined. ES01-02 A project management framework is followed.
  • 16. Governance Process Base Practices (BPs) Number Description Supports ES01-BP1 Define a project management framework for IT investments. ES01-01 ES01-BP2 Establish and maintain an IT project management framework ES01-01 ES01-02 ES01-BP3 Establish Project Management Office ES01-01
  • 17. Governance Process Work Products Inputs Number Description Supports From corporate governance Decision-making model ES01-01 ES01-02 ES03-WP1 Authority limits ES01-01 ES01-02 From corporate governance Enterprise governance guiding principles ES01-01 ES01-02 From corporate governance Process architecture model ES01-01
  • 18. Governance Process Outputs Number Description Input to Supports ES01-WP1 Project management guidelines All processes ES01-01 ES01-WP2 PMO Charter All processes ES01-01 ES01-WP3 Definition of organizational structure and functions All processes ES01-01 ES01-WP4 Definition of project-related roles and responsibilities All processes ES01-01 ES01-WP5 Process capability assessments All processes ES01-02 ES01-WP6 Performance goals and metrics of process improvement tracking All processes ES01-02
  • 19. Governance Process References Document Section COBIT 5 Framework APO01 ISO 21500:2012 3.4.2, 3.6 PMBOK 6th Edition 1.4 PRINCE2 6
  • 20. … Level 5 Level 4Level 3 Level 2 Level 1Level 0 Capability Dimension Innovating process (2 attributes) Incomplete process Performed process (1 attribute) Managed process (2 attributes) Established process (2 attributes) Predictable process (2 attributes) Based on ISO /IEC 33020 Process Assessment Model (PAM) Overview Establish (ES) 3 Monitor (MO) 3 Initiate (IN) 3 Plan (PL) 16 Implement (IM) 7 Control (CO) 11 Close (CL) 2 45
  • 21. … Level 5 Level 4Level 3 Level 2 Level 1Level 0 Capability Dimension Establish (ES) 3 Monitor (MO) 3 Initiate (IN) 3 Plan (PL) 16 Implement (IM) 7 Control (CO) 11 Close (CL) 2 45 Process Assessment Model (PAM) Overview Based on (Level 1 to 5) Process Attribute Indicators (PAI): - GP : Generic Practice - GWP: Generic Work Product Additional performance indicators Level 1 based on: - BP : Base practices - WP : Work products PA5.2 Process innovation implementation PA5.1 Process innovation PA3.1 Process definition PA2.1 Performance management PA1.1 Process performance PA4.1 Quantitative analysis PA4.2 Quantitative process control PA2.2 Work product management PA3.2 Process deployment
  • 22. ISO 33004 a. Appropriate data are collected and analyzed as a basis for understanding the behaviour of the process, to demonstrate the suitability and effectiveness of the process, and to evaluate where continual improvement of the process can be made. GP3.2.6 Collect and analyze data about performance of the process to demonstrate its suitability and effectiveness. Data required to monitor the suitability and effectiveness of the process across the organization are defined, collected and analyzed as a basis for continual improvement. GWP4.0 Quality records. Should provide evidence of reviews undertaken for each instance of the process. GWP9.0 Process performance records. Should provide evidence of reviews undertaken for each instance of the process. PA 3.2 Process Deployment: This process attribute is a measure of the extent to which the standard process is deployed as a defined process to achieve its process outcomes.
  • 23. ISO 33004 © 2017 Peter Davis+Associates 23 b. Assignable causes of process variation are determined through analysis of the collected data. GP4.2.2 Analyze measurement data of the process to identify real and potential variations in process performance. Process performance data are analyzed to identify variations in process performance together with the root cause of common process performance issues. GP4.2.3 Analyze process and product measurement results to identify variations in process performance. The results of process control measurements are analyzed to GWP9.0 Process performance records. Should provide details of measurements collected and analyzed. PA 4.2 Quantitative Process Control: This process attribute is a measure of the extent to which objective data is used to manage process performance that is predictable.
  • 24. ISO 33004 a. Corrective actions are taken to address special causes of variation. GP4.2.5 Identify and implement corrective actions to address assignable causes. Corrective action is taken to address process control concerns and results are monitored and evaluated. GWP9.0 Process performance records. Should provide details of measurements collected and analyzed and corrective action taken. PA 4.2 Quantitative Process Control: This process attribute is a measure of the extent to which objective data is used to manage process performance that is predictable.
  • 25. Rating Scales Rating Meaning Level of Achievement P - Partially achieved - > 15 % to ≤ 32.5 % P + Partially achieved + > 32.5 % to ≤ 50 % L - Largely achieved - > 50 % to ≤ 67.5 % L + Largely achieved + > 67.5 % to ≤ 85 % Rating Meaning Level of Achievement N Not achieved 0 % to ≤ 15 % P Partially achieved > 15 % to ≤ 50 % L Largely achieved > 50 % to ≤ 85 % F Fully achieved > 85 % to ≤ 100 %
  • 27. Consequence of Capability Gaps Capability level where gap occurs Nature of consequence Seriousness of consequence 5 – Innovating process Inability to achieve or evaluate process requirements Lowest Highest 4 – Predictable process Inability to quantify performance or detect problems early 3 – Established process Inconsistent process performance across organization 2 – Managed process Cost or time overruns; unpredictable product quality 1 – Performed process Missing work products; process outcomes not achieved
  • 28. Potential consequences of process attribute gaps Gap/s in Process attribute Potential Consequences  missing work products; process outcomes not achieved  cost or time overruns; inefficient use of resources  unclear responsibilities, uncontrolled decisions, and uncertainty over whether time and cost objectives will be met  unpredictable product quality and integrity, uncontrolled versions,  increased support costs, integration problems and increased rework costs identified best practice and lessons learned from previous projects not defined, published and available within organization  no foundation for organization-wide process improvement  no quantitative understanding of how well process performance objectives and defined business goals are being achieved  no quantitative ability to detect performance problems early  implemented process not incorporating identified best practice and lessons learned from previous projects; inconsistent process performance across organization  lost opportunities to understand process and identify improvements.  process not capable and/or stable (predictable) within defined limits  quantitative performance objectives and defined business goals not met  inability to change process effectively to achieve relevant process improvement objectives  inability to evaluate effectiveness of process changes  process improvement objectives not clearly defined  opportunities for improvement not clearly identified PA 1.1 Process performance PA 2.1 Performance management PA 2.2 Work product management PA 3.1 Process definition PA 3.2 Process deployment PA 4.1 Quantitative analysis PA 4.2 Quantitative process controlPA 5.1 Process innovation PA 5.2 Process innovation implementation Source: This figure is reproduced from ISO/IEC 15504-4. Copyright remains with ISO/IEC.
  • 29. Capability Gaps and Risk Consequence indicated by capability level where gap occurs Probability indicated by extent of capability level gap Slight Significant Substantial 5 – Innovating process Low risk Low risk Low risk 4 – Predictable process Low risk Low risk Medium risk 3 – Established process Low risk Medium risk Medium risk 2 – Managed process Medium risk Medium risk High risk 1 – Performed process Medium risk High risk High risk
  • 30. Review Process review Process assessment model Process reference model
  • 31. PECB Training Courses • Information Security • Quality Management Systems • Continuity, Resilience And Recovery • IT Security • Governance, Risk And Compliance Exam and certification fees are included in the training price. https://pecb.com/en/education-and-certification-for-individuals www.pecb.com/events

Editor's Notes

  1. October 1-2, 2009
  2. February 4-5, 2010
  3. Activities that reduce the quality or efficiency of a manufacturing operation or business process, but are not initially known to managers or others seeking to improve the process. 
  4. Section 1.5 of PAM
  5. Two dimensional: process dimension and the capability dimension.
  6. Not exhaustive list
  7. Not exhaustive list
  8. If you know ISO 21500 or PMBOK, then you will recognize the processes within process groups. 2 areas, 7 domains, 45 processes and numerous base practices or activities.
  9. Mapping Obtain clearer understanding of how the process currently operates Helps “learn to see” and “develop eyes for waste” Redundant processing, unnecessary movement or wait time Assist with identifying and planning improvements
  10. 2 areas, 7 domains, 45 processes, many activities.
  11. Page 19 of part 5 In the syllabus we have a number of references to PAM Chapter 2 pages 11-14 SC 3.03, DC 3.01 and DV 3.01 These pages address: The Measurement Framework: The Process Dimension The Capability Dimension The Rating Scale And The COBIT 5 Domain and Process Structure
  12. Page 32 In the syllabus we have a number of references to PAM Chapter 2 pages 11-14 SC 3.03, DC 3.01 and DV 3.01 These pages address: The Measurement Framework: The Process Dimension The Capability Dimension The Rating Scale And The COBIT 5 Domain and Process Structure
  13. Why not ask the delegates which roles they would expect to be represented? Sponsor Co-ordinator Lead Assessor Assessors Other Participants – e.g. Process Owner/s, Process Professional The animation will reveal the above roles (ATO – these may need to change to reflect local norms) Communication is not about delivering a message, it’s all about the recipient understanding the message
  14. Table 3 from Part 4 used in conjunction with Appendix A