This document provides information about Al Ashiqaa Company (ASHCO), an Iraqi construction company. It details the company's background, vision, mission, subsidiaries including an asphalt factory and concrete plants. It also outlines the company's organizational structure, equipment, and the scope of its business, which includes infrastructure projects, power/telecom facilities, transportation projects, and logistics support services. The document concludes with details on several completed construction projects in Najaf, Iraq, commissioned by the Ministry of Works including budgets and timelines.
Arcadis has over 140 years of experience working with architects, construction companies, and cities leaders to plan, design, and build some of the world's most complex infrastructure projects. Arcadis Singapore office now has a team of experienced Engineers who are now working on various major Infrastructure projects in Singapore and around the region.
Sommaire
Ingénieur civil bilingue possédant plusieurs années d'expérience dans la direction et la gestion de projets majeurs ainsi qu’une expérience diversifiée dans les domaines suivants :
• Réalisation et exécution de projets
• Ordonnancement et planification
• Gestion d’équipe de projets
• Gestion des clients
• Contrôle des coûts
• Construction de bâtiments industriels
• Gestion de fabrication manufacturière
• Contrôle de la qualité
• Amélioration de la productivité et la qualité
• Contrôle d'approvisionnement des équipements
• Gestion des réclamations
• Santé et Sécurité
Capacité à diriger et à motiver diverses équipes de professionnels dans la réalisation des objectifs. Maitrise la coordination entres les disciplines suivantes :
• Civil – Structure - Architecture
• Mécanique et électrique
• Contrôle et automatisation
• Télécommunication
• Ferroviaire
• Aéronautique
• Métallurgie
• Minier
• Pétrochimie
• Biotechnologie
Arcadis has over 140 years of experience working with architects, construction companies, and cities leaders to plan, design, and build some of the world's most complex infrastructure projects. Arcadis Singapore office now has a team of experienced Engineers who are now working on various major Infrastructure projects in Singapore and around the region.
Sommaire
Ingénieur civil bilingue possédant plusieurs années d'expérience dans la direction et la gestion de projets majeurs ainsi qu’une expérience diversifiée dans les domaines suivants :
• Réalisation et exécution de projets
• Ordonnancement et planification
• Gestion d’équipe de projets
• Gestion des clients
• Contrôle des coûts
• Construction de bâtiments industriels
• Gestion de fabrication manufacturière
• Contrôle de la qualité
• Amélioration de la productivité et la qualité
• Contrôle d'approvisionnement des équipements
• Gestion des réclamations
• Santé et Sécurité
Capacité à diriger et à motiver diverses équipes de professionnels dans la réalisation des objectifs. Maitrise la coordination entres les disciplines suivantes :
• Civil – Structure - Architecture
• Mécanique et électrique
• Contrôle et automatisation
• Télécommunication
• Ferroviaire
• Aéronautique
• Métallurgie
• Minier
• Pétrochimie
• Biotechnologie
L&T MMH IC Summer Internship Report (Coal Handling Plant in Chhabra, Rajasthan.)rajguptanitw
This is the summer internship report for my 45 days summer internship at Coal Handling Plant for 2x660 MW Supercritical Thermal Power Plant Unit-5 and 6, Stage-II, Phase-III, Chhabra, Rajasthan of L & T Metallurgical and Material Handling Independent Company.
VINACONEX E&C is a general construction company in Vietnam established since 2003, offers a broad range of services in project management, procurement, construction and technology transfer to assist clients in all phases of development – from pre-construction to occupancy. Our services include consulting, contracting & project management services related to CSA, MEP for industrial - civil projects and Road & Bridge Projects.
Mẫu thiết kế profile Công ty xây dựng Cầu 14 bằng tiếng AnhSaoKim.com.vn
Mẫu thiết kế profile Công ty xây dựng Cầu 14 bằng tiếng Anh với dung lượng 24 trang do Sao Kim thực hiện.
Xem ngay các dự án thiết kế profile được nhiều khách hàng lựa chọn nhất: http://www.saokim.com.vn/dich-vu/tai-lieu-marketing/thiet-ke-profile/
Liên hệ để được tư vấn thiết kế profile trực tiếp ngay hôm nay: 0964.699.499 (Chuyên gia Nguyễn Tuấn Hùng)
Work: Presentation
Scoop of work: Content Writing, Content Development, Photo shooting, Design
Client: Construction House Company (CHC)
Construction
Riyadh, Saudi Arabia
Work: Profile
Scoop of work: Content Writing, Content Development, Photo shooting, Design
Client: Al Qemma Alaqaryiah
Real Estate Development
Riyadh, Saudi Arabia
Work: Profile
Scoop of work: Content Writing, Content Development, Photo shooting, Design
Client: Al Majal United Metal Construction
Construction
Riyadh, Saudi Arabia
Work: Profile
Scoop of work: Content Writing, Content Development, Photo shooting, Design
Client: Bach International
Branding, advertising, and communication
Riyadh, Saudi Arabia
Work: Profile
Scoop of work: Content Writing, Content Development, Photo shooting, Design
Client: Smart and Art
Information Technology
Riyadh, Saudi Arabia
Work: Profile
Scoop of work: Content Writing, Content Development, Photo shooting, Design
Client: Syndian, Babel Real Estate Development
Real Estate
Amman, Jordan
Hierarchical Digital Twin of a Naval Power SystemKerry Sado
A hierarchical digital twin of a Naval DC power system has been developed and experimentally verified. Similar to other state-of-the-art digital twins, this technology creates a digital replica of the physical system executed in real-time or faster, which can modify hardware controls. However, its advantage stems from distributing computational efforts by utilizing a hierarchical structure composed of lower-level digital twin blocks and a higher-level system digital twin. Each digital twin block is associated with a physical subsystem of the hardware and communicates with a singular system digital twin, which creates a system-level response. By extracting information from each level of the hierarchy, power system controls of the hardware were reconfigured autonomously. This hierarchical digital twin development offers several advantages over other digital twins, particularly in the field of naval power systems. The hierarchical structure allows for greater computational efficiency and scalability while the ability to autonomously reconfigure hardware controls offers increased flexibility and responsiveness. The hierarchical decomposition and models utilized were well aligned with the physical twin, as indicated by the maximum deviations between the developed digital twin hierarchy and the hardware.
Student information management system project report ii.pdfKamal Acharya
Our project explains about the student management. This project mainly explains the various actions related to student details. This project shows some ease in adding, editing and deleting the student details. It also provides a less time consuming process for viewing, adding, editing and deleting the marks of the students.
About
Indigenized remote control interface card suitable for MAFI system CCR equipment. Compatible for IDM8000 CCR. Backplane mounted serial and TCP/Ethernet communication module for CCR remote access. IDM 8000 CCR remote control on serial and TCP protocol.
• Remote control: Parallel or serial interface.
• Compatible with MAFI CCR system.
• Compatible with IDM8000 CCR.
• Compatible with Backplane mount serial communication.
• Compatible with commercial and Defence aviation CCR system.
• Remote control system for accessing CCR and allied system over serial or TCP.
• Indigenized local Support/presence in India.
• Easy in configuration using DIP switches.
Technical Specifications
Indigenized remote control interface card suitable for MAFI system CCR equipment. Compatible for IDM8000 CCR. Backplane mounted serial and TCP/Ethernet communication module for CCR remote access. IDM 8000 CCR remote control on serial and TCP protocol.
Key Features
Indigenized remote control interface card suitable for MAFI system CCR equipment. Compatible for IDM8000 CCR. Backplane mounted serial and TCP/Ethernet communication module for CCR remote access. IDM 8000 CCR remote control on serial and TCP protocol.
• Remote control: Parallel or serial interface
• Compatible with MAFI CCR system
• Copatiable with IDM8000 CCR
• Compatible with Backplane mount serial communication.
• Compatible with commercial and Defence aviation CCR system.
• Remote control system for accessing CCR and allied system over serial or TCP.
• Indigenized local Support/presence in India.
Application
• Remote control: Parallel or serial interface.
• Compatible with MAFI CCR system.
• Compatible with IDM8000 CCR.
• Compatible with Backplane mount serial communication.
• Compatible with commercial and Defence aviation CCR system.
• Remote control system for accessing CCR and allied system over serial or TCP.
• Indigenized local Support/presence in India.
• Easy in configuration using DIP switches.
Saudi Arabia stands as a titan in the global energy landscape, renowned for its abundant oil and gas resources. It's the largest exporter of petroleum and holds some of the world's most significant reserves. Let's delve into the top 10 oil and gas projects shaping Saudi Arabia's energy future in 2024.
Overview of the fundamental roles in Hydropower generation and the components involved in wider Electrical Engineering.
This paper presents the design and construction of hydroelectric dams from the hydrologist’s survey of the valley before construction, all aspects and involved disciplines, fluid dynamics, structural engineering, generation and mains frequency regulation to the very transmission of power through the network in the United Kingdom.
Author: Robbie Edward Sayers
Collaborators and co editors: Charlie Sims and Connor Healey.
(C) 2024 Robbie E. Sayers
3. About Us
- - "ASHCO"
3
.
"ASHCO"
“ASHCO”
.
(ASHCO)
Al Ashiqaa’ Company (ASHCO) was
established with an initial capital of five
billion Iraqi Dinar, contributed by Iraqi
investors. Within a short period of time,
we became pioneers in building commer-
cial, industrial, and multi-purposes
projects
To cope with our growth, we have heavily
invested in building new factories and
establishing specialized companies
(Concrete plants and Asphalt plant
(WIPO)) as a part of our expansion strat-
egy towards more effectiveness, by
reducing implementation times, associ-
ated costs and improving quality manage-
ment control.
.
.
To be of the top five respected construction companies by
providing our clients with convenient, reliable and environmen-
tal friendly construction solutions and services, using the latest
available technologies.
"
.
To enhance the lives of Iraqi people, by not only providing
healthy and environmentally safe construction, but also an
affordable wide range of multi-purpose constructions. We also
focus on providing deliverables within predetermined budgets
and schedules and adhere to the best safety procedures and
practices in order to achieve the operational excellence in build-
ing a better future for the Iraqi people.
Al Ashiqaa’ Company
(ASHCO)
Our Vision
Our Mission
0102
4. 140.000 ( )
. 160
60
.
Our subsidiary Asphalt factory is located in
the Governorate of Muthanna ( Samawa)
with an area of 140.000 square meters and
production capacity of 160 tons per hour. It is
run proudly by 60 of our highly qualified
engineers and professional workers. The
factory has its own fleet of heavy transfer
mechanisms, mixers and equipment.
Company structure
General Manager
Deputy General
Manager
MarketingAdministration
Public Relations
Procurement
Stores
Equipment
Freight
Engineering
Architecture
Executive
Mechanical
Electrical
Human Resources
Secretary
Training
Personnel
Secretary
Asphalt plant (WIPO)
( )
Plants and Heavy Equipments
Plants and Heavy Equipments
0304
5. 6
2
1
2
1
3
3
1
1
3
1
2
1
1
2
3
1
2
2
2
2
2
7
Quantity
62.500
120 -
60
30
The company has a subsidiary concrete
factory in Anbar Governorate. This factory is
fully equipped with two state-of-the-art plants,
each of which has crushers, a sand plant and
mixing machinery with an approximate area of
62.500 square meters. Our 30 employees,
including engineers, professionals and workers,
run the two plants with a total production
capacity of 180 cubic meters per hour; where
the first unit has a capacity of 120 cubic meters
per hour.
Concrete plants
Plants and Heavy Equipments
Heavy Machinery & Equipments
0506
( )
210
45
45
70
85
80
Type Of Mechanism
Drum Roller-compactor
Tired Roller-compactor
(Backhoe Loader(JCB
Hitachi excavator 210
Komatsu excavator 45
Caterpillar excavator 45
Trench Excavator
Dynapac Asphalt Pavers
Voegele Asphalt Pavers
Kawasaki loader 70
Kawasaki loader 85
Kawasaki loader 80
Asphalt Distributor
Water Tanker
Tank Trailer
Kia pickup double cabin
Caterpillar Motor Graders
Caterpillar Large Bulldozer
Fork-lift
Broce Broom
Loader Trailer
Truck Mixer
Pickup Double Cabin
6. OUR
SCOPE OF BUSINESS
.
:
.
.
:
.
.
We are committed to providing the highest
standards in all aspects of our projects. Our
Quality Assurance department aims at
exceeding the international standards of
design, execution and delivery our projects,
with high emphasis on maintaining high client
satisfaction. We have complex processes of
measurement and comparison with interna-
tional standards. Our Proactive Procedures
for error prevention and client’s feedback and
comments are our live indicator for our perfor-
mance and the compass for our continuous
development.
The scope of our business includes the imple-
mentation of the projects, renovation and
repair of industrial and mechanical construc-
tion, as well as projects and infrastructure
facilities of the transportation sector of road
works, bridges, railways, and water works of
irrigation projects and drinking water systems
and the supply and installation of sewage
treatment facilities. In addition, our projects
include building projects and educational
facilities, medical facilities, services support
and transfer projects and install high-tension
electrical towers.
0708
Our scope of business
Infrastructure Projects
Power Distribution &
Telecommunication Facilities
Logistics Support Services
Transportation Projects
7. .
"ASHCO"
.
.
.
What is unique about our services and sets us
apart, is the belief that every project we do is
more than concrete and steel, it is about the
future prosperity of the Iraqi people.
Therefore, we complete our work with integrity
and we have a constructive partnership with
our clients.
ASHCO carries out infrastructure construc-
tion projects in all aspects of public and
private sectors, from installing foundations of
highways to building bridges; We are a civil
construction company that does it all.
We have the knowledge and expertise to
understand the projects from different
perspective levels. This enables us to offer
specialized services in project and construc-
tion management, pre-construction services,
design-build and general contracting.
:
. .
. .
. .
Industrial and mechanical renovation projects Infrastructure projects and facilities
Roads, bridges and railways projects Waste water and drinking water projects
Medical facilities Irrigation to facilities
Supply and install waste water equipment Transport and install high tension towers
Our Constructional Services & Activities :
Infrastructure Projects
Our scope of business
0910
Our scope of business
8. "ASHCO"
.
.
"
"ASHCO"
.
ASHCO has the capacity, resources and experi-
ence to offer full services of power distribution
and telecommunication projects from concep-
tion to completion (e.g. power and transmission
projects).We are a key partner to our clients by
achieving the highest quality, reliability and
project safety.
Telecommunication projects require expertise
and creative solutions. At ASHCO we have the
ability and equipment to plan, design, and
execute reliable systems for all types of
telecommunication facilities including telephone
exchangers, cables and fiber optic systems, etc.
.
ASHCO performs all types of transportation-
related construction services. Using the latest
technologies and equipment, we offer our
clients all aspects of construction including all
the works of grading, aggregate production,
granular base course placement, paving and
bridge construction and steel structures.
Power Distribution & Telecommunication Facilities
Our scope of businessOur scope of business
Transportation Projects
1112
9. Our scope of business
Logistics Support Services
Our
Projects
1314
.
"ASHCO"
.
Iraq has a high demand for property mainte-
nance and renovation. This requires qualified
manpower and reliable equipment to execute
the task perfectly. We at ASHCO have the
modern technology to complete the most
renovation projects using our company’s
modern, heavy-duty machines, Which can
deliver the best results.
10. Project Location
Beneficiary
Project Description
Najaf
Ministry of Works, Municipalities Affairs and Urban Planning
Start Date/ /16/12/2008
.
.
Project/ Execution of multi floors car parking building in Najaf
858,900,000Iraqi Dinars 858,900,000
/ /18/12/2012
Project Location
Beneficiary
Project Description
Najaf
Ministry of Works, Municipalities Affairs and Urban Planning
Start Date/ /16/12/2008
12 174
30
.
Project/ Execution of multi floors car parking building in Najaf
4,065,000,000Iraqi Dinars 4,065,000,000
18/12/2012
1516
Cost
Completion
Cost
Completion
11. Project Location
Beneficiary
Project Description
.
Najaf
Ministry of Works, Municipalities Affairs and Urban Planning
Start Date/ /16/12/2008
:
.
.
4,632,276,000Iraqi Dinars 4,632,276,000
/ /18/12/2012
Project/ Execution of multi floors car parking building in NajafProject/ Execution of multi floors car parking building in Najaf
Project Location
Beneficiary
Project Description
Najaf
Ministry of Works, Municipalities Affairs and Urban Planning
Start Date/ /16/12/2008
: ,
.
2400 (700)
.
Project/ Execution of multi floors car parking building in Najaf
7,122,231,300Iraqi Dinars 7,122,231,300
/ /18/12/2012
1718
Cost
Completion
Cost
Completion
12. Project Location
Beneficiary
Project Description
Najaf
Ministry of Works, Municipalities
Start Date2 0 0 9 / 7 / 2 516/12/2008
5
. .
.
Project/ Execution of multi floors car parking building in Najaf
2,763,240,834Iraqi Dinars 2,763,240,834
/ /18/12/2012
Project Location
Beneficiary
Project Description
Najaf
Ministry of Works, Municipalities Affairs and
Start Date/ /16/12/2008
.
57
.
.
13,592,349,900Iraqi Dinars 13,592,349,900
/ /18/12/2012
Project/ Execution of multi floors car parking building in Najaf
57
1920
Cost
Completion
Cost
Completion
13. Project Location
Beneficiary
Project Description
Najaf
Ministry of Works, Municipalities Affairs and
Start Date/ /16/12/2008
28 4
1 60
6 10 6.5 30
. 1,5
.
7,892,548,000Iraqi Dinars 7,892,548,000
/ /18/12/2012
Project/ Execution of multi floors car parking building in Najaf
4
Project Location
Beneficiary
Project Description
Najaf
Ministry of Works, Municipalities
Start Date2 0 0 8 / 1 0 / 2 016/12/2008
(1.74)
.
:
.
Project/ Execution of multi floors car parking building in Najaf
12,555,255,782Iraqi Dinars 12,555,255,782
/ /18/12/2012
4 / /
2122
Cost
Completion
Cost
Completion
14. Project Location
Beneficiary
Project Description
Najaf
Ministry of Works, Municipalities Affairs and Urban Planning
Start Date2 0 0 9 / 2 / 416/12/2008
.
.
.
28
30 6,5 (B )
1 75
. (10) (6)
Project/ Execution of multi floors car parking building in Najaf
7,616,334,388Iraqi Dinars 7,616,334,388
18/12/2012 / /
Project Location
Beneficiary
Project Description
Najaf
Ministry of Works, Municipalities
Start Date2 0 0 9 / 1 2 / 2 516/12/2008
.
(% 99,9)
.
.
Project/ Execution of multi floors car parking building in Najaf
525,000,000Iraqi Dinars 525,000,000
/ /18/12/2012
2324
Cost
Completion
Cost
Completion
15. Project Location
Beneficiary
Project Description
Najaf
Ministry of Works, Municipalities
Start Date2 0 0 7 / 7 / 2 516/12/2008
.
10
.
Project/ Execution of multi floors car parking building in Najaf
3,333,333,000Iraqi Dinars 3,333,333,000
/ /18/12/2012
Project Location
Beneficiary
Project Description
Najaf
Ministry of Works, Municipalities Affairs and
Start Date/ /16/12/2008
-
. 10
4,046,000,000Iraqi Dinars 4,046,000,000
/ /18/12/2012
Project/ Execution of multi floors car parking building in Najaf
/
2526
Cost
Completion
Cost
Completion
16. Project Location
Beneficiary
Project Description
Najaf
Ministry of Works, Municipalities
Start Date/ /16/12/2008
. 40
1,4
.
22,5
.
.
3,719,390,000Iraqi Dinars 3,719,390,000
/ /18/12/2012
Project/ Execution of multi floors car parking building in Najaf
Project Location
Beneficiary
Project Description
Najaf
Ministry of Works, Municipalities Affairs and Urban Planning
Start Date/ /16/12/2008
smart )
. (board
.
Project/ Execution of multi floors car parking building in Najaf
1,091,485,000Iraqi Dinars 1,091,485,000
/ /18/12/2012
2728
Cost
Completion
Cost
Completion
17. Project Location
Beneficiary
Project Description
.
Najaf
.Ministry of Works, Municipalities
Start Date2 0 0 8 / 3 / 2 116/12/2008
200
.
10
.
.
Project/ Execution of multi floors car parking building in Najaf
1,100,000,000Iraqi Dinars 1,100,000,000
/ /18/12/2012
200
Project Location
Beneficiary
Project Description
Najaf
Ministry of Works, Municipalities
Start Date/ /16/12/2008
.
.
4,688,746,000Iraqi Dinars 132,968,2500
/ /18/12/2012
Project/ Execution of multi floors car parking building in Najaf
2930
Cost
Completion
Cost
Completion
18. Project Location
Beneficiary
Project Description
Najaf
Ministry of Works, Municipalities
Start Date/ /16/12/2008
. 3
Cost1,014,650,000Iraqi Dinars 1,014,650,000
Completion/ /18/12/2012
Project/ Execution of multi floors car parking building in Najaf
Project Location
Beneficiary
Project Description
Najaf
Ministry of Works, Municipalities
Start Date/ /16/12/2008
.
10
.
802,500,000Iraqi Dinars 802,500,000
/ /18/12/2012
Project/ Execution of multi floors car parking building in Najaf
3132
Cost
Completion
19. Project Location
Beneficiary
Project Description
Najaf
Ministry of Works, Municipalities
Start Date2 0 0 5 / 1 / 2 016/12/2008
(147,146,145,144,143,138)
.
Project/ Execution of multi floors car parking building in Najaf
69,370,000Iraqi Dinars 69,370,00
/ /18/12/2012
3334
Project Location
Beneficiary
Project Description
Najaf
Ministry of Works, Municipalities Affairs and
Start Date/ /16/12/2008
. "
Cost284,000,000Iraqi Dinars 284,000,000
Completion/ /18/12/2012
Project/ Execution of multi floors car parking building in Najaf
20. Project Location
Beneficiary
Project Description
Najaf
Ministry of Works, Municipalities
Start Date/ /16/12/2008
70 30 65
. 30
3
.
5
.
Cost480,000,000Iraqi Dinars 480,000,000
Completion/ /18/12/2012
Project/ Execution of multi floors car parking building in Najaf
Project Location
Beneficiary
Project Description
Najaf
Ministry of Works, Municipalities Affairs and Urban Planning
Start Date2 0 0 4 / 5 / 116/12/2008
:
. 10
Project/ Execution of multi floors car parking building in Najaf
Cost360,785,962Iraqi Dinars 360,785,962
Completion18/12/2012 / /
3536
21. Project Location
Beneficiary
Project Description
.
Najaf
Ministry of Works, Municipalities Affairs and
Start Date/ /16/12/2008
.
:
.
Cost206,499,131Iraqi Dinars 206,499,131
Completion/ /18/12/2012
Project/ Execution of multi floors car parking building in Najaf
Project Location
Beneficiary
Project Description
Najaf
Ministry of Works, Municipalities Affairs and Urban Planning
Start Date/ /16/12/2008
( )
.
Project/ Execution of multi floors car parking building in Najaf
Cost25,968,900Iraqi Dinars 25,968,900
Completion/ /18/12/2012
3738
22. Project Location
Beneficiary
Project Description
Najaf
Ministry of Works, Municipalities Affairs and
Start Date/ /16/12/2008
.
.
Cost10,182,783Iraqi Dinars 10,182,783
Completion/ /18/12/2012
Project/ Execution of multi floors car parking building in Najaf
Project Location
Beneficiary
Project Description
Najaf
/Ministry of Works, Municipalities
Start Date/ /16/12/2008
. 30
.
Cost450,000,000Iraqi Dinars 450,000,000
Completion/ /18/12/2012
Project/ Execution of multi floors car parking building in Najaf
4041
23. Project Location
Beneficiary
Project Description
.
Najaf
Ministry of Works, Municipalities Affairs and
Urban Planning
Start Date/ /16/12/2008
.(HSE)
.
Cost88,000,000Iraqi Dinars 88,000,000
Completion/ /18/12/2012
Project/ Execution of multi floors car parking building in Najaf
Project Location
Beneficiary
Project Description
Najaf
Ministry of Works, Municipalities
Start Date2 0 0 2 / 5 / 1 116/12/2008
.
Project/ Execution of multi floors car parking building in Najaf
Cost53,000,000Iraqi Dinars 53,000,000
Completion/ /18/12/2012
( - - )
4243
24. Project Location
Beneficiary
Project Description
Najaf
Ministry of Works, Municipalities
Start Date/ /16/12/2008
.
Cost132,968,2500Iraqi Dinars 132,968,2500
Completion/ /18/12/2012
Project/ Execution of multi floors car parking building in Najaf
Project Location
Beneficiary
Project Description
Najaf
Ministry of Works, Municipalities
Start Date/ /16/12/2008
. 10
Cost73,889,790Iraqi Dinars 73,889,790
Completion/ /18/12/2012
Project/ Execution of multi floors car parking building in Najaf
4445
25. Project Location
Beneficiary
Project Description
Najaf
Ministry of Works, Municipalities Affairs and Urban Planning
Start Date/ /16/12/2008
.
Project/ Execution of multi floors car parking building in Najaf
Cost39,823,000Iraqi Dinars 39,823,000
Completion/ /18/12/2012
Project Location
Beneficiary
Project Description
Najaf
Ministry of Works, Municipalities
Start Date/ /16/12/2008
.
Cost65,000,000raqi Dinars 65,000,000
Completion/ /18/12/2012
Project/ Execution of multi floors car parking building in Najaf
4647
26. Project Location
Beneficiary
Project Description
Najaf
Ministry of Works, Municipalities
Start Date2 0 0 1 / 7 / 2 216/12/2008
28
.
Project/ Execution of multi floors car parking building in Najaf
Cost13,960,000Iraqi Dinars 13,960,000
Completion/ /18/12/2012
Project Location
Beneficiary
Project Description
Najaf
Ministry of Works, Municipalities
Start Date/ /16/12/2008
.
Cost17,000,000Iraqi Dinars 17,000,000
Completion/ /18/12/2012
Project/ Execution of multi floors car parking building in Najaf
4849
27. Project Location
Beneficiary
Project Description
Najaf
Ministry of Works, Municipalities Affairs and Urban Planning
Start Date2 0 0 1 / 1 0 / 516/12/2008
10
.
Project/ Execution of multi floors car parking building in Najaf
Cost60,245,000Iraqi Dinars 60,245,000
Completion/ /18/12/2012
50