Proven project
management
People power Petrofac, and every project we deliver. Their project
management expertise, supported by internationally recognised
systems and fit-for-purpose controls, underpin safe, on-time
delivery.
The projects we support are usually complex. We balance local
awareness, and learnings from our truly global network to simplify the
complex and overcome the seemingly impossible.
Tap into their problem-solving culture, for smarter, faster, more effective
delivery across any size of project.
Extensive delivery capability
Our certified Project Management Professionals support a range of
services:
• Project Management Contractor (PMC)
• Engineering, Procurement and Construction (EPC)
• Engineering, Procurement and Construction Management (EPCm)
contractor
• Discreet project management services across the life cycle of an asset
• Health, safety and environmental services
• Project cost, schedule and risk management analysis
Experience to succeed
Our methodologies and processes capture the experience of our past
projects
The system toolkit that we have created, using our experience of
designing, building and operating real facilities, drives genuine
operational improvement.
The Petrofac procurement benchmarking database provides us with the
optimum prices at which facilities can be built, and give us a real
advantage when managing the procurement phase for clients.
Tools and services that drive
transparency
We use industry-leading software and our global IT infrastructure, to
create visibility, transparency and assurance of all project management
activity.
Turus: our project management tool
Our proprietary project management tool, Turus, provides information,
assurance and control, supporting the delivery of projects efficiently, and
often on an accelerated schedule. A global data repository that grows
with each project, Turus, provides essential project assurance and
oversight in a simple, easy to understand format, that facilitates audits
and full compliance with regulatory requirements.
IPMS: our project management service
Leveraging our project management and operations know-how, and
access to a global network of IT partners, we have developed a fully
integrated work management model called iPMS. It enables the
integration of various project management platforms and tools, ensuring
all project data is visible and connected. Using techniques like robotic
process automation, decision makers can quickly identify an issue before
it causes a delay.
Our project execution
services
Multidisciplinary
engineering
capability
Our teams provide engineering solutions across the asset life
cycle. From conceptual studies and FEED, to detailed design for
onshore and offshore energy facilities.
Working with you to understand your requirements, and using the
learnings of hundreds of capital projects and our extensive operations
portfolio, we will bring unique insights to your project. Challenging the
norm, drilling into key cost drivers, and applying value-adding
engineering techniques to deliver the best solutions in line with your
investment strategy. Everything we do is focused on safe, fit-for-purpose
design and specification, that ensures constructability and operability.
With us, delivery is always assured.
FEED and detailed design
When we execute a front-end engineering design (FEED), we are
committed to providing security of quality, cost and schedule, along with
safe designs which are implementable and operable.
The knowledge held by our global E&P, EPCm, operations, maintenance
and construction teams enables us to produce front-end solutions which
reduce CAPEX, OPEX and schedule, while enhancing safety and
operability.
We make sure this knowledge, gained through our experience, is utilised
at the earliest opportunity within a project, so we can add the most value
and reduce the risk of change in later phases.
Detailed design experience means we can accurately predict
requirements, supporting construction schedules through the timely
availability of drawings, equipment and material and the early
procurement of long lead items. This enables us to support clients in the
early commencement of construction activities.
Global procurement
expertise
Our expert buyers, expeditors, logistics officers and material
controllers are strategically located around the world. They
provide sourcing, expediting and logistics support to greenfield
and brownfield projects, on and offshore. We also have strong
relationships with third party agencies who we can engage to
enhance our service when necessary.
Using a flexible commercial delivery model enables us to procure directly
in support of your projects, returning value through a gain share
approach, such as the one currently taken for Petroleum Development
Oman (PDO).
Each year we spend billions of dollars across anywhere between 2,000
and 3,000 suppliers. Leveraging our procurement expertise, vast
established network and global buying power, we will bring additional
value to your project.
“RHIP is an enormous city in itself, well below
budget and ahead of schedule. Our
partnership with Petrofac has worked
extremely well in reducing costs, securing
major leveraging of our turbines, compressors
and other equipment at lower costs.”
R A O U L R E S T U C C I M A N A G I N G D I R E C T O R , P D O , 2 0 1 9
Local delivery adds value
Local delivery has always been central to our approach, underpinned by
robust business practices. We evaluate our impact by calculating in-
country value (ICV).
Working with local suppliers and developing local capabilities wherever
possible, we ensure that all goods and services are procured in an
ethical and cost-effective manner.
The success of our supply chain operations is built on several factors:
our operational structure, which enables prompt approvals and decision
making; our strong and long-standing relationships with our vendors; and
our early commitment to long lead items through early engagement with
vendors at the proposal stage.
Petrofac works with approved vendor lists from our clients. If you are a
vendor or service provider, we would like to know you better and we
invite you to register with us by visiting our vendor registration portal.
O U R W O R K
Safe, smart and on-time
prTechnological
innovation driving
safe, smart and on-
time project delivery
A strategic investment for Oman, the Salalah LPG Extraction project will
enable the Sultanate to get more value from its gas assets. The award of
the prestigious Engineering, Procurement and Construction (EPC) and
start-up contract to Petrofac in 2017 built on our long track record in
Oman, took us into the Salalah region for the first time.
 Overvi ew
Scope
Engineering, procurement and construction (EPC)
Client
OQ LPG
oject
dDeveloping new
employment opportunities
and skills for Omanis
Once completed, the project will create new opportunities for the
employment of Omanis, particularly in the Dhofar region.
A supply chain roadshow event was held in Salalah, allowing more than
100 small and medium sized local companies the opportunity to
demonstrate their capabilities and work on energy development projects.
Building relationships with local
businesses
Across the project, we engaged with more than 300 locally based
businesses. We built relationships through knowledge transfer and our
provision of support in the areas of workforce upskilling to further
enhance in-country value (ICV).
elivery
Outstanding technical and
safety achievements
Our project team accomplished impressive operational and Health,
Safety, Security and Environment (HSSE) milestones throughout the
project, including the safe installation of huge dome roofs on two LPG
tanks using nothing but air and the achievement of 14 million man-hours
without a Lost Time Incident (LTI). In challenging mountainous terrain,
we removed half a million cubic metres of rock over the course of seven
months prior to commencing work on site.
The safe and successful connection of the project in January 2020 to the
North-South main gas pipeline, which supplies gas for the South of Oman
was a testament to our commitment to safe delivery.
Enhancing project execution
To enhance project execution our connected construction digital solution
was trialed on the project for the first time, providing valuable insights
and further driving efficient project management.
Now in its final stages, the Salalah LPG extraction project is progressing
well despite recent wider logistical challenges due to COVID-19.
Decades of
execution excellence
For over 40 years, our engineering and construction experts have
been turning complex concepts into reality. Building and delivering
the world’s most exciting energy projects, in some of its most
challenging locations.
From the world’s largest offshore wind converter platform, to facilities
that function efficiently in sub-Saharan temperatures, our portfolio
reflects the ingenuity of our engineers and the quality of our execution.
Delivering complex
construction
projects
Our award-winning construction team turn complex blueprints into
reality. The installations we design and build are usually in remote
locations and have to survive challenging and harsh
environments. Our expertise and innovative solutions underpin
efficient logistics planning and management, and help navigate
through challenges imposed by geography, terrain and
infrastructure.
Often the size of small cities, our projects have even spanned multiple
countries. We’ve literally stopped traffic and moved mountains to deliver
assets that support the world’s energy needs.
As well as driving world-firsts, our construction teams breathe new life
into existing infrastructure. We can help you safely expand existing
operations to enhance energy production and extend asset life.
The applications for our expertise are diverse. So too are the commercial
models we offer; each designed with your needs in mind.
Whether you’re building the processing facility for an onshore gas field;
or a liquid-based greenfield downstream refinery project; planning to
construct an HVDC platform to transmit from your offshore wind farm; or
exploring options to tie-back stranded reserves to an existing offshore
asset – with us, you receive deep construction expertise, strong project
management capability and a clear focus on safety, integrity and quality.
Over 200 EPC projects delivered around the world
From concept to completion
Petrofac clients experience a seamless journey from front-end
engineering design (FEED) to detailed design, to construction
and completion of your asset.
Early-stage engagement between our engineering, procurement and
construction teams ensures our project plans are integrated and built to
flow seamlessly.
On-time and on-budget delivery is made possible through ensuring the
accuracy of the engineering input and the availability of the material from
efficient supply chain planning.
Global capability and local mindset
We employ and invest in local people, work with local suppliers, and,
where there is a need, help to develop local capabilities.
By placing a strong focus on driving In-country-Value we make a net
contribution to the economies in which we operate, leaving a positive
legacy after our involvement in a project has finished.
Safe delivery assured
Nothing is more important to Petrofac than safety; from our people,
clients and the communities we work with, to the integrity of the assets
and facilities we build, maintain and run.
Our vision is a future with zero incidents. We employ the latest
technology on our sites to manage workers’ health, safety and wellbeing,
while maintaining efficiency and high productivity by being always
connected.
Supporting your Net Zero
goals
Across every construction project, decarbonisation has become an
inescapable theme. We’re committed to achieving Net Zero across our
businesses by 2030 and will work with you to construct infrastructure that
supports your environmental goals.
Play videoP L A Y V I D E O
1/1
Achieving NetZero by 2030
Proven scalable delivery
models
No matter the size of the project, we flex to suit your needs – sizing our
delivery team to apply the right levels of governance and risk
management, while delivering safe, cost-effective and purpose-met
solutions.
Breathe new life into existing
assets
Where others see challenges, we see opportunities. Ageing assets are
being given a new lease of life through subsea tiebacks and repurposing
from traditional to new energy production, including hydrogen and
electrification.
When it comes to construction projects on existing assets, you need a fit-
for-purpose solution, with minimal impact on operations.
Our unparalleled track record of delivering major modification projects
includes subsea tie-back projects, field development topside activities
and facilities upgrades.
With no requirement to build new platforms, subsea tiebacks and
repurposing existing infrastructure for new energy significantly reduces
costs, delays decommissioning and reduces emissions.
espite the tight timeframes and changes to the original scope, the project was
completed one month ahead of schedule and was inaugurated at a ceremony in
Istanbul, attended by the presidents of Turkey and Russia.
A project of enormous scale
and diversity
We provided Engineering, Procurement and Construction (EPC) of the
gas receiving terminal near the small coastal village of Kiyikoy and
onshore inlet pipeline installation.
The terminal receives 31.5 billion cubic metres of natural gas annually
from Russia, supplementing Turkey’s domestic supply, and enabling
onward export to Bulgaria and beyond.
Equivalent to the size of 27 football pitches, the receiving station facility
is vast and complex. We executed the preparatory work including
surveying, vegetation clearance, site levelling and construction of access
roads. We also provided the piping and mechanical works: laying of
cables, electric works and construction of internal roads, foundations,
buildings such as the control room and the operational and
instrumentation control systems.
A project of enormous scale and
diversity
We carried out the installation of the onshore pipelines from the Black
Sea to the gas receiving terminal. We stripped the vegetation and topsoil
off the corridor to prepare it for pipe-laying before digging trenches to a
depth of 2.5 metres. Once welded, we laid the pipelines in the trenches
and covered with the topsoil.
At peak, the site’s camp was home to a workforce of almost 2,500 people
including British, Turkish, Indian, Lebanese and Russian nationals.
Fast tracked and flexible
delivery
Our delivery of a fast-track project in just two years brought many
challenges, one of which was procurement. The delivery of long-lead
items was carried out efficiently, in many cases even ahead of the
committed dates.
Construction was also challenging. Working in a remote area with no
existing infrastructure meant an initial six months preparing the site. This
had a knock-on effect on construction and our team only had 18 months
to build the facility. We maintained continuous engagement with our
subcontractors to ensure engineering remained on track and of the
highest quality.
Flexible delivery m
Flexibility critical to
complete final link in
vital TurkStream
project
TurkStream, a project that will meet the energy demands of Turkey and
southeast Europe for decades to come, reached completion in 2019. The
newly developed offshore pipeline system will power an incredible 15
million homes, transforming the region’s future prospects.
 Overvi ew
Scope
Engineering, procurement and construction (EPC)
Client
South Stream Transport B.V.
K E Y F A C T S
Million homes powered
Football pitches in size
Billion cubic metres of gas to be
received
31.5
Million homes powered
Football pitches in size
Billion cubic metres of gas to be
received
Million homes powered
Football pitches in size
1/3
TurkStream Gas Pipeline, Turkey
1/3
TurkStream Gas Pipeline, Turkey
1/3
TurkStream Gas Pipeline, Turkey
Flexible delivery model
Our flexible delivery model meant we could start the project on a
reimbursable basis while the scope was being defined and convert to a
lump-sum turnkey at the 90% Model Review, allowing us to manage and
accelerate the schedule to deliver on time.
Driving in-country value
We employed 87 locals who remained employed on site after project
completion. The project team also helped in the local community,
providing equipment to fix roads, and supported businesses such as
restaurants and hotels.
Our team launched a road safety campaign to support awareness on site
and within the wider local community of Kıyıköy in Turkey. We used
vehicle crash simulators and roll over demonstrations to highlight the
dangers of not wearing a seat belt through our “Think and drive, stay
alive” campaign.
Breaking new ground
As Petrofac’s first project in Turkey, our successful contribution to the
project has proven that our flexible commercial approach, local delivery
ethos and fast track capabilities are transferrable to wherever we work in
the world.
Petrofac Sharjah
U A E
Al-Khan Road, Sharjah
PO Box 23467
OPEN IN GOOGLE MAPS
+971 6 574 0999
Petrofac Aberdeen
U N I T E D K I N G D O M
Bridge View
1 North Esplanade West
AB11 5QF
OPEN IN GOOGLE MAPS
+44 1224 247000
Petrofac Brisbane
A U S T R A L I A
320 Adelaide Street
Queensland
4000
OPEN IN GOOGLE MAPS
+61 7 3010 9441
Petrofac Perth
A U S T R A L I A
Suite 1 Level 6 182 St Georges Terrace
PO Box 7458
Cloisters WA 6850
OPEN IN GOOGLE MAPS
+61 861540323
Petrofac Algiers
A L G E R I A
Pins Maritimes
Mohamadia, Algiers
OPEN IN GOOGLE MAPS
+213 21 89 15 52 / +213 21 89 15 55
Petrofac Brunei
B R U N E I
3rd Floor, Sentral Shopping Centre
Jalan Seri Maharaja
Kg. Mumong 'A', KA 1531
OPEN IN GOOGLE MAPS
+673 333 3903
L O A D M O R E
Quick links
 Investors
 Media
 Careers
 Who we are
 Services
 Markets
Accessibility and legal
 Accessibility
 Legal notice
 Privacy and cookies
Work with us
 Vendors and suppliers
 Find a contact
 Find an office
 Find a service
Connect with Petrofac
 LinkedIn
 YouTube
Our structure
We operate together as One Petrofac, a global company,
working in cohesion and using a consistent operating model
across our businesses and geographies – The Petrofac Way.
Set up to deliver for clients
We are organised into business delivery and business enabling units.
Our business delivery units comprise our two P&L businesses (our lump-
sum EPC business and our operations and projects business) and our
growing New Energies team.
With a 40-year track record for excellence, our EPC business delivers
onshore and offshore EPC (engineering, procurement, construction),
installation and commissioning projects. Lump-sum turnkey is our
predominant commercial model, but we also offer our clients the flexibility
of other models, such as services on a reimbursable basis, through our
engineering, procurement and construction management (EPCm)
business model. Our services encompass both greenfield and brownfield
developments in oil and gas, plus renewable energy projects.
Our operations business manages and maintains client operational
activities and services across the asset lifecycle, both onshore and
offshore; delivers small to medium scale EPC projects and provides
concept, feasibility and front-end engineering design (FEED) services,
mostly on a reimbursable basis. It’s also home to our market-leading well
engineering, decommissioning and training capabilities, our brownfield
modifications services, and the sole remaining operating asset of our
Integrated Energy Services division.
Our New Energies team is focused purely on operations and projects that
support new and existing customers with their decarbonisation ambitions,
notably in offshore wind, CCUS, hydrogen and waste to x. This team
blends the best our EPC expertise and lump-sum discipline with the
business development, flexibility, cost-effectiveness and customer
centricity of our operations business.
How we add value
Our business enabling functions comprise our 1 tec technical function
and our five corporate functions: QHSE, Finance, HR, Legal and
Commercial, and Communications and Sustainability.
1tec is the technical heart of the company, with our subject matter
expertise globally working as a global technical collective to deliver
technical excellence, drive top quartile performance, help achieve
competitive solutions for us and our clients; and provide independent
value assurance to our service quality standards.
We deliver locally though our in-country teams, partners, contractors and
supply chains, to deliver our business objectives in line with our values
and strategy.
Wherever in the world we are working, it’s always to one single global
standard of excellence that assures consistent delivery for our clients.
W H O W E A R E
Group Executive Committee
Each member of our Group Executive Committee is the leader of a single
business delivery or business enabling function, and they work together
to provide solutions that maximise value to stakeholders.
O U R L E A D E R S H I P
Jim Andrews, Group Head of HSE
Responsibility
As Group Director for HSE, Jim has overall accountability for quality,
health, safety, security and environment.
Experience
Jim has almost 30 years’ of experience with Schlumberger, working in
numerous countries and across several senior managerial positions in
operations and functions. Most recently he was the President of
Production Management and prior to that spent three years as
Schlumberger’s Vice President of Health, Safety, Security and
Environment.
Nick Shorten, Chief Operating Officer, Engineering & Production
Services
Petrofac
Oil & Energy
We design, build, manage and maintain infrastructure for the energy industries.
See jobsFollow

View all 15,467 employees
 Overview
 Jobs
 Life
About us
We’re a leading energy services company that helps our clients meet the world’s evolving energy
needs. We use our engineering know-how and our consultancy expertise to design, build, and
operate world-class energy facilities that are engineered for safety, optimal efficiency, and low
emissions. We operate in a range of markets and work across the entire asset life-cycle - from
design to decommissioning. These competencies, supported by flexible commercial models,
robust local delivery, and a technology neutral approach, set us apart. Our operations are heavily
dependent on our ability to attract, retain and lead the right level of skilled and experienced
personnel. Core to our offering is our distinctive, delivery-focused culture. We are a people-
based business. We started life in 1981 with just 25 people on board and today we have 31
offices and around 11,500 staff worldwide, representing more than 80 nationalities. We support
our clients to unlock the potential of their assets; onshore and offshore, greenfield and
brownfield. To find out more, visit www.petrofac.com
Website
http://www.petrofac.com
Industries
Oil & Energy
Company size
10,001+ employees
Headquarters
London
Type
Public Company
Founded
1981
Specialties
Oil & Gas, Design engineering, Procurement, Construction, Commissioning, Asset
management, Asset maintenance, Operations, Training, Competency development,
Production enhancement, Decommissioning, Well engineering, Consultancy, Onshore
and offshore engineering, New energy, Offshore wind, and Hydrogen
Locations
 Primary
117 Jermyn Street
London, GB
Get directions
Employees at Petrofac

SANJEEV SINGH AMIChemE

Hemant Jain
Certified Life Coach, Amazon Best Seller Author and experienced Change Management
Consultant with 20+ years experience

Jim Molloy

Bryan Hutcheson
See all employees
Updates

Petrofac
991,343 followers
1w
You can find our statement on the final outcome of the SFO investigation below. � Sami
Iskander, Group Chief Executive, said: “We emerge from this cloud as the world needs more
energy – both traditional energies that can be produced in the most efficient manner, and
renewable energies on which a lower carbon world can be built. Petrofac is well positioned to
support both, with the capabilities, experience, and expertise to deliver for our expanding
customer needs. Our markets in both traditional and new energies are growing and we have a
clear path to rebuild our business with a differentiated customer proposition that sets us apart.”
Statement on final outcome of SFO investigation
petrofac.com
885
LikeCommentShare

Petrofac
991,343 followers
3d
A team blending talented young graduates and experienced long-serving engineers is delivering a
unique project for #Petrofac: substations for the Seagreen wind farm. Seagreen offshore wind
farm will be the largest in Scotland once complete. Meet five of the people involved:
https://lnkd.in/dNqCzeQH
Seagreen: platform for excellence
petrofac.com
760 72 Comments
LikeCommentShare

Petrofac
991,343 followers
4d
We have signed a strategic partnership with Gazprom through Gazprom’s INTI - Russian
Institute Oil/Gas Technology Initiatives to export and promote the ambition, quality, and
standards of the Russian energy industry domestically and internationally. Full press release �
Gazprom and Petrofac create strategic partnership
petrofac.com
1,048 23 Comments
LikeCommentShare

Petrofac
991,343 followers
4d
� Civil/Structural Group Manager, Justin Jones, presented to the Offshore Engineering Society
this week, outlining our novel concept design for HVAC and HVDC floating offshore
substations. With the UK at the forefront of developing floating offshore wind power, we’re
proud to be contributing to the UK’s target of developing 1GW of floating wind by 2030. � Find
out more here � https://bit.ly/3FrG6ac Watch Justin discuss the concept in the video below �
#offshorewind #floatingoffshorewind #renewableenergy
Play Video
188 5 Comments
LikeCommentShare

Petrofac
991,343 followers
5d
� Our New Energy Services team enjoyed meeting familiar and new faces at the Global
Offshore Wind Conference, our first in-person event for 18-months. Find out about our offshore
wind capabilities here � https://bit.ly/2Ypmxyg #RUKGOW21 #offshorewind #newenergy
Play Video
203
LikeCommentShare

Petrofac
991,343 followers
6d
Modularisation is often described as being like piecing together a giant Lego set. At Sriracha
Refinery in Thailand, the term just doesn’t do justice to the level of precision required. You
could say it’s more like assembling a Swiss watch… Read more about the Thaioil Clean Fuel
Project
Like a Swiss watch - Thaioil Clean Fuel project
petrofac.com
1,102 47 Comments
LikeCommentShare

Petrofac
991,343 followers
2w
It's currently #NationalInclusionWeek and in honour of the occasion, we have organised a
variety of internal events and activities that showcase our rich diversity, share learnings, and
provide opportunities for all of our teams to get involved. We also asked our colleagues around
the world what Diversity and Inclusion (D&I) means to them. From being kinder to one another,
to appreciating what makes us different, and valuing what each of us brings, D&I means
something to us all. � Watch the full range of responses below ⬇� #nationalinclusionweek2021
#diversityandinclusion #diversitymatters #inclusionforall
Play Video
354 13 Comments
LikeCommentShare

Petrofac
991,343 followers
2w
Understanding of hydrogen and the semantics behind its colourful names - green, blue, grey,
pink, turquoise, black, brown, yellow - requires answers to two essential questions: what is it and
how is it produced? ⁣ At Petrofac, we have expertise in delivering #greyhydrogen scopes, a
growing track record in delivering complex CO2 removal scopes to support large-scale
#bluehydrogen opportunities, and experience which allows us to support both large and small-
scale #greenhydrogen projects. If you would like to learn more about the hydrogen colour
spectrum, visit: https://lnkd.in/dpsCPwzk For insight on the science and the expertise behind green
hydrogen and the Arrowsmith Hydrogen Project go to: https://lnkd.in/dAbCfXTi
Play Video
189 1 Comment
LikeCommentShare

Petrofac
10,001+ employees
2w
Statement on resolution of SFO investigation ⬇� Update | 01 October 2021 : � https://lnkd.in/d-
8jMAv7 Update on court process in relation to SFO investigation | 27 September 2021: �
https://lnkd.in/d_m9wTVG
Statement on resolution of SFO investigation
petrofac.com
970
LikeCommentShare

Petrofac
10,001+ employees
2w
From 𝘢𝘪𝘳 𝘦𝘮𝘪𝘴𝘴𝘪𝘰𝘯𝘴 and 𝘣𝘪𝘰𝘥𝘪𝘷𝘦𝘳𝘴𝘪𝘵𝘺 to 𝘜𝘕 𝘚𝘶𝘴𝘵𝘢𝘪𝘯𝘢𝘣𝘭𝘦 𝘋𝘦𝘷𝘦𝘭𝘰𝘱𝘮𝘦𝘯𝘵 𝘎𝘰𝘢𝘭𝘴 and 𝘸𝘢𝘵𝘦𝘳 use -
our sustainability glossary provides a quick summary and access to more detailed information on
key sustainability topics. �� Find out more �� #sustainability
A-Z of sustainability - our sustainability glossary
petrofac.com
184 4 Comments
LikeCommentShare

Petrofac
10,001+ employees
3w
Today we announced a new strategic partnership to expedite the delivery of green hydrogen
projects. Read about how our Alliance with Protium will support the creation of a more
integrated energy future in the UK. ⬇� #Petrofac #Protium #greenhydrogen #renewableenergy
Petrofac signs strategic partnership with green hydrogen firm, Protium
petrofac.com
744 41 Comments
LikeCommentShare

Petrofac
10,001+ employees
3w
We have been successfully supporting Tatweer Petroleum to deliver a number of key upstream
gas projects in Bahrain since 2015 and energise the Kingdom’s economic growth and prosperity.
Find out more on our latest contract award in Bahrain: ➡� http://ow.ly/zr9V50GdxwB
Petrofac awarded EPCC contract in Bahrain
petrofac.com
1,524 104 Comments
LikeCommentShare

Petrofac
10,001+ employees
3w
The Matrix �� starring Keanu Reeves was one of the first films to use #photogrammetry and
today filmmakers use the technology to create crowd scenes and digital stunt doubles. Game of
Thrones used it extensively for many of its iconic locations and scenes. Its use is on the increase
beyond the motion picture industry. After the fire at Notre Dame in Paris restorers used it to help
rebuild the famous cathedral. At Petrofac, we have hit upon a new application for
photogrammetry. Read how it could be used in the future to look after offshore
assets. #offshore #Petrofac #digital
The photogrammetric future of offshore maintenance
petrofac.com
297 5 Comments
LikeCommentShare

Petrofac
10,001+ employees
4w
� Through our non-exclusive agreement with CO2 Capsol AS, we will work as a preferred
engineering services partner to support its carbon capture opportunities across the UK, Europe
and over time, globally. John Pearson, Petrofac Chief Operating Officer, commented: “Industry
collaborations that support the acceleration of critical net zero infrastructure will be fundamental
to the Energy Transition. Alongside Petrofac’s global engineering and operations experience, we
see great potential for efficient technologies such as those developed by CO2 Capsol, to bring
down cost across the value chain as we seek to de-risk and fast-track carbon capture projects for
industrial emitters.” ⬇� Read more about the collaboration, and how we’re currently working
together on what will be the largest Bio Energy Carbon Capture and Storage plant in Europe,
below. ⬇� #Petrofac #CO2Capsol #carboncapture #NetZero
Petrofac and CO2 Capsol collaborate on carbon capture initiatives
petrofac.com
264 3 Comments
LikeCommentShare

Petrofac
10,001+ employees
4w
Here at Petrofac, we are passionate about finding talented individuals, from all industries, to
support the shift to a carbon neutral future. Those in the Armed Forces have the potential to
contribute towards this goal, which is why we’re proud to have signed the Armed Forces
Covenant. Petrofac now joins more than 2,000 UK organisations that have signed the Covenant –
an initiative aimed at ensuring those who serve, or have served, in the Armed Forces are treated
with fairness and respect. ⬇� Read more about our pledges to the Covenant and how we’re
working to attract, retain and reskill people for the energy transition. #Petrofac
#ArmedForcesCovenant #ArmedForcesCommunity
Petrofac pledges commitment to UK Armed Forces community
petrofac.com
444 31 Comments
LikeCommentShare

Petrofac
10,001+ employees
4w
We’re proud to have been shortlisted in the ‘Excellence in Decommissioning’ category at this
year’s OGUK Awards for our successful delivery of a plug and abandonment campaign for Hess
Corporation. By applying our extensive skill and experience, we safely planned and delivered a
multi-well decommissioning project for our client that provided cost certainty through an
innovative lump-sum turnkey commercial offering. This approach involved collaboration with
our industry partners, Awilco Drilling and Halliburton, and also built on our previous success
delivering complex decommissioning projects in the UKCS and globally. Congratulations to all
the finalists! � Click below to find out more about the #OGUKAwards ⬇�
Home - OGUK Awards
https://ogukawards.co.uk
195 21 Comments
LikeCommentShare

Petrofac
10,001+ employees
1mo
We’ve been shortlisted as one of the finalists in the ‘Digital Transformation of the Year’
category at next week’s The Big 5 - International Building & Construction Showawards being held
in the UAE. Well done to our team involved, good luck at the event �: https://bit.ly/3C0blXn
#big5impactawards #Construction #DigitalTransformation
o
399 38 Comments
LikeCommentShare

Petrofac
10,001+ employees
1mo
Vice President, Jonathan Carpenter, spoke with Renewables Now Ltd about the many colours of
hydrogen – one of the hottest topics in energy today. � Click below to read the exclusive
interview – Jonathan discusses how we’re supporting our clients to decarbonise, the role that
hydrogen will play, and the challenges and opportunities that come with the development of this
‘fuel of the future’. ⬇� ⬇� #Petrofac #renewableenergy #bluehydrogen #greenhydrogen
INTERVIEW - Petrofac sees green matching blue, even grey H2 by 2030
renewablesnow.com
861 34 Comments
LikeCommentShare

Petrofac
10,001+ employees
1mo
We’ve been delivering complex projects, engineering services and training local workforces in
North Africa for over 20 years now. Find out more on our new contract with Zallaf Libya Oil &
Gas Exploration and Production Company. ⬇� Read more ⬇�
Petrofac secures Libya EPCC contract
petrofac.com
2,776 370 Comments
LikeCommentShare

Petrofac
10,001+ employees
1mo
The UAE is celebrating #EmiratiWomensDay today. It aims to highlight the unlimited ambitions
of Emirati women and their hopes for the future. At Petrofac we’re building teams that better
reflect the communities we serve. We visited one of our project sites in Dubai and caught up
with some of our inspirational UAE women. They told us about their pride in the country’s
support and empowerment of women, the achievements they are making in their careers with
Petrofac, some of the challenges and their hopes for the future. A big ‘Mabrouk’ to all Emirati
women celebrating this weekend. #UAE #genderequality #UnitingBusiness #genderbalance
#womeninSTEM
Play Video
543 22 Comments
LikeCommentShare

Petrofac
10,001+ employees
2mo
A warm welcome to our new Country Manager in Oman. Dr. Khalid Al Jahwari brings more than
20 years’ industry experience. His appointment is aligned to Petrofac’s model of local execution
to global standards and generating in-country value. #InvestedInOman #PetrofacOman
#InCountryValue
Dr Khalid Al Jahwari joins Petrofac as Country Manager - Oman
petrofac.com
1,168 137 Comments
LikeCommentShare

Petrofac
10,001+ employees
2mo
Supporting more than 9,000 UK jobs and unlocking £4 billion of investment by 2030, the UK
Government released its hydrogen strategy. Jonathan Carpenter, Vice President of our New
Energy Services business said: “We welcome the Government’s hydrogen strategy and
upcoming consultations to define revenue models and means to blend H2 into the gas grid.
Petrofac has been supporting the #Acorn project since 2020; when complete that one
development will contribute significantly to the targets set out today. With the right support, the
UK has the potential to become global leaders in both the Blue and Green Hydrogen sectors,
accelerating beyond 5GW by 2030. We look forward to working with BEIS, UK project
developers and industrial users to turn that ambition, into action.”
UK government launches plan for a world-leading hydrogen economy
gov.uk
309 17 Comments
LikeCommentShare

Petrofac
10,001+ employees
2mo
Photography is deeply ingrained within #lifeatPetrofac. This came about quite organically –
Petrofac’s synergies with photography are clear. Technique, creativity, and technology are
principles that our colleagues live and breathe in their day-to-day work, so it was no surprise that
many of them share an appetite for photography. Find out more about stunning images created
by the community of enthusiast photographers at Petrofac. ����
Picture Petrofac
petrofac.com
142 7 Comments
LikeCommentShare

Petrofac
10,001+ employees
2mo
Imagine an endlessly available fuel source that could be burned to release energy, yet whose only
by-product is water. The most abundant element in the universe does not naturally occur on
Earth. And yet many consider it to be the most important fuel for the #energytransition away
from carbon. We take a closer at how Petrofac is helping Infinite Blue Energy achieve ‘green’
hydrogen from electrolysed water using renewable energy at the Arrowsmith Green Hydrogen
project in Australia. #greenhydrogen #hydrogen #Petrofac #renewableenergy
Something in the water
petrofac.com
292 15 Comments
LikeCommentShare

Petrofac
10,001+ employees
2mo
Times of Oman spoke with Ian Debattista, Petrofac’s Country Manager in the Sultanate. � Take
a look at the exclusive interview - Ian provides an update on our activity in-country, looks ahead
and outlines some of our plans as we remain at the heart of the region’s energy transition. ⬇�
⬇� http://ow.ly/affA50FOIBv #InCountryValue #InvestedInOman #TimesOfOman #Business
Petrofac expects acceleration of energy transition and a wider sector recovery
timesofoman.com
531 24 Comments
LikeCommentShare

Petrofac
10,001+ employees
2mo
To all celebrating, we wish you joyous festivities and a prosperous Hijri new year. ‫ىنمتن‬ ‫مكل‬ ‫ماع‬
raeYweNcimalsI# .‫ير‬ ‫خ‬ ‫ب‬ ‫تم‬ ‫وأن‬ ‫عام‬ ‫ل‬ ‫ك‬ .‫اإلزدهار‬ ‫ب‬ ‫ليء‬ ‫م‬ ‫د‬ ‫جدي‬ ‫هجري‬
o
339 7 Comments
LikeCommentShare

Petrofac
10,001+ employees
2mo
Our Mumbai team is supporting India’s fight against Covid-19 with a mobile vaccination drive.
The programme is designed to reach those in the local communities who need help most. Find
out more: http://ow.ly/MP5f50FNaaf #PetrofacCares #ChooseToVaccinate
Mobile vaccination drive to support local communities in India
petrofac.com
147 2 Comments
LikeCommentShare

Petrofac
10,001+ employees
2mo
Our new corporate website is now live! � Putting Petrofac’s purpose and its rich and diverse
service offering at the forefront, the website provides clear and detailed information on topics
that matter most to our stakeholders, including how under new management we’re reshaping and
rebuilding the company, our growing focus on new energies, as well as our approach to ESG,
climate change, diversity and inclusion, and more. Visit our website and let us know your
thoughts! #Petrofac
Petrofac launches new corporate website
petrofac.com
363 29 Comments
LikeCommentShare

Petrofac
10,001+ employees
3mo
Jonathan Carpenter, our Vice President, New Energy Services shared insights with Gulf Business
on ways to build a sustainable future in the energy sector across the Gulf Cooperation Council
(GCC) region. “For a sustainable future, we will need a mix of fuels and energy sources,
depending on the application and environment, to ensure we can get to net zero quickly and cost
effectively,” Jon said. Find out more about new technologies being explored in the industry,
what the future holds for new energies, and more here: http://ow.ly/8Hhv50FF9EP #Greenenergy
#Sustainablefuture
GCC's energy space: What does the future hold?
https://gulfbusiness.com
231 6 Comments
LikeCommentShare

Petrofac
10,001+ employees
3mo
We’re working to achieve a better gender balance by targeting 30% of women in senior roles by
2030, further increasing our female graduate intake, and building teams that reflect the
communities we serve. This is why we’re proud to be a participant of #TargetGenderEquality,
an accelerator programme from United Nations Global Compact tackling barriers to gender
equality and advancing women’s equal representation and leadership in
business. #genderequality #UnitingBusiness #genderbalance #womeninSTEM
o
206 14 Comments
LikeCommentShare

Petrofac
10,001+ employees
3mo
Direct Air Capture (DAC) provides a high quality, permanent solution to remove carbon dioxide
from the air, reversing the emissions process. That’s why in addition to our existing efforts to
reach #NetZero, we’ve committed to become the first customer of Storegga’s proposed UK DAC
facility – the first large-scale facility of its kind in Europe. John Pearson, Petrofac COO,
commented: “As well as drawing on our engineering experience to support the design and initial
engineering of this project, and other low carbon initiatives like it, Petrofac is committed to
decarbonising its own operations, and those of our supply chain.” ⬇� Read more ⬇� #Petrofac
#Storegga #DirectAirCapture #energytransition
Petrofac builds Direct Air Capture into its Net Zero plan
petrofac.com
349 14 Comments
LikeCommentShare

Petrofac
10,001+ employees
3mo
The award of our first contract in Sweden signals an important step in our growth strategy.
Adding to the recent clutch of new energy projects secured in the UK and Australia, Petrofac has
been chosen by Stockholm Exergi to undertake the front-end engineering design for a planned
CO2 capture facility. Read about how we’re supporting our client to achieve negative emissions
in this “game changing” project for Sweden ⬇�. #Petrofac #StockholmExergi #Sweden
#newenergy #negativeemissions
Petrofac to support negative emissions in Stockholm
petrofac.com
445 24 Comments
LikeCommentShare

Petrofac
10,001+ employees
3mo
In a UK energy industry first, we recently replaced a spool piece in the North Sea, without the
need to mobilise a survey team. Through our collaboration with James Fisher Asset Information
Services, we combined the use of Self-Capture Point Cloud and an asset’s Digital Twin to capture
detailed visual and measurement data which can be used to design asset modifications to a high
level of dimensional accuracy. Steve Johnson, Vice President of Digital, commented: “As our
industry continues to balance its focus on the maximisation of economic recovery and
accelerating towards a lower-carbon future, this type of digital execution provides a means to
optimise use of existing infrastructure by extending field life, whilst reducing offshore travel.” �
Read more about how this collaboration has eliminated the need for offshore surveys ahead of
modification scopes. � #Petrofac #JamesFisher #digital #northsea
Petrofac proves value of digital modifications execution in industry first
petrofac.com
551 15 Comments
LikeCommentShare

Petrofac
10,001+ employees
3mo
Eid Mubarak from the Petrofac family, we wish you safe and happy festivities. #EidMubarak
o
638 43 Comments
LikeCommentShare

Petrofac
10,001+ employees
3mo
We have a long and rich history in the Sultanate of Oman. Find out how we’ve been leading in
building ICV and investing in Omani youth from Ian Debattista, Country Manager - Oman and
Faisal Al-Gheilani, In-Country Value (ICV) Manager, who spoke with Oil & Gas News as part
of their Oman Review. �Read the latest edition: https://lnkd.in/ddidXad #InvestedinOman
#Petrofac
Oil and Gas News
ognnews.com
317 4 Comments
LikeCommentShare

Petrofac
10,001+ employees
3mo
We continue to expand our UK EPC portfolio through a new three-year contract with
ONEgas. Commenting on the award, Nick Shorten, COO of our Engineering and Production
Services business, said: “Over the last 18 months Petrofac’s UK brownfield projects business has
achieved notable growth. Our best-in class engineering teams, scalable delivery model and
project control systems are now being deployed in support of more than 30 assets in the
UK.” ⬇� Read more ⬇� #Petrofac #ONEgas #UKCS #SouthernNorthSea #EPCcontract
Petrofac grows EPC provision for ONEgas
petrofac.com
623 35 Comments
LikeCommentShare

Petrofac
10,001+ employees
3mo
Kuwait’s Clean Fuels Project has involved the expansion and upgrading of two existing KNPC
refineries, to develop an integrated complex, increasing processing capacity to 800,000 barrels
per day. The production of a new generation of ultra-low Sulphur fuel products will boost the
country’s global position in the industry. Find out more on the latest significant milestone here:
⬇� ⬇� http://ow.ly/FvyH50FuJLh #Kuwait #KNPC #Petrofac #CleanFuels
Handover of MAB1 facilities at Kuwait’s Clean Fuels Project
petrofac.com
1,960 117 Comments
LikeCommentShare

Petrofac
10,001+ employees
3mo
“Petrofac has been an integral part of the team at Cygnus over the past decade”, said Alexandra
Thomas, Neptune Energy's UK Managing Director, of our three-year renewal announced
today. ⬇� Read more ⬇� #NeptuneEnergy #Petrofac #Cygnus #UKCS #NorthSea
Petrofac marks a decade on Cygnus with new three-year Neptune Energy
contract
petrofac.com
618 21 Comments
LikeCommentShare

Petrofac
10,001+ employees
3mo
Marking another significant milestone, Oman’s OQ has successfully exported its first shipment
of Liquified Petroleum Gas (LPG) products internationally, taking 5,000 tonnes of both propane
and butane from Salalah, Southern Oman to the Indian sub-continent. We were awarded the EPC
contract for the gas treatment project in 2017. With its centrepiece extraction facilities located in
the Salalah Free Zone adjoining the Port of Salalah, it is a new energy hub for the production of
LPG, with growing demand in both domestic and international markets. Our scope of work has
included construction of the LPG unit and associated facilities, including tie-ins to existing
pipeline infrastructure, together with LPG storage and jetty facilities at the port. You can find out
more on some of the project’s major milestones, its importance for the region and meet some of
our colleagues involved in making it a success here ➡� https://lnkd.in/duGWK-r
#Salalah #OQ #InvestedinOman #InCountryValue
o
1,420 91 Comments
LikeCommentShare

Petrofac
10,001+ employees
3mo
Duqm Refinery is the largest ever investment project between two GCC countries in the
refineries and petrochemical sector, a joint venture between Oman Oil Company and Kuwait
Petroleum International. Located around 600 kilometres south of Muscat, it will form the
cornerstone of the Duqm Special Economic Zone, Oman’s next industrial centre. The Refinery is
designed to be able to process a range of blended crude oils, configured as a full-conversion
hydrocracker/coking facility that will utilise advanced technology. Petrofac, in a 50/50 joint
venture with Samsung Engineering, are delivering the EPC package 2 worth approximately
US$2 billion. Our scope of work includes the engineering, procurement, construction,
commissioning, training and start-up operations for all the utilities and offsites. ⬇� Watch the
latest OQ8 project progress video ⬇� http://ow.ly/RfW750FlxF3 #Petrofac #InvestedInOman
Duqm refinery project | Middle East projects | Petrofac
petrofac.com
1,425 113 Comments
LikeCommentShare

Petrofac
10,001+ employees
3mo
In mature basins, the incremental efficiencies and reduction of interfaces achieved through
integrated delivery, drive huge value as our clients seek to extend field life. We’re bringing this
philosophy to life on Ithaca Energy's EOR project ��� https://lnkd.in/dd7WeEj #Petrofac
#PetrofacUK #NorthSea
Petrofac grows support for Ithaca Energy with Captain project delivery
petrofac.com
251 11 Comments
LikeCommentShare

Petrofac
10,001+ employees
3mo
The world’s energy needs are evolving, and we are too. Our latest strategic development marries
global engineering, project delivery and operations expertise with proven entrepreneurial
development skills, to fast-track delivery of net zero infrastructure #Petrofac #netzero
https://lnkd.in/dY7Ysgx
Petrofac and Storegga enter strategic Alliance to fast-track net zero…
petrofac.com
318 12 Comments
LikeCommentShare

Petrofac
10,001+ employees
3mo
The HKZ offshore wind project continues to move forwards, with the second transformer
platform jacket safely and successfully installed for our client TenneT. The North Sea is
emerging as a wind power super hub, and we have the expertise to support this transition. Find
out how: http://ow.ly/jHRD50FkH5I #TenneT #HollandseKustZuid #WindEnergy
#RenewableEnergy #OffshoreWind
Play Video
446 7 Comments
LikeCommentShare

Petrofac
10,001+ employees
4mo
“This latest contract award builds on our expanding footprint in-country. The SOCAR Petrofac
JV is well positioned to support bp’s operations more widely in the Caspian Sea,” said Patty Eid,
Global Head of Petrofac Training Services and SOCAR Petrofac JV Board member, following
the announcement of our new contract to support Azerbaijan’s ACE project. ⬇� Read more ⬇�
http://ow.ly/xdi850FhnEy #Petrofac #SOCAR #Azerbaijan #CaspianSea
Petrofac, in a joint venture (JV) with the State Oil Company of the Republic of…
petrofac.com
651 23 Comments
LikeCommentShare
Affiliated pages

Petrofac Training Services
Oil & Energy
Similar pages

Saipem
Mechanical or Industrial Engineering
San Donato Milanese, (Milan)

Shell
Oil & Energy

Wood
Oil & Energy

Schlumberger
Oil & Energy
Sugar Land, Texas
Show more similar pages
 LinkedIn© 2021
 About
 Accessibility
 User Agreement
 Privacy Policy
 Cookie Policy
 Copyri
https://file.io/G4CUNWUDpQWb
TARIQkhan*747 18731@
f69b7dba-2f50-4992-8d7c-2ba1d7e8a52e
Email
tariqkhan7747@gmail.com
Reset Password
To reset your password, please follow the forgot password flow.

Proven project management.docx

  • 1.
    Proven project management People powerPetrofac, and every project we deliver. Their project management expertise, supported by internationally recognised systems and fit-for-purpose controls, underpin safe, on-time delivery. The projects we support are usually complex. We balance local awareness, and learnings from our truly global network to simplify the complex and overcome the seemingly impossible. Tap into their problem-solving culture, for smarter, faster, more effective delivery across any size of project.
  • 2.
  • 3.
    Our certified ProjectManagement Professionals support a range of services: • Project Management Contractor (PMC) • Engineering, Procurement and Construction (EPC) • Engineering, Procurement and Construction Management (EPCm) contractor • Discreet project management services across the life cycle of an asset • Health, safety and environmental services • Project cost, schedule and risk management analysis Experience to succeed Our methodologies and processes capture the experience of our past projects The system toolkit that we have created, using our experience of designing, building and operating real facilities, drives genuine operational improvement. The Petrofac procurement benchmarking database provides us with the optimum prices at which facilities can be built, and give us a real advantage when managing the procurement phase for clients. Tools and services that drive transparency
  • 4.
    We use industry-leadingsoftware and our global IT infrastructure, to create visibility, transparency and assurance of all project management activity. Turus: our project management tool Our proprietary project management tool, Turus, provides information, assurance and control, supporting the delivery of projects efficiently, and often on an accelerated schedule. A global data repository that grows with each project, Turus, provides essential project assurance and oversight in a simple, easy to understand format, that facilitates audits and full compliance with regulatory requirements. IPMS: our project management service Leveraging our project management and operations know-how, and access to a global network of IT partners, we have developed a fully integrated work management model called iPMS. It enables the integration of various project management platforms and tools, ensuring all project data is visible and connected. Using techniques like robotic process automation, decision makers can quickly identify an issue before it causes a delay. Our project execution services
  • 5.
    Multidisciplinary engineering capability Our teams provideengineering solutions across the asset life cycle. From conceptual studies and FEED, to detailed design for onshore and offshore energy facilities. Working with you to understand your requirements, and using the learnings of hundreds of capital projects and our extensive operations portfolio, we will bring unique insights to your project. Challenging the norm, drilling into key cost drivers, and applying value-adding engineering techniques to deliver the best solutions in line with your investment strategy. Everything we do is focused on safe, fit-for-purpose design and specification, that ensures constructability and operability. With us, delivery is always assured.
  • 6.
  • 7.
    When we executea front-end engineering design (FEED), we are committed to providing security of quality, cost and schedule, along with safe designs which are implementable and operable. The knowledge held by our global E&P, EPCm, operations, maintenance and construction teams enables us to produce front-end solutions which reduce CAPEX, OPEX and schedule, while enhancing safety and operability. We make sure this knowledge, gained through our experience, is utilised at the earliest opportunity within a project, so we can add the most value and reduce the risk of change in later phases. Detailed design experience means we can accurately predict requirements, supporting construction schedules through the timely availability of drawings, equipment and material and the early procurement of long lead items. This enables us to support clients in the early commencement of construction activities. Global procurement expertise Our expert buyers, expeditors, logistics officers and material controllers are strategically located around the world. They provide sourcing, expediting and logistics support to greenfield and brownfield projects, on and offshore. We also have strong
  • 8.
    relationships with thirdparty agencies who we can engage to enhance our service when necessary. Using a flexible commercial delivery model enables us to procure directly in support of your projects, returning value through a gain share approach, such as the one currently taken for Petroleum Development Oman (PDO). Each year we spend billions of dollars across anywhere between 2,000 and 3,000 suppliers. Leveraging our procurement expertise, vast established network and global buying power, we will bring additional value to your project. “RHIP is an enormous city in itself, well below budget and ahead of schedule. Our partnership with Petrofac has worked extremely well in reducing costs, securing major leveraging of our turbines, compressors and other equipment at lower costs.” R A O U L R E S T U C C I M A N A G I N G D I R E C T O R , P D O , 2 0 1 9 Local delivery adds value Local delivery has always been central to our approach, underpinned by robust business practices. We evaluate our impact by calculating in- country value (ICV).
  • 9.
    Working with localsuppliers and developing local capabilities wherever possible, we ensure that all goods and services are procured in an ethical and cost-effective manner. The success of our supply chain operations is built on several factors: our operational structure, which enables prompt approvals and decision making; our strong and long-standing relationships with our vendors; and our early commitment to long lead items through early engagement with vendors at the proposal stage. Petrofac works with approved vendor lists from our clients. If you are a vendor or service provider, we would like to know you better and we invite you to register with us by visiting our vendor registration portal. O U R W O R K
  • 10.
    Safe, smart andon-time prTechnological innovation driving safe, smart and on- time project delivery A strategic investment for Oman, the Salalah LPG Extraction project will enable the Sultanate to get more value from its gas assets. The award of the prestigious Engineering, Procurement and Construction (EPC) and start-up contract to Petrofac in 2017 built on our long track record in Oman, took us into the Salalah region for the first time.  Overvi ew Scope Engineering, procurement and construction (EPC) Client OQ LPG
  • 11.
    oject dDeveloping new employment opportunities andskills for Omanis Once completed, the project will create new opportunities for the employment of Omanis, particularly in the Dhofar region. A supply chain roadshow event was held in Salalah, allowing more than 100 small and medium sized local companies the opportunity to demonstrate their capabilities and work on energy development projects.
  • 12.
    Building relationships withlocal businesses Across the project, we engaged with more than 300 locally based businesses. We built relationships through knowledge transfer and our provision of support in the areas of workforce upskilling to further enhance in-country value (ICV). elivery
  • 13.
    Outstanding technical and safetyachievements Our project team accomplished impressive operational and Health, Safety, Security and Environment (HSSE) milestones throughout the project, including the safe installation of huge dome roofs on two LPG tanks using nothing but air and the achievement of 14 million man-hours without a Lost Time Incident (LTI). In challenging mountainous terrain, we removed half a million cubic metres of rock over the course of seven months prior to commencing work on site. The safe and successful connection of the project in January 2020 to the North-South main gas pipeline, which supplies gas for the South of Oman was a testament to our commitment to safe delivery.
  • 14.
    Enhancing project execution Toenhance project execution our connected construction digital solution was trialed on the project for the first time, providing valuable insights and further driving efficient project management. Now in its final stages, the Salalah LPG extraction project is progressing well despite recent wider logistical challenges due to COVID-19. Decades of execution excellence
  • 15.
    For over 40years, our engineering and construction experts have been turning complex concepts into reality. Building and delivering the world’s most exciting energy projects, in some of its most challenging locations. From the world’s largest offshore wind converter platform, to facilities that function efficiently in sub-Saharan temperatures, our portfolio reflects the ingenuity of our engineers and the quality of our execution. Delivering complex construction projects Our award-winning construction team turn complex blueprints into reality. The installations we design and build are usually in remote locations and have to survive challenging and harsh environments. Our expertise and innovative solutions underpin efficient logistics planning and management, and help navigate through challenges imposed by geography, terrain and infrastructure.
  • 16.
    Often the sizeof small cities, our projects have even spanned multiple countries. We’ve literally stopped traffic and moved mountains to deliver assets that support the world’s energy needs. As well as driving world-firsts, our construction teams breathe new life into existing infrastructure. We can help you safely expand existing operations to enhance energy production and extend asset life. The applications for our expertise are diverse. So too are the commercial models we offer; each designed with your needs in mind. Whether you’re building the processing facility for an onshore gas field; or a liquid-based greenfield downstream refinery project; planning to construct an HVDC platform to transmit from your offshore wind farm; or exploring options to tie-back stranded reserves to an existing offshore asset – with us, you receive deep construction expertise, strong project management capability and a clear focus on safety, integrity and quality.
  • 18.
    Over 200 EPCprojects delivered around the world
  • 19.
    From concept tocompletion Petrofac clients experience a seamless journey from front-end engineering design (FEED) to detailed design, to construction and completion of your asset. Early-stage engagement between our engineering, procurement and construction teams ensures our project plans are integrated and built to flow seamlessly. On-time and on-budget delivery is made possible through ensuring the accuracy of the engineering input and the availability of the material from efficient supply chain planning. Global capability and local mindset
  • 20.
    We employ andinvest in local people, work with local suppliers, and, where there is a need, help to develop local capabilities. By placing a strong focus on driving In-country-Value we make a net contribution to the economies in which we operate, leaving a positive legacy after our involvement in a project has finished. Safe delivery assured Nothing is more important to Petrofac than safety; from our people, clients and the communities we work with, to the integrity of the assets and facilities we build, maintain and run. Our vision is a future with zero incidents. We employ the latest technology on our sites to manage workers’ health, safety and wellbeing,
  • 21.
    while maintaining efficiencyand high productivity by being always connected. Supporting your Net Zero goals Across every construction project, decarbonisation has become an inescapable theme. We’re committed to achieving Net Zero across our businesses by 2030 and will work with you to construct infrastructure that supports your environmental goals.
  • 22.
    Play videoP LA Y V I D E O 1/1 Achieving NetZero by 2030 Proven scalable delivery models
  • 23.
    No matter thesize of the project, we flex to suit your needs – sizing our delivery team to apply the right levels of governance and risk management, while delivering safe, cost-effective and purpose-met solutions. Breathe new life into existing assets Where others see challenges, we see opportunities. Ageing assets are being given a new lease of life through subsea tiebacks and repurposing from traditional to new energy production, including hydrogen and electrification. When it comes to construction projects on existing assets, you need a fit- for-purpose solution, with minimal impact on operations. Our unparalleled track record of delivering major modification projects includes subsea tie-back projects, field development topside activities and facilities upgrades. With no requirement to build new platforms, subsea tiebacks and repurposing existing infrastructure for new energy significantly reduces costs, delays decommissioning and reduces emissions. espite the tight timeframes and changes to the original scope, the project was completed one month ahead of schedule and was inaugurated at a ceremony in Istanbul, attended by the presidents of Turkey and Russia.
  • 24.
    A project ofenormous scale and diversity We provided Engineering, Procurement and Construction (EPC) of the gas receiving terminal near the small coastal village of Kiyikoy and onshore inlet pipeline installation. The terminal receives 31.5 billion cubic metres of natural gas annually from Russia, supplementing Turkey’s domestic supply, and enabling onward export to Bulgaria and beyond. Equivalent to the size of 27 football pitches, the receiving station facility is vast and complex. We executed the preparatory work including surveying, vegetation clearance, site levelling and construction of access roads. We also provided the piping and mechanical works: laying of cables, electric works and construction of internal roads, foundations, buildings such as the control room and the operational and instrumentation control systems.
  • 25.
    A project ofenormous scale and diversity We carried out the installation of the onshore pipelines from the Black Sea to the gas receiving terminal. We stripped the vegetation and topsoil off the corridor to prepare it for pipe-laying before digging trenches to a depth of 2.5 metres. Once welded, we laid the pipelines in the trenches and covered with the topsoil. At peak, the site’s camp was home to a workforce of almost 2,500 people including British, Turkish, Indian, Lebanese and Russian nationals.
  • 26.
    Fast tracked andflexible delivery Our delivery of a fast-track project in just two years brought many challenges, one of which was procurement. The delivery of long-lead items was carried out efficiently, in many cases even ahead of the committed dates. Construction was also challenging. Working in a remote area with no existing infrastructure meant an initial six months preparing the site. This had a knock-on effect on construction and our team only had 18 months to build the facility. We maintained continuous engagement with our subcontractors to ensure engineering remained on track and of the highest quality.
  • 27.
    Flexible delivery m Flexibilitycritical to complete final link in vital TurkStream project
  • 28.
    TurkStream, a projectthat will meet the energy demands of Turkey and southeast Europe for decades to come, reached completion in 2019. The newly developed offshore pipeline system will power an incredible 15 million homes, transforming the region’s future prospects.  Overvi ew Scope Engineering, procurement and construction (EPC) Client South Stream Transport B.V. K E Y F A C T S Million homes powered Football pitches in size Billion cubic metres of gas to be received 31.5
  • 29.
    Million homes powered Footballpitches in size Billion cubic metres of gas to be received Million homes powered Football pitches in size
  • 30.
  • 31.
  • 32.
    1/3 TurkStream Gas Pipeline,Turkey Flexible delivery model Our flexible delivery model meant we could start the project on a reimbursable basis while the scope was being defined and convert to a
  • 33.
    lump-sum turnkey atthe 90% Model Review, allowing us to manage and accelerate the schedule to deliver on time. Driving in-country value We employed 87 locals who remained employed on site after project completion. The project team also helped in the local community, providing equipment to fix roads, and supported businesses such as restaurants and hotels. Our team launched a road safety campaign to support awareness on site and within the wider local community of Kıyıköy in Turkey. We used vehicle crash simulators and roll over demonstrations to highlight the dangers of not wearing a seat belt through our “Think and drive, stay alive” campaign. Breaking new ground As Petrofac’s first project in Turkey, our successful contribution to the project has proven that our flexible commercial approach, local delivery ethos and fast track capabilities are transferrable to wherever we work in the world. Petrofac Sharjah U A E Al-Khan Road, Sharjah PO Box 23467
  • 34.
    OPEN IN GOOGLEMAPS +971 6 574 0999 Petrofac Aberdeen U N I T E D K I N G D O M Bridge View 1 North Esplanade West AB11 5QF OPEN IN GOOGLE MAPS +44 1224 247000
  • 35.
    Petrofac Brisbane A US T R A L I A 320 Adelaide Street Queensland 4000 OPEN IN GOOGLE MAPS +61 7 3010 9441 Petrofac Perth
  • 36.
    A U ST R A L I A Suite 1 Level 6 182 St Georges Terrace PO Box 7458 Cloisters WA 6850 OPEN IN GOOGLE MAPS +61 861540323 Petrofac Algiers A L G E R I A Pins Maritimes Mohamadia, Algiers OPEN IN GOOGLE MAPS +213 21 89 15 52 / +213 21 89 15 55
  • 37.
    Petrofac Brunei B RU N E I 3rd Floor, Sentral Shopping Centre Jalan Seri Maharaja Kg. Mumong 'A', KA 1531 OPEN IN GOOGLE MAPS +673 333 3903 L O A D M O R E Quick links  Investors  Media  Careers  Who we are  Services  Markets Accessibility and legal  Accessibility
  • 38.
     Legal notice Privacy and cookies Work with us  Vendors and suppliers  Find a contact  Find an office  Find a service Connect with Petrofac  LinkedIn  YouTube Our structure We operate together as One Petrofac, a global company, working in cohesion and using a consistent operating model across our businesses and geographies – The Petrofac Way. Set up to deliver for clients We are organised into business delivery and business enabling units. Our business delivery units comprise our two P&L businesses (our lump- sum EPC business and our operations and projects business) and our growing New Energies team. With a 40-year track record for excellence, our EPC business delivers onshore and offshore EPC (engineering, procurement, construction), installation and commissioning projects. Lump-sum turnkey is our
  • 39.
    predominant commercial model,but we also offer our clients the flexibility of other models, such as services on a reimbursable basis, through our engineering, procurement and construction management (EPCm) business model. Our services encompass both greenfield and brownfield developments in oil and gas, plus renewable energy projects. Our operations business manages and maintains client operational activities and services across the asset lifecycle, both onshore and offshore; delivers small to medium scale EPC projects and provides concept, feasibility and front-end engineering design (FEED) services, mostly on a reimbursable basis. It’s also home to our market-leading well engineering, decommissioning and training capabilities, our brownfield modifications services, and the sole remaining operating asset of our Integrated Energy Services division. Our New Energies team is focused purely on operations and projects that support new and existing customers with their decarbonisation ambitions, notably in offshore wind, CCUS, hydrogen and waste to x. This team blends the best our EPC expertise and lump-sum discipline with the business development, flexibility, cost-effectiveness and customer centricity of our operations business. How we add value Our business enabling functions comprise our 1 tec technical function and our five corporate functions: QHSE, Finance, HR, Legal and Commercial, and Communications and Sustainability.
  • 40.
    1tec is thetechnical heart of the company, with our subject matter expertise globally working as a global technical collective to deliver technical excellence, drive top quartile performance, help achieve competitive solutions for us and our clients; and provide independent value assurance to our service quality standards. We deliver locally though our in-country teams, partners, contractors and supply chains, to deliver our business objectives in line with our values and strategy. Wherever in the world we are working, it’s always to one single global standard of excellence that assures consistent delivery for our clients. W H O W E A R E
  • 41.
    Group Executive Committee Eachmember of our Group Executive Committee is the leader of a single business delivery or business enabling function, and they work together to provide solutions that maximise value to stakeholders. O U R L E A D E R S H I P Jim Andrews, Group Head of HSE Responsibility As Group Director for HSE, Jim has overall accountability for quality, health, safety, security and environment.
  • 42.
    Experience Jim has almost30 years’ of experience with Schlumberger, working in numerous countries and across several senior managerial positions in operations and functions. Most recently he was the President of Production Management and prior to that spent three years as Schlumberger’s Vice President of Health, Safety, Security and Environment. Nick Shorten, Chief Operating Officer, Engineering & Production Services Petrofac Oil & Energy We design, build, manage and maintain infrastructure for the energy industries. See jobsFollow  View all 15,467 employees  Overview  Jobs  Life About us We’re a leading energy services company that helps our clients meet the world’s evolving energy needs. We use our engineering know-how and our consultancy expertise to design, build, and operate world-class energy facilities that are engineered for safety, optimal efficiency, and low emissions. We operate in a range of markets and work across the entire asset life-cycle - from design to decommissioning. These competencies, supported by flexible commercial models, robust local delivery, and a technology neutral approach, set us apart. Our operations are heavily dependent on our ability to attract, retain and lead the right level of skilled and experienced personnel. Core to our offering is our distinctive, delivery-focused culture. We are a people- based business. We started life in 1981 with just 25 people on board and today we have 31 offices and around 11,500 staff worldwide, representing more than 80 nationalities. We support our clients to unlock the potential of their assets; onshore and offshore, greenfield and brownfield. To find out more, visit www.petrofac.com
  • 43.
    Website http://www.petrofac.com Industries Oil & Energy Companysize 10,001+ employees Headquarters London Type Public Company Founded 1981 Specialties Oil & Gas, Design engineering, Procurement, Construction, Commissioning, Asset management, Asset maintenance, Operations, Training, Competency development, Production enhancement, Decommissioning, Well engineering, Consultancy, Onshore and offshore engineering, New energy, Offshore wind, and Hydrogen Locations  Primary 117 Jermyn Street London, GB Get directions Employees at Petrofac  SANJEEV SINGH AMIChemE 
  • 44.
    Hemant Jain Certified LifeCoach, Amazon Best Seller Author and experienced Change Management Consultant with 20+ years experience  Jim Molloy  Bryan Hutcheson See all employees Updates  Petrofac 991,343 followers 1w You can find our statement on the final outcome of the SFO investigation below. � Sami Iskander, Group Chief Executive, said: “We emerge from this cloud as the world needs more energy – both traditional energies that can be produced in the most efficient manner, and renewable energies on which a lower carbon world can be built. Petrofac is well positioned to support both, with the capabilities, experience, and expertise to deliver for our expanding customer needs. Our markets in both traditional and new energies are growing and we have a clear path to rebuild our business with a differentiated customer proposition that sets us apart.” Statement on final outcome of SFO investigation petrofac.com
  • 45.
    885 LikeCommentShare  Petrofac 991,343 followers 3d A teamblending talented young graduates and experienced long-serving engineers is delivering a unique project for #Petrofac: substations for the Seagreen wind farm. Seagreen offshore wind farm will be the largest in Scotland once complete. Meet five of the people involved: https://lnkd.in/dNqCzeQH
  • 46.
    Seagreen: platform forexcellence petrofac.com 760 72 Comments LikeCommentShare  Petrofac 991,343 followers 4d
  • 47.
    We have signeda strategic partnership with Gazprom through Gazprom’s INTI - Russian Institute Oil/Gas Technology Initiatives to export and promote the ambition, quality, and standards of the Russian energy industry domestically and internationally. Full press release � Gazprom and Petrofac create strategic partnership petrofac.com 1,048 23 Comments LikeCommentShare
  • 48.
     Petrofac 991,343 followers 4d � Civil/StructuralGroup Manager, Justin Jones, presented to the Offshore Engineering Society this week, outlining our novel concept design for HVAC and HVDC floating offshore substations. With the UK at the forefront of developing floating offshore wind power, we’re proud to be contributing to the UK’s target of developing 1GW of floating wind by 2030. � Find out more here � https://bit.ly/3FrG6ac Watch Justin discuss the concept in the video below � #offshorewind #floatingoffshorewind #renewableenergy Play Video 188 5 Comments LikeCommentShare  Petrofac 991,343 followers 5d � Our New Energy Services team enjoyed meeting familiar and new faces at the Global Offshore Wind Conference, our first in-person event for 18-months. Find out about our offshore wind capabilities here � https://bit.ly/2Ypmxyg #RUKGOW21 #offshorewind #newenergy Play Video 203 LikeCommentShare
  • 49.
     Petrofac 991,343 followers 6d Modularisation isoften described as being like piecing together a giant Lego set. At Sriracha Refinery in Thailand, the term just doesn’t do justice to the level of precision required. You could say it’s more like assembling a Swiss watch… Read more about the Thaioil Clean Fuel Project
  • 50.
    Like a Swisswatch - Thaioil Clean Fuel project petrofac.com
  • 51.
    1,102 47 Comments LikeCommentShare  Petrofac 991,343followers 2w It's currently #NationalInclusionWeek and in honour of the occasion, we have organised a variety of internal events and activities that showcase our rich diversity, share learnings, and provide opportunities for all of our teams to get involved. We also asked our colleagues around the world what Diversity and Inclusion (D&I) means to them. From being kinder to one another, to appreciating what makes us different, and valuing what each of us brings, D&I means something to us all. � Watch the full range of responses below ⬇� #nationalinclusionweek2021 #diversityandinclusion #diversitymatters #inclusionforall Play Video 354 13 Comments LikeCommentShare  Petrofac 991,343 followers 2w Understanding of hydrogen and the semantics behind its colourful names - green, blue, grey, pink, turquoise, black, brown, yellow - requires answers to two essential questions: what is it and how is it produced? ⁣ At Petrofac, we have expertise in delivering #greyhydrogen scopes, a
  • 52.
    growing track recordin delivering complex CO2 removal scopes to support large-scale #bluehydrogen opportunities, and experience which allows us to support both large and small- scale #greenhydrogen projects. If you would like to learn more about the hydrogen colour spectrum, visit: https://lnkd.in/dpsCPwzk For insight on the science and the expertise behind green hydrogen and the Arrowsmith Hydrogen Project go to: https://lnkd.in/dAbCfXTi Play Video 189 1 Comment LikeCommentShare  Petrofac 10,001+ employees 2w Statement on resolution of SFO investigation ⬇� Update | 01 October 2021 : � https://lnkd.in/d- 8jMAv7 Update on court process in relation to SFO investigation | 27 September 2021: � https://lnkd.in/d_m9wTVG
  • 53.
    Statement on resolutionof SFO investigation petrofac.com 970 LikeCommentShare
  • 54.
     Petrofac 10,001+ employees 2w From 𝘢𝘪𝘳𝘦𝘮𝘪𝘴𝘴𝘪𝘰𝘯𝘴 and 𝘣𝘪𝘰𝘥𝘪𝘷𝘦𝘳𝘴𝘪𝘵𝘺 to 𝘜𝘕 𝘚𝘶𝘴𝘵𝘢𝘪𝘯𝘢𝘣𝘭𝘦 𝘋𝘦𝘷𝘦𝘭𝘰𝘱𝘮𝘦𝘯𝘵 𝘎𝘰𝘢𝘭𝘴 and 𝘸𝘢𝘵𝘦𝘳 use - our sustainability glossary provides a quick summary and access to more detailed information on key sustainability topics. �� Find out more �� #sustainability A-Z of sustainability - our sustainability glossary petrofac.com 184 4 Comments LikeCommentShare  Petrofac 10,001+ employees 3w Today we announced a new strategic partnership to expedite the delivery of green hydrogen projects. Read about how our Alliance with Protium will support the creation of a more integrated energy future in the UK. ⬇� #Petrofac #Protium #greenhydrogen #renewableenergy
  • 55.
    Petrofac signs strategicpartnership with green hydrogen firm, Protium petrofac.com 744 41 Comments LikeCommentShare  Petrofac 10,001+ employees 3w We have been successfully supporting Tatweer Petroleum to deliver a number of key upstream gas projects in Bahrain since 2015 and energise the Kingdom’s economic growth and prosperity. Find out more on our latest contract award in Bahrain: ➡� http://ow.ly/zr9V50GdxwB
  • 56.
    Petrofac awarded EPCCcontract in Bahrain petrofac.com 1,524 104 Comments LikeCommentShare
  • 57.
     Petrofac 10,001+ employees 3w The Matrix�� starring Keanu Reeves was one of the first films to use #photogrammetry and today filmmakers use the technology to create crowd scenes and digital stunt doubles. Game of Thrones used it extensively for many of its iconic locations and scenes. Its use is on the increase beyond the motion picture industry. After the fire at Notre Dame in Paris restorers used it to help rebuild the famous cathedral. At Petrofac, we have hit upon a new application for photogrammetry. Read how it could be used in the future to look after offshore assets. #offshore #Petrofac #digital
  • 58.
    The photogrammetric futureof offshore maintenance petrofac.com 297 5 Comments LikeCommentShare  Petrofac 10,001+ employees 4w � Through our non-exclusive agreement with CO2 Capsol AS, we will work as a preferred engineering services partner to support its carbon capture opportunities across the UK, Europe and over time, globally. John Pearson, Petrofac Chief Operating Officer, commented: “Industry collaborations that support the acceleration of critical net zero infrastructure will be fundamental to the Energy Transition. Alongside Petrofac’s global engineering and operations experience, we see great potential for efficient technologies such as those developed by CO2 Capsol, to bring down cost across the value chain as we seek to de-risk and fast-track carbon capture projects for industrial emitters.” ⬇� Read more about the collaboration, and how we’re currently working together on what will be the largest Bio Energy Carbon Capture and Storage plant in Europe, below. ⬇� #Petrofac #CO2Capsol #carboncapture #NetZero
  • 59.
    Petrofac and CO2Capsol collaborate on carbon capture initiatives petrofac.com 264 3 Comments LikeCommentShare  Petrofac 10,001+ employees 4w Here at Petrofac, we are passionate about finding talented individuals, from all industries, to support the shift to a carbon neutral future. Those in the Armed Forces have the potential to contribute towards this goal, which is why we’re proud to have signed the Armed Forces Covenant. Petrofac now joins more than 2,000 UK organisations that have signed the Covenant –
  • 60.
    an initiative aimedat ensuring those who serve, or have served, in the Armed Forces are treated with fairness and respect. ⬇� Read more about our pledges to the Covenant and how we’re working to attract, retain and reskill people for the energy transition. #Petrofac #ArmedForcesCovenant #ArmedForcesCommunity Petrofac pledges commitment to UK Armed Forces community petrofac.com 444 31 Comments LikeCommentShare  Petrofac 10,001+ employees 4w
  • 61.
    We’re proud tohave been shortlisted in the ‘Excellence in Decommissioning’ category at this year’s OGUK Awards for our successful delivery of a plug and abandonment campaign for Hess Corporation. By applying our extensive skill and experience, we safely planned and delivered a multi-well decommissioning project for our client that provided cost certainty through an innovative lump-sum turnkey commercial offering. This approach involved collaboration with our industry partners, Awilco Drilling and Halliburton, and also built on our previous success delivering complex decommissioning projects in the UKCS and globally. Congratulations to all the finalists! � Click below to find out more about the #OGUKAwards ⬇� Home - OGUK Awards https://ogukawards.co.uk 195 21 Comments LikeCommentShare
  • 62.
     Petrofac 10,001+ employees 1mo We’ve beenshortlisted as one of the finalists in the ‘Digital Transformation of the Year’ category at next week’s The Big 5 - International Building & Construction Showawards being held in the UAE. Well done to our team involved, good luck at the event �: https://bit.ly/3C0blXn #big5impactawards #Construction #DigitalTransformation o 399 38 Comments LikeCommentShare  Petrofac 10,001+ employees 1mo Vice President, Jonathan Carpenter, spoke with Renewables Now Ltd about the many colours of hydrogen – one of the hottest topics in energy today. � Click below to read the exclusive interview – Jonathan discusses how we’re supporting our clients to decarbonise, the role that hydrogen will play, and the challenges and opportunities that come with the development of this ‘fuel of the future’. ⬇� ⬇� #Petrofac #renewableenergy #bluehydrogen #greenhydrogen
  • 63.
    INTERVIEW - Petrofacsees green matching blue, even grey H2 by 2030 renewablesnow.com 861 34 Comments LikeCommentShare  Petrofac 10,001+ employees 1mo
  • 64.
    We’ve been deliveringcomplex projects, engineering services and training local workforces in North Africa for over 20 years now. Find out more on our new contract with Zallaf Libya Oil & Gas Exploration and Production Company. ⬇� Read more ⬇� Petrofac secures Libya EPCC contract petrofac.com 2,776 370 Comments LikeCommentShare
  • 65.
     Petrofac 10,001+ employees 1mo The UAEis celebrating #EmiratiWomensDay today. It aims to highlight the unlimited ambitions of Emirati women and their hopes for the future. At Petrofac we’re building teams that better reflect the communities we serve. We visited one of our project sites in Dubai and caught up with some of our inspirational UAE women. They told us about their pride in the country’s support and empowerment of women, the achievements they are making in their careers with Petrofac, some of the challenges and their hopes for the future. A big ‘Mabrouk’ to all Emirati women celebrating this weekend. #UAE #genderequality #UnitingBusiness #genderbalance #womeninSTEM Play Video 543 22 Comments LikeCommentShare  Petrofac 10,001+ employees 2mo A warm welcome to our new Country Manager in Oman. Dr. Khalid Al Jahwari brings more than 20 years’ industry experience. His appointment is aligned to Petrofac’s model of local execution to global standards and generating in-country value. #InvestedInOman #PetrofacOman #InCountryValue
  • 66.
    Dr Khalid AlJahwari joins Petrofac as Country Manager - Oman petrofac.com 1,168 137 Comments LikeCommentShare  Petrofac 10,001+ employees 2mo Supporting more than 9,000 UK jobs and unlocking £4 billion of investment by 2030, the UK Government released its hydrogen strategy. Jonathan Carpenter, Vice President of our New Energy Services business said: “We welcome the Government’s hydrogen strategy and upcoming consultations to define revenue models and means to blend H2 into the gas grid.
  • 67.
    Petrofac has beensupporting the #Acorn project since 2020; when complete that one development will contribute significantly to the targets set out today. With the right support, the UK has the potential to become global leaders in both the Blue and Green Hydrogen sectors, accelerating beyond 5GW by 2030. We look forward to working with BEIS, UK project developers and industrial users to turn that ambition, into action.” UK government launches plan for a world-leading hydrogen economy gov.uk 309 17 Comments LikeCommentShare  Petrofac 10,001+ employees 2mo Photography is deeply ingrained within #lifeatPetrofac. This came about quite organically – Petrofac’s synergies with photography are clear. Technique, creativity, and technology are principles that our colleagues live and breathe in their day-to-day work, so it was no surprise that many of them share an appetite for photography. Find out more about stunning images created by the community of enthusiast photographers at Petrofac. ����
  • 68.
    Picture Petrofac petrofac.com 142 7Comments LikeCommentShare
  • 69.
     Petrofac 10,001+ employees 2mo Imagine anendlessly available fuel source that could be burned to release energy, yet whose only by-product is water. The most abundant element in the universe does not naturally occur on Earth. And yet many consider it to be the most important fuel for the #energytransition away from carbon. We take a closer at how Petrofac is helping Infinite Blue Energy achieve ‘green’ hydrogen from electrolysed water using renewable energy at the Arrowsmith Green Hydrogen project in Australia. #greenhydrogen #hydrogen #Petrofac #renewableenergy
  • 70.
    Something in thewater petrofac.com 292 15 Comments LikeCommentShare  Petrofac 10,001+ employees 2mo Times of Oman spoke with Ian Debattista, Petrofac’s Country Manager in the Sultanate. � Take a look at the exclusive interview - Ian provides an update on our activity in-country, looks ahead and outlines some of our plans as we remain at the heart of the region’s energy transition. ⬇� ⬇� http://ow.ly/affA50FOIBv #InCountryValue #InvestedInOman #TimesOfOman #Business Petrofac expects acceleration of energy transition and a wider sector recovery
  • 71.
    timesofoman.com 531 24 Comments LikeCommentShare  Petrofac 10,001+employees 2mo To all celebrating, we wish you joyous festivities and a prosperous Hijri new year. ‫ىنمتن‬ ‫مكل‬ ‫ماع‬ raeYweNcimalsI# .‫ير‬ ‫خ‬ ‫ب‬ ‫تم‬ ‫وأن‬ ‫عام‬ ‫ل‬ ‫ك‬ .‫اإلزدهار‬ ‫ب‬ ‫ليء‬ ‫م‬ ‫د‬ ‫جدي‬ ‫هجري‬ o 339 7 Comments LikeCommentShare  Petrofac 10,001+ employees 2mo Our Mumbai team is supporting India’s fight against Covid-19 with a mobile vaccination drive. The programme is designed to reach those in the local communities who need help most. Find out more: http://ow.ly/MP5f50FNaaf #PetrofacCares #ChooseToVaccinate
  • 72.
    Mobile vaccination driveto support local communities in India petrofac.com 147 2 Comments LikeCommentShare
  • 73.
     Petrofac 10,001+ employees 2mo Our newcorporate website is now live! � Putting Petrofac’s purpose and its rich and diverse service offering at the forefront, the website provides clear and detailed information on topics that matter most to our stakeholders, including how under new management we’re reshaping and rebuilding the company, our growing focus on new energies, as well as our approach to ESG, climate change, diversity and inclusion, and more. Visit our website and let us know your thoughts! #Petrofac
  • 74.
    Petrofac launches newcorporate website petrofac.com 363 29 Comments LikeCommentShare
  • 75.
     Petrofac 10,001+ employees 3mo Jonathan Carpenter,our Vice President, New Energy Services shared insights with Gulf Business on ways to build a sustainable future in the energy sector across the Gulf Cooperation Council (GCC) region. “For a sustainable future, we will need a mix of fuels and energy sources, depending on the application and environment, to ensure we can get to net zero quickly and cost effectively,” Jon said. Find out more about new technologies being explored in the industry, what the future holds for new energies, and more here: http://ow.ly/8Hhv50FF9EP #Greenenergy #Sustainablefuture
  • 76.
    GCC's energy space:What does the future hold? https://gulfbusiness.com 231 6 Comments LikeCommentShare  Petrofac 10,001+ employees 3mo
  • 77.
    We’re working toachieve a better gender balance by targeting 30% of women in senior roles by 2030, further increasing our female graduate intake, and building teams that reflect the communities we serve. This is why we’re proud to be a participant of #TargetGenderEquality, an accelerator programme from United Nations Global Compact tackling barriers to gender equality and advancing women’s equal representation and leadership in business. #genderequality #UnitingBusiness #genderbalance #womeninSTEM o 206 14 Comments LikeCommentShare  Petrofac 10,001+ employees 3mo Direct Air Capture (DAC) provides a high quality, permanent solution to remove carbon dioxide from the air, reversing the emissions process. That’s why in addition to our existing efforts to reach #NetZero, we’ve committed to become the first customer of Storegga’s proposed UK DAC facility – the first large-scale facility of its kind in Europe. John Pearson, Petrofac COO, commented: “As well as drawing on our engineering experience to support the design and initial engineering of this project, and other low carbon initiatives like it, Petrofac is committed to decarbonising its own operations, and those of our supply chain.” ⬇� Read more ⬇� #Petrofac #Storegga #DirectAirCapture #energytransition
  • 78.
    Petrofac builds DirectAir Capture into its Net Zero plan petrofac.com 349 14 Comments LikeCommentShare
  • 79.
     Petrofac 10,001+ employees 3mo The awardof our first contract in Sweden signals an important step in our growth strategy. Adding to the recent clutch of new energy projects secured in the UK and Australia, Petrofac has been chosen by Stockholm Exergi to undertake the front-end engineering design for a planned CO2 capture facility. Read about how we’re supporting our client to achieve negative emissions in this “game changing” project for Sweden ⬇�. #Petrofac #StockholmExergi #Sweden #newenergy #negativeemissions Petrofac to support negative emissions in Stockholm petrofac.com
  • 80.
    445 24 Comments LikeCommentShare  Petrofac 10,001+employees 3mo In a UK energy industry first, we recently replaced a spool piece in the North Sea, without the need to mobilise a survey team. Through our collaboration with James Fisher Asset Information Services, we combined the use of Self-Capture Point Cloud and an asset’s Digital Twin to capture detailed visual and measurement data which can be used to design asset modifications to a high level of dimensional accuracy. Steve Johnson, Vice President of Digital, commented: “As our industry continues to balance its focus on the maximisation of economic recovery and accelerating towards a lower-carbon future, this type of digital execution provides a means to optimise use of existing infrastructure by extending field life, whilst reducing offshore travel.” � Read more about how this collaboration has eliminated the need for offshore surveys ahead of modification scopes. � #Petrofac #JamesFisher #digital #northsea
  • 81.
    Petrofac proves valueof digital modifications execution in industry first petrofac.com 551 15 Comments LikeCommentShare
  • 82.
     Petrofac 10,001+ employees 3mo Eid Mubarakfrom the Petrofac family, we wish you safe and happy festivities. #EidMubarak o 638 43 Comments LikeCommentShare  Petrofac 10,001+ employees 3mo We have a long and rich history in the Sultanate of Oman. Find out how we’ve been leading in building ICV and investing in Omani youth from Ian Debattista, Country Manager - Oman and Faisal Al-Gheilani, In-Country Value (ICV) Manager, who spoke with Oil & Gas News as part of their Oman Review. �Read the latest edition: https://lnkd.in/ddidXad #InvestedinOman #Petrofac
  • 83.
    Oil and GasNews ognnews.com 317 4 Comments LikeCommentShare  Petrofac
  • 84.
    10,001+ employees 3mo We continueto expand our UK EPC portfolio through a new three-year contract with ONEgas. Commenting on the award, Nick Shorten, COO of our Engineering and Production Services business, said: “Over the last 18 months Petrofac’s UK brownfield projects business has achieved notable growth. Our best-in class engineering teams, scalable delivery model and project control systems are now being deployed in support of more than 30 assets in the UK.” ⬇� Read more ⬇� #Petrofac #ONEgas #UKCS #SouthernNorthSea #EPCcontract Petrofac grows EPC provision for ONEgas
  • 85.
    petrofac.com 623 35 Comments LikeCommentShare  Petrofac 10,001+employees 3mo Kuwait’s Clean Fuels Project has involved the expansion and upgrading of two existing KNPC refineries, to develop an integrated complex, increasing processing capacity to 800,000 barrels per day. The production of a new generation of ultra-low Sulphur fuel products will boost the country’s global position in the industry. Find out more on the latest significant milestone here: ⬇� ⬇� http://ow.ly/FvyH50FuJLh #Kuwait #KNPC #Petrofac #CleanFuels Handover of MAB1 facilities at Kuwait’s Clean Fuels Project petrofac.com 1,960 117 Comments LikeCommentShare  Petrofac 10,001+ employees 3mo “Petrofac has been an integral part of the team at Cygnus over the past decade”, said Alexandra Thomas, Neptune Energy's UK Managing Director, of our three-year renewal announced today. ⬇� Read more ⬇� #NeptuneEnergy #Petrofac #Cygnus #UKCS #NorthSea Petrofac marks a decade on Cygnus with new three-year Neptune Energy contract petrofac.com 618 21 Comments LikeCommentShare
  • 86.
     Petrofac 10,001+ employees 3mo Marking anothersignificant milestone, Oman’s OQ has successfully exported its first shipment of Liquified Petroleum Gas (LPG) products internationally, taking 5,000 tonnes of both propane and butane from Salalah, Southern Oman to the Indian sub-continent. We were awarded the EPC contract for the gas treatment project in 2017. With its centrepiece extraction facilities located in the Salalah Free Zone adjoining the Port of Salalah, it is a new energy hub for the production of LPG, with growing demand in both domestic and international markets. Our scope of work has included construction of the LPG unit and associated facilities, including tie-ins to existing pipeline infrastructure, together with LPG storage and jetty facilities at the port. You can find out more on some of the project’s major milestones, its importance for the region and meet some of our colleagues involved in making it a success here ➡� https://lnkd.in/duGWK-r #Salalah #OQ #InvestedinOman #InCountryValue o 1,420 91 Comments LikeCommentShare  Petrofac 10,001+ employees 3mo Duqm Refinery is the largest ever investment project between two GCC countries in the refineries and petrochemical sector, a joint venture between Oman Oil Company and Kuwait Petroleum International. Located around 600 kilometres south of Muscat, it will form the cornerstone of the Duqm Special Economic Zone, Oman’s next industrial centre. The Refinery is designed to be able to process a range of blended crude oils, configured as a full-conversion hydrocracker/coking facility that will utilise advanced technology. Petrofac, in a 50/50 joint venture with Samsung Engineering, are delivering the EPC package 2 worth approximately US$2 billion. Our scope of work includes the engineering, procurement, construction, commissioning, training and start-up operations for all the utilities and offsites. ⬇� Watch the latest OQ8 project progress video ⬇� http://ow.ly/RfW750FlxF3 #Petrofac #InvestedInOman Duqm refinery project | Middle East projects | Petrofac petrofac.com 1,425 113 Comments LikeCommentShare  Petrofac 10,001+ employees
  • 87.
    3mo In mature basins,the incremental efficiencies and reduction of interfaces achieved through integrated delivery, drive huge value as our clients seek to extend field life. We’re bringing this philosophy to life on Ithaca Energy's EOR project ��� https://lnkd.in/dd7WeEj #Petrofac #PetrofacUK #NorthSea Petrofac grows support for Ithaca Energy with Captain project delivery petrofac.com 251 11 Comments LikeCommentShare  Petrofac 10,001+ employees 3mo The world’s energy needs are evolving, and we are too. Our latest strategic development marries global engineering, project delivery and operations expertise with proven entrepreneurial development skills, to fast-track delivery of net zero infrastructure #Petrofac #netzero https://lnkd.in/dY7Ysgx Petrofac and Storegga enter strategic Alliance to fast-track net zero… petrofac.com 318 12 Comments LikeCommentShare  Petrofac 10,001+ employees 3mo The HKZ offshore wind project continues to move forwards, with the second transformer platform jacket safely and successfully installed for our client TenneT. The North Sea is emerging as a wind power super hub, and we have the expertise to support this transition. Find out how: http://ow.ly/jHRD50FkH5I #TenneT #HollandseKustZuid #WindEnergy #RenewableEnergy #OffshoreWind Play Video 446 7 Comments LikeCommentShare  Petrofac 10,001+ employees 4mo
  • 88.
    “This latest contractaward builds on our expanding footprint in-country. The SOCAR Petrofac JV is well positioned to support bp’s operations more widely in the Caspian Sea,” said Patty Eid, Global Head of Petrofac Training Services and SOCAR Petrofac JV Board member, following the announcement of our new contract to support Azerbaijan’s ACE project. ⬇� Read more ⬇� http://ow.ly/xdi850FhnEy #Petrofac #SOCAR #Azerbaijan #CaspianSea Petrofac, in a joint venture (JV) with the State Oil Company of the Republic of… petrofac.com 651 23 Comments LikeCommentShare Affiliated pages  Petrofac Training Services Oil & Energy Similar pages  Saipem Mechanical or Industrial Engineering San Donato Milanese, (Milan)  Shell Oil & Energy
  • 89.
     Wood Oil & Energy  Schlumberger Oil& Energy Sugar Land, Texas Show more similar pages  LinkedIn© 2021  About  Accessibility  User Agreement  Privacy Policy  Cookie Policy  Copyri https://file.io/G4CUNWUDpQWb TARIQkhan*747 18731@
  • 90.