Scope:
Type of Services: Execution
Appointed Schedule: 180 days.
Status: Accomplished on schedule.
Cost: JD 650.000.
Consultant: King Abdullah II Design & Development Bureau (KADDB).
KADDB Administrative Bldg's.
24 ProjectsMAJOR
- The Administrative Building: A two-story bldg. (approx 1100 sq. m.) including all the high-end finishing works
such as combining curtain walls with the stone walls in order to add beauty and innovation to the bldg.
- The Extensional bldg.: A one-story bldg. of 100 sq. m. It includes a praying area, janitors' room, and toilets.
- The External works such as the asphalted areas, retaining walls, and fences; in addition to all the necessary
electromechanical works.
- The project includes split air conditioning units (cold & hot) in addition to an emergency alarm system and fire
fighting equipments.
This project has been inaugurated by His Majesty King Abdullah II. 17-09-2009
ProjectsMAJOR
Madaba Sports City.
Location(s):
The Higher Council of Youth.
Client:
Scope:
- A 50×25×2-meter Olympic size swimming pool, including its grandstands made of fair-face concrete.
- All the other extensions such as tunnels, water reservoirs, and a number of service buildings with a total area
of 2000 sq. m.
- External works: Walls and grandstands made of fair-face concrete, and external terraces and yards comprising
a total area of 3000 sq. m.
- The internal finishes work, including the ceramic pool's floor and walls.
- All the electromechanical works, (the systems used to fill & drain the pool and distill the water), audio system,
and fire fighting system.
Type of Services: Execution
Appointed Schedule: 13 months.
Status: Accomplished on schedule.
Cost: JD 1.5 million
Consultant: Sabeel al-Handasah.
Swimming Pool
This project has been inaugurated by His Majesty King Abdullah II. 10-03-2009
ProjectsMAJOR
Madaba Sports City.
Location(s):
The Higher Council of Youth.
Client:
Scope:
- A 3000 sq. m. × 12 m. high gym whose roof is constructed with a Steel Structure covered with sandwiched panels
- Offices and other extensions whose roof structure is also constructed with with Steel Structure comprising a total
area of 2000 sq. m.
- Wood molded steel grandstands, rubber floors, and parquet floors for the squash courts. In addition to all the
electromechanical works (internal and external lighting, fire fighting system, audio system, and sewage lines).
- External works: High retaining walls with paved roads covering a total area of 3700 m.
Type of Services: Execution
Appointed Schedule: 13 months
Status: Accomplished on schedule.
Cost: JD 2.2 million
Consultant: Al-Baahah for Engineering Consultations.
Gymnasium Hall
This project has been inaugurated by His Majesty King Abdullah II. 10-03-2009
ProjectsMAJOR
Sult, Jordan
Location(s):
The oyal Court.
Client:
Scope:
Type of Services: Execution
Appointed Schedule: months.
Status:
alue: JD3.0 million
Consultant:
His a s y s o l oyal P o in Sul
ing ulla S ool o ll n
A pro ect in Sult comprised of a four-level building of approximate 77 3.35 sq. m.
- The basement floor includes parking, power plants, boilers and pumps as well as employees administrative and
services rooms of about 1 5 . sq. m.
- The ground floor is about 21 7. 3 sq.m. It consists of workshops, theater, chemical, biological, physical labs in
addition to teachers, vocational, special education counselors rooms.
- The 1st and 2nd floors are of 17 7.1 sq.m. Each includes aids, lecturing and musical halls, computer and
languages labs, libraries and classrooms along with all other services.
- External works: all of the external works, yards, and fences.
- All electrical & mechanical works, sound system, computer network system, theater works, fire fighting system.
Accomplished on schedule.
Ministry of ublic Works
44
A
RA
ROJ
This project has been inaugurated by His Majesty King Abdullah II. 30-08-2009
Babel company profile
Babel company profile
Babel company profile
Babel company profile
Babel company profile
Babel company profile
Babel company profile
Babel company profile

Babel company profile

  • 7.
  • 24.
  • 25.
    KADDB duty-free zone,al-Dhulail, Jordan. Location(s): King Abdullah II Design & Development Bureau (KADDB). Client: I Desig K Loc u (KADDB). ulail, Jo velopm Jordan. pment BureauKing Cl e zone (s): KADDB duty-free ocation(s g Abdullah II Client: ).). ne, al-Dhul ign & Deveig ula ve ne Scope: Type of Services: Execution Appointed Schedule: 180 days. Status: Accomplished on schedule. Cost: JD 650.000. Consultant: King Abdullah II Design & Development Bureau (KADDB). KADDB Administrative Bldg's. 24 ProjectsMAJOR - The Administrative Building: A two-story bldg. (approx 1100 sq. m.) including all the high-end finishing works such as combining curtain walls with the stone walls in order to add beauty and innovation to the bldg. - The Extensional bldg.: A one-story bldg. of 100 sq. m. It includes a praying area, janitors' room, and toilets. - The External works such as the asphalted areas, retaining walls, and fences; in addition to all the necessary electromechanical works. - The project includes split air conditioning units (cold & hot) in addition to an emergency alarm system and fire fighting equipments. This project has been inaugurated by His Majesty King Abdullah II. 17-09-2009
  • 39.
    ProjectsMAJOR Madaba Sports City. Location(s): TheHigher Council of Youth. Client: Scope: - A 50×25×2-meter Olympic size swimming pool, including its grandstands made of fair-face concrete. - All the other extensions such as tunnels, water reservoirs, and a number of service buildings with a total area of 2000 sq. m. - External works: Walls and grandstands made of fair-face concrete, and external terraces and yards comprising a total area of 3000 sq. m. - The internal finishes work, including the ceramic pool's floor and walls. - All the electromechanical works, (the systems used to fill & drain the pool and distill the water), audio system, and fire fighting system. Type of Services: Execution Appointed Schedule: 13 months. Status: Accomplished on schedule. Cost: JD 1.5 million Consultant: Sabeel al-Handasah. Swimming Pool This project has been inaugurated by His Majesty King Abdullah II. 10-03-2009
  • 40.
    ProjectsMAJOR Madaba Sports City. Location(s): TheHigher Council of Youth. Client: Scope: - A 3000 sq. m. × 12 m. high gym whose roof is constructed with a Steel Structure covered with sandwiched panels - Offices and other extensions whose roof structure is also constructed with with Steel Structure comprising a total area of 2000 sq. m. - Wood molded steel grandstands, rubber floors, and parquet floors for the squash courts. In addition to all the electromechanical works (internal and external lighting, fire fighting system, audio system, and sewage lines). - External works: High retaining walls with paved roads covering a total area of 3700 m. Type of Services: Execution Appointed Schedule: 13 months Status: Accomplished on schedule. Cost: JD 2.2 million Consultant: Al-Baahah for Engineering Consultations. Gymnasium Hall This project has been inaugurated by His Majesty King Abdullah II. 10-03-2009
  • 44.
    ProjectsMAJOR Sult, Jordan Location(s): The oyalCourt. Client: Scope: Type of Services: Execution Appointed Schedule: months. Status: alue: JD3.0 million Consultant: His a s y s o l oyal P o in Sul ing ulla S ool o ll n A pro ect in Sult comprised of a four-level building of approximate 77 3.35 sq. m. - The basement floor includes parking, power plants, boilers and pumps as well as employees administrative and services rooms of about 1 5 . sq. m. - The ground floor is about 21 7. 3 sq.m. It consists of workshops, theater, chemical, biological, physical labs in addition to teachers, vocational, special education counselors rooms. - The 1st and 2nd floors are of 17 7.1 sq.m. Each includes aids, lecturing and musical halls, computer and languages labs, libraries and classrooms along with all other services. - External works: all of the external works, yards, and fences. - All electrical & mechanical works, sound system, computer network system, theater works, fire fighting system. Accomplished on schedule. Ministry of ublic Works 44 A RA ROJ This project has been inaugurated by His Majesty King Abdullah II. 30-08-2009