VINACONEX E&C is a general construction company in Vietnam established since 2003, offers a broad range of services in project management, procurement, construction and technology transfer to assist clients in all phases of development – from pre-construction to occupancy. Our services include consulting, contracting & project management services related to CSA, MEP for industrial - civil projects and Road & Bridge Projects.
2. ENGINEERING
CONSTRUCTION
& INVESTMENT
VINACONEX E&C
Our reputation has been
consistently built based on the
successful accomplishment of
undertaken projects as well as
our keen dedication to the
quality, safety, sustainability,
within-budget and on-time
completion, with the distinct
values bring to each of its
buildings.
3. Vinaconex E&C Profile
ABOUT US
OUR PROJECTS
BUILDING CONTRUCTION
INDUSTRIAL CONSTRUCTION
INFRASTRUCTURE CONSTRUCTION
PROJECT MANAGEMENT
REAL ESTATE DEVELOPEMENT
OUT OF WORKS
OUR HISTORY
OUR DEPARTMENT
06
08
14
22
32
38
40
42
43
4. We are proud of playing a role
in shaping the world we know today.
Each project we involved in closes distant lands
& unlocks more development potentials
5.
6. ABOUT US
Our all-sizes projects involve in construction
of roads, motorway, ports, bridges, industrial
plants, warehousing, hospital, business
center, multistoried office-buildings,
apartment, … varying from planning,
design, engineering, project management
and construction responsibilities.
VINACONEX E&C is a general construction
company, offers a broad range of
professional services in project
management and engineering, caters both
public and private sector to assist clients in
all phases of development – from
pre-construction to occupancy. VINACONEX
E&C became an independent joint stock
company in 2012 when VINACONEX., JSC
withdrew all their capital investment from
the Company
ENGINEERING
CONSTRUCTION
& INVESTMENT
And we always want to
venture further as meeting
the client’s dreams.
For the growth of client
and development of ours.
06
7. Our reputation has been consistently built
based on the successful accomplishment of
undertaken projects as well as our keen
dedication to the quality, safety,
sustainability, within-budget- and on-time
completion, with distinct values bring to
each of its buildings. Our clients appreciate
single point of responsibility, flexibility,
speed, reasonable costs, and true partnering.
Headquartered in Hanoi, VINACONEX E&C
employs hundred planners, designers,
engineers and specialists nationwide. This
represents one of the most diverse, talented
and innovative workforces anywhere. All
staffs of VINACONEX E&C strive to bring their
expertise, experience, youth and enthusiasm
for the development and success of the
Company. We share the same vision and
ambition in paving the way for the
establishment of a modern infrastructure,
convenient residential areas, and working
together towards a common purpose of
bringing the construction industry a growth
pace and a fresh look, as well as contribute
to the development of construction
industry.
In the coming years, VINACONEX E&C
continue to invest for a consistent
development and expansion. It has been
said that, “Success is a journey, not a
destination” After several initial years, our
successful journey has just commenced
……
We share the same vision and ambition in paving
the way for the establishment of a modern
infrastructure, convenient residential areas
07
8. OURPROJECTSBUILDINGCONTRUCTION
BUILDING
CONTRUCTION
BUILDING
CONTRUCTION
VINACONEX E&C applies the tools of science, art and
engineering in our construction works. We have successfully
completed a great variety of project types and sizes,
representing millions of construction manhours, with a constant
focus on safety, quality, progress and meeting contract
requirements.
BUSINESS CENTER AND OFFICE BUIDLING
08
9.
10. National Convention Center is one of the
biggest and most Vietnamese large-scale
comprehensive convention center that
integrates convention, exhibition,
performance, banquet and mas-media into a
whole.
National Convention Center possesses a
convention venue of more than 60,000 square
meters, comprising of a 3800-seat Great
Conference Hall, two presidential meeting
rooms, 72 small conference halls and meeting
rooms, parking areas, heliport and square, built
to serve a wide variety of purposes with the
capacity from 10 up to 3800 people. The halls
are equipped with international-advanced
simultaneous interpretation system, first-rate
acoustic apparatus, a live TV relay system,
inside and outside communication system,
video conference system and other internally
advanced facilities and equipments to meet
the needs of conferences of all scales and
types.
The completed National Convention Center is
not only a place for large-scale political and
cultural activities, but also a landmark building
of construction industry in Vietnam.
We acted as one of the main Contractors
during the construction stage of this fast
tracked project. Thousand of Vinaconex labors
and millions of man-hours spending for the
successful of this project have shown our
consistent adherence to principle of high
efficiency, low cost and zero accident record.
Client: Project Management Unit for National
Convention Center
Location: Ha Noi City
Construction time:
Commencement: April 2004,
Completion: September 2006
National Convention Center
OURPROJECTSBUILDINGCONTRUCTION
10
12. Client: Petrovietnam
Location: 18 Lang Ha - Dong Da –Ha Noi
Construction time: from 2006 to 2008
Petrovietnam
Trading Centre
PetrovietnamTrading Center is one of the most
modern high-rise office buildings in Hanoi,
using state-of-the-art technologies and new
material in construction. Setting up joint
venture with REE, Vinaconex-REE is a General
Contractor to provide construction, supply and
installation of equipment, transferal, commis-
sioning, training, instructions for equipment
use for this 19-floor office building.
The services included construction work,
finishing work, M&E work, lighting system,
generators, elevators system, plumbing, gas
system, fire hose …. Especially the construction
management of project involves in construc-
tion and installation of high-tech systems such
as Curtain wall system; BCMS (Control and
management system of building); Security
control system, including Access control
security system and CCTV (Close Cable Televi-
sion System); Communication and data system,
including portions: Voice and Data system,
network equipment and PABX (system of
communication, data, network equipment and
telephone switch board).
OURPROJECTSBUILDINGCONTRUCTION
12
13. Client: REE corporation
Location: Hochiminh City
REETECH Building
Client: NationalTreasury of Hochiminh city
Location: Hochiminh City
Construction time: From 2004 to 2007
National Treasury
of Hochiminh city
13
14. OURPROJECTSINDUSTRIALCONSTRUCTION
INDUSTRIAL
CONSTRUCTION
INDUSTRIAL
CONSTRUCTION
VINACONEX E&C completed numerous small-, medium-,
large-scale plants for the steel, chemical, oil, refinery,
electronic, warehouse, assembly, cement, water-treatment,
thermal-power, food...
Applying technology, experience and expertise which are already
accumulated in existing areas of activity, our completed plants
stand out for their durability, high yield, energy, cost efficiency
and environment-friendly considerations. Working with us and
you shall not need to look anywhere else.
14
15.
16. Dung Quat refinery project is the first oil
refinery plant built in Vietnam, executed by
Technip Consortium. Vinaconex E&C
participated in the project under two
subcontracts as building temporary facility, site
preparation, civil works and infrastructure of
the plant such as internal road, drainage
system, underground utilities, piping
installations, cable trench, sleepers, concrete
works, culverts, tankpad foundations ect…..
Client: PetroVietnam
Location: Dung Quat Economic Zone
Quang Ngai Province
Construction time:
From Mar 2006 to Feb 2009
Dung Quat
Refinery Factory
OURPROJECTSINDUSTRIALCONSTRUCTION
16
17. Client: Southern Steel Corporation (SSC)
Location: Ba Ria - Vung Tau Province
Construction time:
From October 2003 to January 2005
Phu My
Rolling Steel Plant
17
18. Our customers have appreciated VINACONEX
E&C works not only for perfect completion of
single item as site preparation, silo
construction, equipment foundations,
warehouse, operation buildings, M&E work,
.....but distinct way we approach to each
specific project to provide our customers with
best plant performances and reliability.
Client: Holcim Vietnam
Location: Vung Tau Province
Construction time:
From 11/06/2003 to 26/08/2004
Thi Vai Grinding Terminal
OURPROJECTSINDUSTRIALCONTRUCTION
Strongest advantage that
VINACONEX E&C and its
associates can take for
cement silo construction is
that the excellent master of
sliding-form technology,
which helps us much in
assuring best quality and
accelerating the progress
when required, as we had
made for all silo structures in
previous time.
18
19. Client: Orion Vina Food Co., Ltd.
Location: Bac Ninh Province
Construction time: Feb 2009 - Oct 2009
Orion Vina Food Vietnam.
Client: Thang Long Logistic Co., Ltd.
Location: Thang Long IZ, Vietnam
Construction time: : 01/2007 - 05/2007
Dragon Logistic Phase III
19
Johoku Haiphong Co., Ltd Toyota Gosei Haiphong Co., Ltd
Matsuoka Vietnam Co., Ltd Sumitomo Heavy Industry Factory Phase II
20. Nghi Son Cement Plant – Expansion project
aims at building a second cement production
line with a capacity of 2.15 million tpy. This
plant meets international standards for
insurance, environment/social performance
and local community development.
Participating in this project, VINACONEX E&C
undertakes a wide range of civil construction
works that include simple jobs like construc-
tion of boundary walls, warehouse to special-
ized structures like Silos, bunkers, tunnels, track
hoppers, heavy machine foundations, Raw
Material Proportioning House, Raw Mill House,
Raw Mill Cyclone, Kiln Stack, Blending Silo etc.
Having the overall control of the projects from
in-house shop drawings and manufacturing
to on-site construction activities, start-up,
finishing to commissioning creates an ideal
virtual loop that guarantees on-time and
quality deliveries.
Client: Nghi Son Cement Corporation
Location: Tinh Gia, Thanh Hoa Province
Construction time: 2007-2009
Nghi Son Cement Plant
Expansion Project - Phase II
OURPROJECTSINDUSTRIALCONTRUCTION
Be it fabrication of
industrial silos and
chimney of more
than 100m height or
equipment
structures of 90 mts
height at different
levels of complexity,
We make it all
possible.
20
21. Client: MeikoVietnam Co., Ltd.
Location: Ha Tay Province
Construction time: From 2008 to 2009
Meiko Electronics
Vietnam Factory
Client: Brother Vietnam Co., Ltd.
Location:
Phuc Dien Industrial Zone, HaiDuong Province
Construction time:
From June 2006 to January 2007.
Brother Industries
(Vietnam) Ltd. Factory
21
24. Bai Chay bridge is a new wonder for World
Heritage Site Ha Long Bay. It has total length
903m, clearance space is 50 metres high and
130 metres wide, allowing 50,000 ton ships to
pass under it easily. The main span of this
single-plane cable-stayed structure is 435 m, a
new world record for a single span of a bridge
of this type.
Subleted by Shimizu-Sumitomo Mitsui JO,
VINACONEX E&C undertook substructure
works at Hon Gai site, approach roads and part
of superstructure works for this landmark
bridge project.
The substructure work involved in the
construction of shin-so pile and pneumatic
caisson foundation structures, pile caps, pier
columns, etc…. This construction technology
and work nature required the enforcement of
highest level of working safety standards, the
mobilization of well-trained and high-skilled
workers with technical expertise. And VINAC-
ONEX E&C proved to be professional in this
field.
Package BC2: Construction of Main Bridge
Client: Ministry of Transport of Vietnam
Location: Quang Ninh Province
Construction time: 2003 - 2005
Bai Chay Bridge Project
OURPROJECTS
24
INFRASTRUCTURE
CONSTRUCTION
25. Package A8: Construction of Section
Km 218+040 - Km 244+155
Client: Vietnam Expressway Corporation
Location: Lao Cai Province
Construction time: 40 months,
commence in January 2010
Noi Bai Lao Cai Highway
Construction Project
Hanoi-Lao Cao Highway Construction Project
is part of Greater Mekong subregion - Kunming
Haiphong Transport Corridor, aims at
promoting the trade relationship between
Vietnam and China as well as developing
economy and culture for North – North West of
Vietnam.
VINACONEX E&C is awarded for construction of
package A8, Km 218+040-Km 244+155, that
encompasses works of underpasses, ramp
roads, bridges, drainge box culverts, pipe
culverts, interchanges, traffic signal and toll
plaza. The contract value is VND1627 billions
under loan funded by ADB.
VINACONEX E&C, bases on its engineering
know-how, huge in-house resources, and
capacity for mobilizing additional resources
throught its associated agencies is ready to
commence the works, makes it a success and
launches more development opportunities for
this remote and mountainous area.
25
26. Package CP2: Construction of Nga Tu So
Intersection
Client: Major Projects Management Unit for
Urban Development of Hanoi (MPMU)
Location: Hanoi City
Construction time: From 2005 to 2006
Urban Transportation and
Infrastructure Development
Project – Phase I
Package CP5: ConstructionofTechnical
InfrastructureforNamTrungYenResettlementArea
Client: Major Projects Management Unit for
Urban Development of Hanoi (MPMU)
Location: Hanoi City
Construction time: 21 months
Urban Transportation and
Infrastructure Development
Project – Phase I
OURPROJECTS
26
INFRASTRUCTURE
CONSTRUCTION
27. Package B2: Construction of Quy Cao Bridge
Client: Ministry of Transport
Location: Hai Phong city
Construction time: 24 months
National Highway No.10 Widening
and Improvement Project.
Package R4: Nam Dinh Bypass Section
Client: Ministry of Transport of Vietnam
Location: Nam Dinh Province
Construction time: 24 months
National Highway No.10 Widening
and Improvement Project.
27
28. Package NIP/CP-8:
Trang Bridge-Hung Yen Section.
Client: Project Management Unit No 2
( PMU 2) - MOT
Location: Hung Yen Province
Construction time: March 2008 to March 2010
National Highway No 38B
Construction Project
Package no. 2: Km 218+500-Km 227+500.
Client: Viet Nam Expressway Corporation - MOT
Location: Ha Nam Province
Construction time: 32 months since 2007
Cau Gie – Ninh Binh Highway
Construction Project
Pakage no. 1: Construction of Main Bridge
Client: Project Management Unit of Thang
Long - MOT
Location: Ha Noi city
Construction time: From 2003 to 2007
Thanh Tri Bridge
Construction Project
OURPROJECTS
28
INFRASTRUCTURE
CONSTRUCTION
29. Package NIP/CP-11: Section from Nam Dinh –
Lac Quan bridge
Client: Project Management Unit No 2
( PMU 2) - MOT
Location: Nam Dinh Province
Construction time: 24 months since 2008
National Highway No 21
Construction Project
Package PK2: Construction of Soc Son – Thai
Nguyen Section.
Client: Project Management Unit No 2
( PMU 2) - MOT
Location: FromSocSontoThaiNguyenProvince
Construction time: 42 months,
commenced early 2010
The New National Highway no. 3 is a critical
highway among road network connecting
Hanoi to Thai Nguyen. This project is a part of a
strategy to improve Vietnam’s transportation
system, aims at boosting economic exchanges
between Hanoi and the northern mountainous
areas surrounding Thai Nguyen.
We were awarded Package 2, Construction of
Section from Soc Son to Thai Nguyen in
November 2009 under the capacity of a joint
operation with other reliable partners. Main
structures encompass 34.4km of four-lane
expressway, 03 interchanges and intersections,
12 bridges, a great number of box and pipe
culverts, relocation of irrigation canals, AC
pavement and other general items. The
Package is funded by JBIC for nearly 1524
billion VNdong and will be implemented in late
2009. The progress is scheduled for 42 months
since commencement date.
New National Highway
No.3 Project
29
30. 30
OURPROJECTSINFRASTRUCTURE
CONSTRUCTION
Package no.1: Construction of Main Bridge
and North Approach of Nhat Tan Bridge
Project.
Employer: Minstry of Transport.
Main Contractor: IHI Infrastructure System &
Sumitomo Mitsui JO
Subcontractor: Vinaconex E&C.
Location: Hanoi city
Commencement date: 2012
Nhat Tan bridge project
Ministry of Transport is the Employer of Nhat
Tan bridge and approaches construction
project. It locates on the Ring road II of Hanoi
city with total length of 8.95km. This is a
continuous stayed cable bridge with 5 Tower
Bridge. The length of main bridge is 3,755m.
The project is financed by ODA fund, under
STEP conditions of Japan Government.
Vinaconex E&C have taken part in the
construction of 02 packages amongst 03
packages of project.
Vinaconex E&C have involved in the construc-
tion of main bridge and approach road at the
North, 3080m long and 32m wide, from
Abutment A2 to Pier P11. The key work scope
varies from casting and launching of super T
girder, casting for deck slab, casting surface of
bridge, cast-in-place box girders, cantilever
works.
31. 31
Package 2: Construction of Main bridge and
South Approach of Nhat Tan bridge project.
Employer: Minstry of Transport.
Main Contractor: Sumitomo Mitsui-
VINACONEX JO
Location: Hanoi city
Commencement date: 2012
The value of the package no. 2 is
1,312,973,190,959 Vietnam dong. The main
work is construction of main bridge and South
approach road of Nhat Tan bridge, with total
length of 1251m, detailed in construction
bridge, 1500 D bored pile, cantilever work,
south approach road, all main ramp roads,
retaining walls, drainage system, lighting
system….
32. OURPROJECTSPROJECTMANAGEMENT
PROJECT
MANAGEMENT
PROJECT
MANAGEMENT
VINACONEX E&C management teams are prepared to provide knowledge,
experience and innovative solutions to clear the same questions of waste, cost
overrun and delays that challenge any Owner in any construction project.
We collaborate and harmonize among your designer, vendors, contractor and
specialists and believe the optimum environment is one where all parties see
each other as complimenting equals working together to bring Owners the
absolute best value they can buy.
32
33.
34. Vinaconex tower is a distinguished place to all
its affiliates nationwide as the headquarter of
the Corporation. Located at 34 Lang Ha, Hanoi,
Vinaconex building enjoys the benefit of a
double frontage. This dignified office building
is delivering a gross floor area of 24,000 sqm,
including 27 storey and 03 basement parking.
Showing a modern architecture, the building is
also equipped with state-of-the art technical
systems such as high-speed lifts, M&E system,
security system…and distinctive curtain walls
system. The construction started in 2007 and
finished in 2009.
Vinaconex Tower
Client: VINACONEX Corporation
Location: Ha Noi city
Construction time: From 2007 to June 2009
OURPROJECTSPROJECTMANAGEMENT
34
36. The Hanoi Museum is an exceptional
architecture - bringing together the old and
the new on one single site. It has four storeys
on the surface and two underground with total
area of 53,963 square meters and is 30.7 meters
high. The design and build form of the contract
were firstly adopted among projects in
Vietnam. Hanoi Museum has the form of a
counter pyramid with a hard structure leans
upon 04 cores that bear almost of loading
capacity, all floors are hung up against the roof
structure. This venue is harmonious with
surrounding landscape and buildings, showing
as a museum with the youngest and most
innovative soul.
Construction began in May 2008 on site at
Pham Hung street. VINACONEX E&C acted as
the project management consultant during
the construction and tender of this landmark
project, including the selection and
procurement of required equipment and the
commissioning of facilities. We are also
responsible for the majority of statutory
compliance checking during construction
stage. By providing our own unique solutions,
we continue to provide the highest levels of
quality and safety through workflow
management and the foreseeable successful of
the project.
Hanoi Museum
Construction Project
Client: Hanoi people’s committee
Location: Ha Noi city
Construction time: Started: 19/05/2008,
estimated finishing: 19/05/2010
OURPROJECTSPROJECTMANAGEMENT
36
37. The main goal of the project was to create a
well functioning residential area of high quality
with all the necessary services for the
low-income workers.
The scope of the project was turnkey construc-
tion of 17 high-rise apartment buildings,
encompasses low-income house and dormi-
tory with total floor area of 135,550 sqm for
12,000 people on land area of 9 hectares.
The venue also involved in construction of
infrastructure works of water supply system,
water drainage system, lighting system, roads
pavements and landscaping.
The overall construction works covered under
separate contracts, commenced on February
2007 and scheduled to complete on 2011.
Apartment for Workers
Client: Hanoi People Committee
Location: Dong Anh, Hanoi
Construction time: 2007 - 2011
Most of workers in IZ or high-tech zone
of any developing countries face the
same problems of poor accommoda-
tion as the physical demands of the
work, low status, low pay, few benefits,
and limited advancement potential
deter them from accessing to a better
living standards.
By taking part in this worker-house
project, VINACONEX E&C could make a
considerable contribution to release
this burden.
37
38. OURPROJECTSREALESTATE
DEVELOPEMENT
REAL ESTATE
DEVELOPMENT
REAL ESTATE
DEVELOPMENT
Even you need a small or large house, a good-to-live-in or high-class
luxury apartments or modern & comfortable offices VINACONEX E&C
can fit your dream with keen dedication to your full comfort and true
values.
Our design specialists are not limited, the only limit is your imagination.
38
39. At present, VINACONEX E&C is developing a
mix-use project that combines offices, trading
center and apartments with comprehensive
service integration.
Located in Trung Hoa Nhan Chinh, Hanoi, the
complex offers a lifestyle of full comfort and
convenience, with in-the-door shopping mall
and easy reach of the Hanoi downtown.
Comprising two 23-storey and two 27-storey
blocks with total gross floor area of 110.000m2,
the modernity of architectural language is
characterized by clear simple lines. This condo-
minium development shows the harmony to
surrounding environment and landscape.
The apartment units begin at 4th storey. Each
floor offers both 2-, 3- and 4-bedroom unit
types, In addition, to meet the needs of
extended families, all towers arrange duplex
3-4 bedroom apartments, that commence
from 20th floor upward. Parking facilities are
provided at 03-storey basements below. The
project is scheduled to complete in late 2012.
Mix-use High-rise Buildings
in Trung Hoa, Nhan Chinh
39
40. OUT OF
WORKS
Each year, our staffs share with us their enthusiasm,
energy, expertise, challenges and victories ……. ,
and we desire to share our employees the joys and
pleasures whenever we have chance.
We wish to give our employees the best
possible conditions for a good, challenging
working life and to develop an environment
where each employee can fully demonstrate
their skills, capabilities and maximize his/her
value. Through which, energy, enthusiasm
and creativity of each staff can be unlocked.
It is essential for us to balance naturally
between work and family life of our staffs.
And nothing is more precious than seeing
happy moments together and smiles of
spouse and children of their family during
each company summer holiday.
40
41. Over the past few years, we are continually reinforcing our core competencies by
fostering the development of talents through education and other relevant job-training
programs. And today our team is prepared to deliver superior performance wherever
there is a need for professional construction services.
Scholarship
42. OUR
HISTORY
Origin
Beginning from a Consultancy Department of
Vietnam Construction and Import-Export
Joint-Stock Corporation (VINACONEX), The
Department of Bidding and Project Manage-
ment served as a consultant of the Corpora-
tion, support in management works of
construction investment projects of all sizes.
To further develop the efficiency of this mode,
the Corporation expanded the Department
into two Centers, specializing in bidding works
and management of great projects under-
taken by VINACONEX, as well as providing
advices and technical supports for VINACONEX
affiliates in their construction and procure-
ment works.
2003
Foundation for VINACONEX E&C was laid as
merging two Centers of Project Manage-
ment and Bidding into unique Center,
centralized the bidding work and construc-
tion management of large-scale project
under VINACONEX trade mark
May 2007
VINACONEX E&C was established under the
mode of a joint stock company.
Commenced large-scale projects such as:
Nghi Son Cement Plant, Vinaconex Tower,
Worker House in Kim Chung, Cau Ghe-Ninh
Binh construction project ….
42
2012
VINACONEX E&C turned in to an indepen-
dent joint stock company at the end of 2012
when VINACONEX., JSC withdrew all their
capital investment from the Company.
43. OUR
DEPARTMENT
Office
Tell: (84-4) 37765.888
Ext 101, 102, 107, 109, 110, 111, 213
Infrastructure Engineering Section
Tell: (84-4) 3776.5888
Ext 175 - 198
Quantity Survey Unit: 189
Quality Control Unit: 179
Bidding Unit: 198
Investment Dept
Tell: (84-4) 3776.5888
Ext 126, 121, 128, 133, 134
Accounting and Financial Department
Tell: (84-4) 3776.5888
Ext 136,104,123,125
Consultancy Section
Tell: (84-4) 37764.740
Civil & Industrial Engineering Section
Tell: (84-4) 3776.5888
Ext: 150-152, 155-157, 166-172
Quantity Survey Unit: 166
Quality Control Unit
Bidding Unit : 157
Planning Department
Tell: (84-4) 3776.5888 Ext 214, 215
Quality system management
& Safety Department
Tell: (84-4) 3776.5888 Ext 140, 131
Representative office in HCMC
Tel: (84-8) 3910.4448
Fax: (84-8) 3910.4448
Level 18, VINACONEX Tower
34 Lang Ha Str.,
Dong Da Dist.
Hanoi, Vietnam
T (84.4) 3776 5888
F (84.4) 3776 5999
2003 2007 NOW
43
44. Vinaconex E&C Profile
Level 18, VINACONEX Tower
34 Lang Ha Str., Dong Da Dist.
Hanoi, Vietnam
Tel: (84.4) 3776 5888
Fax: (84.4) 3776 5999
Email: vinaconex.ec@hn.vnn.vn
Website: www.vinaconexec.com.vn
Vinaconex
Engineering Construction
& Investment., JSC