SlideShare a Scribd company logo
RAFAELA AHSAN
Portfolio Sample | 2020
rafaela.ahsan@gmail.com
+31 643703131
2
Synergistic Heterogeneity
Housing for Temporary Migrants in India
Nalasopara, Maharshtra, India
Master’s Thesis, TU Delft
3
Tectonic Copyright2007
Tectonic Copyright2007
Tectonic Copyright2007
Tectonic Copyright2007
Tectonic Copyright2007Tectonic Copyright2007
Tectonic Copyright2007
27-40 Middle Class Units
4-5 Amenities/Businesses
8-11 Migrant Rental Units
75, 384, 000
INR
30%
75, 400, 000
INR
109, 450, 000
INR
75, 384, 000
INR
30%
75, 400, 000
INR
109, 450, 000
INR
75, 384, 000
INR
30%
75, 400, 000
INR
109, 450, 000
INR
Construction
Cost
Sales Total at
Break Even
Sales Total at
Market Prices
Savings off
Market Prices
75, 384, 000
INR
30%
75, 400, 000
INR
109, 450, 000
INR
75, 384, 000
INR
30%
75, 400, 000
INR
109, 450, 000
INR
75, 384, 000
INR
30%
75, 400, 000
INR
109, 450, 000
INR
75, 384, 000
INR
30%
75, 400, 000
INR
109, 450, 000
INR
Each group is given
spaces suited to their
needs. Middle class
dwellings are located in
towers,givingeachfamily
privacy with minimal
space for interaction.
The migrants are located
on the ‘street’, allowing
them to spill out into
more familiar and social
surroundings. Groups are
able to coexist without
forced interaction.
Section Through Square
Ground Floor First Floor Second Floor
4
300
300
200
CERAMIC FLOOR TILE
SCREED
200 mm THK REINFORCED
CONCRETE FILLER SLAB
FILLER: CLAY POT
STEEL ANGLE
LINTEL
W/ DRIP EDGE
ADJUSTABLE TIMBER
LOUVER
HALF DOOR
GLASS PANEL
TOP LEAF
100 mm THK REINFORCED
CONCRETE PLATFORM
CEMENT, SLOPED
MOSAIC FLOOR TILE FINISH,
BROKEN/WASTE TILE
SCREED
CERAMIC FLOOR TILE
200 mm THK REINFORCED
CONCRETE SLAB
300 mm THK REINFORCED
CONCRETE TUB FOUNDATION
RECYCLED CONCRETE
PAVERS, PERMEABLE CONCRETE STRIP FOOTING
Ø 100 mm DRAINAGE PIPE
75 mm FLY ASH BRICK SKIRTING
RAINWATER STORAGE
1500
Construction is kept
simple — fly ash bricks
compose the main building
material with a reinforced
concrete infill. Floor slabs
are either clay pot slabs
and hollow core slabs
to reduce concrete and
weight. Water is collected
and stored underneath
in the foundation. Lastly,
the buildings are raised to
prevent flooding.
Hollow core slab
in tower units
Broken tile mosaic
finish for waterproofing
Clay pot slab
Awning windows
Gutter for drainage
and water storage
Jali for privacy &
ventilation
Dutch doors for
live/work flexibility
Tub foundation for
water storage
“Street” social space
for migrant workers
Fly-Ash brick as main
structural material
Raised platform
for flood proofing
Foundation & Ground Floor DetailConstruction Axo
5
Model - Medium Square Model - Temple Courtyard
Public and open spaces come in three sizes: small,
medium and large. Smaller spaces foster more
intimate social interactions, while larger open spaces
can host a variety of events, larger business/amenity
spaces, places for prayer and playgrounds. The colour
and material palette is kept simple—residents are
encouraged to make the spaces their own.
Social “Street”
Medium Open Space with Temple
Market Square
6
ourHaus
sustainable community living
Old Ottawa East, Ottawa, Canada
In collaboration with Rachel Rodd
Studio 6, Carleton University
1
ourHaus, a multi-unit residential development
tackles the challenge of densification on an
irregularly-shaped urban infill site while also giving
back to the community at large. The complex
focuses on the key concepts of sustainable
community-centred living, taking cues from One
Planet Communities and Passive House design.
7
Alargeportionofthecomplexisorientedsouth
in order to maximize on solar heat gain. A solar
wall heats air and distributes it throughout the
complex. Residents were grouped according
to proximity to the highway and views of the
Rideau Canal.
Key features:
Solar Wall- preheats air to be used to
heat the building using solar thermal
energy
Buffer Zone that acts as balcony space
and reduces heating/cooling costs
CLT floors & steel column hybrid
construction- using local, renewable,
recyclable materials
Green Roofs on two buildings
Sustainability Education Centre for the
public
Penthouse amenity space showcases
CLT construction and has views to the
canal
Communal dining areas for each group
of residents
8
Professional Work
Architectural Assistant, 2015-2016
KPMB Architects, Toronto
Project: Girls’ Private School in Manhattan
Duringmy10-monthco-op placementatKPMBArchitects,
I worked on a single project, a girls’ K-12 private school
in Manhattan. Some of the tasks I was responsible for
include rendering interior and exterior project views,
modelling the Auditorium in Revit, creating sketches for
consultants, and modelling the auditorium in the existing
building and proposed changes using Point Cloud data.
All visuals are my own work.
9
LEVEL 6M
127' ‐ 8 1/4"
LEVEL 8
153' ‐ 8 1/4"
Level 7
138' ‐ 1 1/4"
LEVEL 6S
117' ‐ 10
1/4"
SPIRALIFT
FIXED STAGE ADJ. STAGE WALK RAMP A RAMP B RAMP C FIXED
23' ‐ 6 1/4" 9' ‐ 0 1/8" 3' ‐ 9" 14' ‐ 5 1/2" 11' ‐ 11 1/2" 12' ‐ 4 1/8" 20' ‐ 1 1/4"
LEVEL 6M
127' ‐ 8 1/4"
LEVEL 8
153' ‐ 8 1/4"
Level 7
138' ‐ 1 1/4"
LEVEL 6S
117' ‐ 10
1/4"
SPIRALIFT
FIXED STAGE ADJ. STAGE WALK RAMP A RAMP B RAMP C FIXED
23' ‐ 6 1/4" 9' ‐ 0 1/8" 3' ‐ 9" 14' ‐ 5 1/2" 11' ‐ 11 1/2" 12' ‐ 4 1/8" 20' ‐ 1 1/4"
322 King St W, 3rd Fl, Toronto, ON, Canada M5V 1J2 416.977.5104
KPMB Architects 1/8" = 1'-0"
The Brearley School - 590 L6 RAMP FLOOR DETAIL
2015.11.03
AUDITORIUM SECTION (RAKED) Detail
1:15
AUDITORIUM SECTION (RAKED) Detail Stage Up
LEVEL 6M
127' ‐ 8 1/4"
LEVEL 8
153' ‐ 8 1/4"
Level 7
138' ‐ 1 1/4"
LEVEL 6S
117' ‐ 10
1/4"
SPIRALIFT
FIXED STAGE ADJ. STAGE WALK RAMP A RAMP B RAMP C FIXED
23' ‐ 6 1/4" 9' ‐ 0 1/8" 3' ‐ 9" 14' ‐ 5 1/2" 11' ‐ 11 1/2" 12' ‐ 4 1/8" 20' ‐ 1 1/4"
LEVEL 6M
127' ‐ 8 1/4"
LEVEL 8
153' ‐ 8 1/4"
Level 7
138' ‐ 1 1/4"
LEVEL 6S
117' ‐ 10
1/4"
SPIRALIFT
FIXED STAGE ADJ. STAGE WALK RAMP A RAMP B RAMP C FIXED
23' ‐ 6 1/4" 9' ‐ 0 1/8" 3' ‐ 9" 14' ‐ 5 1/2" 11' ‐ 11 1/2" 12' ‐ 4 1/8" 20' ‐ 1 1/4"
322 King St W, 3rd Fl, Toronto, ON, Canada M5V 1J2 416.977.5104
KPMB Architects 1/8" = 1'-0"
The Brearley School - 590 L6 RAMP FLOOR DETAIL
2015.11.03
AUDITORIUM SECTION (RAKED) Detail
1:15
AUDITORIUM SECTION (RAKED) Detail Stage Up
UP
UPDN
DN
UP
322 King St W, 3rd Fl, Toronto, ON, Canada M5V 1J2 416.977.5104
KPMB Architects 1" = 20'-0"
AUDITORIUM- EXISTING PLANSThe Brearley School - 610
10/05/15
Deck B_Existing Auditorium Deck A‐Existing Auditorium
322 King St W, 3rd Fl, Toronto, ON, Canada M5V 1J2 416.977.5104
KPMB Architects
The Brearley School - 610
Deck A‐NDeck B_Theater Round
201 SEATS
18 SEATS
Level1
39' ‐
11"
Deck A
27' ‐ 1"
Deck B
14' ‐ 3"
322 King St W, 3rd Fl, Toronto, ON, Canada M5V 1J2 416.977.5104
KPMB Architects 1/8" = 1'-0"
BLACK BOX THEATER IN THE ROUND SECTIONSThe Brearley School - 610
10/13/15
Above: Moving floor sketches for theatre consultants
Below: Proposed Auditorium, Orchestra layout, new school Below: Black Box Theatre, previously the auditorium in existing school
Above:Conversionofexistingauditoriumtoablackboxtheatre,oneofthreeconfigurations
10
DN
UP
DN
REF.REF.
REF.
4
3
2
1
A B C
D
E
1
A‐421
‐
‐
2
A‐500
4
A‐500
4
A‐501
‐
‐‐‐
A‐4002
A‐401
2
‐
‐
‐
‐‐‐
‐
‐‐‐
3.9
D.9
3
A‐111
P‐515
2
A‐811
3
12
680 SF
CHEMISTRY LAB
1015
739 SF
BIOLOGY LAB
1016
23' ‐ 3 3/4" 21' ‐ 8 3/8"
A‐812
1
A‐815
2
A‐815
A‐815
5
A‐852
5 A‐818
8
A‐81810 9
A‐818 1314
11
12
A‐401
3
‐
‐‐‐
4
A‐502
6
A‐502
‐
‐‐‐
A‐8142 1
3
A‐814 7
6
4
A‐815 41
3
A‐814 10
9
8
8
9
7
6
‐
‐
‐‐
429 SF
PREP ROOM/STORAGE
1007
260 SF
ADVANCED RESEARCH
1010
689 SF
SCIENCE LAB (III/IV/MS/US)
1011
164 SF
WC
1008
Copyright is that of the Architect.
Any version of this drawing reproduced by any
means from any media without prior written
approval of the Architect is to be read for
information only.
The Architect is not liable for any loss or
distortion of information resulting from subsequent
reproduction of the original drawing.
SCALE
PROJECT NO.
ISSUE DATE
GENERAL NOTES:
1. Drawings are not to be scaled. Contractor will
verify all existing conditions and dimensions
required to perform the Work and will report
any discrepancies with the Contract
Documents to the Architect before
commencing work.
2. The Architectural Drawings are to be read in
conjunction with all other Contract Documents
including the Project Manuals and the
Structural, Mechanical and Electrical
Drawings. In cases of difference between the
Consultants' documents with respect to the
quantity, sizes or scope of work, the greater
shall apply.
3. Positions of exposed or finished Mechanical
or Electrical devices, fittings and fixtures are
indicated on the Architectural Drawings.
Locations shown on the Architectural
Drawings shall govern over Mechanical and
Electrical Drawings. Mechanical and Electrical
items not clearly located will be located as
directed by the Architect.
4. Dimensions indicated are taken between the
faces of finished surfaces unless otherwise
noted.
5. The architect has not been retained for
supervision of construction and assumes no
responsibility for means, methods and
techniques of construction.
6. These documents are not to be used for
construction unless specifically noted for such
purpose.
Project North True North
Rev. Date Issued
KPMB Architects
322 King St W, 3rd Fl
Toronto, ON, Canada M5V 1J2
416 977 5104
.00
1/4" = 1'-0"
A- 822
LEVEL 10 FLOOR
PLAN
1455
2016.02.29
The Brearley School -
590
590 East 83rd Street, NY, New York
The project hit a tough point when a cantilever with a
large portion of the program was removed. We were given
a week to propose the new design changes, given the
addition of two extra floors. I was tasked with the layout
of the science floors. The following are the drawings I
produced within two days o f the change. The initial layout
was approved, with additional changes being made later
on to accomodate the loss of program on other levels.

More Related Content

What's hot

Architect Charles Correa
Architect Charles CorreaArchitect Charles Correa
Architect Charles Correa
Fawad Khan
 
VOCATIONAL CENTRE AT KHURJA
VOCATIONAL CENTRE AT KHURJAVOCATIONAL CENTRE AT KHURJA
VOCATIONAL CENTRE AT KHURJA
Anuj Singhal
 
Ar habib rahman
Ar habib rahmanAr habib rahman
Ar habib rahman
Mehul Laddha
 
Lecture 7_ Ar. Anant Raje .pdf
Lecture 7_ Ar. Anant Raje .pdfLecture 7_ Ar. Anant Raje .pdf
Lecture 7_ Ar. Anant Raje .pdf
Anwesha Baruah
 
Architecture case study presentation
Architecture case study presentationArchitecture case study presentation
Architecture case study presentation
Writers Per Hour
 
Kohinoor square
Kohinoor squareKohinoor square
Kohinoor square
Shubham Jain
 
Halen-housing.pptx
Halen-housing.pptxHalen-housing.pptx
Halen-housing.pptx
54PiyushParodhe
 
Architectural Portfolio by Siddanth S Rao
Architectural Portfolio by Siddanth S RaoArchitectural Portfolio by Siddanth S Rao
Architectural Portfolio by Siddanth S Rao
siddanth RAO
 
(Norman foster)
(Norman foster)(Norman foster)
(Norman foster)
vijay meena
 
Transitional space presentation
Transitional space presentationTransitional space presentation
Transitional space presentation
You-Wen Liang
 
Norman Foster
Norman FosterNorman Foster
Norman Foster
Dipannita Saha
 
HOUSING LITERATURE STUDY M.ARCH CCA
HOUSING LITERATURE STUDY M.ARCH CCAHOUSING LITERATURE STUDY M.ARCH CCA
HOUSING LITERATURE STUDY M.ARCH CCA
Ar. Prerna Chouhan
 
Charles correa
Charles correaCharles correa
Charles correa
vikashsaini78
 
IIT, Kanpur.
IIT, Kanpur.IIT, Kanpur.
IIT, Kanpur.
Mayur Waghulde
 
Hall of nations, Pragati Maidan, Delhi.
Hall of nations, Pragati Maidan, Delhi.Hall of nations, Pragati Maidan, Delhi.
Hall of nations, Pragati Maidan, Delhi.
Mayur Waghulde
 
Yale Art + Architecture Building - Case Study
Yale Art + Architecture Building - Case StudyYale Art + Architecture Building - Case Study
Yale Art + Architecture Building - Case Study
Vikram Bengani
 
le corbusier principles
le corbusier principlesle corbusier principles
le corbusier principles
kunal singh
 
highrise report bangladesh (city center)
highrise report bangladesh (city center)highrise report bangladesh (city center)
highrise report bangladesh (city center)
iftekhar rafat
 
Geoffrey bawa
Geoffrey bawaGeoffrey bawa
Geoffrey bawa
Amal Sridar
 
Geoffrey Bawa - Bentota Beach Hotel Analysis
Geoffrey Bawa - Bentota Beach Hotel AnalysisGeoffrey Bawa - Bentota Beach Hotel Analysis
Geoffrey Bawa - Bentota Beach Hotel Analysis
Sukanya Chatterjee
 

What's hot (20)

Architect Charles Correa
Architect Charles CorreaArchitect Charles Correa
Architect Charles Correa
 
VOCATIONAL CENTRE AT KHURJA
VOCATIONAL CENTRE AT KHURJAVOCATIONAL CENTRE AT KHURJA
VOCATIONAL CENTRE AT KHURJA
 
Ar habib rahman
Ar habib rahmanAr habib rahman
Ar habib rahman
 
Lecture 7_ Ar. Anant Raje .pdf
Lecture 7_ Ar. Anant Raje .pdfLecture 7_ Ar. Anant Raje .pdf
Lecture 7_ Ar. Anant Raje .pdf
 
Architecture case study presentation
Architecture case study presentationArchitecture case study presentation
Architecture case study presentation
 
Kohinoor square
Kohinoor squareKohinoor square
Kohinoor square
 
Halen-housing.pptx
Halen-housing.pptxHalen-housing.pptx
Halen-housing.pptx
 
Architectural Portfolio by Siddanth S Rao
Architectural Portfolio by Siddanth S RaoArchitectural Portfolio by Siddanth S Rao
Architectural Portfolio by Siddanth S Rao
 
(Norman foster)
(Norman foster)(Norman foster)
(Norman foster)
 
Transitional space presentation
Transitional space presentationTransitional space presentation
Transitional space presentation
 
Norman Foster
Norman FosterNorman Foster
Norman Foster
 
HOUSING LITERATURE STUDY M.ARCH CCA
HOUSING LITERATURE STUDY M.ARCH CCAHOUSING LITERATURE STUDY M.ARCH CCA
HOUSING LITERATURE STUDY M.ARCH CCA
 
Charles correa
Charles correaCharles correa
Charles correa
 
IIT, Kanpur.
IIT, Kanpur.IIT, Kanpur.
IIT, Kanpur.
 
Hall of nations, Pragati Maidan, Delhi.
Hall of nations, Pragati Maidan, Delhi.Hall of nations, Pragati Maidan, Delhi.
Hall of nations, Pragati Maidan, Delhi.
 
Yale Art + Architecture Building - Case Study
Yale Art + Architecture Building - Case StudyYale Art + Architecture Building - Case Study
Yale Art + Architecture Building - Case Study
 
le corbusier principles
le corbusier principlesle corbusier principles
le corbusier principles
 
highrise report bangladesh (city center)
highrise report bangladesh (city center)highrise report bangladesh (city center)
highrise report bangladesh (city center)
 
Geoffrey bawa
Geoffrey bawaGeoffrey bawa
Geoffrey bawa
 
Geoffrey Bawa - Bentota Beach Hotel Analysis
Geoffrey Bawa - Bentota Beach Hotel AnalysisGeoffrey Bawa - Bentota Beach Hotel Analysis
Geoffrey Bawa - Bentota Beach Hotel Analysis
 

Similar to Architecture Portfolio Sample

Seismic Analysis of Multistorey Structure
Seismic Analysis of Multistorey StructureSeismic Analysis of Multistorey Structure
Seismic Analysis of Multistorey Structure
IRJET Journal
 
Stewart Spence Elect_Comm CV 2015
Stewart Spence Elect_Comm CV 2015Stewart Spence Elect_Comm CV 2015
Stewart Spence Elect_Comm CV 2015
Stewart Spence
 
IRJET- Performance based Seismic Analysis and Design of Building Resting ...
IRJET-  	  Performance based Seismic Analysis and Design of Building Resting ...IRJET-  	  Performance based Seismic Analysis and Design of Building Resting ...
IRJET- Performance based Seismic Analysis and Design of Building Resting ...
IRJET Journal
 
report
reportreport
report
Udayan Mitra
 
2013 csem uae-m sc proposal to kth students
2013 csem uae-m sc  proposal to kth students2013 csem uae-m sc  proposal to kth students
2013 csem uae-m sc proposal to kth students
energya
 
C.V Mohammed ahmed ezzuldin alrawi
C.V Mohammed ahmed ezzuldin alrawiC.V Mohammed ahmed ezzuldin alrawi
C.V Mohammed ahmed ezzuldin alrawi
mohammed Ahmed Ezzuldin alrawi
 
Energy Floors (Pedestrian flooring that converts human pressure to electricity)
Energy Floors (Pedestrian flooring that converts human pressure to electricity)Energy Floors (Pedestrian flooring that converts human pressure to electricity)
Energy Floors (Pedestrian flooring that converts human pressure to electricity)
Mandar Tulankar
 
David Resume Updated 1-13-15
David Resume Updated 1-13-15David Resume Updated 1-13-15
David Resume Updated 1-13-15
David Snyder
 
IRJET- Structural and Modal Analysis of Kaplan Turbine
IRJET-  	  Structural and Modal Analysis of Kaplan TurbineIRJET-  	  Structural and Modal Analysis of Kaplan Turbine
IRJET- Structural and Modal Analysis of Kaplan Turbine
IRJET Journal
 
Engineering in industry - what’s it all about?
Engineering in industry - what’s it all about?Engineering in industry - what’s it all about?
Engineering in industry - what’s it all about?
Association for Project Management
 
ABCCOM Profile1
ABCCOM Profile1ABCCOM Profile1
ABCCOM Profile1
Nader wadie
 
Senior electrical engineer resume
Senior electrical engineer    resumeSenior electrical engineer    resume
Senior electrical engineer resume
VEERABHARATHI MUNI
 
Setty & Associates Net Zero Building AIA Course
Setty & Associates Net Zero Building AIA CourseSetty & Associates Net Zero Building AIA Course
Setty & Associates Net Zero Building AIA Course
John Schultz
 
Comparative characteristics of pert and cpm
Comparative characteristics of pert and cpmComparative characteristics of pert and cpm
Comparative characteristics of pert and cpm
Kinshook Chaturvedi
 
0132740648
01327406480132740648
0132740648
AnkitSudani1
 
Jose Serrano - 2016
Jose Serrano - 2016Jose Serrano - 2016
Jose Serrano - 2016
Jose Serrano
 
November Cv
November CvNovember Cv
November Cv
NEIL HARVEY
 
FIELD SHAKE TABLE TESTS: AN EFFECTIVE DEMONSTRATIVE TOOL FOR SIESMIC STRENGTH...
FIELD SHAKE TABLE TESTS: AN EFFECTIVE DEMONSTRATIVE TOOL FOR SIESMIC STRENGTH...FIELD SHAKE TABLE TESTS: AN EFFECTIVE DEMONSTRATIVE TOOL FOR SIESMIC STRENGTH...
FIELD SHAKE TABLE TESTS: AN EFFECTIVE DEMONSTRATIVE TOOL FOR SIESMIC STRENGTH...
IRJET Journal
 
ResumeAug14
ResumeAug14ResumeAug14
ResumeAug14
TELAL AMED
 
dhaha new2
dhaha new2dhaha new2
dhaha new2
Dhana sekar
 

Similar to Architecture Portfolio Sample (20)

Seismic Analysis of Multistorey Structure
Seismic Analysis of Multistorey StructureSeismic Analysis of Multistorey Structure
Seismic Analysis of Multistorey Structure
 
Stewart Spence Elect_Comm CV 2015
Stewart Spence Elect_Comm CV 2015Stewart Spence Elect_Comm CV 2015
Stewart Spence Elect_Comm CV 2015
 
IRJET- Performance based Seismic Analysis and Design of Building Resting ...
IRJET-  	  Performance based Seismic Analysis and Design of Building Resting ...IRJET-  	  Performance based Seismic Analysis and Design of Building Resting ...
IRJET- Performance based Seismic Analysis and Design of Building Resting ...
 
report
reportreport
report
 
2013 csem uae-m sc proposal to kth students
2013 csem uae-m sc  proposal to kth students2013 csem uae-m sc  proposal to kth students
2013 csem uae-m sc proposal to kth students
 
C.V Mohammed ahmed ezzuldin alrawi
C.V Mohammed ahmed ezzuldin alrawiC.V Mohammed ahmed ezzuldin alrawi
C.V Mohammed ahmed ezzuldin alrawi
 
Energy Floors (Pedestrian flooring that converts human pressure to electricity)
Energy Floors (Pedestrian flooring that converts human pressure to electricity)Energy Floors (Pedestrian flooring that converts human pressure to electricity)
Energy Floors (Pedestrian flooring that converts human pressure to electricity)
 
David Resume Updated 1-13-15
David Resume Updated 1-13-15David Resume Updated 1-13-15
David Resume Updated 1-13-15
 
IRJET- Structural and Modal Analysis of Kaplan Turbine
IRJET-  	  Structural and Modal Analysis of Kaplan TurbineIRJET-  	  Structural and Modal Analysis of Kaplan Turbine
IRJET- Structural and Modal Analysis of Kaplan Turbine
 
Engineering in industry - what’s it all about?
Engineering in industry - what’s it all about?Engineering in industry - what’s it all about?
Engineering in industry - what’s it all about?
 
ABCCOM Profile1
ABCCOM Profile1ABCCOM Profile1
ABCCOM Profile1
 
Senior electrical engineer resume
Senior electrical engineer    resumeSenior electrical engineer    resume
Senior electrical engineer resume
 
Setty & Associates Net Zero Building AIA Course
Setty & Associates Net Zero Building AIA CourseSetty & Associates Net Zero Building AIA Course
Setty & Associates Net Zero Building AIA Course
 
Comparative characteristics of pert and cpm
Comparative characteristics of pert and cpmComparative characteristics of pert and cpm
Comparative characteristics of pert and cpm
 
0132740648
01327406480132740648
0132740648
 
Jose Serrano - 2016
Jose Serrano - 2016Jose Serrano - 2016
Jose Serrano - 2016
 
November Cv
November CvNovember Cv
November Cv
 
FIELD SHAKE TABLE TESTS: AN EFFECTIVE DEMONSTRATIVE TOOL FOR SIESMIC STRENGTH...
FIELD SHAKE TABLE TESTS: AN EFFECTIVE DEMONSTRATIVE TOOL FOR SIESMIC STRENGTH...FIELD SHAKE TABLE TESTS: AN EFFECTIVE DEMONSTRATIVE TOOL FOR SIESMIC STRENGTH...
FIELD SHAKE TABLE TESTS: AN EFFECTIVE DEMONSTRATIVE TOOL FOR SIESMIC STRENGTH...
 
ResumeAug14
ResumeAug14ResumeAug14
ResumeAug14
 
dhaha new2
dhaha new2dhaha new2
dhaha new2
 

Recently uploaded

Manual ISH (International Society of Hypertension)
Manual ISH (International Society of Hypertension)Manual ISH (International Society of Hypertension)
Manual ISH (International Society of Hypertension)
bagmai
 
哪里办理美国中央华盛顿大学毕业证双学位证书原版一模一样
哪里办理美国中央华盛顿大学毕业证双学位证书原版一模一样哪里办理美国中央华盛顿大学毕业证双学位证书原版一模一样
哪里办理美国中央华盛顿大学毕业证双学位证书原版一模一样
qo1as76n
 
International Upcycling Research Network advisory board meeting 4
International Upcycling Research Network advisory board meeting 4International Upcycling Research Network advisory board meeting 4
International Upcycling Research Network advisory board meeting 4
Kyungeun Sung
 
ARENA - Young adults in the workplace (Knight Moves).pdf
ARENA - Young adults in the workplace (Knight Moves).pdfARENA - Young adults in the workplace (Knight Moves).pdf
ARENA - Young adults in the workplace (Knight Moves).pdf
Knight Moves
 
Heuristics Evaluation - How to Guide.pdf
Heuristics Evaluation - How to Guide.pdfHeuristics Evaluation - How to Guide.pdf
Heuristics Evaluation - How to Guide.pdf
Jaime Brown
 
一比一原版亚利桑那大学毕业证(UA毕业证书)如何办理
一比一原版亚利桑那大学毕业证(UA毕业证书)如何办理一比一原版亚利桑那大学毕业证(UA毕业证书)如何办理
一比一原版亚利桑那大学毕业证(UA毕业证书)如何办理
21uul8se
 
一比一原版马里兰大学毕业证(UMD毕业证书)如何办理
一比一原版马里兰大学毕业证(UMD毕业证书)如何办理一比一原版马里兰大学毕业证(UMD毕业证书)如何办理
一比一原版马里兰大学毕业证(UMD毕业证书)如何办理
9lq7ultg
 
NHL Stenden University of Applied Sciences Diploma Degree Transcript
NHL Stenden University of Applied Sciences Diploma Degree TranscriptNHL Stenden University of Applied Sciences Diploma Degree Transcript
NHL Stenden University of Applied Sciences Diploma Degree Transcript
lhtvqoag
 
按照学校原版(UIUC文凭证书)伊利诺伊大学|厄巴纳-香槟分校毕业证快速办理
按照学校原版(UIUC文凭证书)伊利诺伊大学|厄巴纳-香槟分校毕业证快速办理按照学校原版(UIUC文凭证书)伊利诺伊大学|厄巴纳-香槟分校毕业证快速办理
按照学校原版(UIUC文凭证书)伊利诺伊大学|厄巴纳-香槟分校毕业证快速办理
kuapy
 
一比一原版布兰登大学毕业证(BU毕业证书)如何办理
一比一原版布兰登大学毕业证(BU毕业证书)如何办理一比一原版布兰登大学毕业证(BU毕业证书)如何办理
一比一原版布兰登大学毕业证(BU毕业证书)如何办理
wkip62b
 
Graphic Design Tools and Software .pptx
Graphic Design Tools and Software   .pptxGraphic Design Tools and Software   .pptx
Graphic Design Tools and Software .pptx
Virtual Real Design
 
NHR Engineers Portfolio 2023 2024 NISHANT RATHI
NHR Engineers Portfolio 2023 2024 NISHANT RATHINHR Engineers Portfolio 2023 2024 NISHANT RATHI
NHR Engineers Portfolio 2023 2024 NISHANT RATHI
NishantRathi18
 
LGBTQIA Pride Month presentation Template
LGBTQIA Pride Month presentation TemplateLGBTQIA Pride Month presentation Template
LGBTQIA Pride Month presentation Template
DakshGudwani
 
Divertidamente SLIDE.pptxufururururuhrurid8dj
Divertidamente SLIDE.pptxufururururuhrurid8djDivertidamente SLIDE.pptxufururururuhrurid8dj
Divertidamente SLIDE.pptxufururururuhrurid8dj
lunaemel03
 
Discovering the Best Indian Architects A Spotlight on Design Forum Internatio...
Discovering the Best Indian Architects A Spotlight on Design Forum Internatio...Discovering the Best Indian Architects A Spotlight on Design Forum Internatio...
Discovering the Best Indian Architects A Spotlight on Design Forum Internatio...
Designforuminternational
 
一比一原版马来西亚世纪大学毕业证成绩单一模一样
一比一原版马来西亚世纪大学毕业证成绩单一模一样一比一原版马来西亚世纪大学毕业证成绩单一模一样
一比一原版马来西亚世纪大学毕业证成绩单一模一样
k4krdgxx
 
一比一原版(Vancouver毕业证书)温哥华岛大学毕业证如何办理
一比一原版(Vancouver毕业证书)温哥华岛大学毕业证如何办理一比一原版(Vancouver毕业证书)温哥华岛大学毕业证如何办理
一比一原版(Vancouver毕业证书)温哥华岛大学毕业证如何办理
ijk38lw
 
AHMED TALAAT ARCHITECTURE PORTFOLIO .pdf
AHMED TALAAT ARCHITECTURE PORTFOLIO .pdfAHMED TALAAT ARCHITECTURE PORTFOLIO .pdf
AHMED TALAAT ARCHITECTURE PORTFOLIO .pdf
talaatahm
 
Introduction to User experience design for beginner
Introduction to User experience design for beginnerIntroduction to User experience design for beginner
Introduction to User experience design for beginner
ellemjani
 
Practical eLearning Makeovers for Everyone
Practical eLearning Makeovers for EveryonePractical eLearning Makeovers for Everyone
Practical eLearning Makeovers for Everyone
Bianca Woods
 

Recently uploaded (20)

Manual ISH (International Society of Hypertension)
Manual ISH (International Society of Hypertension)Manual ISH (International Society of Hypertension)
Manual ISH (International Society of Hypertension)
 
哪里办理美国中央华盛顿大学毕业证双学位证书原版一模一样
哪里办理美国中央华盛顿大学毕业证双学位证书原版一模一样哪里办理美国中央华盛顿大学毕业证双学位证书原版一模一样
哪里办理美国中央华盛顿大学毕业证双学位证书原版一模一样
 
International Upcycling Research Network advisory board meeting 4
International Upcycling Research Network advisory board meeting 4International Upcycling Research Network advisory board meeting 4
International Upcycling Research Network advisory board meeting 4
 
ARENA - Young adults in the workplace (Knight Moves).pdf
ARENA - Young adults in the workplace (Knight Moves).pdfARENA - Young adults in the workplace (Knight Moves).pdf
ARENA - Young adults in the workplace (Knight Moves).pdf
 
Heuristics Evaluation - How to Guide.pdf
Heuristics Evaluation - How to Guide.pdfHeuristics Evaluation - How to Guide.pdf
Heuristics Evaluation - How to Guide.pdf
 
一比一原版亚利桑那大学毕业证(UA毕业证书)如何办理
一比一原版亚利桑那大学毕业证(UA毕业证书)如何办理一比一原版亚利桑那大学毕业证(UA毕业证书)如何办理
一比一原版亚利桑那大学毕业证(UA毕业证书)如何办理
 
一比一原版马里兰大学毕业证(UMD毕业证书)如何办理
一比一原版马里兰大学毕业证(UMD毕业证书)如何办理一比一原版马里兰大学毕业证(UMD毕业证书)如何办理
一比一原版马里兰大学毕业证(UMD毕业证书)如何办理
 
NHL Stenden University of Applied Sciences Diploma Degree Transcript
NHL Stenden University of Applied Sciences Diploma Degree TranscriptNHL Stenden University of Applied Sciences Diploma Degree Transcript
NHL Stenden University of Applied Sciences Diploma Degree Transcript
 
按照学校原版(UIUC文凭证书)伊利诺伊大学|厄巴纳-香槟分校毕业证快速办理
按照学校原版(UIUC文凭证书)伊利诺伊大学|厄巴纳-香槟分校毕业证快速办理按照学校原版(UIUC文凭证书)伊利诺伊大学|厄巴纳-香槟分校毕业证快速办理
按照学校原版(UIUC文凭证书)伊利诺伊大学|厄巴纳-香槟分校毕业证快速办理
 
一比一原版布兰登大学毕业证(BU毕业证书)如何办理
一比一原版布兰登大学毕业证(BU毕业证书)如何办理一比一原版布兰登大学毕业证(BU毕业证书)如何办理
一比一原版布兰登大学毕业证(BU毕业证书)如何办理
 
Graphic Design Tools and Software .pptx
Graphic Design Tools and Software   .pptxGraphic Design Tools and Software   .pptx
Graphic Design Tools and Software .pptx
 
NHR Engineers Portfolio 2023 2024 NISHANT RATHI
NHR Engineers Portfolio 2023 2024 NISHANT RATHINHR Engineers Portfolio 2023 2024 NISHANT RATHI
NHR Engineers Portfolio 2023 2024 NISHANT RATHI
 
LGBTQIA Pride Month presentation Template
LGBTQIA Pride Month presentation TemplateLGBTQIA Pride Month presentation Template
LGBTQIA Pride Month presentation Template
 
Divertidamente SLIDE.pptxufururururuhrurid8dj
Divertidamente SLIDE.pptxufururururuhrurid8djDivertidamente SLIDE.pptxufururururuhrurid8dj
Divertidamente SLIDE.pptxufururururuhrurid8dj
 
Discovering the Best Indian Architects A Spotlight on Design Forum Internatio...
Discovering the Best Indian Architects A Spotlight on Design Forum Internatio...Discovering the Best Indian Architects A Spotlight on Design Forum Internatio...
Discovering the Best Indian Architects A Spotlight on Design Forum Internatio...
 
一比一原版马来西亚世纪大学毕业证成绩单一模一样
一比一原版马来西亚世纪大学毕业证成绩单一模一样一比一原版马来西亚世纪大学毕业证成绩单一模一样
一比一原版马来西亚世纪大学毕业证成绩单一模一样
 
一比一原版(Vancouver毕业证书)温哥华岛大学毕业证如何办理
一比一原版(Vancouver毕业证书)温哥华岛大学毕业证如何办理一比一原版(Vancouver毕业证书)温哥华岛大学毕业证如何办理
一比一原版(Vancouver毕业证书)温哥华岛大学毕业证如何办理
 
AHMED TALAAT ARCHITECTURE PORTFOLIO .pdf
AHMED TALAAT ARCHITECTURE PORTFOLIO .pdfAHMED TALAAT ARCHITECTURE PORTFOLIO .pdf
AHMED TALAAT ARCHITECTURE PORTFOLIO .pdf
 
Introduction to User experience design for beginner
Introduction to User experience design for beginnerIntroduction to User experience design for beginner
Introduction to User experience design for beginner
 
Practical eLearning Makeovers for Everyone
Practical eLearning Makeovers for EveryonePractical eLearning Makeovers for Everyone
Practical eLearning Makeovers for Everyone
 

Architecture Portfolio Sample

  • 1. RAFAELA AHSAN Portfolio Sample | 2020 rafaela.ahsan@gmail.com +31 643703131
  • 2. 2 Synergistic Heterogeneity Housing for Temporary Migrants in India Nalasopara, Maharshtra, India Master’s Thesis, TU Delft
  • 3. 3 Tectonic Copyright2007 Tectonic Copyright2007 Tectonic Copyright2007 Tectonic Copyright2007 Tectonic Copyright2007Tectonic Copyright2007 Tectonic Copyright2007 27-40 Middle Class Units 4-5 Amenities/Businesses 8-11 Migrant Rental Units 75, 384, 000 INR 30% 75, 400, 000 INR 109, 450, 000 INR 75, 384, 000 INR 30% 75, 400, 000 INR 109, 450, 000 INR 75, 384, 000 INR 30% 75, 400, 000 INR 109, 450, 000 INR Construction Cost Sales Total at Break Even Sales Total at Market Prices Savings off Market Prices 75, 384, 000 INR 30% 75, 400, 000 INR 109, 450, 000 INR 75, 384, 000 INR 30% 75, 400, 000 INR 109, 450, 000 INR 75, 384, 000 INR 30% 75, 400, 000 INR 109, 450, 000 INR 75, 384, 000 INR 30% 75, 400, 000 INR 109, 450, 000 INR Each group is given spaces suited to their needs. Middle class dwellings are located in towers,givingeachfamily privacy with minimal space for interaction. The migrants are located on the ‘street’, allowing them to spill out into more familiar and social surroundings. Groups are able to coexist without forced interaction. Section Through Square Ground Floor First Floor Second Floor
  • 4. 4 300 300 200 CERAMIC FLOOR TILE SCREED 200 mm THK REINFORCED CONCRETE FILLER SLAB FILLER: CLAY POT STEEL ANGLE LINTEL W/ DRIP EDGE ADJUSTABLE TIMBER LOUVER HALF DOOR GLASS PANEL TOP LEAF 100 mm THK REINFORCED CONCRETE PLATFORM CEMENT, SLOPED MOSAIC FLOOR TILE FINISH, BROKEN/WASTE TILE SCREED CERAMIC FLOOR TILE 200 mm THK REINFORCED CONCRETE SLAB 300 mm THK REINFORCED CONCRETE TUB FOUNDATION RECYCLED CONCRETE PAVERS, PERMEABLE CONCRETE STRIP FOOTING Ø 100 mm DRAINAGE PIPE 75 mm FLY ASH BRICK SKIRTING RAINWATER STORAGE 1500 Construction is kept simple — fly ash bricks compose the main building material with a reinforced concrete infill. Floor slabs are either clay pot slabs and hollow core slabs to reduce concrete and weight. Water is collected and stored underneath in the foundation. Lastly, the buildings are raised to prevent flooding. Hollow core slab in tower units Broken tile mosaic finish for waterproofing Clay pot slab Awning windows Gutter for drainage and water storage Jali for privacy & ventilation Dutch doors for live/work flexibility Tub foundation for water storage “Street” social space for migrant workers Fly-Ash brick as main structural material Raised platform for flood proofing Foundation & Ground Floor DetailConstruction Axo
  • 5. 5 Model - Medium Square Model - Temple Courtyard Public and open spaces come in three sizes: small, medium and large. Smaller spaces foster more intimate social interactions, while larger open spaces can host a variety of events, larger business/amenity spaces, places for prayer and playgrounds. The colour and material palette is kept simple—residents are encouraged to make the spaces their own. Social “Street” Medium Open Space with Temple Market Square
  • 6. 6 ourHaus sustainable community living Old Ottawa East, Ottawa, Canada In collaboration with Rachel Rodd Studio 6, Carleton University 1 ourHaus, a multi-unit residential development tackles the challenge of densification on an irregularly-shaped urban infill site while also giving back to the community at large. The complex focuses on the key concepts of sustainable community-centred living, taking cues from One Planet Communities and Passive House design.
  • 7. 7 Alargeportionofthecomplexisorientedsouth in order to maximize on solar heat gain. A solar wall heats air and distributes it throughout the complex. Residents were grouped according to proximity to the highway and views of the Rideau Canal. Key features: Solar Wall- preheats air to be used to heat the building using solar thermal energy Buffer Zone that acts as balcony space and reduces heating/cooling costs CLT floors & steel column hybrid construction- using local, renewable, recyclable materials Green Roofs on two buildings Sustainability Education Centre for the public Penthouse amenity space showcases CLT construction and has views to the canal Communal dining areas for each group of residents
  • 8. 8 Professional Work Architectural Assistant, 2015-2016 KPMB Architects, Toronto Project: Girls’ Private School in Manhattan Duringmy10-monthco-op placementatKPMBArchitects, I worked on a single project, a girls’ K-12 private school in Manhattan. Some of the tasks I was responsible for include rendering interior and exterior project views, modelling the Auditorium in Revit, creating sketches for consultants, and modelling the auditorium in the existing building and proposed changes using Point Cloud data. All visuals are my own work.
  • 9. 9 LEVEL 6M 127' ‐ 8 1/4" LEVEL 8 153' ‐ 8 1/4" Level 7 138' ‐ 1 1/4" LEVEL 6S 117' ‐ 10 1/4" SPIRALIFT FIXED STAGE ADJ. STAGE WALK RAMP A RAMP B RAMP C FIXED 23' ‐ 6 1/4" 9' ‐ 0 1/8" 3' ‐ 9" 14' ‐ 5 1/2" 11' ‐ 11 1/2" 12' ‐ 4 1/8" 20' ‐ 1 1/4" LEVEL 6M 127' ‐ 8 1/4" LEVEL 8 153' ‐ 8 1/4" Level 7 138' ‐ 1 1/4" LEVEL 6S 117' ‐ 10 1/4" SPIRALIFT FIXED STAGE ADJ. STAGE WALK RAMP A RAMP B RAMP C FIXED 23' ‐ 6 1/4" 9' ‐ 0 1/8" 3' ‐ 9" 14' ‐ 5 1/2" 11' ‐ 11 1/2" 12' ‐ 4 1/8" 20' ‐ 1 1/4" 322 King St W, 3rd Fl, Toronto, ON, Canada M5V 1J2 416.977.5104 KPMB Architects 1/8" = 1'-0" The Brearley School - 590 L6 RAMP FLOOR DETAIL 2015.11.03 AUDITORIUM SECTION (RAKED) Detail 1:15 AUDITORIUM SECTION (RAKED) Detail Stage Up LEVEL 6M 127' ‐ 8 1/4" LEVEL 8 153' ‐ 8 1/4" Level 7 138' ‐ 1 1/4" LEVEL 6S 117' ‐ 10 1/4" SPIRALIFT FIXED STAGE ADJ. STAGE WALK RAMP A RAMP B RAMP C FIXED 23' ‐ 6 1/4" 9' ‐ 0 1/8" 3' ‐ 9" 14' ‐ 5 1/2" 11' ‐ 11 1/2" 12' ‐ 4 1/8" 20' ‐ 1 1/4" LEVEL 6M 127' ‐ 8 1/4" LEVEL 8 153' ‐ 8 1/4" Level 7 138' ‐ 1 1/4" LEVEL 6S 117' ‐ 10 1/4" SPIRALIFT FIXED STAGE ADJ. STAGE WALK RAMP A RAMP B RAMP C FIXED 23' ‐ 6 1/4" 9' ‐ 0 1/8" 3' ‐ 9" 14' ‐ 5 1/2" 11' ‐ 11 1/2" 12' ‐ 4 1/8" 20' ‐ 1 1/4" 322 King St W, 3rd Fl, Toronto, ON, Canada M5V 1J2 416.977.5104 KPMB Architects 1/8" = 1'-0" The Brearley School - 590 L6 RAMP FLOOR DETAIL 2015.11.03 AUDITORIUM SECTION (RAKED) Detail 1:15 AUDITORIUM SECTION (RAKED) Detail Stage Up UP UPDN DN UP 322 King St W, 3rd Fl, Toronto, ON, Canada M5V 1J2 416.977.5104 KPMB Architects 1" = 20'-0" AUDITORIUM- EXISTING PLANSThe Brearley School - 610 10/05/15 Deck B_Existing Auditorium Deck A‐Existing Auditorium 322 King St W, 3rd Fl, Toronto, ON, Canada M5V 1J2 416.977.5104 KPMB Architects The Brearley School - 610 Deck A‐NDeck B_Theater Round 201 SEATS 18 SEATS Level1 39' ‐ 11" Deck A 27' ‐ 1" Deck B 14' ‐ 3" 322 King St W, 3rd Fl, Toronto, ON, Canada M5V 1J2 416.977.5104 KPMB Architects 1/8" = 1'-0" BLACK BOX THEATER IN THE ROUND SECTIONSThe Brearley School - 610 10/13/15 Above: Moving floor sketches for theatre consultants Below: Proposed Auditorium, Orchestra layout, new school Below: Black Box Theatre, previously the auditorium in existing school Above:Conversionofexistingauditoriumtoablackboxtheatre,oneofthreeconfigurations
  • 10. 10 DN UP DN REF.REF. REF. 4 3 2 1 A B C D E 1 A‐421 ‐ ‐ 2 A‐500 4 A‐500 4 A‐501 ‐ ‐‐‐ A‐4002 A‐401 2 ‐ ‐ ‐ ‐‐‐ ‐ ‐‐‐ 3.9 D.9 3 A‐111 P‐515 2 A‐811 3 12 680 SF CHEMISTRY LAB 1015 739 SF BIOLOGY LAB 1016 23' ‐ 3 3/4" 21' ‐ 8 3/8" A‐812 1 A‐815 2 A‐815 A‐815 5 A‐852 5 A‐818 8 A‐81810 9 A‐818 1314 11 12 A‐401 3 ‐ ‐‐‐ 4 A‐502 6 A‐502 ‐ ‐‐‐ A‐8142 1 3 A‐814 7 6 4 A‐815 41 3 A‐814 10 9 8 8 9 7 6 ‐ ‐ ‐‐ 429 SF PREP ROOM/STORAGE 1007 260 SF ADVANCED RESEARCH 1010 689 SF SCIENCE LAB (III/IV/MS/US) 1011 164 SF WC 1008 Copyright is that of the Architect. Any version of this drawing reproduced by any means from any media without prior written approval of the Architect is to be read for information only. The Architect is not liable for any loss or distortion of information resulting from subsequent reproduction of the original drawing. SCALE PROJECT NO. ISSUE DATE GENERAL NOTES: 1. Drawings are not to be scaled. Contractor will verify all existing conditions and dimensions required to perform the Work and will report any discrepancies with the Contract Documents to the Architect before commencing work. 2. The Architectural Drawings are to be read in conjunction with all other Contract Documents including the Project Manuals and the Structural, Mechanical and Electrical Drawings. In cases of difference between the Consultants' documents with respect to the quantity, sizes or scope of work, the greater shall apply. 3. Positions of exposed or finished Mechanical or Electrical devices, fittings and fixtures are indicated on the Architectural Drawings. Locations shown on the Architectural Drawings shall govern over Mechanical and Electrical Drawings. Mechanical and Electrical items not clearly located will be located as directed by the Architect. 4. Dimensions indicated are taken between the faces of finished surfaces unless otherwise noted. 5. The architect has not been retained for supervision of construction and assumes no responsibility for means, methods and techniques of construction. 6. These documents are not to be used for construction unless specifically noted for such purpose. Project North True North Rev. Date Issued KPMB Architects 322 King St W, 3rd Fl Toronto, ON, Canada M5V 1J2 416 977 5104 .00 1/4" = 1'-0" A- 822 LEVEL 10 FLOOR PLAN 1455 2016.02.29 The Brearley School - 590 590 East 83rd Street, NY, New York The project hit a tough point when a cantilever with a large portion of the program was removed. We were given a week to propose the new design changes, given the addition of two extra floors. I was tasked with the layout of the science floors. The following are the drawings I produced within two days o f the change. The initial layout was approved, with additional changes being made later on to accomodate the loss of program on other levels.