Overview
 At first, Apple Inc. appointed two general contractors : DPR and Skanska in
2013.
 They were fired because of they were unable to come to an agreement
with the revised scope of work.
 The companies are replaced with Rudolph & Sletten and Holder
Construction.
Holder Construction
(General Contractor)
Seele Construction
(Sub-Contractor)
AHC Glass
(Sub-Contractor)
AHC Glass
 AHC is a local company situated in a bay area of Hayward, CA having
more than 20 years of experience in a design, fabrication and construction
of structural glasses.
 They have designed and fabricated materials, they naturally move on to
provide the installation service of the glass and its component.
 Contract: Installation of 350 heavy glasses in apple campus.
 Work started: May 2016
 Status: In progress
The ten
knowledge
areas of
construction
management
Project Integration Management
1
Develop
Project
Charter
2
Develop
Project
Manage-
ment Plan
3
Direct and
Manage
Project
Work
4
Monitor
and
Control
Project
Work
5
Perform
Integrated
Change
Control
6
Close
Project or
Phase
Integration
In 2008, Steve Jobs
thought to construct new
Apple campus, the whole
glass structure.
In 2011 Architectural
design was submitted to
city of Cupertino.
Legal documentation
work completed in 2013.
General Contractors and
Sub Contractors were
appointed.
Two general contractors
were fired and they were
replaced.
Glasses and related
materials to fix the
glasses were
manufactured and
imported by Seele from
Germany.
Seele gave guidelines to
AHC on all glass related
works
AHC experimented
different combination of
teams for different type of
work and finalized the
best teams to deal with
the work suitable to them
The work by AHC started
in May, 2016.
Project Scope
Management
 This knowledge area involves the
project scope, that is, the work that is
included within the project.
 Plan Scope Management
 Collect Requirements
 Define Scope
 Create WBS
 Validate Scope
 Control Scope
Scope
 Study the requirements presented by Apple Inc.
 Work according to the guidelines provided by Seele.
 Installation of all the 350 glasses within estimated time as well as in
budget.
 Work with 100% accuracy.
 Safety is the first.
 To achieve the scope,
 Various combinations of team.
 3 teams in operation : Installation of glasses, Caulking Process, Quality
Assurance
 Instant communication on completion of tasks and getting confirmation.
Work Breakdown Structure
AHC
Starting Phase
Define Scope
Identifying
resources
Appoint Project
Team
Storage space
for glass
Equipment
Arranging
Gantry Crane
Arranging
Lowboy Trailer
Arranging
Vacuum Glass
Lifter
Safety signs
Glass Work
Bottom Rail
Installation
Alignment
Measurement
Top Rail
Installation
Alignment
Measurement
Glass
installation
Adjusting Glass
Caulking
Final
measurement
Quality
Quality check
by AHC
Quality check
by Seele
Quality Check
by Holder
Quality check
by Apple Inc.
Communication
Assigning tasks
Reporting of
completed work
Getting
Confirmation
Punchlist
Site Clearance
Final Review
Project Time
Management
 This is usually the most time
consuming of the knowledge areas.
 During planning, the project manager
must divide the project into tasks and
create both a schedule (start and finish
dates for each task) and budget for
each task.
 Plan Schedule Management
 Define Activities
 Sequence Activities
 Estimate Activity Resources
 Estimate Activity Durations
 Develop Schedule
 Control Schedule
Project Time Management
 DPR and SKANSKA were fired by Apple and Apple hired new Company.
 Delay in construction and interior work, because of this AHC faced
problem in starting their work.
 Time increased due to changing of all glass door handles.
 Resources-Top Rail-Bottom Rail-Glass Fitting(2 days)-Site clearance.
 It takes 1-2 days to fit the glass.
 They review the progress every weekly.
 To manage scheduling problem, Employees are still working for 12 hours
since last 8 months.
Project Cost
Management
 The project budget is usually one of
the most sensitive parts of a project.
 Plan Cost Management
 Estimate Costs
 Determine Budget
 Control Costs
Project Cost
Management
 The budget for the glass:- 6 million.
 Around 17% of budget is for equipment.
 Major expanse is for gantry Crane(50-
50).
 They also make a cost-benefit graph.
 Over budgeting due to error in
estimation.
 Cost increased because 45 glasses
were damage and because of increased
rate of rental machinery due to error in
scheduling.
Project Quality
Management
 Quality is one of the triple constraints
of Time, Cost, and Quality. As such,
when you need better quality you need
to put in more time or cost.
 Plan Quality Management
 Perform Quality Assurance
 Control Quality
 Quality work checking by following authorities
 AHC glass inc.
 Seele Company.
 Holder Company.
 Apple (Randomly).
 The typical glass have 1/8 inch tolerance but apple
demanded THE 1/32 inch tolerance.
 The gap :- 5 mm (< 1mm allowable).
 Glass work- Noise(ITU-R 468 noise weighting).
 Even worker wear gloves to touch the material
which we can touch without gloves.
Project Quality
Management
Project Human
Resource
Management
 The Project team is usually one of the
most important factors in the success
of a project.
 If you have a good team, you will have
a successful project. This knowledge
area is concerned with acquiring the
right team, ensuring their satisfaction,
and tracking their performance.
 Plan Human Resource Management
 Acquire Project Team
 Develop Project Team
 Manage Project Team
 15-16 members.
 20 members team for Apple Campus 2 at site.
 Different Combination – Final Team on base on output.
 Seele taught the worker of AHC.
 4 Manager.
 Site Manager.
 Safety Manager.
 Project Manager.
 Project Co-ordinater.
 4 types of labours
 Apparatus
 Journey Man
 Lead Man
 Forman
Project Human
Resource
Management
Material Management
 Warehouse 1:- AHC warehouse(5000 sf).
 Warehouse 2:- 3 time larger than AHC one.
 Equipment:-
 Lowboy Trailer.
 Gantry Truck.
 Gang Box.
 Vacuum Glass Lifter.
 Laser Machine for alignment.
Project
Communication
Management
 Communication with stakeholders is
often the key factor that allows
stakeholders to be satisfied even when
unexpected changes happen.
 It is essential to develop
communication plan to keep all
stakeholders “in the loop” throughout
the project and communicate early and
often when unexpected issues occur.
 Plan Communications Management
 Manage Communications
 Control Communications
Project Communication Management
 Email through.
 Report within 5 min of the completion of work.
 Quality Check at the same day of completion (by 3 members).
 Weekly and Monthly Meetings.
 Walkie Talkie communication while construction.
 Develop software(Park-2.0) to cumulate the work process.
 Daily schedules-Whatsapp-Email-Text.
Project Risk
Management
 Managing project risk is one of the
most underrated aspects of project
management. Major risk are very
seldom identified up front and analyzed
within the project management plan,
but when they are project stakeholders
tend to forgive the unexpected issues
much quicker.
 Plan Risk Management
 Identify Risks
 Perform Qualitative Risk Analysis
 Perform Quantitative Risk Analysis
 Plan Risk Responses
 Control Risks
Project Risk Management
 Handling of Vacuum Glass Lifter
(Weight-limited space).
 Safety risk for material and man
power(45- glass damaged).
 It’s challenging when you’re doing
first-of’s.
 They certainly have a lot more
schedule and cost risk associated
with them.
Project
Procurement
Management
 Almost all projects have some form
of outside procurement. Hiring
subcontractors can get the job done
quicker or with better expertise but
sacrifices the ability to control the
quality, schedule, or other factors.
 Plan Procurement Management
 Conduct Procurements
 Control Procurements
 Close Procurements
 Procurement for machinery from another company
 Procurement for glass which they are getting from Germany
 Procurement for safety
Project
Stakeholder
Management
 There is nothing more important than
the project’s stakeholders.
 You could, in theory, declare a project
a success if the stakeholders are
satisfied but the project was a disaster
if the stake holders are not satisfied.
 The stakeholders should be actively
managed and addressed within the
project management plan.
 Identify Stakeholders
 Plan Stakeholder Management
 Manage Stakeholder Engagement
 Control Stakeholder Engagement
Project Stakeholder Management
 Apple-Monthly meeting.
 Holder-Monthly meeting.
 Seele- weekly meeting.
 Also workers was taught for
new technique.
Delivery Methods
 AHC – Design Bid Built.
Constructor:- Unite Price
Apple
Foster &
Partner
Holder
Seele
AHC
Glass Inc.
Organization Structure
 Balanced Matrix Organization Structure
Seele Manager 1 Seele Manager 2 Seele Manager 3
Holder Manager 1 AHC Manager AHC Manager AHC Manager
Holder Manager 2 AHC Manager AHC Manager AHC Manager
Thank You

More Related Content

What's hot

maxxi construction
maxxi constructionmaxxi construction
maxxi constructionkedai hantu
 
Hearst Tower
Hearst TowerHearst Tower
Hearst Towermisschand
 
warm and humid climate
warm and humid climatewarm and humid climate
warm and humid climateDhvaniR2
 
AL BAHR - an intelligent building of ABU DHABI.
AL BAHR - an intelligent building of ABU DHABI.AL BAHR - an intelligent building of ABU DHABI.
AL BAHR - an intelligent building of ABU DHABI.Sajida Shah
 
High-tech Architecture
High-tech ArchitectureHigh-tech Architecture
High-tech ArchitectureKhaled Almusa
 
Joseph allen stein
Joseph allen steinJoseph allen stein
Joseph allen steingaurav bhatt
 
The Louvre Abu Dhabi (Museum)
The Louvre Abu Dhabi (Museum)The Louvre Abu Dhabi (Museum)
The Louvre Abu Dhabi (Museum)Osama Bodiaf
 
Chicago School of Architecture
Chicago School of ArchitectureChicago School of Architecture
Chicago School of ArchitectureAndhra University
 
Ar raj rewal, regionalism
Ar raj rewal, regionalismAr raj rewal, regionalism
Ar raj rewal, regionalismVISHAKA BOTHRA
 
le corbusier principles
le corbusier principlesle corbusier principles
le corbusier principleskunal singh
 
Johnson wax headquaters, architectural presentation
Johnson  wax  headquaters, architectural presentationJohnson  wax  headquaters, architectural presentation
Johnson wax headquaters, architectural presentationShahnaz Parvin
 
Inference from case studies for designing ISBT
Inference from case studies for designing ISBTInference from case studies for designing ISBT
Inference from case studies for designing ISBTMridul Bhandari
 
Courtyard Effect (passive cooling technique)
Courtyard Effect (passive cooling technique)Courtyard Effect (passive cooling technique)
Courtyard Effect (passive cooling technique)Drishty Ranjit
 
Buoyant foundation
Buoyant foundationBuoyant foundation
Buoyant foundationParth Patil
 

What's hot (20)

maxxi construction
maxxi constructionmaxxi construction
maxxi construction
 
Hearst Tower
Hearst TowerHearst Tower
Hearst Tower
 
warm and humid climate
warm and humid climatewarm and humid climate
warm and humid climate
 
AL BAHR - an intelligent building of ABU DHABI.
AL BAHR - an intelligent building of ABU DHABI.AL BAHR - an intelligent building of ABU DHABI.
AL BAHR - an intelligent building of ABU DHABI.
 
The edge.pptx
The edge.pptxThe edge.pptx
The edge.pptx
 
High rise
High rise High rise
High rise
 
High-tech Architecture
High-tech ArchitectureHigh-tech Architecture
High-tech Architecture
 
Joseph allen stein
Joseph allen steinJoseph allen stein
Joseph allen stein
 
Zaha hadid
Zaha hadidZaha hadid
Zaha hadid
 
The Louvre Abu Dhabi (Museum)
The Louvre Abu Dhabi (Museum)The Louvre Abu Dhabi (Museum)
The Louvre Abu Dhabi (Museum)
 
IIM, Ahmedabad.
IIM, Ahmedabad.IIM, Ahmedabad.
IIM, Ahmedabad.
 
Chicago School of Architecture
Chicago School of ArchitectureChicago School of Architecture
Chicago School of Architecture
 
Daniel libeskind
Daniel libeskindDaniel libeskind
Daniel libeskind
 
Ar raj rewal, regionalism
Ar raj rewal, regionalismAr raj rewal, regionalism
Ar raj rewal, regionalism
 
le corbusier principles
le corbusier principlesle corbusier principles
le corbusier principles
 
Johnson wax headquaters, architectural presentation
Johnson  wax  headquaters, architectural presentationJohnson  wax  headquaters, architectural presentation
Johnson wax headquaters, architectural presentation
 
Inference from case studies for designing ISBT
Inference from case studies for designing ISBTInference from case studies for designing ISBT
Inference from case studies for designing ISBT
 
Courtyard Effect (passive cooling technique)
Courtyard Effect (passive cooling technique)Courtyard Effect (passive cooling technique)
Courtyard Effect (passive cooling technique)
 
Buoyant foundation
Buoyant foundationBuoyant foundation
Buoyant foundation
 
THESIS GREEN BUILDING
THESIS GREEN BUILDINGTHESIS GREEN BUILDING
THESIS GREEN BUILDING
 

Similar to Apple campus 2 Project management

ACHAL_JOSHI_Academic_Profile
ACHAL_JOSHI_Academic_ProfileACHAL_JOSHI_Academic_Profile
ACHAL_JOSHI_Academic_ProfileACHAL JOSHI
 
Introduction to Project Management
Introduction to Project ManagementIntroduction to Project Management
Introduction to Project ManagementAbbas Ali
 
Project Management ORION Systems
Project Management ORION SystemsProject Management ORION Systems
Project Management ORION Systemsreeza fazily
 
Critical Chain Basics
Critical Chain BasicsCritical Chain Basics
Critical Chain BasicsJakub Linhart
 
Northern Finishing School: IT Project Managment
Northern Finishing School: IT Project ManagmentNorthern Finishing School: IT Project Managment
Northern Finishing School: IT Project ManagmentSiwawong Wuttipongprasert
 
Project Management Framework
Project Management FrameworkProject Management Framework
Project Management FrameworkRahul Sudame
 
Lci la chapter lean intro 071410 no pics
Lci la chapter lean intro 071410 no picsLci la chapter lean intro 071410 no pics
Lci la chapter lean intro 071410 no picshaganone
 
Creek Vista Marine FARAAZ KHAN WORK Report.docx
Creek Vista Marine FARAAZ KHAN WORK Report.docxCreek Vista Marine FARAAZ KHAN WORK Report.docx
Creek Vista Marine FARAAZ KHAN WORK Report.docxZiyad Zaidi
 
Project Management For The Curious
Project Management For The CuriousProject Management For The Curious
Project Management For The Curiousdwhelbourn
 
Agile Methods: Fact or Fiction
Agile Methods: Fact or FictionAgile Methods: Fact or Fiction
Agile Methods: Fact or FictionMatt Ganis
 
Gyasi Brown Resume 6-8-16
Gyasi Brown Resume 6-8-16Gyasi Brown Resume 6-8-16
Gyasi Brown Resume 6-8-16Gyasi Brown
 
Project presentation - Filing Cabinet Project
Project presentation - Filing Cabinet ProjectProject presentation - Filing Cabinet Project
Project presentation - Filing Cabinet ProjectMichal Harcej
 
The project plan
The project planThe project plan
The project planVatsalaPG
 
Assignment 3 Project PerformanceDue Week 8 and worth 150 .docx
Assignment 3 Project PerformanceDue Week 8 and worth 150 .docxAssignment 3 Project PerformanceDue Week 8 and worth 150 .docx
Assignment 3 Project PerformanceDue Week 8 and worth 150 .docxbraycarissa250
 

Similar to Apple campus 2 Project management (20)

William Richards
William RichardsWilliam Richards
William Richards
 
ACHAL_JOSHI_Academic_Profile
ACHAL_JOSHI_Academic_ProfileACHAL_JOSHI_Academic_Profile
ACHAL_JOSHI_Academic_Profile
 
Introduction to Project Management
Introduction to Project ManagementIntroduction to Project Management
Introduction to Project Management
 
Project Management ORION Systems
Project Management ORION SystemsProject Management ORION Systems
Project Management ORION Systems
 
Critical Chain Basics
Critical Chain BasicsCritical Chain Basics
Critical Chain Basics
 
Northern Finishing School: IT Project Managment
Northern Finishing School: IT Project ManagmentNorthern Finishing School: IT Project Managment
Northern Finishing School: IT Project Managment
 
Project Management Framework
Project Management FrameworkProject Management Framework
Project Management Framework
 
Lci la chapter lean intro 071410 no pics
Lci la chapter lean intro 071410 no picsLci la chapter lean intro 071410 no pics
Lci la chapter lean intro 071410 no pics
 
Adaptive Management
Adaptive ManagementAdaptive Management
Adaptive Management
 
Risk Management
Risk ManagementRisk Management
Risk Management
 
Creek Vista Marine FARAAZ KHAN WORK Report.docx
Creek Vista Marine FARAAZ KHAN WORK Report.docxCreek Vista Marine FARAAZ KHAN WORK Report.docx
Creek Vista Marine FARAAZ KHAN WORK Report.docx
 
Cms solution 08072010
Cms solution 08072010Cms solution 08072010
Cms solution 08072010
 
Project Management For The Curious
Project Management For The CuriousProject Management For The Curious
Project Management For The Curious
 
Pm fundamentals
Pm fundamentalsPm fundamentals
Pm fundamentals
 
Agile Methods: Fact or Fiction
Agile Methods: Fact or FictionAgile Methods: Fact or Fiction
Agile Methods: Fact or Fiction
 
Gyasi Brown Resume 6-8-16
Gyasi Brown Resume 6-8-16Gyasi Brown Resume 6-8-16
Gyasi Brown Resume 6-8-16
 
Project presentation - Filing Cabinet Project
Project presentation - Filing Cabinet ProjectProject presentation - Filing Cabinet Project
Project presentation - Filing Cabinet Project
 
The project plan
The project planThe project plan
The project plan
 
Assignment 3 Project PerformanceDue Week 8 and worth 150 .docx
Assignment 3 Project PerformanceDue Week 8 and worth 150 .docxAssignment 3 Project PerformanceDue Week 8 and worth 150 .docx
Assignment 3 Project PerformanceDue Week 8 and worth 150 .docx
 
Dave Parta sipm resume 2017 11 15
Dave Parta sipm resume 2017 11 15Dave Parta sipm resume 2017 11 15
Dave Parta sipm resume 2017 11 15
 

Recently uploaded

The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...ranjana rawat
 
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Christo Ananth
 
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCollege Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCall Girls in Nagpur High Profile
 
UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its PerformanceUNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performancesivaprakash250
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Dr.Costas Sachpazis
 
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Christo Ananth
 
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSAPPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSKurinjimalarL3
 
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordCCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordAsst.prof M.Gokilavani
 
KubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlyKubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlysanyuktamishra911
 
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)Suman Mia
 
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
Introduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxIntroduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxupamatechverse
 
Microscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxMicroscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxpurnimasatapathy1234
 
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and workingUNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and workingrknatarajan
 
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Call Girls in Nagpur High Profile
 
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Serviceranjana rawat
 

Recently uploaded (20)

The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
 
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
 
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCollege Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
 
UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its PerformanceUNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performance
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
 
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
 
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
 
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSAPPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
 
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordCCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
 
Roadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and RoutesRoadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and Routes
 
KubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlyKubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghly
 
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
 
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
 
Introduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxIntroduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptx
 
Microscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxMicroscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptx
 
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
 
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and workingUNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
 
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
 
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
 

Apple campus 2 Project management

  • 1. TEXAS A&M UNIVERSITY- KINGSVILLE CEEN 5303 CONSTRUTION MANAGEMENT
  • 2. Apple Campus 2 (The Glass Structure) AVANI BORSADIYA (K00411) ANAND THAKKAR (K00412844) KAVAN TADHANI (K00422582) SHREEKUMAR PATEL (K00411525) SUMIT PATEL (K00411648) PARTH DESAI (K00383385)
  • 3. Overview  At first, Apple Inc. appointed two general contractors : DPR and Skanska in 2013.  They were fired because of they were unable to come to an agreement with the revised scope of work.  The companies are replaced with Rudolph & Sletten and Holder Construction. Holder Construction (General Contractor) Seele Construction (Sub-Contractor) AHC Glass (Sub-Contractor)
  • 4. AHC Glass  AHC is a local company situated in a bay area of Hayward, CA having more than 20 years of experience in a design, fabrication and construction of structural glasses.  They have designed and fabricated materials, they naturally move on to provide the installation service of the glass and its component.  Contract: Installation of 350 heavy glasses in apple campus.  Work started: May 2016  Status: In progress
  • 6. Project Integration Management 1 Develop Project Charter 2 Develop Project Manage- ment Plan 3 Direct and Manage Project Work 4 Monitor and Control Project Work 5 Perform Integrated Change Control 6 Close Project or Phase
  • 7. Integration In 2008, Steve Jobs thought to construct new Apple campus, the whole glass structure. In 2011 Architectural design was submitted to city of Cupertino. Legal documentation work completed in 2013. General Contractors and Sub Contractors were appointed. Two general contractors were fired and they were replaced. Glasses and related materials to fix the glasses were manufactured and imported by Seele from Germany. Seele gave guidelines to AHC on all glass related works AHC experimented different combination of teams for different type of work and finalized the best teams to deal with the work suitable to them The work by AHC started in May, 2016.
  • 8. Project Scope Management  This knowledge area involves the project scope, that is, the work that is included within the project.  Plan Scope Management  Collect Requirements  Define Scope  Create WBS  Validate Scope  Control Scope
  • 9. Scope  Study the requirements presented by Apple Inc.  Work according to the guidelines provided by Seele.  Installation of all the 350 glasses within estimated time as well as in budget.  Work with 100% accuracy.  Safety is the first.  To achieve the scope,  Various combinations of team.  3 teams in operation : Installation of glasses, Caulking Process, Quality Assurance  Instant communication on completion of tasks and getting confirmation.
  • 10. Work Breakdown Structure AHC Starting Phase Define Scope Identifying resources Appoint Project Team Storage space for glass Equipment Arranging Gantry Crane Arranging Lowboy Trailer Arranging Vacuum Glass Lifter Safety signs Glass Work Bottom Rail Installation Alignment Measurement Top Rail Installation Alignment Measurement Glass installation Adjusting Glass Caulking Final measurement Quality Quality check by AHC Quality check by Seele Quality Check by Holder Quality check by Apple Inc. Communication Assigning tasks Reporting of completed work Getting Confirmation Punchlist Site Clearance Final Review
  • 11. Project Time Management  This is usually the most time consuming of the knowledge areas.  During planning, the project manager must divide the project into tasks and create both a schedule (start and finish dates for each task) and budget for each task.  Plan Schedule Management  Define Activities  Sequence Activities  Estimate Activity Resources  Estimate Activity Durations  Develop Schedule  Control Schedule
  • 12. Project Time Management  DPR and SKANSKA were fired by Apple and Apple hired new Company.  Delay in construction and interior work, because of this AHC faced problem in starting their work.  Time increased due to changing of all glass door handles.  Resources-Top Rail-Bottom Rail-Glass Fitting(2 days)-Site clearance.  It takes 1-2 days to fit the glass.  They review the progress every weekly.  To manage scheduling problem, Employees are still working for 12 hours since last 8 months.
  • 13. Project Cost Management  The project budget is usually one of the most sensitive parts of a project.  Plan Cost Management  Estimate Costs  Determine Budget  Control Costs
  • 14. Project Cost Management  The budget for the glass:- 6 million.  Around 17% of budget is for equipment.  Major expanse is for gantry Crane(50- 50).  They also make a cost-benefit graph.  Over budgeting due to error in estimation.  Cost increased because 45 glasses were damage and because of increased rate of rental machinery due to error in scheduling.
  • 15. Project Quality Management  Quality is one of the triple constraints of Time, Cost, and Quality. As such, when you need better quality you need to put in more time or cost.  Plan Quality Management  Perform Quality Assurance  Control Quality
  • 16.  Quality work checking by following authorities  AHC glass inc.  Seele Company.  Holder Company.  Apple (Randomly).  The typical glass have 1/8 inch tolerance but apple demanded THE 1/32 inch tolerance.  The gap :- 5 mm (< 1mm allowable).  Glass work- Noise(ITU-R 468 noise weighting).  Even worker wear gloves to touch the material which we can touch without gloves. Project Quality Management
  • 17. Project Human Resource Management  The Project team is usually one of the most important factors in the success of a project.  If you have a good team, you will have a successful project. This knowledge area is concerned with acquiring the right team, ensuring their satisfaction, and tracking their performance.  Plan Human Resource Management  Acquire Project Team  Develop Project Team  Manage Project Team
  • 18.  15-16 members.  20 members team for Apple Campus 2 at site.  Different Combination – Final Team on base on output.  Seele taught the worker of AHC.  4 Manager.  Site Manager.  Safety Manager.  Project Manager.  Project Co-ordinater.  4 types of labours  Apparatus  Journey Man  Lead Man  Forman Project Human Resource Management
  • 19. Material Management  Warehouse 1:- AHC warehouse(5000 sf).  Warehouse 2:- 3 time larger than AHC one.  Equipment:-  Lowboy Trailer.  Gantry Truck.  Gang Box.  Vacuum Glass Lifter.  Laser Machine for alignment.
  • 20. Project Communication Management  Communication with stakeholders is often the key factor that allows stakeholders to be satisfied even when unexpected changes happen.  It is essential to develop communication plan to keep all stakeholders “in the loop” throughout the project and communicate early and often when unexpected issues occur.  Plan Communications Management  Manage Communications  Control Communications
  • 21. Project Communication Management  Email through.  Report within 5 min of the completion of work.  Quality Check at the same day of completion (by 3 members).  Weekly and Monthly Meetings.  Walkie Talkie communication while construction.  Develop software(Park-2.0) to cumulate the work process.  Daily schedules-Whatsapp-Email-Text.
  • 22. Project Risk Management  Managing project risk is one of the most underrated aspects of project management. Major risk are very seldom identified up front and analyzed within the project management plan, but when they are project stakeholders tend to forgive the unexpected issues much quicker.  Plan Risk Management  Identify Risks  Perform Qualitative Risk Analysis  Perform Quantitative Risk Analysis  Plan Risk Responses  Control Risks
  • 23. Project Risk Management  Handling of Vacuum Glass Lifter (Weight-limited space).  Safety risk for material and man power(45- glass damaged).  It’s challenging when you’re doing first-of’s.  They certainly have a lot more schedule and cost risk associated with them.
  • 24. Project Procurement Management  Almost all projects have some form of outside procurement. Hiring subcontractors can get the job done quicker or with better expertise but sacrifices the ability to control the quality, schedule, or other factors.  Plan Procurement Management  Conduct Procurements  Control Procurements  Close Procurements
  • 25.  Procurement for machinery from another company  Procurement for glass which they are getting from Germany  Procurement for safety
  • 26. Project Stakeholder Management  There is nothing more important than the project’s stakeholders.  You could, in theory, declare a project a success if the stakeholders are satisfied but the project was a disaster if the stake holders are not satisfied.  The stakeholders should be actively managed and addressed within the project management plan.  Identify Stakeholders  Plan Stakeholder Management  Manage Stakeholder Engagement  Control Stakeholder Engagement
  • 27. Project Stakeholder Management  Apple-Monthly meeting.  Holder-Monthly meeting.  Seele- weekly meeting.  Also workers was taught for new technique.
  • 28. Delivery Methods  AHC – Design Bid Built. Constructor:- Unite Price Apple Foster & Partner Holder Seele AHC Glass Inc.
  • 29. Organization Structure  Balanced Matrix Organization Structure Seele Manager 1 Seele Manager 2 Seele Manager 3 Holder Manager 1 AHC Manager AHC Manager AHC Manager Holder Manager 2 AHC Manager AHC Manager AHC Manager