Page 2 DF MC R&D LO2 A.Kreyenberg
Business Unit Motion Control
2015-11-05
© Siemens AG 2015
Page 4 DF MC R&D LO2 A.Kreyenberg
Siemens Digital Factory Organization
Integrated product portfolio paves the way for the Digital Enterprise.
Factory
Automation
Control
Products
Product
Lifecycle
Management
Motion
Control
eCar
Powertrain
Systems
Customer
Services
World market
leader in
automation with
integrated
automation
portfolio for all
industries
Products and
systems to
switch, protect
and control low-
voltage
consumers
Proven software
solutions to
create, validate
and manage
product and
process
knowledge across
the product
lifecycle
Global leading
supplier of
products, systems
and solutions
including services:
Drives, Motion
Control Motors,
CNC Solutions
for machinery and
plants
High quality
powertrain
components and
charging systems
for series
production of
electric and
hybrid vehicles
Integrated service
offering from a
single source
throughout the
product lifecycle
Digital Factory Division
2015-11-05
© Siemens AG 2015
Page 5 DF MC R&D LO2 A.Kreyenberg
Holistic Approach to Optimize the Entire Value Chain
1
2
3 4 5
• Optimizing all five steps of the product development and production process
thanks to the intelligent interlinkage and use of the most efficient technologies
• Integrating all steps in the value added chain via sophisticated industry
software
Excellent manufacturing starts with excellent product design.
Services
Product design
Production planning
Production engineering
Production execution
2015-11-05
© Siemens AG 2015
Page 7 DF MC R&D LO2 A.Kreyenberg
Portfolio and Top Products
SIMOTICS motors for
every motion control
tasks the right motor –
worldwide the most
comprehensive range of
motion control motors
SINAMICS low-voltage
converters -
the integrated drive family
for every application
SINUMERIK –
the perfect CNC solution
for every machine tool
concept
2015-11-05
© Siemens AG 2015
Page 9 DF MC R&D LO2 A.Kreyenberg
• Marketing
• Distribution
• Customer Service
• Supply Center
• Repair Center
• System Development
• Component Development
• Manufacturing
• Controls
• Drives
Location Erlangen F80
Gerätewerk Erlangen (GWE)
2004 2006 2007 2013 2014 2015
2015-11-05
© Siemens AG 2015
Page 10 DF MC R&D LO2 A.Kreyenberg
Lean TransitionTimeline
MC on the way to a Lean Company
2015-11-05
© Siemens AG 2015
Page 11 DF MC R&D LO2 A.Kreyenberg
Development of MC Obeya of Obeya
Ceremonies & Methods
2015-11-05
© Siemens AG 2015
Page 12 DF MC R&D LO2 A.Kreyenberg
Changing the setting …
2015-11-05
© Siemens AG 2015
Page 13 DF MC R&D LO2 A.Kreyenberg
October 2013
Fastlane
Projects
Overview
Lean Office
2015-11-05
© Siemens AG 2015
Page 14 DF MC R&D LO2 A.Kreyenberg
Development of MC Obeya of Obeya
Problem Solving
2015-11-05
© Siemens AG 2015
Page 15 DF MC R&D LO2 A.Kreyenberg
Dezember 2013
Fastlane
Projects
Management Board with Core
Problems
Lean Office
2015-11-05
© Siemens AG 2015
Page 16 DF MC R&D LO2 A.Kreyenberg
Organizational change
inspire change
remove the obstacles
help others deal with fear, uncertainty and doubt
2015-11-05
© Siemens AG 2015
Page 17 DF MC R&D LO2 A.Kreyenberg
Januar 2014
Fastlane
Projects
Management Board
Lean Office
(frees up space)
2015-11-05
© Siemens AG 2015
Page 18 DF MC R&D LO2 A.Kreyenberg
Development of MC Obeya of Obeya
Priorization & Flow
2015-11-05
© Siemens AG 2015
Page 19 DF MC R&D LO2 A.Kreyenberg
Juli 2014
Fastlane Projects
Visualization with Structure
Core-problems
PLM Kanban
2015-11-05
© Siemens AG 2015
Page 20 DF MC R&D LO2 A.Kreyenberg
Dezember 2014
Focus Projects
Core-problems
PLM Kanban
2015-11-05
© Siemens AG 2015
Page 21 DF MC R&D LO2 A.Kreyenberg
Portfolio Kanban to visualize stepwise maturation of
opportunities according strong policies
PLM Kanban – a visual process management system for all MC development projects
Pull decision according common agreed policies by PPM-JF, steered by MC Alignment Team
Pull principle is guiding idea
Vision w/
key
benefits
Opportunities w/ biz
impact
Opportunities w/ rough effort Opps on
Start Block
Analysis
assigned
Opp
statement
clarified
Impact
identified
Req. Areas
identified
Rough
Effort
estimated
Ranked MC
Backlog
Opps in
Realization
Ranked
Queue
max max
-12 -11 -10 -9 -1…-3 -2 -1
Ranked
Queue
Develop-
ment
Deploy-
ment
Technical
Analysis
assigned
Opps in
Post
Surveillance
+3 +12 +24
M* M300M150+
2015-11-05
© Siemens AG 2015
Page 22 DF MC R&D LO2 A.Kreyenberg
Development of MC Obeya of Obeya
Increase Transparency
2015-11-05
© Siemens AG 2015
Page 23 DF MC R&D LO2 A.Kreyenberg
Februar 2015
Focus Projects PLM Kanban
Core problems R&D Projectboard
2015-11-05
© Siemens AG 2015
Page 24 DF MC R&D LO2 A.Kreyenberg
2015-11-05
© Siemens AG 2015
Page 25 DF MC R&D LO2 A.Kreyenberg
October 2015
Focus Projects PLM Kanban
Core problems R&D Projectboard
2015-11-05
© Siemens AG 2015
Page 26 DF MC R&D LO2 A.Kreyenberg
Lean Training Overview
PLM Kanban Teamtraining
Project-
members
Product Owner/
Opportunity Owner
Coach/
Scrum Master
Managers
Target Groups
Awareness Workshop
Support
Training
Bikablo
Training
Kanban
for Teams
Lean Leaders
Coach@MC
Lean Development
LDE Expert PO Training
ValueStream
analysis
CPO Training
PLM Biz
Simulation
1279 MA
258 MA344 MA
27 MA
213 MA
31 MA
46 MA23 MA
40 MA
Total Participants
as of April 2015
Target: 350, ~100%Mgmt)
Target 1200 MA, ~100% MA PLM
Target: 60, ~100%CPOs
Target: 90, ~100%POsTarget: 30, ~2%MA PLM
Target 300 MA, ~10% MA PLM
2015-11-05
© Siemens AG 2015
Page 27 DF MC R&D LO2 A.Kreyenberg
Development of MC Obeya of Obeya
Questions?
2015-11-05
© Siemens AG 2015
Page 28 DF MC R&D LO2 A.Kreyenberg
Thank you for your attention!
Annemarie Kreyenberg
Lean Coaching & Training
DF MC R&D LO 2
Frauenauracher Str. 80
91056 Erlangen
Phone: +49 (9131) 98-3079
Fax: +49 (9131) 98-1315
Cellular: +49 (173) 2949538
E-Mail: annemarie.kreyenberg@siemens.com
siemens.com/motioncontrol

More Related Content

What's hot

Project Portfolio Management
Project Portfolio ManagementProject Portfolio Management
Project Portfolio Management
Anand Subramaniam
 
2018-11-13 Don Reinertsen: An Introduction to Second Generation Lean Product ...
2018-11-13 Don Reinertsen: An Introduction to Second Generation Lean Product ...2018-11-13 Don Reinertsen: An Introduction to Second Generation Lean Product ...
2018-11-13 Don Reinertsen: An Introduction to Second Generation Lean Product ...
Niels Harre
 
Scaled Agile Framework (SAFe) Roles and Meetings
Scaled Agile Framework (SAFe) Roles and MeetingsScaled Agile Framework (SAFe) Roles and Meetings
Scaled Agile Framework (SAFe) Roles and Meetings
Rob Betcher
 
Agile Philips Journey
Agile Philips JourneyAgile Philips Journey
Agile Philips Journey
India Scrum Enthusiasts Community
 
value stream mapping and metrics based process mapping
value stream mapping and metrics based process mappingvalue stream mapping and metrics based process mapping
value stream mapping and metrics based process mapping
TKMG, Inc.
 
What is a SCRUM Master
What is a SCRUM MasterWhat is a SCRUM Master
What is a SCRUM MasterJoost Mulders
 
Foundations of the Scaled Agile Framework® (SAFe® ) 4.5
Foundations of the Scaled Agile Framework® (SAFe® ) 4.5Foundations of the Scaled Agile Framework® (SAFe® ) 4.5
Foundations of the Scaled Agile Framework® (SAFe® ) 4.5
netmind
 
The Effective Program Management Office (PgMO) (c) 2010
The Effective Program Management Office (PgMO) (c) 2010The Effective Program Management Office (PgMO) (c) 2010
The Effective Program Management Office (PgMO) (c) 2010
Karen Y. Lucas PMP, PgMP, CISA, CISSP
 
Introduction to Business Analysis
Introduction to Business AnalysisIntroduction to Business Analysis
Introduction to Business Analysis
SwatiS-BA
 
Lean Project Management PowerPoint Presentation Slides
Lean Project Management PowerPoint Presentation Slides Lean Project Management PowerPoint Presentation Slides
Lean Project Management PowerPoint Presentation Slides
SlideTeam
 
Agile Methodology and Tools
Agile Methodology and ToolsAgile Methodology and Tools
Agile Methodology and Tools
Naresh Gajuveni
 
Introduction to Project Management by Javid Hamdard
Introduction to Project Management by Javid HamdardIntroduction to Project Management by Javid Hamdard
Introduction to Project Management by Javid Hamdard
Javid Hamdard
 
Agile project management using scrum
Agile project management using scrumAgile project management using scrum
Agile project management using scrum
PrudentialSolutions
 
Project Management PowerPoint Presentation Slides
Project Management PowerPoint Presentation SlidesProject Management PowerPoint Presentation Slides
Project Management PowerPoint Presentation Slides
SlideTeam
 
What does a Scrum Master do, or should do, all day?
What does a Scrum Master do, or should do, all day? What does a Scrum Master do, or should do, all day?
What does a Scrum Master do, or should do, all day?
Stefania Marinelli
 
Lean six sigma tollgate checklists
Lean six sigma tollgate checklistsLean six sigma tollgate checklists
Lean six sigma tollgate checklistsSteven Bonacorsi
 
Agile methodology
Agile methodologyAgile methodology
Agile methodology
Dhruv Kumar
 
Introduction to Scrum.ppt
Introduction to Scrum.pptIntroduction to Scrum.ppt
Introduction to Scrum.pptMohan Late
 
Agile Scrum
Agile ScrumAgile Scrum
Agile Scrum
Ram Srivastava
 
Agile Ways of Working For High-Performing Teams
Agile Ways of Working For High-Performing TeamsAgile Ways of Working For High-Performing Teams
Agile Ways of Working For High-Performing Teams
Michael Goschnick
 

What's hot (20)

Project Portfolio Management
Project Portfolio ManagementProject Portfolio Management
Project Portfolio Management
 
2018-11-13 Don Reinertsen: An Introduction to Second Generation Lean Product ...
2018-11-13 Don Reinertsen: An Introduction to Second Generation Lean Product ...2018-11-13 Don Reinertsen: An Introduction to Second Generation Lean Product ...
2018-11-13 Don Reinertsen: An Introduction to Second Generation Lean Product ...
 
Scaled Agile Framework (SAFe) Roles and Meetings
Scaled Agile Framework (SAFe) Roles and MeetingsScaled Agile Framework (SAFe) Roles and Meetings
Scaled Agile Framework (SAFe) Roles and Meetings
 
Agile Philips Journey
Agile Philips JourneyAgile Philips Journey
Agile Philips Journey
 
value stream mapping and metrics based process mapping
value stream mapping and metrics based process mappingvalue stream mapping and metrics based process mapping
value stream mapping and metrics based process mapping
 
What is a SCRUM Master
What is a SCRUM MasterWhat is a SCRUM Master
What is a SCRUM Master
 
Foundations of the Scaled Agile Framework® (SAFe® ) 4.5
Foundations of the Scaled Agile Framework® (SAFe® ) 4.5Foundations of the Scaled Agile Framework® (SAFe® ) 4.5
Foundations of the Scaled Agile Framework® (SAFe® ) 4.5
 
The Effective Program Management Office (PgMO) (c) 2010
The Effective Program Management Office (PgMO) (c) 2010The Effective Program Management Office (PgMO) (c) 2010
The Effective Program Management Office (PgMO) (c) 2010
 
Introduction to Business Analysis
Introduction to Business AnalysisIntroduction to Business Analysis
Introduction to Business Analysis
 
Lean Project Management PowerPoint Presentation Slides
Lean Project Management PowerPoint Presentation Slides Lean Project Management PowerPoint Presentation Slides
Lean Project Management PowerPoint Presentation Slides
 
Agile Methodology and Tools
Agile Methodology and ToolsAgile Methodology and Tools
Agile Methodology and Tools
 
Introduction to Project Management by Javid Hamdard
Introduction to Project Management by Javid HamdardIntroduction to Project Management by Javid Hamdard
Introduction to Project Management by Javid Hamdard
 
Agile project management using scrum
Agile project management using scrumAgile project management using scrum
Agile project management using scrum
 
Project Management PowerPoint Presentation Slides
Project Management PowerPoint Presentation SlidesProject Management PowerPoint Presentation Slides
Project Management PowerPoint Presentation Slides
 
What does a Scrum Master do, or should do, all day?
What does a Scrum Master do, or should do, all day? What does a Scrum Master do, or should do, all day?
What does a Scrum Master do, or should do, all day?
 
Lean six sigma tollgate checklists
Lean six sigma tollgate checklistsLean six sigma tollgate checklists
Lean six sigma tollgate checklists
 
Agile methodology
Agile methodologyAgile methodology
Agile methodology
 
Introduction to Scrum.ppt
Introduction to Scrum.pptIntroduction to Scrum.ppt
Introduction to Scrum.ppt
 
Agile Scrum
Agile ScrumAgile Scrum
Agile Scrum
 
Agile Ways of Working For High-Performing Teams
Agile Ways of Working For High-Performing TeamsAgile Ways of Working For High-Performing Teams
Agile Ways of Working For High-Performing Teams
 

Viewers also liked

Enterprise Planning and Control. Planning for Siemens Manufacturing
Enterprise Planning and Control. Planning for Siemens ManufacturingEnterprise Planning and Control. Planning for Siemens Manufacturing
Enterprise Planning and Control. Planning for Siemens Manufacturing
RAMON RIOS
 
Leading using the Oobeya Room
Leading using the Oobeya RoomLeading using the Oobeya Room
Leading using the Oobeya Room
Lean Enterprise Academy
 
Siemens Corporate Strategy and Proposed Acquisition
Siemens Corporate Strategy and Proposed AcquisitionSiemens Corporate Strategy and Proposed Acquisition
Siemens Corporate Strategy and Proposed Acquisition
Francesco Colombo
 
Webinar Agile Corporate Learning
Webinar Agile Corporate Learning Webinar Agile Corporate Learning
Webinar Agile Corporate Learning
edutrainment company
 
Pasaporte Semana Santa 2013
Pasaporte Semana Santa 2013Pasaporte Semana Santa 2013
Pasaporte Semana Santa 2013
Ruta do Viño Rías Baixas
 
Presentación de empresa TECNOMUNDO S.A
Presentación de empresa TECNOMUNDO S.APresentación de empresa TECNOMUNDO S.A
Presentación de empresa TECNOMUNDO S.AMonroy03
 
Infographie I Les français et le casual gaming
Infographie I Les français et le casual gamingInfographie I Les français et le casual gaming
Infographie I Les français et le casual gaming
Actiplay (Groupe ConcoursMania)
 
Amexco kundenanlass 111122 version3
Amexco kundenanlass 111122 version3Amexco kundenanlass 111122 version3
Amexco kundenanlass 111122 version3Travelbrain GmbH
 
FokusLeasingFleet_Juni2016
FokusLeasingFleet_Juni2016FokusLeasingFleet_Juni2016
FokusLeasingFleet_Juni2016Yannick Depr
 
Programa ADIVAC 2012
Programa ADIVAC 2012Programa ADIVAC 2012
Programa ADIVAC 2012jehu
 
Cold Chain Logistics
Cold Chain LogisticsCold Chain Logistics
Cold Chain Logistics
Zubin Poonawalla
 
Catalogue accessoires 4x4 nissan x trail 09-2010
Catalogue accessoires 4x4 nissan x trail 09-2010Catalogue accessoires 4x4 nissan x trail 09-2010
Catalogue accessoires 4x4 nissan x trail 09-2010
autoprestige
 
Balneario de Zújar
Balneario de Zújar Balneario de Zújar
Balneario de Zújar
morafines
 
Rock and wall fountains kansas city 816 500-4198
Rock and wall fountains kansas city 816 500-4198Rock and wall fountains kansas city 816 500-4198
Rock and wall fountains kansas city 816 500-4198
UMKC MASONRY / LANDSCAPE / FOUNTAINS COMPANY
 
Hoja de vida
Hoja de vidaHoja de vida
Hoja de vidaecpb23
 
Como Vender con YouTube Marketing
Como Vender con YouTube MarketingComo Vender con YouTube Marketing
Science In Sl Short Notes
Science In Sl   Short   NotesScience In Sl   Short   Notes
Science In Sl Short Notes
Kate Farrell
 
Rockscripts Instalacion de plantilla | Readme file | plantilla para tienda en...
Rockscripts Instalacion de plantilla | Readme file | plantilla para tienda en...Rockscripts Instalacion de plantilla | Readme file | plantilla para tienda en...
Rockscripts Instalacion de plantilla | Readme file | plantilla para tienda en...
Alexandre Rivera
 
Presentación entrenadores (pps)
Presentación entrenadores (pps)Presentación entrenadores (pps)
Presentación entrenadores (pps)
Andreu Ore
 
Reflections, New Methodologies, and Thought Processes
Reflections, New Methodologies, and Thought ProcessesReflections, New Methodologies, and Thought Processes
Reflections, New Methodologies, and Thought Processes
Babu George
 

Viewers also liked (20)

Enterprise Planning and Control. Planning for Siemens Manufacturing
Enterprise Planning and Control. Planning for Siemens ManufacturingEnterprise Planning and Control. Planning for Siemens Manufacturing
Enterprise Planning and Control. Planning for Siemens Manufacturing
 
Leading using the Oobeya Room
Leading using the Oobeya RoomLeading using the Oobeya Room
Leading using the Oobeya Room
 
Siemens Corporate Strategy and Proposed Acquisition
Siemens Corporate Strategy and Proposed AcquisitionSiemens Corporate Strategy and Proposed Acquisition
Siemens Corporate Strategy and Proposed Acquisition
 
Webinar Agile Corporate Learning
Webinar Agile Corporate Learning Webinar Agile Corporate Learning
Webinar Agile Corporate Learning
 
Pasaporte Semana Santa 2013
Pasaporte Semana Santa 2013Pasaporte Semana Santa 2013
Pasaporte Semana Santa 2013
 
Presentación de empresa TECNOMUNDO S.A
Presentación de empresa TECNOMUNDO S.APresentación de empresa TECNOMUNDO S.A
Presentación de empresa TECNOMUNDO S.A
 
Infographie I Les français et le casual gaming
Infographie I Les français et le casual gamingInfographie I Les français et le casual gaming
Infographie I Les français et le casual gaming
 
Amexco kundenanlass 111122 version3
Amexco kundenanlass 111122 version3Amexco kundenanlass 111122 version3
Amexco kundenanlass 111122 version3
 
FokusLeasingFleet_Juni2016
FokusLeasingFleet_Juni2016FokusLeasingFleet_Juni2016
FokusLeasingFleet_Juni2016
 
Programa ADIVAC 2012
Programa ADIVAC 2012Programa ADIVAC 2012
Programa ADIVAC 2012
 
Cold Chain Logistics
Cold Chain LogisticsCold Chain Logistics
Cold Chain Logistics
 
Catalogue accessoires 4x4 nissan x trail 09-2010
Catalogue accessoires 4x4 nissan x trail 09-2010Catalogue accessoires 4x4 nissan x trail 09-2010
Catalogue accessoires 4x4 nissan x trail 09-2010
 
Balneario de Zújar
Balneario de Zújar Balneario de Zújar
Balneario de Zújar
 
Rock and wall fountains kansas city 816 500-4198
Rock and wall fountains kansas city 816 500-4198Rock and wall fountains kansas city 816 500-4198
Rock and wall fountains kansas city 816 500-4198
 
Hoja de vida
Hoja de vidaHoja de vida
Hoja de vida
 
Como Vender con YouTube Marketing
Como Vender con YouTube MarketingComo Vender con YouTube Marketing
Como Vender con YouTube Marketing
 
Science In Sl Short Notes
Science In Sl   Short   NotesScience In Sl   Short   Notes
Science In Sl Short Notes
 
Rockscripts Instalacion de plantilla | Readme file | plantilla para tienda en...
Rockscripts Instalacion de plantilla | Readme file | plantilla para tienda en...Rockscripts Instalacion de plantilla | Readme file | plantilla para tienda en...
Rockscripts Instalacion de plantilla | Readme file | plantilla para tienda en...
 
Presentación entrenadores (pps)
Presentación entrenadores (pps)Presentación entrenadores (pps)
Presentación entrenadores (pps)
 
Reflections, New Methodologies, and Thought Processes
Reflections, New Methodologies, and Thought ProcessesReflections, New Methodologies, and Thought Processes
Reflections, New Methodologies, and Thought Processes
 

Similar to The Obeya Room - Tool and Mirror for Culture Change

Enterprise^2 going agile - Siemens Manufacturing Software Case Study - Yael B...
Enterprise^2 going agile - Siemens Manufacturing Software Case Study - Yael B...Enterprise^2 going agile - Siemens Manufacturing Software Case Study - Yael B...
Enterprise^2 going agile - Siemens Manufacturing Software Case Study - Yael B...
AgileSparks
 
How a Leading Brand Achieved Digital Transformation at a Global Scale - Jeff ...
How a Leading Brand Achieved Digital Transformation at a Global Scale - Jeff ...How a Leading Brand Achieved Digital Transformation at a Global Scale - Jeff ...
How a Leading Brand Achieved Digital Transformation at a Global Scale - Jeff ...
MuleSoft
 
2015-11-24-zoutman-brengt-zijn-labo-op-smaak-met-siemens-lims
2015-11-24-zoutman-brengt-zijn-labo-op-smaak-met-siemens-lims2015-11-24-zoutman-brengt-zijn-labo-op-smaak-met-siemens-lims
2015-11-24-zoutman-brengt-zijn-labo-op-smaak-met-siemens-lims
Sirris
 
E4 e automotive_designrelease_v15-3
E4 e automotive_designrelease_v15-3E4 e automotive_designrelease_v15-3
E4 e automotive_designrelease_v15-3
AIMFirst
 
Evolution of Vehicle aftter it has been released, How its made and managed
Evolution of Vehicle aftter it has been released, How its made and managedEvolution of Vehicle aftter it has been released, How its made and managed
Evolution of Vehicle aftter it has been released, How its made and managed
Samuel Festus
 
BMW Showcase - Celosphere 2019
BMW Showcase - Celosphere 2019BMW Showcase - Celosphere 2019
BMW Showcase - Celosphere 2019
Celonis
 
10 good reasons to go for model-based systems engineering in your organization
10 good reasons to go for model-based systems engineering in your organization10 good reasons to go for model-based systems engineering in your organization
10 good reasons to go for model-based systems engineering in your organization
Siemens PLM Software
 
How we became lean
How we became leanHow we became lean
How we became lean
Lean India Summit
 
Mes SW Factory in Siemens AS MES - 2014.05.17 - mini Italian Agile Day - Genova
Mes SW Factory in Siemens AS MES - 2014.05.17 - mini Italian Agile Day - GenovaMes SW Factory in Siemens AS MES - 2014.05.17 - mini Italian Agile Day - Genova
Mes SW Factory in Siemens AS MES - 2014.05.17 - mini Italian Agile Day - Genova
icelands
 
Dave Kellogg Keynote at Host Analytics World 2013
Dave Kellogg Keynote at Host Analytics World 2013Dave Kellogg Keynote at Host Analytics World 2013
Dave Kellogg Keynote at Host Analytics World 2013
Dave Kellogg
 
CAE for Digital Development
CAE for Digital DevelopmentCAE for Digital Development
CAE for Digital Development
Altair
 
DevOps KPIs as a Service: Daimler’s Solution
DevOps KPIs as a Service: Daimler’s SolutionDevOps KPIs as a Service: Daimler’s Solution
DevOps KPIs as a Service: Daimler’s Solution
VMware Tanzu
 
Dynamics CRM: which 3rd Party solutions do I need
Dynamics CRM: which 3rd Party solutions do I needDynamics CRM: which 3rd Party solutions do I need
Dynamics CRM: which 3rd Party solutions do I need
QuantiQ Technology
 
Releasemanagement in integration projects
Releasemanagement in integration projectsReleasemanagement in integration projects
Releasemanagement in integration projects
Sven Bernhardt
 
SedApta automotive case study
SedApta automotive case studySedApta automotive case study
SedApta automotive case study
Skillaware™ Company of sedApta Group
 
E4 e extension_tx_assembly_robotics_commissioning_final-2
E4 e extension_tx_assembly_robotics_commissioning_final-2E4 e extension_tx_assembly_robotics_commissioning_final-2
E4 e extension_tx_assembly_robotics_commissioning_final-2
AIMFirst
 
Se for cross industry presentation #5
Se for cross industry presentation #5Se for cross industry presentation #5
Se for cross industry presentation #5
AIMFirst
 
Removing Crucial Dependencies to Enable KPN as a Virtual Telecom Provider
Removing Crucial Dependencies to Enable KPN as a Virtual Telecom ProviderRemoving Crucial Dependencies to Enable KPN as a Virtual Telecom Provider
Removing Crucial Dependencies to Enable KPN as a Virtual Telecom Provider
CA Technologies
 
Data Management For Automated Production
Data Management For Automated Production Data Management For Automated Production
Data Management For Automated Production
Ching Kok Pang
 

Similar to The Obeya Room - Tool and Mirror for Culture Change (20)

Enterprise^2 going agile - Siemens Manufacturing Software Case Study - Yael B...
Enterprise^2 going agile - Siemens Manufacturing Software Case Study - Yael B...Enterprise^2 going agile - Siemens Manufacturing Software Case Study - Yael B...
Enterprise^2 going agile - Siemens Manufacturing Software Case Study - Yael B...
 
PLM_for_New_Normal_KK_Pres_May15
PLM_for_New_Normal_KK_Pres_May15PLM_for_New_Normal_KK_Pres_May15
PLM_for_New_Normal_KK_Pres_May15
 
How a Leading Brand Achieved Digital Transformation at a Global Scale - Jeff ...
How a Leading Brand Achieved Digital Transformation at a Global Scale - Jeff ...How a Leading Brand Achieved Digital Transformation at a Global Scale - Jeff ...
How a Leading Brand Achieved Digital Transformation at a Global Scale - Jeff ...
 
2015-11-24-zoutman-brengt-zijn-labo-op-smaak-met-siemens-lims
2015-11-24-zoutman-brengt-zijn-labo-op-smaak-met-siemens-lims2015-11-24-zoutman-brengt-zijn-labo-op-smaak-met-siemens-lims
2015-11-24-zoutman-brengt-zijn-labo-op-smaak-met-siemens-lims
 
E4 e automotive_designrelease_v15-3
E4 e automotive_designrelease_v15-3E4 e automotive_designrelease_v15-3
E4 e automotive_designrelease_v15-3
 
Evolution of Vehicle aftter it has been released, How its made and managed
Evolution of Vehicle aftter it has been released, How its made and managedEvolution of Vehicle aftter it has been released, How its made and managed
Evolution of Vehicle aftter it has been released, How its made and managed
 
BMW Showcase - Celosphere 2019
BMW Showcase - Celosphere 2019BMW Showcase - Celosphere 2019
BMW Showcase - Celosphere 2019
 
10 good reasons to go for model-based systems engineering in your organization
10 good reasons to go for model-based systems engineering in your organization10 good reasons to go for model-based systems engineering in your organization
10 good reasons to go for model-based systems engineering in your organization
 
How we became lean
How we became leanHow we became lean
How we became lean
 
Mes SW Factory in Siemens AS MES - 2014.05.17 - mini Italian Agile Day - Genova
Mes SW Factory in Siemens AS MES - 2014.05.17 - mini Italian Agile Day - GenovaMes SW Factory in Siemens AS MES - 2014.05.17 - mini Italian Agile Day - Genova
Mes SW Factory in Siemens AS MES - 2014.05.17 - mini Italian Agile Day - Genova
 
Dave Kellogg Keynote at Host Analytics World 2013
Dave Kellogg Keynote at Host Analytics World 2013Dave Kellogg Keynote at Host Analytics World 2013
Dave Kellogg Keynote at Host Analytics World 2013
 
CAE for Digital Development
CAE for Digital DevelopmentCAE for Digital Development
CAE for Digital Development
 
DevOps KPIs as a Service: Daimler’s Solution
DevOps KPIs as a Service: Daimler’s SolutionDevOps KPIs as a Service: Daimler’s Solution
DevOps KPIs as a Service: Daimler’s Solution
 
Dynamics CRM: which 3rd Party solutions do I need
Dynamics CRM: which 3rd Party solutions do I needDynamics CRM: which 3rd Party solutions do I need
Dynamics CRM: which 3rd Party solutions do I need
 
Releasemanagement in integration projects
Releasemanagement in integration projectsReleasemanagement in integration projects
Releasemanagement in integration projects
 
SedApta automotive case study
SedApta automotive case studySedApta automotive case study
SedApta automotive case study
 
E4 e extension_tx_assembly_robotics_commissioning_final-2
E4 e extension_tx_assembly_robotics_commissioning_final-2E4 e extension_tx_assembly_robotics_commissioning_final-2
E4 e extension_tx_assembly_robotics_commissioning_final-2
 
Se for cross industry presentation #5
Se for cross industry presentation #5Se for cross industry presentation #5
Se for cross industry presentation #5
 
Removing Crucial Dependencies to Enable KPN as a Virtual Telecom Provider
Removing Crucial Dependencies to Enable KPN as a Virtual Telecom ProviderRemoving Crucial Dependencies to Enable KPN as a Virtual Telecom Provider
Removing Crucial Dependencies to Enable KPN as a Virtual Telecom Provider
 
Data Management For Automated Production
Data Management For Automated Production Data Management For Automated Production
Data Management For Automated Production
 

More from agile42

It takes structure and discipline – It is about new habits and a change of mi...
It takes structure and discipline – It is about new habits and a change of mi...It takes structure and discipline – It is about new habits and a change of mi...
It takes structure and discipline – It is about new habits and a change of mi...
agile42
 
Where next?
Where next?Where next?
Where next?
agile42
 
Create a Workplace People Love – Just add Joy
Create a Workplace People Love – Just add JoyCreate a Workplace People Love – Just add Joy
Create a Workplace People Love – Just add Joy
agile42
 
User Requirements - A Radical Beginning of the Agile Journey
User Requirements - A Radical Beginning of the Agile JourneyUser Requirements - A Radical Beginning of the Agile Journey
User Requirements - A Radical Beginning of the Agile Journey
agile42
 
Agile Adoption and Transformation in a regulated environment
Agile Adoption and Transformation in a regulated environmentAgile Adoption and Transformation in a regulated environment
Agile Adoption and Transformation in a regulated environment
agile42
 
The challenge of being a team representative in a scaled agile environment
The challenge of being a team representative in a scaled agile environmentThe challenge of being a team representative in a scaled agile environment
The challenge of being a team representative in a scaled agile environment
agile42
 
agile42 TCF Team Assessment
agile42 TCF Team Assessmentagile42 TCF Team Assessment
agile42 TCF Team Assessment
agile42
 
Lars Aagaard – Scrum and Innovation: How do we ensure innovation while using ...
Lars Aagaard – Scrum and Innovation: How do we ensure innovation while using ...Lars Aagaard – Scrum and Innovation: How do we ensure innovation while using ...
Lars Aagaard – Scrum and Innovation: How do we ensure innovation while using ...
agile42
 

More from agile42 (8)

It takes structure and discipline – It is about new habits and a change of mi...
It takes structure and discipline – It is about new habits and a change of mi...It takes structure and discipline – It is about new habits and a change of mi...
It takes structure and discipline – It is about new habits and a change of mi...
 
Where next?
Where next?Where next?
Where next?
 
Create a Workplace People Love – Just add Joy
Create a Workplace People Love – Just add JoyCreate a Workplace People Love – Just add Joy
Create a Workplace People Love – Just add Joy
 
User Requirements - A Radical Beginning of the Agile Journey
User Requirements - A Radical Beginning of the Agile JourneyUser Requirements - A Radical Beginning of the Agile Journey
User Requirements - A Radical Beginning of the Agile Journey
 
Agile Adoption and Transformation in a regulated environment
Agile Adoption and Transformation in a regulated environmentAgile Adoption and Transformation in a regulated environment
Agile Adoption and Transformation in a regulated environment
 
The challenge of being a team representative in a scaled agile environment
The challenge of being a team representative in a scaled agile environmentThe challenge of being a team representative in a scaled agile environment
The challenge of being a team representative in a scaled agile environment
 
agile42 TCF Team Assessment
agile42 TCF Team Assessmentagile42 TCF Team Assessment
agile42 TCF Team Assessment
 
Lars Aagaard – Scrum and Innovation: How do we ensure innovation while using ...
Lars Aagaard – Scrum and Innovation: How do we ensure innovation while using ...Lars Aagaard – Scrum and Innovation: How do we ensure innovation while using ...
Lars Aagaard – Scrum and Innovation: How do we ensure innovation while using ...
 

Recently uploaded

SOCIO-ANTHROPOLOGY FACULTY OF NURSING.....
SOCIO-ANTHROPOLOGY FACULTY OF NURSING.....SOCIO-ANTHROPOLOGY FACULTY OF NURSING.....
SOCIO-ANTHROPOLOGY FACULTY OF NURSING.....
juniourjohnstone
 
一比一原版杜克大学毕业证(Duke毕业证)成绩单留信认证
一比一原版杜克大学毕业证(Duke毕业证)成绩单留信认证一比一原版杜克大学毕业证(Duke毕业证)成绩单留信认证
一比一原版杜克大学毕业证(Duke毕业证)成绩单留信认证
gcljeuzdu
 
TCS AI for Business Study – Key Findings
TCS AI for Business Study – Key FindingsTCS AI for Business Study – Key Findings
TCS AI for Business Study – Key Findings
Tata Consultancy Services
 
Protected Workmen required today for growth
Protected Workmen required today for growthProtected Workmen required today for growth
Protected Workmen required today for growth
rivaraj2711
 
W.H.Bender Quote 65 - The Team Member and Guest Experience
W.H.Bender Quote 65 - The Team Member and Guest ExperienceW.H.Bender Quote 65 - The Team Member and Guest Experience
W.H.Bender Quote 65 - The Team Member and Guest Experience
William (Bill) H. Bender, FCSI
 
W.H.Bender Quote 66 - ServPoints Sequence of Service™ should be Identified fo...
W.H.Bender Quote 66 - ServPoints Sequence of Service™ should be Identified fo...W.H.Bender Quote 66 - ServPoints Sequence of Service™ should be Identified fo...
W.H.Bender Quote 66 - ServPoints Sequence of Service™ should be Identified fo...
William (Bill) H. Bender, FCSI
 
Founder-Game Director Workshop (Session 1)
Founder-Game Director  Workshop (Session 1)Founder-Game Director  Workshop (Session 1)
Founder-Game Director Workshop (Session 1)
Amir H. Fassihi
 
在线办理(Murdoch毕业证书)莫道克大学毕业证电子版成绩单一模一样
在线办理(Murdoch毕业证书)莫道克大学毕业证电子版成绩单一模一样在线办理(Murdoch毕业证书)莫道克大学毕业证电子版成绩单一模一样
在线办理(Murdoch毕业证书)莫道克大学毕业证电子版成绩单一模一样
tdt5v4b
 
Senior Project and Engineering Leader Jim Smith.pdf
Senior Project and Engineering Leader Jim Smith.pdfSenior Project and Engineering Leader Jim Smith.pdf
Senior Project and Engineering Leader Jim Smith.pdf
Jim Smith
 
Training- integrated management system (iso)
Training- integrated management system (iso)Training- integrated management system (iso)
Training- integrated management system (iso)
akaash13
 
Case Analysis - The Sky is the Limit | Principles of Management
Case Analysis - The Sky is the Limit | Principles of ManagementCase Analysis - The Sky is the Limit | Principles of Management
Case Analysis - The Sky is the Limit | Principles of Management
A. F. M. Rubayat-Ul Jannat
 
Leadership Ethics and Change, Purpose to Impact Plan
Leadership Ethics and Change, Purpose to Impact PlanLeadership Ethics and Change, Purpose to Impact Plan
Leadership Ethics and Change, Purpose to Impact Plan
Muhammad Adil Jamil
 
CV Ensio Suopanki1.pdf ENGLISH Russian Finnish German
CV Ensio Suopanki1.pdf ENGLISH Russian Finnish GermanCV Ensio Suopanki1.pdf ENGLISH Russian Finnish German
CV Ensio Suopanki1.pdf ENGLISH Russian Finnish German
EUS+ Management & Consulting Excellence
 
原版制作(澳洲WSU毕业证书)西悉尼大学毕业证文凭证书一模一样
原版制作(澳洲WSU毕业证书)西悉尼大学毕业证文凭证书一模一样原版制作(澳洲WSU毕业证书)西悉尼大学毕业证文凭证书一模一样
原版制作(澳洲WSU毕业证书)西悉尼大学毕业证文凭证书一模一样
tdt5v4b
 
原版制作(CDU毕业证书)查尔斯达尔文大学毕业证PDF成绩单一模一样
原版制作(CDU毕业证书)查尔斯达尔文大学毕业证PDF成绩单一模一样原版制作(CDU毕业证书)查尔斯达尔文大学毕业证PDF成绩单一模一样
原版制作(CDU毕业证书)查尔斯达尔文大学毕业证PDF成绩单一模一样
tdt5v4b
 
在线办理(UVic毕业证书)维多利亚大学毕业证录取通知书一模一样
在线办理(UVic毕业证书)维多利亚大学毕业证录取通知书一模一样在线办理(UVic毕业证书)维多利亚大学毕业证录取通知书一模一样
在线办理(UVic毕业证书)维多利亚大学毕业证录取通知书一模一样
tdt5v4b
 

Recently uploaded (16)

SOCIO-ANTHROPOLOGY FACULTY OF NURSING.....
SOCIO-ANTHROPOLOGY FACULTY OF NURSING.....SOCIO-ANTHROPOLOGY FACULTY OF NURSING.....
SOCIO-ANTHROPOLOGY FACULTY OF NURSING.....
 
一比一原版杜克大学毕业证(Duke毕业证)成绩单留信认证
一比一原版杜克大学毕业证(Duke毕业证)成绩单留信认证一比一原版杜克大学毕业证(Duke毕业证)成绩单留信认证
一比一原版杜克大学毕业证(Duke毕业证)成绩单留信认证
 
TCS AI for Business Study – Key Findings
TCS AI for Business Study – Key FindingsTCS AI for Business Study – Key Findings
TCS AI for Business Study – Key Findings
 
Protected Workmen required today for growth
Protected Workmen required today for growthProtected Workmen required today for growth
Protected Workmen required today for growth
 
W.H.Bender Quote 65 - The Team Member and Guest Experience
W.H.Bender Quote 65 - The Team Member and Guest ExperienceW.H.Bender Quote 65 - The Team Member and Guest Experience
W.H.Bender Quote 65 - The Team Member and Guest Experience
 
W.H.Bender Quote 66 - ServPoints Sequence of Service™ should be Identified fo...
W.H.Bender Quote 66 - ServPoints Sequence of Service™ should be Identified fo...W.H.Bender Quote 66 - ServPoints Sequence of Service™ should be Identified fo...
W.H.Bender Quote 66 - ServPoints Sequence of Service™ should be Identified fo...
 
Founder-Game Director Workshop (Session 1)
Founder-Game Director  Workshop (Session 1)Founder-Game Director  Workshop (Session 1)
Founder-Game Director Workshop (Session 1)
 
在线办理(Murdoch毕业证书)莫道克大学毕业证电子版成绩单一模一样
在线办理(Murdoch毕业证书)莫道克大学毕业证电子版成绩单一模一样在线办理(Murdoch毕业证书)莫道克大学毕业证电子版成绩单一模一样
在线办理(Murdoch毕业证书)莫道克大学毕业证电子版成绩单一模一样
 
Senior Project and Engineering Leader Jim Smith.pdf
Senior Project and Engineering Leader Jim Smith.pdfSenior Project and Engineering Leader Jim Smith.pdf
Senior Project and Engineering Leader Jim Smith.pdf
 
Training- integrated management system (iso)
Training- integrated management system (iso)Training- integrated management system (iso)
Training- integrated management system (iso)
 
Case Analysis - The Sky is the Limit | Principles of Management
Case Analysis - The Sky is the Limit | Principles of ManagementCase Analysis - The Sky is the Limit | Principles of Management
Case Analysis - The Sky is the Limit | Principles of Management
 
Leadership Ethics and Change, Purpose to Impact Plan
Leadership Ethics and Change, Purpose to Impact PlanLeadership Ethics and Change, Purpose to Impact Plan
Leadership Ethics and Change, Purpose to Impact Plan
 
CV Ensio Suopanki1.pdf ENGLISH Russian Finnish German
CV Ensio Suopanki1.pdf ENGLISH Russian Finnish GermanCV Ensio Suopanki1.pdf ENGLISH Russian Finnish German
CV Ensio Suopanki1.pdf ENGLISH Russian Finnish German
 
原版制作(澳洲WSU毕业证书)西悉尼大学毕业证文凭证书一模一样
原版制作(澳洲WSU毕业证书)西悉尼大学毕业证文凭证书一模一样原版制作(澳洲WSU毕业证书)西悉尼大学毕业证文凭证书一模一样
原版制作(澳洲WSU毕业证书)西悉尼大学毕业证文凭证书一模一样
 
原版制作(CDU毕业证书)查尔斯达尔文大学毕业证PDF成绩单一模一样
原版制作(CDU毕业证书)查尔斯达尔文大学毕业证PDF成绩单一模一样原版制作(CDU毕业证书)查尔斯达尔文大学毕业证PDF成绩单一模一样
原版制作(CDU毕业证书)查尔斯达尔文大学毕业证PDF成绩单一模一样
 
在线办理(UVic毕业证书)维多利亚大学毕业证录取通知书一模一样
在线办理(UVic毕业证书)维多利亚大学毕业证录取通知书一模一样在线办理(UVic毕业证书)维多利亚大学毕业证录取通知书一模一样
在线办理(UVic毕业证书)维多利亚大学毕业证录取通知书一模一样
 

The Obeya Room - Tool and Mirror for Culture Change

  • 1. © Siemens AG 2015 siemens.com/motioncontrol DF MC R&D LO2, A.Kreyenberg The Obeya Room (@Siemens DF MC) Tool and Mirror for Culture Change
  • 2. 2015-11-05 © Siemens AG 2015 Page 2 DF MC R&D LO2 A.Kreyenberg Business Unit Motion Control
  • 3. 2015-11-05 © Siemens AG 2015 Page 4 DF MC R&D LO2 A.Kreyenberg Siemens Digital Factory Organization Integrated product portfolio paves the way for the Digital Enterprise. Factory Automation Control Products Product Lifecycle Management Motion Control eCar Powertrain Systems Customer Services World market leader in automation with integrated automation portfolio for all industries Products and systems to switch, protect and control low- voltage consumers Proven software solutions to create, validate and manage product and process knowledge across the product lifecycle Global leading supplier of products, systems and solutions including services: Drives, Motion Control Motors, CNC Solutions for machinery and plants High quality powertrain components and charging systems for series production of electric and hybrid vehicles Integrated service offering from a single source throughout the product lifecycle Digital Factory Division
  • 4. 2015-11-05 © Siemens AG 2015 Page 5 DF MC R&D LO2 A.Kreyenberg Holistic Approach to Optimize the Entire Value Chain 1 2 3 4 5 • Optimizing all five steps of the product development and production process thanks to the intelligent interlinkage and use of the most efficient technologies • Integrating all steps in the value added chain via sophisticated industry software Excellent manufacturing starts with excellent product design. Services Product design Production planning Production engineering Production execution
  • 5. 2015-11-05 © Siemens AG 2015 Page 7 DF MC R&D LO2 A.Kreyenberg Portfolio and Top Products SIMOTICS motors for every motion control tasks the right motor – worldwide the most comprehensive range of motion control motors SINAMICS low-voltage converters - the integrated drive family for every application SINUMERIK – the perfect CNC solution for every machine tool concept
  • 6. 2015-11-05 © Siemens AG 2015 Page 9 DF MC R&D LO2 A.Kreyenberg • Marketing • Distribution • Customer Service • Supply Center • Repair Center • System Development • Component Development • Manufacturing • Controls • Drives Location Erlangen F80 Gerätewerk Erlangen (GWE) 2004 2006 2007 2013 2014 2015
  • 7. 2015-11-05 © Siemens AG 2015 Page 10 DF MC R&D LO2 A.Kreyenberg Lean TransitionTimeline MC on the way to a Lean Company
  • 8. 2015-11-05 © Siemens AG 2015 Page 11 DF MC R&D LO2 A.Kreyenberg Development of MC Obeya of Obeya Ceremonies & Methods
  • 9. 2015-11-05 © Siemens AG 2015 Page 12 DF MC R&D LO2 A.Kreyenberg Changing the setting …
  • 10. 2015-11-05 © Siemens AG 2015 Page 13 DF MC R&D LO2 A.Kreyenberg October 2013 Fastlane Projects Overview Lean Office
  • 11. 2015-11-05 © Siemens AG 2015 Page 14 DF MC R&D LO2 A.Kreyenberg Development of MC Obeya of Obeya Problem Solving
  • 12. 2015-11-05 © Siemens AG 2015 Page 15 DF MC R&D LO2 A.Kreyenberg Dezember 2013 Fastlane Projects Management Board with Core Problems Lean Office
  • 13. 2015-11-05 © Siemens AG 2015 Page 16 DF MC R&D LO2 A.Kreyenberg Organizational change inspire change remove the obstacles help others deal with fear, uncertainty and doubt
  • 14. 2015-11-05 © Siemens AG 2015 Page 17 DF MC R&D LO2 A.Kreyenberg Januar 2014 Fastlane Projects Management Board Lean Office (frees up space)
  • 15. 2015-11-05 © Siemens AG 2015 Page 18 DF MC R&D LO2 A.Kreyenberg Development of MC Obeya of Obeya Priorization & Flow
  • 16. 2015-11-05 © Siemens AG 2015 Page 19 DF MC R&D LO2 A.Kreyenberg Juli 2014 Fastlane Projects Visualization with Structure Core-problems PLM Kanban
  • 17. 2015-11-05 © Siemens AG 2015 Page 20 DF MC R&D LO2 A.Kreyenberg Dezember 2014 Focus Projects Core-problems PLM Kanban
  • 18. 2015-11-05 © Siemens AG 2015 Page 21 DF MC R&D LO2 A.Kreyenberg Portfolio Kanban to visualize stepwise maturation of opportunities according strong policies PLM Kanban – a visual process management system for all MC development projects Pull decision according common agreed policies by PPM-JF, steered by MC Alignment Team Pull principle is guiding idea Vision w/ key benefits Opportunities w/ biz impact Opportunities w/ rough effort Opps on Start Block Analysis assigned Opp statement clarified Impact identified Req. Areas identified Rough Effort estimated Ranked MC Backlog Opps in Realization Ranked Queue max max -12 -11 -10 -9 -1…-3 -2 -1 Ranked Queue Develop- ment Deploy- ment Technical Analysis assigned Opps in Post Surveillance +3 +12 +24 M* M300M150+
  • 19. 2015-11-05 © Siemens AG 2015 Page 22 DF MC R&D LO2 A.Kreyenberg Development of MC Obeya of Obeya Increase Transparency
  • 20. 2015-11-05 © Siemens AG 2015 Page 23 DF MC R&D LO2 A.Kreyenberg Februar 2015 Focus Projects PLM Kanban Core problems R&D Projectboard
  • 21. 2015-11-05 © Siemens AG 2015 Page 24 DF MC R&D LO2 A.Kreyenberg
  • 22. 2015-11-05 © Siemens AG 2015 Page 25 DF MC R&D LO2 A.Kreyenberg October 2015 Focus Projects PLM Kanban Core problems R&D Projectboard
  • 23. 2015-11-05 © Siemens AG 2015 Page 26 DF MC R&D LO2 A.Kreyenberg Lean Training Overview PLM Kanban Teamtraining Project- members Product Owner/ Opportunity Owner Coach/ Scrum Master Managers Target Groups Awareness Workshop Support Training Bikablo Training Kanban for Teams Lean Leaders Coach@MC Lean Development LDE Expert PO Training ValueStream analysis CPO Training PLM Biz Simulation 1279 MA 258 MA344 MA 27 MA 213 MA 31 MA 46 MA23 MA 40 MA Total Participants as of April 2015 Target: 350, ~100%Mgmt) Target 1200 MA, ~100% MA PLM Target: 60, ~100%CPOs Target: 90, ~100%POsTarget: 30, ~2%MA PLM Target 300 MA, ~10% MA PLM
  • 24. 2015-11-05 © Siemens AG 2015 Page 27 DF MC R&D LO2 A.Kreyenberg Development of MC Obeya of Obeya Questions?
  • 25. 2015-11-05 © Siemens AG 2015 Page 28 DF MC R&D LO2 A.Kreyenberg Thank you for your attention! Annemarie Kreyenberg Lean Coaching & Training DF MC R&D LO 2 Frauenauracher Str. 80 91056 Erlangen Phone: +49 (9131) 98-3079 Fax: +49 (9131) 98-1315 Cellular: +49 (173) 2949538 E-Mail: annemarie.kreyenberg@siemens.com siemens.com/motioncontrol