1
11 Successful Implementation & Improved Operation
Installation – Issues and Solutions
Andreas Agostin
Industrial Network Sales Specialist Asia Pacific
MTL Instruments Singapore, part of Cooper Crouse-Hinds
15.05.2013 Perth
2
22 Successful Implementation & Improved Operation
Introduction
Fieldbus is in use since 19981, yet still new for
many customers today.
This presentation will look at the installation issues
and the “lessons learned”, so that you can
benefits from their experience.
1 Shell Malampaya is one of the early, larger projects. 1600 FF instruments are in use. The project produced first gas in
Oct 2001. Source: J. Seaver, Shell Philippines Exploration B.V., “Malampaya Deep Water Gas-to-Power Project:
Malampaya Subsea Development”, Offshore Technology Conference, 6 May-9 May 2002, Houston, Texas.
3
33 Successful Implementation & Improved Operation
Introduction
The pictures you will see are collected from “real”
projects; they are neither simulated nor “demo”.
We will look at
– Control room: cabinet design and wiring
– Field: Wiring, field junction boxes, field device installation.
Processes typically involve explosion protection methods
“intrinsic safety” (I.S. / Ex i; energy limitation by a ‘barrier’)
or “explosion proof” (Ex d; protection by explosionproof
enclosure).
Many examples use “IS” as this is a key product of my
company and that is where I get involved.
4
44 Successful Implementation & Improved Operation
Disclaimer
All products shown serve as EXAMPLE only.
In particular, problems shown in conjunction with a product
serve as example only.
The brand/make/model of the product serving as example
is IRRELEVANT.
Problems highlighted serve as example only, are do in no
way express problems with a particular product,
model or brand.
5
55 Successful Implementation & Improved Operation
The conventional system
6
66 Successful Implementation & Improved Operation
Control room – Conventional wiring
2nd level 1st level
junction box Marshalling
and barrier
Control system
7
77 Successful Implementation & Improved Operation
Control room – Conventional wiring
Marshalling: to group AI / AO / DI / DO / etc
8
88 Successful Implementation & Improved Operation
Control room – Conventional wiring
9
99 Successful Implementation & Improved Operation
Control room – Conventional wiring
Long wires, standard length
Allows pre-fabrication of wire
(ferrules, mounting)
Conventional signals (4-20mA,
RTD, thermocouple, 0-
5V/10V/24V) – slow, hardware
filtered, length less important
10
1010 Successful Implementation & Improved Operation
Field – Conventional wiring
Quality (material)
Safety
Location / access
Weight/size, …
10
11
1111 Successful Implementation & Improved Operation
Fieldbus versus conventional
12
1212 Successful Implementation & Improved Operation
Control room – DCS wiring EXAMPLES
Fieldbus
Conventional
13
1313 Successful Implementation & Improved Operation
Control room – DCS wiring EXAMPLES
Installations do not have
to look messy. They
can be very nice, too.
Fieldbus
Conventional
14
1414 Successful Implementation & Improved Operation
Control room – DCS wiring EXAMPLES
Fieldbus Conventional
15
1515 Successful Implementation & Improved Operation
Control room – DCS wiring EXAMPLES
Fieldbus
Fieldbus
16
1616 Successful Implementation & Improved Operation
Control room – DCS wiring
Important:
do not use individual wires to
wire cabinet. Use fieldbus cable
and shield properly.
Why?
Higher signal
frequency – protect
them against
disturbances.
Individual wires will
cause crosstalk from
one wire to another –
communication faults
can occur.
??
17
1717 Successful Implementation & Improved Operation
Fieldbus Cable
Recommended:
Type A cable: Shielded twisted pair
Other cable is possible, but there are limitations in terms
of achievable cable distance and electromagnetic
compatibility (EMC).
Fieldbus is a digital “high speed” (31kBit/s)
communication, a current modulated signal
superimposed on the DC power.
18
1818 Successful Implementation & Improved Operation
Fieldbus Cable
Shielded pair
principle
Foil
shield
Foil plus
braided
shield
SWA
Not round – Not recommended
Ideally round – Recommended
Fillers (solid or fiber)
19
1919 Successful Implementation & Improved Operation
Fieldbus Cable
SWA Multi-pair
Multi-pair (multi-trunk)
20
2020 Successful Implementation & Improved Operation
Please not this way
Images obscured – Brand is irrelevant.
21
2121 Successful Implementation & Improved Operation
Control room – DCS wiring
22
2222 Successful Implementation & Improved Operation
Fieldbus system – Field wiring
??
•• Parallel wiringParallel wiring
(terminals)(terminals)
•• special wiringspecial wiring
blocksblocks
•• (daisy chaining)(daisy chaining)
23
2323 Successful Implementation & Improved Operation
Fieldbus system – Field junction boxes
Principle of wiring distribution in junction box:
all devices are in parallel
Source: FF AG 140 Rev. 1
24
2424 Successful Implementation & Improved Operation
Fieldbus system – Field junction boxes
Please not this way
25
2525 Successful Implementation & Improved Operation25
Fieldbus system – Field junction boxes
Use dedicated
wiring blocks
with built-in
electronic
short circuit
protection.
LEDs: - built-in s/c protection
26
2626 Successful Implementation & Improved Operation
Good Wiring Practices
Test segment wiring before connecting components
Avoid damaging the wire when removing insulation
Ground the cable shield only at one point (at the control
room end)
Insulate the ungrounded end of the cable shield (at the
instrument)
Ground armor on both sides (potential equalization)
Use crimp ferrules
– Ferrule diameter must fit wire
– Crimp tool must fit ferrule
– Ferrule must fit terminals
Maintain polarity and associated color codes throughout
the segment
27
2727 Successful Implementation & Improved Operation
Good Wiring Practices
Lessons learned:
Torque screwdriver
Wire end ferrules
Right (!) wire strippers
Fieldbus tester
Harms
wire strands
Choose
right size
AWG ..
28
2828 Successful Implementation & Improved Operation
Fieldbus Design Tools
(Examples)
29
2929 Successful Implementation & Improved Operation
Project Procedure
Best practice:
Bench test
Functional tests and interoperability test
FAT
SAT
30
3030 Successful Implementation & Improved Operation
Installation Guidelines
Cable Tests
– Experience has shown that new cable irregularities are
so infrequent that it is more efficient to check cable
after installation
Cable Installation
– Verify that cable is properly installed, bypassing impact
from wiring components
Segment Checkout
– Check of proper wiring of wiring components
Device installation
– Check of proper device installation
Loop checkout
– Functional test
31
3131 Successful Implementation & Improved Operation
Installation tools
Portable fieldbus diagnostic test equipment
(Handhelds)
Measures relevant fieldbus
parameters
Establish baseline
after commissioning
32
3232 Successful Implementation & Improved Operation
Handheld diagnostic tools
Handheld
Diagnostic
Tool
Device 1 Device 3Device 2
T
Device Coupler
& Terminator
(non-IS) Spurs
FFPS
T
FF Power Supply
& Conditioner
&Terminator
24VDC
Host
Computer
H1 Interface
Connect at respective location to obtain accurate measurement.
33
3333 Successful Implementation & Improved Operation
Handheld diagnostic tools
Handheld
Diagnostic
Tool
FFPS
T
FF Power Supply
& Conditioner
&Terminator
24VDC
Host
Computer
H1 Interface
Fieldbus
barrier
Device 1 Device 3Device 2
Fieldbus barrier
& Terminator
Intrinsically
Safe Spurs
T
Fieldbus
barrier
To measure at fieldbus barrier/IS segments, Handheld needs to be Ex i approved.
Important since the galvanic isolation of fieldbus barrier impacts on measurement.
34
3434 Successful Implementation & Improved Operation
Earthing/Grounding
Grounding in the control room
One point grounding only
Continuous shield from control room to the field
Shield not connected at the field instrument
Connect cable armor at both ends (potential
equalization)
35
3535 Successful Implementation & Improved Operation
Earthing/Grounding
Device 1 Device 3Device 2
T
Wiring Block
& TerminatorFFPS
T
FF Power Supply
& Conditioner
&Terminator
24VDC
Host
Computer
H1 Interface
36
3636 Successful Implementation & Improved Operation
Fieldbus
barrier
Device 1 Device 3Device 2
Fieldbus barrier
& Terminator
Intrinsically
Safe Spurs
T
Fieldbus
barrier
Earthing/Grounding
FFPS
T
FF Power Supply
& Conditioner
&Terminator
24VDC
Host
Computer
H1 Interface
37
3737 Successful Implementation & Improved Operation
Local field junction box for 4
instruments. Rust prevented
proper grounding, so that
separate ground connection
was required
38
3838 Successful Implementation & Improved Operation
Field – Fieldbus wiring
Green: fieldbus
Red: Power (Motors, etc)
For easy maintenance
39
3939 Successful Implementation & Improved Operation
Troubleshooting
40
4040 Successful Implementation & Improved Operation
Daisy chaining – not recommended
41
4141 Successful Implementation & Improved Operation
Troubleshooting
Electrical welding can generate significant surges
42
4242 Successful Implementation & Improved Operation
Bend radius too tight, Upward facing gland risks water ingress
Two cables into one gland
prevents sealing of gland
43
4343 Successful Implementation & Improved Operation
Water ingress caused corrosion of wire and terminals
44
4444 Successful Implementation & Improved Operation
Cable jacket stripped back too far
Troubleshooting
45
4545 Successful Implementation & Improved Operation
Wires coming out of ferrules
46
4646 Successful Implementation & Improved Operation
Troubleshooting
Earth stud not connected – internal
surge protectors not working
47
4747 Successful Implementation & Improved Operation
Troubleshooting
Ground not connected
48
4848 Successful Implementation & Improved Operation
Troubleshooting
Poor cable (shield) quality
49
4949 Successful Implementation & Improved Operation
Troubleshooting
Grounding concept failure-prone
50
5050 Successful Implementation & Improved Operation
Troubleshooting
Water marks, fungus inside junction box
51
5151 Successful Implementation & Improved Operation
Troubleshooting
Wire squeezed by enclosure lid – water ingress
52
5252 Successful Implementation & Improved Operation
http://forums.fieldbus.org/showthread.php?t=1298
53
5353 Successful Implementation & Improved Operation
Conclusion
Fieldbus is robust if the installation is adjusted to
the requirements of a digital communication line
Do not simply copy 4-20 methods
Use fieldbus smartly (e.g. eliminate marshalling)
Good wiring practices are more important than
on 4-20 due to bus structure
Train your installers on fieldbus practices
54
5454 Successful Implementation & Improved Operation
Installation – Issues and Solutions
Andreas Agostin
Industrial Network Sales Specialist Asia Pacific
MTL Instruments Singapore, part of Cooper Crouse-Hinds
andreas.agostin@cooperindustries.com
Ph: +65 97585161

More Related Content

What's hot

Duotech's F-16 Briefing During the 2015 F-16 TCG WWR
Duotech's F-16 Briefing During the 2015 F-16 TCG WWRDuotech's F-16 Briefing During the 2015 F-16 TCG WWR
Duotech's F-16 Briefing During the 2015 F-16 TCG WWRLee Cloer
 
ETAP - Arc flash analysis etap
ETAP - Arc flash analysis etapETAP - Arc flash analysis etap
ETAP - Arc flash analysis etapHimmelstern
 
RELAY CO-ORDINATION WITH FAULT CALCULATION
RELAY CO-ORDINATION WITH FAULT CALCULATIONRELAY CO-ORDINATION WITH FAULT CALCULATION
RELAY CO-ORDINATION WITH FAULT CALCULATIONMd Sarowar Alam
 
Relay Setting Calculation For REF615/ REJ601
Relay Setting Calculation For REF615/ REJ601Relay Setting Calculation For REF615/ REJ601
Relay Setting Calculation For REF615/ REJ601SARAVANAN A
 
Breaking the rules! bicsi
Breaking the rules! bicsi  Breaking the rules! bicsi
Breaking the rules! bicsi Jeffrey Lam
 
HYPERSIM Relay Protection Webinar
HYPERSIM Relay Protection WebinarHYPERSIM Relay Protection Webinar
HYPERSIM Relay Protection WebinarEtienne Leduc
 
EE673+F14+T2+Project1+Final+Pres+r3rg
EE673+F14+T2+Project1+Final+Pres+r3rgEE673+F14+T2+Project1+Final+Pres+r3rg
EE673+F14+T2+Project1+Final+Pres+r3rgAshikur Rahman
 
aps - product overview
aps - product overviewaps - product overview
aps - product overviewnnorbert
 
Pepperl+Fuchs 2011 Emerson Global Users Exchange fieldbus presentation
Pepperl+Fuchs  2011 Emerson Global Users Exchange fieldbus presentationPepperl+Fuchs  2011 Emerson Global Users Exchange fieldbus presentation
Pepperl+Fuchs 2011 Emerson Global Users Exchange fieldbus presentationKristen_Barbour_PF
 
Principals of Low Resistance Testing Webinar with Megger
Principals of Low Resistance Testing Webinar with MeggerPrincipals of Low Resistance Testing Webinar with Megger
Principals of Low Resistance Testing Webinar with MeggerTranscat
 
Webinar: Practical DDR Testing for Compliance, Validation and Debug
Webinar: Practical DDR Testing for Compliance, Validation and DebugWebinar: Practical DDR Testing for Compliance, Validation and Debug
Webinar: Practical DDR Testing for Compliance, Validation and Debugteledynelecroy
 
ComNet FDX55S1 Data Sheet
ComNet FDX55S1 Data SheetComNet FDX55S1 Data Sheet
ComNet FDX55S1 Data SheetJMAC Supply
 
Athens Datacentres And 10 G
Athens Datacentres And 10 GAthens Datacentres And 10 G
Athens Datacentres And 10 GGianluca Musetti
 
Webinar: High Voltage Fiber Optic (HVFO) Probe for Small Signal Floating Meas...
Webinar: High Voltage Fiber Optic (HVFO) Probe for Small Signal Floating Meas...Webinar: High Voltage Fiber Optic (HVFO) Probe for Small Signal Floating Meas...
Webinar: High Voltage Fiber Optic (HVFO) Probe for Small Signal Floating Meas...teledynelecroy
 
Talk IT_ Agilent_최석근_111007
Talk IT_ Agilent_최석근_111007Talk IT_ Agilent_최석근_111007
Talk IT_ Agilent_최석근_111007Cana Ko
 
Integrated RFIC Front End Architecture for 77 GHz Car Radar
Integrated RFIC Front End Architecture for 77 GHz Car RadarIntegrated RFIC Front End Architecture for 77 GHz Car Radar
Integrated RFIC Front End Architecture for 77 GHz Car RadarJaved G S, PhD
 

What's hot (20)

Ethernet Emergency Repair Kit
Ethernet Emergency Repair KitEthernet Emergency Repair Kit
Ethernet Emergency Repair Kit
 
Duotech's F-16 Briefing During the 2015 F-16 TCG WWR
Duotech's F-16 Briefing During the 2015 F-16 TCG WWRDuotech's F-16 Briefing During the 2015 F-16 TCG WWR
Duotech's F-16 Briefing During the 2015 F-16 TCG WWR
 
ETAP - Arc flash analysis etap
ETAP - Arc flash analysis etapETAP - Arc flash analysis etap
ETAP - Arc flash analysis etap
 
RELAY CO-ORDINATION WITH FAULT CALCULATION
RELAY CO-ORDINATION WITH FAULT CALCULATIONRELAY CO-ORDINATION WITH FAULT CALCULATION
RELAY CO-ORDINATION WITH FAULT CALCULATION
 
Relay Setting Calculation For REF615/ REJ601
Relay Setting Calculation For REF615/ REJ601Relay Setting Calculation For REF615/ REJ601
Relay Setting Calculation For REF615/ REJ601
 
Breaking the rules! bicsi
Breaking the rules! bicsi  Breaking the rules! bicsi
Breaking the rules! bicsi
 
Sofics Linkedin
Sofics LinkedinSofics Linkedin
Sofics Linkedin
 
HYPERSIM Relay Protection Webinar
HYPERSIM Relay Protection WebinarHYPERSIM Relay Protection Webinar
HYPERSIM Relay Protection Webinar
 
EE673+F14+T2+Project1+Final+Pres+r3rg
EE673+F14+T2+Project1+Final+Pres+r3rgEE673+F14+T2+Project1+Final+Pres+r3rg
EE673+F14+T2+Project1+Final+Pres+r3rg
 
Recognizing Sales Opportunities in Protective Relaying
Recognizing Sales Opportunities in Protective RelayingRecognizing Sales Opportunities in Protective Relaying
Recognizing Sales Opportunities in Protective Relaying
 
aps - product overview
aps - product overviewaps - product overview
aps - product overview
 
Pepperl+Fuchs 2011 Emerson Global Users Exchange fieldbus presentation
Pepperl+Fuchs  2011 Emerson Global Users Exchange fieldbus presentationPepperl+Fuchs  2011 Emerson Global Users Exchange fieldbus presentation
Pepperl+Fuchs 2011 Emerson Global Users Exchange fieldbus presentation
 
Principals of Low Resistance Testing Webinar with Megger
Principals of Low Resistance Testing Webinar with MeggerPrincipals of Low Resistance Testing Webinar with Megger
Principals of Low Resistance Testing Webinar with Megger
 
Webinar: Practical DDR Testing for Compliance, Validation and Debug
Webinar: Practical DDR Testing for Compliance, Validation and DebugWebinar: Practical DDR Testing for Compliance, Validation and Debug
Webinar: Practical DDR Testing for Compliance, Validation and Debug
 
ComNet FDX55S1 Data Sheet
ComNet FDX55S1 Data SheetComNet FDX55S1 Data Sheet
ComNet FDX55S1 Data Sheet
 
Athens Datacentres And 10 G
Athens Datacentres And 10 GAthens Datacentres And 10 G
Athens Datacentres And 10 G
 
Webinar: High Voltage Fiber Optic (HVFO) Probe for Small Signal Floating Meas...
Webinar: High Voltage Fiber Optic (HVFO) Probe for Small Signal Floating Meas...Webinar: High Voltage Fiber Optic (HVFO) Probe for Small Signal Floating Meas...
Webinar: High Voltage Fiber Optic (HVFO) Probe for Small Signal Floating Meas...
 
Talk IT_ Agilent_최석근_111007
Talk IT_ Agilent_최석근_111007Talk IT_ Agilent_최석근_111007
Talk IT_ Agilent_최석근_111007
 
Integrated RFIC Front End Architecture for 77 GHz Car Radar
Integrated RFIC Front End Architecture for 77 GHz Car RadarIntegrated RFIC Front End Architecture for 77 GHz Car Radar
Integrated RFIC Front End Architecture for 77 GHz Car Radar
 
EIT_Presentation
EIT_PresentationEIT_Presentation
EIT_Presentation
 

Viewers also liked

FOUNDATION Fieldbus Moving Forward
FOUNDATION Fieldbus Moving ForwardFOUNDATION Fieldbus Moving Forward
FOUNDATION Fieldbus Moving ForwardFieldComm Group
 
Foundation for rom 2013 14 presentation
Foundation for rom 2013 14 presentationFoundation for rom 2013 14 presentation
Foundation for rom 2013 14 presentationFieldComm Group
 
Automation mumbai 2013 fieldbus update
Automation mumbai 2013 fieldbus updateAutomation mumbai 2013 fieldbus update
Automation mumbai 2013 fieldbus updateFieldComm Group
 
Realizing the Potential of Intelligent Device Management
Realizing the Potential of Intelligent Device ManagementRealizing the Potential of Intelligent Device Management
Realizing the Potential of Intelligent Device ManagementFieldComm Group
 
Training and Education Presentation
Training and Education PresentationTraining and Education Presentation
Training and Education PresentationFieldComm Group
 
Fieldbus Foundation Celebrates 20 Years!
Fieldbus Foundation Celebrates 20 Years!Fieldbus Foundation Celebrates 20 Years!
Fieldbus Foundation Celebrates 20 Years!FieldComm Group
 
Jonas Berge Advances in Fieldbus Technology
Jonas Berge Advances in Fieldbus TechnologyJonas Berge Advances in Fieldbus Technology
Jonas Berge Advances in Fieldbus TechnologyFieldComm Group
 
Benefits of foundation in the operational phase
Benefits of foundation in the operational phaseBenefits of foundation in the operational phase
Benefits of foundation in the operational phaseFieldComm Group
 
Interoperable ROM DCS Integration
Interoperable ROM DCS IntegrationInteroperable ROM DCS Integration
Interoperable ROM DCS IntegrationFieldComm Group
 
FOUNDATION for ROM - Petrobras Event
FOUNDATION for ROM - Petrobras EventFOUNDATION for ROM - Petrobras Event
FOUNDATION for ROM - Petrobras EventFieldComm Group
 
Cenpes ff rom demo overview renato ogeda - petrobras
Cenpes ff rom demo overview   renato ogeda - petrobrasCenpes ff rom demo overview   renato ogeda - petrobras
Cenpes ff rom demo overview renato ogeda - petrobrasFieldComm Group
 
1 Ling Rong - Keynote Presentation Chinese
1 Ling Rong - Keynote Presentation Chinese1 Ling Rong - Keynote Presentation Chinese
1 Ling Rong - Keynote Presentation ChineseFieldComm Group
 
Petrobras rom demonstration miguel borges - petrobras
Petrobras rom demonstration   miguel borges - petrobrasPetrobras rom demonstration   miguel borges - petrobras
Petrobras rom demonstration miguel borges - petrobrasFieldComm Group
 
1 Ling Rong - Keynote Presentation English
1 Ling Rong - Keynote Presentation English1 Ling Rong - Keynote Presentation English
1 Ling Rong - Keynote Presentation EnglishFieldComm Group
 
FOUNDATION for ROM End User Perspective
FOUNDATION for ROM End User PerspectiveFOUNDATION for ROM End User Perspective
FOUNDATION for ROM End User PerspectiveFieldComm Group
 
7 Ye YingMin Diagnostics and Maintenance
7 Ye YingMin Diagnostics and Maintenance7 Ye YingMin Diagnostics and Maintenance
7 Ye YingMin Diagnostics and MaintenanceFieldComm Group
 
Arasu Thanigai Commissioning Solutions
Arasu Thanigai Commissioning SolutionsArasu Thanigai Commissioning Solutions
Arasu Thanigai Commissioning SolutionsFieldComm Group
 
The Fieldbus Diagnostics Difference
The Fieldbus Diagnostics DifferenceThe Fieldbus Diagnostics Difference
The Fieldbus Diagnostics DifferenceFieldComm Group
 

Viewers also liked (20)

Sf taga3 a
Sf taga3 aSf taga3 a
Sf taga3 a
 
FOUNDATION Fieldbus Moving Forward
FOUNDATION Fieldbus Moving ForwardFOUNDATION Fieldbus Moving Forward
FOUNDATION Fieldbus Moving Forward
 
Foundation for rom 2013 14 presentation
Foundation for rom 2013 14 presentationFoundation for rom 2013 14 presentation
Foundation for rom 2013 14 presentation
 
Automation mumbai 2013 fieldbus update
Automation mumbai 2013 fieldbus updateAutomation mumbai 2013 fieldbus update
Automation mumbai 2013 fieldbus update
 
Realizing the Potential of Intelligent Device Management
Realizing the Potential of Intelligent Device ManagementRealizing the Potential of Intelligent Device Management
Realizing the Potential of Intelligent Device Management
 
Training and Education Presentation
Training and Education PresentationTraining and Education Presentation
Training and Education Presentation
 
Fieldbus Foundation Celebrates 20 Years!
Fieldbus Foundation Celebrates 20 Years!Fieldbus Foundation Celebrates 20 Years!
Fieldbus Foundation Celebrates 20 Years!
 
Jonas Berge Advances in Fieldbus Technology
Jonas Berge Advances in Fieldbus TechnologyJonas Berge Advances in Fieldbus Technology
Jonas Berge Advances in Fieldbus Technology
 
2013 Fieldbus Update
2013 Fieldbus Update2013 Fieldbus Update
2013 Fieldbus Update
 
Benefits of foundation in the operational phase
Benefits of foundation in the operational phaseBenefits of foundation in the operational phase
Benefits of foundation in the operational phase
 
Interoperable ROM DCS Integration
Interoperable ROM DCS IntegrationInteroperable ROM DCS Integration
Interoperable ROM DCS Integration
 
FOUNDATION for ROM - Petrobras Event
FOUNDATION for ROM - Petrobras EventFOUNDATION for ROM - Petrobras Event
FOUNDATION for ROM - Petrobras Event
 
Cenpes ff rom demo overview renato ogeda - petrobras
Cenpes ff rom demo overview   renato ogeda - petrobrasCenpes ff rom demo overview   renato ogeda - petrobras
Cenpes ff rom demo overview renato ogeda - petrobras
 
1 Ling Rong - Keynote Presentation Chinese
1 Ling Rong - Keynote Presentation Chinese1 Ling Rong - Keynote Presentation Chinese
1 Ling Rong - Keynote Presentation Chinese
 
Petrobras rom demonstration miguel borges - petrobras
Petrobras rom demonstration   miguel borges - petrobrasPetrobras rom demonstration   miguel borges - petrobras
Petrobras rom demonstration miguel borges - petrobras
 
1 Ling Rong - Keynote Presentation English
1 Ling Rong - Keynote Presentation English1 Ling Rong - Keynote Presentation English
1 Ling Rong - Keynote Presentation English
 
FOUNDATION for ROM End User Perspective
FOUNDATION for ROM End User PerspectiveFOUNDATION for ROM End User Perspective
FOUNDATION for ROM End User Perspective
 
7 Ye YingMin Diagnostics and Maintenance
7 Ye YingMin Diagnostics and Maintenance7 Ye YingMin Diagnostics and Maintenance
7 Ye YingMin Diagnostics and Maintenance
 
Arasu Thanigai Commissioning Solutions
Arasu Thanigai Commissioning SolutionsArasu Thanigai Commissioning Solutions
Arasu Thanigai Commissioning Solutions
 
The Fieldbus Diagnostics Difference
The Fieldbus Diagnostics DifferenceThe Fieldbus Diagnostics Difference
The Fieldbus Diagnostics Difference
 

Similar to Andreas Agostin Installation Solutions

Railway Data Communication in Harsh Environments
Railway Data Communication in Harsh EnvironmentsRailway Data Communication in Harsh Environments
Railway Data Communication in Harsh EnvironmentsIbrahim Al-Hudhaif
 
Megger Cable Fault Locators - Power Cable Fault Locators, Van mountable Solut...
Megger Cable Fault Locators - Power Cable Fault Locators, Van mountable Solut...Megger Cable Fault Locators - Power Cable Fault Locators, Van mountable Solut...
Megger Cable Fault Locators - Power Cable Fault Locators, Van mountable Solut...Thorne & Derrick International
 
Cable Sniffer LV Cable Fault Locator - Operating Manual
Cable Sniffer LV Cable Fault Locator - Operating ManualCable Sniffer LV Cable Fault Locator - Operating Manual
Cable Sniffer LV Cable Fault Locator - Operating ManualThorne & Derrick International
 
1 Introduction To Premises Cabling System
1 Introduction To Premises Cabling System1 Introduction To Premises Cabling System
1 Introduction To Premises Cabling SystemMrirfan
 
General Or Gc Electrical Safety
General Or Gc Electrical SafetyGeneral Or Gc Electrical Safety
General Or Gc Electrical Safetyjboullemet
 
Présentation ffc electronica 11 2012
Présentation ffc electronica 11 2012Présentation ffc electronica 11 2012
Présentation ffc electronica 11 2012Phil Heft
 
5e361f6f7aa7cf6628a2bfda_Protection-Basics_r3.ppt
5e361f6f7aa7cf6628a2bfda_Protection-Basics_r3.ppt5e361f6f7aa7cf6628a2bfda_Protection-Basics_r3.ppt
5e361f6f7aa7cf6628a2bfda_Protection-Basics_r3.pptVara Prasad
 
5e361f6f7aa7cf6628a2bfda_Protection-Basics_r3.ppt
5e361f6f7aa7cf6628a2bfda_Protection-Basics_r3.ppt5e361f6f7aa7cf6628a2bfda_Protection-Basics_r3.ppt
5e361f6f7aa7cf6628a2bfda_Protection-Basics_r3.pptelectrical1012000
 
Overhead & Underground Electric Safety Webinar Presented by Amprobe
Overhead & Underground Electric Safety Webinar Presented by AmprobeOverhead & Underground Electric Safety Webinar Presented by Amprobe
Overhead & Underground Electric Safety Webinar Presented by AmprobeTranscat
 
ABB Kabeldon - HV High Voltage Cable Joints, Cable Terminations & Separable C...
ABB Kabeldon - HV High Voltage Cable Joints, Cable Terminations & Separable C...ABB Kabeldon - HV High Voltage Cable Joints, Cable Terminations & Separable C...
ABB Kabeldon - HV High Voltage Cable Joints, Cable Terminations & Separable C...Thorne & Derrick International
 
Carlisle Interconnect Technologies - Product Overview
Carlisle Interconnect Technologies - Product OverviewCarlisle Interconnect Technologies - Product Overview
Carlisle Interconnect Technologies - Product OverviewStephenDavies40
 
RLE Technologies | How Leak Detection Can Minimize Catastrophes
RLE Technologies | How Leak Detection Can Minimize CatastrophesRLE Technologies | How Leak Detection Can Minimize Catastrophes
RLE Technologies | How Leak Detection Can Minimize CatastrophesCochrane_Supply
 
Don't get caught without SURGE PROTECTION!
Don't get caught without SURGE PROTECTION!Don't get caught without SURGE PROTECTION!
Don't get caught without SURGE PROTECTION!R. J. McRep
 
Power System Protection basics
Power System Protection basicsPower System Protection basics
Power System Protection basicsRajan Singh Tanwar
 

Similar to Andreas Agostin Installation Solutions (20)

Newson Gale Bond Rite Clamp
Newson Gale Bond Rite ClampNewson Gale Bond Rite Clamp
Newson Gale Bond Rite Clamp
 
Railway Data Communication in Harsh Environments
Railway Data Communication in Harsh EnvironmentsRailway Data Communication in Harsh Environments
Railway Data Communication in Harsh Environments
 
Megger Cable Fault Locators - Power Cable Fault Locators, Van mountable Solut...
Megger Cable Fault Locators - Power Cable Fault Locators, Van mountable Solut...Megger Cable Fault Locators - Power Cable Fault Locators, Van mountable Solut...
Megger Cable Fault Locators - Power Cable Fault Locators, Van mountable Solut...
 
Cable Sniffer LV Cable Fault Locator - Operating Manual
Cable Sniffer LV Cable Fault Locator - Operating ManualCable Sniffer LV Cable Fault Locator - Operating Manual
Cable Sniffer LV Cable Fault Locator - Operating Manual
 
1 Introduction To Premises Cabling System
1 Introduction To Premises Cabling System1 Introduction To Premises Cabling System
1 Introduction To Premises Cabling System
 
General Or Gc Electrical Safety
General Or Gc Electrical SafetyGeneral Or Gc Electrical Safety
General Or Gc Electrical Safety
 
Profi bus DATA SHEET
Profi  bus  DATA  SHEETProfi  bus  DATA  SHEET
Profi bus DATA SHEET
 
Présentation ffc electronica 11 2012
Présentation ffc electronica 11 2012Présentation ffc electronica 11 2012
Présentation ffc electronica 11 2012
 
5e361f6f7aa7cf6628a2bfda_Protection-Basics_r3.ppt
5e361f6f7aa7cf6628a2bfda_Protection-Basics_r3.ppt5e361f6f7aa7cf6628a2bfda_Protection-Basics_r3.ppt
5e361f6f7aa7cf6628a2bfda_Protection-Basics_r3.ppt
 
5e361f6f7aa7cf6628a2bfda_Protection-Basics_r3.ppt
5e361f6f7aa7cf6628a2bfda_Protection-Basics_r3.ppt5e361f6f7aa7cf6628a2bfda_Protection-Basics_r3.ppt
5e361f6f7aa7cf6628a2bfda_Protection-Basics_r3.ppt
 
Vfd white paper_2012
Vfd white paper_2012Vfd white paper_2012
Vfd white paper_2012
 
Overhead & Underground Electric Safety Webinar Presented by Amprobe
Overhead & Underground Electric Safety Webinar Presented by AmprobeOverhead & Underground Electric Safety Webinar Presented by Amprobe
Overhead & Underground Electric Safety Webinar Presented by Amprobe
 
ABB Kabeldon - HV High Voltage Cable Joints, Cable Terminations & Separable C...
ABB Kabeldon - HV High Voltage Cable Joints, Cable Terminations & Separable C...ABB Kabeldon - HV High Voltage Cable Joints, Cable Terminations & Separable C...
ABB Kabeldon - HV High Voltage Cable Joints, Cable Terminations & Separable C...
 
Carlisle Interconnect Technologies - Product Overview
Carlisle Interconnect Technologies - Product OverviewCarlisle Interconnect Technologies - Product Overview
Carlisle Interconnect Technologies - Product Overview
 
EIT_Presentation
EIT_PresentationEIT_Presentation
EIT_Presentation
 
Moog Case Study
Moog Case StudyMoog Case Study
Moog Case Study
 
RLE Technologies | How Leak Detection Can Minimize Catastrophes
RLE Technologies | How Leak Detection Can Minimize CatastrophesRLE Technologies | How Leak Detection Can Minimize Catastrophes
RLE Technologies | How Leak Detection Can Minimize Catastrophes
 
Don't get caught without SURGE PROTECTION!
Don't get caught without SURGE PROTECTION!Don't get caught without SURGE PROTECTION!
Don't get caught without SURGE PROTECTION!
 
ABB Kabeldon Fusegear and Cable Distribution Cabinets
ABB Kabeldon Fusegear and Cable Distribution CabinetsABB Kabeldon Fusegear and Cable Distribution Cabinets
ABB Kabeldon Fusegear and Cable Distribution Cabinets
 
Power System Protection basics
Power System Protection basicsPower System Protection basics
Power System Protection basics
 

More from FieldComm Group

Cenpes ff rom demo wireless backhaul edgar hofmann - petrobras
Cenpes ff rom demo wireless backhaul   edgar hofmann - petrobrasCenpes ff rom demo wireless backhaul   edgar hofmann - petrobras
Cenpes ff rom demo wireless backhaul edgar hofmann - petrobrasFieldComm Group
 
8 Dave Glanzer Technology Update
8 Dave Glanzer Technology Update8 Dave Glanzer Technology Update
8 Dave Glanzer Technology UpdateFieldComm Group
 
5 Huang Weibo Importance of Training
5 Huang Weibo Importance of Training5 Huang Weibo Importance of Training
5 Huang Weibo Importance of TrainingFieldComm Group
 
4 Larry O'Brien FOUNDATION for ROM
4 Larry O'Brien FOUNDATION for ROM4 Larry O'Brien FOUNDATION for ROM
4 Larry O'Brien FOUNDATION for ROMFieldComm Group
 
3 Liu Zhiqiang FOUNDATION Project Best Practices
3 Liu Zhiqiang FOUNDATION Project Best Practices3 Liu Zhiqiang FOUNDATION Project Best Practices
3 Liu Zhiqiang FOUNDATION Project Best PracticesFieldComm Group
 
2 Wei Hua Installation and Commissioning
2 Wei Hua Installation and Commissioning2 Wei Hua Installation and Commissioning
2 Wei Hua Installation and CommissioningFieldComm Group
 
6 Bai Guo Hua FOUNDATION in the Power Generation Industry
6 Bai Guo Hua FOUNDATION in the Power Generation Industry6 Bai Guo Hua FOUNDATION in the Power Generation Industry
6 Bai Guo Hua FOUNDATION in the Power Generation IndustryFieldComm Group
 
Foundation for rom general assembly
Foundation for rom general assemblyFoundation for rom general assembly
Foundation for rom general assemblyFieldComm Group
 
Quality training and fctp
Quality training and fctpQuality training and fctp
Quality training and fctpFieldComm Group
 
Field device integration evolution in asset integration
Field device integration evolution in asset integrationField device integration evolution in asset integration
Field device integration evolution in asset integrationFieldComm Group
 

More from FieldComm Group (10)

Cenpes ff rom demo wireless backhaul edgar hofmann - petrobras
Cenpes ff rom demo wireless backhaul   edgar hofmann - petrobrasCenpes ff rom demo wireless backhaul   edgar hofmann - petrobras
Cenpes ff rom demo wireless backhaul edgar hofmann - petrobras
 
8 Dave Glanzer Technology Update
8 Dave Glanzer Technology Update8 Dave Glanzer Technology Update
8 Dave Glanzer Technology Update
 
5 Huang Weibo Importance of Training
5 Huang Weibo Importance of Training5 Huang Weibo Importance of Training
5 Huang Weibo Importance of Training
 
4 Larry O'Brien FOUNDATION for ROM
4 Larry O'Brien FOUNDATION for ROM4 Larry O'Brien FOUNDATION for ROM
4 Larry O'Brien FOUNDATION for ROM
 
3 Liu Zhiqiang FOUNDATION Project Best Practices
3 Liu Zhiqiang FOUNDATION Project Best Practices3 Liu Zhiqiang FOUNDATION Project Best Practices
3 Liu Zhiqiang FOUNDATION Project Best Practices
 
2 Wei Hua Installation and Commissioning
2 Wei Hua Installation and Commissioning2 Wei Hua Installation and Commissioning
2 Wei Hua Installation and Commissioning
 
6 Bai Guo Hua FOUNDATION in the Power Generation Industry
6 Bai Guo Hua FOUNDATION in the Power Generation Industry6 Bai Guo Hua FOUNDATION in the Power Generation Industry
6 Bai Guo Hua FOUNDATION in the Power Generation Industry
 
Foundation for rom general assembly
Foundation for rom general assemblyFoundation for rom general assembly
Foundation for rom general assembly
 
Quality training and fctp
Quality training and fctpQuality training and fctp
Quality training and fctp
 
Field device integration evolution in asset integration
Field device integration evolution in asset integrationField device integration evolution in asset integration
Field device integration evolution in asset integration
 

Recently uploaded

Dev Dives: Streamline document processing with UiPath Studio Web
Dev Dives: Streamline document processing with UiPath Studio WebDev Dives: Streamline document processing with UiPath Studio Web
Dev Dives: Streamline document processing with UiPath Studio WebUiPathCommunity
 
SIP trunking in Janus @ Kamailio World 2024
SIP trunking in Janus @ Kamailio World 2024SIP trunking in Janus @ Kamailio World 2024
SIP trunking in Janus @ Kamailio World 2024Lorenzo Miniero
 
Beyond Boundaries: Leveraging No-Code Solutions for Industry Innovation
Beyond Boundaries: Leveraging No-Code Solutions for Industry InnovationBeyond Boundaries: Leveraging No-Code Solutions for Industry Innovation
Beyond Boundaries: Leveraging No-Code Solutions for Industry InnovationSafe Software
 
Science&tech:THE INFORMATION AGE STS.pdf
Science&tech:THE INFORMATION AGE STS.pdfScience&tech:THE INFORMATION AGE STS.pdf
Science&tech:THE INFORMATION AGE STS.pdfjimielynbastida
 
APIForce Zurich 5 April Automation LPDG
APIForce Zurich 5 April  Automation LPDGAPIForce Zurich 5 April  Automation LPDG
APIForce Zurich 5 April Automation LPDGMarianaLemus7
 
"Federated learning: out of reach no matter how close",Oleksandr Lapshyn
"Federated learning: out of reach no matter how close",Oleksandr Lapshyn"Federated learning: out of reach no matter how close",Oleksandr Lapshyn
"Federated learning: out of reach no matter how close",Oleksandr LapshynFwdays
 
Pigging Solutions in Pet Food Manufacturing
Pigging Solutions in Pet Food ManufacturingPigging Solutions in Pet Food Manufacturing
Pigging Solutions in Pet Food ManufacturingPigging Solutions
 
"LLMs for Python Engineers: Advanced Data Analysis and Semantic Kernel",Oleks...
"LLMs for Python Engineers: Advanced Data Analysis and Semantic Kernel",Oleks..."LLMs for Python Engineers: Advanced Data Analysis and Semantic Kernel",Oleks...
"LLMs for Python Engineers: Advanced Data Analysis and Semantic Kernel",Oleks...Fwdays
 
Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)
Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)
Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)Mark Simos
 
Human Factors of XR: Using Human Factors to Design XR Systems
Human Factors of XR: Using Human Factors to Design XR SystemsHuman Factors of XR: Using Human Factors to Design XR Systems
Human Factors of XR: Using Human Factors to Design XR SystemsMark Billinghurst
 
"Debugging python applications inside k8s environment", Andrii Soldatenko
"Debugging python applications inside k8s environment", Andrii Soldatenko"Debugging python applications inside k8s environment", Andrii Soldatenko
"Debugging python applications inside k8s environment", Andrii SoldatenkoFwdays
 
Scanning the Internet for External Cloud Exposures via SSL Certs
Scanning the Internet for External Cloud Exposures via SSL CertsScanning the Internet for External Cloud Exposures via SSL Certs
Scanning the Internet for External Cloud Exposures via SSL CertsRizwan Syed
 
Unraveling Multimodality with Large Language Models.pdf
Unraveling Multimodality with Large Language Models.pdfUnraveling Multimodality with Large Language Models.pdf
Unraveling Multimodality with Large Language Models.pdfAlex Barbosa Coqueiro
 
SQL Database Design For Developers at php[tek] 2024
SQL Database Design For Developers at php[tek] 2024SQL Database Design For Developers at php[tek] 2024
SQL Database Design For Developers at php[tek] 2024Scott Keck-Warren
 
Advanced Test Driven-Development @ php[tek] 2024
Advanced Test Driven-Development @ php[tek] 2024Advanced Test Driven-Development @ php[tek] 2024
Advanced Test Driven-Development @ php[tek] 2024Scott Keck-Warren
 
Understanding the Laravel MVC Architecture
Understanding the Laravel MVC ArchitectureUnderstanding the Laravel MVC Architecture
Understanding the Laravel MVC ArchitecturePixlogix Infotech
 
Integration and Automation in Practice: CI/CD in Mule Integration and Automat...
Integration and Automation in Practice: CI/CD in Mule Integration and Automat...Integration and Automation in Practice: CI/CD in Mule Integration and Automat...
Integration and Automation in Practice: CI/CD in Mule Integration and Automat...Patryk Bandurski
 
WordPress Websites for Engineers: Elevate Your Brand
WordPress Websites for Engineers: Elevate Your BrandWordPress Websites for Engineers: Elevate Your Brand
WordPress Websites for Engineers: Elevate Your Brandgvaughan
 
Designing IA for AI - Information Architecture Conference 2024
Designing IA for AI - Information Architecture Conference 2024Designing IA for AI - Information Architecture Conference 2024
Designing IA for AI - Information Architecture Conference 2024Enterprise Knowledge
 

Recently uploaded (20)

Dev Dives: Streamline document processing with UiPath Studio Web
Dev Dives: Streamline document processing with UiPath Studio WebDev Dives: Streamline document processing with UiPath Studio Web
Dev Dives: Streamline document processing with UiPath Studio Web
 
SIP trunking in Janus @ Kamailio World 2024
SIP trunking in Janus @ Kamailio World 2024SIP trunking in Janus @ Kamailio World 2024
SIP trunking in Janus @ Kamailio World 2024
 
Beyond Boundaries: Leveraging No-Code Solutions for Industry Innovation
Beyond Boundaries: Leveraging No-Code Solutions for Industry InnovationBeyond Boundaries: Leveraging No-Code Solutions for Industry Innovation
Beyond Boundaries: Leveraging No-Code Solutions for Industry Innovation
 
Science&tech:THE INFORMATION AGE STS.pdf
Science&tech:THE INFORMATION AGE STS.pdfScience&tech:THE INFORMATION AGE STS.pdf
Science&tech:THE INFORMATION AGE STS.pdf
 
APIForce Zurich 5 April Automation LPDG
APIForce Zurich 5 April  Automation LPDGAPIForce Zurich 5 April  Automation LPDG
APIForce Zurich 5 April Automation LPDG
 
"Federated learning: out of reach no matter how close",Oleksandr Lapshyn
"Federated learning: out of reach no matter how close",Oleksandr Lapshyn"Federated learning: out of reach no matter how close",Oleksandr Lapshyn
"Federated learning: out of reach no matter how close",Oleksandr Lapshyn
 
Vulnerability_Management_GRC_by Sohang Sengupta.pptx
Vulnerability_Management_GRC_by Sohang Sengupta.pptxVulnerability_Management_GRC_by Sohang Sengupta.pptx
Vulnerability_Management_GRC_by Sohang Sengupta.pptx
 
Pigging Solutions in Pet Food Manufacturing
Pigging Solutions in Pet Food ManufacturingPigging Solutions in Pet Food Manufacturing
Pigging Solutions in Pet Food Manufacturing
 
"LLMs for Python Engineers: Advanced Data Analysis and Semantic Kernel",Oleks...
"LLMs for Python Engineers: Advanced Data Analysis and Semantic Kernel",Oleks..."LLMs for Python Engineers: Advanced Data Analysis and Semantic Kernel",Oleks...
"LLMs for Python Engineers: Advanced Data Analysis and Semantic Kernel",Oleks...
 
Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)
Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)
Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)
 
Human Factors of XR: Using Human Factors to Design XR Systems
Human Factors of XR: Using Human Factors to Design XR SystemsHuman Factors of XR: Using Human Factors to Design XR Systems
Human Factors of XR: Using Human Factors to Design XR Systems
 
"Debugging python applications inside k8s environment", Andrii Soldatenko
"Debugging python applications inside k8s environment", Andrii Soldatenko"Debugging python applications inside k8s environment", Andrii Soldatenko
"Debugging python applications inside k8s environment", Andrii Soldatenko
 
Scanning the Internet for External Cloud Exposures via SSL Certs
Scanning the Internet for External Cloud Exposures via SSL CertsScanning the Internet for External Cloud Exposures via SSL Certs
Scanning the Internet for External Cloud Exposures via SSL Certs
 
Unraveling Multimodality with Large Language Models.pdf
Unraveling Multimodality with Large Language Models.pdfUnraveling Multimodality with Large Language Models.pdf
Unraveling Multimodality with Large Language Models.pdf
 
SQL Database Design For Developers at php[tek] 2024
SQL Database Design For Developers at php[tek] 2024SQL Database Design For Developers at php[tek] 2024
SQL Database Design For Developers at php[tek] 2024
 
Advanced Test Driven-Development @ php[tek] 2024
Advanced Test Driven-Development @ php[tek] 2024Advanced Test Driven-Development @ php[tek] 2024
Advanced Test Driven-Development @ php[tek] 2024
 
Understanding the Laravel MVC Architecture
Understanding the Laravel MVC ArchitectureUnderstanding the Laravel MVC Architecture
Understanding the Laravel MVC Architecture
 
Integration and Automation in Practice: CI/CD in Mule Integration and Automat...
Integration and Automation in Practice: CI/CD in Mule Integration and Automat...Integration and Automation in Practice: CI/CD in Mule Integration and Automat...
Integration and Automation in Practice: CI/CD in Mule Integration and Automat...
 
WordPress Websites for Engineers: Elevate Your Brand
WordPress Websites for Engineers: Elevate Your BrandWordPress Websites for Engineers: Elevate Your Brand
WordPress Websites for Engineers: Elevate Your Brand
 
Designing IA for AI - Information Architecture Conference 2024
Designing IA for AI - Information Architecture Conference 2024Designing IA for AI - Information Architecture Conference 2024
Designing IA for AI - Information Architecture Conference 2024
 

Andreas Agostin Installation Solutions

  • 1. 1 11 Successful Implementation & Improved Operation Installation – Issues and Solutions Andreas Agostin Industrial Network Sales Specialist Asia Pacific MTL Instruments Singapore, part of Cooper Crouse-Hinds 15.05.2013 Perth
  • 2. 2 22 Successful Implementation & Improved Operation Introduction Fieldbus is in use since 19981, yet still new for many customers today. This presentation will look at the installation issues and the “lessons learned”, so that you can benefits from their experience. 1 Shell Malampaya is one of the early, larger projects. 1600 FF instruments are in use. The project produced first gas in Oct 2001. Source: J. Seaver, Shell Philippines Exploration B.V., “Malampaya Deep Water Gas-to-Power Project: Malampaya Subsea Development”, Offshore Technology Conference, 6 May-9 May 2002, Houston, Texas.
  • 3. 3 33 Successful Implementation & Improved Operation Introduction The pictures you will see are collected from “real” projects; they are neither simulated nor “demo”. We will look at – Control room: cabinet design and wiring – Field: Wiring, field junction boxes, field device installation. Processes typically involve explosion protection methods “intrinsic safety” (I.S. / Ex i; energy limitation by a ‘barrier’) or “explosion proof” (Ex d; protection by explosionproof enclosure). Many examples use “IS” as this is a key product of my company and that is where I get involved.
  • 4. 4 44 Successful Implementation & Improved Operation Disclaimer All products shown serve as EXAMPLE only. In particular, problems shown in conjunction with a product serve as example only. The brand/make/model of the product serving as example is IRRELEVANT. Problems highlighted serve as example only, are do in no way express problems with a particular product, model or brand.
  • 5. 5 55 Successful Implementation & Improved Operation The conventional system
  • 6. 6 66 Successful Implementation & Improved Operation Control room – Conventional wiring 2nd level 1st level junction box Marshalling and barrier Control system
  • 7. 7 77 Successful Implementation & Improved Operation Control room – Conventional wiring Marshalling: to group AI / AO / DI / DO / etc
  • 8. 8 88 Successful Implementation & Improved Operation Control room – Conventional wiring
  • 9. 9 99 Successful Implementation & Improved Operation Control room – Conventional wiring Long wires, standard length Allows pre-fabrication of wire (ferrules, mounting) Conventional signals (4-20mA, RTD, thermocouple, 0- 5V/10V/24V) – slow, hardware filtered, length less important
  • 10. 10 1010 Successful Implementation & Improved Operation Field – Conventional wiring Quality (material) Safety Location / access Weight/size, … 10
  • 11. 11 1111 Successful Implementation & Improved Operation Fieldbus versus conventional
  • 12. 12 1212 Successful Implementation & Improved Operation Control room – DCS wiring EXAMPLES Fieldbus Conventional
  • 13. 13 1313 Successful Implementation & Improved Operation Control room – DCS wiring EXAMPLES Installations do not have to look messy. They can be very nice, too. Fieldbus Conventional
  • 14. 14 1414 Successful Implementation & Improved Operation Control room – DCS wiring EXAMPLES Fieldbus Conventional
  • 15. 15 1515 Successful Implementation & Improved Operation Control room – DCS wiring EXAMPLES Fieldbus Fieldbus
  • 16. 16 1616 Successful Implementation & Improved Operation Control room – DCS wiring Important: do not use individual wires to wire cabinet. Use fieldbus cable and shield properly. Why? Higher signal frequency – protect them against disturbances. Individual wires will cause crosstalk from one wire to another – communication faults can occur. ??
  • 17. 17 1717 Successful Implementation & Improved Operation Fieldbus Cable Recommended: Type A cable: Shielded twisted pair Other cable is possible, but there are limitations in terms of achievable cable distance and electromagnetic compatibility (EMC). Fieldbus is a digital “high speed” (31kBit/s) communication, a current modulated signal superimposed on the DC power.
  • 18. 18 1818 Successful Implementation & Improved Operation Fieldbus Cable Shielded pair principle Foil shield Foil plus braided shield SWA Not round – Not recommended Ideally round – Recommended Fillers (solid or fiber)
  • 19. 19 1919 Successful Implementation & Improved Operation Fieldbus Cable SWA Multi-pair Multi-pair (multi-trunk)
  • 20. 20 2020 Successful Implementation & Improved Operation Please not this way Images obscured – Brand is irrelevant.
  • 21. 21 2121 Successful Implementation & Improved Operation Control room – DCS wiring
  • 22. 22 2222 Successful Implementation & Improved Operation Fieldbus system – Field wiring ?? •• Parallel wiringParallel wiring (terminals)(terminals) •• special wiringspecial wiring blocksblocks •• (daisy chaining)(daisy chaining)
  • 23. 23 2323 Successful Implementation & Improved Operation Fieldbus system – Field junction boxes Principle of wiring distribution in junction box: all devices are in parallel Source: FF AG 140 Rev. 1
  • 24. 24 2424 Successful Implementation & Improved Operation Fieldbus system – Field junction boxes Please not this way
  • 25. 25 2525 Successful Implementation & Improved Operation25 Fieldbus system – Field junction boxes Use dedicated wiring blocks with built-in electronic short circuit protection. LEDs: - built-in s/c protection
  • 26. 26 2626 Successful Implementation & Improved Operation Good Wiring Practices Test segment wiring before connecting components Avoid damaging the wire when removing insulation Ground the cable shield only at one point (at the control room end) Insulate the ungrounded end of the cable shield (at the instrument) Ground armor on both sides (potential equalization) Use crimp ferrules – Ferrule diameter must fit wire – Crimp tool must fit ferrule – Ferrule must fit terminals Maintain polarity and associated color codes throughout the segment
  • 27. 27 2727 Successful Implementation & Improved Operation Good Wiring Practices Lessons learned: Torque screwdriver Wire end ferrules Right (!) wire strippers Fieldbus tester Harms wire strands Choose right size AWG ..
  • 28. 28 2828 Successful Implementation & Improved Operation Fieldbus Design Tools (Examples)
  • 29. 29 2929 Successful Implementation & Improved Operation Project Procedure Best practice: Bench test Functional tests and interoperability test FAT SAT
  • 30. 30 3030 Successful Implementation & Improved Operation Installation Guidelines Cable Tests – Experience has shown that new cable irregularities are so infrequent that it is more efficient to check cable after installation Cable Installation – Verify that cable is properly installed, bypassing impact from wiring components Segment Checkout – Check of proper wiring of wiring components Device installation – Check of proper device installation Loop checkout – Functional test
  • 31. 31 3131 Successful Implementation & Improved Operation Installation tools Portable fieldbus diagnostic test equipment (Handhelds) Measures relevant fieldbus parameters Establish baseline after commissioning
  • 32. 32 3232 Successful Implementation & Improved Operation Handheld diagnostic tools Handheld Diagnostic Tool Device 1 Device 3Device 2 T Device Coupler & Terminator (non-IS) Spurs FFPS T FF Power Supply & Conditioner &Terminator 24VDC Host Computer H1 Interface Connect at respective location to obtain accurate measurement.
  • 33. 33 3333 Successful Implementation & Improved Operation Handheld diagnostic tools Handheld Diagnostic Tool FFPS T FF Power Supply & Conditioner &Terminator 24VDC Host Computer H1 Interface Fieldbus barrier Device 1 Device 3Device 2 Fieldbus barrier & Terminator Intrinsically Safe Spurs T Fieldbus barrier To measure at fieldbus barrier/IS segments, Handheld needs to be Ex i approved. Important since the galvanic isolation of fieldbus barrier impacts on measurement.
  • 34. 34 3434 Successful Implementation & Improved Operation Earthing/Grounding Grounding in the control room One point grounding only Continuous shield from control room to the field Shield not connected at the field instrument Connect cable armor at both ends (potential equalization)
  • 35. 35 3535 Successful Implementation & Improved Operation Earthing/Grounding Device 1 Device 3Device 2 T Wiring Block & TerminatorFFPS T FF Power Supply & Conditioner &Terminator 24VDC Host Computer H1 Interface
  • 36. 36 3636 Successful Implementation & Improved Operation Fieldbus barrier Device 1 Device 3Device 2 Fieldbus barrier & Terminator Intrinsically Safe Spurs T Fieldbus barrier Earthing/Grounding FFPS T FF Power Supply & Conditioner &Terminator 24VDC Host Computer H1 Interface
  • 37. 37 3737 Successful Implementation & Improved Operation Local field junction box for 4 instruments. Rust prevented proper grounding, so that separate ground connection was required
  • 38. 38 3838 Successful Implementation & Improved Operation Field – Fieldbus wiring Green: fieldbus Red: Power (Motors, etc) For easy maintenance
  • 39. 39 3939 Successful Implementation & Improved Operation Troubleshooting
  • 40. 40 4040 Successful Implementation & Improved Operation Daisy chaining – not recommended
  • 41. 41 4141 Successful Implementation & Improved Operation Troubleshooting Electrical welding can generate significant surges
  • 42. 42 4242 Successful Implementation & Improved Operation Bend radius too tight, Upward facing gland risks water ingress Two cables into one gland prevents sealing of gland
  • 43. 43 4343 Successful Implementation & Improved Operation Water ingress caused corrosion of wire and terminals
  • 44. 44 4444 Successful Implementation & Improved Operation Cable jacket stripped back too far Troubleshooting
  • 45. 45 4545 Successful Implementation & Improved Operation Wires coming out of ferrules
  • 46. 46 4646 Successful Implementation & Improved Operation Troubleshooting Earth stud not connected – internal surge protectors not working
  • 47. 47 4747 Successful Implementation & Improved Operation Troubleshooting Ground not connected
  • 48. 48 4848 Successful Implementation & Improved Operation Troubleshooting Poor cable (shield) quality
  • 49. 49 4949 Successful Implementation & Improved Operation Troubleshooting Grounding concept failure-prone
  • 50. 50 5050 Successful Implementation & Improved Operation Troubleshooting Water marks, fungus inside junction box
  • 51. 51 5151 Successful Implementation & Improved Operation Troubleshooting Wire squeezed by enclosure lid – water ingress
  • 52. 52 5252 Successful Implementation & Improved Operation http://forums.fieldbus.org/showthread.php?t=1298
  • 53. 53 5353 Successful Implementation & Improved Operation Conclusion Fieldbus is robust if the installation is adjusted to the requirements of a digital communication line Do not simply copy 4-20 methods Use fieldbus smartly (e.g. eliminate marshalling) Good wiring practices are more important than on 4-20 due to bus structure Train your installers on fieldbus practices
  • 54. 54 5454 Successful Implementation & Improved Operation Installation – Issues and Solutions Andreas Agostin Industrial Network Sales Specialist Asia Pacific MTL Instruments Singapore, part of Cooper Crouse-Hinds andreas.agostin@cooperindustries.com Ph: +65 97585161