SlideShare a Scribd company logo
ALFRED J. SOCIAS, CSI, CDT
5209 Greyfield Blvd.
Durham, NC 27713
Home: [919] 321-6659
Mobile: [925] 451-1761
E-mail: alsocias@sbcglobal.net
OBJECTIVE Employment as a job captain / project architect on commercial building
or educational building project types.
EDUCATION Revit Training Videos (Scott Onstott) – June 2008
Revit Fundamentals Class – April 2008
Design + Technology of Roofing Systems Class - May 2003
Better Understanding of Roof Systems Institute
Principal & Practices of Specifying Class - March 2003
East Bay/Oakland CSI Chapter
2001 CBC Non-Structural Update Class - June 2002
International Conference of Building Officials
Building Codes Semester Long Class [1998 UBC] - December 2000
San Francisco City College
Bachelor of Architecture - December 1991
California State Polytechnic University, Pomona, California
Graphic Arts Certificate - December 1988
Mount San Antonio College, Walnut, California
Contra Costa College, San Pablo, California
CERTIFICATION Construction Documents Technologist Certificate 2000
Construction Specifications Institute
MANAGEMENT Managed a variety of architectural projects such as school laboratory
buildings, school modernizations, grocery store additions / remodels,
retail shell buildings, mid-rise offices, tenant improvements, warehouses,
single and multi-family housing developments, custom estate residences,
residential room addition/remodels, and churches from schematic
design, to design development, to bid, to construction documents, and to
construction administration phases. All included building official
coordination, consultant coordination, project file management,
specification coordination, and construction administration.
TECHNICAL Drafted architectural design development packages, construction
documents, addenda, and clarifications on CAD. Prepared detailed
building code analysis for various project types including assigning
building occupancy classification and construction types. Determined
occupancy, and or area separation requirements, exterior wall protection,
allowable area and occupant loads. Prepared allowable area
calculations, and exit width calculations. Researched and incorporated
architectural products into projects. Solved architectural, fireproofing and
waterproofing details. Coordinated architectural drawings with consultant
drawings. Edited specification sections including door hardware groups.
Assisted with construction administration including shop drawing and
submittal processing, and clarification generation. Field verified existing
fire & life safety exiting schemes. Field verified existing accessible or
non-accessible conditions.
DESIGN Designed architectural space plans, sections and elevations. Designed
exiting schemes from hallways to corridors to enclosed stair towers.
Designed accessible and non-accessible site parking, drive aisles, site
and building paths of travel. Designed ramps, stairs, toilet rooms, areas
of rescue assistance, wheelchair lifts and elevators for school
modernization projects. Design developed various project types in
preparation for construction documents.
COMPUTER Windows XP: Revit 8.1, AutoCAD 2013, Microstation CAD V8, Microsoft
Outlook, Microsoft Word, Microsoft Excel, Adobe Acrobat, and WinZip.
Windows Mobile: Pocket Word, Pocket Excel, Adobe Reader, Pocket
CAD
COMMUNICATION Direct communication with building officials, project consultants - civil,
structural, mechanical, electrical, plumbing, landscape, fire alarm,
telecommunication, and title 24 energy, and product representatives.
PROJECTS Microsoft Building 4, Redmond, WA - Construction Documents &
Construction Administration
Interior tenant improvement & office remodel of existing type II building
Nazareth Terrace, San Mateo, CA - Construction Documents
Mixed use multi-family residential / office / retail building with 1 stories of
apartments, 1 story of office, and 1 story of retail / parking garage. 9 total
dwelling units, elevator, storefront, basically 2 stories of wood frame
construction on a concrete podium.
AOL, Palo Alto, CA - Construction Documents & Construction
Administration
Interior tenant improvement & office remodel of existing type II building
including entry lobby & custom furniture and graphics.
Box.net, Palo Alto, CA - Construction Documents
Interior tenant improvement & office remodel
Hangar 42 Studios, Walker, MI
Interior remodel of office & support spaces for future movie studio.
University of California, Berkeley, School of Law Building, Boalt Hall,
Berkeley, CA - Construction Documents
Interior tenant improvement of existing law school building. Program
included distance learning room, classrooms, offices & journal rooms.
Albertsons Grocery Store, Lake Forest, CA – Construction Documents &
Specifications
Existing 43,000 s.f. grocery store remodel / addition. Entry piece
addition, new interior décor package, and new refrigeration.
Traditions Building, Walnut Creek, CA - Construction Documents
Interior tenant improvement and minor exterior building improvements.
Phased project included obtaining demolition permit, site development
permit, tenant improvement permit, exterior building improvements
permit, and fire district approval.
Hillcrest Village, Antioch, CA – Site Plan Design Development
16 building office / retail / restaurant on a 1,004,000 s.f. site. Calculated
parking basis including HCP. Determined fire truck access and
accessible paths of travel.
Enea Plaza, Dublin, CA - Site Plan Design Development
3 retail buildings on a 166,800 s.f. site. Calculated parking basis
including HCP. Determined fire truck access and accessible paths of
travel.
Buchanan Crossings, Antioch, CA - Site Plan Design Development
9 building office / retail / restaurant on a 590,000 s.f. site. Calculated
parking basis including HCP. Determined fire truck access and
accessible paths of travel.
Canyon Oaks Plaza, Chico, CA - Site Plan Design Development
6 building office / retail / restaurant on a 245,600 s.f. site. Calculated
parking basis including HCP. Determined fire truck access and
accessible paths of travel.
Kiernan Plaza, Salida, CA - Construction Documents
New 12,000 s.f. retail shell building that was subdivided into 8 tenant
spaces. Built on a 52,000 s.f. lot.
Bristol Farms Grocery Store, Santa Barbara, CA - Construction
Documents & Specifications
Existing 34,700 s.f. grocery store remodel. Included minor exterior
building architectural elements, new interior décor, and new refrigeration.
557 Merrimac, Oakland, CA - Construction Documents
Mixed use multi-family residential / retail building with 3 stories of
apartments, 1 story of retail / parking garage and basement parking. 30
total dwelling units, elevator, storefront, basically 3 stories of wood frame
construction on a concrete podium. Calculated as 3 separate buildings
for allowable area purposes.
Contra Costa Gospel Church, Walnut Creek, CA – Construction
Documents
New 3096 s.f. multi-purpose building on an existing church site.
Leonard Flynn Elementary School Modernization, San Francisco, CA -
Construction Documents
One building which includes a day care center, multi-purpose room,
library, and classrooms whose scope of work included accessibility and
fire-life safety upgrades to current code, separate exit routes for
kindergarten and elementary students, exterior door replacement, interior
finishes and casework, toilet room remodels, and electrical, plumbing
systems upgrades.
Tileshop Warehouse, Berkeley, CA - Construction Documents
New 23,000 s.f. two story warehouse with ancillary office space features
metal cladding over steel and metal stud structure.
Thurgood Marshall High School Modernization, San Franciso, CA -
Construction Documents
One 150,000 s.f. building which included an auditorium, gymnasium,
cafeteria, library, classrooms, and laboratories whose scope of work
included accessibility and fire-life safety upgrades to current code,
gymnasium addition, roofing and waterproofing, interior finishes and
casework, toilet room remodels, and electrical, plumbing, and data-
communication systems upgrades.
Salvio Street Parking Structure, Concord, CA - Construction Documents
Addtition-remodel of existing 6 story post tension structure parking
garage. Work included new offices, accessible parking re-stripping, new
accessible toilets, and upgrade mechanical, electrical and plumbing
systems.
Zio Fraedo's Banquet Hall, Pleasant Hill, CA - Construction Documents
New Mediterranean influenced 8700 s.f. banquet facility with restaurant,
commercial kitchen, and offices.
King of Thai Noodle House, San Francisco, CA - Construction
Documents
Tenant improvement of two story restaurant with commercial kitchen,
and offices.
Palo Alto High School Science Building, Palo Alto, CA - Construction
Documents & Specifications
New 28,000 s.f. 1 story science building on an existing campus.
Building program included 10 labs, prep space, and a teachers' office
suite.
California State University Hayward Library Fire Repair, Hayward CA -
Construction Documents
Interior remodel of fire damaged library. Included offices, instructional
media center and a high tech distance learning classroom. Seismic
upgrade included floor to ceiling high steel K bracing.
AC Transit Headquarters, Oakland, CA - Construction Documents
7 floor tenant improvement of an existing 10 floor mid-rise office building.
Includes custom ticket window casework with butt glazing, computer
casework and new manufacturer workstations.
AT Systems Armored Transport Facility, Oakland, CA - Construction
Documents
Existing 12,000 s.f. repair garage converted to a mixed use repair
garage-coin counting facility.
Jackson Center One, Oakland, CA - Construction Documents
Tenant improvement and seismic upgrade of the existing mid-rise
defunct State Office Building. 10 floor scope includes new gunite
exterior, exterior granite cladding, exterior metal canopies, new built-up
roofing, and storefront.
Foley & Lardner Law Offices, San Francisco, CA - Construction
Documents
Two floors of high rise, high end, high tech design interior tenant
improvement. Includes custom detailed desks, cabinetry, partitions,
soffits, glass railed stairways, and doors. Approximately 33,000 s.f.
Villa Cortona, San Jose, CA - Construction Documents
New 72 unit French Provincial multi-family housing project consisting of 2
duplex town home building types and 2 condominium building types of
approximately 4800 to 10,300 s.f., all units are multi-level which
exempted accessible requirements, and all are located on a complex
sloping site.
Palo Alto High School Modernization, Palo Alto, CA - Construction
Documents
19 existing buildings whose scope of work included accessibility and fire-
life safety upgrades to current code, exterior door replacement, roofing
and waterproofing, interior finishes and casework, toilet room remodels,
and electrical, plumbing, and data-communication systems upgrades.
Vallejo School Modernization, Vallejo, CA - Construction Documents
8 elementary school modernization projects whose scope of work
included accessibility and fire-life safety upgrades to current code,
exterior door and window replacement, interior finishes and casework,
toilet room remodels, and electrical, plumbing, and data-communication
systems upgrades.
Marr Residence, Atherton, CA - Construction Documents
A new 11,000 s.f. French Normandy style custom estate home included
a sunroom greenhouse, swimming pool, pool pavilion, three car garage,
carriage house, guest house, tennis courts, a hidden garden and 'smart
home' electronics.
Del Grande Residence, Los Gatos, CA - Construction Documents
A new 7,600 s.f. hillside custom estate home reflects the architecture of
Carmel. It features decks and terraces that take full advantage of a
panoramic valley view below, swimming pool and croquet lawn.
Nepenthe, Sedona, AZ - Construction Documents
A new 182 unit complex of multi-family town houses comprised of four,
five, and seven unit buildings. Geometric shapes and colors relate to the
Sedona's surrounding red sandstone Bell Mountain which is adjacent to
the site.
Highlands at Clearbrook, Hayward, CA - Construction Documents
2 designs of new single family production housing about 2600 s.f. to
3200 s.f. each. Both designs were for lots with a 2:1 downward slope and
incorporated view decks from both the first and second floors.
AWARDS San Jose Veterans Memorial Design Competition, 1993,
COMPETITIONS participant. San Francisco Waterfront Competition, 1992, Honorable
mention/gallery exhibitor. Tijuana Cultural Center Demountable Roof
Structure Competition, 1991. Douglas Conelly Memorial Scholarship in
Architecture, Contra Costa College, San Pablo, California, 1987. Solano
County fair ribbons in architectural and mechanical drafting, 1984.
EMPLOYMENT PROJECT ARCHITECT
Studio O+A, San Francisco, CA 9/09 to present (working remotely from
home in Durham, NC)
PROJECT ARCHITECT (Contract Work)
ID Architecture, Pleasanton, CA 2/09 to 8/09
PROJECT ARCHITECT
The Ratcliff Architects, Emeryville, CA 2/08 to 12/08
JOB CAPTAIN
Craig+Grant Architects, Danville, CA 11/05 to 1/08
JOB CAPTAIN
VBN Architects, Oakland, CA 4/98 to 11/05
JOB CAPTAIN
Loving & Campos Architects, Inc., Walnut Creek, CA 3/95 to 4/98
JUNIOR ARCHITECT
Kattenburg & Associates, Benicia, CA 6/92 to11/94
ARCHITECTURAL DRAFTSMAN
Architectural Design, San Dimas, CA 6/88 to 5/90
ENGINEERING AIDE
Vallejo Sanitation & Flood Control District, Vallejo, CA 4/83 to 8/87
ORGANIZATIONS Construction Specifications Institute - Professional Member - SF Chapter
- 2000 to 2003
International Conference of Building Officials/International Code Council
- Professional Member, 1998 to 2004
PORTFOLIO And samples of working drawings available upon request
REFERENCES Primo Orpilla, Owner, and Perry Stephney, Studio Manger, Studio O+A,
San Francisco, CA
[415] 908-1880
Bill Douglas & Carmen Campos, Owners, ID Architecture, Pleasanton,
CA
[925] 484-5245
Moshe Dinar, Owner, Dinar & Associates, Oakland, CA
[510] 893-8300
WEBSITE https://www.linkedin.com/in/alfred-j-socias-csi-cdt-b8069512
AOL Lobby
AOL Lobby
AOL Conference Room AOL Reception Desk

More Related Content

What's hot

Morris Group Resume
Morris Group ResumeMorris Group Resume
Morris Group Resume
morrisgroup
 
Kbe parking structures
Kbe parking structuresKbe parking structures
Kbe parking structures
charkins
 
A Portfolio 101007
A Portfolio 101007A Portfolio 101007
A Portfolio 101007
TRKnappArch
 
William Pitt Union Energy Improvement Report
William Pitt Union Energy Improvement ReportWilliam Pitt Union Energy Improvement Report
William Pitt Union Energy Improvement ReportDejia Kong
 
McNamara Profile Summary
McNamara Profile SummaryMcNamara Profile Summary
McNamara Profile SummaryUzoma Nwakuche
 
D Ford Resume 3 14 10
D Ford Resume 3 14 10D Ford Resume 3 14 10
D Ford Resume 3 14 10
gueste65323
 
Brochure of Professional Experience
Brochure of Professional ExperienceBrochure of Professional Experience
Brochure of Professional Experiencepederson
 
FJL presentation
FJL presentationFJL presentation
FJL presentationfj_link
 
Resume 2016
Resume 2016Resume 2016
Resume 2016
Randy Reynolds
 
Multi Unit Housing.3.26.12
Multi Unit Housing.3.26.12Multi Unit Housing.3.26.12
Multi Unit Housing.3.26.12
charkins
 
Measure A Status Report, 2010
Measure A Status Report, 2010Measure A Status Report, 2010
Measure A Status Report, 2010
San Ramon Valley USD
 
Interiors
InteriorsInteriors
Interiorststack
 
Master_Resume__Ron_White_9
Master_Resume__Ron_White_9Master_Resume__Ron_White_9
Master_Resume__Ron_White_9Ron White
 
Steve Binger - Resume & Project List
Steve Binger - Resume & Project ListSteve Binger - Resume & Project List
Steve Binger - Resume & Project ListStephen Binger
 
Did You Know: M SPACE
Did You Know: M SPACEDid You Know: M SPACE
Did You Know: M SPACE
M SPACE
 
Arl Project List
Arl Project ListArl Project List
Arl Project Listanthee13
 

What's hot (20)

Francisco Quintana Resume
Francisco Quintana Resume Francisco Quintana Resume
Francisco Quintana Resume
 
Morris Group Resume
Morris Group ResumeMorris Group Resume
Morris Group Resume
 
E. Kochaeva - projects (1)
E. Kochaeva - projects (1)E. Kochaeva - projects (1)
E. Kochaeva - projects (1)
 
Kbe parking structures
Kbe parking structuresKbe parking structures
Kbe parking structures
 
A Portfolio 101007
A Portfolio 101007A Portfolio 101007
A Portfolio 101007
 
William Pitt Union Energy Improvement Report
William Pitt Union Energy Improvement ReportWilliam Pitt Union Energy Improvement Report
William Pitt Union Energy Improvement Report
 
McNamara Profile Summary
McNamara Profile SummaryMcNamara Profile Summary
McNamara Profile Summary
 
BPA Commercial
BPA CommercialBPA Commercial
BPA Commercial
 
D Ford Resume 3 14 10
D Ford Resume 3 14 10D Ford Resume 3 14 10
D Ford Resume 3 14 10
 
Brochure of Professional Experience
Brochure of Professional ExperienceBrochure of Professional Experience
Brochure of Professional Experience
 
FJL presentation
FJL presentationFJL presentation
FJL presentation
 
Resume 2016
Resume 2016Resume 2016
Resume 2016
 
Multi Unit Housing.3.26.12
Multi Unit Housing.3.26.12Multi Unit Housing.3.26.12
Multi Unit Housing.3.26.12
 
Measure A Status Report, 2010
Measure A Status Report, 2010Measure A Status Report, 2010
Measure A Status Report, 2010
 
Interiors
InteriorsInteriors
Interiors
 
Master_Resume__Ron_White_9
Master_Resume__Ron_White_9Master_Resume__Ron_White_9
Master_Resume__Ron_White_9
 
Steve Binger - Resume & Project List
Steve Binger - Resume & Project ListSteve Binger - Resume & Project List
Steve Binger - Resume & Project List
 
mohamadalmasri cv,.
mohamadalmasri cv,.mohamadalmasri cv,.
mohamadalmasri cv,.
 
Did You Know: M SPACE
Did You Know: M SPACEDid You Know: M SPACE
Did You Know: M SPACE
 
Arl Project List
Arl Project ListArl Project List
Arl Project List
 

Viewers also liked

Presentazioa j.pollock
Presentazioa j.pollockPresentazioa j.pollock
Presentazioa j.pollockmikeljara
 
Rename with Confidence – Building Dynamic FileMaker Systems
Rename with Confidence – Building Dynamic FileMaker SystemsRename with Confidence – Building Dynamic FileMaker Systems
Rename with Confidence – Building Dynamic FileMaker Systems
DB Services
 
Moltrup Content Strategy Stanford Medicine 9 2016
Moltrup Content Strategy Stanford Medicine 9 2016Moltrup Content Strategy Stanford Medicine 9 2016
Moltrup Content Strategy Stanford Medicine 9 2016Wendy Moltrup
 
10 Most Frequently Asked Questions about Measuring Social Media
10 Most Frequently Asked Questions about Measuring Social Media10 Most Frequently Asked Questions about Measuring Social Media
10 Most Frequently Asked Questions about Measuring Social Media
Alan K'necht
 
CV Karen Silence January 2016
CV Karen Silence January 2016CV Karen Silence January 2016
CV Karen Silence January 2016Karen Silence
 
Rx16 workshop 200_group_ppt
Rx16 workshop 200_group_pptRx16 workshop 200_group_ppt
Rx16 workshop 200_group_ppt
OPUNITE
 
WordPress Website Creation Training Course Slides
WordPress Website Creation Training Course SlidesWordPress Website Creation Training Course Slides
WordPress Website Creation Training Course Slides
Equinet Academy
 
flat design and colors
flat design and colorsflat design and colors
flat design and colors
Halil Eren Çelik
 
Elementos básicos de la computadora y sus funciones.
Elementos básicos de la computadora y sus funciones.Elementos básicos de la computadora y sus funciones.
Elementos básicos de la computadora y sus funciones.
jrtorresb
 
Capítulo 1 introducción a los servicios y aplicaciones móviles
Capítulo 1   introducción a los servicios y aplicaciones móvilesCapítulo 1   introducción a los servicios y aplicaciones móviles
Capítulo 1 introducción a los servicios y aplicaciones móviles
Juan Carlos Cuevas Martínez
 
Resources and Tools For Website Development
Resources and Tools For Website DevelopmentResources and Tools For Website Development
Resources and Tools For Website Development
199.design
 

Viewers also liked (14)

Presentazioa j.pollock
Presentazioa j.pollockPresentazioa j.pollock
Presentazioa j.pollock
 
Rename with Confidence – Building Dynamic FileMaker Systems
Rename with Confidence – Building Dynamic FileMaker SystemsRename with Confidence – Building Dynamic FileMaker Systems
Rename with Confidence – Building Dynamic FileMaker Systems
 
Moltrup Content Strategy Stanford Medicine 9 2016
Moltrup Content Strategy Stanford Medicine 9 2016Moltrup Content Strategy Stanford Medicine 9 2016
Moltrup Content Strategy Stanford Medicine 9 2016
 
10 Most Frequently Asked Questions about Measuring Social Media
10 Most Frequently Asked Questions about Measuring Social Media10 Most Frequently Asked Questions about Measuring Social Media
10 Most Frequently Asked Questions about Measuring Social Media
 
Work and education of Dr.Anvarsalim
Work and education of Dr.AnvarsalimWork and education of Dr.Anvarsalim
Work and education of Dr.Anvarsalim
 
Vovici Vision 2011: Better Surveys Through Social Media
Vovici Vision 2011: Better Surveys Through Social MediaVovici Vision 2011: Better Surveys Through Social Media
Vovici Vision 2011: Better Surveys Through Social Media
 
CV Karen Silence January 2016
CV Karen Silence January 2016CV Karen Silence January 2016
CV Karen Silence January 2016
 
Rx16 workshop 200_group_ppt
Rx16 workshop 200_group_pptRx16 workshop 200_group_ppt
Rx16 workshop 200_group_ppt
 
WordPress Website Creation Training Course Slides
WordPress Website Creation Training Course SlidesWordPress Website Creation Training Course Slides
WordPress Website Creation Training Course Slides
 
flat design and colors
flat design and colorsflat design and colors
flat design and colors
 
Elementos básicos de la computadora y sus funciones.
Elementos básicos de la computadora y sus funciones.Elementos básicos de la computadora y sus funciones.
Elementos básicos de la computadora y sus funciones.
 
Capítulo 1 introducción a los servicios y aplicaciones móviles
Capítulo 1   introducción a los servicios y aplicaciones móvilesCapítulo 1   introducción a los servicios y aplicaciones móviles
Capítulo 1 introducción a los servicios y aplicaciones móviles
 
Resources and Tools For Website Development
Resources and Tools For Website DevelopmentResources and Tools For Website Development
Resources and Tools For Website Development
 
3D
3D3D
3D
 

Similar to Al's_Resume - Job Captain - Commercial

Custom Commercial Projects
Custom Commercial ProjectsCustom Commercial Projects
Custom Commercial ProjectsDaniel Scales
 
Lon Dunaway Resume
Lon Dunaway ResumeLon Dunaway Resume
Lon Dunaway ResumeLon Dunaway
 
Project Portfolio Powerpoint
Project Portfolio PowerpointProject Portfolio Powerpoint
Project Portfolio Powerpointwdemshar
 
KGEIGER_PROJECTHISTORY2015
KGEIGER_PROJECTHISTORY2015KGEIGER_PROJECTHISTORY2015
KGEIGER_PROJECTHISTORY2015Kelly Geiger
 
Robin resume pub works
Robin resume pub worksRobin resume pub works
Robin resume pub works
Robin Paul Roderick
 
Newton Peter Master 04 15 09
Newton Peter Master 04 15 09Newton Peter Master 04 15 09
Newton Peter Master 04 15 09
Archicon
 
David h page 2 and 3 resume
David h page 2 and 3 resumeDavid h page 2 and 3 resume
David h page 2 and 3 resumeguestd769e2
 
Heyer Professional Profile
Heyer Professional ProfileHeyer Professional Profile
Heyer Professional Profilepheyer351
 
Enriquez_Adriana_Portfolio binder
Enriquez_Adriana_Portfolio binderEnriquez_Adriana_Portfolio binder
Enriquez_Adriana_Portfolio binderAdriana Enriquez
 
WoodWorks: Cost Dialogues: The Contractor Perspective on Mass Timber Buildings
WoodWorks: Cost Dialogues: The Contractor Perspective on Mass Timber BuildingsWoodWorks: Cost Dialogues: The Contractor Perspective on Mass Timber Buildings
WoodWorks: Cost Dialogues: The Contractor Perspective on Mass Timber Buildings
Amanda Schreiner
 
CDE_Sustainability Performance_20240214.pdf
CDE_Sustainability Performance_20240214.pdfCDE_Sustainability Performance_20240214.pdf
CDE_Sustainability Performance_20240214.pdf
8-koi
 
MJH Projects
MJH ProjectsMJH Projects
MJH Projects
Mike Harness
 
Selected Municipal & Governmental Projects
Selected Municipal & Governmental Projects Selected Municipal & Governmental Projects
Selected Municipal & Governmental Projects Perry Becker
 
Completed project list for mark shaw 160614
Completed project list for mark shaw 160614Completed project list for mark shaw 160614
Completed project list for mark shaw 160614
Mark Shaw
 

Similar to Al's_Resume - Job Captain - Commercial (20)

Green leed projects
Green leed projectsGreen leed projects
Green leed projects
 
Custom Commercial Projects
Custom Commercial ProjectsCustom Commercial Projects
Custom Commercial Projects
 
Shital_Resume
Shital_ResumeShital_Resume
Shital_Resume
 
Lon Dunaway Resume
Lon Dunaway ResumeLon Dunaway Resume
Lon Dunaway Resume
 
Project Portfolio Powerpoint
Project Portfolio PowerpointProject Portfolio Powerpoint
Project Portfolio Powerpoint
 
Timothy-Bennett-CV
Timothy-Bennett-CVTimothy-Bennett-CV
Timothy-Bennett-CV
 
KGEIGER_PROJECTHISTORY2015
KGEIGER_PROJECTHISTORY2015KGEIGER_PROJECTHISTORY2015
KGEIGER_PROJECTHISTORY2015
 
Robin resume pub works
Robin resume pub worksRobin resume pub works
Robin resume pub works
 
Biron Resume 3
Biron Resume 3Biron Resume 3
Biron Resume 3
 
Newton Peter Master 04 15 09
Newton Peter Master 04 15 09Newton Peter Master 04 15 09
Newton Peter Master 04 15 09
 
Michael Sackler AIA_Portfolio
Michael Sackler AIA_PortfolioMichael Sackler AIA_Portfolio
Michael Sackler AIA_Portfolio
 
David h page 2 and 3 resume
David h page 2 and 3 resumeDavid h page 2 and 3 resume
David h page 2 and 3 resume
 
Heyer Professional Profile
Heyer Professional ProfileHeyer Professional Profile
Heyer Professional Profile
 
Enriquez_Adriana_Portfolio binder
Enriquez_Adriana_Portfolio binderEnriquez_Adriana_Portfolio binder
Enriquez_Adriana_Portfolio binder
 
WoodWorks: Cost Dialogues: The Contractor Perspective on Mass Timber Buildings
WoodWorks: Cost Dialogues: The Contractor Perspective on Mass Timber BuildingsWoodWorks: Cost Dialogues: The Contractor Perspective on Mass Timber Buildings
WoodWorks: Cost Dialogues: The Contractor Perspective on Mass Timber Buildings
 
CDE_Sustainability Performance_20240214.pdf
CDE_Sustainability Performance_20240214.pdfCDE_Sustainability Performance_20240214.pdf
CDE_Sustainability Performance_20240214.pdf
 
MJH Projects
MJH ProjectsMJH Projects
MJH Projects
 
MJH Projects
MJH ProjectsMJH Projects
MJH Projects
 
Selected Municipal & Governmental Projects
Selected Municipal & Governmental Projects Selected Municipal & Governmental Projects
Selected Municipal & Governmental Projects
 
Completed project list for mark shaw 160614
Completed project list for mark shaw 160614Completed project list for mark shaw 160614
Completed project list for mark shaw 160614
 

More from Alfred Socias

Microsoft Building 4
Microsoft Building 4Microsoft Building 4
Microsoft Building 4Alfred Socias
 
CSUH CDs AutoCAD Finished Photos
CSUH CDs AutoCAD Finished PhotosCSUH CDs AutoCAD Finished Photos
CSUH CDs AutoCAD Finished PhotosAlfred Socias
 
Foley & Lardner Finished Photos
Foley & Lardner Finished PhotosFoley & Lardner Finished Photos
Foley & Lardner Finished PhotosAlfred Socias
 
Nazareth Terrace CDs AutoCAD
Nazareth Terrace CDs AutoCADNazareth Terrace CDs AutoCAD
Nazareth Terrace CDs AutoCADAlfred Socias
 
Evernote Finished Photos
Evernote Finished PhotosEvernote Finished Photos
Evernote Finished PhotosAlfred Socias
 
Photoshop Illustrator Work
Photoshop Illustrator WorkPhotoshop Illustrator Work
Photoshop Illustrator WorkAlfred Socias
 
CAD CD Screen Shots
CAD CD Screen ShotsCAD CD Screen Shots
CAD CD Screen Shots
Alfred Socias
 
AOL Headquarters
AOL HeadquartersAOL Headquarters
AOL Headquarters
Alfred Socias
 
557 Merrimac
557 Merrimac557 Merrimac
557 Merrimac
Alfred Socias
 

More from Alfred Socias (15)

Snagels
SnagelsSnagels
Snagels
 
08-5
08-508-5
08-5
 
BASE-FLR-6
BASE-FLR-6BASE-FLR-6
BASE-FLR-6
 
oplusa-aol_0001B
oplusa-aol_0001Boplusa-aol_0001B
oplusa-aol_0001B
 
Microsoft Building 4
Microsoft Building 4Microsoft Building 4
Microsoft Building 4
 
CSUH CDs AutoCAD Finished Photos
CSUH CDs AutoCAD Finished PhotosCSUH CDs AutoCAD Finished Photos
CSUH CDs AutoCAD Finished Photos
 
AOL Cds AutoCAD
AOL Cds AutoCADAOL Cds AutoCAD
AOL Cds AutoCAD
 
Foley & Lardner Finished Photos
Foley & Lardner Finished PhotosFoley & Lardner Finished Photos
Foley & Lardner Finished Photos
 
Nazareth Terrace CDs AutoCAD
Nazareth Terrace CDs AutoCADNazareth Terrace CDs AutoCAD
Nazareth Terrace CDs AutoCAD
 
Evernote Finished Photos
Evernote Finished PhotosEvernote Finished Photos
Evernote Finished Photos
 
Photoshop Illustrator Work
Photoshop Illustrator WorkPhotoshop Illustrator Work
Photoshop Illustrator Work
 
Revit Screen Shots
Revit Screen ShotsRevit Screen Shots
Revit Screen Shots
 
CAD CD Screen Shots
CAD CD Screen ShotsCAD CD Screen Shots
CAD CD Screen Shots
 
AOL Headquarters
AOL HeadquartersAOL Headquarters
AOL Headquarters
 
557 Merrimac
557 Merrimac557 Merrimac
557 Merrimac
 

Al's_Resume - Job Captain - Commercial

  • 1. ALFRED J. SOCIAS, CSI, CDT 5209 Greyfield Blvd. Durham, NC 27713 Home: [919] 321-6659 Mobile: [925] 451-1761 E-mail: alsocias@sbcglobal.net OBJECTIVE Employment as a job captain / project architect on commercial building or educational building project types. EDUCATION Revit Training Videos (Scott Onstott) – June 2008 Revit Fundamentals Class – April 2008 Design + Technology of Roofing Systems Class - May 2003 Better Understanding of Roof Systems Institute Principal & Practices of Specifying Class - March 2003 East Bay/Oakland CSI Chapter 2001 CBC Non-Structural Update Class - June 2002 International Conference of Building Officials Building Codes Semester Long Class [1998 UBC] - December 2000 San Francisco City College Bachelor of Architecture - December 1991 California State Polytechnic University, Pomona, California Graphic Arts Certificate - December 1988 Mount San Antonio College, Walnut, California Contra Costa College, San Pablo, California CERTIFICATION Construction Documents Technologist Certificate 2000 Construction Specifications Institute MANAGEMENT Managed a variety of architectural projects such as school laboratory buildings, school modernizations, grocery store additions / remodels, retail shell buildings, mid-rise offices, tenant improvements, warehouses, single and multi-family housing developments, custom estate residences, residential room addition/remodels, and churches from schematic design, to design development, to bid, to construction documents, and to construction administration phases. All included building official coordination, consultant coordination, project file management, specification coordination, and construction administration. TECHNICAL Drafted architectural design development packages, construction documents, addenda, and clarifications on CAD. Prepared detailed building code analysis for various project types including assigning building occupancy classification and construction types. Determined occupancy, and or area separation requirements, exterior wall protection, allowable area and occupant loads. Prepared allowable area calculations, and exit width calculations. Researched and incorporated architectural products into projects. Solved architectural, fireproofing and waterproofing details. Coordinated architectural drawings with consultant drawings. Edited specification sections including door hardware groups. Assisted with construction administration including shop drawing and submittal processing, and clarification generation. Field verified existing fire & life safety exiting schemes. Field verified existing accessible or non-accessible conditions. DESIGN Designed architectural space plans, sections and elevations. Designed
  • 2. exiting schemes from hallways to corridors to enclosed stair towers. Designed accessible and non-accessible site parking, drive aisles, site and building paths of travel. Designed ramps, stairs, toilet rooms, areas of rescue assistance, wheelchair lifts and elevators for school modernization projects. Design developed various project types in preparation for construction documents. COMPUTER Windows XP: Revit 8.1, AutoCAD 2013, Microstation CAD V8, Microsoft Outlook, Microsoft Word, Microsoft Excel, Adobe Acrobat, and WinZip. Windows Mobile: Pocket Word, Pocket Excel, Adobe Reader, Pocket CAD COMMUNICATION Direct communication with building officials, project consultants - civil, structural, mechanical, electrical, plumbing, landscape, fire alarm, telecommunication, and title 24 energy, and product representatives. PROJECTS Microsoft Building 4, Redmond, WA - Construction Documents & Construction Administration Interior tenant improvement & office remodel of existing type II building Nazareth Terrace, San Mateo, CA - Construction Documents Mixed use multi-family residential / office / retail building with 1 stories of apartments, 1 story of office, and 1 story of retail / parking garage. 9 total dwelling units, elevator, storefront, basically 2 stories of wood frame construction on a concrete podium. AOL, Palo Alto, CA - Construction Documents & Construction Administration Interior tenant improvement & office remodel of existing type II building including entry lobby & custom furniture and graphics. Box.net, Palo Alto, CA - Construction Documents Interior tenant improvement & office remodel Hangar 42 Studios, Walker, MI Interior remodel of office & support spaces for future movie studio. University of California, Berkeley, School of Law Building, Boalt Hall, Berkeley, CA - Construction Documents Interior tenant improvement of existing law school building. Program included distance learning room, classrooms, offices & journal rooms. Albertsons Grocery Store, Lake Forest, CA – Construction Documents & Specifications Existing 43,000 s.f. grocery store remodel / addition. Entry piece addition, new interior décor package, and new refrigeration. Traditions Building, Walnut Creek, CA - Construction Documents Interior tenant improvement and minor exterior building improvements. Phased project included obtaining demolition permit, site development permit, tenant improvement permit, exterior building improvements permit, and fire district approval. Hillcrest Village, Antioch, CA – Site Plan Design Development 16 building office / retail / restaurant on a 1,004,000 s.f. site. Calculated
  • 3. parking basis including HCP. Determined fire truck access and accessible paths of travel. Enea Plaza, Dublin, CA - Site Plan Design Development 3 retail buildings on a 166,800 s.f. site. Calculated parking basis including HCP. Determined fire truck access and accessible paths of travel. Buchanan Crossings, Antioch, CA - Site Plan Design Development 9 building office / retail / restaurant on a 590,000 s.f. site. Calculated parking basis including HCP. Determined fire truck access and accessible paths of travel. Canyon Oaks Plaza, Chico, CA - Site Plan Design Development 6 building office / retail / restaurant on a 245,600 s.f. site. Calculated parking basis including HCP. Determined fire truck access and accessible paths of travel. Kiernan Plaza, Salida, CA - Construction Documents New 12,000 s.f. retail shell building that was subdivided into 8 tenant spaces. Built on a 52,000 s.f. lot. Bristol Farms Grocery Store, Santa Barbara, CA - Construction Documents & Specifications Existing 34,700 s.f. grocery store remodel. Included minor exterior building architectural elements, new interior décor, and new refrigeration. 557 Merrimac, Oakland, CA - Construction Documents Mixed use multi-family residential / retail building with 3 stories of apartments, 1 story of retail / parking garage and basement parking. 30 total dwelling units, elevator, storefront, basically 3 stories of wood frame construction on a concrete podium. Calculated as 3 separate buildings for allowable area purposes. Contra Costa Gospel Church, Walnut Creek, CA – Construction Documents New 3096 s.f. multi-purpose building on an existing church site. Leonard Flynn Elementary School Modernization, San Francisco, CA - Construction Documents One building which includes a day care center, multi-purpose room, library, and classrooms whose scope of work included accessibility and fire-life safety upgrades to current code, separate exit routes for kindergarten and elementary students, exterior door replacement, interior finishes and casework, toilet room remodels, and electrical, plumbing systems upgrades. Tileshop Warehouse, Berkeley, CA - Construction Documents New 23,000 s.f. two story warehouse with ancillary office space features metal cladding over steel and metal stud structure. Thurgood Marshall High School Modernization, San Franciso, CA - Construction Documents One 150,000 s.f. building which included an auditorium, gymnasium, cafeteria, library, classrooms, and laboratories whose scope of work included accessibility and fire-life safety upgrades to current code,
  • 4. gymnasium addition, roofing and waterproofing, interior finishes and casework, toilet room remodels, and electrical, plumbing, and data- communication systems upgrades. Salvio Street Parking Structure, Concord, CA - Construction Documents Addtition-remodel of existing 6 story post tension structure parking garage. Work included new offices, accessible parking re-stripping, new accessible toilets, and upgrade mechanical, electrical and plumbing systems. Zio Fraedo's Banquet Hall, Pleasant Hill, CA - Construction Documents New Mediterranean influenced 8700 s.f. banquet facility with restaurant, commercial kitchen, and offices. King of Thai Noodle House, San Francisco, CA - Construction Documents Tenant improvement of two story restaurant with commercial kitchen, and offices. Palo Alto High School Science Building, Palo Alto, CA - Construction Documents & Specifications New 28,000 s.f. 1 story science building on an existing campus. Building program included 10 labs, prep space, and a teachers' office suite. California State University Hayward Library Fire Repair, Hayward CA - Construction Documents Interior remodel of fire damaged library. Included offices, instructional media center and a high tech distance learning classroom. Seismic upgrade included floor to ceiling high steel K bracing. AC Transit Headquarters, Oakland, CA - Construction Documents 7 floor tenant improvement of an existing 10 floor mid-rise office building. Includes custom ticket window casework with butt glazing, computer casework and new manufacturer workstations. AT Systems Armored Transport Facility, Oakland, CA - Construction Documents Existing 12,000 s.f. repair garage converted to a mixed use repair garage-coin counting facility. Jackson Center One, Oakland, CA - Construction Documents Tenant improvement and seismic upgrade of the existing mid-rise defunct State Office Building. 10 floor scope includes new gunite exterior, exterior granite cladding, exterior metal canopies, new built-up roofing, and storefront. Foley & Lardner Law Offices, San Francisco, CA - Construction Documents Two floors of high rise, high end, high tech design interior tenant improvement. Includes custom detailed desks, cabinetry, partitions, soffits, glass railed stairways, and doors. Approximately 33,000 s.f. Villa Cortona, San Jose, CA - Construction Documents New 72 unit French Provincial multi-family housing project consisting of 2 duplex town home building types and 2 condominium building types of
  • 5. approximately 4800 to 10,300 s.f., all units are multi-level which exempted accessible requirements, and all are located on a complex sloping site. Palo Alto High School Modernization, Palo Alto, CA - Construction Documents 19 existing buildings whose scope of work included accessibility and fire- life safety upgrades to current code, exterior door replacement, roofing and waterproofing, interior finishes and casework, toilet room remodels, and electrical, plumbing, and data-communication systems upgrades. Vallejo School Modernization, Vallejo, CA - Construction Documents 8 elementary school modernization projects whose scope of work included accessibility and fire-life safety upgrades to current code, exterior door and window replacement, interior finishes and casework, toilet room remodels, and electrical, plumbing, and data-communication systems upgrades. Marr Residence, Atherton, CA - Construction Documents A new 11,000 s.f. French Normandy style custom estate home included a sunroom greenhouse, swimming pool, pool pavilion, three car garage, carriage house, guest house, tennis courts, a hidden garden and 'smart home' electronics. Del Grande Residence, Los Gatos, CA - Construction Documents A new 7,600 s.f. hillside custom estate home reflects the architecture of Carmel. It features decks and terraces that take full advantage of a panoramic valley view below, swimming pool and croquet lawn. Nepenthe, Sedona, AZ - Construction Documents A new 182 unit complex of multi-family town houses comprised of four, five, and seven unit buildings. Geometric shapes and colors relate to the Sedona's surrounding red sandstone Bell Mountain which is adjacent to the site. Highlands at Clearbrook, Hayward, CA - Construction Documents 2 designs of new single family production housing about 2600 s.f. to 3200 s.f. each. Both designs were for lots with a 2:1 downward slope and incorporated view decks from both the first and second floors. AWARDS San Jose Veterans Memorial Design Competition, 1993, COMPETITIONS participant. San Francisco Waterfront Competition, 1992, Honorable mention/gallery exhibitor. Tijuana Cultural Center Demountable Roof Structure Competition, 1991. Douglas Conelly Memorial Scholarship in Architecture, Contra Costa College, San Pablo, California, 1987. Solano County fair ribbons in architectural and mechanical drafting, 1984. EMPLOYMENT PROJECT ARCHITECT Studio O+A, San Francisco, CA 9/09 to present (working remotely from home in Durham, NC) PROJECT ARCHITECT (Contract Work) ID Architecture, Pleasanton, CA 2/09 to 8/09 PROJECT ARCHITECT The Ratcliff Architects, Emeryville, CA 2/08 to 12/08 JOB CAPTAIN Craig+Grant Architects, Danville, CA 11/05 to 1/08
  • 6. JOB CAPTAIN VBN Architects, Oakland, CA 4/98 to 11/05 JOB CAPTAIN Loving & Campos Architects, Inc., Walnut Creek, CA 3/95 to 4/98 JUNIOR ARCHITECT Kattenburg & Associates, Benicia, CA 6/92 to11/94 ARCHITECTURAL DRAFTSMAN Architectural Design, San Dimas, CA 6/88 to 5/90 ENGINEERING AIDE Vallejo Sanitation & Flood Control District, Vallejo, CA 4/83 to 8/87 ORGANIZATIONS Construction Specifications Institute - Professional Member - SF Chapter - 2000 to 2003 International Conference of Building Officials/International Code Council - Professional Member, 1998 to 2004 PORTFOLIO And samples of working drawings available upon request REFERENCES Primo Orpilla, Owner, and Perry Stephney, Studio Manger, Studio O+A, San Francisco, CA [415] 908-1880 Bill Douglas & Carmen Campos, Owners, ID Architecture, Pleasanton, CA [925] 484-5245 Moshe Dinar, Owner, Dinar & Associates, Oakland, CA [510] 893-8300 WEBSITE https://www.linkedin.com/in/alfred-j-socias-csi-cdt-b8069512
  • 8. AOL Lobby AOL Conference Room AOL Reception Desk