1. Stephen C. Binger
4260 Wheeled Caisson Square, Fairfax VA - 703-928-1986 - steve.binger@yahoo.com
Key Skills:
— Problem Solving & Documentation
— Experienced in Lean/Last Planner
— Proficient in Computer Software
— Site Safety/OSHA Compliance
— QC/Field Engineering
— Change Order Management
— Budgeting & Cost Controls
— Bidding/Estimating/Proposals
— Subcontractor/Crew Supervision
Construction Management Employment History:
• HITT Construction Company (Falls Church, VA) – Assistant Project Manager, 10/10-Current
• The Weitz Company, LLC (West Palm Beach, FL) — Assistant Project Manager, 6/04 to 12/09
• Turner Construction Company (Champaign, IL) — Assistant Project Manager, 8/02 to 12/03
• The Norwood Company (West Chester, PA) — Assistant Project Manager, 3/01 to 6/02
• Wholsen Construction Company (New Castle, DE) – Project Engineer, 9/97 to 2/01
Project Experience:
• Includes Healthcare, Office Buildings, Schools, Maintenance Facilities (see attached Project List for details)
Duties:
• Preconstruction: Participated in preconstruction activities including site visits, review of Bid and Construction
documents (for completeness, omissions, conflicts, etc.). Solicited bids & developed of scopes of work.
Participated in scope review meetings, development of Owner Contract Clarifications and buyout of subcontracts.
Managed Buyout Logs.
• Document & Change Management: Created and managed document and change logs. Posted and distributed
updates/changes. Created and managed Submittal and RFI logs, Material Delivery, Outage and Inspection Logs.
Reviewed and processed submittals and RFIs. Managed ASI logs, distribution and pricing of ASIs. Reviewed,
negotiated and presented COPs to Owner.
• Meeting Management: Conducted and/or maintained Minutes for project meetings (including OAC, Subcontractor
and Preconstruction). Conducted Safety Orientation Meetings and Safety Audits; maintained records for both.
• Scheduling and Material Delivery Management: Developed material delivery schedules. Inspected, tracked and
monitored material deliveries.
• Lean/Last Planner Management Techniques: Participated in Lean Management Techniques (including QC &
scheduling and Risk Assessments).
• Managed Punch List completion, Owner Training and Closeout.
Software Skills:
• Expert in Prolog
• Proficient in MS Office and Outlook
• Proficient in E-Builder
• Proficient in Procore.
• Proficient in Autodesk Bim 360 (QC Software)
• Proficient in JD Edwards (Financial Software)
Education & Certifications
• UNIVERSITY OF CALIFORNIA, BERKELEY (Berkeley, CA) — Bachelor of Arts
• Healthcare Construction Certificate (HCC)
• Erosion and Sedimentation Control Inspector Certificate
• Paralegal Certificate - 3 years employment with a Zoning/Land Use/Real Estate law firm
• OSHA 10 and 30 Hour Certification
• Certified in First Aid/CPR
2. STEVE BINGER’S CONSTRUCTION PROJECT LIST
PROJECT NAME TYPE SIZE CONSTRUCTION FEATURES VALUE
NTB/CCW Renovation
Inova Fairfax Medical Campus
Falls Church, VA
Healthcare
Renovation
309,000 SF
Two-phase gut and renovation of an 11-story
inpatient tower and adjacent three-story critical care
wing. The project included 144 patient rooms,
offices, conference rooms, nurse stations, etc. Work
was conducted on an occupied campus (which
includes multiple towers) with shared utilities and
occupied floors above, below and adjacent to our
construction areas. Work required intensive
coordination with hospital construction department,
hospital staff and facilities (Engineering) to plan and
minimize impact to hospital operations.
$73 Million
Sibley Cancer Center
Sibley Memorial Hospital
Washington , DC
Healthcare
New Construction
45,000 SF
2 story CIP concrete structure with shielded
radiology treatment vaults for Linear Accelerators
and Tomotherapy. It also included a simulator,
offices, exam rooms and conference rooms. This
was a LEED Gold project.
$17 Million
Sibley MOB and Garage
Sibley Memorial Hospital
Washington , DC
Healthcare
New Construction
364,000 SF
6 story 141,000 SF patient care and medical office
building with adjacent 223,000 SF, 5 story parking
garage. Parking Garage included post tension slabs
and brick façade. MOB included a full service
outpatient surgery center with operating rooms, CAT
Scan, MRI and X-Ray machines, offices and retail
space.
$31 Million
FPL-PSL (Nuclear Plant)
Maintenance Building
Jensen Beach, FL
Office/Maintenance
New Construction
92,000 SF
3 story structure with precast columns, beams &
floor panels with topping slabs. CMU and metal stud
walls. Materials hoists, instrument air, N2 and fuel
oil piping. Hydraulic Elevator, Rotary Screw Chillers,
Air Handlers, VAVs, Fire Sprinkler, Fire Alarm and
EAS System. The building was constructed within
the secure area of the FPL-PSL Nuclear Plant
$13 Million
Human Resource
Development Center Phase I
and II *
Fort Pierce, FL
Education
New Construction
33,000 SF Boys & Girls Club Gymnasium and IRSC Classroom
Buildings. Cast in place concrete with CMU and
metal stud partitions.
$9 Million
The Metropolitan
West Palm Beach, FL
Residential
New Construction
343,000 SF 8 story, 149 unit condo building with CIP columns &
beams with post tension and CIP slabs,
underground garage, rooftop pool, CMU/Stucco
walls, emergency generator, traction elevators.
$28 Million
The Slade Condominium
West Palm Beach, FL
Residential
New Construction
425,000 SF
15 story, 248 unit condo building with CIP columns &
beams with post tension and CIP slabs, garage,
rooftop pool, CMU/Stucco walls, fire sprinkler, FA,
emergency generator, traction elevators.
$35 Million
Taylorville Elementary School
Taylorville, Illinois
Education
New Construction
and Renovations
90,000 SF Steel structure with brick walls, metal stud partitions.
CIP columns, beams & floor slabs with cmu infill $15 Million
Taylorville Junior High School
Taylorville, Illinois
Education
New Construction
30,000 SF
Steel structure with brick walls, metal stud partitions.
CIP columns, beams & floor slabs with cmu infill $6 Million
St. Anne High School
St. Anne, Illinois
Education 62,000 SF Steel structure with brick walls, metal stud partitions.
CIP columns, beams & floor slabs with cmu infill $11 Million
Rantoul High School
Rantoul, Illinois
Education
New Construction
44,000 SF Steel structure with precast skin. Special feature
included performance auditorium and cafeteria. $8 Million
3. Glaxo-Smith-Kline
Headquarters
2301 Renaissance Blvd.
Pennsylvania
Office
New Construction
195,000 SF Steel structure, brick walls with metal stud partitions.
CIP columns & beams with cmu infill. CIP floor
slabs.
$14 Million
900 State Street
Pennsylvania
Office
New Construction
120,000 SF
Steel structure, brick walls with metal stud partitions.
CIP columns & beams with cmu infill. CIP floor
slabs.
$12 Million
PECO Pennsylvania Energy
Corporation Headquarters
Pennsylvania
Office
New Construction
200,000 SF
Steel Structure with precast wall panels and CIP
floor slabs. Helipad, brokerage floor and commercial
kitchen.
$24 Million
Dover Assisted Living
Dover, Delaware
Healthcare
New Construction
54,000 SF
3 story Assisted Living Facility. Wood frame with
concrete board siding. Included Memory Care units
with security features, dining areas and a
commercial kitchen.
$11 Million