Stephen C. Binger
4260 Wheeled Caisson Square, Fairfax VA - 703-928-1986 - steve.binger@yahoo.com
Key Skills:
— Problem Solving & Documentation
— Experienced in Lean/Last Planner
— Proficient in Computer Software
— Site Safety/OSHA Compliance
— QC/Field Engineering
— Change Order Management
— Budgeting & Cost Controls
— Bidding/Estimating/Proposals
— Subcontractor/Crew Supervision
Construction Management Employment History:
• HITT Construction Company (Falls Church, VA) – Assistant Project Manager, 10/10-Current
• The Weitz Company, LLC (West Palm Beach, FL) — Assistant Project Manager, 6/04 to 12/09
• Turner Construction Company (Champaign, IL) — Assistant Project Manager, 8/02 to 12/03
• The Norwood Company (West Chester, PA) — Assistant Project Manager, 3/01 to 6/02
• Wholsen Construction Company (New Castle, DE) – Project Engineer, 9/97 to 2/01
Project Experience:
• Includes Healthcare, Office Buildings, Schools, Maintenance Facilities (see attached Project List for details)
Duties:
• Preconstruction: Participated in preconstruction activities including site visits, review of Bid and Construction
documents (for completeness, omissions, conflicts, etc.). Solicited bids & developed of scopes of work.
Participated in scope review meetings, development of Owner Contract Clarifications and buyout of subcontracts.
Managed Buyout Logs.
• Document & Change Management: Created and managed document and change logs. Posted and distributed
updates/changes. Created and managed Submittal and RFI logs, Material Delivery, Outage and Inspection Logs.
Reviewed and processed submittals and RFIs. Managed ASI logs, distribution and pricing of ASIs. Reviewed,
negotiated and presented COPs to Owner.
• Meeting Management: Conducted and/or maintained Minutes for project meetings (including OAC, Subcontractor
and Preconstruction). Conducted Safety Orientation Meetings and Safety Audits; maintained records for both.
• Scheduling and Material Delivery Management: Developed material delivery schedules. Inspected, tracked and
monitored material deliveries.
• Lean/Last Planner Management Techniques: Participated in Lean Management Techniques (including QC &
scheduling and Risk Assessments).
• Managed Punch List completion, Owner Training and Closeout.
Software Skills:
• Expert in Prolog
• Proficient in MS Office and Outlook
• Proficient in E-Builder
• Proficient in Procore.
• Proficient in Autodesk Bim 360 (QC Software)
• Proficient in JD Edwards (Financial Software)
Education & Certifications
• UNIVERSITY OF CALIFORNIA, BERKELEY (Berkeley, CA) — Bachelor of Arts
• Healthcare Construction Certificate (HCC)
• Erosion and Sedimentation Control Inspector Certificate
• Paralegal Certificate - 3 years employment with a Zoning/Land Use/Real Estate law firm
• OSHA 10 and 30 Hour Certification
• Certified in First Aid/CPR
STEVE BINGER’S CONSTRUCTION PROJECT LIST
PROJECT NAME TYPE SIZE CONSTRUCTION FEATURES VALUE
NTB/CCW Renovation
Inova Fairfax Medical Campus
Falls Church, VA
Healthcare
Renovation
309,000 SF
Two-phase gut and renovation of an 11-story
inpatient tower and adjacent three-story critical care
wing. The project included 144 patient rooms,
offices, conference rooms, nurse stations, etc. Work
was conducted on an occupied campus (which
includes multiple towers) with shared utilities and
occupied floors above, below and adjacent to our
construction areas. Work required intensive
coordination with hospital construction department,
hospital staff and facilities (Engineering) to plan and
minimize impact to hospital operations.
$73 Million
Sibley Cancer Center
Sibley Memorial Hospital
Washington , DC
Healthcare
New Construction
45,000 SF
2 story CIP concrete structure with shielded
radiology treatment vaults for Linear Accelerators
and Tomotherapy. It also included a simulator,
offices, exam rooms and conference rooms. This
was a LEED Gold project.
$17 Million
Sibley MOB and Garage
Sibley Memorial Hospital
Washington , DC
Healthcare
New Construction
364,000 SF
6 story 141,000 SF patient care and medical office
building with adjacent 223,000 SF, 5 story parking
garage. Parking Garage included post tension slabs
and brick façade. MOB included a full service
outpatient surgery center with operating rooms, CAT
Scan, MRI and X-Ray machines, offices and retail
space.
$31 Million
FPL-PSL (Nuclear Plant)
Maintenance Building
Jensen Beach, FL
Office/Maintenance
New Construction
92,000 SF
3 story structure with precast columns, beams &
floor panels with topping slabs. CMU and metal stud
walls. Materials hoists, instrument air, N2 and fuel
oil piping. Hydraulic Elevator, Rotary Screw Chillers,
Air Handlers, VAVs, Fire Sprinkler, Fire Alarm and
EAS System. The building was constructed within
the secure area of the FPL-PSL Nuclear Plant
$13 Million
Human Resource
Development Center Phase I
and II *
Fort Pierce, FL
Education
New Construction
33,000 SF Boys & Girls Club Gymnasium and IRSC Classroom
Buildings. Cast in place concrete with CMU and
metal stud partitions.
$9 Million
The Metropolitan
West Palm Beach, FL
Residential
New Construction
343,000 SF 8 story, 149 unit condo building with CIP columns &
beams with post tension and CIP slabs,
underground garage, rooftop pool, CMU/Stucco
walls, emergency generator, traction elevators.
$28 Million
The Slade Condominium
West Palm Beach, FL
Residential
New Construction
425,000 SF
15 story, 248 unit condo building with CIP columns &
beams with post tension and CIP slabs, garage,
rooftop pool, CMU/Stucco walls, fire sprinkler, FA,
emergency generator, traction elevators.
$35 Million
Taylorville Elementary School
Taylorville, Illinois
Education
New Construction
and Renovations
90,000 SF Steel structure with brick walls, metal stud partitions.
CIP columns, beams & floor slabs with cmu infill $15 Million
Taylorville Junior High School
Taylorville, Illinois
Education
New Construction
30,000 SF
Steel structure with brick walls, metal stud partitions.
CIP columns, beams & floor slabs with cmu infill $6 Million
St. Anne High School
St. Anne, Illinois
Education 62,000 SF Steel structure with brick walls, metal stud partitions.
CIP columns, beams & floor slabs with cmu infill $11 Million
Rantoul High School
Rantoul, Illinois
Education
New Construction
44,000 SF Steel structure with precast skin. Special feature
included performance auditorium and cafeteria. $8 Million
Glaxo-Smith-Kline
Headquarters
2301 Renaissance Blvd.
Pennsylvania
Office
New Construction
195,000 SF Steel structure, brick walls with metal stud partitions.
CIP columns & beams with cmu infill. CIP floor
slabs.
$14 Million
900 State Street
Pennsylvania
Office
New Construction
120,000 SF
Steel structure, brick walls with metal stud partitions.
CIP columns & beams with cmu infill. CIP floor
slabs.
$12 Million
PECO Pennsylvania Energy
Corporation Headquarters
Pennsylvania
Office
New Construction
200,000 SF
Steel Structure with precast wall panels and CIP
floor slabs. Helipad, brokerage floor and commercial
kitchen.
$24 Million
Dover Assisted Living
Dover, Delaware
Healthcare
New Construction
54,000 SF
3 story Assisted Living Facility. Wood frame with
concrete board siding. Included Memory Care units
with security features, dining areas and a
commercial kitchen.
$11 Million

More Related Content

What's hot

A REPORT ON CITRIX INDEPENDENT COMPUTING ARCHITECTURE (ICA) PROTOCOL
A REPORT ON CITRIX INDEPENDENT COMPUTING  ARCHITECTURE (ICA) PROTOCOL A REPORT ON CITRIX INDEPENDENT COMPUTING  ARCHITECTURE (ICA) PROTOCOL
A REPORT ON CITRIX INDEPENDENT COMPUTING ARCHITECTURE (ICA) PROTOCOL chaitanya ivvala
 
UrvashiShrivastavaResumeLatest2017
UrvashiShrivastavaResumeLatest2017UrvashiShrivastavaResumeLatest2017
UrvashiShrivastavaResumeLatest2017Urvashi Shrivastava
 
Industrial Training report Civil Engineering.
Industrial Training report Civil Engineering.Industrial Training report Civil Engineering.
Industrial Training report Civil Engineering.JAPJEETSINGH13
 
Summer training report in civil engineering
Summer training report in civil engineeringSummer training report in civil engineering
Summer training report in civil engineeringalok0025
 
Underwater construction
Underwater construction Underwater construction
Underwater construction Pranay Kumar
 
training report on commercial building
training report on commercial buildingtraining report on commercial building
training report on commercial buildingSumit Saini
 
1. STUDY ON QUALITY ASSURANCE AND QUALITY CONTROL MANAGEMENT SYSTEM IN 20 STO...
1.	STUDY ON QUALITY ASSURANCE AND QUALITY CONTROL MANAGEMENT SYSTEM IN 20 STO...1.	STUDY ON QUALITY ASSURANCE AND QUALITY CONTROL MANAGEMENT SYSTEM IN 20 STO...
1. STUDY ON QUALITY ASSURANCE AND QUALITY CONTROL MANAGEMENT SYSTEM IN 20 STO...AELC
 
Advance Construction Technology
Advance Construction Technology Advance Construction Technology
Advance Construction Technology GAURAV. H .TANDON
 
BUILDING ESTIMATION (Details Estimate For G+2 Storied Building presentation ...
BUILDING ESTIMATION (Details Estimate For G+2  Storied Building presentation ...BUILDING ESTIMATION (Details Estimate For G+2  Storied Building presentation ...
BUILDING ESTIMATION (Details Estimate For G+2 Storied Building presentation ...Manoranjan Roy
 
SEISMIC VULNERABILITY ASSESSMENT OF RESIDENTIAL BUILDINGS IN AGARTALA CITY US...
SEISMIC VULNERABILITY ASSESSMENT OF RESIDENTIAL BUILDINGS IN AGARTALA CITY US...SEISMIC VULNERABILITY ASSESSMENT OF RESIDENTIAL BUILDINGS IN AGARTALA CITY US...
SEISMIC VULNERABILITY ASSESSMENT OF RESIDENTIAL BUILDINGS IN AGARTALA CITY US...shankar kumar
 
AN INTERNSHIP REPORT ON RESIDENTIAL BUILDING CONSTRUCTION
AN INTERNSHIP  REPORT  ON  RESIDENTIAL  BUILDING  CONSTRUCTIONAN INTERNSHIP  REPORT  ON  RESIDENTIAL  BUILDING  CONSTRUCTION
AN INTERNSHIP REPORT ON RESIDENTIAL BUILDING CONSTRUCTIONAbhishek Singh
 
Civil enginerring internship report
Civil enginerring internship reportCivil enginerring internship report
Civil enginerring internship reportZahid Khan
 
Time cost optimisation
Time cost optimisationTime cost optimisation
Time cost optimisationCharul Sharma
 
Staad.Pro Training Report or Summer Internship
Staad.Pro Training Report or Summer Internship  Staad.Pro Training Report or Summer Internship
Staad.Pro Training Report or Summer Internship Ravi Kant Sahu
 
DESTRUCTIVE AND NON-DESTRUCTIVE TEST OF CONCRETE
DESTRUCTIVE AND NON-DESTRUCTIVE TEST OF CONCRETEDESTRUCTIVE AND NON-DESTRUCTIVE TEST OF CONCRETE
DESTRUCTIVE AND NON-DESTRUCTIVE TEST OF CONCRETEKaran Patel
 
Super Structure Construction.pptx
Super Structure Construction.pptxSuper Structure Construction.pptx
Super Structure Construction.pptxAnanthakumar75
 
ppt on pwd cement concrete road pavement
ppt on pwd cement concrete road pavementppt on pwd cement concrete road pavement
ppt on pwd cement concrete road pavementNIWASHISH VISWAS
 

What's hot (20)

A REPORT ON CITRIX INDEPENDENT COMPUTING ARCHITECTURE (ICA) PROTOCOL
A REPORT ON CITRIX INDEPENDENT COMPUTING  ARCHITECTURE (ICA) PROTOCOL A REPORT ON CITRIX INDEPENDENT COMPUTING  ARCHITECTURE (ICA) PROTOCOL
A REPORT ON CITRIX INDEPENDENT COMPUTING ARCHITECTURE (ICA) PROTOCOL
 
UrvashiShrivastavaResumeLatest2017
UrvashiShrivastavaResumeLatest2017UrvashiShrivastavaResumeLatest2017
UrvashiShrivastavaResumeLatest2017
 
Industrial Training report Civil Engineering.
Industrial Training report Civil Engineering.Industrial Training report Civil Engineering.
Industrial Training report Civil Engineering.
 
Summer training report in civil engineering
Summer training report in civil engineeringSummer training report in civil engineering
Summer training report in civil engineering
 
Underwater construction
Underwater construction Underwater construction
Underwater construction
 
training report on commercial building
training report on commercial buildingtraining report on commercial building
training report on commercial building
 
1. STUDY ON QUALITY ASSURANCE AND QUALITY CONTROL MANAGEMENT SYSTEM IN 20 STO...
1.	STUDY ON QUALITY ASSURANCE AND QUALITY CONTROL MANAGEMENT SYSTEM IN 20 STO...1.	STUDY ON QUALITY ASSURANCE AND QUALITY CONTROL MANAGEMENT SYSTEM IN 20 STO...
1. STUDY ON QUALITY ASSURANCE AND QUALITY CONTROL MANAGEMENT SYSTEM IN 20 STO...
 
Advance Construction Technology
Advance Construction Technology Advance Construction Technology
Advance Construction Technology
 
BUILDING ESTIMATION (Details Estimate For G+2 Storied Building presentation ...
BUILDING ESTIMATION (Details Estimate For G+2  Storied Building presentation ...BUILDING ESTIMATION (Details Estimate For G+2  Storied Building presentation ...
BUILDING ESTIMATION (Details Estimate For G+2 Storied Building presentation ...
 
compaction equipment
compaction equipmentcompaction equipment
compaction equipment
 
SEISMIC VULNERABILITY ASSESSMENT OF RESIDENTIAL BUILDINGS IN AGARTALA CITY US...
SEISMIC VULNERABILITY ASSESSMENT OF RESIDENTIAL BUILDINGS IN AGARTALA CITY US...SEISMIC VULNERABILITY ASSESSMENT OF RESIDENTIAL BUILDINGS IN AGARTALA CITY US...
SEISMIC VULNERABILITY ASSESSMENT OF RESIDENTIAL BUILDINGS IN AGARTALA CITY US...
 
AN INTERNSHIP REPORT ON RESIDENTIAL BUILDING CONSTRUCTION
AN INTERNSHIP  REPORT  ON  RESIDENTIAL  BUILDING  CONSTRUCTIONAN INTERNSHIP  REPORT  ON  RESIDENTIAL  BUILDING  CONSTRUCTION
AN INTERNSHIP REPORT ON RESIDENTIAL BUILDING CONSTRUCTION
 
Civil enginerring internship report
Civil enginerring internship reportCivil enginerring internship report
Civil enginerring internship report
 
Time cost optimisation
Time cost optimisationTime cost optimisation
Time cost optimisation
 
Metro Project
Metro ProjectMetro Project
Metro Project
 
Windsor probe test
Windsor probe testWindsor probe test
Windsor probe test
 
Staad.Pro Training Report or Summer Internship
Staad.Pro Training Report or Summer Internship  Staad.Pro Training Report or Summer Internship
Staad.Pro Training Report or Summer Internship
 
DESTRUCTIVE AND NON-DESTRUCTIVE TEST OF CONCRETE
DESTRUCTIVE AND NON-DESTRUCTIVE TEST OF CONCRETEDESTRUCTIVE AND NON-DESTRUCTIVE TEST OF CONCRETE
DESTRUCTIVE AND NON-DESTRUCTIVE TEST OF CONCRETE
 
Super Structure Construction.pptx
Super Structure Construction.pptxSuper Structure Construction.pptx
Super Structure Construction.pptx
 
ppt on pwd cement concrete road pavement
ppt on pwd cement concrete road pavementppt on pwd cement concrete road pavement
ppt on pwd cement concrete road pavement
 

Similar to Steve Binger - Resume & Project List

Al's_Resume - Job Captain - Commercial
Al's_Resume - Job Captain - CommercialAl's_Resume - Job Captain - Commercial
Al's_Resume - Job Captain - CommercialAlfred Socias
 
Carlos Yibirin - CAY Group International 2014
Carlos Yibirin - CAY Group International 2014Carlos Yibirin - CAY Group International 2014
Carlos Yibirin - CAY Group International 2014Carlos Yibirin
 
USGBC SC Chapter-SustainSC 2013_Building Commissioning - Sustainability Verif...
USGBC SC Chapter-SustainSC 2013_Building Commissioning - Sustainability Verif...USGBC SC Chapter-SustainSC 2013_Building Commissioning - Sustainability Verif...
USGBC SC Chapter-SustainSC 2013_Building Commissioning - Sustainability Verif...CxA Commissioning Authority
 
RESUME OF PROFESSIONAL EXPERIENCE
RESUME OF PROFESSIONAL EXPERIENCERESUME OF PROFESSIONAL EXPERIENCE
RESUME OF PROFESSIONAL EXPERIENCEJackie Mims-Rivera
 
Karl Keller Clover Leaf Resume Sept2015
Karl Keller Clover Leaf Resume Sept2015Karl Keller Clover Leaf Resume Sept2015
Karl Keller Clover Leaf Resume Sept2015Karl Keller
 
Heyer Professional Profile
Heyer Professional ProfileHeyer Professional Profile
Heyer Professional Profilepheyer351
 
Gerald Durand Resume
Gerald Durand ResumeGerald Durand Resume
Gerald Durand ResumeJerry Durand
 
Optimum CM presentation
Optimum CM presentationOptimum CM presentation
Optimum CM presentationTomKummer
 
Construction Experience
Construction ExperienceConstruction Experience
Construction Experiencemdkaucher
 
RESUME OF PROFESSIONAL EXPERIENCE
RESUME OF PROFESSIONAL EXPERIENCERESUME OF PROFESSIONAL EXPERIENCE
RESUME OF PROFESSIONAL EXPERIENCEJackie Mims-Rivera
 
8-koi_Construction & Design Engineering_20240209.pdf
8-koi_Construction & Design Engineering_20240209.pdf8-koi_Construction & Design Engineering_20240209.pdf
8-koi_Construction & Design Engineering_20240209.pdf8-koi
 
Newton Peter Master 04 15 09
Newton Peter Master 04 15 09Newton Peter Master 04 15 09
Newton Peter Master 04 15 09Archicon
 
Mike Haller - Professional Resume
Mike Haller - Professional ResumeMike Haller - Professional Resume
Mike Haller - Professional ResumeMichael Haller
 
Master_Resume__Ron_White_9
Master_Resume__Ron_White_9Master_Resume__Ron_White_9
Master_Resume__Ron_White_9Ron White
 
Linkedin Resume 1 161104
Linkedin Resume 1 161104Linkedin Resume 1 161104
Linkedin Resume 1 161104Phillip Schuler
 
Steve_Schumacher_Resume_5-10-16
Steve_Schumacher_Resume_5-10-16Steve_Schumacher_Resume_5-10-16
Steve_Schumacher_Resume_5-10-16Steve Schumacher
 

Similar to Steve Binger - Resume & Project List (20)

Al's_Resume - Job Captain - Commercial
Al's_Resume - Job Captain - CommercialAl's_Resume - Job Captain - Commercial
Al's_Resume - Job Captain - Commercial
 
My Resume
My ResumeMy Resume
My Resume
 
Carlos Yibirin - CAY Group International 2014
Carlos Yibirin - CAY Group International 2014Carlos Yibirin - CAY Group International 2014
Carlos Yibirin - CAY Group International 2014
 
C. Lavache Management & Consulting, Inc.
C. Lavache Management & Consulting, Inc.C. Lavache Management & Consulting, Inc.
C. Lavache Management & Consulting, Inc.
 
Michael Sackler AIA_Portfolio
Michael Sackler AIA_PortfolioMichael Sackler AIA_Portfolio
Michael Sackler AIA_Portfolio
 
USGBC SC Chapter-SustainSC 2013_Building Commissioning - Sustainability Verif...
USGBC SC Chapter-SustainSC 2013_Building Commissioning - Sustainability Verif...USGBC SC Chapter-SustainSC 2013_Building Commissioning - Sustainability Verif...
USGBC SC Chapter-SustainSC 2013_Building Commissioning - Sustainability Verif...
 
RESUME OF PROFESSIONAL EXPERIENCE
RESUME OF PROFESSIONAL EXPERIENCERESUME OF PROFESSIONAL EXPERIENCE
RESUME OF PROFESSIONAL EXPERIENCE
 
Karl Keller Clover Leaf Resume Sept2015
Karl Keller Clover Leaf Resume Sept2015Karl Keller Clover Leaf Resume Sept2015
Karl Keller Clover Leaf Resume Sept2015
 
Heyer Professional Profile
Heyer Professional ProfileHeyer Professional Profile
Heyer Professional Profile
 
Gerald Durand Resume
Gerald Durand ResumeGerald Durand Resume
Gerald Durand Resume
 
Optimum CM presentation
Optimum CM presentationOptimum CM presentation
Optimum CM presentation
 
Construction Experience
Construction ExperienceConstruction Experience
Construction Experience
 
RESUME OF PROFESSIONAL EXPERIENCE
RESUME OF PROFESSIONAL EXPERIENCERESUME OF PROFESSIONAL EXPERIENCE
RESUME OF PROFESSIONAL EXPERIENCE
 
8-koi_Construction & Design Engineering_20240209.pdf
8-koi_Construction & Design Engineering_20240209.pdf8-koi_Construction & Design Engineering_20240209.pdf
8-koi_Construction & Design Engineering_20240209.pdf
 
Newton Peter Master 04 15 09
Newton Peter Master 04 15 09Newton Peter Master 04 15 09
Newton Peter Master 04 15 09
 
Mike Haller - Professional Resume
Mike Haller - Professional ResumeMike Haller - Professional Resume
Mike Haller - Professional Resume
 
Master_Resume__Ron_White_9
Master_Resume__Ron_White_9Master_Resume__Ron_White_9
Master_Resume__Ron_White_9
 
Biron Resume 3
Biron Resume 3Biron Resume 3
Biron Resume 3
 
Linkedin Resume 1 161104
Linkedin Resume 1 161104Linkedin Resume 1 161104
Linkedin Resume 1 161104
 
Steve_Schumacher_Resume_5-10-16
Steve_Schumacher_Resume_5-10-16Steve_Schumacher_Resume_5-10-16
Steve_Schumacher_Resume_5-10-16
 

Steve Binger - Resume & Project List

  • 1. Stephen C. Binger 4260 Wheeled Caisson Square, Fairfax VA - 703-928-1986 - steve.binger@yahoo.com Key Skills: — Problem Solving & Documentation — Experienced in Lean/Last Planner — Proficient in Computer Software — Site Safety/OSHA Compliance — QC/Field Engineering — Change Order Management — Budgeting & Cost Controls — Bidding/Estimating/Proposals — Subcontractor/Crew Supervision Construction Management Employment History: • HITT Construction Company (Falls Church, VA) – Assistant Project Manager, 10/10-Current • The Weitz Company, LLC (West Palm Beach, FL) — Assistant Project Manager, 6/04 to 12/09 • Turner Construction Company (Champaign, IL) — Assistant Project Manager, 8/02 to 12/03 • The Norwood Company (West Chester, PA) — Assistant Project Manager, 3/01 to 6/02 • Wholsen Construction Company (New Castle, DE) – Project Engineer, 9/97 to 2/01 Project Experience: • Includes Healthcare, Office Buildings, Schools, Maintenance Facilities (see attached Project List for details) Duties: • Preconstruction: Participated in preconstruction activities including site visits, review of Bid and Construction documents (for completeness, omissions, conflicts, etc.). Solicited bids & developed of scopes of work. Participated in scope review meetings, development of Owner Contract Clarifications and buyout of subcontracts. Managed Buyout Logs. • Document & Change Management: Created and managed document and change logs. Posted and distributed updates/changes. Created and managed Submittal and RFI logs, Material Delivery, Outage and Inspection Logs. Reviewed and processed submittals and RFIs. Managed ASI logs, distribution and pricing of ASIs. Reviewed, negotiated and presented COPs to Owner. • Meeting Management: Conducted and/or maintained Minutes for project meetings (including OAC, Subcontractor and Preconstruction). Conducted Safety Orientation Meetings and Safety Audits; maintained records for both. • Scheduling and Material Delivery Management: Developed material delivery schedules. Inspected, tracked and monitored material deliveries. • Lean/Last Planner Management Techniques: Participated in Lean Management Techniques (including QC & scheduling and Risk Assessments). • Managed Punch List completion, Owner Training and Closeout. Software Skills: • Expert in Prolog • Proficient in MS Office and Outlook • Proficient in E-Builder • Proficient in Procore. • Proficient in Autodesk Bim 360 (QC Software) • Proficient in JD Edwards (Financial Software) Education & Certifications • UNIVERSITY OF CALIFORNIA, BERKELEY (Berkeley, CA) — Bachelor of Arts • Healthcare Construction Certificate (HCC) • Erosion and Sedimentation Control Inspector Certificate • Paralegal Certificate - 3 years employment with a Zoning/Land Use/Real Estate law firm • OSHA 10 and 30 Hour Certification • Certified in First Aid/CPR
  • 2. STEVE BINGER’S CONSTRUCTION PROJECT LIST PROJECT NAME TYPE SIZE CONSTRUCTION FEATURES VALUE NTB/CCW Renovation Inova Fairfax Medical Campus Falls Church, VA Healthcare Renovation 309,000 SF Two-phase gut and renovation of an 11-story inpatient tower and adjacent three-story critical care wing. The project included 144 patient rooms, offices, conference rooms, nurse stations, etc. Work was conducted on an occupied campus (which includes multiple towers) with shared utilities and occupied floors above, below and adjacent to our construction areas. Work required intensive coordination with hospital construction department, hospital staff and facilities (Engineering) to plan and minimize impact to hospital operations. $73 Million Sibley Cancer Center Sibley Memorial Hospital Washington , DC Healthcare New Construction 45,000 SF 2 story CIP concrete structure with shielded radiology treatment vaults for Linear Accelerators and Tomotherapy. It also included a simulator, offices, exam rooms and conference rooms. This was a LEED Gold project. $17 Million Sibley MOB and Garage Sibley Memorial Hospital Washington , DC Healthcare New Construction 364,000 SF 6 story 141,000 SF patient care and medical office building with adjacent 223,000 SF, 5 story parking garage. Parking Garage included post tension slabs and brick façade. MOB included a full service outpatient surgery center with operating rooms, CAT Scan, MRI and X-Ray machines, offices and retail space. $31 Million FPL-PSL (Nuclear Plant) Maintenance Building Jensen Beach, FL Office/Maintenance New Construction 92,000 SF 3 story structure with precast columns, beams & floor panels with topping slabs. CMU and metal stud walls. Materials hoists, instrument air, N2 and fuel oil piping. Hydraulic Elevator, Rotary Screw Chillers, Air Handlers, VAVs, Fire Sprinkler, Fire Alarm and EAS System. The building was constructed within the secure area of the FPL-PSL Nuclear Plant $13 Million Human Resource Development Center Phase I and II * Fort Pierce, FL Education New Construction 33,000 SF Boys & Girls Club Gymnasium and IRSC Classroom Buildings. Cast in place concrete with CMU and metal stud partitions. $9 Million The Metropolitan West Palm Beach, FL Residential New Construction 343,000 SF 8 story, 149 unit condo building with CIP columns & beams with post tension and CIP slabs, underground garage, rooftop pool, CMU/Stucco walls, emergency generator, traction elevators. $28 Million The Slade Condominium West Palm Beach, FL Residential New Construction 425,000 SF 15 story, 248 unit condo building with CIP columns & beams with post tension and CIP slabs, garage, rooftop pool, CMU/Stucco walls, fire sprinkler, FA, emergency generator, traction elevators. $35 Million Taylorville Elementary School Taylorville, Illinois Education New Construction and Renovations 90,000 SF Steel structure with brick walls, metal stud partitions. CIP columns, beams & floor slabs with cmu infill $15 Million Taylorville Junior High School Taylorville, Illinois Education New Construction 30,000 SF Steel structure with brick walls, metal stud partitions. CIP columns, beams & floor slabs with cmu infill $6 Million St. Anne High School St. Anne, Illinois Education 62,000 SF Steel structure with brick walls, metal stud partitions. CIP columns, beams & floor slabs with cmu infill $11 Million Rantoul High School Rantoul, Illinois Education New Construction 44,000 SF Steel structure with precast skin. Special feature included performance auditorium and cafeteria. $8 Million
  • 3. Glaxo-Smith-Kline Headquarters 2301 Renaissance Blvd. Pennsylvania Office New Construction 195,000 SF Steel structure, brick walls with metal stud partitions. CIP columns & beams with cmu infill. CIP floor slabs. $14 Million 900 State Street Pennsylvania Office New Construction 120,000 SF Steel structure, brick walls with metal stud partitions. CIP columns & beams with cmu infill. CIP floor slabs. $12 Million PECO Pennsylvania Energy Corporation Headquarters Pennsylvania Office New Construction 200,000 SF Steel Structure with precast wall panels and CIP floor slabs. Helipad, brokerage floor and commercial kitchen. $24 Million Dover Assisted Living Dover, Delaware Healthcare New Construction 54,000 SF 3 story Assisted Living Facility. Wood frame with concrete board siding. Included Memory Care units with security features, dining areas and a commercial kitchen. $11 Million