SlideShare a Scribd company logo
Piemonte Office Building – Ontario, CA 125,685 SF Class A, 5- story office building, 1/300 Parking ratio, Type II FR B occupancy, Lobby finishes include stone flooring from slab materials, stone and wood paneling on wall
Bayfair Center Regional Mall – San Leandro, CA Demolition, renovation, and seismic retrofit of approx. 115,00 s/f of an existing 850,000 s/f regional mall, interior finish upgrade of entire public area of mall, parking lot reconfiguration and renovation
The Pike at Rainbow Harbor – Long Beach, CA 370,000-square-foot entertainment and retail center that includes waterfront restaurants and a 14-screen theater. The center is divided into distinct zones, each featuring its own architecture to provide a unique entertainment experience and signature elements, such as the pedestrian bridge reminiscent of the wooden roller coaster that operated in the city’s historic Pike amusement zone from 1930 to 1968
Irvine Spectrum Center – Irvine, CA Phases III & IV of this long term project added approx. 220,000 SF of retail and dining venues, continuing the Moorish village theme comprised of cobblestone walkways, Andalusian districts and plazas.  Notable is the 105 foot diameter Giant Wheel, which comes to life at night with over 15.000 solar powered lights.
Balboa Bay Club – Newport Beach, CA Phase I includes a new clubhouse, ladies’ and men’s spas, a state-of-the-art fitness center with racquetball and basketball courts, child care service, a pro shop, bar/lounge, indoor/outdoor restaurant, a swimming pool, outdoor Jacuzzi and children’s pool, as well as 28 waterfront guest rooms
Lakeshore Towers Phase II  –  Irvine, CA 128,135-SF Class A, 5 story office building constructed at a cost of $10 million, designed with precast concrete panels, punched windows and glazed ribbon walls.
TEAM FORD – Las Vegas, NV 14-acre site featuring an 85,000-square-foot building with 60 service bays and inventory parking that can accommodate in excess of 900 cars. The 6,000-square-foot showroom features a 20-foot curtain wall glazed with Ford blue glass, extensive detail lighting, specially designed concrete and desert-style landscaping, including oversized boulders and palm trees.
SOLANO MALL – Fairfield, CA 161,000-square-foot retail/entertainment venue replacing a former department store, and the centerpiece to the $15 million project is a new 16-screen Edwards Theater megaplex cinema.  The 72,000-square-foot theater complex features stadium seating as well as state-of-the-art sound and screening technology.
Mercedes Benz of Laguna Niguel – Laguna Niguel, CA 85,000-square-foot facility comprised of two buildings on 12 acres.  With its 8,000-square-foot, single-level showroom featuring 12 new cars, a 3,000-square-foot, pre-owned vehicle showroom, 62 service bays, three customer waiting areas and a parking lot offering more than 500 parking stalls, the spacious new Mercedes-Benz dealership is one of the largest and finest facilities of its type in the world.
Bal Seal Engineering – Foothill Ranch, CA 125,225 SF concrete tilt up facility on a 7.2 acre site, including corporate office improvements, research and development departments, onsite manufacturing and distribution facilities for this maker of world class industrial springs and seals.
Candlewood Hotels – Lake Forest, CA $4M design build contract for a 122 all suite hotel building as part of a national rollout program, including infrastructure development, wood frame construction, full FF&E coordination, tenant improvements, and site amenities including pool.
Eisenhower Medical Center – Rancho Mirage, CA Complete build out of a 23,000-square-foot, 18-bed birthing center that included OB/GYN, E.N.T. trauma and cardiac, nursery space along with 14 LDRP suites. The project also consisted of elaborate site work with a new pedestrian bridge. The project was reviewed and inspected under OSHPD requirements
Mallinckrodt Medical – Irvine, CA Complete design/build responsibility for a 110,000 SF medical manufacturing facility, warehousing and offices. Project features Class 100,000 and 10,000 clean rooms with chilled water and condenser water systems for injection molding equipment and a separate chilled water system for the clean area air conditioning system, three overhead rolling bridge cranes, compressed air, industrial, process and lab vacuum systems. Project also includes research and test laboratories, significant seismic strengthening, and hazardous materials abatement.
Toyota NAPLD – Ontario, CA 760,000-square-foot regional facility, constructed of concrete tilt-up walls with a steel-framed roof, includes administration offices, a teleconferencing center, a full-service cafeteria, and a distribution area. The surrounding 94-acre site features decorative colored stone, olive trees and traditional Japanese flora

More Related Content

What's hot

Vancouver convention center (vecc)
Vancouver convention center (vecc)Vancouver convention center (vecc)
Vancouver convention center (vecc)
Pukar Bhandari
 
Project Description - St. Charles High School
Project Description - St. Charles High SchoolProject Description - St. Charles High School
Project Description - St. Charles High SchoolJahonn Naimi
 
FJL presentation
FJL presentationFJL presentation
FJL presentationfj_link
 
Suntree Construction And Mgmt Soq 5.5.09 2
Suntree Construction And Mgmt Soq 5.5.09 2Suntree Construction And Mgmt Soq 5.5.09 2
Suntree Construction And Mgmt Soq 5.5.09 2guest9930e26
 
Bolney Meadow, Lambeth
Bolney Meadow, LambethBolney Meadow, Lambeth
Bolney Meadow, Lambeth
spifphotography8231
 
2017 Fairfax County Walkway Rehab Projects
2017 Fairfax County Walkway Rehab Projects2017 Fairfax County Walkway Rehab Projects
2017 Fairfax County Walkway Rehab Projects
Fairfax County
 

What's hot (11)

Vancouver convention center (vecc)
Vancouver convention center (vecc)Vancouver convention center (vecc)
Vancouver convention center (vecc)
 
Resume - 2016
Resume - 2016Resume - 2016
Resume - 2016
 
Holspl station
Holspl stationHolspl station
Holspl station
 
Project Description - St. Charles High School
Project Description - St. Charles High SchoolProject Description - St. Charles High School
Project Description - St. Charles High School
 
AJ_Port_2016
AJ_Port_2016AJ_Port_2016
AJ_Port_2016
 
Milex Resume
Milex ResumeMilex Resume
Milex Resume
 
RRL-workpackages
RRL-workpackagesRRL-workpackages
RRL-workpackages
 
FJL presentation
FJL presentationFJL presentation
FJL presentation
 
Suntree Construction And Mgmt Soq 5.5.09 2
Suntree Construction And Mgmt Soq 5.5.09 2Suntree Construction And Mgmt Soq 5.5.09 2
Suntree Construction And Mgmt Soq 5.5.09 2
 
Bolney Meadow, Lambeth
Bolney Meadow, LambethBolney Meadow, Lambeth
Bolney Meadow, Lambeth
 
2017 Fairfax County Walkway Rehab Projects
2017 Fairfax County Walkway Rehab Projects2017 Fairfax County Walkway Rehab Projects
2017 Fairfax County Walkway Rehab Projects
 

Viewers also liked

Positive Attitude Is Every Thing 5908
Positive Attitude Is Every Thing 5908Positive Attitude Is Every Thing 5908
Positive Attitude Is Every Thing 5908Gmaniac
 
Uk’S Tobacco Ban
Uk’S Tobacco BanUk’S Tobacco Ban
Uk’S Tobacco Ban
guesta31e8e1
 
Origins of the universe
Origins of the universeOrigins of the universe
Origins of the universeRick Turner
 
MJH Projects
MJH ProjectsMJH Projects
MJH Projects
Mike Harness
 
Frank Migge It Security Patch Monitoring With Nagios 02
Frank Migge It Security Patch Monitoring With Nagios 02Frank Migge It Security Patch Monitoring With Nagios 02
Frank Migge It Security Patch Monitoring With Nagios 02
frank4dd
 
Science staar review 2012 2
Science staar review 2012 2Science staar review 2012 2
Science staar review 2012 2Rick Turner
 
Hotel Victoria broshure
Hotel Victoria broshureHotel Victoria broshure
Hotel Victoria broshureHotel Victoria
 
Stock Analysis
Stock AnalysisStock Analysis
Stock Analysispmf153
 
Science STAAR Review 2013
Science STAAR Review 2013 Science STAAR Review 2013
Science STAAR Review 2013 Rick Turner
 
RevBoss Overview -- Sales Development Software & Services
RevBoss Overview -- Sales Development Software & ServicesRevBoss Overview -- Sales Development Software & Services
RevBoss Overview -- Sales Development Software & Services
Eric Boggs
 
Atoms and Molecules
Atoms and MoleculesAtoms and Molecules
Atoms and MoleculesRick Turner
 
Routing protocols in smart grids
Routing protocols in smart gridsRouting protocols in smart grids
Routing protocols in smart grids
Moaz Ateeq
 
Top 20 Teams In Social Media
Top 20 Teams In Social MediaTop 20 Teams In Social Media
Top 20 Teams In Social Media
Activ8Social
 
DiferèNcies Entre Oral I Escrit
DiferèNcies Entre Oral I EscritDiferèNcies Entre Oral I Escrit
DiferèNcies Entre Oral I Escritcristina
 

Viewers also liked (17)

Positive Attitude Is Every Thing 5908
Positive Attitude Is Every Thing 5908Positive Attitude Is Every Thing 5908
Positive Attitude Is Every Thing 5908
 
DeborahRoffel
DeborahRoffelDeborahRoffel
DeborahRoffel
 
Uk’S Tobacco Ban
Uk’S Tobacco BanUk’S Tobacco Ban
Uk’S Tobacco Ban
 
Origins of the universe
Origins of the universeOrigins of the universe
Origins of the universe
 
MJH Projects
MJH ProjectsMJH Projects
MJH Projects
 
Frank Migge It Security Patch Monitoring With Nagios 02
Frank Migge It Security Patch Monitoring With Nagios 02Frank Migge It Security Patch Monitoring With Nagios 02
Frank Migge It Security Patch Monitoring With Nagios 02
 
Science staar review 2012 2
Science staar review 2012 2Science staar review 2012 2
Science staar review 2012 2
 
Hotel Victoria broshure
Hotel Victoria broshureHotel Victoria broshure
Hotel Victoria broshure
 
Chem equations
Chem equationsChem equations
Chem equations
 
Stock Analysis
Stock AnalysisStock Analysis
Stock Analysis
 
Periodic table
Periodic tablePeriodic table
Periodic table
 
Science STAAR Review 2013
Science STAAR Review 2013 Science STAAR Review 2013
Science STAAR Review 2013
 
RevBoss Overview -- Sales Development Software & Services
RevBoss Overview -- Sales Development Software & ServicesRevBoss Overview -- Sales Development Software & Services
RevBoss Overview -- Sales Development Software & Services
 
Atoms and Molecules
Atoms and MoleculesAtoms and Molecules
Atoms and Molecules
 
Routing protocols in smart grids
Routing protocols in smart gridsRouting protocols in smart grids
Routing protocols in smart grids
 
Top 20 Teams In Social Media
Top 20 Teams In Social MediaTop 20 Teams In Social Media
Top 20 Teams In Social Media
 
DiferèNcies Entre Oral I Escrit
DiferèNcies Entre Oral I EscritDiferèNcies Entre Oral I Escrit
DiferèNcies Entre Oral I Escrit
 

Similar to MJH Projects

Keith Holt Personal Portfolio2
Keith Holt Personal Portfolio2Keith Holt Personal Portfolio2
Keith Holt Personal Portfolio2Keith Holt
 
Al's_Resume - Job Captain - Commercial
Al's_Resume - Job Captain - CommercialAl's_Resume - Job Captain - Commercial
Al's_Resume - Job Captain - CommercialAlfred Socias
 
Custom Commercial Projects
Custom Commercial ProjectsCustom Commercial Projects
Custom Commercial ProjectsDaniel Scales
 
Ryan Davis-Selected Work
Ryan Davis-Selected WorkRyan Davis-Selected Work
Ryan Davis-Selected WorkRyan Davis
 
Project Portfolio Powerpoint
Project Portfolio PowerpointProject Portfolio Powerpoint
Project Portfolio Powerpointwdemshar
 
Carl Tallon Projects Presentaion 2016
Carl Tallon Projects Presentaion 2016Carl Tallon Projects Presentaion 2016
Carl Tallon Projects Presentaion 2016
Carl Tallon
 
ABACUS Statement of Qualifications
ABACUS Statement of QualificationsABACUS Statement of Qualifications
ABACUS Statement of Qualifications
Jonovich
 
Vcc canada
Vcc canadaVcc canada
Vcc canada
Jonna Vasu
 
highrise report bangladesh (city center)
highrise report bangladesh (city center)highrise report bangladesh (city center)
highrise report bangladesh (city center)
iftekhar rafat
 
Chris coonan project list november 1 2020
Chris coonan project list november 1 2020Chris coonan project list november 1 2020
Chris coonan project list november 1 2020
Chris Coonan
 
CM&B Construction Overview
CM&B Construction OverviewCM&B Construction Overview
CM&B Construction Overview
Leah Blackman
 
Steve Lockwood’s Project Photos
Steve Lockwood’s Project PhotosSteve Lockwood’s Project Photos
Steve Lockwood’s Project PhotosSlock
 
Radical Re-Design- How the Industrial Real Estate Boom is changing the market...
Radical Re-Design- How the Industrial Real Estate Boom is changing the market...Radical Re-Design- How the Industrial Real Estate Boom is changing the market...
Radical Re-Design- How the Industrial Real Estate Boom is changing the market...
Steve Kapp, SIOR
 
Resume 2 Ppa
Resume 2 PpaResume 2 Ppa
Resume 2 PpaAndresva
 

Similar to MJH Projects (20)

Keith Holt Personal Portfolio2
Keith Holt Personal Portfolio2Keith Holt Personal Portfolio2
Keith Holt Personal Portfolio2
 
Al's_Resume - Job Captain - Commercial
Al's_Resume - Job Captain - CommercialAl's_Resume - Job Captain - Commercial
Al's_Resume - Job Captain - Commercial
 
Green leed projects
Green leed projectsGreen leed projects
Green leed projects
 
Custom Commercial Projects
Custom Commercial ProjectsCustom Commercial Projects
Custom Commercial Projects
 
Ryan Davis-Selected Work
Ryan Davis-Selected WorkRyan Davis-Selected Work
Ryan Davis-Selected Work
 
Project Portfolio Powerpoint
Project Portfolio PowerpointProject Portfolio Powerpoint
Project Portfolio Powerpoint
 
International
InternationalInternational
International
 
Carl Tallon Projects Presentaion 2016
Carl Tallon Projects Presentaion 2016Carl Tallon Projects Presentaion 2016
Carl Tallon Projects Presentaion 2016
 
ABACUS Statement of Qualifications
ABACUS Statement of QualificationsABACUS Statement of Qualifications
ABACUS Statement of Qualifications
 
Vcc canada
Vcc canadaVcc canada
Vcc canada
 
work at LMN
work at LMNwork at LMN
work at LMN
 
Francisco Quintana Resume
Francisco Quintana Resume Francisco Quintana Resume
Francisco Quintana Resume
 
highrise report bangladesh (city center)
highrise report bangladesh (city center)highrise report bangladesh (city center)
highrise report bangladesh (city center)
 
Chris coonan project list november 1 2020
Chris coonan project list november 1 2020Chris coonan project list november 1 2020
Chris coonan project list november 1 2020
 
CM&B Construction Overview
CM&B Construction OverviewCM&B Construction Overview
CM&B Construction Overview
 
STC Projects
STC ProjectsSTC Projects
STC Projects
 
Steve Lockwood’s Project Photos
Steve Lockwood’s Project PhotosSteve Lockwood’s Project Photos
Steve Lockwood’s Project Photos
 
Radical Re-Design- How the Industrial Real Estate Boom is changing the market...
Radical Re-Design- How the Industrial Real Estate Boom is changing the market...Radical Re-Design- How the Industrial Real Estate Boom is changing the market...
Radical Re-Design- How the Industrial Real Estate Boom is changing the market...
 
EmCarroll Portfolio
EmCarroll PortfolioEmCarroll Portfolio
EmCarroll Portfolio
 
Resume 2 Ppa
Resume 2 PpaResume 2 Ppa
Resume 2 Ppa
 

Recently uploaded

Dr. Nazrul Islam, Northern University Bangladesh - CV (29.5.2024).pdf
Dr. Nazrul Islam, Northern University Bangladesh - CV (29.5.2024).pdfDr. Nazrul Islam, Northern University Bangladesh - CV (29.5.2024).pdf
Dr. Nazrul Islam, Northern University Bangladesh - CV (29.5.2024).pdf
Dr. Nazrul Islam
 
太阳城娱乐-太阳城娱乐推荐-太阳城娱乐官方网站| 立即访问【ac123.net】
太阳城娱乐-太阳城娱乐推荐-太阳城娱乐官方网站| 立即访问【ac123.net】太阳城娱乐-太阳城娱乐推荐-太阳城娱乐官方网站| 立即访问【ac123.net】
太阳城娱乐-太阳城娱乐推荐-太阳城娱乐官方网站| 立即访问【ac123.net】
foismail170
 
135. Reviewer Certificate in Journal of Engineering
135. Reviewer Certificate in Journal of Engineering135. Reviewer Certificate in Journal of Engineering
135. Reviewer Certificate in Journal of Engineering
Manu Mitra
 
Transferable Skills - Your Roadmap - Part 1 and 2 - Dirk Spencer Senior Recru...
Transferable Skills - Your Roadmap - Part 1 and 2 - Dirk Spencer Senior Recru...Transferable Skills - Your Roadmap - Part 1 and 2 - Dirk Spencer Senior Recru...
Transferable Skills - Your Roadmap - Part 1 and 2 - Dirk Spencer Senior Recru...
Dirk Spencer Corporate Recruiter LION
 
Chapters 3 Contracts.pptx Chapters 3 Contracts.pptx
Chapters 3  Contracts.pptx Chapters 3  Contracts.pptxChapters 3  Contracts.pptx Chapters 3  Contracts.pptx
Chapters 3 Contracts.pptx Chapters 3 Contracts.pptx
Sheldon Byron
 
皇冠体育- 皇冠体育官方网站- CROWN SPORTS| 立即访问【ac123.net】
皇冠体育- 皇冠体育官方网站- CROWN SPORTS| 立即访问【ac123.net】皇冠体育- 皇冠体育官方网站- CROWN SPORTS| 立即访问【ac123.net】
皇冠体育- 皇冠体育官方网站- CROWN SPORTS| 立即访问【ac123.net】
larisashrestha558
 
My Story of Getting into Tech By Gertrude Chilufya Westrin
My Story of Getting into Tech By Gertrude Chilufya WestrinMy Story of Getting into Tech By Gertrude Chilufya Westrin
My Story of Getting into Tech By Gertrude Chilufya Westrin
AlinaseFaith
 
132. Acta Scientific Pharmaceutical Sciences
132. Acta Scientific Pharmaceutical Sciences132. Acta Scientific Pharmaceutical Sciences
132. Acta Scientific Pharmaceutical Sciences
Manu Mitra
 
134. Reviewer Certificate in Computer Science
134. Reviewer Certificate in Computer Science134. Reviewer Certificate in Computer Science
134. Reviewer Certificate in Computer Science
Manu Mitra
 
15385-LESSON PLAN- 7TH - SS-Insian Constitution an Introduction.pdf
15385-LESSON PLAN- 7TH - SS-Insian Constitution an Introduction.pdf15385-LESSON PLAN- 7TH - SS-Insian Constitution an Introduction.pdf
15385-LESSON PLAN- 7TH - SS-Insian Constitution an Introduction.pdf
gobogo3542
 
How Mentoring Elevates Your PM Career | PMI Silver Spring Chapter
How Mentoring Elevates Your PM Career | PMI Silver Spring ChapterHow Mentoring Elevates Your PM Career | PMI Silver Spring Chapter
How Mentoring Elevates Your PM Career | PMI Silver Spring Chapter
Hector Del Castillo, CPM, CPMM
 
New Explore Careers and College Majors 2024.pdf
New Explore Careers and College Majors 2024.pdfNew Explore Careers and College Majors 2024.pdf
New Explore Careers and College Majors 2024.pdf
Dr. Mary Askew
 
133. Reviewer Certificate in Advances in Research
133. Reviewer Certificate in Advances in Research133. Reviewer Certificate in Advances in Research
133. Reviewer Certificate in Advances in Research
Manu Mitra
 
salivary gland disorders.pdf nothing more
salivary gland disorders.pdf nothing moresalivary gland disorders.pdf nothing more
salivary gland disorders.pdf nothing more
GokulnathMbbs
 
How to create an effective K-POC tutorial
How to create an effective K-POC tutorialHow to create an effective K-POC tutorial
How to create an effective K-POC tutorial
vencislavkaaa
 
han han widi kembar tapi beda han han dan widi kembar tapi sama
han han widi kembar tapi beda han han dan widi kembar tapi samahan han widi kembar tapi beda han han dan widi kembar tapi sama
han han widi kembar tapi beda han han dan widi kembar tapi sama
IrlanMalik
 
欧洲杯买球平台-欧洲杯买球平台推荐-欧洲杯买球平台| 立即访问【ac123.net】
欧洲杯买球平台-欧洲杯买球平台推荐-欧洲杯买球平台| 立即访问【ac123.net】欧洲杯买球平台-欧洲杯买球平台推荐-欧洲杯买球平台| 立即访问【ac123.net】
欧洲杯买球平台-欧洲杯买球平台推荐-欧洲杯买球平台| 立即访问【ac123.net】
foismail170
 
DOC-20240602-WA0001..pdf DOC-20240602-WA0001..pdf
DOC-20240602-WA0001..pdf DOC-20240602-WA0001..pdfDOC-20240602-WA0001..pdf DOC-20240602-WA0001..pdf
DOC-20240602-WA0001..pdf DOC-20240602-WA0001..pdf
Pushpendra Kumar
 
Personal Brand Exploration Comedy Jxnelle.
Personal Brand Exploration Comedy Jxnelle.Personal Brand Exploration Comedy Jxnelle.
Personal Brand Exploration Comedy Jxnelle.
alexthomas971
 
Midterm Contract Law and Adminstration.pptx
Midterm Contract Law and Adminstration.pptxMidterm Contract Law and Adminstration.pptx
Midterm Contract Law and Adminstration.pptx
Sheldon Byron
 

Recently uploaded (20)

Dr. Nazrul Islam, Northern University Bangladesh - CV (29.5.2024).pdf
Dr. Nazrul Islam, Northern University Bangladesh - CV (29.5.2024).pdfDr. Nazrul Islam, Northern University Bangladesh - CV (29.5.2024).pdf
Dr. Nazrul Islam, Northern University Bangladesh - CV (29.5.2024).pdf
 
太阳城娱乐-太阳城娱乐推荐-太阳城娱乐官方网站| 立即访问【ac123.net】
太阳城娱乐-太阳城娱乐推荐-太阳城娱乐官方网站| 立即访问【ac123.net】太阳城娱乐-太阳城娱乐推荐-太阳城娱乐官方网站| 立即访问【ac123.net】
太阳城娱乐-太阳城娱乐推荐-太阳城娱乐官方网站| 立即访问【ac123.net】
 
135. Reviewer Certificate in Journal of Engineering
135. Reviewer Certificate in Journal of Engineering135. Reviewer Certificate in Journal of Engineering
135. Reviewer Certificate in Journal of Engineering
 
Transferable Skills - Your Roadmap - Part 1 and 2 - Dirk Spencer Senior Recru...
Transferable Skills - Your Roadmap - Part 1 and 2 - Dirk Spencer Senior Recru...Transferable Skills - Your Roadmap - Part 1 and 2 - Dirk Spencer Senior Recru...
Transferable Skills - Your Roadmap - Part 1 and 2 - Dirk Spencer Senior Recru...
 
Chapters 3 Contracts.pptx Chapters 3 Contracts.pptx
Chapters 3  Contracts.pptx Chapters 3  Contracts.pptxChapters 3  Contracts.pptx Chapters 3  Contracts.pptx
Chapters 3 Contracts.pptx Chapters 3 Contracts.pptx
 
皇冠体育- 皇冠体育官方网站- CROWN SPORTS| 立即访问【ac123.net】
皇冠体育- 皇冠体育官方网站- CROWN SPORTS| 立即访问【ac123.net】皇冠体育- 皇冠体育官方网站- CROWN SPORTS| 立即访问【ac123.net】
皇冠体育- 皇冠体育官方网站- CROWN SPORTS| 立即访问【ac123.net】
 
My Story of Getting into Tech By Gertrude Chilufya Westrin
My Story of Getting into Tech By Gertrude Chilufya WestrinMy Story of Getting into Tech By Gertrude Chilufya Westrin
My Story of Getting into Tech By Gertrude Chilufya Westrin
 
132. Acta Scientific Pharmaceutical Sciences
132. Acta Scientific Pharmaceutical Sciences132. Acta Scientific Pharmaceutical Sciences
132. Acta Scientific Pharmaceutical Sciences
 
134. Reviewer Certificate in Computer Science
134. Reviewer Certificate in Computer Science134. Reviewer Certificate in Computer Science
134. Reviewer Certificate in Computer Science
 
15385-LESSON PLAN- 7TH - SS-Insian Constitution an Introduction.pdf
15385-LESSON PLAN- 7TH - SS-Insian Constitution an Introduction.pdf15385-LESSON PLAN- 7TH - SS-Insian Constitution an Introduction.pdf
15385-LESSON PLAN- 7TH - SS-Insian Constitution an Introduction.pdf
 
How Mentoring Elevates Your PM Career | PMI Silver Spring Chapter
How Mentoring Elevates Your PM Career | PMI Silver Spring ChapterHow Mentoring Elevates Your PM Career | PMI Silver Spring Chapter
How Mentoring Elevates Your PM Career | PMI Silver Spring Chapter
 
New Explore Careers and College Majors 2024.pdf
New Explore Careers and College Majors 2024.pdfNew Explore Careers and College Majors 2024.pdf
New Explore Careers and College Majors 2024.pdf
 
133. Reviewer Certificate in Advances in Research
133. Reviewer Certificate in Advances in Research133. Reviewer Certificate in Advances in Research
133. Reviewer Certificate in Advances in Research
 
salivary gland disorders.pdf nothing more
salivary gland disorders.pdf nothing moresalivary gland disorders.pdf nothing more
salivary gland disorders.pdf nothing more
 
How to create an effective K-POC tutorial
How to create an effective K-POC tutorialHow to create an effective K-POC tutorial
How to create an effective K-POC tutorial
 
han han widi kembar tapi beda han han dan widi kembar tapi sama
han han widi kembar tapi beda han han dan widi kembar tapi samahan han widi kembar tapi beda han han dan widi kembar tapi sama
han han widi kembar tapi beda han han dan widi kembar tapi sama
 
欧洲杯买球平台-欧洲杯买球平台推荐-欧洲杯买球平台| 立即访问【ac123.net】
欧洲杯买球平台-欧洲杯买球平台推荐-欧洲杯买球平台| 立即访问【ac123.net】欧洲杯买球平台-欧洲杯买球平台推荐-欧洲杯买球平台| 立即访问【ac123.net】
欧洲杯买球平台-欧洲杯买球平台推荐-欧洲杯买球平台| 立即访问【ac123.net】
 
DOC-20240602-WA0001..pdf DOC-20240602-WA0001..pdf
DOC-20240602-WA0001..pdf DOC-20240602-WA0001..pdfDOC-20240602-WA0001..pdf DOC-20240602-WA0001..pdf
DOC-20240602-WA0001..pdf DOC-20240602-WA0001..pdf
 
Personal Brand Exploration Comedy Jxnelle.
Personal Brand Exploration Comedy Jxnelle.Personal Brand Exploration Comedy Jxnelle.
Personal Brand Exploration Comedy Jxnelle.
 
Midterm Contract Law and Adminstration.pptx
Midterm Contract Law and Adminstration.pptxMidterm Contract Law and Adminstration.pptx
Midterm Contract Law and Adminstration.pptx
 

MJH Projects

  • 1. Piemonte Office Building – Ontario, CA 125,685 SF Class A, 5- story office building, 1/300 Parking ratio, Type II FR B occupancy, Lobby finishes include stone flooring from slab materials, stone and wood paneling on wall
  • 2. Bayfair Center Regional Mall – San Leandro, CA Demolition, renovation, and seismic retrofit of approx. 115,00 s/f of an existing 850,000 s/f regional mall, interior finish upgrade of entire public area of mall, parking lot reconfiguration and renovation
  • 3. The Pike at Rainbow Harbor – Long Beach, CA 370,000-square-foot entertainment and retail center that includes waterfront restaurants and a 14-screen theater. The center is divided into distinct zones, each featuring its own architecture to provide a unique entertainment experience and signature elements, such as the pedestrian bridge reminiscent of the wooden roller coaster that operated in the city’s historic Pike amusement zone from 1930 to 1968
  • 4. Irvine Spectrum Center – Irvine, CA Phases III & IV of this long term project added approx. 220,000 SF of retail and dining venues, continuing the Moorish village theme comprised of cobblestone walkways, Andalusian districts and plazas. Notable is the 105 foot diameter Giant Wheel, which comes to life at night with over 15.000 solar powered lights.
  • 5. Balboa Bay Club – Newport Beach, CA Phase I includes a new clubhouse, ladies’ and men’s spas, a state-of-the-art fitness center with racquetball and basketball courts, child care service, a pro shop, bar/lounge, indoor/outdoor restaurant, a swimming pool, outdoor Jacuzzi and children’s pool, as well as 28 waterfront guest rooms
  • 6. Lakeshore Towers Phase II – Irvine, CA 128,135-SF Class A, 5 story office building constructed at a cost of $10 million, designed with precast concrete panels, punched windows and glazed ribbon walls.
  • 7. TEAM FORD – Las Vegas, NV 14-acre site featuring an 85,000-square-foot building with 60 service bays and inventory parking that can accommodate in excess of 900 cars. The 6,000-square-foot showroom features a 20-foot curtain wall glazed with Ford blue glass, extensive detail lighting, specially designed concrete and desert-style landscaping, including oversized boulders and palm trees.
  • 8. SOLANO MALL – Fairfield, CA 161,000-square-foot retail/entertainment venue replacing a former department store, and the centerpiece to the $15 million project is a new 16-screen Edwards Theater megaplex cinema. The 72,000-square-foot theater complex features stadium seating as well as state-of-the-art sound and screening technology.
  • 9. Mercedes Benz of Laguna Niguel – Laguna Niguel, CA 85,000-square-foot facility comprised of two buildings on 12 acres. With its 8,000-square-foot, single-level showroom featuring 12 new cars, a 3,000-square-foot, pre-owned vehicle showroom, 62 service bays, three customer waiting areas and a parking lot offering more than 500 parking stalls, the spacious new Mercedes-Benz dealership is one of the largest and finest facilities of its type in the world.
  • 10. Bal Seal Engineering – Foothill Ranch, CA 125,225 SF concrete tilt up facility on a 7.2 acre site, including corporate office improvements, research and development departments, onsite manufacturing and distribution facilities for this maker of world class industrial springs and seals.
  • 11. Candlewood Hotels – Lake Forest, CA $4M design build contract for a 122 all suite hotel building as part of a national rollout program, including infrastructure development, wood frame construction, full FF&E coordination, tenant improvements, and site amenities including pool.
  • 12. Eisenhower Medical Center – Rancho Mirage, CA Complete build out of a 23,000-square-foot, 18-bed birthing center that included OB/GYN, E.N.T. trauma and cardiac, nursery space along with 14 LDRP suites. The project also consisted of elaborate site work with a new pedestrian bridge. The project was reviewed and inspected under OSHPD requirements
  • 13. Mallinckrodt Medical – Irvine, CA Complete design/build responsibility for a 110,000 SF medical manufacturing facility, warehousing and offices. Project features Class 100,000 and 10,000 clean rooms with chilled water and condenser water systems for injection molding equipment and a separate chilled water system for the clean area air conditioning system, three overhead rolling bridge cranes, compressed air, industrial, process and lab vacuum systems. Project also includes research and test laboratories, significant seismic strengthening, and hazardous materials abatement.
  • 14. Toyota NAPLD – Ontario, CA 760,000-square-foot regional facility, constructed of concrete tilt-up walls with a steel-framed roof, includes administration offices, a teleconferencing center, a full-service cafeteria, and a distribution area. The surrounding 94-acre site features decorative colored stone, olive trees and traditional Japanese flora

Editor's Notes

  1. asfsadf