Agile Development with Scrum
            and XP
           Joe Drumgoole
   http://twitter.com/jdrumgoole
A Little Bit Of History
  Requirements


               Functional Spec


                            Design


                                         Implementation


                                                                 Test


                                                                        Deploy


23 July 2010                     http://twitter.com/jdrumgoole                   2
Why Waterfall Sucks
• Can’t tell good software by observation
• What we see changes what we want
• Users are rotten at articulating their desires
       – Obsessed with How rather than What
• Domain knowledge car crash
• Requirements change over time
• Responsiveness

23 July 2010           http://twitter.com/jdrumgoole   3
Waterfall Works…
•    When specs are detailed and unchanging
•    E.g X400, TCP/IP stack, SMTP etc.
•    Requirement to deliver all at once e.g CREST
•    Minimal technical innovation required
•    UI Free Deployments
•    Project team uses appropriate process/tools



23 July 2010         http://twitter.com/jdrumgoole   4
Performance Potential

                                                     Mentor
    Move




                                                     Support
  Manage




23 July 2010         http://twitter.com/jdrumgoole             5
Software Sector
•    Highly Motivated individuals
•    Don’t need more process
•    Need more mentoring
•    .. So PRINCE2/Six Sigma etc. Won’t help
•    Some things need lots of process
       – Pharma, Big Oil, Agriculture
       – Software development ain’t one of them


23 July 2010           http://twitter.com/jdrumgoole   6
Conway’s Law
    Organisations which design systems … are
    constrained to produce designs which are
    copies of the communications structures of
    these organisations




23 July 2010        http://twitter.com/jdrumgoole   7
Software Development
•    Takes 15 minutes to get in the zone
•    Interrupts reset the 15 minute timer
•    Takes 6 months to build product value
•    Takes 18 months to build market value
•    Great developers don’t know how they do it
•    10000 hours of practice (Outliers)



23 July 2010         http://twitter.com/jdrumgoole   8
Agile Manifesto

Individuals and interactions over processes and tools
Working software over comprehensive documentation
Customer collaboration over contract negotiation
Responding to change over following a plan

                http://agilemanifesto.org/




23 July 2010         http://twitter.com/jdrumgoole      9
What does this mean?
•    Avoiding Software Engineering
•    Mostly we don’t know what we are doing
•    … so do less of it until we do know
•    Lets look at some specific processes
         Extreme Programming & SCRUM



23 July 2010         http://twitter.com/jdrumgoole   10
XP & SCRUM
• Loose Definitions
       –XP is what the programmers do
       –SCRUM is what the management do




23 July 2010       http://twitter.com/jdrumgoole   11
Extreme Programming
•    On site Customer
•    User Stories
•    Simplest possible Design
•    Pair Programming
•    Short Iterations
•    Test Driven Development
•    Refactoring
•    Continuous Integration
•    Incremental Releases
•    Visibility

23 July 2010           http://twitter.com/jdrumgoole   12
XP: On Site Customer
•    Customer available to team
•    Detailed domain knowledge
•    Understanding of ROI
•    Explains priorities from a business perspective
•    Balances effort /reward
•    Builds a relationship with team



23 July 2010         http://twitter.com/jdrumgoole   13
XP : User Stories
•    Simple stories that detail end-user functions
•    Written by the user
•    Fit on a single card
•    Focus on simple incremental improvements
•    Prune the backlog regularily
•    Priorities driven by customer demands



23 July 2010         http://twitter.com/jdrumgoole   14
XP: Simplest Possible Design
•    Over Architecture
•    You are probably building the wrong thing
•    Linear list/flat file preferred to DB table
•    Validate that the feature is desired
•    Optimise performance as a refactoring
•    Sometimes slow is good enough



23 July 2010            http://twitter.com/jdrumgoole   15
XP : Pair Programming
• Most difficult XP practice to adopt
• Not a master/slave, mentor/acolyte Role
• A sharing by peers
• Oversight at the coal face
• The minute you leave the code your
  knowledge decays exponentially
• Moment of creation
• Eliminates “ownership issues”

23 July 2010         http://twitter.com/jdrumgoole   16
Short Iterations
•    Don’t go dark
•    Validate your assumptions
•    Get customer feedback early and often
•    Don’t do work on non-essential stuff
•    Discover changes in priorities
•    Making a wrong turn at the start



23 July 2010        http://twitter.com/jdrumgoole   17
Test Driven Development
•    Write the tests first
•    Tests fail initially
•    Tests start to pass as code gets written
•    Refactoring breaks tests and then passes
•    Unit Tests (class level)
•    Acceptances Tests (end user level)
•    Use automation (xUnit, Hudson, Ant etc.)
•    If it doesn’t have a test it doesn’t exist
•    Design for automated test

23 July 2010           http://twitter.com/jdrumgoole   18
Refactoring
•    Driven by user stories
•    Performance demands a new sort
•    Flat files cannot be restructured for new data
•    Increase users from 10 to 1000
•    Environment changes (Windows to Linux)
•    Software Rot reduction



23 July 2010         http://twitter.com/jdrumgoole    19
Continuous Integration
•    Single Code Repository
•    Automate the Build
•    Make The Build Self Testing
•    Everyone commits to mainline everyday
•    Every commit builds the system
•    Keep the build fast
•    Test in a production clone
•    Make it easy to get a production copy

23 July 2010         http://twitter.com/jdrumgoole   20
Incremental Releases
• Get the smallest feature working
• Use tests to validate working system
• Make sure each release modifies a small part
  of the system
• Understand all changes
• Focus on end-to-end functionality



23 July 2010         http://twitter.com/jdrumgoole   21
Visibility
• Broken tests detected and fixed
• Broken builds detected and fixed
• Clear stats on:
       – No of builds
       – No of tests
       – No of deployments
       – Development is Data Centric


23 July 2010            http://twitter.com/jdrumgoole   22
XP : Velocity
• An understanding of how many stories we can
  complete
• Measured like the weather
• Feedback loop leads to consistent stories




23 July 2010     http://twitter.com/jdrumgoole   23
XP : Example Velocity
                       350
                                Example Velocity for SaaS Project
                       300



                       250
      Tickets Closed




                       200



                       150
                                                                      Total

                       100



                       50



                         0




                                           Sprints (Two Weeks)


23 July 2010                          http://twitter.com/jdrumgoole           24
XP: 80/20 Rule
                  120
                        Example Velocity for SaaS Project
                        Example Velocity for SaaS Project
                  100



                  80
 Tickets Closed




                  60


                                                              KP
                                                               DR
                  40



                  20



                    0




                                    Sprints (Two Weeks)
                                    Sprints (Two Weeks)




23 July 2010                  http://twitter.com/jdrumgoole   25
Velocity Errors
•    Need to focus on consistent sprint tasks
•    Tasks must be > 4 hrs
•    Tasks must be < 16 hrs
•    Break up or coalesce
•    Product Backlog too coarse grained
•    80/20 rule goes for performance



23 July 2010         http://twitter.com/jdrumgoole   26
Exercise
• Write two User Stories for your software




23 July 2010      http://twitter.com/jdrumgoole   27
SCRUM


Scrum is an agile process that allows us to
focus on delivering the highest business
value in the shortest time




23 July 2010     http://twitter.com/jdrumgoole   28
General George Patton


  A good plan, violently executed
   now, is better than a perfect
          plan next week


23 July 2010         http://twitter.com/jdrumgoole   29
Its Been Around a While
     • Jeff Sutherland
           – Initial scrums at Easel Corp in 1993
           – IDX and 500+ people doing Scrum
           – Scrum presented at OOPLSA 96
     • Ken Schwaber
           – Scrum presented at OOPSLA 96
           – Author of three books on Scrum
     • Mike Beedle
           – Scrum patterns in PLOPD4
     • Ken Schwaber and Mike Cohn
           – Co-founded Scrum Alliance in 2002

23 July 2010                  http://twitter.com/jdrumgoole   30
SCRUM Users
•    Microsoft                            •    Intuit
•    Yahoo                                •    Nielsen Media
•    Google                               •    First American Real Estate
•    Electronic Arts                      •    BMC Software
•    Philips                              •    John Deere
•    Siemens                              •    Lexis Nexis
•    Nokia                                •    Sabre
•    IBM                                  •    Salesforce.com
•    Capital One                          •    Time Warner
•    BBC                                  •    Oce

23 July 2010             http://twitter.com/jdrumgoole                  31
Key Facets
     • Self-organizing teams
     • Product progresses in a series of two- to
       four-week “sprints”
     • Requirements are captured as items in a list
       of “product backlog”
     • No specific engineering practices prescribed
     • Uses generative rules to create an agile
       environment for delivering projects
     • One of the “agile processes”
23 July 2010         http://twitter.com/jdrumgoole   32
SCRUM Overview




23 July 2010      http://twitter.com/jdrumgoole   33
The Sprint – Coin of the Realm
• A release is broken down into sprints
• Sprints are of fixed identical duration
       – Helps manage velocity
       – Helps keep a rhythm
• Team decides sprint duration
• No changes during a sprint



23 July 2010            http://twitter.com/jdrumgoole   34
Scrum Structure
• Roles
       – Product Owner
       – Scrum Master
       – Team
• Processes
       –   Sprint Planning
       –   Daily Scrum Meeting
       –   Sprint Review
       –   Sprint Retrospective
• Artefacts
       – Product Backlog
       – Sprint Backlog
       – Burn Down Charts

23 July 2010                  http://twitter.com/jdrumgoole   35
Roles: Product Owner
     • Define the features of the product
     • Decide on release date and content
     • Be responsible for the profitability of the
       product (ROI)
     • Prioritize features according to market value
     • Adjust features and priority every
       iteration, as needed
     • Accept or reject work results
23 July 2010         http://twitter.com/jdrumgoole   36
Roles : Scrum Master
     • Represents management to the project
     • Responsible for enacting Scrum values and
       practices
     • Removes impediments
     • Ensure that the team is fully functional and
       productive
     • Enable close cooperation across all roles and
       functions
     • Shield the team from external interferences
23 July 2010          http://twitter.com/jdrumgoole    37
Roles: The Team
     • Typically 5-9 people
     • Cross-functional:
       – Programmers, testers, user experience
         designers, etc.
     • Members should be full-time
       – May be exceptions (e.g., database administrator)
     • Teams are self-organizing
           – Ideally, no titles but rarely a possibility
     • Membership should change only between
       sprints
23 July 2010                  http://twitter.com/jdrumgoole   38
Process : Sprint Planning
• The Product Backlog




23 July 2010           http://twitter.com/jdrumgoole   39
Processes : Sprint Planning
• Sprint Prioritization
       – Analyse and evaluate sprint backlog
       – Takes account of changing business priorities
       – Define Sprint Goal
       – Feed into Sprint Plan




23 July 2010             http://twitter.com/jdrumgoole   40
Processes : Sprint Plan
• Decide how to achieve sprint goal
• Create sprint backlog from product backlog
       – A list of product backlog tasks aligned with goal
• Time estimates for sprint backlog
• Sprint backlog is the Sprint Plan




23 July 2010             http://twitter.com/jdrumgoole       41
Example : Product Backlog
• Product Backlog : Invoicing System
        Feature                                                      Development
                                                                     Effort (Days)
        Allow login using facebook credentials                       5
        Generate PDF copies of invoices                              7
        Graph credit risk                                            4
        Send duplicates of all invoices                              3
        Annotate invoice                                             3
        Customise invoice look and feel                              5
        Support multi-currency                                       10
        Support time sheets for work                                 10
        Store list of clients and allow editing                      4
23 July 2010                         http://twitter.com/jdrumgoole                   42
Exercise
• Prioritise Two Features
• Write sprint backlog with estimates
• Present to group




23 July 2010      http://twitter.com/jdrumgoole   43
Process : The Daily Scrum
     • Parameters
           – Daily
           – 15-minutes
           – Stand-up
     • Not for problem solving
           – Whole world is invited
           – Only team members, ScrumMaster, product
             owner, can talk
     • Helps avoid other unnecessary meetings

23 July 2010              http://twitter.com/jdrumgoole   44
Process : Daily Scrum
• Three Questions for each Team Member
       – What did you do yesterday?
       – What will you do today?
       – Is there anything in your way?
• Not status updates for Scrum Master
• Commitments to your peers
• Keeps SCRUM moving forward
23 July 2010          http://twitter.com/jdrumgoole   45
Processes : Sprint Review
     • Team presents Sprint Goal
     • Ideally a Demo
     • Informal
           – 2-hour prep time rule
           – No slides
     • Whole team participates
     • Invite the world

23 July 2010            http://twitter.com/jdrumgoole   46
Process : Sprint Retrospective
     • Periodically take a look at what is and is not
       working
     • Typically 15–30 minutes
     • Done after every sprint
     • Whole team participates
           – ScrumMaster
           – Product owner
           – Team
           – Possibly customers and others

23 July 2010              http://twitter.com/jdrumgoole   47
Processes : Sprint Retrospective

           Start Doing


                         Stop Doing


                                                Continue Doing

23 July 2010              http://twitter.com/jdrumgoole          48
Artefacts : Product Backlog
•    The engine that drives scrum
•    All desired work (from users perspective)
•    Articulated as value delivered to customer
•    Prioritised by Product Owner
•    Should have rough development estimates
•    Reprioritised at the start of each sprint



23 July 2010            http://twitter.com/jdrumgoole   49
Artefacts : Product Backlog
•    Avoids “infrastructure”
•    Avoids “architecture astronauts”
•    Focuses all efforts on business value
•    Sprint Backlog articulates technical issues
•    Anyone can add to the backlog
•    Product Owner sets priority
•    Starvation is healthy

23 July 2010            http://twitter.com/jdrumgoole   50
Artefacts : Sprint Backlog
• Sprint Goal
       – Centralising paradigm of the overall sprint
       – Put an umbrella over a number of backlog items
       – Can be one backlog item
• Example
       – Support multiple users per account
       – Integrate Google Docs
       – Support Sage Accounting

23 July 2010            http://twitter.com/jdrumgoole     51
Artefacts : Sprint Backlog
     • Individuals sign up for work of their own choosing
           – Work is never assigned, collective ownership
     • Estimated work remaining is updated daily
     • Any team member can add, delete or change the
       sprint backlog
     • Work for the sprint emerges
     • If work is unclear, define a sprint backlog item with a
       larger amount of time and break it down later
     • Update work remaining as more becomes known


23 July 2010                 http://twitter.com/jdrumgoole   52
Artefacts : Sprint Backlog
• Sprint Tasks
       – Each task 8-16 hours
       – Should be achievable by any team member
       – Task time limits avoids “skunk works”




23 July 2010           http://twitter.com/jdrumgoole   53
Artefacts : Burn Down Chart




23 July 2010            http://twitter.com/jdrumgoole   54
Agile Deployment
• Use what works for you
• Phase 1
       – Test Driven Development
       – Continuous Integration
• Phase 2
       – Continuous Integration
       – Shorter release cycles


23 July 2010            http://twitter.com/jdrumgoole   55
What can go wrong Internally?
•    No onsite customer
•    Sprints too long
•    TDD Lip service (all tests pass, nothing works)
•    Techno Bigotry
       – The solution to everything is a NoSQL Db
• Over architecting solutions



23 July 2010            http://twitter.com/jdrumgoole   56
What can go wrong Externally?
• No management buy in
• Expectations that 12 month long waterfall
  schedules will hit their dates
• Expectations of Quarterly “move the market”
  releases
• No domain expertise
• The blame game


23 July 2010     http://twitter.com/jdrumgoole   57
Tools Overview
•    Source Code Control
•    Ticket/Story Tracking
•    Burn Down Charts
•    Sprints
•    Continuous Integration
•    Unit Testing
•    Acceptance Testing

23 July 2010        http://twitter.com/jdrumgoole   58
Source Code Control
• Subversion
       –   Centralised
       –   Mature
       –   Good tool support
       –   Lots of hosting providers
       –   TortoiseSVN for Windows Clients
• GitHub
       –   Distributed
       –   Younger Lineage
       –   Better for Branching
       –   A few hosting providers
23 July 2010               http://twitter.com/jdrumgoole   59
Tickets: Trac
• Trac
       – Open Source
       – Simple wiki and ticketing support
       – Integration with Mylyn
       – Lots of hosting providers
       – Very simple clean interface
       – Can be deployed on-premise
       – Nice integration with subversion

23 July 2010             http://twitter.com/jdrumgoole   60
Tickets : Assembla
•    Nice Ticket interface
•    Mylyn integration for Eclipse
•    Client interface with good scrum support
•    Good wiki integration
•    Good Multi-project support




23 July 2010         http://twitter.com/jdrumgoole   61
Tickets: JIRA
• JIRA
       – Hosted or on-premise
       – Great ticketing system
       – Lots of features and integrations
       – Comes with full development suite
       – $125 a month for 5 developers




23 July 2010            http://twitter.com/jdrumgoole   62
Burn Down : Charts
• Assembla
• Wush
• Pretty easy to knock out in Excel
       – If they come for free, use them
       – Don’t pay for them
       – Consider tracking Unit tests and Tickets Closed




23 July 2010             http://twitter.com/jdrumgoole     63
Sprints
• Wush
• Assembla
• JIRA
       – All support sprint structures
       – Progress indicators
       – Correlation with source code control system
• Backlog management is hard in Wush
• Multi-projects hard in Wush
23 July 2010            http://twitter.com/jdrumgoole   64
Continuous Integration
• Hudson
       – Apache, easy to setup, works for all scripted builds
       – Great UI
• Cruise Control
       – Older than hudson, but does .NET stuff
• Continuum
       – Apache project, primarily Java builds
• Bamboo
       – Slick but need to pay for it

23 July 2010               http://twitter.com/jdrumgoole        65
Unit Testing
•    Various xUnit Frameworks
•    Use one
•    Good integration with eclipse for JUnit
•    Every language has a framework
• http://en.wikipedia.org/wiki/List_of_unit_testing_fra
  meworks (66 listed)




23 July 2010         http://twitter.com/jdrumgoole    66
Acceptance Testing
• Selenium
       – Plugin and IDE
       – Stores web requests and results
       – Reports success/failure
• FIT
       – Create “fixtures” in Word/Excel
       – Test using FIT library


23 July 2010             http://twitter.com/jdrumgoole   67
Summary
•    Get the individual activities working
•    Get the group activities working
•    Embraced rather than imposed
•    Automation really helps
•    Deliver value before delivering a sea change
•    Start Small



23 July 2010         http://twitter.com/jdrumgoole   68
Deming



                 In God We Trust.
               All others bring data.

23 July 2010          http://twitter.com/jdrumgoole   69
Thanks




23 July 2010   http://twitter.com/jdrumgoole   70

Agile development using SCRUM

  • 1.
    Agile Development withScrum and XP Joe Drumgoole http://twitter.com/jdrumgoole
  • 2.
    A Little BitOf History Requirements Functional Spec Design Implementation Test Deploy 23 July 2010 http://twitter.com/jdrumgoole 2
  • 3.
    Why Waterfall Sucks •Can’t tell good software by observation • What we see changes what we want • Users are rotten at articulating their desires – Obsessed with How rather than What • Domain knowledge car crash • Requirements change over time • Responsiveness 23 July 2010 http://twitter.com/jdrumgoole 3
  • 4.
    Waterfall Works… • When specs are detailed and unchanging • E.g X400, TCP/IP stack, SMTP etc. • Requirement to deliver all at once e.g CREST • Minimal technical innovation required • UI Free Deployments • Project team uses appropriate process/tools 23 July 2010 http://twitter.com/jdrumgoole 4
  • 5.
    Performance Potential Mentor Move Support Manage 23 July 2010 http://twitter.com/jdrumgoole 5
  • 6.
    Software Sector • Highly Motivated individuals • Don’t need more process • Need more mentoring • .. So PRINCE2/Six Sigma etc. Won’t help • Some things need lots of process – Pharma, Big Oil, Agriculture – Software development ain’t one of them 23 July 2010 http://twitter.com/jdrumgoole 6
  • 7.
    Conway’s Law Organisations which design systems … are constrained to produce designs which are copies of the communications structures of these organisations 23 July 2010 http://twitter.com/jdrumgoole 7
  • 8.
    Software Development • Takes 15 minutes to get in the zone • Interrupts reset the 15 minute timer • Takes 6 months to build product value • Takes 18 months to build market value • Great developers don’t know how they do it • 10000 hours of practice (Outliers) 23 July 2010 http://twitter.com/jdrumgoole 8
  • 9.
    Agile Manifesto Individuals andinteractions over processes and tools Working software over comprehensive documentation Customer collaboration over contract negotiation Responding to change over following a plan http://agilemanifesto.org/ 23 July 2010 http://twitter.com/jdrumgoole 9
  • 10.
    What does thismean? • Avoiding Software Engineering • Mostly we don’t know what we are doing • … so do less of it until we do know • Lets look at some specific processes Extreme Programming & SCRUM 23 July 2010 http://twitter.com/jdrumgoole 10
  • 11.
    XP & SCRUM •Loose Definitions –XP is what the programmers do –SCRUM is what the management do 23 July 2010 http://twitter.com/jdrumgoole 11
  • 12.
    Extreme Programming • On site Customer • User Stories • Simplest possible Design • Pair Programming • Short Iterations • Test Driven Development • Refactoring • Continuous Integration • Incremental Releases • Visibility 23 July 2010 http://twitter.com/jdrumgoole 12
  • 13.
    XP: On SiteCustomer • Customer available to team • Detailed domain knowledge • Understanding of ROI • Explains priorities from a business perspective • Balances effort /reward • Builds a relationship with team 23 July 2010 http://twitter.com/jdrumgoole 13
  • 14.
    XP : UserStories • Simple stories that detail end-user functions • Written by the user • Fit on a single card • Focus on simple incremental improvements • Prune the backlog regularily • Priorities driven by customer demands 23 July 2010 http://twitter.com/jdrumgoole 14
  • 15.
    XP: Simplest PossibleDesign • Over Architecture • You are probably building the wrong thing • Linear list/flat file preferred to DB table • Validate that the feature is desired • Optimise performance as a refactoring • Sometimes slow is good enough 23 July 2010 http://twitter.com/jdrumgoole 15
  • 16.
    XP : PairProgramming • Most difficult XP practice to adopt • Not a master/slave, mentor/acolyte Role • A sharing by peers • Oversight at the coal face • The minute you leave the code your knowledge decays exponentially • Moment of creation • Eliminates “ownership issues” 23 July 2010 http://twitter.com/jdrumgoole 16
  • 17.
    Short Iterations • Don’t go dark • Validate your assumptions • Get customer feedback early and often • Don’t do work on non-essential stuff • Discover changes in priorities • Making a wrong turn at the start 23 July 2010 http://twitter.com/jdrumgoole 17
  • 18.
    Test Driven Development • Write the tests first • Tests fail initially • Tests start to pass as code gets written • Refactoring breaks tests and then passes • Unit Tests (class level) • Acceptances Tests (end user level) • Use automation (xUnit, Hudson, Ant etc.) • If it doesn’t have a test it doesn’t exist • Design for automated test 23 July 2010 http://twitter.com/jdrumgoole 18
  • 19.
    Refactoring • Driven by user stories • Performance demands a new sort • Flat files cannot be restructured for new data • Increase users from 10 to 1000 • Environment changes (Windows to Linux) • Software Rot reduction 23 July 2010 http://twitter.com/jdrumgoole 19
  • 20.
    Continuous Integration • Single Code Repository • Automate the Build • Make The Build Self Testing • Everyone commits to mainline everyday • Every commit builds the system • Keep the build fast • Test in a production clone • Make it easy to get a production copy 23 July 2010 http://twitter.com/jdrumgoole 20
  • 21.
    Incremental Releases • Getthe smallest feature working • Use tests to validate working system • Make sure each release modifies a small part of the system • Understand all changes • Focus on end-to-end functionality 23 July 2010 http://twitter.com/jdrumgoole 21
  • 22.
    Visibility • Broken testsdetected and fixed • Broken builds detected and fixed • Clear stats on: – No of builds – No of tests – No of deployments – Development is Data Centric 23 July 2010 http://twitter.com/jdrumgoole 22
  • 23.
    XP : Velocity •An understanding of how many stories we can complete • Measured like the weather • Feedback loop leads to consistent stories 23 July 2010 http://twitter.com/jdrumgoole 23
  • 24.
    XP : ExampleVelocity 350 Example Velocity for SaaS Project 300 250 Tickets Closed 200 150 Total 100 50 0 Sprints (Two Weeks) 23 July 2010 http://twitter.com/jdrumgoole 24
  • 25.
    XP: 80/20 Rule 120 Example Velocity for SaaS Project Example Velocity for SaaS Project 100 80 Tickets Closed 60 KP DR 40 20 0 Sprints (Two Weeks) Sprints (Two Weeks) 23 July 2010 http://twitter.com/jdrumgoole 25
  • 26.
    Velocity Errors • Need to focus on consistent sprint tasks • Tasks must be > 4 hrs • Tasks must be < 16 hrs • Break up or coalesce • Product Backlog too coarse grained • 80/20 rule goes for performance 23 July 2010 http://twitter.com/jdrumgoole 26
  • 27.
    Exercise • Write twoUser Stories for your software 23 July 2010 http://twitter.com/jdrumgoole 27
  • 28.
    SCRUM Scrum is anagile process that allows us to focus on delivering the highest business value in the shortest time 23 July 2010 http://twitter.com/jdrumgoole 28
  • 29.
    General George Patton A good plan, violently executed now, is better than a perfect plan next week 23 July 2010 http://twitter.com/jdrumgoole 29
  • 30.
    Its Been Arounda While • Jeff Sutherland – Initial scrums at Easel Corp in 1993 – IDX and 500+ people doing Scrum – Scrum presented at OOPLSA 96 • Ken Schwaber – Scrum presented at OOPSLA 96 – Author of three books on Scrum • Mike Beedle – Scrum patterns in PLOPD4 • Ken Schwaber and Mike Cohn – Co-founded Scrum Alliance in 2002 23 July 2010 http://twitter.com/jdrumgoole 30
  • 31.
    SCRUM Users • Microsoft • Intuit • Yahoo • Nielsen Media • Google • First American Real Estate • Electronic Arts • BMC Software • Philips • John Deere • Siemens • Lexis Nexis • Nokia • Sabre • IBM • Salesforce.com • Capital One • Time Warner • BBC • Oce 23 July 2010 http://twitter.com/jdrumgoole 31
  • 32.
    Key Facets • Self-organizing teams • Product progresses in a series of two- to four-week “sprints” • Requirements are captured as items in a list of “product backlog” • No specific engineering practices prescribed • Uses generative rules to create an agile environment for delivering projects • One of the “agile processes” 23 July 2010 http://twitter.com/jdrumgoole 32
  • 33.
    SCRUM Overview 23 July2010 http://twitter.com/jdrumgoole 33
  • 34.
    The Sprint –Coin of the Realm • A release is broken down into sprints • Sprints are of fixed identical duration – Helps manage velocity – Helps keep a rhythm • Team decides sprint duration • No changes during a sprint 23 July 2010 http://twitter.com/jdrumgoole 34
  • 35.
    Scrum Structure • Roles – Product Owner – Scrum Master – Team • Processes – Sprint Planning – Daily Scrum Meeting – Sprint Review – Sprint Retrospective • Artefacts – Product Backlog – Sprint Backlog – Burn Down Charts 23 July 2010 http://twitter.com/jdrumgoole 35
  • 36.
    Roles: Product Owner • Define the features of the product • Decide on release date and content • Be responsible for the profitability of the product (ROI) • Prioritize features according to market value • Adjust features and priority every iteration, as needed • Accept or reject work results 23 July 2010 http://twitter.com/jdrumgoole 36
  • 37.
    Roles : ScrumMaster • Represents management to the project • Responsible for enacting Scrum values and practices • Removes impediments • Ensure that the team is fully functional and productive • Enable close cooperation across all roles and functions • Shield the team from external interferences 23 July 2010 http://twitter.com/jdrumgoole 37
  • 38.
    Roles: The Team • Typically 5-9 people • Cross-functional: – Programmers, testers, user experience designers, etc. • Members should be full-time – May be exceptions (e.g., database administrator) • Teams are self-organizing – Ideally, no titles but rarely a possibility • Membership should change only between sprints 23 July 2010 http://twitter.com/jdrumgoole 38
  • 39.
    Process : SprintPlanning • The Product Backlog 23 July 2010 http://twitter.com/jdrumgoole 39
  • 40.
    Processes : SprintPlanning • Sprint Prioritization – Analyse and evaluate sprint backlog – Takes account of changing business priorities – Define Sprint Goal – Feed into Sprint Plan 23 July 2010 http://twitter.com/jdrumgoole 40
  • 41.
    Processes : SprintPlan • Decide how to achieve sprint goal • Create sprint backlog from product backlog – A list of product backlog tasks aligned with goal • Time estimates for sprint backlog • Sprint backlog is the Sprint Plan 23 July 2010 http://twitter.com/jdrumgoole 41
  • 42.
    Example : ProductBacklog • Product Backlog : Invoicing System Feature Development Effort (Days) Allow login using facebook credentials 5 Generate PDF copies of invoices 7 Graph credit risk 4 Send duplicates of all invoices 3 Annotate invoice 3 Customise invoice look and feel 5 Support multi-currency 10 Support time sheets for work 10 Store list of clients and allow editing 4 23 July 2010 http://twitter.com/jdrumgoole 42
  • 43.
    Exercise • Prioritise TwoFeatures • Write sprint backlog with estimates • Present to group 23 July 2010 http://twitter.com/jdrumgoole 43
  • 44.
    Process : TheDaily Scrum • Parameters – Daily – 15-minutes – Stand-up • Not for problem solving – Whole world is invited – Only team members, ScrumMaster, product owner, can talk • Helps avoid other unnecessary meetings 23 July 2010 http://twitter.com/jdrumgoole 44
  • 45.
    Process : DailyScrum • Three Questions for each Team Member – What did you do yesterday? – What will you do today? – Is there anything in your way? • Not status updates for Scrum Master • Commitments to your peers • Keeps SCRUM moving forward 23 July 2010 http://twitter.com/jdrumgoole 45
  • 46.
    Processes : SprintReview • Team presents Sprint Goal • Ideally a Demo • Informal – 2-hour prep time rule – No slides • Whole team participates • Invite the world 23 July 2010 http://twitter.com/jdrumgoole 46
  • 47.
    Process : SprintRetrospective • Periodically take a look at what is and is not working • Typically 15–30 minutes • Done after every sprint • Whole team participates – ScrumMaster – Product owner – Team – Possibly customers and others 23 July 2010 http://twitter.com/jdrumgoole 47
  • 48.
    Processes : SprintRetrospective Start Doing Stop Doing Continue Doing 23 July 2010 http://twitter.com/jdrumgoole 48
  • 49.
    Artefacts : ProductBacklog • The engine that drives scrum • All desired work (from users perspective) • Articulated as value delivered to customer • Prioritised by Product Owner • Should have rough development estimates • Reprioritised at the start of each sprint 23 July 2010 http://twitter.com/jdrumgoole 49
  • 50.
    Artefacts : ProductBacklog • Avoids “infrastructure” • Avoids “architecture astronauts” • Focuses all efforts on business value • Sprint Backlog articulates technical issues • Anyone can add to the backlog • Product Owner sets priority • Starvation is healthy 23 July 2010 http://twitter.com/jdrumgoole 50
  • 51.
    Artefacts : SprintBacklog • Sprint Goal – Centralising paradigm of the overall sprint – Put an umbrella over a number of backlog items – Can be one backlog item • Example – Support multiple users per account – Integrate Google Docs – Support Sage Accounting 23 July 2010 http://twitter.com/jdrumgoole 51
  • 52.
    Artefacts : SprintBacklog • Individuals sign up for work of their own choosing – Work is never assigned, collective ownership • Estimated work remaining is updated daily • Any team member can add, delete or change the sprint backlog • Work for the sprint emerges • If work is unclear, define a sprint backlog item with a larger amount of time and break it down later • Update work remaining as more becomes known 23 July 2010 http://twitter.com/jdrumgoole 52
  • 53.
    Artefacts : SprintBacklog • Sprint Tasks – Each task 8-16 hours – Should be achievable by any team member – Task time limits avoids “skunk works” 23 July 2010 http://twitter.com/jdrumgoole 53
  • 54.
    Artefacts : BurnDown Chart 23 July 2010 http://twitter.com/jdrumgoole 54
  • 55.
    Agile Deployment • Usewhat works for you • Phase 1 – Test Driven Development – Continuous Integration • Phase 2 – Continuous Integration – Shorter release cycles 23 July 2010 http://twitter.com/jdrumgoole 55
  • 56.
    What can gowrong Internally? • No onsite customer • Sprints too long • TDD Lip service (all tests pass, nothing works) • Techno Bigotry – The solution to everything is a NoSQL Db • Over architecting solutions 23 July 2010 http://twitter.com/jdrumgoole 56
  • 57.
    What can gowrong Externally? • No management buy in • Expectations that 12 month long waterfall schedules will hit their dates • Expectations of Quarterly “move the market” releases • No domain expertise • The blame game 23 July 2010 http://twitter.com/jdrumgoole 57
  • 58.
    Tools Overview • Source Code Control • Ticket/Story Tracking • Burn Down Charts • Sprints • Continuous Integration • Unit Testing • Acceptance Testing 23 July 2010 http://twitter.com/jdrumgoole 58
  • 59.
    Source Code Control •Subversion – Centralised – Mature – Good tool support – Lots of hosting providers – TortoiseSVN for Windows Clients • GitHub – Distributed – Younger Lineage – Better for Branching – A few hosting providers 23 July 2010 http://twitter.com/jdrumgoole 59
  • 60.
    Tickets: Trac • Trac – Open Source – Simple wiki and ticketing support – Integration with Mylyn – Lots of hosting providers – Very simple clean interface – Can be deployed on-premise – Nice integration with subversion 23 July 2010 http://twitter.com/jdrumgoole 60
  • 61.
    Tickets : Assembla • Nice Ticket interface • Mylyn integration for Eclipse • Client interface with good scrum support • Good wiki integration • Good Multi-project support 23 July 2010 http://twitter.com/jdrumgoole 61
  • 62.
    Tickets: JIRA • JIRA – Hosted or on-premise – Great ticketing system – Lots of features and integrations – Comes with full development suite – $125 a month for 5 developers 23 July 2010 http://twitter.com/jdrumgoole 62
  • 63.
    Burn Down :Charts • Assembla • Wush • Pretty easy to knock out in Excel – If they come for free, use them – Don’t pay for them – Consider tracking Unit tests and Tickets Closed 23 July 2010 http://twitter.com/jdrumgoole 63
  • 64.
    Sprints • Wush • Assembla •JIRA – All support sprint structures – Progress indicators – Correlation with source code control system • Backlog management is hard in Wush • Multi-projects hard in Wush 23 July 2010 http://twitter.com/jdrumgoole 64
  • 65.
    Continuous Integration • Hudson – Apache, easy to setup, works for all scripted builds – Great UI • Cruise Control – Older than hudson, but does .NET stuff • Continuum – Apache project, primarily Java builds • Bamboo – Slick but need to pay for it 23 July 2010 http://twitter.com/jdrumgoole 65
  • 66.
    Unit Testing • Various xUnit Frameworks • Use one • Good integration with eclipse for JUnit • Every language has a framework • http://en.wikipedia.org/wiki/List_of_unit_testing_fra meworks (66 listed) 23 July 2010 http://twitter.com/jdrumgoole 66
  • 67.
    Acceptance Testing • Selenium – Plugin and IDE – Stores web requests and results – Reports success/failure • FIT – Create “fixtures” in Word/Excel – Test using FIT library 23 July 2010 http://twitter.com/jdrumgoole 67
  • 68.
    Summary • Get the individual activities working • Get the group activities working • Embraced rather than imposed • Automation really helps • Deliver value before delivering a sea change • Start Small 23 July 2010 http://twitter.com/jdrumgoole 68
  • 69.
    Deming In God We Trust. All others bring data. 23 July 2010 http://twitter.com/jdrumgoole 69
  • 70.
    Thanks 23 July 2010 http://twitter.com/jdrumgoole 70

Editor's Notes

  • #3 Needwatefall picture here
  • #4 Analysis of buildings vs analysis of softwareDECnet Phase VPicture of an oil tanker
  • #6 Sometimes you just have to fire all the unhappy people
  • #8 Oracle’s struggles
  • #16 Thumbnails in PutPlace
  • #36 Break into boxes and redraw