The document discusses a proposed method for actuator fault isolation in laterally moving aircraft, shifting from traditional maintenance to condition-based maintenance (CBM). It introduces a combination of transformation matrix and special filter to generate decoupled residuals for fault detection. The results demonstrate improved fault detection performance compared to conventional methods, effectively reconstructing and isolating fault signals.