SlideShare a Scribd company logo
Sundaram-Clayton Limited Slide Number: 1
5S Improvement management
5S Improvement
Management
- SCL Experience
Sundaram-Clayton Limited Slide Number: 2
5S Improvement management
How to diagnose a company?
Look at its 5-S first
No TQM ,TPM or Lean without 5-S
Sundaram-Clayton Limited Slide Number: 3
5S Improvement management
Understanding of 5S
1S - Sorting out
2S - Set Limits & Systemize
3S - Shine equipment
4S - Search time elimination
5S - Set standards, Practice & Discipline
Purpose of 5S improvement management is to discipline
ourselves, conduct daily audits and take corrective action(i.e)
find non-conformity,abnormality,deviation,discrepancies and
take immediate corrective action by self
Sundaram-Clayton Limited Slide Number: 4
5S Improvement management
1S - Sorting out
 Change from wet to dry –
• Nothing on the floor, table, top of racks, cup-boards,
gangways, roadways etc
• If no swarf, water ,oil, dust, paper, litter, potholes etc are
found then it is called Dry
 Keep only wanted items for the day’s requirement and remove
unwanted items to the designated areas such as stores,Filing
cabinet,suppliers as the case maybe
 Keep only useful items and remove not useful items to
designated areas such as as Red-tag area,scrap yard
 No mix up of parts and products in pallets,in racks,in drawers,
bins etc
Sundaram-Clayton Limited Slide Number: 5
5S Improvement management
1S - Sorting out
Example : Wet to Dry; Nothing on the floor and gangways
Sundaram-Clayton Limited Slide Number: 6
5S Improvement management
1S - Sorting out
Example : Wet to Dry; No potholes,no litter
Sundaram-Clayton Limited Slide Number: 7
5S Improvement management
1S - Sorting out
Example : Wet to Dry; Only wanted items
Sundaram-Clayton Limited Slide Number: 8
5S Improvement management
1S - Sorting out benefits
 Good house keeping (Hospital clean,Garden green
atmosphere)
 Pleasant and conducive atmosphere
 Facilitates thinking and idea generation for improvement
 Keeping all things in order
 Facilitates visual control and corrective action
Sundaram-Clayton Limited Slide Number: 9
5S Improvement management
2S - Set limits & Systemize
 A place for everything: every useful thing has a place
 To discipline and work within marked boundaries
 Prefixed locations/markings
Sundaram-Clayton Limited Slide Number: 10
5S Improvement management
2S - Set limits & Systemize - Examples
 Gang-Way marking in shop floor
 Curb stones in roadway
 Dedicated containers - easy for identification, traceability and
counting
 Containers with separators - No parts touching each other to
prevent dents/damages
 Pre fixed location in shop floor/office (tools,fixtures,gauges etc)
Sundaram-Clayton Limited Slide Number: 11
5S Improvement management
2S - Set limits & Systemize –Examples (Contd.)
 X R Chart for quality
 Metal temperature, die temperature control limits in
Foundry
 Recipe for cooking in kitchen
 Fixed number of shots between die-servicing in Foundry
 Fixed tool regrinding frequency and operate accordingly
Sundaram-Clayton Limited Slide Number: 12
5S Improvement management
2S - Set limits & Systemize
Example: Gangway marking
Sundaram-Clayton Limited Slide Number: 13
5S Improvement management
2S - Set limits & Systemize
Example: Fixed time for garbage disposal
Sundaram-Clayton Limited Slide Number: 14
5S Improvement management
2S - Set limits & Systemize
Example:Dedicated Containers
Sundaram-Clayton Limited Slide Number: 15
5S Improvement management
2S - Set limits & Systemize
Example: Containers with Separators
Sundaram-Clayton Limited Slide Number: 16
5S Improvement management
Before
After
2S - Set limits & Systemize
Example: Pre fixed location
Sundaram-Clayton Limited Slide Number: 17
5S Improvement management
2S - Set limits & Systemize
Example: Pre fixed location
Sundaram-Clayton Limited Slide Number: 18
5S Improvement management
2S - Set limits & Systemize - Benefits
 Prevents accidents,improves safety
 Helps to optimize and achieve best in quality, cost and delivery
 Facilitates clear cut visual controls
 Easy to observe and take corrective / preventive actions
 Lead time reduction
 Good discipline
Sundaram-Clayton Limited Slide Number: 19
5S Improvement management
3S - Shine equipment
 Refurbishing of facilities, systems to ensure continuous
improvement
 Revising product,processes,methods for enhancing life cycle
 Audits for correction and prevention
Sundaram-Clayton Limited Slide Number: 20
5S Improvement management
3S - Shine equipment - Examples
 Cleaning of machines. Equipment cleaning is checking
 Preventive maintenance activities
 Poka yoke implementation
 Oil,water recycling and reusing
 Oil reclamation from wet swarf
 Reclaiming aluminium from dross
 Replacement of spares/ machinery
Sundaram-Clayton Limited Slide Number: 21
5S Improvement management
3S - Shine equipment-Examples (contd.)
 Revisiting tools,methods,processes and cells for
implementation and improvement
 Refurbishing of old files,painted walls,printer cartridges,
uniforms,shoes etc
 Reconditioning of machines
 Doing things differently
 Shop Floor painting
 Refilling of oil
 Washing components,hands
Sundaram-Clayton Limited Slide Number: 22
5S Improvement management
3S - Shine Equipment
Example: Clean Machines
Sundaram-Clayton Limited Slide Number: 23
5S Improvement management
3S - Shine Equipment
Example: Clean Hand wash area
Sundaram-Clayton Limited Slide Number: 24
5S Improvement management
3S - Shine Equipment
Example: Water Recycling plant
Sundaram-Clayton Limited Slide Number: 25
5S Improvement management
3S - Shine Equipment-Benefits
 Facilitates preventive measures
 Reduces downtime
 Increases flow of equipment effectiveness
 Improves productivity
 Reduces cost
Sundaram-Clayton Limited Slide Number: 26
5S Improvement management
4S - Search time elimination
 Transparent storage systems with nomenclature/coding
 Well established visual controls
 Maximum 2 minute for part/document retrieval
 Set up time reduction
 Tool change time reduction
Sundaram-Clayton Limited Slide Number: 27
5S Improvement management
4S - Search time elimination-Examples
 Open filing system
 Transparent storage cupboards
 Tool cupboards in shop floor
 Fixture stand in the shop floor
 Color codification for electrical lines, water lines, air lines etc
 Live documents in filing and not records
 Parts identification, fixture identification in the shop floor
Sundaram-Clayton Limited Slide Number: 28
5S Improvement management
4S - Search time elimination
Example: Open filing system – Quick retrieval
Sundaram-Clayton Limited Slide Number: 29
5S Improvement management
4S - Search time elimination
Example: Transparent storage cupboards
Sundaram-Clayton Limited Slide Number: 30
5S Improvement management
4S - Search time elimination
Example: Tool cupboards in shop floor
Sundaram-Clayton Limited Slide Number: 31
5S Improvement management
4S - Search time elimination
Example: Fixture stand in shop floor
Sundaram-Clayton Limited Slide Number: 32
5S Improvement management
4S - Search time elimination-Benefits
Search time reduced to less than 2 minutes
 Increase in productivity
 Cost reduction
 Eliminates Non Value added (NVA) activities
 Reduces mental agony
Sundaram-Clayton Limited Slide Number: 33
5S Improvement management
5S - Set standards, Practice &Discipline
 Standardizing the 4S practices
 Continuous audit and revision of standards
 Training of concerned in the revised standards
 Abolishing unwanted standards
Sundaram-Clayton Limited Slide Number: 34
5S Improvement management
5S-Set standard,Practice and Discipline-Examples
 Operation Standards ,Limit samples,Quality Control
Process Charts etc
 Horizontal deployment of standards
 Quality system manual
 Gauge calibration standards
 Recipe standard for cooking in canteen
Sundaram-Clayton Limited Slide Number: 35
5S Improvement management
Process of holding gains
Sundaram-Clayton Limited Slide Number: 36
5S Improvement management
Process of holding gains
 Daily monitoring through audit scores
 Improving ownership by allocating areas
 Using red tag campaigns
 Communicating visually through fixed point photographs
 Structured communication
 Continuous training of all employees
 Periodic audits at all levels
Sundaram-Clayton Limited Slide Number: 37
5S Improvement management
Process of holding gains
 Motivating through recognition
 Encouraging house-keeping projects through Total Employee
Involvement (TEI)
Sundaram-Clayton Limited Slide Number: 38
5S Improvement management
Improving ownership by allocating areas
Sundaram-Clayton Limited Slide Number: 39
5S Improvement management
Using red tag campaigns
Sundaram-Clayton Limited Slide Number: 40
5S Improvement management
Structured communication
 Reviews
 Sunrise meetings
 PDCA meetings for daily management
 In-house journal
Sundaram-Clayton Limited Slide Number: 41
5S Improvement management
Results of 5S Management
Sundaram-Clayton Limited Slide Number: 42
5S Improvement management
Results of 5S Management
5S management helps to achieve:
 Reduction in warranty claims
 Reduction in assembly rework in-house
 Improvement in inventory turn ratio
 Reduction in customer end line stoppers

More Related Content

Similar to 5s presentation english

Lean presentation ppt
Lean presentation pptLean presentation ppt
Lean presentation ppt
bwu.nl
 
Introduction to maintenance
Introduction to maintenanceIntroduction to maintenance
Introduction to maintenance
Hashim V tkmce
 
Part 3 - Mfg excellence thr TPS (1).pdf
Part 3 - Mfg excellence thr TPS  (1).pdfPart 3 - Mfg excellence thr TPS  (1).pdf
Part 3 - Mfg excellence thr TPS (1).pdf
PrabagaraneRamachand1
 
Part 3 - Mfg excellence thr TPS (1).pdf
Part 3 - Mfg excellence thr TPS  (1).pdfPart 3 - Mfg excellence thr TPS  (1).pdf
Part 3 - Mfg excellence thr TPS (1).pdf
PrabagaraneRamachand1
 
Tpm performance measure
Tpm performance measureTpm performance measure
Total Productive Maintenance - TPM
Total Productive Maintenance - TPM Total Productive Maintenance - TPM
Total Productive Maintenance - TPM
Achuthan Rajagopal
 
5 s and lean manufacturing
5 s and lean manufacturing5 s and lean manufacturing
5 s and lean manufacturing
Nouman Ali
 
Total Productive Maintenance
Total Productive MaintenanceTotal Productive Maintenance
Total Productive Maintenance
Vikas Awasthi
 
Autonomous Maintenance
Autonomous MaintenanceAutonomous Maintenance
Autonomous Maintenance
Anand Subramaniam
 
unit -5 Quality Management and Control.ppt
unit -5 Quality Management and Control.pptunit -5 Quality Management and Control.ppt
unit -5 Quality Management and Control.ppt
almazwmbashira
 
20141209_AM Pillar_Introduction
20141209_AM Pillar_Introduction20141209_AM Pillar_Introduction
20141209_AM Pillar_Introduction
Henrik Gantzel
 
What is six sigma
What is six sigmaWhat is six sigma
What is six sigma
Muhammad Islam
 
Tpm principles and concepts
Tpm principles and conceptsTpm principles and concepts
Tpm principles and concepts
Marvin Norona
 
5S Rules HSE Training workers (1).pptx
5S Rules HSE Training workers   (1).pptx5S Rules HSE Training workers   (1).pptx
5S Rules HSE Training workers (1).pptx
usmanahmad901
 
Business process innovation for entrepreneurs
Business process innovation for entrepreneursBusiness process innovation for entrepreneurs
Business process innovation for entrepreneurs
Jorge Saguinsin
 
tpmprinciplesandconcepts-190103043928.pdf
tpmprinciplesandconcepts-190103043928.pdftpmprinciplesandconcepts-190103043928.pdf
tpmprinciplesandconcepts-190103043928.pdf
mihirpatel306953
 
Tpm principles and concepts
Tpm principles and conceptsTpm principles and concepts
Tpm principles and concepts
Paul Robere
 
Tpm principles and concepts
Tpm principles and conceptsTpm principles and concepts
Tpm principles and concepts
Kumaraguru College of Technology
 
Presentation new copy
Presentation new   copyPresentation new   copy
Presentation new copy
Vinaya Bandla
 
AME 2010 Conference - Baltimore
AME 2010 Conference - BaltimoreAME 2010 Conference - Baltimore
AME 2010 Conference - Baltimore
Didier Rabino, Lbc
 

Similar to 5s presentation english (20)

Lean presentation ppt
Lean presentation pptLean presentation ppt
Lean presentation ppt
 
Introduction to maintenance
Introduction to maintenanceIntroduction to maintenance
Introduction to maintenance
 
Part 3 - Mfg excellence thr TPS (1).pdf
Part 3 - Mfg excellence thr TPS  (1).pdfPart 3 - Mfg excellence thr TPS  (1).pdf
Part 3 - Mfg excellence thr TPS (1).pdf
 
Part 3 - Mfg excellence thr TPS (1).pdf
Part 3 - Mfg excellence thr TPS  (1).pdfPart 3 - Mfg excellence thr TPS  (1).pdf
Part 3 - Mfg excellence thr TPS (1).pdf
 
Tpm performance measure
Tpm performance measureTpm performance measure
Tpm performance measure
 
Total Productive Maintenance - TPM
Total Productive Maintenance - TPM Total Productive Maintenance - TPM
Total Productive Maintenance - TPM
 
5 s and lean manufacturing
5 s and lean manufacturing5 s and lean manufacturing
5 s and lean manufacturing
 
Total Productive Maintenance
Total Productive MaintenanceTotal Productive Maintenance
Total Productive Maintenance
 
Autonomous Maintenance
Autonomous MaintenanceAutonomous Maintenance
Autonomous Maintenance
 
unit -5 Quality Management and Control.ppt
unit -5 Quality Management and Control.pptunit -5 Quality Management and Control.ppt
unit -5 Quality Management and Control.ppt
 
20141209_AM Pillar_Introduction
20141209_AM Pillar_Introduction20141209_AM Pillar_Introduction
20141209_AM Pillar_Introduction
 
What is six sigma
What is six sigmaWhat is six sigma
What is six sigma
 
Tpm principles and concepts
Tpm principles and conceptsTpm principles and concepts
Tpm principles and concepts
 
5S Rules HSE Training workers (1).pptx
5S Rules HSE Training workers   (1).pptx5S Rules HSE Training workers   (1).pptx
5S Rules HSE Training workers (1).pptx
 
Business process innovation for entrepreneurs
Business process innovation for entrepreneursBusiness process innovation for entrepreneurs
Business process innovation for entrepreneurs
 
tpmprinciplesandconcepts-190103043928.pdf
tpmprinciplesandconcepts-190103043928.pdftpmprinciplesandconcepts-190103043928.pdf
tpmprinciplesandconcepts-190103043928.pdf
 
Tpm principles and concepts
Tpm principles and conceptsTpm principles and concepts
Tpm principles and concepts
 
Tpm principles and concepts
Tpm principles and conceptsTpm principles and concepts
Tpm principles and concepts
 
Presentation new copy
Presentation new   copyPresentation new   copy
Presentation new copy
 
AME 2010 Conference - Baltimore
AME 2010 Conference - BaltimoreAME 2010 Conference - Baltimore
AME 2010 Conference - Baltimore
 

More from Jitesh Gaurav

What i es do iie iab v2
What i es do iie iab v2What i es do iie iab v2
What i es do iie iab v2
Jitesh Gaurav
 
Weld material
Weld materialWeld material
Weld material
Jitesh Gaurav
 
Six sigma
Six sigmaSix sigma
Six sigma
Jitesh Gaurav
 
Spi link
Spi linkSpi link
Spi link
Jitesh Gaurav
 
6 Sigma - Chapter3
6 Sigma - Chapter36 Sigma - Chapter3
6 Sigma - Chapter3
Jitesh Gaurav
 
6 Sigma - Chapter2
6 Sigma - Chapter26 Sigma - Chapter2
6 Sigma - Chapter2
Jitesh Gaurav
 
6 Sigma - Chapter1
6 Sigma - Chapter16 Sigma - Chapter1
6 Sigma - Chapter1
Jitesh Gaurav
 
6 Sigma - Chapter8
6 Sigma - Chapter86 Sigma - Chapter8
6 Sigma - Chapter8
Jitesh Gaurav
 
6 Sigma - Chapter7
6 Sigma - Chapter76 Sigma - Chapter7
6 Sigma - Chapter7
Jitesh Gaurav
 
6 Sigma - Chapter6
6 Sigma - Chapter66 Sigma - Chapter6
6 Sigma - Chapter6
Jitesh Gaurav
 
6 Sigma - Chapter5
6 Sigma - Chapter56 Sigma - Chapter5
6 Sigma - Chapter5
Jitesh Gaurav
 
6 Sigma - Chapter4
6 Sigma - Chapter46 Sigma - Chapter4
6 Sigma - Chapter4
Jitesh Gaurav
 
Pattern production
Pattern productionPattern production
Pattern production
Jitesh Gaurav
 
smed
smedsmed
Methods of kaizen
Methods of kaizenMethods of kaizen
Methods of kaizen
Jitesh Gaurav
 
Dfmea rating
Dfmea ratingDfmea rating
Dfmea rating
Jitesh Gaurav
 
Qip
QipQip
Rodebaugh sixsigma[1]
Rodebaugh sixsigma[1]Rodebaugh sixsigma[1]
Rodebaugh sixsigma[1]
Jitesh Gaurav
 
Tqm
TqmTqm
Tpm+basics
Tpm+basicsTpm+basics
Tpm+basics
Jitesh Gaurav
 

More from Jitesh Gaurav (20)

What i es do iie iab v2
What i es do iie iab v2What i es do iie iab v2
What i es do iie iab v2
 
Weld material
Weld materialWeld material
Weld material
 
Six sigma
Six sigmaSix sigma
Six sigma
 
Spi link
Spi linkSpi link
Spi link
 
6 Sigma - Chapter3
6 Sigma - Chapter36 Sigma - Chapter3
6 Sigma - Chapter3
 
6 Sigma - Chapter2
6 Sigma - Chapter26 Sigma - Chapter2
6 Sigma - Chapter2
 
6 Sigma - Chapter1
6 Sigma - Chapter16 Sigma - Chapter1
6 Sigma - Chapter1
 
6 Sigma - Chapter8
6 Sigma - Chapter86 Sigma - Chapter8
6 Sigma - Chapter8
 
6 Sigma - Chapter7
6 Sigma - Chapter76 Sigma - Chapter7
6 Sigma - Chapter7
 
6 Sigma - Chapter6
6 Sigma - Chapter66 Sigma - Chapter6
6 Sigma - Chapter6
 
6 Sigma - Chapter5
6 Sigma - Chapter56 Sigma - Chapter5
6 Sigma - Chapter5
 
6 Sigma - Chapter4
6 Sigma - Chapter46 Sigma - Chapter4
6 Sigma - Chapter4
 
Pattern production
Pattern productionPattern production
Pattern production
 
smed
smedsmed
smed
 
Methods of kaizen
Methods of kaizenMethods of kaizen
Methods of kaizen
 
Dfmea rating
Dfmea ratingDfmea rating
Dfmea rating
 
Qip
QipQip
Qip
 
Rodebaugh sixsigma[1]
Rodebaugh sixsigma[1]Rodebaugh sixsigma[1]
Rodebaugh sixsigma[1]
 
Tqm
TqmTqm
Tqm
 
Tpm+basics
Tpm+basicsTpm+basics
Tpm+basics
 

Recently uploaded

ISPM 15 Heat Treated Wood Stamps and why your shipping must have one
ISPM 15 Heat Treated Wood Stamps and why your shipping must have oneISPM 15 Heat Treated Wood Stamps and why your shipping must have one
ISPM 15 Heat Treated Wood Stamps and why your shipping must have one
Las Vegas Warehouse
 
Data Driven Maintenance | UReason Webinar
Data Driven Maintenance | UReason WebinarData Driven Maintenance | UReason Webinar
Data Driven Maintenance | UReason Webinar
UReason
 
Comparative analysis between traditional aquaponics and reconstructed aquapon...
Comparative analysis between traditional aquaponics and reconstructed aquapon...Comparative analysis between traditional aquaponics and reconstructed aquapon...
Comparative analysis between traditional aquaponics and reconstructed aquapon...
bijceesjournal
 
哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样
哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样
哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样
insn4465
 
Embedded machine learning-based road conditions and driving behavior monitoring
Embedded machine learning-based road conditions and driving behavior monitoringEmbedded machine learning-based road conditions and driving behavior monitoring
Embedded machine learning-based road conditions and driving behavior monitoring
IJECEIAES
 
AI assisted telemedicine KIOSK for Rural India.pptx
AI assisted telemedicine KIOSK for Rural India.pptxAI assisted telemedicine KIOSK for Rural India.pptx
AI assisted telemedicine KIOSK for Rural India.pptx
architagupta876
 
IEEE Aerospace and Electronic Systems Society as a Graduate Student Member
IEEE Aerospace and Electronic Systems Society as a Graduate Student MemberIEEE Aerospace and Electronic Systems Society as a Graduate Student Member
IEEE Aerospace and Electronic Systems Society as a Graduate Student Member
VICTOR MAESTRE RAMIREZ
 
Generative AI leverages algorithms to create various forms of content
Generative AI leverages algorithms to create various forms of contentGenerative AI leverages algorithms to create various forms of content
Generative AI leverages algorithms to create various forms of content
Hitesh Mohapatra
 
Advanced control scheme of doubly fed induction generator for wind turbine us...
Advanced control scheme of doubly fed induction generator for wind turbine us...Advanced control scheme of doubly fed induction generator for wind turbine us...
Advanced control scheme of doubly fed induction generator for wind turbine us...
IJECEIAES
 
Use PyCharm for remote debugging of WSL on a Windo cf5c162d672e4e58b4dde5d797...
Use PyCharm for remote debugging of WSL on a Windo cf5c162d672e4e58b4dde5d797...Use PyCharm for remote debugging of WSL on a Windo cf5c162d672e4e58b4dde5d797...
Use PyCharm for remote debugging of WSL on a Windo cf5c162d672e4e58b4dde5d797...
shadow0702a
 
john krisinger-the science and history of the alcoholic beverage.pptx
john krisinger-the science and history of the alcoholic beverage.pptxjohn krisinger-the science and history of the alcoholic beverage.pptx
john krisinger-the science and history of the alcoholic beverage.pptx
Madan Karki
 
KuberTENes Birthday Bash Guadalajara - K8sGPT first impressions
KuberTENes Birthday Bash Guadalajara - K8sGPT first impressionsKuberTENes Birthday Bash Guadalajara - K8sGPT first impressions
KuberTENes Birthday Bash Guadalajara - K8sGPT first impressions
Victor Morales
 
22CYT12-Unit-V-E Waste and its Management.ppt
22CYT12-Unit-V-E Waste and its Management.ppt22CYT12-Unit-V-E Waste and its Management.ppt
22CYT12-Unit-V-E Waste and its Management.ppt
KrishnaveniKrishnara1
 
Redefining brain tumor segmentation: a cutting-edge convolutional neural netw...
Redefining brain tumor segmentation: a cutting-edge convolutional neural netw...Redefining brain tumor segmentation: a cutting-edge convolutional neural netw...
Redefining brain tumor segmentation: a cutting-edge convolutional neural netw...
IJECEIAES
 
Introduction to AI Safety (public presentation).pptx
Introduction to AI Safety (public presentation).pptxIntroduction to AI Safety (public presentation).pptx
Introduction to AI Safety (public presentation).pptx
MiscAnnoy1
 
Transformers design and coooling methods
Transformers design and coooling methodsTransformers design and coooling methods
Transformers design and coooling methods
Roger Rozario
 
Properties Railway Sleepers and Test.pptx
Properties Railway Sleepers and Test.pptxProperties Railway Sleepers and Test.pptx
Properties Railway Sleepers and Test.pptx
MDSABBIROJJAMANPAYEL
 
Software Engineering and Project Management - Introduction, Modeling Concepts...
Software Engineering and Project Management - Introduction, Modeling Concepts...Software Engineering and Project Management - Introduction, Modeling Concepts...
Software Engineering and Project Management - Introduction, Modeling Concepts...
Prakhyath Rai
 
BRAIN TUMOR DETECTION for seminar ppt.pdf
BRAIN TUMOR DETECTION for seminar ppt.pdfBRAIN TUMOR DETECTION for seminar ppt.pdf
BRAIN TUMOR DETECTION for seminar ppt.pdf
LAXMAREDDY22
 
Hematology Analyzer Machine - Complete Blood Count
Hematology Analyzer Machine - Complete Blood CountHematology Analyzer Machine - Complete Blood Count
Hematology Analyzer Machine - Complete Blood Count
shahdabdulbaset
 

Recently uploaded (20)

ISPM 15 Heat Treated Wood Stamps and why your shipping must have one
ISPM 15 Heat Treated Wood Stamps and why your shipping must have oneISPM 15 Heat Treated Wood Stamps and why your shipping must have one
ISPM 15 Heat Treated Wood Stamps and why your shipping must have one
 
Data Driven Maintenance | UReason Webinar
Data Driven Maintenance | UReason WebinarData Driven Maintenance | UReason Webinar
Data Driven Maintenance | UReason Webinar
 
Comparative analysis between traditional aquaponics and reconstructed aquapon...
Comparative analysis between traditional aquaponics and reconstructed aquapon...Comparative analysis between traditional aquaponics and reconstructed aquapon...
Comparative analysis between traditional aquaponics and reconstructed aquapon...
 
哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样
哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样
哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样
 
Embedded machine learning-based road conditions and driving behavior monitoring
Embedded machine learning-based road conditions and driving behavior monitoringEmbedded machine learning-based road conditions and driving behavior monitoring
Embedded machine learning-based road conditions and driving behavior monitoring
 
AI assisted telemedicine KIOSK for Rural India.pptx
AI assisted telemedicine KIOSK for Rural India.pptxAI assisted telemedicine KIOSK for Rural India.pptx
AI assisted telemedicine KIOSK for Rural India.pptx
 
IEEE Aerospace and Electronic Systems Society as a Graduate Student Member
IEEE Aerospace and Electronic Systems Society as a Graduate Student MemberIEEE Aerospace and Electronic Systems Society as a Graduate Student Member
IEEE Aerospace and Electronic Systems Society as a Graduate Student Member
 
Generative AI leverages algorithms to create various forms of content
Generative AI leverages algorithms to create various forms of contentGenerative AI leverages algorithms to create various forms of content
Generative AI leverages algorithms to create various forms of content
 
Advanced control scheme of doubly fed induction generator for wind turbine us...
Advanced control scheme of doubly fed induction generator for wind turbine us...Advanced control scheme of doubly fed induction generator for wind turbine us...
Advanced control scheme of doubly fed induction generator for wind turbine us...
 
Use PyCharm for remote debugging of WSL on a Windo cf5c162d672e4e58b4dde5d797...
Use PyCharm for remote debugging of WSL on a Windo cf5c162d672e4e58b4dde5d797...Use PyCharm for remote debugging of WSL on a Windo cf5c162d672e4e58b4dde5d797...
Use PyCharm for remote debugging of WSL on a Windo cf5c162d672e4e58b4dde5d797...
 
john krisinger-the science and history of the alcoholic beverage.pptx
john krisinger-the science and history of the alcoholic beverage.pptxjohn krisinger-the science and history of the alcoholic beverage.pptx
john krisinger-the science and history of the alcoholic beverage.pptx
 
KuberTENes Birthday Bash Guadalajara - K8sGPT first impressions
KuberTENes Birthday Bash Guadalajara - K8sGPT first impressionsKuberTENes Birthday Bash Guadalajara - K8sGPT first impressions
KuberTENes Birthday Bash Guadalajara - K8sGPT first impressions
 
22CYT12-Unit-V-E Waste and its Management.ppt
22CYT12-Unit-V-E Waste and its Management.ppt22CYT12-Unit-V-E Waste and its Management.ppt
22CYT12-Unit-V-E Waste and its Management.ppt
 
Redefining brain tumor segmentation: a cutting-edge convolutional neural netw...
Redefining brain tumor segmentation: a cutting-edge convolutional neural netw...Redefining brain tumor segmentation: a cutting-edge convolutional neural netw...
Redefining brain tumor segmentation: a cutting-edge convolutional neural netw...
 
Introduction to AI Safety (public presentation).pptx
Introduction to AI Safety (public presentation).pptxIntroduction to AI Safety (public presentation).pptx
Introduction to AI Safety (public presentation).pptx
 
Transformers design and coooling methods
Transformers design and coooling methodsTransformers design and coooling methods
Transformers design and coooling methods
 
Properties Railway Sleepers and Test.pptx
Properties Railway Sleepers and Test.pptxProperties Railway Sleepers and Test.pptx
Properties Railway Sleepers and Test.pptx
 
Software Engineering and Project Management - Introduction, Modeling Concepts...
Software Engineering and Project Management - Introduction, Modeling Concepts...Software Engineering and Project Management - Introduction, Modeling Concepts...
Software Engineering and Project Management - Introduction, Modeling Concepts...
 
BRAIN TUMOR DETECTION for seminar ppt.pdf
BRAIN TUMOR DETECTION for seminar ppt.pdfBRAIN TUMOR DETECTION for seminar ppt.pdf
BRAIN TUMOR DETECTION for seminar ppt.pdf
 
Hematology Analyzer Machine - Complete Blood Count
Hematology Analyzer Machine - Complete Blood CountHematology Analyzer Machine - Complete Blood Count
Hematology Analyzer Machine - Complete Blood Count
 

5s presentation english

  • 1. Sundaram-Clayton Limited Slide Number: 1 5S Improvement management 5S Improvement Management - SCL Experience
  • 2. Sundaram-Clayton Limited Slide Number: 2 5S Improvement management How to diagnose a company? Look at its 5-S first No TQM ,TPM or Lean without 5-S
  • 3. Sundaram-Clayton Limited Slide Number: 3 5S Improvement management Understanding of 5S 1S - Sorting out 2S - Set Limits & Systemize 3S - Shine equipment 4S - Search time elimination 5S - Set standards, Practice & Discipline Purpose of 5S improvement management is to discipline ourselves, conduct daily audits and take corrective action(i.e) find non-conformity,abnormality,deviation,discrepancies and take immediate corrective action by self
  • 4. Sundaram-Clayton Limited Slide Number: 4 5S Improvement management 1S - Sorting out  Change from wet to dry – • Nothing on the floor, table, top of racks, cup-boards, gangways, roadways etc • If no swarf, water ,oil, dust, paper, litter, potholes etc are found then it is called Dry  Keep only wanted items for the day’s requirement and remove unwanted items to the designated areas such as stores,Filing cabinet,suppliers as the case maybe  Keep only useful items and remove not useful items to designated areas such as as Red-tag area,scrap yard  No mix up of parts and products in pallets,in racks,in drawers, bins etc
  • 5. Sundaram-Clayton Limited Slide Number: 5 5S Improvement management 1S - Sorting out Example : Wet to Dry; Nothing on the floor and gangways
  • 6. Sundaram-Clayton Limited Slide Number: 6 5S Improvement management 1S - Sorting out Example : Wet to Dry; No potholes,no litter
  • 7. Sundaram-Clayton Limited Slide Number: 7 5S Improvement management 1S - Sorting out Example : Wet to Dry; Only wanted items
  • 8. Sundaram-Clayton Limited Slide Number: 8 5S Improvement management 1S - Sorting out benefits  Good house keeping (Hospital clean,Garden green atmosphere)  Pleasant and conducive atmosphere  Facilitates thinking and idea generation for improvement  Keeping all things in order  Facilitates visual control and corrective action
  • 9. Sundaram-Clayton Limited Slide Number: 9 5S Improvement management 2S - Set limits & Systemize  A place for everything: every useful thing has a place  To discipline and work within marked boundaries  Prefixed locations/markings
  • 10. Sundaram-Clayton Limited Slide Number: 10 5S Improvement management 2S - Set limits & Systemize - Examples  Gang-Way marking in shop floor  Curb stones in roadway  Dedicated containers - easy for identification, traceability and counting  Containers with separators - No parts touching each other to prevent dents/damages  Pre fixed location in shop floor/office (tools,fixtures,gauges etc)
  • 11. Sundaram-Clayton Limited Slide Number: 11 5S Improvement management 2S - Set limits & Systemize –Examples (Contd.)  X R Chart for quality  Metal temperature, die temperature control limits in Foundry  Recipe for cooking in kitchen  Fixed number of shots between die-servicing in Foundry  Fixed tool regrinding frequency and operate accordingly
  • 12. Sundaram-Clayton Limited Slide Number: 12 5S Improvement management 2S - Set limits & Systemize Example: Gangway marking
  • 13. Sundaram-Clayton Limited Slide Number: 13 5S Improvement management 2S - Set limits & Systemize Example: Fixed time for garbage disposal
  • 14. Sundaram-Clayton Limited Slide Number: 14 5S Improvement management 2S - Set limits & Systemize Example:Dedicated Containers
  • 15. Sundaram-Clayton Limited Slide Number: 15 5S Improvement management 2S - Set limits & Systemize Example: Containers with Separators
  • 16. Sundaram-Clayton Limited Slide Number: 16 5S Improvement management Before After 2S - Set limits & Systemize Example: Pre fixed location
  • 17. Sundaram-Clayton Limited Slide Number: 17 5S Improvement management 2S - Set limits & Systemize Example: Pre fixed location
  • 18. Sundaram-Clayton Limited Slide Number: 18 5S Improvement management 2S - Set limits & Systemize - Benefits  Prevents accidents,improves safety  Helps to optimize and achieve best in quality, cost and delivery  Facilitates clear cut visual controls  Easy to observe and take corrective / preventive actions  Lead time reduction  Good discipline
  • 19. Sundaram-Clayton Limited Slide Number: 19 5S Improvement management 3S - Shine equipment  Refurbishing of facilities, systems to ensure continuous improvement  Revising product,processes,methods for enhancing life cycle  Audits for correction and prevention
  • 20. Sundaram-Clayton Limited Slide Number: 20 5S Improvement management 3S - Shine equipment - Examples  Cleaning of machines. Equipment cleaning is checking  Preventive maintenance activities  Poka yoke implementation  Oil,water recycling and reusing  Oil reclamation from wet swarf  Reclaiming aluminium from dross  Replacement of spares/ machinery
  • 21. Sundaram-Clayton Limited Slide Number: 21 5S Improvement management 3S - Shine equipment-Examples (contd.)  Revisiting tools,methods,processes and cells for implementation and improvement  Refurbishing of old files,painted walls,printer cartridges, uniforms,shoes etc  Reconditioning of machines  Doing things differently  Shop Floor painting  Refilling of oil  Washing components,hands
  • 22. Sundaram-Clayton Limited Slide Number: 22 5S Improvement management 3S - Shine Equipment Example: Clean Machines
  • 23. Sundaram-Clayton Limited Slide Number: 23 5S Improvement management 3S - Shine Equipment Example: Clean Hand wash area
  • 24. Sundaram-Clayton Limited Slide Number: 24 5S Improvement management 3S - Shine Equipment Example: Water Recycling plant
  • 25. Sundaram-Clayton Limited Slide Number: 25 5S Improvement management 3S - Shine Equipment-Benefits  Facilitates preventive measures  Reduces downtime  Increases flow of equipment effectiveness  Improves productivity  Reduces cost
  • 26. Sundaram-Clayton Limited Slide Number: 26 5S Improvement management 4S - Search time elimination  Transparent storage systems with nomenclature/coding  Well established visual controls  Maximum 2 minute for part/document retrieval  Set up time reduction  Tool change time reduction
  • 27. Sundaram-Clayton Limited Slide Number: 27 5S Improvement management 4S - Search time elimination-Examples  Open filing system  Transparent storage cupboards  Tool cupboards in shop floor  Fixture stand in the shop floor  Color codification for electrical lines, water lines, air lines etc  Live documents in filing and not records  Parts identification, fixture identification in the shop floor
  • 28. Sundaram-Clayton Limited Slide Number: 28 5S Improvement management 4S - Search time elimination Example: Open filing system – Quick retrieval
  • 29. Sundaram-Clayton Limited Slide Number: 29 5S Improvement management 4S - Search time elimination Example: Transparent storage cupboards
  • 30. Sundaram-Clayton Limited Slide Number: 30 5S Improvement management 4S - Search time elimination Example: Tool cupboards in shop floor
  • 31. Sundaram-Clayton Limited Slide Number: 31 5S Improvement management 4S - Search time elimination Example: Fixture stand in shop floor
  • 32. Sundaram-Clayton Limited Slide Number: 32 5S Improvement management 4S - Search time elimination-Benefits Search time reduced to less than 2 minutes  Increase in productivity  Cost reduction  Eliminates Non Value added (NVA) activities  Reduces mental agony
  • 33. Sundaram-Clayton Limited Slide Number: 33 5S Improvement management 5S - Set standards, Practice &Discipline  Standardizing the 4S practices  Continuous audit and revision of standards  Training of concerned in the revised standards  Abolishing unwanted standards
  • 34. Sundaram-Clayton Limited Slide Number: 34 5S Improvement management 5S-Set standard,Practice and Discipline-Examples  Operation Standards ,Limit samples,Quality Control Process Charts etc  Horizontal deployment of standards  Quality system manual  Gauge calibration standards  Recipe standard for cooking in canteen
  • 35. Sundaram-Clayton Limited Slide Number: 35 5S Improvement management Process of holding gains
  • 36. Sundaram-Clayton Limited Slide Number: 36 5S Improvement management Process of holding gains  Daily monitoring through audit scores  Improving ownership by allocating areas  Using red tag campaigns  Communicating visually through fixed point photographs  Structured communication  Continuous training of all employees  Periodic audits at all levels
  • 37. Sundaram-Clayton Limited Slide Number: 37 5S Improvement management Process of holding gains  Motivating through recognition  Encouraging house-keeping projects through Total Employee Involvement (TEI)
  • 38. Sundaram-Clayton Limited Slide Number: 38 5S Improvement management Improving ownership by allocating areas
  • 39. Sundaram-Clayton Limited Slide Number: 39 5S Improvement management Using red tag campaigns
  • 40. Sundaram-Clayton Limited Slide Number: 40 5S Improvement management Structured communication  Reviews  Sunrise meetings  PDCA meetings for daily management  In-house journal
  • 41. Sundaram-Clayton Limited Slide Number: 41 5S Improvement management Results of 5S Management
  • 42. Sundaram-Clayton Limited Slide Number: 42 5S Improvement management Results of 5S Management 5S management helps to achieve:  Reduction in warranty claims  Reduction in assembly rework in-house  Improvement in inventory turn ratio  Reduction in customer end line stoppers