3G Drive Test
Procedure
Contents
1 Introduction
2 Drive test tools
3 Drive test type
4 Site Verification
5 Rigging Audit
6 Cluster Drive Test Optimization
Introduction:
Objectives:
The purpose of the drive test to perform the RF design verification, identify any
coverage and quality problems to optimise WCDMA network performance.
At this stage, the main focus is on fundamental end-to-end service accessibility
target (e.g. Calls set up and drop rates) and on performance targets such as
coverage related targets (such as CPICH RSCP and CPICH Ec/No), and
HSDPA/HSUPA speed performance.
For this case it was needed each other from drive test data collection and also
Physical site changes like tilting, antenna orientation and antenna height.
RF Solution Department
Drive Test Tools:
Hardware:
• 1x Laptop
• 2x/3x/4x Smart Phones (2G/3G/LTE)
• 1x FDD Data Dongle (should be supporting 3G 42M)
• 1x GPS (G-Star IV)
• 1x Car DC/AC Inverter
• 1x Car.
• 4x SIM Cards (Data & Normal) Software:
• TEMS Investigation 16.1
• Map Tools (Map Info & Google Earth)
• Cell File
• Actix 5.0.1
RF Solution Department
Drive Test Type
Site Verification
Individual cell verification test : To investigate detail of site performance by
checking all single sectors with AMR call and Throughput test. In addition also
required to perform small area dedicated test for Intra/Intercell HO.
Cluster Optimization Normal Drive
To frame the potential area of the new site planned. Also to improve the important
neighboring sites for which the handover to be defined.
Cluster Optimization Dedicated Drive
Performed call to the test number and drive to the potential area given to determine
i) call set up time
ii) call set up success
iii) drop call
iv) SHO
v) HSDPA ( Average & Maximum) Speed
vi) Coverage Status ( Technology)
vii) Pilot polution
RF Solution Department
When the site is completely integrated, Drive tester team will start to perform site
investigation.
The detail sub-activities are outlined below:
1. Rigging Audit
2. Site Verification
3. Site corrective action (cross feeder, inconsistent data, functionality problem, etc.)
4. Acceptance Test
The site has been built and integrated as planned and that the planned coverage has
been achieved
Site Verification:
RF Solution Department
All Tests Clear?
Corrective Actions
No
Yes
New On Air Site Flow
New Site Integration
1. Consistency Check
2. Rigging Audit
3. Site Verification
Site Acceptance
Site Verification:
RF Solution Department
• Voice/vedio calls
• Verify on per cell basis for all
carriers:
• RSCP
• EC/No
• Scrambling Code
• LAC / RAC
• Cell ID
• Etc.
• Frequency
• Data / Throughput test
• HSDPA and HSUPA / Internet
Browsing
• Verify on per cell basis for all
carriers:
• RSCP
• EC/No
• Scrambling Code
• LAC / RAC
• Cell ID
• Max/Ave Speed
• Etc.
Site Verification:
RF Solution Department
Static test (Per Sector / Cell)
At the best radio location required to perform for all carriers
1. Voice call to determine if any call failure or block calls
2. Video call to determine if any call failure or block calls
3. Throughput R99/ HSDPA/HSUPA/Latency test using http / fttp and
speed test.
4. Internet browsing successful
5. SMS
Mobility Test
1. Scanning the CPICH BY 3 MS (Lock by 3 Frequency as F1, F2, F3) & S4
Modem or Data Card DC HSDPA by Downloading High volume of Data
2. Long Call use by 3 MS (Lock by 3 Frequency as F1, F2, F3) MS4 Modem or
Data Card Lock F1, HSDPA by Downloading High volume of Data
3. Idle use by 3 MS (Lock by 3 Frequency as F1, F2, F3) MS4 Modem or Data
Card Lock F2, HSUPA by Downloading High volume of Data.
4. MS1 Lock F1 Short Call & MS2 Modem or Data Card DC HSDPA by
Downloading High volume of Data
5. MS1 Lock F2 Short Call & MS2 Modem or Data Card DC HSUPA by
Downloading High volume of Data
Site Verification:
RF Solution Department
Rigging Audit
Test Items in Rigging Audit:
Antenna Installation Verification
- Azimuth
- Height
- Location
- Cross-feeder/s
Rigging Tools :
- Safety Belt
- Compass
- GPS
- Measurement tape
- Digital Inclinometer
Site Audit required from the Rigger
1. Panoramic photos surrounding sites including antenna sectors/objective area
2. Ensure no blocking sectors from the main beam antenna
3. Antenna mechanical/electrical tilt was in correct value
4. Antenna was in correct orientation for the objective/target area
5. Site Height
6. Site Coordinates
RF Solution Department
• Cluster Definition, Site Information Data and Site Location Map
• With Site/Cell ID, Site name, Primary SC, Neighbor list, RNC ID and
Cluster border highlighted
• Prepare Route Map for Drive Testing
• Perform drive test either Idle mode or Dedicated mode
• Identify Problematic Areas
• The result from the data will showing of Network performance such as
1. Drop call rate
2. Accessibility – mobile originated/terminated call set up success rate
3. Coverage – RSCP and Ec/No
Cluster Drive test Optimization:
RF Solution Department
Cluster Drive test Optimization:
RF Solution Department
• The area which doesn't meet the criteria below is defined as "Problematic Area“
• Coverage Problem Area
• Dominance Problem Area
• Pilot Pollution
Best Server’s CPICH RSCP < - 99 dBm
Best Server’s CPICH Ec/No < -14 dB
4th Best Server’s CPICH RSCP > - 99 dBm
Cluster Drive test Optimisation:
RF Solution Department
Thank You

More Related Content

What's hot

Muhammad Waqas Khan-Resume
Muhammad Waqas Khan-ResumeMuhammad Waqas Khan-Resume
Muhammad Waqas Khan-Resume
Waqas Khan
 
SCFT-Training_v8.2-1
SCFT-Training_v8.2-1SCFT-Training_v8.2-1
SCFT-Training_v8.2-1
mahesh savita
 
How to perform trouble shooting based on counters
How to perform trouble shooting based on countersHow to perform trouble shooting based on counters
How to perform trouble shooting based on counters
Abdul Muin
 
Gps waas class 5 nov10
Gps waas class 5 nov10Gps waas class 5 nov10
Gps waas class 5 nov10
Clark Jay Wilson
 
Sema History and Overview
Sema History and OverviewSema History and Overview
Sema History and Overview
Clark Jay Wilson
 
CATS Brochure
CATS BrochureCATS Brochure
CATS Brochure
Balfour Beatty Rail
 
Drive test analysis
Drive test analysisDrive test analysis
Drive test analysis
ducnm1977
 
Anguruwathota [wb klt-2106]-umts2100 swap site ssv report_v2.0
Anguruwathota [wb klt-2106]-umts2100 swap site ssv report_v2.0Anguruwathota [wb klt-2106]-umts2100 swap site ssv report_v2.0
Anguruwathota [wb klt-2106]-umts2100 swap site ssv report_v2.0
Yasas Anuradha
 
W(level3) wcdma rno rf optimization-20041217-a-1[1].0
W(level3) wcdma rno rf optimization-20041217-a-1[1].0W(level3) wcdma rno rf optimization-20041217-a-1[1].0
W(level3) wcdma rno rf optimization-20041217-a-1[1].0
Malik Md Nurani
 
Cw testing
Cw testingCw testing
Cw testing
Md Joynal Abaden
 
55166535 k-parameters-and-model-tuning
55166535 k-parameters-and-model-tuning55166535 k-parameters-and-model-tuning
55166535 k-parameters-and-model-tuning
Jamil Awan
 
Using WireShark with AirPCAP
Using WireShark with AirPCAPUsing WireShark with AirPCAP
Using WireShark with AirPCAP
David Sweigert
 
said bacha cv
said bacha cvsaid bacha cv
said bacha cv
NGI.SAID BACHA
 
TT&C subsystem
TT&C subsystemTT&C subsystem
Lte pre launch
Lte pre launchLte pre launch
Lte pre launch
Hatim100
 
Huawei wcdma-rno-single-site-verificationV1
Huawei wcdma-rno-single-site-verificationV1Huawei wcdma-rno-single-site-verificationV1
Huawei wcdma-rno-single-site-verificationV1
Md Kamruzzaman
 
Rf planning for lte using atoll v1
Rf planning for lte using atoll v1Rf planning for lte using atoll v1
Rf planning for lte using atoll v1
Muhammad Rizki
 
LTE Planning Basic
LTE Planning BasicLTE Planning Basic
LTE Planning Basic
Mohamed Shaamiq
 

What's hot (18)

Muhammad Waqas Khan-Resume
Muhammad Waqas Khan-ResumeMuhammad Waqas Khan-Resume
Muhammad Waqas Khan-Resume
 
SCFT-Training_v8.2-1
SCFT-Training_v8.2-1SCFT-Training_v8.2-1
SCFT-Training_v8.2-1
 
How to perform trouble shooting based on counters
How to perform trouble shooting based on countersHow to perform trouble shooting based on counters
How to perform trouble shooting based on counters
 
Gps waas class 5 nov10
Gps waas class 5 nov10Gps waas class 5 nov10
Gps waas class 5 nov10
 
Sema History and Overview
Sema History and OverviewSema History and Overview
Sema History and Overview
 
CATS Brochure
CATS BrochureCATS Brochure
CATS Brochure
 
Drive test analysis
Drive test analysisDrive test analysis
Drive test analysis
 
Anguruwathota [wb klt-2106]-umts2100 swap site ssv report_v2.0
Anguruwathota [wb klt-2106]-umts2100 swap site ssv report_v2.0Anguruwathota [wb klt-2106]-umts2100 swap site ssv report_v2.0
Anguruwathota [wb klt-2106]-umts2100 swap site ssv report_v2.0
 
W(level3) wcdma rno rf optimization-20041217-a-1[1].0
W(level3) wcdma rno rf optimization-20041217-a-1[1].0W(level3) wcdma rno rf optimization-20041217-a-1[1].0
W(level3) wcdma rno rf optimization-20041217-a-1[1].0
 
Cw testing
Cw testingCw testing
Cw testing
 
55166535 k-parameters-and-model-tuning
55166535 k-parameters-and-model-tuning55166535 k-parameters-and-model-tuning
55166535 k-parameters-and-model-tuning
 
Using WireShark with AirPCAP
Using WireShark with AirPCAPUsing WireShark with AirPCAP
Using WireShark with AirPCAP
 
said bacha cv
said bacha cvsaid bacha cv
said bacha cv
 
TT&C subsystem
TT&C subsystemTT&C subsystem
TT&C subsystem
 
Lte pre launch
Lte pre launchLte pre launch
Lte pre launch
 
Huawei wcdma-rno-single-site-verificationV1
Huawei wcdma-rno-single-site-verificationV1Huawei wcdma-rno-single-site-verificationV1
Huawei wcdma-rno-single-site-verificationV1
 
Rf planning for lte using atoll v1
Rf planning for lte using atoll v1Rf planning for lte using atoll v1
Rf planning for lte using atoll v1
 
LTE Planning Basic
LTE Planning BasicLTE Planning Basic
LTE Planning Basic
 

Viewers also liked

Economic infrastructure
Economic infrastructureEconomic infrastructure
Economic infrastructure
jithin koshy
 
Meià Runners Presentació 19 d'abril de 2014
Meià Runners Presentació 19 d'abril de 2014Meià Runners Presentació 19 d'abril de 2014
Meià Runners Presentació 19 d'abril de 2014
meiarunners
 
Teoria Do Campo Unificado
Teoria Do Campo UnificadoTeoria Do Campo Unificado
Teoria Do Campo Unificado
Mika Mesquita
 
Cuadernillo de termoquimica
Cuadernillo de termoquimicaCuadernillo de termoquimica
Cuadernillo de termoquimica
Freddy AC
 
Materi iman kepada rasul allah
Materi iman kepada rasul allahMateri iman kepada rasul allah
Materi iman kepada rasul allah
kemarau20
 
Cve.
Cve.Cve.
Cve.
cve95
 
Monitoramento e Boca-a-boca na Web
Monitoramento e Boca-a-boca na WebMonitoramento e Boca-a-boca na Web
Monitoramento e Boca-a-boca na Web
PaperCliQ Comunicação
 
31.12.2016 frente aos escombros da vida-neemias 2.11 - 20
31.12.2016   frente aos escombros da vida-neemias 2.11 - 2031.12.2016   frente aos escombros da vida-neemias 2.11 - 20
31.12.2016 frente aos escombros da vida-neemias 2.11 - 20
Hugo Machado
 
zaman CV__With Reference
zaman  CV__With  Referencezaman  CV__With  Reference
zaman CV__With Reference
MD ASHRAFUZZAMAN
 
Παραμύθια του κόσμου
Παραμύθια του κόσμουΠαραμύθια του κόσμου
Παραμύθια του κόσμου
vakokkini
 
Lesson 6 - Bat Loves the Night
Lesson 6 - Bat Loves the NightLesson 6 - Bat Loves the Night
Lesson 6 - Bat Loves the Night
Mister Valverde
 
Grupa Kapitałowa EGB Investments
Grupa Kapitałowa EGB InvestmentsGrupa Kapitałowa EGB Investments
Grupa Kapitałowa EGB Investments
EGB Investments SA
 

Viewers also liked (13)

Economic infrastructure
Economic infrastructureEconomic infrastructure
Economic infrastructure
 
Page 7
Page 7Page 7
Page 7
 
Meià Runners Presentació 19 d'abril de 2014
Meià Runners Presentació 19 d'abril de 2014Meià Runners Presentació 19 d'abril de 2014
Meià Runners Presentació 19 d'abril de 2014
 
Teoria Do Campo Unificado
Teoria Do Campo UnificadoTeoria Do Campo Unificado
Teoria Do Campo Unificado
 
Cuadernillo de termoquimica
Cuadernillo de termoquimicaCuadernillo de termoquimica
Cuadernillo de termoquimica
 
Materi iman kepada rasul allah
Materi iman kepada rasul allahMateri iman kepada rasul allah
Materi iman kepada rasul allah
 
Cve.
Cve.Cve.
Cve.
 
Monitoramento e Boca-a-boca na Web
Monitoramento e Boca-a-boca na WebMonitoramento e Boca-a-boca na Web
Monitoramento e Boca-a-boca na Web
 
31.12.2016 frente aos escombros da vida-neemias 2.11 - 20
31.12.2016   frente aos escombros da vida-neemias 2.11 - 2031.12.2016   frente aos escombros da vida-neemias 2.11 - 20
31.12.2016 frente aos escombros da vida-neemias 2.11 - 20
 
zaman CV__With Reference
zaman  CV__With  Referencezaman  CV__With  Reference
zaman CV__With Reference
 
Παραμύθια του κόσμου
Παραμύθια του κόσμουΠαραμύθια του κόσμου
Παραμύθια του κόσμου
 
Lesson 6 - Bat Loves the Night
Lesson 6 - Bat Loves the NightLesson 6 - Bat Loves the Night
Lesson 6 - Bat Loves the Night
 
Grupa Kapitałowa EGB Investments
Grupa Kapitałowa EGB InvestmentsGrupa Kapitałowa EGB Investments
Grupa Kapitałowa EGB Investments
 

Similar to 3G Drive Test Procedure_ By Md Joynal Abaden@ MYM

3G drive test procedure (SSV) by Md Joynal Abaden
3G drive test procedure (SSV)  by Md Joynal Abaden3G drive test procedure (SSV)  by Md Joynal Abaden
3G drive test procedure (SSV) by Md Joynal Abaden
Md Joynal Abaden
 
Curriculam Vitea_Hisham Zahoor
Curriculam Vitea_Hisham ZahoorCurriculam Vitea_Hisham Zahoor
Curriculam Vitea_Hisham Zahoor
Hisham Zahoor
 
Resume_MS Nishant J
Resume_MS Nishant JResume_MS Nishant J
Resume_MS Nishant J
Nishant Jawale
 
SKK RESUME (1)
SKK RESUME (1)SKK RESUME (1)
SKK RESUME (1)
Subodh kant kumar
 
Naqash
NaqashNaqash
FIELD TESTING of 2G 3G Devices.ppt
FIELD TESTING  of 2G 3G Devices.pptFIELD TESTING  of 2G 3G Devices.ppt
FIELD TESTING of 2G 3G Devices.ppt
patrickwang85
 
YILMA GIRMA 9-18-2015
YILMA GIRMA 9-18-2015YILMA GIRMA 9-18-2015
YILMA GIRMA 9-18-2015
Girma Yilma
 
Adeel Ahmed- CV
Adeel Ahmed- CVAdeel Ahmed- CV
Adeel Ahmed- CV
ADEEL AHMED
 
Adeel Ahmed- CV
Adeel Ahmed- CVAdeel Ahmed- CV
Adeel Ahmed- CV
ADEEL AHMED
 
Updated
UpdatedUpdated
Pankaj Patel Resume
Pankaj Patel  ResumePankaj Patel  Resume
Pankaj Patel Resume
pankaj patel
 
Usman Ghani Resume LTE
Usman Ghani Resume LTE Usman Ghani Resume LTE
Usman Ghani Resume LTE
usman ghani
 
Anoop_RF_
Anoop_RF_Anoop_RF_
Anoop_RF_
Anoop Singh
 
Resume_Sushil Kumar Kushwaha
Resume_Sushil Kumar KushwahaResume_Sushil Kumar Kushwaha
Resume_Sushil Kumar Kushwaha
sushil kuamr kushwaha
 
Resume_Ajith
Resume_AjithResume_Ajith
Resume_Ajith
Ajith Shetty
 
Drive Test and Optimization Tutorial - I.pdf
Drive Test and Optimization Tutorial - I.pdfDrive Test and Optimization Tutorial - I.pdf
Drive Test and Optimization Tutorial - I.pdf
hamdi_saif
 
Sandeep Sharma_CV
Sandeep Sharma_CVSandeep Sharma_CV
Sandeep Sharma_CV
sandeep sharma
 
Brijmani_kumar
Brijmani_kumarBrijmani_kumar
Brijmani_kumar
Brijmani kumar
 
Ijett v4 i10p113
Ijett v4 i10p113Ijett v4 i10p113
Ijett v4 i10p113
agni mohananda
 
telecom engineer
telecom engineertelecom engineer
telecom engineer
Mohammed Arif
 

Similar to 3G Drive Test Procedure_ By Md Joynal Abaden@ MYM (20)

3G drive test procedure (SSV) by Md Joynal Abaden
3G drive test procedure (SSV)  by Md Joynal Abaden3G drive test procedure (SSV)  by Md Joynal Abaden
3G drive test procedure (SSV) by Md Joynal Abaden
 
Curriculam Vitea_Hisham Zahoor
Curriculam Vitea_Hisham ZahoorCurriculam Vitea_Hisham Zahoor
Curriculam Vitea_Hisham Zahoor
 
Resume_MS Nishant J
Resume_MS Nishant JResume_MS Nishant J
Resume_MS Nishant J
 
SKK RESUME (1)
SKK RESUME (1)SKK RESUME (1)
SKK RESUME (1)
 
Naqash
NaqashNaqash
Naqash
 
FIELD TESTING of 2G 3G Devices.ppt
FIELD TESTING  of 2G 3G Devices.pptFIELD TESTING  of 2G 3G Devices.ppt
FIELD TESTING of 2G 3G Devices.ppt
 
YILMA GIRMA 9-18-2015
YILMA GIRMA 9-18-2015YILMA GIRMA 9-18-2015
YILMA GIRMA 9-18-2015
 
Adeel Ahmed- CV
Adeel Ahmed- CVAdeel Ahmed- CV
Adeel Ahmed- CV
 
Adeel Ahmed- CV
Adeel Ahmed- CVAdeel Ahmed- CV
Adeel Ahmed- CV
 
Updated
UpdatedUpdated
Updated
 
Pankaj Patel Resume
Pankaj Patel  ResumePankaj Patel  Resume
Pankaj Patel Resume
 
Usman Ghani Resume LTE
Usman Ghani Resume LTE Usman Ghani Resume LTE
Usman Ghani Resume LTE
 
Anoop_RF_
Anoop_RF_Anoop_RF_
Anoop_RF_
 
Resume_Sushil Kumar Kushwaha
Resume_Sushil Kumar KushwahaResume_Sushil Kumar Kushwaha
Resume_Sushil Kumar Kushwaha
 
Resume_Ajith
Resume_AjithResume_Ajith
Resume_Ajith
 
Drive Test and Optimization Tutorial - I.pdf
Drive Test and Optimization Tutorial - I.pdfDrive Test and Optimization Tutorial - I.pdf
Drive Test and Optimization Tutorial - I.pdf
 
Sandeep Sharma_CV
Sandeep Sharma_CVSandeep Sharma_CV
Sandeep Sharma_CV
 
Brijmani_kumar
Brijmani_kumarBrijmani_kumar
Brijmani_kumar
 
Ijett v4 i10p113
Ijett v4 i10p113Ijett v4 i10p113
Ijett v4 i10p113
 
telecom engineer
telecom engineertelecom engineer
telecom engineer
 

More from Md Joynal Abaden

IBS
IBSIBS
Presentation
PresentationPresentation
Presentation
Md Joynal Abaden
 
Auspicious_Profile_Teletalk(DT)_technical _Proposal
Auspicious_Profile_Teletalk(DT)_technical _ProposalAuspicious_Profile_Teletalk(DT)_technical _Proposal
Auspicious_Profile_Teletalk(DT)_technical _Proposal
Md Joynal Abaden
 
Technical Proposal ( Teletalk)
Technical Proposal ( Teletalk)Technical Proposal ( Teletalk)
Technical Proposal ( Teletalk)
Md Joynal Abaden
 
Handover Overview
Handover OverviewHandover Overview
Handover Overview
Md Joynal Abaden
 
New Resource
New ResourceNew Resource
New Resource
Md Joynal Abaden
 
3G Drive Test Procedure_ By Md Joynal Abaden@ MYM
3G Drive Test Procedure_ By Md Joynal Abaden@ MYM3G Drive Test Procedure_ By Md Joynal Abaden@ MYM
3G Drive Test Procedure_ By Md Joynal Abaden@ MYM
Md Joynal Abaden
 
CW Testing
CW TestingCW Testing
CW Testing
Md Joynal Abaden
 
New Resource
New ResourceNew Resource
New Resource
Md Joynal Abaden
 
Antenna alignment tool
Antenna alignment toolAntenna alignment tool
Antenna alignment tool
Md Joynal Abaden
 
WCDMA Overall
WCDMA OverallWCDMA Overall
WCDMA Overall
Md Joynal Abaden
 
WCDMA Overall
WCDMA OverallWCDMA Overall
WCDMA Overall
Md Joynal Abaden
 
Handover Overview
Handover OverviewHandover Overview
Handover Overview
Md Joynal Abaden
 
CW Testing
CW TestingCW Testing
CW Testing
Md Joynal Abaden
 
TEMS PARAMETER (3G)
TEMS PARAMETER (3G)TEMS PARAMETER (3G)
TEMS PARAMETER (3G)
Md Joynal Abaden
 
Pilot Pollution
Pilot PollutionPilot Pollution
Pilot Pollution
Md Joynal Abaden
 
PCTEL_ By Md Joynal Abaden
PCTEL_ By Md Joynal AbadenPCTEL_ By Md Joynal Abaden
PCTEL_ By Md Joynal Abaden
Md Joynal Abaden
 
Drive Test Using Tems Investation 16
Drive Test Using Tems Investation 16Drive Test Using Tems Investation 16
Drive Test Using Tems Investation 16
Md Joynal Abaden
 
WCDMA OverView
WCDMA OverViewWCDMA OverView
WCDMA OverView
Md Joynal Abaden
 
Handover Overview
Handover OverviewHandover Overview
Handover Overview
Md Joynal Abaden
 

More from Md Joynal Abaden (20)

IBS
IBSIBS
IBS
 
Presentation
PresentationPresentation
Presentation
 
Auspicious_Profile_Teletalk(DT)_technical _Proposal
Auspicious_Profile_Teletalk(DT)_technical _ProposalAuspicious_Profile_Teletalk(DT)_technical _Proposal
Auspicious_Profile_Teletalk(DT)_technical _Proposal
 
Technical Proposal ( Teletalk)
Technical Proposal ( Teletalk)Technical Proposal ( Teletalk)
Technical Proposal ( Teletalk)
 
Handover Overview
Handover OverviewHandover Overview
Handover Overview
 
New Resource
New ResourceNew Resource
New Resource
 
3G Drive Test Procedure_ By Md Joynal Abaden@ MYM
3G Drive Test Procedure_ By Md Joynal Abaden@ MYM3G Drive Test Procedure_ By Md Joynal Abaden@ MYM
3G Drive Test Procedure_ By Md Joynal Abaden@ MYM
 
CW Testing
CW TestingCW Testing
CW Testing
 
New Resource
New ResourceNew Resource
New Resource
 
Antenna alignment tool
Antenna alignment toolAntenna alignment tool
Antenna alignment tool
 
WCDMA Overall
WCDMA OverallWCDMA Overall
WCDMA Overall
 
WCDMA Overall
WCDMA OverallWCDMA Overall
WCDMA Overall
 
Handover Overview
Handover OverviewHandover Overview
Handover Overview
 
CW Testing
CW TestingCW Testing
CW Testing
 
TEMS PARAMETER (3G)
TEMS PARAMETER (3G)TEMS PARAMETER (3G)
TEMS PARAMETER (3G)
 
Pilot Pollution
Pilot PollutionPilot Pollution
Pilot Pollution
 
PCTEL_ By Md Joynal Abaden
PCTEL_ By Md Joynal AbadenPCTEL_ By Md Joynal Abaden
PCTEL_ By Md Joynal Abaden
 
Drive Test Using Tems Investation 16
Drive Test Using Tems Investation 16Drive Test Using Tems Investation 16
Drive Test Using Tems Investation 16
 
WCDMA OverView
WCDMA OverViewWCDMA OverView
WCDMA OverView
 
Handover Overview
Handover OverviewHandover Overview
Handover Overview
 

3G Drive Test Procedure_ By Md Joynal Abaden@ MYM

  • 2. Contents 1 Introduction 2 Drive test tools 3 Drive test type 4 Site Verification 5 Rigging Audit 6 Cluster Drive Test Optimization
  • 3. Introduction: Objectives: The purpose of the drive test to perform the RF design verification, identify any coverage and quality problems to optimise WCDMA network performance. At this stage, the main focus is on fundamental end-to-end service accessibility target (e.g. Calls set up and drop rates) and on performance targets such as coverage related targets (such as CPICH RSCP and CPICH Ec/No), and HSDPA/HSUPA speed performance. For this case it was needed each other from drive test data collection and also Physical site changes like tilting, antenna orientation and antenna height. RF Solution Department
  • 4. Drive Test Tools: Hardware: • 1x Laptop • 2x/3x/4x Smart Phones (2G/3G/LTE) • 1x FDD Data Dongle (should be supporting 3G 42M) • 1x GPS (G-Star IV) • 1x Car DC/AC Inverter • 1x Car. • 4x SIM Cards (Data & Normal) Software: • TEMS Investigation 16.1 • Map Tools (Map Info & Google Earth) • Cell File • Actix 5.0.1 RF Solution Department
  • 5. Drive Test Type Site Verification Individual cell verification test : To investigate detail of site performance by checking all single sectors with AMR call and Throughput test. In addition also required to perform small area dedicated test for Intra/Intercell HO. Cluster Optimization Normal Drive To frame the potential area of the new site planned. Also to improve the important neighboring sites for which the handover to be defined. Cluster Optimization Dedicated Drive Performed call to the test number and drive to the potential area given to determine i) call set up time ii) call set up success iii) drop call iv) SHO v) HSDPA ( Average & Maximum) Speed vi) Coverage Status ( Technology) vii) Pilot polution RF Solution Department
  • 6. When the site is completely integrated, Drive tester team will start to perform site investigation. The detail sub-activities are outlined below: 1. Rigging Audit 2. Site Verification 3. Site corrective action (cross feeder, inconsistent data, functionality problem, etc.) 4. Acceptance Test The site has been built and integrated as planned and that the planned coverage has been achieved Site Verification: RF Solution Department
  • 7. All Tests Clear? Corrective Actions No Yes New On Air Site Flow New Site Integration 1. Consistency Check 2. Rigging Audit 3. Site Verification Site Acceptance Site Verification: RF Solution Department
  • 8. • Voice/vedio calls • Verify on per cell basis for all carriers: • RSCP • EC/No • Scrambling Code • LAC / RAC • Cell ID • Etc. • Frequency • Data / Throughput test • HSDPA and HSUPA / Internet Browsing • Verify on per cell basis for all carriers: • RSCP • EC/No • Scrambling Code • LAC / RAC • Cell ID • Max/Ave Speed • Etc. Site Verification: RF Solution Department
  • 9. Static test (Per Sector / Cell) At the best radio location required to perform for all carriers 1. Voice call to determine if any call failure or block calls 2. Video call to determine if any call failure or block calls 3. Throughput R99/ HSDPA/HSUPA/Latency test using http / fttp and speed test. 4. Internet browsing successful 5. SMS Mobility Test 1. Scanning the CPICH BY 3 MS (Lock by 3 Frequency as F1, F2, F3) & S4 Modem or Data Card DC HSDPA by Downloading High volume of Data 2. Long Call use by 3 MS (Lock by 3 Frequency as F1, F2, F3) MS4 Modem or Data Card Lock F1, HSDPA by Downloading High volume of Data 3. Idle use by 3 MS (Lock by 3 Frequency as F1, F2, F3) MS4 Modem or Data Card Lock F2, HSUPA by Downloading High volume of Data. 4. MS1 Lock F1 Short Call & MS2 Modem or Data Card DC HSDPA by Downloading High volume of Data 5. MS1 Lock F2 Short Call & MS2 Modem or Data Card DC HSUPA by Downloading High volume of Data Site Verification: RF Solution Department
  • 10. Rigging Audit Test Items in Rigging Audit: Antenna Installation Verification - Azimuth - Height - Location - Cross-feeder/s Rigging Tools : - Safety Belt - Compass - GPS - Measurement tape - Digital Inclinometer Site Audit required from the Rigger 1. Panoramic photos surrounding sites including antenna sectors/objective area 2. Ensure no blocking sectors from the main beam antenna 3. Antenna mechanical/electrical tilt was in correct value 4. Antenna was in correct orientation for the objective/target area 5. Site Height 6. Site Coordinates RF Solution Department
  • 11. • Cluster Definition, Site Information Data and Site Location Map • With Site/Cell ID, Site name, Primary SC, Neighbor list, RNC ID and Cluster border highlighted • Prepare Route Map for Drive Testing • Perform drive test either Idle mode or Dedicated mode • Identify Problematic Areas • The result from the data will showing of Network performance such as 1. Drop call rate 2. Accessibility – mobile originated/terminated call set up success rate 3. Coverage – RSCP and Ec/No Cluster Drive test Optimization: RF Solution Department
  • 12. Cluster Drive test Optimization: RF Solution Department
  • 13. • The area which doesn't meet the criteria below is defined as "Problematic Area“ • Coverage Problem Area • Dominance Problem Area • Pilot Pollution Best Server’s CPICH RSCP < - 99 dBm Best Server’s CPICH Ec/No < -14 dB 4th Best Server’s CPICH RSCP > - 99 dBm Cluster Drive test Optimisation: RF Solution Department