SlideShare a Scribd company logo
BRIJMANI KUMAR
RF LTE Optimizer
Email: brij.mani@gmail.com
Contact no: +919582805078
OBJECTIVE
To pursue a highly challenging and creative career in the field of Telecom, where I can apply my existing
knowledge and creativity, acquire new skills and contribute effectively to the organization.
Total Experience: 8 years’ experience in RF.
A) RF Manager – Reliance Jio March 2015 to Present
Designation : RF LTE Optimizer
Project : Deployment & optimizing for LTE on 1800 & 2300 MHz.
Location : Delhi-Gurgaon
Scope of Work: LTE 1800 & 2300 MHz Pre-launch and Post launch for Delhi & NCR region
LTE 2300/ 1800 MHz: - PRE Optimization Process
• Currently working on deployment for VoLTE in Reliance JIO
• Working on recommending optimization changes by analysis of coverage, pilot pollution for LTE.
• Analyzed data on problem areas such as call drops, and attach failure, volte set up time.
• Understanding of the Access Technologies LTE air interface
• Responsible for improving LTE network KPIs like Retainability / Accessibility etc.
• Perform Parameter tuning for network optimization
• Undertake neighbor optimization activities for network performance improvement (KPIs) and
optimization tasks
• MRO testing with the help of grid testing to analysis of RSRP & Throughput value.
B) Lead RF Optimizer – Ericsson Global India pvt.ltd. March 2010 to Present
Designation : Senior Engineer
Project : Deployment & optimizing for CDMA & LTE on 800 MHz (Sprint)
Location : Noida, UP
Scope of Work: CDMA & LTE 800 MHz Pre-launch and Post launch for Houston & Kansas Market
CDMA 800MHz: - PRE Process:- (Ericsson system)
1. Parameter Audit (Like Switch, Market, Frequency Band, SID, NID, TPTLO, CBTH, PAGEG, SYNG,
PILOTG, PERPOWER, MPTTR
2. Tilt Audit (initially we need to Set according to the design tilt)
3. NOA Tag Audit (Initially whenever the site integrates, there is NOA tag with it in CACP, then after
Approval of sprint, sites need to be launched and launched sites shouldn’t have NOA tag in CACP. )
4. Non Approved on Air Audit (if the cluster is not approved by sprint then all the sites in that clusters
Should be wilted i.e. not taking traffic)
5. Data fill in CACP.
6. As per integrated sites status (if the sites more than 95% integrated) need to send the cluster for the
Approval of Sprint.
7. If the cluster is approved, need to make the cluster alarm free to launch the cluster. Need to provide the
list of sites lying in the approved cluster to the NIC to check the alarms.
8. NIC will revert the updated report for the cluster and after looking into the alarms provided by the NIC;
we need to raise the tickets in ERTT and takes follow up and track daily the status of ERTT.
9. Need to create logical neighbors in CACP
10. Need to check neighbor in CACP.
11. MMTA & HHO (Hard Handover)
12. Need to check the hardware from NIC.(If any issue persisting need to raise the ERTT ticket).
13. Daily need to plot the integrated sites on the MapInfo to check the current scenario.
14. Database should need to update without any fail.
Post Process:-
1. Need to work on Top offenders of the cluster (Top offender is decided on basis of drop raw count)
2. NLTA (NEWTUN RUN), By NEWTUN we can check swap sector and coverage hole, PN overshoot
sectors etc.
3. ACO/PCO for CDMA 800MHz & Rx Delta check
LTE 800MHz: - PRE & POST Process
• Currently working on optimizing Data networks for LTE
• Working on recommending optimization changes by analysis of coverage, pilot pollution for LTE.
• Analyzed data on problem areas such as call drops, and call set up failure.
• Understanding of the Access Technologies LTE air interface
• LTE Basic Call flow, mobile operations, Ability to use Network Performance tools
• Responsible for improving LTE network KPIs like Retainability / Accessibility etc.
• Perform Parameter tuning for network optimization
• Undertake neighbor optimization activities for network performance improvement (KPIs) and
optimization tasks
• Experienced with performing LTE new site ATP.
Previous Experience in Ericsson India Global services
Designation : Engineer Engineering
Project : Sprint Nextel Corporation (Vendor Lucent)
Location : Noida (India)
Worked on Sprint project for EVDO & 3G1X (CDMA) on 1900MHz planning &optimization
• Providing an excellent customer experience, by anticipating and resolving customer issues in a manner
that exceeds the customer expectations.
• Communicating regularly with the customer to evaluate satisfaction and proactively identify upcoming
Needs.
• Coordinating with product teams to meet customer needs, while managing customer expectations to
Prevent overload or missed deadlines.
• Analyzing SLA and KPI on a regular basis to raise issues proactively and getting them corrected.
• Neighbor List tuning by generating periodic Homax and MapInfo for new and existing sites.
• Kpi’s improvement through search window optimization & various Lucent forms like OMCR-RAN, OMP
SHELL, ECP, CELL2, FCI, GUI, BTSEQP, CDHFL, CDHNL & CEQFACE
• Identification of correct handoff targets for sites on all major & secondary traffic.
• Monitoring KPI’s and Performance analysis by % block call, %Call drop, soft handoff, hard handoff,
semi-soft handoff (Target & Request), Peak TCE, Carrier MOU, cell CE blocking etc.
• Responsible for Pre & Post Optimization by verify the factors like-RxThroughput, TX Throughput, DRC,
SINR, Interference, Pilot Pollution, fringe sector etc.
• Report analyses for kpi’s improvement are Distance banding report, Translation report, Trending
Report, RF SM report.
• Working on Daily SLA Report to meet the KPI of the Existing network.
• Analysis of sites due to CEs, Packet Pipes and Walsh code blocks etc.
• Report analyses i.e., T1 ADD/REMOVAL, CARRIER ADD/REMOVAL & CEs CARD
• ADD/REMOVAL for kpi’s
Improvement by using deployment tracker, translation report, trending report etc.
• Working on ACO & PCO to meet threshold value of network i.e. ACO is less than 20% and PCO is less
than 72%.
Ericsson Training
• Training(1 month) on 3G1X CDMA containing single carrier optimization & multicarrier optimization,
RTD & DBOT concept, CDHFL & CDHNL tuning, neighbors list & combined neighbor list concept.(Mr.
Telex by sprint trainer)
• Training on LTE Basic Call flow, mobile operations, Ability to use Network Performance tools,
Understanding of the Access Technologies LTE air interface.
• Training (1 month) on CDMA & EVDO & multicarrier optimization, IFHO Concept (Mr. Anirban Ghosh
by sprint trainer).
• Fluency & Expression training duration 2 weeks (Mrs. Vandana by Evolv trainer )
Achievements
• Got ACE award for meeting the majority KPI’s of the network for my market.
• Got POWER award for taking initiatives, doing Zone Splitting & Rezoning and also for handling
customer complaints in real time.
• Cleared TOEIC similar to TOFEL.
Tools Used
 Citrix tool
• Tems Discovery, Neat Pass tool, Site handler, ACTIX, Netwatch Live, Reveal, Falcon, Ntac mobility,
Rop filter, RCV log filter, DO-NL, iTune-NL, Cockpit optimization tool.
• Windcatcher, Vertex tool, and Flux evdo.
• MapInfo 6.5, 7.5, 8.5, 10.0, MapWindow GIS, Quantum GIS 1.0, Google earth.
B) RF Engineer – Prithvi Information Solutions Ltd January 2008 to March 2010
Designation : RF Engineer (Optimizer)
Project : Reliance EVDO
Location : Gurgaon
Job Profile
• Worked on ALU (EVDO) in Delhi as Analyzer & optimizer.
• Co-ordinate the drive test team
• Analysis of Drive Test log files using ACTIX Post Processing Tool to resolve the problem.
• Neighbor List tuning by generating periodic Homx and MapInfo for new and existing sites.
• KPI improvement through various Lucent forms like FCI, GUI, and CEQFACE.
• Identification of correct Handover Targets for sites on all major & secondary traffic.
• Monitoring KPI and Performance analysis by Call drop, soft handoff, CSSR etc.
• Verify network performance factors like site locations, antenna heights, azimuths, antenna
Tilts (MT&ET)
• Responsible for Pre & Post Optimization by verify the factors like-RxThroughput, TX Throughput, DRC,
SINR, Interference, Pilot Pollution etc.
• Preparations of cluster reports and plot based on cluster acceptance signoff with Reliance customer.
Tools Used
• ACTIX(Spotlight)
• LDAT 3G1X
• MAPINFO PROFESSIONAL 6.5,7.5,8.5,10.0
• AGILENT E6474A nitro 9.3,12.1,14.0
• NET TERM & GUI
Previous Employer
C) RF Engineer – Aircom International India LTD. June 2007 to December 2008
Designation : RF Engineer
Project -1 : Worked on Alcatel-Lucent 600 new sites project for Reliance Communications carried out
In Rajasthan and 200 new sites in Maharashtra.
Job Profile
• Drive test on Agilent E6474A version nitro 9.3 & Tems investigation 8.1 and physical optimization.
• Solving RF problems through Physical optimization of network according to coverage and capacity
requirement.
• Monitoring KPI and Performance analysis by Call drop, HOSR, CSSR. Etc.
• Responsible for Pre & Post Optimization and verify network performance factors like- Rx level, TX level,
FER, EcIo, Interference, Pilot Pollution etc.
• Processing of data collected from sites on LDAT4.11.030.
• ECP Form updating (FCI)
• Verify network performance factors like site locations, antenna heights, azimuths, antenna
Tilts (MT&ET)
• Able to relate problems faced by subscribers to RF optimization.
• Done VSWR by site master.
Relevant Tools and Software proficiency:
Design Tool: MapInfo 7.5, 8.5, 10.0
Post Processing Tool: MAPINFO 7.5, LDAT 3G CDMA.Actix
Drive Testing Tool: Agilent Nitro9.3 12.1, Tems6.1, Neptune.
Other Tools: VSWR meter (Anritsu & Bird), & GPS
Software/OS: windows 2000/XP and office 2000/XP
Relevant Tools and Software Proficiency
Design Tool : MapInfo Version 6.5, 8.5, RL Tool, Google earth
Post Processing Tool : Global Mapper8, MAPINFO 7.5, LDAT 3G CDMA, MIPT
Drive Testing Tool : Agilent Nitro 9.3, 12.0, 12.1, Tems Investigation 6.1
Other Tools : VSWR meter (Anritsu & Bird), & GPS
Software/OS : C & C++, Dos, Windows XP
Packages : Excel, power point, word
Training and Workshop
• One month training on GSM & CDMA at Infinite softcom solution (ISS), Gurgaon
• Done Drive test for TTSL in Rajasthan, Madhya Pradesh, and Gujrat.
Professional Qualification
• B.Tech in Electronics with First Division from Bhagwant Institute of Technology, Muzaffarnagar
Affiliated to U.P.Technical University, Lucknow (U.P).
Personal Information
Father’s Name : Shri Dwarika Prasad
Date of Birth : 25th
Dec 1984
Marital Status : Married
Languages Know : English and Hindi
Nationality : Indian
Permanent address : R-Z-A/150 Dabri Extension (EAST)
New Delhi-45
Date: (Brijmani Kumar)
• One month training on GSM & CDMA at Infinite softcom solution (ISS), Gurgaon
• Done Drive test for TTSL in Rajasthan, Madhya Pradesh, and Gujrat.
Professional Qualification
• B.Tech in Electronics with First Division from Bhagwant Institute of Technology, Muzaffarnagar
Affiliated to U.P.Technical University, Lucknow (U.P).
Personal Information
Father’s Name : Shri Dwarika Prasad
Date of Birth : 25th
Dec 1984
Marital Status : Married
Languages Know : English and Hindi
Nationality : Indian
Permanent address : R-Z-A/150 Dabri Extension (EAST)
New Delhi-45
Date: (Brijmani Kumar)

More Related Content

What's hot

Ousainou Demba ResumeDM
Ousainou Demba ResumeDMOusainou Demba ResumeDM
Ousainou Demba ResumeDMOusainou Demba
 
Munendra Singh Jadon LTE Optimization (1)
Munendra Singh Jadon LTE Optimization (1)Munendra Singh Jadon LTE Optimization (1)
Munendra Singh Jadon LTE Optimization (1)Munendra singh jadon
 
Lte drivetest guideline with genex assistant
Lte drivetest guideline with genex assistantLte drivetest guideline with genex assistant
Lte drivetest guideline with genex assistant
Ray KHASTUR
 
LTE optimization engineer
LTE optimization engineerLTE optimization engineer
LTE optimization engineerAbdul Qudoos
 
Lte kpis
Lte kpisLte kpis
Lte kpis
Anil kumar
 
Lemuelle L. Labadan_CV_2015
Lemuelle L. Labadan_CV_2015Lemuelle L. Labadan_CV_2015
Lemuelle L. Labadan_CV_2015Lemuelle Labadan
 
Curriculam Vitea_Hisham Zahoor
Curriculam Vitea_Hisham ZahoorCurriculam Vitea_Hisham Zahoor
Curriculam Vitea_Hisham ZahoorHisham Zahoor
 
Inop presentation dec sgb 2017
Inop presentation dec sgb 2017Inop presentation dec sgb 2017
Inop presentation dec sgb 2017
frankjoh
 
04. lte kpi in lte radio network
04. lte   kpi in lte radio network04. lte   kpi in lte radio network
04. lte kpi in lte radio network
Dani Indra Kumara
 
Radio network optimization flow 20090429-a-4.0
Radio network optimization flow 20090429-a-4.0Radio network optimization flow 20090429-a-4.0
Radio network optimization flow 20090429-a-4.0
Mashaal322
 
Introduction to Genex Assistance
Introduction to  Genex AssistanceIntroduction to  Genex Assistance
Introduction to Genex Assistance
Tempus Telcosys
 

What's hot (20)

AMIT MODI
AMIT MODIAMIT MODI
AMIT MODI
 
CV(M.Javed )
CV(M.Javed )CV(M.Javed )
CV(M.Javed )
 
Adeel Ahmed-CV
Adeel Ahmed-CVAdeel Ahmed-CV
Adeel Ahmed-CV
 
Ousainou Demba ResumeDM
Ousainou Demba ResumeDMOusainou Demba ResumeDM
Ousainou Demba ResumeDM
 
Anoop_RF_
Anoop_RF_Anoop_RF_
Anoop_RF_
 
Munendra Singh Jadon LTE Optimization (1)
Munendra Singh Jadon LTE Optimization (1)Munendra Singh Jadon LTE Optimization (1)
Munendra Singh Jadon LTE Optimization (1)
 
SKK RESUME (1)
SKK RESUME (1)SKK RESUME (1)
SKK RESUME (1)
 
said bacha cv
said bacha cvsaid bacha cv
said bacha cv
 
Lte drivetest guideline with genex assistant
Lte drivetest guideline with genex assistantLte drivetest guideline with genex assistant
Lte drivetest guideline with genex assistant
 
LTE optimization engineer
LTE optimization engineerLTE optimization engineer
LTE optimization engineer
 
Lte kpis
Lte kpisLte kpis
Lte kpis
 
Lemuelle L. Labadan_CV_2015
Lemuelle L. Labadan_CV_2015Lemuelle L. Labadan_CV_2015
Lemuelle L. Labadan_CV_2015
 
Curriculam Vitea_Hisham Zahoor
Curriculam Vitea_Hisham ZahoorCurriculam Vitea_Hisham Zahoor
Curriculam Vitea_Hisham Zahoor
 
Inop presentation dec sgb 2017
Inop presentation dec sgb 2017Inop presentation dec sgb 2017
Inop presentation dec sgb 2017
 
syed mohsin ali Resume.
syed mohsin ali Resume.syed mohsin ali Resume.
syed mohsin ali Resume.
 
04. lte kpi in lte radio network
04. lte   kpi in lte radio network04. lte   kpi in lte radio network
04. lte kpi in lte radio network
 
Radio network optimization flow 20090429-a-4.0
Radio network optimization flow 20090429-a-4.0Radio network optimization flow 20090429-a-4.0
Radio network optimization flow 20090429-a-4.0
 
Introduction to Genex Assistance
Introduction to  Genex AssistanceIntroduction to  Genex Assistance
Introduction to Genex Assistance
 
CV-Harith Zaidan
CV-Harith ZaidanCV-Harith Zaidan
CV-Harith Zaidan
 
KHAJA iFTEKHAR UDDIN CV
KHAJA iFTEKHAR UDDIN CVKHAJA iFTEKHAR UDDIN CV
KHAJA iFTEKHAR UDDIN CV
 

Viewers also liked

Survival Crash Course in South Korea (2)
Survival Crash Course in South Korea (2)Survival Crash Course in South Korea (2)
Survival Crash Course in South Korea (2)Hyohee Jo
 
Camera shots & angles
Camera shots & anglesCamera shots & angles
Camera shots & angles
mwking1999
 
Institution questions
Institution questionsInstitution questions
Institution questions
AaronHunt99
 
Joseph resume updated
Joseph resume updatedJoseph resume updated
Joseph resume updatedJoe Renno
 
Какво трябва да знае всяко православно момиче
Какво трябва да знае всяко православно момичеКакво трябва да знае всяко православно момиче
Какво трябва да знае всяко православно момиче
Petar Vasilev
 
Storytelling Lesson Plan
Storytelling Lesson PlanStorytelling Lesson Plan
Storytelling Lesson Plan
Jovelyn Azuelo
 
Jeffrey Minor resume
Jeffrey Minor resumeJeffrey Minor resume
Jeffrey Minor resumeJeff Minor
 
B'tween foccus for_the_future_en
B'tween foccus for_the_future_enB'tween foccus for_the_future_en
B'tween foccus for_the_future_en
amason04
 
Noir - Classwork
Noir - ClassworkNoir - Classwork
Noir - Classwork
Emily Ventress
 
Boost your GK
Boost your GKBoost your GK
Boost your GK
Baljeet Kaur
 
What Does NAPAC Do Now
What Does NAPAC Do NowWhat Does NAPAC Do Now
What Does NAPAC Do Now
parliaments.cluster
 
Demokratikleşme ve büyüme ilişkisi
Demokratikleşme ve büyüme ilişkisi Demokratikleşme ve büyüme ilişkisi
Demokratikleşme ve büyüme ilişkisi Arma?an ?ahin
 
The rhetoric-of-article-abstracts-a-sweep-through-the-literature-and-a-prelim...
The rhetoric-of-article-abstracts-a-sweep-through-the-literature-and-a-prelim...The rhetoric-of-article-abstracts-a-sweep-through-the-literature-and-a-prelim...
The rhetoric-of-article-abstracts-a-sweep-through-the-literature-and-a-prelim...
ToniCupluk
 
Вяра и живот
Вяра и животВяра и живот
Вяра и живот
Petar Vasilev
 
CITYRAMA Sightseeing Tours 2015/16
CITYRAMA Sightseeing Tours 2015/16 CITYRAMA Sightseeing Tours 2015/16
CITYRAMA Sightseeing Tours 2015/16
CityramaBudapest
 
Photoshop process text size
Photoshop process text sizePhotoshop process text size
Photoshop process text size
hibahjan12
 
la vita che meraviglia
la vita che meravigliala vita che meraviglia
la vita che meravigliaEnrico Ponzoni
 

Viewers also liked (18)

Survival Crash Course in South Korea (2)
Survival Crash Course in South Korea (2)Survival Crash Course in South Korea (2)
Survival Crash Course in South Korea (2)
 
Camera shots & angles
Camera shots & anglesCamera shots & angles
Camera shots & angles
 
Institution questions
Institution questionsInstitution questions
Institution questions
 
Joseph resume updated
Joseph resume updatedJoseph resume updated
Joseph resume updated
 
Какво трябва да знае всяко православно момиче
Какво трябва да знае всяко православно момичеКакво трябва да знае всяко православно момиче
Какво трябва да знае всяко православно момиче
 
Storytelling Lesson Plan
Storytelling Lesson PlanStorytelling Lesson Plan
Storytelling Lesson Plan
 
Jeffrey Minor resume
Jeffrey Minor resumeJeffrey Minor resume
Jeffrey Minor resume
 
B'tween foccus for_the_future_en
B'tween foccus for_the_future_enB'tween foccus for_the_future_en
B'tween foccus for_the_future_en
 
Noir - Classwork
Noir - ClassworkNoir - Classwork
Noir - Classwork
 
Boost your GK
Boost your GKBoost your GK
Boost your GK
 
What Does NAPAC Do Now
What Does NAPAC Do NowWhat Does NAPAC Do Now
What Does NAPAC Do Now
 
Demokratikleşme ve büyüme ilişkisi
Demokratikleşme ve büyüme ilişkisi Demokratikleşme ve büyüme ilişkisi
Demokratikleşme ve büyüme ilişkisi
 
The rhetoric-of-article-abstracts-a-sweep-through-the-literature-and-a-prelim...
The rhetoric-of-article-abstracts-a-sweep-through-the-literature-and-a-prelim...The rhetoric-of-article-abstracts-a-sweep-through-the-literature-and-a-prelim...
The rhetoric-of-article-abstracts-a-sweep-through-the-literature-and-a-prelim...
 
Вяра и живот
Вяра и животВяра и живот
Вяра и живот
 
CITYRAMA Sightseeing Tours 2015/16
CITYRAMA Sightseeing Tours 2015/16 CITYRAMA Sightseeing Tours 2015/16
CITYRAMA Sightseeing Tours 2015/16
 
facebook
facebookfacebook
facebook
 
Photoshop process text size
Photoshop process text sizePhotoshop process text size
Photoshop process text size
 
la vita che meraviglia
la vita che meravigliala vita che meraviglia
la vita che meraviglia
 

Similar to Brijmani_kumar

Deepk Resume Updated
Deepk Resume UpdatedDeepk Resume Updated
Deepk Resume UpdatedDeepak Yadav
 
Resume Lelin Kumar singh
Resume Lelin Kumar singhResume Lelin Kumar singh
Resume Lelin Kumar singhlelin singh
 
CV_MALIK MD NURANI.pdf
CV_MALIK MD NURANI.pdfCV_MALIK MD NURANI.pdf
CV_MALIK MD NURANI.pdf
Malik Md Nurani
 
Muhammad Jebran_RF Consultant_2G_3G_LTE
Muhammad Jebran_RF Consultant_2G_3G_LTEMuhammad Jebran_RF Consultant_2G_3G_LTE
Muhammad Jebran_RF Consultant_2G_3G_LTEMuhammad Jibran
 
Fawad Tanveer Butt CV
Fawad Tanveer Butt CVFawad Tanveer Butt CV
Fawad Tanveer Butt CVFawad Butt
 
Abhishek Anand Resume_02-Nov-16
Abhishek Anand Resume_02-Nov-16Abhishek Anand Resume_02-Nov-16
Abhishek Anand Resume_02-Nov-16Abhishek Anand
 
CV_Zafar_Telecom O&M_RF Engineer-Coordinator_Business Development Manager (22...
CV_Zafar_Telecom O&M_RF Engineer-Coordinator_Business Development Manager (22...CV_Zafar_Telecom O&M_RF Engineer-Coordinator_Business Development Manager (22...
CV_Zafar_Telecom O&M_RF Engineer-Coordinator_Business Development Manager (22...Zafar Iqbal
 
Resume_rahul kumar singhRF Engineer
Resume_rahul kumar singhRF EngineerResume_rahul kumar singhRF Engineer
Resume_rahul kumar singhRF Engineerrahul singh
 
Pankaj Patel Resume
Pankaj Patel  ResumePankaj Patel  Resume
Pankaj Patel Resumepankaj patel
 
Lakshman Resume 3 years experience
Lakshman Resume 3 years experienceLakshman Resume 3 years experience
Lakshman Resume 3 years experiencelakshman vatada
 

Similar to Brijmani_kumar (20)

Deepk Resume Updated
Deepk Resume UpdatedDeepk Resume Updated
Deepk Resume Updated
 
Sandeep Sharma_CV
Sandeep Sharma_CVSandeep Sharma_CV
Sandeep Sharma_CV
 
Resume_Ajith
Resume_AjithResume_Ajith
Resume_Ajith
 
Resume Lelin Kumar singh
Resume Lelin Kumar singhResume Lelin Kumar singh
Resume Lelin Kumar singh
 
CV_MALIK MD NURANI.pdf
CV_MALIK MD NURANI.pdfCV_MALIK MD NURANI.pdf
CV_MALIK MD NURANI.pdf
 
Nitesh_CV
Nitesh_CVNitesh_CV
Nitesh_CV
 
Muhammad Jebran_RF Consultant_2G_3G_LTE
Muhammad Jebran_RF Consultant_2G_3G_LTEMuhammad Jebran_RF Consultant_2G_3G_LTE
Muhammad Jebran_RF Consultant_2G_3G_LTE
 
CV_ANUPAM MONDAL
CV_ANUPAM MONDALCV_ANUPAM MONDAL
CV_ANUPAM MONDAL
 
Adeel Ahmed- CV
Adeel Ahmed- CVAdeel Ahmed- CV
Adeel Ahmed- CV
 
Fawad Tanveer Butt CV
Fawad Tanveer Butt CVFawad Tanveer Butt CV
Fawad Tanveer Butt CV
 
Tabish resume
Tabish resumeTabish resume
Tabish resume
 
Abhishek Anand Resume_02-Nov-16
Abhishek Anand Resume_02-Nov-16Abhishek Anand Resume_02-Nov-16
Abhishek Anand Resume_02-Nov-16
 
CV_Satbir
CV_SatbirCV_Satbir
CV_Satbir
 
CV_Zafar_Telecom O&M_RF Engineer-Coordinator_Business Development Manager (22...
CV_Zafar_Telecom O&M_RF Engineer-Coordinator_Business Development Manager (22...CV_Zafar_Telecom O&M_RF Engineer-Coordinator_Business Development Manager (22...
CV_Zafar_Telecom O&M_RF Engineer-Coordinator_Business Development Manager (22...
 
Resume_rahul kumar singhRF Engineer
Resume_rahul kumar singhRF EngineerResume_rahul kumar singhRF Engineer
Resume_rahul kumar singhRF Engineer
 
Amit chakraborty_Resume
Amit chakraborty_ResumeAmit chakraborty_Resume
Amit chakraborty_Resume
 
JAGDISH Updated
JAGDISH UpdatedJAGDISH Updated
JAGDISH Updated
 
Pankaj Patel Resume
Pankaj Patel  ResumePankaj Patel  Resume
Pankaj Patel Resume
 
Resume
ResumeResume
Resume
 
Lakshman Resume 3 years experience
Lakshman Resume 3 years experienceLakshman Resume 3 years experience
Lakshman Resume 3 years experience
 

Brijmani_kumar

  • 1. BRIJMANI KUMAR RF LTE Optimizer Email: brij.mani@gmail.com Contact no: +919582805078 OBJECTIVE To pursue a highly challenging and creative career in the field of Telecom, where I can apply my existing knowledge and creativity, acquire new skills and contribute effectively to the organization. Total Experience: 8 years’ experience in RF. A) RF Manager – Reliance Jio March 2015 to Present Designation : RF LTE Optimizer Project : Deployment & optimizing for LTE on 1800 & 2300 MHz. Location : Delhi-Gurgaon Scope of Work: LTE 1800 & 2300 MHz Pre-launch and Post launch for Delhi & NCR region LTE 2300/ 1800 MHz: - PRE Optimization Process • Currently working on deployment for VoLTE in Reliance JIO • Working on recommending optimization changes by analysis of coverage, pilot pollution for LTE. • Analyzed data on problem areas such as call drops, and attach failure, volte set up time. • Understanding of the Access Technologies LTE air interface • Responsible for improving LTE network KPIs like Retainability / Accessibility etc. • Perform Parameter tuning for network optimization • Undertake neighbor optimization activities for network performance improvement (KPIs) and optimization tasks • MRO testing with the help of grid testing to analysis of RSRP & Throughput value.
  • 2. B) Lead RF Optimizer – Ericsson Global India pvt.ltd. March 2010 to Present Designation : Senior Engineer Project : Deployment & optimizing for CDMA & LTE on 800 MHz (Sprint) Location : Noida, UP Scope of Work: CDMA & LTE 800 MHz Pre-launch and Post launch for Houston & Kansas Market CDMA 800MHz: - PRE Process:- (Ericsson system) 1. Parameter Audit (Like Switch, Market, Frequency Band, SID, NID, TPTLO, CBTH, PAGEG, SYNG, PILOTG, PERPOWER, MPTTR 2. Tilt Audit (initially we need to Set according to the design tilt) 3. NOA Tag Audit (Initially whenever the site integrates, there is NOA tag with it in CACP, then after Approval of sprint, sites need to be launched and launched sites shouldn’t have NOA tag in CACP. ) 4. Non Approved on Air Audit (if the cluster is not approved by sprint then all the sites in that clusters Should be wilted i.e. not taking traffic) 5. Data fill in CACP. 6. As per integrated sites status (if the sites more than 95% integrated) need to send the cluster for the Approval of Sprint. 7. If the cluster is approved, need to make the cluster alarm free to launch the cluster. Need to provide the list of sites lying in the approved cluster to the NIC to check the alarms. 8. NIC will revert the updated report for the cluster and after looking into the alarms provided by the NIC; we need to raise the tickets in ERTT and takes follow up and track daily the status of ERTT. 9. Need to create logical neighbors in CACP 10. Need to check neighbor in CACP. 11. MMTA & HHO (Hard Handover) 12. Need to check the hardware from NIC.(If any issue persisting need to raise the ERTT ticket). 13. Daily need to plot the integrated sites on the MapInfo to check the current scenario. 14. Database should need to update without any fail. Post Process:- 1. Need to work on Top offenders of the cluster (Top offender is decided on basis of drop raw count) 2. NLTA (NEWTUN RUN), By NEWTUN we can check swap sector and coverage hole, PN overshoot sectors etc. 3. ACO/PCO for CDMA 800MHz & Rx Delta check LTE 800MHz: - PRE & POST Process • Currently working on optimizing Data networks for LTE • Working on recommending optimization changes by analysis of coverage, pilot pollution for LTE. • Analyzed data on problem areas such as call drops, and call set up failure.
  • 3. • Understanding of the Access Technologies LTE air interface • LTE Basic Call flow, mobile operations, Ability to use Network Performance tools • Responsible for improving LTE network KPIs like Retainability / Accessibility etc. • Perform Parameter tuning for network optimization • Undertake neighbor optimization activities for network performance improvement (KPIs) and optimization tasks • Experienced with performing LTE new site ATP. Previous Experience in Ericsson India Global services Designation : Engineer Engineering Project : Sprint Nextel Corporation (Vendor Lucent) Location : Noida (India) Worked on Sprint project for EVDO & 3G1X (CDMA) on 1900MHz planning &optimization • Providing an excellent customer experience, by anticipating and resolving customer issues in a manner that exceeds the customer expectations. • Communicating regularly with the customer to evaluate satisfaction and proactively identify upcoming Needs. • Coordinating with product teams to meet customer needs, while managing customer expectations to Prevent overload or missed deadlines. • Analyzing SLA and KPI on a regular basis to raise issues proactively and getting them corrected. • Neighbor List tuning by generating periodic Homax and MapInfo for new and existing sites. • Kpi’s improvement through search window optimization & various Lucent forms like OMCR-RAN, OMP SHELL, ECP, CELL2, FCI, GUI, BTSEQP, CDHFL, CDHNL & CEQFACE • Identification of correct handoff targets for sites on all major & secondary traffic. • Monitoring KPI’s and Performance analysis by % block call, %Call drop, soft handoff, hard handoff, semi-soft handoff (Target & Request), Peak TCE, Carrier MOU, cell CE blocking etc. • Responsible for Pre & Post Optimization by verify the factors like-RxThroughput, TX Throughput, DRC, SINR, Interference, Pilot Pollution, fringe sector etc. • Report analyses for kpi’s improvement are Distance banding report, Translation report, Trending Report, RF SM report. • Working on Daily SLA Report to meet the KPI of the Existing network. • Analysis of sites due to CEs, Packet Pipes and Walsh code blocks etc. • Report analyses i.e., T1 ADD/REMOVAL, CARRIER ADD/REMOVAL & CEs CARD • ADD/REMOVAL for kpi’s Improvement by using deployment tracker, translation report, trending report etc. • Working on ACO & PCO to meet threshold value of network i.e. ACO is less than 20% and PCO is less than 72%. Ericsson Training • Training(1 month) on 3G1X CDMA containing single carrier optimization & multicarrier optimization, RTD & DBOT concept, CDHFL & CDHNL tuning, neighbors list & combined neighbor list concept.(Mr. Telex by sprint trainer) • Training on LTE Basic Call flow, mobile operations, Ability to use Network Performance tools,
  • 4. Understanding of the Access Technologies LTE air interface. • Training (1 month) on CDMA & EVDO & multicarrier optimization, IFHO Concept (Mr. Anirban Ghosh by sprint trainer). • Fluency & Expression training duration 2 weeks (Mrs. Vandana by Evolv trainer ) Achievements • Got ACE award for meeting the majority KPI’s of the network for my market. • Got POWER award for taking initiatives, doing Zone Splitting & Rezoning and also for handling customer complaints in real time. • Cleared TOEIC similar to TOFEL. Tools Used  Citrix tool • Tems Discovery, Neat Pass tool, Site handler, ACTIX, Netwatch Live, Reveal, Falcon, Ntac mobility, Rop filter, RCV log filter, DO-NL, iTune-NL, Cockpit optimization tool. • Windcatcher, Vertex tool, and Flux evdo. • MapInfo 6.5, 7.5, 8.5, 10.0, MapWindow GIS, Quantum GIS 1.0, Google earth. B) RF Engineer – Prithvi Information Solutions Ltd January 2008 to March 2010 Designation : RF Engineer (Optimizer) Project : Reliance EVDO Location : Gurgaon Job Profile • Worked on ALU (EVDO) in Delhi as Analyzer & optimizer. • Co-ordinate the drive test team • Analysis of Drive Test log files using ACTIX Post Processing Tool to resolve the problem. • Neighbor List tuning by generating periodic Homx and MapInfo for new and existing sites. • KPI improvement through various Lucent forms like FCI, GUI, and CEQFACE. • Identification of correct Handover Targets for sites on all major & secondary traffic. • Monitoring KPI and Performance analysis by Call drop, soft handoff, CSSR etc. • Verify network performance factors like site locations, antenna heights, azimuths, antenna Tilts (MT&ET) • Responsible for Pre & Post Optimization by verify the factors like-RxThroughput, TX Throughput, DRC, SINR, Interference, Pilot Pollution etc. • Preparations of cluster reports and plot based on cluster acceptance signoff with Reliance customer. Tools Used • ACTIX(Spotlight) • LDAT 3G1X • MAPINFO PROFESSIONAL 6.5,7.5,8.5,10.0
  • 5. • AGILENT E6474A nitro 9.3,12.1,14.0 • NET TERM & GUI Previous Employer C) RF Engineer – Aircom International India LTD. June 2007 to December 2008 Designation : RF Engineer Project -1 : Worked on Alcatel-Lucent 600 new sites project for Reliance Communications carried out In Rajasthan and 200 new sites in Maharashtra. Job Profile • Drive test on Agilent E6474A version nitro 9.3 & Tems investigation 8.1 and physical optimization. • Solving RF problems through Physical optimization of network according to coverage and capacity requirement. • Monitoring KPI and Performance analysis by Call drop, HOSR, CSSR. Etc. • Responsible for Pre & Post Optimization and verify network performance factors like- Rx level, TX level, FER, EcIo, Interference, Pilot Pollution etc. • Processing of data collected from sites on LDAT4.11.030. • ECP Form updating (FCI) • Verify network performance factors like site locations, antenna heights, azimuths, antenna Tilts (MT&ET) • Able to relate problems faced by subscribers to RF optimization. • Done VSWR by site master. Relevant Tools and Software proficiency: Design Tool: MapInfo 7.5, 8.5, 10.0 Post Processing Tool: MAPINFO 7.5, LDAT 3G CDMA.Actix Drive Testing Tool: Agilent Nitro9.3 12.1, Tems6.1, Neptune. Other Tools: VSWR meter (Anritsu & Bird), & GPS Software/OS: windows 2000/XP and office 2000/XP Relevant Tools and Software Proficiency Design Tool : MapInfo Version 6.5, 8.5, RL Tool, Google earth Post Processing Tool : Global Mapper8, MAPINFO 7.5, LDAT 3G CDMA, MIPT Drive Testing Tool : Agilent Nitro 9.3, 12.0, 12.1, Tems Investigation 6.1 Other Tools : VSWR meter (Anritsu & Bird), & GPS Software/OS : C & C++, Dos, Windows XP Packages : Excel, power point, word Training and Workshop
  • 6. • One month training on GSM & CDMA at Infinite softcom solution (ISS), Gurgaon • Done Drive test for TTSL in Rajasthan, Madhya Pradesh, and Gujrat. Professional Qualification • B.Tech in Electronics with First Division from Bhagwant Institute of Technology, Muzaffarnagar Affiliated to U.P.Technical University, Lucknow (U.P). Personal Information Father’s Name : Shri Dwarika Prasad Date of Birth : 25th Dec 1984 Marital Status : Married Languages Know : English and Hindi Nationality : Indian Permanent address : R-Z-A/150 Dabri Extension (EAST) New Delhi-45 Date: (Brijmani Kumar)
  • 7. • One month training on GSM & CDMA at Infinite softcom solution (ISS), Gurgaon • Done Drive test for TTSL in Rajasthan, Madhya Pradesh, and Gujrat. Professional Qualification • B.Tech in Electronics with First Division from Bhagwant Institute of Technology, Muzaffarnagar Affiliated to U.P.Technical University, Lucknow (U.P). Personal Information Father’s Name : Shri Dwarika Prasad Date of Birth : 25th Dec 1984 Marital Status : Married Languages Know : English and Hindi Nationality : Indian Permanent address : R-Z-A/150 Dabri Extension (EAST) New Delhi-45 Date: (Brijmani Kumar)