NodeB Name Anguruwathota
Site Code WB-KLT-2106
Date of Swap [date]
Date of Submission [date]
Signature
Prepared by (sierra) Checked by (ZTE) Approved by (Etisalat)
Orasa Jerananthan [name]
2. UMTS2100 SWAP SITE SSV REPORT
i
ZTE Confidential Proprietary © 2016 ZTE CORPORATION. All rights reserved.
TABLE OF CONTENTS
1 EXECUTIVE SUMMARY ...................................................................................................................1
2 GENERAL INFORMATION................................................................................................................2
2.1 SITE INFORMATION.......................................................................................................................2
2.2 RADIO/LOGICAL DESIGN CHECK .....................................................................................................2
2.3 LOG FILES ..................................................................................................................................2
2.4 COMMENTS .................................................................................................................................2
2.5 SITE LOCATION............................................................................................................................3
2.6 TEST ITEMS.................................................................................................................................3
3 RADIO SERVICES CHECK ...............................................................................................................4
4 ANALYSIS PLOTS ...........................................................................................................................5
4.1 VOICE LONG CALL RSCP PLOT .....................................................................................................5
4.2 VOICE LONG CALL EC/IO PLOT.......................................................................................................6
4.3 PSC PLOT (BAND LOCK)...............................................................................................................7
4.4 VOICE SHORT CALL RSCP + RXLEV_SUB PLOT...............................................................................8
4.5 EVENTS PLOT (CALL DROP/HO FAILURES).......................................................................................9
4.6 PSC LOCKED RSCP PLOT (IDLE).................................................................................................10
4.7 PSC LOCKED BEST SERVING CELLS (IDLE)....................................................................................11
4.8 HSDPA THROUGHPUT PLOT .......................................................................................................12
4.9 HSUPA THROUGHPUT PLOT .......................................................................................................13
4.10 UE TX POWER PLOT..................................................................................................................14
5 DT KPI SUMMARY .........................................................................................................................15
6 KPI VALUES ..................................................................................................................................16
7 SUMMARY OF KPI COMPARISON .................................................................................................18
8 RESULTS ANALYSIS .....................................................................................................................19
9 CONCLUSION................................................................................................................................19
3. UMTS2100 SWAP SITE SSV REPORT
1
ZTE Confidential Proprietary © 2016 ZTE CORPORATION. All rights reserved.
1 EXECUTIVE SUMMARY
This document has been designed to capture all tests to be conducted along
with the corresponding test results which are required to confirm the site
performance of all swapped 3G sites.
CRITERIA ON DRIVE TEST
A drive test system is set up to evaluate statistical call data. Drive test will be
terminated at the point of detection or handover to the second tier neighbor
cells. Events should be included in the drive test plots.
a) Idle mode drive test should performed by locking to the site’s Primary
Scrambling Code.
b) Dedicated mode drive test should be performed for both short (Dual
mode) and long (3G only) calls using mobiles.
c) HSDPA data session drive test should be performed using dongles.
d) Pre and Post Drive Tests should be performed using the same
mobiles and dongles for both tests.
e) Phone models / Dongle models / Local server used for throughput
testing should be shared with the Purchaser prior to carrying out the
testing.
EQUIPMENT
TEMS version which used for drive test should be compatible with TEMS
Investigation 15.1
4. UMTS2100 SWAP SITE SSV REPORT
2
ZTE Confidential Proprietary © 2016 ZTE CORPORATION. All rights reserved.
2 GENERAL INFORMATION
2.1 Site Information
Site Name Anguruwathota Cluster Cluster 14
Site Code WB-KLT-2106 City/Region Kaluthara
Drive Test Date pre:28/01/16 – post: Date of Analysis
Drive Test Team Analysis Team
RNO Date of Approval
2.2 Radio/Logical Design Check
Sector 1 Sector 2 Sector 3
Planned Actual Planned Actual Planned Actual
PSC 227 235 219
Azimuth 20 120 270
Tilt N/A N/A N/A
LAC N/A N/A N/A
RAC N/A N/A N/A
Height 48 48 48
Alarms
2.3 Log Files
2.4 Comments
5. UMTS2100 SWAP SITE SSV REPORT
3
ZTE Confidential Proprietary © 2016 ZTE CORPORATION. All rights reserved.
2.5 Site Location
2.6 Test Items
Categories Test Item Evaluation Object
Idle Mode
RSCP cell
SINR cell
Voice Long Call
RSCP cell
Ec/Io cell
Handover Success Rate cell
Voice Short Call
RSCP/RxLev cell
Ec/Io cell
Call Setup Success Rate cell
Call Drop Rate cell
Data Call
Average HSDPA Throughput cell
Average HSUPA Throughput cell
6. UMTS2100 SWAP SITE SSV REPORT
4
ZTE Confidential Proprietary © 2016 ZTE CORPORATION. All rights reserved.
3 RADIO SERVICES CHECK
No. Activity/Process cell 1 cell 2 cell 3 Result Remarks
1 Check LA update procedure
2
Check Cell reselection from 3G
to 2G
3
Check Planned Cell selection
and reselection parameters
4
Check Planned neighbor list and
parameters
5
Check Cell reselection from 2G
to 3G
6 Check MO-SMS and MT-SMS
7
Confirm CPICH_RSCP > -70
dBm is within 200m from site
8
Check CPICH_EcIo > -8 dB is
within 200m from site
9
Check MT-Calls and MO-Calls
for voice services.
10
Check MT-Calls and MO-Calls
for video calls.
11 Check quality of video calls.
12 Check PS attach
13 Check PS detach
14
Check PS PDP activation and
deactivation is checked
15
Check PS quality with respect to
speed of downlink
16 Check RA update procedure
17
Check Soft/Hard handover for
voice services to and from the
3G cells
18
Check Soft/Hard handover for
video calls to and from the 3G
cells
19
Check Soft/Hard handover for
PS service to and from the 3G
cells checked
20
Check Inter-system handover for
voice/PS service to the 2G cells
21
Carry out Antenna Swapping
Test
7. UMTS2100 SWAP SITE SSV REPORT
5
ZTE Confidential Proprietary © 2016 ZTE CORPORATION. All rights reserved.
4 ANALYSIS PLOTS
4.1 Voice Long Call RSCP Plot
pre-swap
post-swap
8. UMTS2100 SWAP SITE SSV REPORT
6
ZTE Confidential Proprietary © 2016 ZTE CORPORATION. All rights reserved.
4.2 Voice Long Call Ec/Io Plot
pre-swap
post-swap
9. UMTS2100 SWAP SITE SSV REPORT
7
ZTE Confidential Proprietary © 2016 ZTE CORPORATION. All rights reserved.
4.3 PSC Plot (Band Lock)
pre-swap
post-swap
10. UMTS2100 SWAP SITE SSV REPORT
8
ZTE Confidential Proprietary © 2016 ZTE CORPORATION. All rights reserved.
4.4 Voice Short Call RSCP + RxLev_Sub Plot
pre-swap
post-swap
11. UMTS2100 SWAP SITE SSV REPORT
9
ZTE Confidential Proprietary © 2016 ZTE CORPORATION. All rights reserved.
4.5 Events Plot (Call Drop/HO failures)
pre-swap
post-swap
12. UMTS2100 SWAP SITE SSV REPORT
10
ZTE Confidential Proprietary © 2016 ZTE CORPORATION. All rights reserved.
4.6 PSC Locked RSCP Plot (Idle)
pre-swap
post-swap
13. UMTS2100 SWAP SITE SSV REPORT
11
ZTE Confidential Proprietary © 2016 ZTE CORPORATION. All rights reserved.
4.7 PSC Locked Best Serving Cells (Idle)
pre-swap
post-swap
14. UMTS2100 SWAP SITE SSV REPORT
12
ZTE Confidential Proprietary © 2016 ZTE CORPORATION. All rights reserved.
4.8 HSDPA Throughput Plot
pre-swap
post-swap
15. UMTS2100 SWAP SITE SSV REPORT
13
ZTE Confidential Proprietary © 2016 ZTE CORPORATION. All rights reserved.
4.9 HSUPA Throughput Plot
pre-swap
post-swap
16. UMTS2100 SWAP SITE SSV REPORT
14
ZTE Confidential Proprietary © 2016 ZTE CORPORATION. All rights reserved.
4.10 UE TX Power Plot
pre-swap
post-swap
17. UMTS2100 SWAP SITE SSV REPORT
15
ZTE Confidential Proprietary © 2016 ZTE CORPORATION. All rights reserved.
5 DT KPI Summary
KPI pre-swap post-swap Remark
Accessibility
Call Setup Success Rate
AMR Voice (3G) 98.79%
Retainability
Drop Call Rate
AMR Voice (3G) 2.4%
Mobility
Handover Success Rate
Soft Handover
Success Rate(Voice)
100%
HSDPA
Average HSDPA
Throughput
4456.66Kbps
18. UMTS2100 SWAP SITE SSV REPORT
16
ZTE Confidential Proprietary © 2016 ZTE CORPORATION. All rights reserved.
6 KPI VALUES
(BH = 2100h – 2200h)
(Weekly performance graphs should include performance of2 weeks including 1 week before the swap and 1 week
after the swap)
1. CS traffic/ (Erlang) – (Daily/BH)
Weeklyperformancegraphforall cells
2. PS traffic/ (MB) – (Daily/BH)
Weeklyperformancegraphforall cells
3. HSDPA DL Throughput/(kbps) - (Daily/BH)
Weeklyperformancegraphforall cells
4. HSUPA UL Throughput(kbps) –(Daily/BH)
Weeklyperformancegraphforall cells
5. RRC ConnectionSuccessRate(CS/PS) –(Daily/BH)
Weeklyperformancegraph forall cell
6. RRC Drop rate(CS/PS) - (Daily/BH)
Weeklyperformancegraphforall cell
7. RAB SetupSuccessRate(CS/PS)–(Daily/BH)
Weeklyperformancegraphforall cell
8. RAB Drop Rate(CS/PS) –(Daily/BH)
Weeklyperformancegraphforall cell
9. SoftHandoverSuccessRate – (Daily/BH)
Weeklyperformancegraphforall cell
10. Hard HandoverSuccessRate – (Daily/BH)
Weeklyperformancegraphforall cell
11. Inter-RATHandoverSuccessRate(CS/PS) –(Daily/BH)
Weeklyperformancegraphforall cells
12. HS-DSCH-> DCH HandoverSuccessRate – (Daily/BH)
Weeklyperformancegraphforall cells
13. DCH ->HSDSCH HandoverSuccessRate – (Daily/BH)
Weeklyperformancegraphforall cells
14. HS-DSCHService Cell Change SuccessRate –(Daily/BH)
Weeklyperformancegraphforall cells
15. FrameLoss(Iub) –(Daily/BH)
Weeklyperformancegraphforall cells
16. BLER(Cell) –(Daily/BH)
Weeklyperformancegraphforall cells
17. DelayBuiltup(Iub)–( Daily/BH)
Weeklyperformancegraphforall cells
18. RAB CongestionRate (CS/PS)–(Daily/BH)
Weeklyperformancegraphforall cells
19. Call successrate – (Daily/BH)
Weeklyperformancegraphforall cells
20. HSDPA Fallback – (Daily/BH)
Weeklyperformancegraphforall cells
19. UMTS2100 SWAP SITE SSV REPORT
17
ZTE Confidential Proprietary © 2016 ZTE CORPORATION. All rights reserved.
Sample Graph
0.00
0.50
1.00
1.50
2.00
Mo
Tu
We
Th
Fr
Sa
Su
Mo
Tu
We
Th
Fr
Sa
Su
Mo
Tu
We
Th
Fr
Sa
KUUDU1W KUUDU1X KUUDU1Y
CsTraffic/Erlang
Pre
Post
20. UMTS2100 SWAP SITE SSV REPORT
18
ZTE Confidential Proprietary © 2016 ZTE CORPORATION. All rights reserved.
7 SUMMARYOF KPI COMPARISON
Weekly average KPI Cell 1 Cell 2 Cell 3
F1 F2 F1 F2 F1 F2
CS traffic / (Erlang)
PS traffic / (MB)
HSDPA DL Throughput / (kbps)
HSDPA UL Throughput / (kbps)
RRC Connection Success Rate (CS)
RRC Connection Success Rate(PS)
RRC Drop rate(CS)
RRC Drop rate(PS)
RAB Setup Success Rate(CS)
RAB Setup Success Rate(PS)
RAB Drop Rate(CS)
RAB Drop Rate(PS)
Soft Handover Success Rate
Hard Handover Success Rate
Inter-RAT Handover Success Rate(CS)
Inter-RAT Handover Success Rate(PS)
DCH ->HSDSCH Handover Success
Rate
HSDSCH ->DCH Handover Success
Rate
Frameloss(%)(Iub)
BLER(%)(Cell)
Delaybuiltup(%)(Iub)
HSDPA Fall Back(%)
RAB Congestion Rate (CS)
RAB Congestion Rate (PS)
CSR(%)
21. UMTS2100 SWAP SITE SSV REPORT
19
ZTE Confidential Proprietary © 2016 ZTE CORPORATION. All rights reserved.
8 RESULTS ANALYSIS
Any configuration changes done
Any hardware changes done
9 CONCLUSION
Suggestions for further improvements