SlideShare a Scribd company logo
Sushil Kumar Kushwaha
Sundarpur, Kora -Jahanabad
Fatehpur U.P, Pin Code-212659,India, E-MAIL: sus_ish100@yahoo.com/sushil.kumar.kushwaha@ericsson.com
Phone Number: +91-9873157135 (India)
+91-9717955452 (india)
CURRICULUM VITAE
Experience Summary
• An Engineering graduate with 8 years of experience in experience in LTE, WCDMA and GSM Network
Deployment/Optimization.
• Having 3 Month onsite experience and worked with Customer AT&T USA for LTE Network Expansion and Optimsation
• Currently designated as Specialist- (Job Stage 6/Grade 5) with Ericsson India Global Services Pvt Ltd, Noida
• Possess strong skills in network optimization, testing of network parameters with latest available tools.
• Strong problem solving/troubleshooting & Technical skills coupled with goal oriented decision making for enabling effective
solutions leading to high customer satisfaction & lower operational costs.
Professional Experience
Organization: Ericsson India Global Services Private Limited
Designation: Specialist , June-2011 to Till Date.
LTE Project, AT&T USA: (Oct 2012 to till date)
• Carrying out SSD (Site Shakedown) of new site coming in the pre launch market.
• Cluster optimization Pre and Post Launch Cluster Analysis in terms of % time on LTE, Accessibility,
Retainability, SINR, Throughput, RSRP Analysis, Mobility and Integrity for ATT LTE Project .
• Optimization of New sites (SSV –Single Site Verification) that are rolled out in the Launched Market.
Functioning test for PCI, TX1/TX2 PATH IMBALANCE, SINR, RSRP, MCS UPLINK & DOWNLINK,
DOWNLOAD & UPLOAD test for UDP, TCP for Macro sites.
• Responsible for Layer 3 and UETR Analysis for trouble shooting problems (Access failure, RRC drops and handover
failures).
• Carried out Post Launch Activities which involved Troubleshooting worst offender cells for Accessibility (RRC
connection, S1 signalling success, E-RAB establishment), Retain-ability (drop on MME or E-NodeB
Functionality, Mobility (Inter Frequency, Intra Frequency & IRAT) and Integrity (TCP/UDP Throughput).
• Responsible for Parametric changes(A2/A3 offset, Hysteresis, Time to Trigger, qRxLevMin, pZeroNominalPusch,
pZeroNominalPucch, sIntraSearch and sNonIntraSearch) and physical change (Tilt) for optimizing RSRP, SINR etc.
• Responsible for CSFB and IRAT, IFHO analysis and Recommendations.
• To give a weekly check over on GLOBAL & LOCAL parameters and remove the discrepancies to optimize
network performance.
WCDMA Project, AT&T USA: (Aug 2011- Sep 2012)
• Analyzing RF Drive Test generated through log files .
• Post processing of data, Plotting RSCP and Ec/Io Information for overall picture of the driven area using Actix.
• Pilot Pollution analysis, down tilting sites, Missing Neighbor Analysis, Handover and Coverage Optimization and also
check HSDPA/HSUPA throughput.
• Neighbor list optimization between 3G and 2G cell, and between HSDPA and R99 cells and fine tuning to avoid ping
pong handover (CS+PS).
Plan and fine tune the orientation and down tilt of antenna to ensure proper signal distribution (reasonably good RSCP,
Ec/lo, overshoot control non-dominant pilot region control) and eliminate rapid signal change condition in the target
area.
• Coordinating DT Team , Check out all of the single sites functions issue and provide SSV report that showing RSCP,
Ec/No and Handovers on plots.
Organization: Sasken Network Engineering Ltd ,Bangalore
Designation: Sr. RF Engineer from Oct-2010 to May-2011
Job Profile – GSM and WCDMA Network Optimisation
WCDMA Project Aircel –Huawei Bangalore
• Analyzing RF Drive Test generated through log files .
• Post processing of data, Plotting RSCP and Ec/Io Information for overall picture of the driven area through Huawei post
processing tool Genex assistant 2.3
• Pilot Pollution analysis, down tilting sites, Missing Neighbor Analysis, Handover and Coverage Optimization and also
check HSDPA/HSUPA throughput.
• Neighbor list optimization between 3G and 2G cell, and between HSDPA and R99 cells and fine tuning to avoid ping
pong handover (CS+PS).
Plan and fine tune the orientation and down tilt of antenna to ensure proper signal distribution (reasonably good RSCP,
Ec/lo, overshoot control non-dominant pilot region control) and eliminate rapid signal change condition in the target
area.
• Coordinating DT Team , Check out all of the single sites functions issue and provide SSV report that showing RSCP,
Ec/No and Handovers on plots.
GSM Project- SFR- Franch with NSN Global Chennai:-
• Closely monitoring the Accessibility, Retainability & mobility KPI’s of the designated Cluster’s.
• Performing periodic Consistency checks and audit’s on the Parameter’s to make sure they are aligned with the design and
agreed strategies.
• Monitor Daily and Hourly Statistics to figure out the cells that are performing bad and in turn that are contributing towards
the KPI’s degradation.
• Doing in-depth analysis on the worst performing cells to find the root cause of the problem and to propose and make
changes physically or Parameter level for getting those cells to perform back normally.
• Performing the Analysis using statistics to know the root cause of the problem’s or degradation on the KPI’s.
Well versed with most of the Counter’s and Formulas used for reporting the statistics .
Organization: Integrated Wireless Solution (IWS)
Designation: Radio Network Optimiser. Nov-2009 to Sep-2010
GSM Project- Loop- ZTE Motorolla swap project , Mumbai
Job Profile –
• Observation on Poor HOSR, Poor CSSR , High DCR & maintain KPI Benchmarks.
• Define proper RF parameters, Neighbour definition using Netnumen & ISMG .
• Verify Planned parameters with BSC dump parameters & retuning parameters as per healthy network requirement.
• Verify Inter BSC handover & rectify problem related to handover .
• Retuning of Neighbour & Frequencies -
• Deleting Unnecessary Neighbour, Adding required Neighbour as per Handover definition.
• Making Unidirectional Neighbour to Bidirectional Neighbour.
• Remove CO-BCCH & CO-BSIC .
• Change BCCH & BSIC as per C/I & C/A analysis.
• Frequency Planning ( Fixed and Hopping) LAC Planning and BSC Planning for New sites, Swap sites• Planning of BSIC, MAIO,
HSN and Neighbors for new coming sites and swap sites as well as deletion and addition of neighbors for existing sites as
per requirement.
• Daily network health monitoring and accordingly taking actions based on key performance indicator parameters to meet
the network benchmarks.
Organization: Nokia Siemens Network India Pvt Ltd. Lucknow.
Designation: RF Cluster Engineer, Sep 2008 –Oct 2009
GSM project- Vodafone , Gorakhpur and Varanasi
Job Profile –
• Optimizing RF related parameters such as BCCH, BSIC and Freq. retuning by analyzing Drive logs and site data.
• Defining missing neighbor relations, Proposing new sites or sector additions with before & After coverage plots,
Proposing antenna azimuth changes, Proposing antenna tilt changes, Proposing antenna type changes, BTS Equipments
change, Re-tuning of interfered frequencies
• Suggesting the changes to be made in the site such as Tilt, Reorientation of antenna.
• Handing C/I, C/A, coverage, call handover, call drop, Rx Quality, SQI, etc.
• Analyzing RF Drive Test generated through log files and verifying & testing of hardware upgrades and new elements
added to the network & keep track of all the up gradation activities.
• Post processing of data, Plotting RX Level and Quality Information.
• Performance analysis of stats/KPIs for drop calls, congestion, TCH & SD assignment failures, handover failures, poor call
success rate and problems resolution using the OMC and daily Reports for New sites.
• Frequency Planning, BCCH retuning, for new and existing sites.
• Analyzing and troubleshooting the worst performing cells .
• Analyzing inconsistency of HOs for proper HOs in network and alarm .
• Report Generation of the pre drive - This included taking out Drive plots of both RX Lev and RX Qual and also
analyzing the NQIs AND KPIs in graphical form.
• Analysis Network problems like Poor Coverage Patches, Interference, call drops, hand over Issues.
• Responsible for new site planning on basis of coverage or capacity site requirement.
• Interface with Customer- Handling all customers related issues (top management).
• New site I.P planning.
• Analysis of drive test logs to resolve the coverage, call drop related problems.
Roll in Drive Test Team:
• Responsible for Drive test of new sites.
• Responsible for conduction of Drive test for the area, which is affected by bad quality, interference and hand over
failures with the coordination of RF team.
• Analysis of Log files on TEMS and Mapinfo.
• Frequency Planning & Handover Definitions.
• Network-Optimization by drive tests, antenna tilts, antenna orientation changes and tuning the Cell-RF
Parameters.
• Drive Test Log Files Analysis.
• Attending Customer Complaints.
• Drive test for testing of new sites & swapped sites, busy hour city drive & for changes in Network.
• Antenna type verifications for antenna types, tilts, azimuths, verification of jumpers and feeders.
• Handling of interference issues by change of frequency, Antenna configuration, parameter of site and neighbouring
sites, parameter adjustments and fine tuning for functioning of the networks at optimum levels.
Organization: Telecomone Teleservices India Pvt Ltd Bangalore
Designation: RF Engineer, Nov 2007 –Sep 2008
GSM project- IMIL Project, Tamilnadu , Kerala and Karnataka Circle
GSM project- Airtel, Trivendram ,Kerla
GSM Project – Relaince, Calicut , Kerla Circle
• Done RF Drive Test in DEDICATED/IDLE mode along with SHORT & LONG CALLS.
• Site Audit and performing study for antenna position,Beamwidth and tilt to meet with desired coverage with minimum
predicted interference and re-engineering.
• Analyzing the log files for signal strength, interference, coverage lacking, handover & Decision improvement.
• Site Survey.
• From given tentative location finding out the exact position of the site which can serve.
• The objective to expand the capacity and coverage of existing Network.
• Done hot spot collection, nominal selection. Decide the azimuth and height and tilt given.
• Depending on the available Line of Sight as well as the capacity in terms of E1 on the same and Height of the Microwave
Link antenna by considering the Fresnel Zone and Maximum obstruction between two sites.
• Checking for obstacle details that may obstruct the transmission path of MW link as planned.
• Extraction of AMSL values from Global Mapper.
• On field obstacle heights collection of transmission path of PTP mw link
• Path profile generation and verification for the PTP MW links using Pathloss4.0
• Proposing the optimum height of antenna keeping in view the height of obstacles and Clearance criteria.
• Generation and submission of LOS Survey reports.
• Giving Feasibility of Customer Request, Coordinating survey teams, Preparation Survey reports, maintaining data of
Reports.
• RF Nominal site planning.
• Design Antenna heights for RF Coverage and Orientation.
• Capacity & Coverage Sites.
Organization: Nutek (I) India Ltd
Designation: RF Engineer, Feb 2007 – Nov 2007
GSM project- BSNL Project, U.P. East
• Site Survey.
• From given tentative location finding out the exact position of the site which can serve.
• The objective to expand the capacity and coverage of existing Network.
• Done hot spot collection, nominal selection. Decide the azimuth and height and tilt given.
• Depending on the available Line of Sight as well as the capacity in terms of E1 on the same and Height of the Microwave
Link antenna by considering the Fresnel Zone and Maximum obstruction between two sites.
• Checking for obstacle details that may obstruct the transmission path of MW link as planned.
• Extraction of AMSL values from Global Mapper.
• On field obstacle heights collection of transmission path of PTP mw link
• Path profile generation and verification for the PTP MW links using Pathloss4.0
• Proposing the optimum height of antenna keeping in view the height of obstacles and Clearance criteria.
• Generation and submission of RF and LOS Survey reports.
• Giving Feasibility of Customer Request, Coordinating survey teams, Preparation Survey reports, maintaining data of
Reports.
• RF Nominal site planning.
Specialized Training/Ericsson Certification/Appreciations
• LTE Air Interface
• LTE Network Functionality
• LTE Performance Management & Optimization (PMO)
• WCDMA Functionality-Ericsson.
• WCDMA Air Interface (Ericsson system).
• WCDMA System Overview – Ericsson.
• WCDMA Optimization (Ericsson system).
• Senior and Experienced BUGS Certificate
• Radio Network Optimization (RNO) Certificate
• Radio Network Design (RND) Certificate
• Radio Network Associate (RAN) Certificate
• IP Networking (IPN) Certificate
• AT &T Customer appreciation Certifiacte
• Performer of the Month
Technical Competencies/skills
Drive Test &
Analysis Tool
Actix ,TEMS-Discovery ,ITK, OSS, ERTT, MAPINFO, X-Nethealing, MCOM, TEMS Investigation,
GENEX PROBE 1.5,NETNUMEN, ISMG, GENEX ASSISTANCE, PATH LOSS 4.0, MAP SOURCE, RL
TOOL.
Performance
Analysis Tool
ERTT, ITK ,NETNUMEN, ISMG
Equipment
vendors
ERICSSON , NSN, ZTE, Huawei
Academic Qualification
Technical Qualifications :
Degree - B.E. in Computer Science Engineering
Institute - United college Of Engineering & Research , Allahabad.
University - U.P.T.U University.
Year of Passing - 2006
Percentage of marks - 66.5 %
Academic Qualifications :
Intermediate (1999) from U.P Board, DEENDAYAL UPADHAYA NAWABGANJ,KANPUR 68.3%
Highschool (1997) From U.P Board, DEENDAYAL UPADHAYA NAWABGANJ,KANPUR 67.5%
Personal Details
• Father’s Name : Mr. Santosh Kumar Kushwaha .
• Date of Birth : 22 Dec 1981
• Sex : Male
• Marital Status : Married
• Nationality : Indian
• Languages Known : English, Hindi
• Passport. : Yes
• Passport. : Yes

More Related Content

What's hot

Afsar_CW FTTH & OSP Senior Engineer-Resume
Afsar_CW  FTTH & OSP Senior Engineer-ResumeAfsar_CW  FTTH & OSP Senior Engineer-Resume
Afsar_CW FTTH & OSP Senior Engineer-ResumeKhaja Afsar Mohiuddin
 
Resume mohammad sharifur rahman 15+ years experience huawei telecommunication
Resume mohammad sharifur rahman 15+ years experience   huawei telecommunicationResume mohammad sharifur rahman 15+ years experience   huawei telecommunication
Resume mohammad sharifur rahman 15+ years experience huawei telecommunication
Sharifur Rahman
 
RAMAKANTA SAHOO Resume
RAMAKANTA SAHOO ResumeRAMAKANTA SAHOO Resume
RAMAKANTA SAHOO Resumerksahoo14
 
Resume - MOSTAFA SAYED (C.V)
Resume - MOSTAFA SAYED (C.V)Resume - MOSTAFA SAYED (C.V)
Resume - MOSTAFA SAYED (C.V)Mostafa Sayed
 
CV For OSP Planning & Design-Kumaran
CV For OSP Planning & Design-KumaranCV For OSP Planning & Design-Kumaran
CV For OSP Planning & Design-Kumarankumaraguru paran
 
Quantity Surveyor CV
Quantity  Surveyor CVQuantity  Surveyor CV
Quantity Surveyor CVvasant koli
 
Civil engineer Resume 24.2.16
Civil engineer Resume  24.2.16Civil engineer Resume  24.2.16
Civil engineer Resume 24.2.16Udhaya Kumar
 
CV for AutoCAD Draftsman ( civil & Arch.)
CV for AutoCAD Draftsman ( civil & Arch.)CV for AutoCAD Draftsman ( civil & Arch.)
CV for AutoCAD Draftsman ( civil & Arch.)Murshid Alam
 
Tanveer iqbal mohammad_cv
Tanveer iqbal mohammad_cv Tanveer iqbal mohammad_cv
Tanveer iqbal mohammad_cv
Tanveer Iqbal Awan
 
The Impact of 5G Network on edotco
The Impact of 5G Network on edotcoThe Impact of 5G Network on edotco
The Impact of 5G Network on edotco
MyNOG
 
Aslam fahmi cv
Aslam fahmi cvAslam fahmi cv
Aslam fahmi cv
Aslam Fahmi
 
Resume offshore field engineer
Resume offshore field engineerResume offshore field engineer
Resume offshore field engineer
andi dipayadnya
 

What's hot (20)

Telecom Resume
Telecom ResumeTelecom Resume
Telecom Resume
 
Afsar_CW FTTH & OSP Senior Engineer-Resume
Afsar_CW  FTTH & OSP Senior Engineer-ResumeAfsar_CW  FTTH & OSP Senior Engineer-Resume
Afsar_CW FTTH & OSP Senior Engineer-Resume
 
Resume mohammad sharifur rahman 15+ years experience huawei telecommunication
Resume mohammad sharifur rahman 15+ years experience   huawei telecommunicationResume mohammad sharifur rahman 15+ years experience   huawei telecommunication
Resume mohammad sharifur rahman 15+ years experience huawei telecommunication
 
RAMAKANTA SAHOO Resume
RAMAKANTA SAHOO ResumeRAMAKANTA SAHOO Resume
RAMAKANTA SAHOO Resume
 
Resume - MOSTAFA SAYED (C.V)
Resume - MOSTAFA SAYED (C.V)Resume - MOSTAFA SAYED (C.V)
Resume - MOSTAFA SAYED (C.V)
 
CV For OSP Planning & Design-Kumaran
CV For OSP Planning & Design-KumaranCV For OSP Planning & Design-Kumaran
CV For OSP Planning & Design-Kumaran
 
CV_Sukumar
CV_SukumarCV_Sukumar
CV_Sukumar
 
Quantity Surveyor CV
Quantity  Surveyor CVQuantity  Surveyor CV
Quantity Surveyor CV
 
MOHAN M&E SUPERVISOR CV
MOHAN M&E SUPERVISOR CVMOHAN M&E SUPERVISOR CV
MOHAN M&E SUPERVISOR CV
 
CV Civil
CV CivilCV Civil
CV Civil
 
Civil engineer Resume 24.2.16
Civil engineer Resume  24.2.16Civil engineer Resume  24.2.16
Civil engineer Resume 24.2.16
 
CV for AutoCAD Draftsman ( civil & Arch.)
CV for AutoCAD Draftsman ( civil & Arch.)CV for AutoCAD Draftsman ( civil & Arch.)
CV for AutoCAD Draftsman ( civil & Arch.)
 
CV Civil Eng..
CV Civil Eng..CV Civil Eng..
CV Civil Eng..
 
Tanveer iqbal mohammad_cv
Tanveer iqbal mohammad_cv Tanveer iqbal mohammad_cv
Tanveer iqbal mohammad_cv
 
CV..Bassam Abdul Gafoor
CV..Bassam Abdul GafoorCV..Bassam Abdul Gafoor
CV..Bassam Abdul Gafoor
 
The Impact of 5G Network on edotco
The Impact of 5G Network on edotcoThe Impact of 5G Network on edotco
The Impact of 5G Network on edotco
 
waseem akram jio resume
waseem akram jio resumewaseem akram jio resume
waseem akram jio resume
 
Iftekhar Civil Engineer CV
Iftekhar Civil Engineer CVIftekhar Civil Engineer CV
Iftekhar Civil Engineer CV
 
Aslam fahmi cv
Aslam fahmi cvAslam fahmi cv
Aslam fahmi cv
 
Resume offshore field engineer
Resume offshore field engineerResume offshore field engineer
Resume offshore field engineer
 

Viewers also liked

5 Challenges women may face in business and how to start to overcome them.
5 Challenges women may face in business and how to start to overcome them.5 Challenges women may face in business and how to start to overcome them.
5 Challenges women may face in business and how to start to overcome them.Claudia Ferreira
 
[Mas 500] Various Topics
[Mas 500] Various Topics[Mas 500] Various Topics
[Mas 500] Various Topicsrahulbot
 
Bloque 3 portada
Bloque 3 portadaBloque 3 portada
Bloque 3 portada
evanellysalazar
 
La leyendadeladamadelmediodia
La leyendadeladamadelmediodiaLa leyendadeladamadelmediodia
La leyendadeladamadelmediodia
FJavierPG
 
Se hacen tesis de pedagogía en ingles
Se hacen tesis de pedagogía en ingles Se hacen tesis de pedagogía en ingles
Se hacen tesis de pedagogía en ingles
bastiano1000
 
Athina_Kinsley_Recommendations
Athina_Kinsley_RecommendationsAthina_Kinsley_Recommendations
Athina_Kinsley_RecommendationsAthina Kinsley
 
13 11-26 construindo uma estrategia de big data para telecom - sas - luiz pires
13 11-26 construindo uma estrategia de big data para telecom - sas - luiz pires13 11-26 construindo uma estrategia de big data para telecom - sas - luiz pires
13 11-26 construindo uma estrategia de big data para telecom - sas - luiz piresCarvalho Comunicação
 

Viewers also liked (15)

La biblia
La bibliaLa biblia
La biblia
 
Excel trabajo
Excel trabajoExcel trabajo
Excel trabajo
 
5 Challenges women may face in business and how to start to overcome them.
5 Challenges women may face in business and how to start to overcome them.5 Challenges women may face in business and how to start to overcome them.
5 Challenges women may face in business and how to start to overcome them.
 
Tecnicas
TecnicasTecnicas
Tecnicas
 
[Mas 500] Various Topics
[Mas 500] Various Topics[Mas 500] Various Topics
[Mas 500] Various Topics
 
CLASSIFICACIÓ SERIE A
CLASSIFICACIÓ SERIE ACLASSIFICACIÓ SERIE A
CLASSIFICACIÓ SERIE A
 
Bloque 3 portada
Bloque 3 portadaBloque 3 portada
Bloque 3 portada
 
Analisis de la obra literaria
Analisis de la obra literariaAnalisis de la obra literaria
Analisis de la obra literaria
 
La leyendadeladamadelmediodia
La leyendadeladamadelmediodiaLa leyendadeladamadelmediodia
La leyendadeladamadelmediodia
 
Biografia de allison
Biografia  de  allisonBiografia  de  allison
Biografia de allison
 
Se hacen tesis de pedagogía en ingles
Se hacen tesis de pedagogía en ingles Se hacen tesis de pedagogía en ingles
Se hacen tesis de pedagogía en ingles
 
SukanyaCV_May2015
SukanyaCV_May2015SukanyaCV_May2015
SukanyaCV_May2015
 
Athina_Kinsley_Recommendations
Athina_Kinsley_RecommendationsAthina_Kinsley_Recommendations
Athina_Kinsley_Recommendations
 
Ggdf
GgdfGgdf
Ggdf
 
13 11-26 construindo uma estrategia de big data para telecom - sas - luiz pires
13 11-26 construindo uma estrategia de big data para telecom - sas - luiz pires13 11-26 construindo uma estrategia de big data para telecom - sas - luiz pires
13 11-26 construindo uma estrategia de big data para telecom - sas - luiz pires
 

Similar to Resume_Sushil Kumar Kushwaha

Resume Lelin Kumar singh
Resume Lelin Kumar singhResume Lelin Kumar singh
Resume Lelin Kumar singhlelin singh
 
Lemuelle L. Labadan_CV_2015
Lemuelle L. Labadan_CV_2015Lemuelle L. Labadan_CV_2015
Lemuelle L. Labadan_CV_2015Lemuelle Labadan
 
Pankaj Patel Resume
Pankaj Patel  ResumePankaj Patel  Resume
Pankaj Patel Resumepankaj patel
 
CV_MALIK MD NURANI.pdf
CV_MALIK MD NURANI.pdfCV_MALIK MD NURANI.pdf
CV_MALIK MD NURANI.pdf
Malik Md Nurani
 
Akhilesh Pandey_RF Optimization Eng
Akhilesh Pandey_RF Optimization EngAkhilesh Pandey_RF Optimization Eng
Akhilesh Pandey_RF Optimization EngAkhilesh Pandey
 
Lakshman Resume 3 years experience
Lakshman Resume 3 years experienceLakshman Resume 3 years experience
Lakshman Resume 3 years experiencelakshman vatada
 
Curriculam Vitea_Hisham Zahoor
Curriculam Vitea_Hisham ZahoorCurriculam Vitea_Hisham Zahoor
Curriculam Vitea_Hisham ZahoorHisham Zahoor
 
Deepk Resume Updated
Deepk Resume UpdatedDeepk Resume Updated
Deepk Resume UpdatedDeepak Yadav
 
Lakshman Resume 3 years experience
Lakshman Resume 3 years experienceLakshman Resume 3 years experience
Lakshman Resume 3 years experiencelakshman vatada
 
YILMA GIRMA 9-18-2015
YILMA GIRMA 9-18-2015YILMA GIRMA 9-18-2015
YILMA GIRMA 9-18-2015Girma Yilma
 
AJIT KUMAR SHARMA CV
AJIT KUMAR SHARMA CVAJIT KUMAR SHARMA CV
AJIT KUMAR SHARMA CVajit sharma
 

Similar to Resume_Sushil Kumar Kushwaha (20)

KHAJA iFTEKHAR UDDIN CV
KHAJA iFTEKHAR UDDIN CVKHAJA iFTEKHAR UDDIN CV
KHAJA iFTEKHAR UDDIN CV
 
Sandeep Sharma_CV
Sandeep Sharma_CVSandeep Sharma_CV
Sandeep Sharma_CV
 
Resume Lelin Kumar singh
Resume Lelin Kumar singhResume Lelin Kumar singh
Resume Lelin Kumar singh
 
Hadi Tohidlou-CV
Hadi Tohidlou-CVHadi Tohidlou-CV
Hadi Tohidlou-CV
 
Lemuelle L. Labadan_CV_2015
Lemuelle L. Labadan_CV_2015Lemuelle L. Labadan_CV_2015
Lemuelle L. Labadan_CV_2015
 
Pankaj Patel Resume
Pankaj Patel  ResumePankaj Patel  Resume
Pankaj Patel Resume
 
CV_MALIK MD NURANI.pdf
CV_MALIK MD NURANI.pdfCV_MALIK MD NURANI.pdf
CV_MALIK MD NURANI.pdf
 
Satisha Kumar_RF Engg(3G)_3.6 year
Satisha Kumar_RF Engg(3G)_3.6 yearSatisha Kumar_RF Engg(3G)_3.6 year
Satisha Kumar_RF Engg(3G)_3.6 year
 
Akhilesh Pandey_RF Optimization Eng
Akhilesh Pandey_RF Optimization EngAkhilesh Pandey_RF Optimization Eng
Akhilesh Pandey_RF Optimization Eng
 
CV_Satbir
CV_SatbirCV_Satbir
CV_Satbir
 
Harpreet Singh Resume
Harpreet Singh ResumeHarpreet Singh Resume
Harpreet Singh Resume
 
SKK RESUME (1)
SKK RESUME (1)SKK RESUME (1)
SKK RESUME (1)
 
Lakshman Resume 3 years experience
Lakshman Resume 3 years experienceLakshman Resume 3 years experience
Lakshman Resume 3 years experience
 
Curriculam Vitea_Hisham Zahoor
Curriculam Vitea_Hisham ZahoorCurriculam Vitea_Hisham Zahoor
Curriculam Vitea_Hisham Zahoor
 
Niraj (RF)
Niraj (RF)Niraj (RF)
Niraj (RF)
 
Deepk Resume Updated
Deepk Resume UpdatedDeepk Resume Updated
Deepk Resume Updated
 
Lakshman Resume 3 years experience
Lakshman Resume 3 years experienceLakshman Resume 3 years experience
Lakshman Resume 3 years experience
 
karunakar.u
karunakar.ukarunakar.u
karunakar.u
 
YILMA GIRMA 9-18-2015
YILMA GIRMA 9-18-2015YILMA GIRMA 9-18-2015
YILMA GIRMA 9-18-2015
 
AJIT KUMAR SHARMA CV
AJIT KUMAR SHARMA CVAJIT KUMAR SHARMA CV
AJIT KUMAR SHARMA CV
 

Resume_Sushil Kumar Kushwaha

  • 1. Sushil Kumar Kushwaha Sundarpur, Kora -Jahanabad Fatehpur U.P, Pin Code-212659,India, E-MAIL: sus_ish100@yahoo.com/sushil.kumar.kushwaha@ericsson.com Phone Number: +91-9873157135 (India) +91-9717955452 (india) CURRICULUM VITAE Experience Summary • An Engineering graduate with 8 years of experience in experience in LTE, WCDMA and GSM Network Deployment/Optimization. • Having 3 Month onsite experience and worked with Customer AT&T USA for LTE Network Expansion and Optimsation • Currently designated as Specialist- (Job Stage 6/Grade 5) with Ericsson India Global Services Pvt Ltd, Noida • Possess strong skills in network optimization, testing of network parameters with latest available tools. • Strong problem solving/troubleshooting & Technical skills coupled with goal oriented decision making for enabling effective solutions leading to high customer satisfaction & lower operational costs. Professional Experience Organization: Ericsson India Global Services Private Limited Designation: Specialist , June-2011 to Till Date. LTE Project, AT&T USA: (Oct 2012 to till date) • Carrying out SSD (Site Shakedown) of new site coming in the pre launch market. • Cluster optimization Pre and Post Launch Cluster Analysis in terms of % time on LTE, Accessibility, Retainability, SINR, Throughput, RSRP Analysis, Mobility and Integrity for ATT LTE Project . • Optimization of New sites (SSV –Single Site Verification) that are rolled out in the Launched Market. Functioning test for PCI, TX1/TX2 PATH IMBALANCE, SINR, RSRP, MCS UPLINK & DOWNLINK, DOWNLOAD & UPLOAD test for UDP, TCP for Macro sites. • Responsible for Layer 3 and UETR Analysis for trouble shooting problems (Access failure, RRC drops and handover failures). • Carried out Post Launch Activities which involved Troubleshooting worst offender cells for Accessibility (RRC connection, S1 signalling success, E-RAB establishment), Retain-ability (drop on MME or E-NodeB Functionality, Mobility (Inter Frequency, Intra Frequency & IRAT) and Integrity (TCP/UDP Throughput). • Responsible for Parametric changes(A2/A3 offset, Hysteresis, Time to Trigger, qRxLevMin, pZeroNominalPusch, pZeroNominalPucch, sIntraSearch and sNonIntraSearch) and physical change (Tilt) for optimizing RSRP, SINR etc. • Responsible for CSFB and IRAT, IFHO analysis and Recommendations. • To give a weekly check over on GLOBAL & LOCAL parameters and remove the discrepancies to optimize network performance. WCDMA Project, AT&T USA: (Aug 2011- Sep 2012) • Analyzing RF Drive Test generated through log files . • Post processing of data, Plotting RSCP and Ec/Io Information for overall picture of the driven area using Actix. • Pilot Pollution analysis, down tilting sites, Missing Neighbor Analysis, Handover and Coverage Optimization and also check HSDPA/HSUPA throughput. • Neighbor list optimization between 3G and 2G cell, and between HSDPA and R99 cells and fine tuning to avoid ping pong handover (CS+PS). Plan and fine tune the orientation and down tilt of antenna to ensure proper signal distribution (reasonably good RSCP, Ec/lo, overshoot control non-dominant pilot region control) and eliminate rapid signal change condition in the target area.
  • 2. • Coordinating DT Team , Check out all of the single sites functions issue and provide SSV report that showing RSCP, Ec/No and Handovers on plots. Organization: Sasken Network Engineering Ltd ,Bangalore Designation: Sr. RF Engineer from Oct-2010 to May-2011 Job Profile – GSM and WCDMA Network Optimisation WCDMA Project Aircel –Huawei Bangalore • Analyzing RF Drive Test generated through log files . • Post processing of data, Plotting RSCP and Ec/Io Information for overall picture of the driven area through Huawei post processing tool Genex assistant 2.3 • Pilot Pollution analysis, down tilting sites, Missing Neighbor Analysis, Handover and Coverage Optimization and also check HSDPA/HSUPA throughput. • Neighbor list optimization between 3G and 2G cell, and between HSDPA and R99 cells and fine tuning to avoid ping pong handover (CS+PS). Plan and fine tune the orientation and down tilt of antenna to ensure proper signal distribution (reasonably good RSCP, Ec/lo, overshoot control non-dominant pilot region control) and eliminate rapid signal change condition in the target area. • Coordinating DT Team , Check out all of the single sites functions issue and provide SSV report that showing RSCP, Ec/No and Handovers on plots. GSM Project- SFR- Franch with NSN Global Chennai:- • Closely monitoring the Accessibility, Retainability & mobility KPI’s of the designated Cluster’s. • Performing periodic Consistency checks and audit’s on the Parameter’s to make sure they are aligned with the design and agreed strategies. • Monitor Daily and Hourly Statistics to figure out the cells that are performing bad and in turn that are contributing towards the KPI’s degradation. • Doing in-depth analysis on the worst performing cells to find the root cause of the problem and to propose and make changes physically or Parameter level for getting those cells to perform back normally. • Performing the Analysis using statistics to know the root cause of the problem’s or degradation on the KPI’s. Well versed with most of the Counter’s and Formulas used for reporting the statistics . Organization: Integrated Wireless Solution (IWS) Designation: Radio Network Optimiser. Nov-2009 to Sep-2010 GSM Project- Loop- ZTE Motorolla swap project , Mumbai Job Profile – • Observation on Poor HOSR, Poor CSSR , High DCR & maintain KPI Benchmarks. • Define proper RF parameters, Neighbour definition using Netnumen & ISMG . • Verify Planned parameters with BSC dump parameters & retuning parameters as per healthy network requirement. • Verify Inter BSC handover & rectify problem related to handover . • Retuning of Neighbour & Frequencies - • Deleting Unnecessary Neighbour, Adding required Neighbour as per Handover definition. • Making Unidirectional Neighbour to Bidirectional Neighbour. • Remove CO-BCCH & CO-BSIC . • Change BCCH & BSIC as per C/I & C/A analysis. • Frequency Planning ( Fixed and Hopping) LAC Planning and BSC Planning for New sites, Swap sites• Planning of BSIC, MAIO, HSN and Neighbors for new coming sites and swap sites as well as deletion and addition of neighbors for existing sites as per requirement. • Daily network health monitoring and accordingly taking actions based on key performance indicator parameters to meet the network benchmarks.
  • 3. Organization: Nokia Siemens Network India Pvt Ltd. Lucknow. Designation: RF Cluster Engineer, Sep 2008 –Oct 2009 GSM project- Vodafone , Gorakhpur and Varanasi Job Profile – • Optimizing RF related parameters such as BCCH, BSIC and Freq. retuning by analyzing Drive logs and site data. • Defining missing neighbor relations, Proposing new sites or sector additions with before & After coverage plots, Proposing antenna azimuth changes, Proposing antenna tilt changes, Proposing antenna type changes, BTS Equipments change, Re-tuning of interfered frequencies • Suggesting the changes to be made in the site such as Tilt, Reorientation of antenna. • Handing C/I, C/A, coverage, call handover, call drop, Rx Quality, SQI, etc. • Analyzing RF Drive Test generated through log files and verifying & testing of hardware upgrades and new elements added to the network & keep track of all the up gradation activities. • Post processing of data, Plotting RX Level and Quality Information. • Performance analysis of stats/KPIs for drop calls, congestion, TCH & SD assignment failures, handover failures, poor call success rate and problems resolution using the OMC and daily Reports for New sites. • Frequency Planning, BCCH retuning, for new and existing sites. • Analyzing and troubleshooting the worst performing cells . • Analyzing inconsistency of HOs for proper HOs in network and alarm . • Report Generation of the pre drive - This included taking out Drive plots of both RX Lev and RX Qual and also analyzing the NQIs AND KPIs in graphical form. • Analysis Network problems like Poor Coverage Patches, Interference, call drops, hand over Issues. • Responsible for new site planning on basis of coverage or capacity site requirement. • Interface with Customer- Handling all customers related issues (top management). • New site I.P planning. • Analysis of drive test logs to resolve the coverage, call drop related problems. Roll in Drive Test Team: • Responsible for Drive test of new sites. • Responsible for conduction of Drive test for the area, which is affected by bad quality, interference and hand over failures with the coordination of RF team. • Analysis of Log files on TEMS and Mapinfo. • Frequency Planning & Handover Definitions. • Network-Optimization by drive tests, antenna tilts, antenna orientation changes and tuning the Cell-RF Parameters. • Drive Test Log Files Analysis. • Attending Customer Complaints. • Drive test for testing of new sites & swapped sites, busy hour city drive & for changes in Network. • Antenna type verifications for antenna types, tilts, azimuths, verification of jumpers and feeders. • Handling of interference issues by change of frequency, Antenna configuration, parameter of site and neighbouring sites, parameter adjustments and fine tuning for functioning of the networks at optimum levels. Organization: Telecomone Teleservices India Pvt Ltd Bangalore Designation: RF Engineer, Nov 2007 –Sep 2008 GSM project- IMIL Project, Tamilnadu , Kerala and Karnataka Circle
  • 4. GSM project- Airtel, Trivendram ,Kerla GSM Project – Relaince, Calicut , Kerla Circle • Done RF Drive Test in DEDICATED/IDLE mode along with SHORT & LONG CALLS. • Site Audit and performing study for antenna position,Beamwidth and tilt to meet with desired coverage with minimum predicted interference and re-engineering. • Analyzing the log files for signal strength, interference, coverage lacking, handover & Decision improvement. • Site Survey. • From given tentative location finding out the exact position of the site which can serve. • The objective to expand the capacity and coverage of existing Network. • Done hot spot collection, nominal selection. Decide the azimuth and height and tilt given. • Depending on the available Line of Sight as well as the capacity in terms of E1 on the same and Height of the Microwave Link antenna by considering the Fresnel Zone and Maximum obstruction between two sites. • Checking for obstacle details that may obstruct the transmission path of MW link as planned. • Extraction of AMSL values from Global Mapper. • On field obstacle heights collection of transmission path of PTP mw link • Path profile generation and verification for the PTP MW links using Pathloss4.0 • Proposing the optimum height of antenna keeping in view the height of obstacles and Clearance criteria. • Generation and submission of LOS Survey reports. • Giving Feasibility of Customer Request, Coordinating survey teams, Preparation Survey reports, maintaining data of Reports. • RF Nominal site planning. • Design Antenna heights for RF Coverage and Orientation. • Capacity & Coverage Sites. Organization: Nutek (I) India Ltd Designation: RF Engineer, Feb 2007 – Nov 2007 GSM project- BSNL Project, U.P. East • Site Survey. • From given tentative location finding out the exact position of the site which can serve. • The objective to expand the capacity and coverage of existing Network. • Done hot spot collection, nominal selection. Decide the azimuth and height and tilt given. • Depending on the available Line of Sight as well as the capacity in terms of E1 on the same and Height of the Microwave Link antenna by considering the Fresnel Zone and Maximum obstruction between two sites. • Checking for obstacle details that may obstruct the transmission path of MW link as planned. • Extraction of AMSL values from Global Mapper. • On field obstacle heights collection of transmission path of PTP mw link • Path profile generation and verification for the PTP MW links using Pathloss4.0 • Proposing the optimum height of antenna keeping in view the height of obstacles and Clearance criteria. • Generation and submission of RF and LOS Survey reports. • Giving Feasibility of Customer Request, Coordinating survey teams, Preparation Survey reports, maintaining data of Reports. • RF Nominal site planning. Specialized Training/Ericsson Certification/Appreciations • LTE Air Interface • LTE Network Functionality • LTE Performance Management & Optimization (PMO) • WCDMA Functionality-Ericsson. • WCDMA Air Interface (Ericsson system). • WCDMA System Overview – Ericsson. • WCDMA Optimization (Ericsson system). • Senior and Experienced BUGS Certificate • Radio Network Optimization (RNO) Certificate
  • 5. • Radio Network Design (RND) Certificate • Radio Network Associate (RAN) Certificate • IP Networking (IPN) Certificate • AT &T Customer appreciation Certifiacte • Performer of the Month Technical Competencies/skills Drive Test & Analysis Tool Actix ,TEMS-Discovery ,ITK, OSS, ERTT, MAPINFO, X-Nethealing, MCOM, TEMS Investigation, GENEX PROBE 1.5,NETNUMEN, ISMG, GENEX ASSISTANCE, PATH LOSS 4.0, MAP SOURCE, RL TOOL. Performance Analysis Tool ERTT, ITK ,NETNUMEN, ISMG Equipment vendors ERICSSON , NSN, ZTE, Huawei Academic Qualification Technical Qualifications : Degree - B.E. in Computer Science Engineering Institute - United college Of Engineering & Research , Allahabad. University - U.P.T.U University. Year of Passing - 2006 Percentage of marks - 66.5 % Academic Qualifications : Intermediate (1999) from U.P Board, DEENDAYAL UPADHAYA NAWABGANJ,KANPUR 68.3% Highschool (1997) From U.P Board, DEENDAYAL UPADHAYA NAWABGANJ,KANPUR 67.5% Personal Details • Father’s Name : Mr. Santosh Kumar Kushwaha . • Date of Birth : 22 Dec 1981 • Sex : Male • Marital Status : Married • Nationality : Indian • Languages Known : English, Hindi