Sept, 2016
Benefits of IWT for NER
2
• A cost effective & environment friendly mode
• Best suited for bulk goods, ODC, Project cargo & hazardous
goods
• IWT offers shorter, alternative route to Arunachal Pradesh,
Assam, Manipur, Mizoram, Nagaland and Tripura.
• Provides port- hinterland connectivity to entire region with
Kolkata – Haldia
• River Brahmaputra & Barak offers immense scope for
development of ‘river cruise’ & ‘eco-tourism’ in NE
3
150
500
4000
0
500
1000
1500
2000
2500
3000
3500
4000
Road Rail IWT
Fuel efficiency: One HP moves
Kgs
Road
Rail
IWT
24
85
105
0
40
80
120
Road Rail IWT
One liter of fuel moves
(T-km)
Road
Rail
IWT
5.2
2.5
1
0
2
4
6
Road Rail IWT
Operatingcost(internationallevel)
Cents/Tkm
Road
Rail
IWT
IWT-A cost effective mode of
transportation
Development Status of Waterways in
NER
4
 River Brahmaputra-NW-2: Covers hinterland of Arunachal
Pradesh, Assam, Meghalaya & Nagaland
 River Barak (Lakhipur to Bhanga-121 km ) - NW-16
connects NER with Kolkata through Indo-Bangladesh
protocol route. Covers hinterland of Manipur, Mizoram
and Tripura in addition to Assam.
 Indo- Bangladesh Protocol routes (1700 km) provide
alternate connectivity to North East avoiding rail/road
connectivity through already congested Chicken neck link
to NE States
 106 new waterways have been declared as National
Waterways under the National Waterways Act 2016, which
includes 19 new National Waterways in North East.
Declared by an Act of Parliament in December
1988
5
6
 Fairway (891 km )
 Dredging done departmentally with 2 CSD units and 2 HSD units
deployed in NW-2.
Stretch LAD in lean
season (Oct.-
Mar)
LAD in flood
season
(April –Sept.)
B’Border-Neamati (630 Km) 2.5 Meter 2.5 Meter
Neamati –Dibrugarh (138 Km) 2.5 Meter 2.5 Meter
Dibrugarh-Sadiya (123 km)/
Oriumghat
1.5 Meter 1.5 Meter
 Dredging and bandalling done every year between October to March
Facilities on NW-2 for IWT
7
Aids to Navigation
 1002 day navigation aids are provided and maintained in entire NW-
2
 455 Night navigation aids are provided from B’Border to Silghat
(440 km)
 DGPS stations are provided at Dhubri, Jogighopa, Silghat &
Dibrugarh
 Fortnightly talweg survey through 5 survey vessels of IWAI to
identify the shoals and river notices being issued
 Besides, pilots provided to cargo vessels for assistance
day navigation marks night navigation aids
Facilities on NW-2 for IWT
8
 Terminals
 Pandu has been developed as a IWT based transportation hub for
multimodal connectivity in the NER
 11 Floating terminals at Hatsingmari,Dhubri, Jogighopa, Tejpur,
Silghat, Biswanthghat, Neamati, Bogibeel, Dibrugarh, Sengajan &
Oriumghat are being maintained with pontoon and bamboo gangway
 Floating terminal can be provided at other locations on need basis
8
BG Siding at PanduLow Level Jetty at
Pandu
Tejpur terminal Silghat terminal Oriumghat terminal
High Level Jetty
at Pandu
9
 Ship Repair facility(Slipway) at Guwahati (Pandu)
 Work awarded on 01.01.2016
 Construction work in progress, 13% physical progress is achieved.
 Work is to be completed by Dec.2018
Transport route to adjacent location from
Hatsingmari
10
 Ro- Ro facility at Dhubri and Hatsingimari (opposite bank) are to
be provided to reduce travel time of vehicles between Meghalaya
and Dhubri in Assam which now have to go over Jogighopa bridge
(220 km)
 Construction of Dhubri terminal is in progress and 94% progress
has been achieved.
 Construction of Hatsingimari terminal could not be taken up due
to severe erosion at the terminal site
 Brahmaputra Board has taken up anti-erosion works at this
location
 Construction of Permanent Terminal at Hatsingimari can be
taken up only after anti-erosion works are completed by
Brahmaputra Board
 Temporary arrangement for Ro-Ro operation has been made by
IWAI to facilitate Ro-Ro operations between Dhubri and
Hatsingimari 11
Ro-Ro terminal at Dhubri &
Hatsingmari
New National Waterways in NER
12
19 rivers of NER has also been included in the list as per
details below.
 Arunachal Pradesh - 1No- Lohit
Assam -11No- Aai,Barak,Beki,Dhansiri,
Dehing,Dikhu,Doyans,
Gangadhar,Kopili,Putimari and
Subansiri
 Meghalaya - 5No- Ganol,Jinijiram,Yanshi,
Simdang and Umngot
Mizoram - 1No - Tlwang
Nagaland - 1 No – Tizu
Process for preparation of TEF/DPR of these waterways are
underway
Indo-Bangladesh Protocol
13
INDO – BANGLADESH
PROTOCOL ROUTES
B A N G L A D E S H
M E G H A L A Y A
MANIPUR
MIZORAM
TRIPURA
HALDIA
KOLKATA
DHUBRI
PANDU
JOGIGHOPA
SHISHUMARA
DHULIAN
KARIMGANJ
RAJSHAHI
NARAYANGANJ
DHAKA
LAKHIPUR
Bay of Bengal
31
DISPUR
40
51
SHILLONG
54
AIZWALAGARTALA
37
37
44
53
BAGHABARI
CHILMARI
BAHADURABAD
SIRAJGANJ
ZAKIGANJ
FENCHUGANJ
SHERPUR
MARKULI
AJMIRIGANJ
BHAIRAB
BAZAR
CHANDPUR
BARISAL
KAUKHALI
MONGLA
KHULNA
CHALNA
NAMKHANA
GODAGARI
ARICHA
ASHUGANJ
Myanmar (Burma)
IMPHAL
KOHIMA
NAGALAND
53
34
35
2
6
41
31
Legend
Kolkata - Guwahati/Pandu ...... 1535 km
Kolkata - Karimganj...................1318 km
Dhulian-Rajshahi...........................78 km
Protocol route distances
N
BHANGA
AKHAURA
DAIKHAWA
Legend
Declared National waterway
Proposed National waterway
Protocol route
Road
Rail
NH 51
ANGTIHARA
SYLHET
P
P
P
P
P
P
P
P
AGARTALA
13
Back
13
Indo-Bangladesh Protocol
14
Description:
• Indo- Bangladesh Trade & Transit Protocol exists to facilitate
movement of cargo from Kolkata / Haldia to Karimganj/ Silghat
in NER and vice versa
• The designated inland water routes in India side under this
protocol are (i) Kolkata-Silghat – Kolkata, (ii) Kolkata –
Karimganj – Kolkata, (iii) Rajshahi – Dhulian, Rajshahi and (iv)
Silghat – Karimganj – Silghat.
• For inter-country trade, five ports of call have been designated in
each country. These are: Haldia, Kolkata, Pandu, Karimganj and
Silghat in India and Narayanganj, Khulna, Mongla, Sirajganj and
Ashuganj in Bangladesh.
• The Protocol is valid till June 2020.
Indo-Bangladesh Protocol
15
Issues:
• Need to develop Protocol routes in Bangladesh with equivalent
LAD as available in Indian side i.e. 2.5m
• For regular cruise and passengers movement between India &
Bangladesh_ Proposal is under process.
Connectivity with Chittagong port
16
• Access to Chittagong port of Bangladesh set to change EXIM cargo
transport pattern in NER as well as Bhutan
• On June 6, during the visit of Prime Minister of India to Dhaka, India
and Bangladesh inked the agreement on Coastal Shipping for two-way
trade through ports; renewed the 1972 Protocol on Inland Waterways
Transit and Trade (PIWTT) for using their waterways for commerce;
and signed an MoU for use of Chittagong and Mongla Ports for
movement of goods to and from India.
• Chittagong and Mongla ports, along with Kolkata port and Haldia dock
system, are located in the Ganga delta. According to the agreement, the
two Bangladesh ports can be used by India to ship goods to its
landlocked states in the northeast - to Agartala in Tripura, to Dawki in
Meghalaya or to Sutarkandi in Assam - either through waterways, rail or
road.
• Bangladesh will also get transit through India into Nepal and Bhutan,
according to the renewed Bilateral Trade Agreement inked in 1972. This
also gives a fillip to connectivity in the Bangladesh, Bhutan, India, Nepal
sub-regional grouping of SAARC.
Trade to Agartala via Mongla and Ashuganj
17
• FCI had ferried 35,000
tonnes of rice in 2014 &
2015 to Tripura from Vizag
and Kolkata via Bangladesh
• Agartala from Kolkata is
1,600 km by road and
2,640 km from New Delhi,
while the distance between
Agartala and Kolkata is just
about 620 km and 2,085
km from New Delhi via
Bangladesh.
•The waterway movement
from Mongla to Ashuganj
(Brahmanbaria,
Chittagong) has a draft of
3.8 m. Hence, it becomes
commercially attractive to
use small and low draft
vessel from Kolkata to
Bhanga
Badarpur
Silchar
 Stretch: Lakhipur- Bhanga
 Length: 121 Km
 Development cost -Rs 141 Cr
Development of River Barak
19
 Development proposed in two phase
 Silchar to Bhanga (70KM) in phase-I and Silchar to
Lakhipur in phase-II
 EPC tender for phase-I invited for dredging & fairway
maintenance with a LAD of 2 m along with
navigational aids.
 EPC tender for up gradation of existing terminal at
Karimganj & Badarpur and for development of new
terminal at Silchar will be invited by Nov 2016
Development of River Barak
20
 Strategic Benefits
 Distance advantage over other modes of
transportation to NE Region
 Higher unit capacity per unit fuel consumption of IWT
vis-à-vis road.
 Pollution levels created by IWT for moving a unit
quantity are much less when compared to road.
 Port- hinterland Connectivity
 Environment Friendly and Safe Mode
Central Sector Scheme for NER
21
Under a Central Sector Scheme, Ministry of Shipping
provides 100% grant to NE States for IWT infrastructure
development
The projects are implemented by Govt. of Tripura
 One project for preparation of DPR for Gumti & Haora rivers
in Tripura was sanctioned at a cost of Rs.0.83Cr and
completed in April 2015
 Another project for development of Gumti & Haora rivers in
Tripura linkage with Meghna river system in Bangladesh was
sanctioned at a cost of Rs.12.59Cr in Nov 2015 & Rs.2.00Cr
released to Govt. of Tripura.
 IWAI is providing necessary assistance as and when required
by the State Govts to prepare projects under this scheme.
Benefits of IWT for Tripura
22
 Development of IWT should not be viewed from
considerations of commercial viability alone.
 The benefits to the economy and the people of this area at
large are equally important considerations.
 The security benefits like connecting to Tripura with rest of
India, socio-economic benefits and environmental benifits
can be achieved through this project.
 Development of IWT may benefits the people of Atharamura
& Longtharai on the NE boundary of South Tripura district
and Sonamura sub division across the Bangladesh border.
 The export cargo (i.e rubber, orange, rice and tea products)
from Tripura to Bangladesh and other nearby areas in
Tripura may be increased.
Kaladan Multimodal Project
23Sittwe
Bay of Bengal
Myanmar
I N D I A
Kolkata Sittwe 539 km Sea
Sittwe Paletwa 158 km IWT
Paletwa Kaletwa 67 km Road
Kaletwa Myeikwa
(IM Border)
62 km Road
Myeikwa (IM
Border)
Lawngtlai 100 km Road
Lawngtlai Aizwal 334 km Road
Kolkata Aizwal 1260 km
Paletwa
Kaletwa
Myeikwa (IM Border)
Kyauktaw
Lawngtlai
Kaladan Multimodal Project
24
• Objective of the project is to provide an alternate connectivity to
North East through Kaladan river & Sittwe port in Myanmar
• Project funded by MEA – total project cost could be of over
Rs.2500 crore
• Multi modal project: Road- IWT- Sea
• IWAI as PDC for IWT and Port Component
• M/s Essar Projects appointed by MEA as main contractor for port
& IWT components
• Cost of work (IWT & Port): Rs 342 crore
• Physical progress of 94% has been achieved; likely completion
Nov 2016
• Road part from Paletwa to Indian Boarder in Mizoram is being
looked after by IRCON
25
Trade to Agartala via Chittagong & Ramgarh
26
• Ramgarh and Sabroom are
the proposed land ports on
Bangladesh and India side
respectively.
• Once this LCS is developed
it would be shortest route
to reach India via
Chittagong.
• World Bank is funding
development of road
infrastructure from
Chittagong Port to
Ramgarh in Bangladesh.
• It is estimated to take 6 to
7 years for the
development of Ramgarh
LCS.
• Once Ramgarh LCS
becomes operational, it will
substantially reduce the
overall logistics cost.
Trade to Agartala via Chittagong and Ashuganj
27
• Good road connectivity from
Chittagong to Ashuganj via
NH-1, Bangladesh
• Indo-Bangla Coastal Trade -
opens a new opportunity by
improving the utilization of
Indian Ports and helps in
decongestion of road
especially at Indo-Bangla
Border
• Vessels take 30hour
steaming time to reach from
Chittagong to Ashuganj
(Brahmanbaria, Chittagong).

More Related Content

What's hot

[Urban management policy training] ulaanbaatar city presentation
[Urban management policy training] ulaanbaatar city presentation[Urban management policy training] ulaanbaatar city presentation
[Urban management policy training] ulaanbaatar city presentation
shrdcinfo
 
Development Plan- Planning Intervention By SVNIT Surat.
Development Plan- Planning Intervention By SVNIT Surat.Development Plan- Planning Intervention By SVNIT Surat.
Development Plan- Planning Intervention By SVNIT Surat.
NOSPlan - National Organisation of Students of Planning
 
Infrastructure of transportation
Infrastructure of transportationInfrastructure of transportation
Infrastructure of transportation
Siddhi Vakharia
 
Pakistan Project 2013-2015
Pakistan Project 2013-2015Pakistan Project 2013-2015
Pakistan Project 2013-2015
Charles Plucky (D.R)
 
Life lines of the national economy
Life lines of the national economyLife lines of the national economy
Life lines of the national economy
Abdullah Mansoor
 
Expressway plan
Expressway planExpressway plan
Expressway plan
Abhishek Dixit
 
Draft Development Plan 2021 (Review) AUDA - D Thara, IAS
Draft Development Plan 2021 (Review) AUDA - D Thara, IASDraft Development Plan 2021 (Review) AUDA - D Thara, IAS
Draft Development Plan 2021 (Review) AUDA - D Thara, IAS
WRI Ross Center for Sustainable Cities
 
Pipeline Transportation 123
Pipeline  Transportation 123Pipeline  Transportation 123
Pipeline Transportation 123
kamlesh
 
12 master planned communities
12 master planned communities12 master planned communities
12 master planned communities
Grupo 4S
 
A study on urban growth trends in kochi
A study on urban growth trends in kochiA study on urban growth trends in kochi
A study on urban growth trends in kochi
Arun Chandra Babu
 
Development Plan- Planning interventions by (VNIT) Visvesvaraya National Inst...
Development Plan- Planning interventions by (VNIT) Visvesvaraya National Inst...Development Plan- Planning interventions by (VNIT) Visvesvaraya National Inst...
Development Plan- Planning interventions by (VNIT) Visvesvaraya National Inst...
NOSPlan - National Organisation of Students of Planning
 
Development plan case study (nagpur & lasvegas)
Development plan  case study (nagpur & lasvegas)Development plan  case study (nagpur & lasvegas)
Development plan case study (nagpur & lasvegas)
ABHI PATEL
 
Road sector in India
Road sector in IndiaRoad sector in India
Road sector in Indiasharifishere
 

What's hot (14)

Kai Tak Submission Documents
Kai Tak Submission DocumentsKai Tak Submission Documents
Kai Tak Submission Documents
 
[Urban management policy training] ulaanbaatar city presentation
[Urban management policy training] ulaanbaatar city presentation[Urban management policy training] ulaanbaatar city presentation
[Urban management policy training] ulaanbaatar city presentation
 
Development Plan- Planning Intervention By SVNIT Surat.
Development Plan- Planning Intervention By SVNIT Surat.Development Plan- Planning Intervention By SVNIT Surat.
Development Plan- Planning Intervention By SVNIT Surat.
 
Infrastructure of transportation
Infrastructure of transportationInfrastructure of transportation
Infrastructure of transportation
 
Pakistan Project 2013-2015
Pakistan Project 2013-2015Pakistan Project 2013-2015
Pakistan Project 2013-2015
 
Life lines of the national economy
Life lines of the national economyLife lines of the national economy
Life lines of the national economy
 
Expressway plan
Expressway planExpressway plan
Expressway plan
 
Draft Development Plan 2021 (Review) AUDA - D Thara, IAS
Draft Development Plan 2021 (Review) AUDA - D Thara, IASDraft Development Plan 2021 (Review) AUDA - D Thara, IAS
Draft Development Plan 2021 (Review) AUDA - D Thara, IAS
 
Pipeline Transportation 123
Pipeline  Transportation 123Pipeline  Transportation 123
Pipeline Transportation 123
 
12 master planned communities
12 master planned communities12 master planned communities
12 master planned communities
 
A study on urban growth trends in kochi
A study on urban growth trends in kochiA study on urban growth trends in kochi
A study on urban growth trends in kochi
 
Development Plan- Planning interventions by (VNIT) Visvesvaraya National Inst...
Development Plan- Planning interventions by (VNIT) Visvesvaraya National Inst...Development Plan- Planning interventions by (VNIT) Visvesvaraya National Inst...
Development Plan- Planning interventions by (VNIT) Visvesvaraya National Inst...
 
Development plan case study (nagpur & lasvegas)
Development plan  case study (nagpur & lasvegas)Development plan  case study (nagpur & lasvegas)
Development plan case study (nagpur & lasvegas)
 
Road sector in India
Road sector in IndiaRoad sector in India
Road sector in India
 

Viewers also liked

27. NECS 2016 _ Inland waterways_ Mr.Asish Bhadra
27. NECS 2016 _ Inland waterways_ Mr.Asish Bhadra27. NECS 2016 _ Inland waterways_ Mr.Asish Bhadra
27. NECS 2016 _ Inland waterways_ Mr.Asish Bhadra
FICCINorthEast
 
23. NECS 2016 _ Digital Connectivity_ Mr. Anupam Agarwal
23. NECS 2016 _ Digital Connectivity_ Mr. Anupam Agarwal23. NECS 2016 _ Digital Connectivity_ Mr. Anupam Agarwal
23. NECS 2016 _ Digital Connectivity_ Mr. Anupam Agarwal
FICCINorthEast
 
26. NECS 2016 _ Inland waterways_ Mr.Amlan Basu
26. NECS 2016 _ Inland waterways_ Mr.Amlan Basu26. NECS 2016 _ Inland waterways_ Mr.Amlan Basu
26. NECS 2016 _ Inland waterways_ Mr.Amlan Basu
FICCINorthEast
 
11. NECS 2016 _Current status and the way ahead for road development in the ...
11.  NECS 2016 _Current status and the way ahead for road development in the ...11.  NECS 2016 _Current status and the way ahead for road development in the ...
11. NECS 2016 _Current status and the way ahead for road development in the ...
FICCINorthEast
 
9. NECS 2016 _ Sub regional people to people connectivity Mr.Sabyasachi Dutta
9. NECS 2016 _ Sub regional people to people connectivity  Mr.Sabyasachi Dutta9. NECS 2016 _ Sub regional people to people connectivity  Mr.Sabyasachi Dutta
9. NECS 2016 _ Sub regional people to people connectivity Mr.Sabyasachi Dutta
FICCINorthEast
 
3. NECS 2016 _ Trade aspects and Northeast connectivity_ Dr.Deeparghya Mukherjee
3. NECS 2016 _ Trade aspects and Northeast connectivity_ Dr.Deeparghya Mukherjee3. NECS 2016 _ Trade aspects and Northeast connectivity_ Dr.Deeparghya Mukherjee
3. NECS 2016 _ Trade aspects and Northeast connectivity_ Dr.Deeparghya Mukherjee
FICCINorthEast
 
8. NECS 2016 _ Inaugural session industry speak-Mr.Rajnish Kumar
8. NECS 2016 _ Inaugural session industry speak-Mr.Rajnish Kumar8. NECS 2016 _ Inaugural session industry speak-Mr.Rajnish Kumar
8. NECS 2016 _ Inaugural session industry speak-Mr.Rajnish Kumar
FICCINorthEast
 
4. NECS 2016 _ Building cross border value chains and border townships Mr.Dhi...
4. NECS 2016 _ Building cross border value chains and border townships Mr.Dhi...4. NECS 2016 _ Building cross border value chains and border townships Mr.Dhi...
4. NECS 2016 _ Building cross border value chains and border townships Mr.Dhi...
FICCINorthEast
 
5. NECS 2016 ease of doing business in assam mr. anil saraf
5. NECS 2016  ease of doing business in assam mr. anil saraf5. NECS 2016  ease of doing business in assam mr. anil saraf
5. NECS 2016 ease of doing business in assam mr. anil saraf
FICCINorthEast
 
10. NECS 2016_ 3 ideas to boost tourism and people to people connectivity Mr...
10. NECS 2016_  3 ideas to boost tourism and people to people connectivity Mr...10. NECS 2016_  3 ideas to boost tourism and people to people connectivity Mr...
10. NECS 2016_ 3 ideas to boost tourism and people to people connectivity Mr...
FICCINorthEast
 
21. NECS 2016 _ Air connectivity Ms.Sangeeta Mahay
21. NECS 2016 _ Air connectivity Ms.Sangeeta Mahay21. NECS 2016 _ Air connectivity Ms.Sangeeta Mahay
21. NECS 2016 _ Air connectivity Ms.Sangeeta Mahay
FICCINorthEast
 
17. NECS 2016 _ Energy_ Evolving power situation and investment opportunities...
17. NECS 2016 _ Energy_ Evolving power situation and investment opportunities...17. NECS 2016 _ Energy_ Evolving power situation and investment opportunities...
17. NECS 2016 _ Energy_ Evolving power situation and investment opportunities...
FICCINorthEast
 
13. NECS 2016 Opportunities in agro - food processing Mr.S.Bhattacharjee
13. NECS 2016  Opportunities in agro - food processing Mr.S.Bhattacharjee13. NECS 2016  Opportunities in agro - food processing Mr.S.Bhattacharjee
13. NECS 2016 Opportunities in agro - food processing Mr.S.Bhattacharjee
FICCINorthEast
 
20. NECS 2016 _ Sub regional cooperation in energy sector Mr.K.M.Zaman Romel
20. NECS 2016 _ Sub regional cooperation in energy sector Mr.K.M.Zaman Romel20. NECS 2016 _ Sub regional cooperation in energy sector Mr.K.M.Zaman Romel
20. NECS 2016 _ Sub regional cooperation in energy sector Mr.K.M.Zaman Romel
FICCINorthEast
 
18. NECS 2016 _ Energy- Way forward for oil and gas exploration in tripura-Mr...
18. NECS 2016 _ Energy- Way forward for oil and gas exploration in tripura-Mr...18. NECS 2016 _ Energy- Way forward for oil and gas exploration in tripura-Mr...
18. NECS 2016 _ Energy- Way forward for oil and gas exploration in tripura-Mr...
FICCINorthEast
 
14. NECS 2016 _ Opportunities in handloom,textiles & apparels Mr.R.E.Zeliang
14. NECS 2016 _  Opportunities in handloom,textiles & apparels Mr.R.E.Zeliang14. NECS 2016 _  Opportunities in handloom,textiles & apparels Mr.R.E.Zeliang
14. NECS 2016 _ Opportunities in handloom,textiles & apparels Mr.R.E.Zeliang
FICCINorthEast
 
22. NECS 2016 _ Air connectivity_ Connecting Southeast Asia through Northeast...
22. NECS 2016 _ Air connectivity_ Connecting Southeast Asia through Northeast...22. NECS 2016 _ Air connectivity_ Connecting Southeast Asia through Northeast...
22. NECS 2016 _ Air connectivity_ Connecting Southeast Asia through Northeast...
FICCINorthEast
 
19. NECS 2016 _ Energy- Way forward for solar and wind power in NE India -Pro...
19. NECS 2016 _ Energy- Way forward for solar and wind power in NE India -Pro...19. NECS 2016 _ Energy- Way forward for solar and wind power in NE India -Pro...
19. NECS 2016 _ Energy- Way forward for solar and wind power in NE India -Pro...
FICCINorthEast
 
2. NECS 2016 dialogue on sustainable growth & integration- Ms.Avia Nahreen
2. NECS 2016  dialogue on sustainable growth  & integration- Ms.Avia Nahreen2. NECS 2016  dialogue on sustainable growth  & integration- Ms.Avia Nahreen
2. NECS 2016 dialogue on sustainable growth & integration- Ms.Avia Nahreen
FICCINorthEast
 
6. NECS 2016 Ease of doing business Mr.George Jenner
6. NECS 2016  Ease of doing business Mr.George Jenner6. NECS 2016  Ease of doing business Mr.George Jenner
6. NECS 2016 Ease of doing business Mr.George Jenner
FICCINorthEast
 

Viewers also liked (20)

27. NECS 2016 _ Inland waterways_ Mr.Asish Bhadra
27. NECS 2016 _ Inland waterways_ Mr.Asish Bhadra27. NECS 2016 _ Inland waterways_ Mr.Asish Bhadra
27. NECS 2016 _ Inland waterways_ Mr.Asish Bhadra
 
23. NECS 2016 _ Digital Connectivity_ Mr. Anupam Agarwal
23. NECS 2016 _ Digital Connectivity_ Mr. Anupam Agarwal23. NECS 2016 _ Digital Connectivity_ Mr. Anupam Agarwal
23. NECS 2016 _ Digital Connectivity_ Mr. Anupam Agarwal
 
26. NECS 2016 _ Inland waterways_ Mr.Amlan Basu
26. NECS 2016 _ Inland waterways_ Mr.Amlan Basu26. NECS 2016 _ Inland waterways_ Mr.Amlan Basu
26. NECS 2016 _ Inland waterways_ Mr.Amlan Basu
 
11. NECS 2016 _Current status and the way ahead for road development in the ...
11.  NECS 2016 _Current status and the way ahead for road development in the ...11.  NECS 2016 _Current status and the way ahead for road development in the ...
11. NECS 2016 _Current status and the way ahead for road development in the ...
 
9. NECS 2016 _ Sub regional people to people connectivity Mr.Sabyasachi Dutta
9. NECS 2016 _ Sub regional people to people connectivity  Mr.Sabyasachi Dutta9. NECS 2016 _ Sub regional people to people connectivity  Mr.Sabyasachi Dutta
9. NECS 2016 _ Sub regional people to people connectivity Mr.Sabyasachi Dutta
 
3. NECS 2016 _ Trade aspects and Northeast connectivity_ Dr.Deeparghya Mukherjee
3. NECS 2016 _ Trade aspects and Northeast connectivity_ Dr.Deeparghya Mukherjee3. NECS 2016 _ Trade aspects and Northeast connectivity_ Dr.Deeparghya Mukherjee
3. NECS 2016 _ Trade aspects and Northeast connectivity_ Dr.Deeparghya Mukherjee
 
8. NECS 2016 _ Inaugural session industry speak-Mr.Rajnish Kumar
8. NECS 2016 _ Inaugural session industry speak-Mr.Rajnish Kumar8. NECS 2016 _ Inaugural session industry speak-Mr.Rajnish Kumar
8. NECS 2016 _ Inaugural session industry speak-Mr.Rajnish Kumar
 
4. NECS 2016 _ Building cross border value chains and border townships Mr.Dhi...
4. NECS 2016 _ Building cross border value chains and border townships Mr.Dhi...4. NECS 2016 _ Building cross border value chains and border townships Mr.Dhi...
4. NECS 2016 _ Building cross border value chains and border townships Mr.Dhi...
 
5. NECS 2016 ease of doing business in assam mr. anil saraf
5. NECS 2016  ease of doing business in assam mr. anil saraf5. NECS 2016  ease of doing business in assam mr. anil saraf
5. NECS 2016 ease of doing business in assam mr. anil saraf
 
10. NECS 2016_ 3 ideas to boost tourism and people to people connectivity Mr...
10. NECS 2016_  3 ideas to boost tourism and people to people connectivity Mr...10. NECS 2016_  3 ideas to boost tourism and people to people connectivity Mr...
10. NECS 2016_ 3 ideas to boost tourism and people to people connectivity Mr...
 
21. NECS 2016 _ Air connectivity Ms.Sangeeta Mahay
21. NECS 2016 _ Air connectivity Ms.Sangeeta Mahay21. NECS 2016 _ Air connectivity Ms.Sangeeta Mahay
21. NECS 2016 _ Air connectivity Ms.Sangeeta Mahay
 
17. NECS 2016 _ Energy_ Evolving power situation and investment opportunities...
17. NECS 2016 _ Energy_ Evolving power situation and investment opportunities...17. NECS 2016 _ Energy_ Evolving power situation and investment opportunities...
17. NECS 2016 _ Energy_ Evolving power situation and investment opportunities...
 
13. NECS 2016 Opportunities in agro - food processing Mr.S.Bhattacharjee
13. NECS 2016  Opportunities in agro - food processing Mr.S.Bhattacharjee13. NECS 2016  Opportunities in agro - food processing Mr.S.Bhattacharjee
13. NECS 2016 Opportunities in agro - food processing Mr.S.Bhattacharjee
 
20. NECS 2016 _ Sub regional cooperation in energy sector Mr.K.M.Zaman Romel
20. NECS 2016 _ Sub regional cooperation in energy sector Mr.K.M.Zaman Romel20. NECS 2016 _ Sub regional cooperation in energy sector Mr.K.M.Zaman Romel
20. NECS 2016 _ Sub regional cooperation in energy sector Mr.K.M.Zaman Romel
 
18. NECS 2016 _ Energy- Way forward for oil and gas exploration in tripura-Mr...
18. NECS 2016 _ Energy- Way forward for oil and gas exploration in tripura-Mr...18. NECS 2016 _ Energy- Way forward for oil and gas exploration in tripura-Mr...
18. NECS 2016 _ Energy- Way forward for oil and gas exploration in tripura-Mr...
 
14. NECS 2016 _ Opportunities in handloom,textiles & apparels Mr.R.E.Zeliang
14. NECS 2016 _  Opportunities in handloom,textiles & apparels Mr.R.E.Zeliang14. NECS 2016 _  Opportunities in handloom,textiles & apparels Mr.R.E.Zeliang
14. NECS 2016 _ Opportunities in handloom,textiles & apparels Mr.R.E.Zeliang
 
22. NECS 2016 _ Air connectivity_ Connecting Southeast Asia through Northeast...
22. NECS 2016 _ Air connectivity_ Connecting Southeast Asia through Northeast...22. NECS 2016 _ Air connectivity_ Connecting Southeast Asia through Northeast...
22. NECS 2016 _ Air connectivity_ Connecting Southeast Asia through Northeast...
 
19. NECS 2016 _ Energy- Way forward for solar and wind power in NE India -Pro...
19. NECS 2016 _ Energy- Way forward for solar and wind power in NE India -Pro...19. NECS 2016 _ Energy- Way forward for solar and wind power in NE India -Pro...
19. NECS 2016 _ Energy- Way forward for solar and wind power in NE India -Pro...
 
2. NECS 2016 dialogue on sustainable growth & integration- Ms.Avia Nahreen
2. NECS 2016  dialogue on sustainable growth  & integration- Ms.Avia Nahreen2. NECS 2016  dialogue on sustainable growth  & integration- Ms.Avia Nahreen
2. NECS 2016 dialogue on sustainable growth & integration- Ms.Avia Nahreen
 
6. NECS 2016 Ease of doing business Mr.George Jenner
6. NECS 2016  Ease of doing business Mr.George Jenner6. NECS 2016  Ease of doing business Mr.George Jenner
6. NECS 2016 Ease of doing business Mr.George Jenner
 

Similar to 25. NECS 2016 _ Connecting NE through IWT_ Mr.Alok Ranjan

inland waterways in india
inland waterways in indiainland waterways in india
inland waterways in india
Daniel Josing
 
Compiled
CompiledCompiled
Compiled
CompiledCompiled
Compiled
Yash Gokhale
 
Dfc
DfcDfc
Frermip presentation navigation in main rivers .ppt v4
Frermip presentation    navigation in main rivers .ppt v4Frermip presentation    navigation in main rivers .ppt v4
Frermip presentation navigation in main rivers .ppt v4
Nazmul Hasan Diptu
 
Vibrant Gujarat Summit on Ports & Ship Building Industry of Gujarat
Vibrant Gujarat Summit on Ports & Ship Building  Industry of GujaratVibrant Gujarat Summit on Ports & Ship Building  Industry of Gujarat
Vibrant Gujarat Summit on Ports & Ship Building Industry of Gujarat
Vibrant Gujarat
 
Viability of inland waterways in india
Viability of inland waterways in indiaViability of inland waterways in india
Viability of inland waterways in india
VEENA VIKRAMAN
 
SAGARMALA
SAGARMALASAGARMALA
Project Sagarmala
Project SagarmalaProject Sagarmala
Sagarmala
SagarmalaSagarmala
Sagarmala
Sailish Cephas
 
Nl infrastructure oct 3 - oct 9, 2015
Nl infrastructure oct 3 - oct 9, 2015Nl infrastructure oct 3 - oct 9, 2015
Nl infrastructure oct 3 - oct 9, 2015
Gyan Research And Analytics
 
Nl infrastructure aug 22 - aug 28, 2015
Nl infrastructure aug 22 - aug 28, 2015Nl infrastructure aug 22 - aug 28, 2015
Nl infrastructure aug 22 - aug 28, 2015
Gyan Research And Analytics
 
Inland waterways of india
Inland waterways of indiaInland waterways of india
Inland waterways of india
Machiraju Presentations Pvt. Ltd.
 
Status of river linking project in india
Status of river linking project in indiaStatus of river linking project in india
Status of river linking project in india
khushal tadas
 
Nl infrastructure aug 29 - sept 4, 2015
Nl infrastructure aug 29 - sept 4, 2015Nl infrastructure aug 29 - sept 4, 2015
Nl infrastructure aug 29 - sept 4, 2015
Gyan Research And Analytics
 
IMPACT OF DEDICATED FREIGHT CORRIDOR ON LOGISTIC CONNECTIVITY IN INDIA
IMPACT  OF DEDICATED FREIGHT CORRIDOR ON LOGISTIC CONNECTIVITY IN INDIA IMPACT  OF DEDICATED FREIGHT CORRIDOR ON LOGISTIC CONNECTIVITY IN INDIA
IMPACT OF DEDICATED FREIGHT CORRIDOR ON LOGISTIC CONNECTIVITY IN INDIA
Chiranjib Mahapatra
 
Transport system ..
Transport system ..Transport system ..
Transport system ..
Sheethal Anchan
 
Expanding Tradable Benefits of Trans-boundary Water: Promoting Navigational U...
Expanding Tradable Benefits of Trans-boundary Water: Promoting Navigational U...Expanding Tradable Benefits of Trans-boundary Water: Promoting Navigational U...
Expanding Tradable Benefits of Trans-boundary Water: Promoting Navigational U...
CUTS International
 
Life Lines of National Economy
Life Lines of National EconomyLife Lines of National Economy
Life Lines of National Economy
Ramjee Nagarajan
 

Similar to 25. NECS 2016 _ Connecting NE through IWT_ Mr.Alok Ranjan (20)

inland waterways in india
inland waterways in indiainland waterways in india
inland waterways in india
 
Compiled
CompiledCompiled
Compiled
 
Compiled
CompiledCompiled
Compiled
 
Dfc
DfcDfc
Dfc
 
Frermip presentation navigation in main rivers .ppt v4
Frermip presentation    navigation in main rivers .ppt v4Frermip presentation    navigation in main rivers .ppt v4
Frermip presentation navigation in main rivers .ppt v4
 
Vibrant Gujarat Summit on Ports & Ship Building Industry of Gujarat
Vibrant Gujarat Summit on Ports & Ship Building  Industry of GujaratVibrant Gujarat Summit on Ports & Ship Building  Industry of Gujarat
Vibrant Gujarat Summit on Ports & Ship Building Industry of Gujarat
 
Viability of inland waterways in india
Viability of inland waterways in indiaViability of inland waterways in india
Viability of inland waterways in india
 
SAGARMALA
SAGARMALASAGARMALA
SAGARMALA
 
Project Sagarmala
Project SagarmalaProject Sagarmala
Project Sagarmala
 
Sagarmala
SagarmalaSagarmala
Sagarmala
 
Nl infrastructure oct 3 - oct 9, 2015
Nl infrastructure oct 3 - oct 9, 2015Nl infrastructure oct 3 - oct 9, 2015
Nl infrastructure oct 3 - oct 9, 2015
 
Nl infrastructure aug 22 - aug 28, 2015
Nl infrastructure aug 22 - aug 28, 2015Nl infrastructure aug 22 - aug 28, 2015
Nl infrastructure aug 22 - aug 28, 2015
 
Inland waterways of india
Inland waterways of indiaInland waterways of india
Inland waterways of india
 
Status of river linking project in india
Status of river linking project in indiaStatus of river linking project in india
Status of river linking project in india
 
Nl infrastructure aug 29 - sept 4, 2015
Nl infrastructure aug 29 - sept 4, 2015Nl infrastructure aug 29 - sept 4, 2015
Nl infrastructure aug 29 - sept 4, 2015
 
IMPACT OF DEDICATED FREIGHT CORRIDOR ON LOGISTIC CONNECTIVITY IN INDIA
IMPACT  OF DEDICATED FREIGHT CORRIDOR ON LOGISTIC CONNECTIVITY IN INDIA IMPACT  OF DEDICATED FREIGHT CORRIDOR ON LOGISTIC CONNECTIVITY IN INDIA
IMPACT OF DEDICATED FREIGHT CORRIDOR ON LOGISTIC CONNECTIVITY IN INDIA
 
Transport system ..
Transport system ..Transport system ..
Transport system ..
 
Expanding Tradable Benefits of Trans-boundary Water: Promoting Navigational U...
Expanding Tradable Benefits of Trans-boundary Water: Promoting Navigational U...Expanding Tradable Benefits of Trans-boundary Water: Promoting Navigational U...
Expanding Tradable Benefits of Trans-boundary Water: Promoting Navigational U...
 
Payra Port Main
Payra Port MainPayra Port Main
Payra Port Main
 
Life Lines of National Economy
Life Lines of National EconomyLife Lines of National Economy
Life Lines of National Economy
 

Recently uploaded

Maksym Vyshnivetskyi: PMO Quality Management (UA)
Maksym Vyshnivetskyi: PMO Quality Management (UA)Maksym Vyshnivetskyi: PMO Quality Management (UA)
Maksym Vyshnivetskyi: PMO Quality Management (UA)
Lviv Startup Club
 
Buy Verified PayPal Account | Buy Google 5 Star Reviews
Buy Verified PayPal Account | Buy Google 5 Star ReviewsBuy Verified PayPal Account | Buy Google 5 Star Reviews
Buy Verified PayPal Account | Buy Google 5 Star Reviews
usawebmarket
 
anas about venice for grade 6f about venice
anas about venice for grade 6f about veniceanas about venice for grade 6f about venice
anas about venice for grade 6f about venice
anasabutalha2013
 
What are the main advantages of using HR recruiter services.pdf
What are the main advantages of using HR recruiter services.pdfWhat are the main advantages of using HR recruiter services.pdf
What are the main advantages of using HR recruiter services.pdf
HumanResourceDimensi1
 
Exploring Patterns of Connection with Social Dreaming
Exploring Patterns of Connection with Social DreamingExploring Patterns of Connection with Social Dreaming
Exploring Patterns of Connection with Social Dreaming
Nicola Wreford-Howard
 
Meas_Dylan_DMBS_PB1_2024-05XX_Revised.pdf
Meas_Dylan_DMBS_PB1_2024-05XX_Revised.pdfMeas_Dylan_DMBS_PB1_2024-05XX_Revised.pdf
Meas_Dylan_DMBS_PB1_2024-05XX_Revised.pdf
dylandmeas
 
Project File Report BBA 6th semester.pdf
Project File Report BBA 6th semester.pdfProject File Report BBA 6th semester.pdf
Project File Report BBA 6th semester.pdf
RajPriye
 
20240425_ TJ Communications Credentials_compressed.pdf
20240425_ TJ Communications Credentials_compressed.pdf20240425_ TJ Communications Credentials_compressed.pdf
20240425_ TJ Communications Credentials_compressed.pdf
tjcomstrang
 
What is the TDS Return Filing Due Date for FY 2024-25.pdf
What is the TDS Return Filing Due Date for FY 2024-25.pdfWhat is the TDS Return Filing Due Date for FY 2024-25.pdf
What is the TDS Return Filing Due Date for FY 2024-25.pdf
seoforlegalpillers
 
The Parable of the Pipeline a book every new businessman or business student ...
The Parable of the Pipeline a book every new businessman or business student ...The Parable of the Pipeline a book every new businessman or business student ...
The Parable of the Pipeline a book every new businessman or business student ...
awaisafdar
 
LA HUG - Video Testimonials with Chynna Morgan - June 2024
LA HUG - Video Testimonials with Chynna Morgan - June 2024LA HUG - Video Testimonials with Chynna Morgan - June 2024
LA HUG - Video Testimonials with Chynna Morgan - June 2024
Lital Barkan
 
falcon-invoice-discounting-a-premier-platform-for-investors-in-india
falcon-invoice-discounting-a-premier-platform-for-investors-in-indiafalcon-invoice-discounting-a-premier-platform-for-investors-in-india
falcon-invoice-discounting-a-premier-platform-for-investors-in-india
Falcon Invoice Discounting
 
RMD24 | Debunking the non-endemic revenue myth Marvin Vacquier Droop | First ...
RMD24 | Debunking the non-endemic revenue myth Marvin Vacquier Droop | First ...RMD24 | Debunking the non-endemic revenue myth Marvin Vacquier Droop | First ...
RMD24 | Debunking the non-endemic revenue myth Marvin Vacquier Droop | First ...
BBPMedia1
 
Memorandum Of Association Constitution of Company.ppt
Memorandum Of Association Constitution of Company.pptMemorandum Of Association Constitution of Company.ppt
Memorandum Of Association Constitution of Company.ppt
seri bangash
 
The Influence of Marketing Strategy and Market Competition on Business Perfor...
The Influence of Marketing Strategy and Market Competition on Business Perfor...The Influence of Marketing Strategy and Market Competition on Business Perfor...
The Influence of Marketing Strategy and Market Competition on Business Perfor...
Adam Smith
 
Digital Transformation and IT Strategy Toolkit and Templates
Digital Transformation and IT Strategy Toolkit and TemplatesDigital Transformation and IT Strategy Toolkit and Templates
Digital Transformation and IT Strategy Toolkit and Templates
Aurelien Domont, MBA
 
一比一原版加拿大渥太华大学毕业证(uottawa毕业证书)如何办理
一比一原版加拿大渥太华大学毕业证(uottawa毕业证书)如何办理一比一原版加拿大渥太华大学毕业证(uottawa毕业证书)如何办理
一比一原版加拿大渥太华大学毕业证(uottawa毕业证书)如何办理
taqyed
 
Affordable Stationery Printing Services in Jaipur | Navpack n Print
Affordable Stationery Printing Services in Jaipur | Navpack n PrintAffordable Stationery Printing Services in Jaipur | Navpack n Print
Affordable Stationery Printing Services in Jaipur | Navpack n Print
Navpack & Print
 
Business Valuation Principles for Entrepreneurs
Business Valuation Principles for EntrepreneursBusiness Valuation Principles for Entrepreneurs
Business Valuation Principles for Entrepreneurs
Ben Wann
 
RMD24 | Retail media: hoe zet je dit in als je geen AH of Unilever bent? Heid...
RMD24 | Retail media: hoe zet je dit in als je geen AH of Unilever bent? Heid...RMD24 | Retail media: hoe zet je dit in als je geen AH of Unilever bent? Heid...
RMD24 | Retail media: hoe zet je dit in als je geen AH of Unilever bent? Heid...
BBPMedia1
 

Recently uploaded (20)

Maksym Vyshnivetskyi: PMO Quality Management (UA)
Maksym Vyshnivetskyi: PMO Quality Management (UA)Maksym Vyshnivetskyi: PMO Quality Management (UA)
Maksym Vyshnivetskyi: PMO Quality Management (UA)
 
Buy Verified PayPal Account | Buy Google 5 Star Reviews
Buy Verified PayPal Account | Buy Google 5 Star ReviewsBuy Verified PayPal Account | Buy Google 5 Star Reviews
Buy Verified PayPal Account | Buy Google 5 Star Reviews
 
anas about venice for grade 6f about venice
anas about venice for grade 6f about veniceanas about venice for grade 6f about venice
anas about venice for grade 6f about venice
 
What are the main advantages of using HR recruiter services.pdf
What are the main advantages of using HR recruiter services.pdfWhat are the main advantages of using HR recruiter services.pdf
What are the main advantages of using HR recruiter services.pdf
 
Exploring Patterns of Connection with Social Dreaming
Exploring Patterns of Connection with Social DreamingExploring Patterns of Connection with Social Dreaming
Exploring Patterns of Connection with Social Dreaming
 
Meas_Dylan_DMBS_PB1_2024-05XX_Revised.pdf
Meas_Dylan_DMBS_PB1_2024-05XX_Revised.pdfMeas_Dylan_DMBS_PB1_2024-05XX_Revised.pdf
Meas_Dylan_DMBS_PB1_2024-05XX_Revised.pdf
 
Project File Report BBA 6th semester.pdf
Project File Report BBA 6th semester.pdfProject File Report BBA 6th semester.pdf
Project File Report BBA 6th semester.pdf
 
20240425_ TJ Communications Credentials_compressed.pdf
20240425_ TJ Communications Credentials_compressed.pdf20240425_ TJ Communications Credentials_compressed.pdf
20240425_ TJ Communications Credentials_compressed.pdf
 
What is the TDS Return Filing Due Date for FY 2024-25.pdf
What is the TDS Return Filing Due Date for FY 2024-25.pdfWhat is the TDS Return Filing Due Date for FY 2024-25.pdf
What is the TDS Return Filing Due Date for FY 2024-25.pdf
 
The Parable of the Pipeline a book every new businessman or business student ...
The Parable of the Pipeline a book every new businessman or business student ...The Parable of the Pipeline a book every new businessman or business student ...
The Parable of the Pipeline a book every new businessman or business student ...
 
LA HUG - Video Testimonials with Chynna Morgan - June 2024
LA HUG - Video Testimonials with Chynna Morgan - June 2024LA HUG - Video Testimonials with Chynna Morgan - June 2024
LA HUG - Video Testimonials with Chynna Morgan - June 2024
 
falcon-invoice-discounting-a-premier-platform-for-investors-in-india
falcon-invoice-discounting-a-premier-platform-for-investors-in-indiafalcon-invoice-discounting-a-premier-platform-for-investors-in-india
falcon-invoice-discounting-a-premier-platform-for-investors-in-india
 
RMD24 | Debunking the non-endemic revenue myth Marvin Vacquier Droop | First ...
RMD24 | Debunking the non-endemic revenue myth Marvin Vacquier Droop | First ...RMD24 | Debunking the non-endemic revenue myth Marvin Vacquier Droop | First ...
RMD24 | Debunking the non-endemic revenue myth Marvin Vacquier Droop | First ...
 
Memorandum Of Association Constitution of Company.ppt
Memorandum Of Association Constitution of Company.pptMemorandum Of Association Constitution of Company.ppt
Memorandum Of Association Constitution of Company.ppt
 
The Influence of Marketing Strategy and Market Competition on Business Perfor...
The Influence of Marketing Strategy and Market Competition on Business Perfor...The Influence of Marketing Strategy and Market Competition on Business Perfor...
The Influence of Marketing Strategy and Market Competition on Business Perfor...
 
Digital Transformation and IT Strategy Toolkit and Templates
Digital Transformation and IT Strategy Toolkit and TemplatesDigital Transformation and IT Strategy Toolkit and Templates
Digital Transformation and IT Strategy Toolkit and Templates
 
一比一原版加拿大渥太华大学毕业证(uottawa毕业证书)如何办理
一比一原版加拿大渥太华大学毕业证(uottawa毕业证书)如何办理一比一原版加拿大渥太华大学毕业证(uottawa毕业证书)如何办理
一比一原版加拿大渥太华大学毕业证(uottawa毕业证书)如何办理
 
Affordable Stationery Printing Services in Jaipur | Navpack n Print
Affordable Stationery Printing Services in Jaipur | Navpack n PrintAffordable Stationery Printing Services in Jaipur | Navpack n Print
Affordable Stationery Printing Services in Jaipur | Navpack n Print
 
Business Valuation Principles for Entrepreneurs
Business Valuation Principles for EntrepreneursBusiness Valuation Principles for Entrepreneurs
Business Valuation Principles for Entrepreneurs
 
RMD24 | Retail media: hoe zet je dit in als je geen AH of Unilever bent? Heid...
RMD24 | Retail media: hoe zet je dit in als je geen AH of Unilever bent? Heid...RMD24 | Retail media: hoe zet je dit in als je geen AH of Unilever bent? Heid...
RMD24 | Retail media: hoe zet je dit in als je geen AH of Unilever bent? Heid...
 

25. NECS 2016 _ Connecting NE through IWT_ Mr.Alok Ranjan

  • 1. 1 CONNECTING NORTH EAST THROUGH IWT DEVELOPMENT OF IWT IN NORTH EAST Sept, 2016
  • 2. Benefits of IWT for NER 2 • A cost effective & environment friendly mode • Best suited for bulk goods, ODC, Project cargo & hazardous goods • IWT offers shorter, alternative route to Arunachal Pradesh, Assam, Manipur, Mizoram, Nagaland and Tripura. • Provides port- hinterland connectivity to entire region with Kolkata – Haldia • River Brahmaputra & Barak offers immense scope for development of ‘river cruise’ & ‘eco-tourism’ in NE
  • 3. 3 150 500 4000 0 500 1000 1500 2000 2500 3000 3500 4000 Road Rail IWT Fuel efficiency: One HP moves Kgs Road Rail IWT 24 85 105 0 40 80 120 Road Rail IWT One liter of fuel moves (T-km) Road Rail IWT 5.2 2.5 1 0 2 4 6 Road Rail IWT Operatingcost(internationallevel) Cents/Tkm Road Rail IWT IWT-A cost effective mode of transportation
  • 4. Development Status of Waterways in NER 4  River Brahmaputra-NW-2: Covers hinterland of Arunachal Pradesh, Assam, Meghalaya & Nagaland  River Barak (Lakhipur to Bhanga-121 km ) - NW-16 connects NER with Kolkata through Indo-Bangladesh protocol route. Covers hinterland of Manipur, Mizoram and Tripura in addition to Assam.  Indo- Bangladesh Protocol routes (1700 km) provide alternate connectivity to North East avoiding rail/road connectivity through already congested Chicken neck link to NE States  106 new waterways have been declared as National Waterways under the National Waterways Act 2016, which includes 19 new National Waterways in North East.
  • 5. Declared by an Act of Parliament in December 1988 5
  • 6. 6  Fairway (891 km )  Dredging done departmentally with 2 CSD units and 2 HSD units deployed in NW-2. Stretch LAD in lean season (Oct.- Mar) LAD in flood season (April –Sept.) B’Border-Neamati (630 Km) 2.5 Meter 2.5 Meter Neamati –Dibrugarh (138 Km) 2.5 Meter 2.5 Meter Dibrugarh-Sadiya (123 km)/ Oriumghat 1.5 Meter 1.5 Meter  Dredging and bandalling done every year between October to March Facilities on NW-2 for IWT
  • 7. 7 Aids to Navigation  1002 day navigation aids are provided and maintained in entire NW- 2  455 Night navigation aids are provided from B’Border to Silghat (440 km)  DGPS stations are provided at Dhubri, Jogighopa, Silghat & Dibrugarh  Fortnightly talweg survey through 5 survey vessels of IWAI to identify the shoals and river notices being issued  Besides, pilots provided to cargo vessels for assistance day navigation marks night navigation aids Facilities on NW-2 for IWT
  • 8. 8  Terminals  Pandu has been developed as a IWT based transportation hub for multimodal connectivity in the NER  11 Floating terminals at Hatsingmari,Dhubri, Jogighopa, Tejpur, Silghat, Biswanthghat, Neamati, Bogibeel, Dibrugarh, Sengajan & Oriumghat are being maintained with pontoon and bamboo gangway  Floating terminal can be provided at other locations on need basis 8 BG Siding at PanduLow Level Jetty at Pandu Tejpur terminal Silghat terminal Oriumghat terminal High Level Jetty at Pandu
  • 9. 9  Ship Repair facility(Slipway) at Guwahati (Pandu)  Work awarded on 01.01.2016  Construction work in progress, 13% physical progress is achieved.  Work is to be completed by Dec.2018
  • 10. Transport route to adjacent location from Hatsingmari 10
  • 11.  Ro- Ro facility at Dhubri and Hatsingimari (opposite bank) are to be provided to reduce travel time of vehicles between Meghalaya and Dhubri in Assam which now have to go over Jogighopa bridge (220 km)  Construction of Dhubri terminal is in progress and 94% progress has been achieved.  Construction of Hatsingimari terminal could not be taken up due to severe erosion at the terminal site  Brahmaputra Board has taken up anti-erosion works at this location  Construction of Permanent Terminal at Hatsingimari can be taken up only after anti-erosion works are completed by Brahmaputra Board  Temporary arrangement for Ro-Ro operation has been made by IWAI to facilitate Ro-Ro operations between Dhubri and Hatsingimari 11 Ro-Ro terminal at Dhubri & Hatsingmari
  • 12. New National Waterways in NER 12 19 rivers of NER has also been included in the list as per details below.  Arunachal Pradesh - 1No- Lohit Assam -11No- Aai,Barak,Beki,Dhansiri, Dehing,Dikhu,Doyans, Gangadhar,Kopili,Putimari and Subansiri  Meghalaya - 5No- Ganol,Jinijiram,Yanshi, Simdang and Umngot Mizoram - 1No - Tlwang Nagaland - 1 No – Tizu Process for preparation of TEF/DPR of these waterways are underway
  • 13. Indo-Bangladesh Protocol 13 INDO – BANGLADESH PROTOCOL ROUTES B A N G L A D E S H M E G H A L A Y A MANIPUR MIZORAM TRIPURA HALDIA KOLKATA DHUBRI PANDU JOGIGHOPA SHISHUMARA DHULIAN KARIMGANJ RAJSHAHI NARAYANGANJ DHAKA LAKHIPUR Bay of Bengal 31 DISPUR 40 51 SHILLONG 54 AIZWALAGARTALA 37 37 44 53 BAGHABARI CHILMARI BAHADURABAD SIRAJGANJ ZAKIGANJ FENCHUGANJ SHERPUR MARKULI AJMIRIGANJ BHAIRAB BAZAR CHANDPUR BARISAL KAUKHALI MONGLA KHULNA CHALNA NAMKHANA GODAGARI ARICHA ASHUGANJ Myanmar (Burma) IMPHAL KOHIMA NAGALAND 53 34 35 2 6 41 31 Legend Kolkata - Guwahati/Pandu ...... 1535 km Kolkata - Karimganj...................1318 km Dhulian-Rajshahi...........................78 km Protocol route distances N BHANGA AKHAURA DAIKHAWA Legend Declared National waterway Proposed National waterway Protocol route Road Rail NH 51 ANGTIHARA SYLHET P P P P P P P P AGARTALA 13 Back 13
  • 14. Indo-Bangladesh Protocol 14 Description: • Indo- Bangladesh Trade & Transit Protocol exists to facilitate movement of cargo from Kolkata / Haldia to Karimganj/ Silghat in NER and vice versa • The designated inland water routes in India side under this protocol are (i) Kolkata-Silghat – Kolkata, (ii) Kolkata – Karimganj – Kolkata, (iii) Rajshahi – Dhulian, Rajshahi and (iv) Silghat – Karimganj – Silghat. • For inter-country trade, five ports of call have been designated in each country. These are: Haldia, Kolkata, Pandu, Karimganj and Silghat in India and Narayanganj, Khulna, Mongla, Sirajganj and Ashuganj in Bangladesh. • The Protocol is valid till June 2020.
  • 15. Indo-Bangladesh Protocol 15 Issues: • Need to develop Protocol routes in Bangladesh with equivalent LAD as available in Indian side i.e. 2.5m • For regular cruise and passengers movement between India & Bangladesh_ Proposal is under process.
  • 16. Connectivity with Chittagong port 16 • Access to Chittagong port of Bangladesh set to change EXIM cargo transport pattern in NER as well as Bhutan • On June 6, during the visit of Prime Minister of India to Dhaka, India and Bangladesh inked the agreement on Coastal Shipping for two-way trade through ports; renewed the 1972 Protocol on Inland Waterways Transit and Trade (PIWTT) for using their waterways for commerce; and signed an MoU for use of Chittagong and Mongla Ports for movement of goods to and from India. • Chittagong and Mongla ports, along with Kolkata port and Haldia dock system, are located in the Ganga delta. According to the agreement, the two Bangladesh ports can be used by India to ship goods to its landlocked states in the northeast - to Agartala in Tripura, to Dawki in Meghalaya or to Sutarkandi in Assam - either through waterways, rail or road. • Bangladesh will also get transit through India into Nepal and Bhutan, according to the renewed Bilateral Trade Agreement inked in 1972. This also gives a fillip to connectivity in the Bangladesh, Bhutan, India, Nepal sub-regional grouping of SAARC.
  • 17. Trade to Agartala via Mongla and Ashuganj 17 • FCI had ferried 35,000 tonnes of rice in 2014 & 2015 to Tripura from Vizag and Kolkata via Bangladesh • Agartala from Kolkata is 1,600 km by road and 2,640 km from New Delhi, while the distance between Agartala and Kolkata is just about 620 km and 2,085 km from New Delhi via Bangladesh. •The waterway movement from Mongla to Ashuganj (Brahmanbaria, Chittagong) has a draft of 3.8 m. Hence, it becomes commercially attractive to use small and low draft vessel from Kolkata to
  • 18. Bhanga Badarpur Silchar  Stretch: Lakhipur- Bhanga  Length: 121 Km  Development cost -Rs 141 Cr
  • 19. Development of River Barak 19  Development proposed in two phase  Silchar to Bhanga (70KM) in phase-I and Silchar to Lakhipur in phase-II  EPC tender for phase-I invited for dredging & fairway maintenance with a LAD of 2 m along with navigational aids.  EPC tender for up gradation of existing terminal at Karimganj & Badarpur and for development of new terminal at Silchar will be invited by Nov 2016
  • 20. Development of River Barak 20  Strategic Benefits  Distance advantage over other modes of transportation to NE Region  Higher unit capacity per unit fuel consumption of IWT vis-à-vis road.  Pollution levels created by IWT for moving a unit quantity are much less when compared to road.  Port- hinterland Connectivity  Environment Friendly and Safe Mode
  • 21. Central Sector Scheme for NER 21 Under a Central Sector Scheme, Ministry of Shipping provides 100% grant to NE States for IWT infrastructure development The projects are implemented by Govt. of Tripura  One project for preparation of DPR for Gumti & Haora rivers in Tripura was sanctioned at a cost of Rs.0.83Cr and completed in April 2015  Another project for development of Gumti & Haora rivers in Tripura linkage with Meghna river system in Bangladesh was sanctioned at a cost of Rs.12.59Cr in Nov 2015 & Rs.2.00Cr released to Govt. of Tripura.  IWAI is providing necessary assistance as and when required by the State Govts to prepare projects under this scheme.
  • 22. Benefits of IWT for Tripura 22  Development of IWT should not be viewed from considerations of commercial viability alone.  The benefits to the economy and the people of this area at large are equally important considerations.  The security benefits like connecting to Tripura with rest of India, socio-economic benefits and environmental benifits can be achieved through this project.  Development of IWT may benefits the people of Atharamura & Longtharai on the NE boundary of South Tripura district and Sonamura sub division across the Bangladesh border.  The export cargo (i.e rubber, orange, rice and tea products) from Tripura to Bangladesh and other nearby areas in Tripura may be increased.
  • 23. Kaladan Multimodal Project 23Sittwe Bay of Bengal Myanmar I N D I A Kolkata Sittwe 539 km Sea Sittwe Paletwa 158 km IWT Paletwa Kaletwa 67 km Road Kaletwa Myeikwa (IM Border) 62 km Road Myeikwa (IM Border) Lawngtlai 100 km Road Lawngtlai Aizwal 334 km Road Kolkata Aizwal 1260 km Paletwa Kaletwa Myeikwa (IM Border) Kyauktaw Lawngtlai
  • 24. Kaladan Multimodal Project 24 • Objective of the project is to provide an alternate connectivity to North East through Kaladan river & Sittwe port in Myanmar • Project funded by MEA – total project cost could be of over Rs.2500 crore • Multi modal project: Road- IWT- Sea • IWAI as PDC for IWT and Port Component • M/s Essar Projects appointed by MEA as main contractor for port & IWT components • Cost of work (IWT & Port): Rs 342 crore • Physical progress of 94% has been achieved; likely completion Nov 2016 • Road part from Paletwa to Indian Boarder in Mizoram is being looked after by IRCON
  • 25. 25
  • 26. Trade to Agartala via Chittagong & Ramgarh 26 • Ramgarh and Sabroom are the proposed land ports on Bangladesh and India side respectively. • Once this LCS is developed it would be shortest route to reach India via Chittagong. • World Bank is funding development of road infrastructure from Chittagong Port to Ramgarh in Bangladesh. • It is estimated to take 6 to 7 years for the development of Ramgarh LCS. • Once Ramgarh LCS becomes operational, it will substantially reduce the overall logistics cost.
  • 27. Trade to Agartala via Chittagong and Ashuganj 27 • Good road connectivity from Chittagong to Ashuganj via NH-1, Bangladesh • Indo-Bangla Coastal Trade - opens a new opportunity by improving the utilization of Indian Ports and helps in decongestion of road especially at Indo-Bangla Border • Vessels take 30hour steaming time to reach from Chittagong to Ashuganj (Brahmanbaria, Chittagong).