SlideShare a Scribd company logo
Airports Authority of India
23rd September, 2016
Airports in North Eastern Region
Shillong
North Lakhimpur
(Lilabari)
Dibrugargh
Dimapur
Agartala
Guwahati
Imphal
JorhatTezpur
Silchar
Tura
Kamalpur
Kailashahar
Ziro
Daparizo Along
Pasighat
Lengpui
Tezu
LEGEND
Operational (11+1)
Non-Operational (12)
New Greenfield (3)
Khowai
Rupsi
Turial
Shella
State Operational Non-
Operational
Assam 6
3 IAF, 3 AAI
2
Arunachal
Pradesh
- 5
Manipur 1 -
Meghalaya 1 1
Mizoram 1 1
Nagaland 1 -
Tripura 1 3
Sikkim - -
West
Bengal
1 -
Total 11+1 12
Bagdogra
Assam
Meghalaya
Nagaland
Manipur
Mizoram
Arunachal Pradesh
Tripura
Pakyong
Sikkim
West Bengal
Greenfield Airport
Itanagar
 Operational - 12
 Agartala,
 Dibrugarh,
 Dimapur,
 Guwahati(Int. Airport),
 Imphal,
 Jorhat (CE),
 Lilabari,
 Shillong (Barapani),
 Silchar (CE),
 Lengpui (SG- Mizoram),
 Tezpur (CE),
 Bagdogra (CE).
 Non-operational – 12
Along(SG- Arunachal Pradesh),
Daparizo (SG- Arunachal Pradesh),
Kailashahar,
Kamalpur,
Khowai,
Pasighat,
Rupsi,
Tezu,
Tura* (SG-Meghalaya),
Turial (Aizwal),
Ziro(SG- Arunachal Pradesh),
Shella.
Airports in the North-East Region
 Greenfield Airports – 3
Pakyong (WIP) Nagaland(Proposed) Itanagar (Holongi-PR)
* Tura Airport has requisite infrastructure to operate flights of Dornier-228 operations. No operators are presently available
PRESENT AIR CONNECTIVITY IN NER (SS-15)
(AIRPORT & AIRLINE-WISE)
Station AI/9I 9W/S2 UK G8 SG 6E KB I5 A/c Movements /wk
Agartala (32) (42) (84) 158
Lengpui (SG) (16) (28) 44
Bagdogra (CE) (28) (28) (14) (28) (28) (56) (8) 190
Dibrugarh (10) (14) (28) 52
Dimapur (10) (14) 24
Guwahati (58) (186) (28) (28) (60) (238) (8) (56) 662
Imphal (30) (20) (56) (14) 120
Jorhat (CE) (14) 14
Lilabari (8) 8
Shillong (12) 12
Silchar (CE) (20) (42) 62
Tezpur (CE) (6) 6
Total 1352
AI-Air India; 9I:Alliance Air; 9W-Jet Airways; S2-JetLite; G8-Go Air; SG-Spicejet; 6E-IndiGo; I5-Air Asia India; UK-Vistara;
KB-Druk Air  Jet  ATR42
BG- Blue Dart Cargo Flight at Guwahati Airport ( 04 movements/Wk )
5
Domestic Connectivity- SS 2015
 GUWAHATI (Assam)
(15 Destinations)
• Agartala
• Bagdogra
• Bangkok
• Bengaluru
• Delhi
• Dibrugarh
• Imphal
• Jorhat
• Kolkata
• Lengpui
• Lilabari
• Mumbai
• Paro
• Silchar
• Chennai
 DIBRUGARH (Assam)
(04 destinations)
• Delhi
• Guwahati
• Kolkata
• Dimapur
 AGARTALA (Tripura)
(05 destinations)
• Guwahati
• Imphal
• Kolkata
• Delhi
• Bengaluru
 IMPHAL (Manipur)
(05 destinations)
• Agartala
• Delhi
• Guwahati
• Lengpui
• Kolkata
 LILABARI(Assam)
(01destinations)
• Guwahati
 Tezpur (Assam)
(01 destinations)
• Silchar
6
Domestic Connectivity- SS 2015
 DIMAPUR (Nagaland) (02)
• Dibrugarh
• Kolkata
 SHILLONG (Meghalaya)(01)
• Kolkata
 LENGPUI (Mizoram) (03)
• Guwahati
• Imphal
• Kolkata
 SILCHAR (Assam) (03 )
• Guwahati
• Kolkata
• Tezpur
 JORHAT (Assam) (02)
• Guwahati
• Kolkata
7
International Connectivity-
At present, Druk Air operating International flights from
Guwahati and Bagdogra.
Sectors : Paro-Guwahati-Bangkok – 04 days
Bangkok-Guwahati-Paro - 04 days
Paro-Bagdogra-Bangkok – 04 days
Bangkok-Bagdogra-Paro – 04 days
33.02 34.04
42.07
55.47 58.84
62.31
67.40
69.15
64.17 59.84
51.35 56.54
14.47 16.21
22.72
28.62 29.78
36.28 45.90
53.19
49.81
51.15 45.08 53.56
10.30 11.01 9.84 11.26 13.35
18.95 24.09
22.74 18.27
21.60
21.81
26.68
2004-05 2005-06 2006-07 2007-08 2008-09 2009-10 2010-11 2011-12 2012-13 2013-14 2014-15 2015-16
AIRCRAFT MOVEMENT (in '000) PASSENGER ( in lakh) FREIGHT ( in '000)
Freight
Passenger
Aircraft
YEAR
Aircraft Movements Passengers Freight
In Nos. % change In Nos. % change MT % change
2006-07 42069 23.6 % 2272213 40.2 % 9836 -10.6%
2007-08 55471 31.9 % 2861671 25.9 % 11260 14.5%
2008-09 58843 6.1 % 2977703 4.1 % 13346 18.5%
2009-10 62307 5.9% 3628313 21.8% 18947 42.0%
2010-11 67395 8.2% 4590271 26.5% 24087 27.1%
2011-12 69158 2.6% 5319387 15.9% 22749 -5.6%
2012-13 64173 -7.2% 4981659 -6.35% 18270 -19.7%
2013-14 59844 -6.7% 5115567 2.7% 21604 18.2%
2014-15 51353 -14.2% 4508860 -11.9% 21813 1.0%
2015-16 56544 10.1% 5356285 18.8% 26687 22.3%
CAGR 6.03 13.76 10.77
Traffic Trends in North East Region
NER TRAFFIC DATA AIRPORT WISE FY 2014-15 AND FY 2015-16
Sr. No.
Airport
A/C Movement ( in Nos) Passengers ( in Nos) Freight ( in MT)
2014-15 2015-16 Growth % 2014-15 2015-16 Growth % 2014-15 2015-16 Growth %
1 GUWAHATI 26871 29425 8.67 2233601 2784315 19.77 10460 15628 33.06
2 Bagdogra 10125 8839 -0.14 1035887 1087239 4.72 2235 4227 47.12
3 IMPHAL 4803 6078 20.97 612188 766877 20.17 4467 4266 -4.71
4 AGARTALA 7612 7158 -6.34 879182 921591 4.60 5681 5456 -4.12
5 DIBRUGARH 3992 3213 -24.24 319260 319646 1.20 336 389 13.62
6 SILCHAR 3110 3586 13.27 189370 200855 5.71 415 443 6.32
7 LENGPUI (AIZWAL) 2899 2839 -2.11 162651 175137 7.12 266 286 6.99
8 JORHAT 702 776 9.53 44989 53224 15.47 14 16 12.5
9 DIMAPUR 598 2307 74.07 52862 111756 52.69 174 203 14.28
10 BARAPANI (SHILLONG) 432 500 13.6 10346 11565 10.54 0 0 0.00
11 TEZPUR 26 286 90.90 354 5063 93.00 0 0 0
12 LAKHIMPUR (LILABARI) 252 334 24.55 4011 6229 35.60 0 0 0
13 TEZU 56 42 -33.33 49 27 -81.48 0 0 0
TOTAL 61478 65383 5.97 5544747 6443524 13.94 24048 30914 22.21
AIRPORT WISE TRAFFIC DATA
S.No. State /Airport Name of Project AA&ES
amount(Rs.
in Crores)
PDC Remarks
A. Greenfield
1. Sikkim
(a) Pakyong (i) C/o Greenfield Airport at
Pakyong for ATR-72
operations.
605.59 Dec.2017 91.50% of operational area works
completed. 48% Terminal building &
other city side works completed.
B.
1.
Non-Operational
to Operational
Arunachal
Pradesh
(a) Tezu
(i) Operationalisation /
upgradation of Tezu Airport
for ATR-72 operations.
96.50 Sept.2017 57% completed. Operational area
work almost completed. Terminal
building work awarded to MTDC
(Deposit Work on 08.04.16 after
rescinding original work).
C.
1.
Operational
Airports
Assam
(a) Guwahati
(a) Dibrugarh
(i) C/o Integrated Office
Complex for AAI/DGCA.
(ii) C/o ASR-MSSR building
(iii) Extension of terminal
building
(i) Extn. Of runway from 6000’
to 7500’
13.16
6.5
10.6
52.3
-
Dec., 2017
Dec. 2017
Nov., 2017
Completed in March 16.
72% completed.
67% completed.
Work awarded. Mobilization in
progress. 5.58% complete.
Major/ Important works in progress
S.N
o.
State
/Airport
Name of Project AA&ES
amount(
Rs. in
Crores)
PDC Remarks
2.
3.
( c) Silchar
Manipur
(a) Imphal
Meghalaya
(a) Shillong
(i) Resurfacing of runway
(i) Extension of Apron
(ii) C/o Boundary wall for
newly acquired land
( i) C/o Boundary Wall for
newly acquired land
(ii) Installation of ILS
(iii) Construction of
Perimeter Road
(iv) Construction of New
ATC Tower cum Fire
station
12.98
13.27
15.10
8.57
5.00
7.70
10.02
Nov. 2016
Oct. 2016
Jan.2017
Dec 2017
Dec,2017
May 2017
Work awarded in Nov. 2015. Mobilization in
progress. 10% complete.
99% completed.(Apron portion fully
completed)
Completed in March,2016.
Work rescinded earlier due to local disturbances
on land compensation issues. (Only 39% done
at that time). Resolved by State Govt. AAI given
balance work to PWD on deposit basis. Overall
80% work completed.
Equipment procured. Civil & Electrical works in
progress. 25% complete.
Estimate stage.
Work awarded in Nov. 2015. Work suspended
by Agency.
Major/ Important works in progress
Airport /
S. N0.
SCHEME
A Operational Airports
Guwahati
Construction of Cargo complex – ASIDC to construct. AAI had given in-principle
approval for providing land.
Construction of new Integrated Terminal building of Capacity 3100 php. Tender for
Project Management Consultancy called.
Construction of Parallel Taxi Track and ancillary works – IAF has agreed in principle
to give land and NOC.
Extension of runway by 550m (Phase-II) and strengthening of runway, taxiway and
apron for operation of Code E aircrafts ( B-747) - State Govt. to provide land for
Cat.I Approach Light System.
Construction of New control tower cum Technical Block and Construction of Fire
station & MT workshop – Design stage.
Dibrugarh
1. Construction of new Control Tower cum Technical Block – Design stage.
2. Construction of Hangar for A-321 – Tender Stage.
Lilabari
1 Installation of ILS - State Govt. to acquire 84 acres of land.
Major Works in Planning Stage
Airport /
S. N0.
SCHEME
A Operational Airports (Conti.)
Jorhat
1. Construction of New Terminal Building including ancillary buildings – Land to be
acquired.
Agartala
1. Construction of New Terminal Building for 1200 PAX. – PMC awarded and
Consultant submitted Preliminary design and conceptual reports.
2. Construction of Hangar for A-321. NEC not agreed for fund support.
3. Construction of Cargo Complex – Design stage.
Barapani
1. Expansion of Apron to park 4 Nos. A-321 aircraft – DPR submitted to NEC
2. Expansion of runway upto 7500’ including ancillary works - DPR submitted to NEC.
Imphal
1. Construction of one hangar for A-321 – Tendering stage.
2. Construction of Cargo Complex – Land allotted to MIDC
Works in Planning Stage in NER
Airport Upgradation of Non-Operational Airports
B Non Operational Airports
Daparizo Operationalisation of Daparizo Airport for ATR-42 – 34.30 acres of Land to be
acquired. DPR submitted to NEC in Nov-2011. State Govt. informed inability to
acquire the land and proposed for Greenfield Airport.
Ziro Construction of Civil Enclave at Ziro Airport - – 10 acres of Land to be acquired.
DPR submitted to NEC in Nov-2011.
Along Construction of Civil Enclave at Along Airport - – 7 acres of Land to be
acquired. DPR submitted to NEC in Nov-2011.
Passighat Construction of Civil Enclave at Passighat Airport - DPR submitted to NEC in
Nov-2011. 11.60 acres land to be provided by State Govt.
Rupsi Construction of Civil Enclave at Rupsi Airport - De-notification of 517.27
acres of land by Forest Department is in process.
Kailashahar Operationalisation of Kailashahar Airport for ATR-72 – 75 acres of Land to be
acquired.
Tura Operationalisation of Tura Airport for ATR-72 – 56.50 acres of Land to be
acquired
Works in Planning Stage in NER
Greenfield Airport
Pakyong (Sikkim)
 A new Greenfield airport is under construction at Pakyong (Gangtok) in Sikkim. Anticipated Revised Cost -
Rs. 605 crores.
 The likely date of completion - December, 2017.
 Funding – 90% Govt. grant and 10% by AAI.
 Physical progress 86%.
 Work got hindered due to intermittent bandhs, heavy rain, earthquake etc. Local residents had stopped
the work on compensation issue for the houses adjacent to the boundary stating cracks on the building.
Even though work restarted from Nov. 2014, it again got stopped by villagers on the demand of payment
of compensation. MoU signed with State Govt on 30.06.2015 and compensation amount has been
released by AAI. Work resumed from 1.10.2015.
 Critical Issues
State Govt
i) Vacation/relocation of houses adjacent to AAI boundary.
ii) Providing land for AAI residential colony(approx 5 acres).
iii) Approach road from Ranipur to Pakyong to be widened.
iv) The MoU between Govt. of Sikkim & AAI/MoCA/NITI Ayog has been signed.
L2
L4
A4 A3
EARLIER EMBANKMENT TOP EDGE
AS PER SITE CONDITION ON 20.09.10
131
J
JA
1
6 5
4a
4a
NO CONSTRUCION ZONE
50 MTS WIDE CORRIDOR
TOWARDS HILLS SLIDE
NO CONSTRUCTION ZONE
BETWEEN AIRPORT WALL
AND APPROCH ROAD
AAI
BOUNDARY
APPROX. 22 KM LONG APPROCH ROAD
TO AIPORT TO BE WIDENED FROM NH 31A
(RANIPOOL TO PAKYONG)
7a
7
Pakyong
Airports in North Eastern Region
TERMINAL BUILDING
FIRESTATION cum
ATC TOWER
ISOLATION BAY
CAR PARK
APRON
WATER SUPPLY
BUILDING
DVOR
RUNWAY 02/20
1700 x 30m
MASTER PLAN ( DEVELOPMENT WORKS IN PROGRESS )
AAI LAND
198 ACRES
HILL CUTTING CHIMNEY DRAIN WORK
BOX CULVERT WORK
Greenfield Airport at Pakyong
Construction Phase
CITY SIDE VIEW OF TERMINAL BUILDING
PROPOSED NEW INTEGRATED TERMINAL AND ASSOCIATED WORKS AT AGARTALA PMC : ARCHITECTS:06-09-2016
18
MASTER PLAN
EXISTING TERMINAL
PROPOSED TERMINAL
PROPOSED NEW INTEGRATED TERMINAL AND ASSOCIATED WORKS AT AGARTALA PMC : ARCHITECTS:06-09-2016
19
PROPOSED TERMINAL
AREA: 30,000 sqm
PEAK HOUR CAPACITY: 1200 pax
ANNUAL PASSENGER CAPACITY :-
SUFFICIENT FOR : 2.5 mmpa
APRON CAPACITY: 6 Airbus 321
MASTER PLAN - PROPOSED
PROPOSED NEW INTEGRATED TERMINAL AND ASSOCIATED WORKS AT AGARTALA PMC : ARCHITECTS:06-09-2016
20
INTERIOR VIEW
VIEW 04
- LOCAL MOTIF DEPICTED IN METAL CLADDING TO CREATE
VIBERANCY
- USE OF METAL CLADDING AND PERFORATED SCREENS IN
INTERIOR AREAS
MATERIALS :- 1. RESTAURANT - METAL MESH
CLADDING
2. BULKHEAD - ACP PANELS WITH MOTIF
INLAY
3. RETAIL BULKHEAD - ACRYLIC SOLID
SURFACE
TRIPURA TRIBAL ART MOTIFS
21. NECS 2016 _ Air connectivity Ms.Sangeeta Mahay

More Related Content

Viewers also liked

8. NECS 2016 _ Inaugural session industry speak-Mr.Rajnish Kumar
8. NECS 2016 _ Inaugural session industry speak-Mr.Rajnish Kumar8. NECS 2016 _ Inaugural session industry speak-Mr.Rajnish Kumar
8. NECS 2016 _ Inaugural session industry speak-Mr.Rajnish Kumar
FICCINorthEast
 
4. NECS 2016 _ Building cross border value chains and border townships Mr.Dhi...
4. NECS 2016 _ Building cross border value chains and border townships Mr.Dhi...4. NECS 2016 _ Building cross border value chains and border townships Mr.Dhi...
4. NECS 2016 _ Building cross border value chains and border townships Mr.Dhi...
FICCINorthEast
 
17. NECS 2016 _ Energy_ Evolving power situation and investment opportunities...
17. NECS 2016 _ Energy_ Evolving power situation and investment opportunities...17. NECS 2016 _ Energy_ Evolving power situation and investment opportunities...
17. NECS 2016 _ Energy_ Evolving power situation and investment opportunities...
FICCINorthEast
 
13. NECS 2016 Opportunities in agro - food processing Mr.S.Bhattacharjee
13. NECS 2016  Opportunities in agro - food processing Mr.S.Bhattacharjee13. NECS 2016  Opportunities in agro - food processing Mr.S.Bhattacharjee
13. NECS 2016 Opportunities in agro - food processing Mr.S.Bhattacharjee
FICCINorthEast
 
11. NECS 2016 _Current status and the way ahead for road development in the ...
11.  NECS 2016 _Current status and the way ahead for road development in the ...11.  NECS 2016 _Current status and the way ahead for road development in the ...
11. NECS 2016 _Current status and the way ahead for road development in the ...
FICCINorthEast
 
20. NECS 2016 _ Sub regional cooperation in energy sector Mr.K.M.Zaman Romel
20. NECS 2016 _ Sub regional cooperation in energy sector Mr.K.M.Zaman Romel20. NECS 2016 _ Sub regional cooperation in energy sector Mr.K.M.Zaman Romel
20. NECS 2016 _ Sub regional cooperation in energy sector Mr.K.M.Zaman Romel
FICCINorthEast
 
18. NECS 2016 _ Energy- Way forward for oil and gas exploration in tripura-Mr...
18. NECS 2016 _ Energy- Way forward for oil and gas exploration in tripura-Mr...18. NECS 2016 _ Energy- Way forward for oil and gas exploration in tripura-Mr...
18. NECS 2016 _ Energy- Way forward for oil and gas exploration in tripura-Mr...
FICCINorthEast
 
14. NECS 2016 _ Opportunities in handloom,textiles & apparels Mr.R.E.Zeliang
14. NECS 2016 _  Opportunities in handloom,textiles & apparels Mr.R.E.Zeliang14. NECS 2016 _  Opportunities in handloom,textiles & apparels Mr.R.E.Zeliang
14. NECS 2016 _ Opportunities in handloom,textiles & apparels Mr.R.E.Zeliang
FICCINorthEast
 
24. NECS 2016 Connectivity through inland waterways_ Mr.Mahboob Ahmed
24. NECS 2016  Connectivity through inland waterways_ Mr.Mahboob Ahmed24. NECS 2016  Connectivity through inland waterways_ Mr.Mahboob Ahmed
24. NECS 2016 Connectivity through inland waterways_ Mr.Mahboob Ahmed
FICCINorthEast
 
19. NECS 2016 _ Energy- Way forward for solar and wind power in NE India -Pro...
19. NECS 2016 _ Energy- Way forward for solar and wind power in NE India -Pro...19. NECS 2016 _ Energy- Way forward for solar and wind power in NE India -Pro...
19. NECS 2016 _ Energy- Way forward for solar and wind power in NE India -Pro...
FICCINorthEast
 
2. NECS 2016 dialogue on sustainable growth & integration- Ms.Avia Nahreen
2. NECS 2016  dialogue on sustainable growth  & integration- Ms.Avia Nahreen2. NECS 2016  dialogue on sustainable growth  & integration- Ms.Avia Nahreen
2. NECS 2016 dialogue on sustainable growth & integration- Ms.Avia Nahreen
FICCINorthEast
 
6. NECS 2016 Ease of doing business Mr.George Jenner
6. NECS 2016  Ease of doing business Mr.George Jenner6. NECS 2016  Ease of doing business Mr.George Jenner
6. NECS 2016 Ease of doing business Mr.George Jenner
FICCINorthEast
 
12. NECS 2016_ Trans Asian overland connectivity ;the progress so far Ms. S...
12. NECS 2016_  Trans Asian overland connectivity ;the progress so far  Ms. S...12. NECS 2016_  Trans Asian overland connectivity ;the progress so far  Ms. S...
12. NECS 2016_ Trans Asian overland connectivity ;the progress so far Ms. S...
FICCINorthEast
 
26. NECS 2016 _ Inland waterways_ Mr.Amlan Basu
26. NECS 2016 _ Inland waterways_ Mr.Amlan Basu26. NECS 2016 _ Inland waterways_ Mr.Amlan Basu
26. NECS 2016 _ Inland waterways_ Mr.Amlan Basu
FICCINorthEast
 
15. NECS 2016_ Investment opportunities in tourism in NER Mr.Gautam Chintey
15. NECS 2016_   Investment opportunities in tourism in NER Mr.Gautam Chintey15. NECS 2016_   Investment opportunities in tourism in NER Mr.Gautam Chintey
15. NECS 2016_ Investment opportunities in tourism in NER Mr.Gautam Chintey
FICCINorthEast
 
16. NECS 2016 _ Energy - Expanding the oil &; gas potential for north east- M...
16. NECS 2016 _ Energy - Expanding the oil &; gas potential for north east- M...16. NECS 2016 _ Energy - Expanding the oil &; gas potential for north east- M...
16. NECS 2016 _ Energy - Expanding the oil &; gas potential for north east- M...
FICCINorthEast
 
1. NECS 2016 opportunities for investment in bamboo processing Mr.George Jenner
1. NECS 2016  opportunities for investment in bamboo processing Mr.George Jenner1. NECS 2016  opportunities for investment in bamboo processing Mr.George Jenner
1. NECS 2016 opportunities for investment in bamboo processing Mr.George Jenner
FICCINorthEast
 

Viewers also liked (17)

8. NECS 2016 _ Inaugural session industry speak-Mr.Rajnish Kumar
8. NECS 2016 _ Inaugural session industry speak-Mr.Rajnish Kumar8. NECS 2016 _ Inaugural session industry speak-Mr.Rajnish Kumar
8. NECS 2016 _ Inaugural session industry speak-Mr.Rajnish Kumar
 
4. NECS 2016 _ Building cross border value chains and border townships Mr.Dhi...
4. NECS 2016 _ Building cross border value chains and border townships Mr.Dhi...4. NECS 2016 _ Building cross border value chains and border townships Mr.Dhi...
4. NECS 2016 _ Building cross border value chains and border townships Mr.Dhi...
 
17. NECS 2016 _ Energy_ Evolving power situation and investment opportunities...
17. NECS 2016 _ Energy_ Evolving power situation and investment opportunities...17. NECS 2016 _ Energy_ Evolving power situation and investment opportunities...
17. NECS 2016 _ Energy_ Evolving power situation and investment opportunities...
 
13. NECS 2016 Opportunities in agro - food processing Mr.S.Bhattacharjee
13. NECS 2016  Opportunities in agro - food processing Mr.S.Bhattacharjee13. NECS 2016  Opportunities in agro - food processing Mr.S.Bhattacharjee
13. NECS 2016 Opportunities in agro - food processing Mr.S.Bhattacharjee
 
11. NECS 2016 _Current status and the way ahead for road development in the ...
11.  NECS 2016 _Current status and the way ahead for road development in the ...11.  NECS 2016 _Current status and the way ahead for road development in the ...
11. NECS 2016 _Current status and the way ahead for road development in the ...
 
20. NECS 2016 _ Sub regional cooperation in energy sector Mr.K.M.Zaman Romel
20. NECS 2016 _ Sub regional cooperation in energy sector Mr.K.M.Zaman Romel20. NECS 2016 _ Sub regional cooperation in energy sector Mr.K.M.Zaman Romel
20. NECS 2016 _ Sub regional cooperation in energy sector Mr.K.M.Zaman Romel
 
18. NECS 2016 _ Energy- Way forward for oil and gas exploration in tripura-Mr...
18. NECS 2016 _ Energy- Way forward for oil and gas exploration in tripura-Mr...18. NECS 2016 _ Energy- Way forward for oil and gas exploration in tripura-Mr...
18. NECS 2016 _ Energy- Way forward for oil and gas exploration in tripura-Mr...
 
14. NECS 2016 _ Opportunities in handloom,textiles & apparels Mr.R.E.Zeliang
14. NECS 2016 _  Opportunities in handloom,textiles & apparels Mr.R.E.Zeliang14. NECS 2016 _  Opportunities in handloom,textiles & apparels Mr.R.E.Zeliang
14. NECS 2016 _ Opportunities in handloom,textiles & apparels Mr.R.E.Zeliang
 
24. NECS 2016 Connectivity through inland waterways_ Mr.Mahboob Ahmed
24. NECS 2016  Connectivity through inland waterways_ Mr.Mahboob Ahmed24. NECS 2016  Connectivity through inland waterways_ Mr.Mahboob Ahmed
24. NECS 2016 Connectivity through inland waterways_ Mr.Mahboob Ahmed
 
19. NECS 2016 _ Energy- Way forward for solar and wind power in NE India -Pro...
19. NECS 2016 _ Energy- Way forward for solar and wind power in NE India -Pro...19. NECS 2016 _ Energy- Way forward for solar and wind power in NE India -Pro...
19. NECS 2016 _ Energy- Way forward for solar and wind power in NE India -Pro...
 
2. NECS 2016 dialogue on sustainable growth & integration- Ms.Avia Nahreen
2. NECS 2016  dialogue on sustainable growth  & integration- Ms.Avia Nahreen2. NECS 2016  dialogue on sustainable growth  & integration- Ms.Avia Nahreen
2. NECS 2016 dialogue on sustainable growth & integration- Ms.Avia Nahreen
 
6. NECS 2016 Ease of doing business Mr.George Jenner
6. NECS 2016  Ease of doing business Mr.George Jenner6. NECS 2016  Ease of doing business Mr.George Jenner
6. NECS 2016 Ease of doing business Mr.George Jenner
 
12. NECS 2016_ Trans Asian overland connectivity ;the progress so far Ms. S...
12. NECS 2016_  Trans Asian overland connectivity ;the progress so far  Ms. S...12. NECS 2016_  Trans Asian overland connectivity ;the progress so far  Ms. S...
12. NECS 2016_ Trans Asian overland connectivity ;the progress so far Ms. S...
 
26. NECS 2016 _ Inland waterways_ Mr.Amlan Basu
26. NECS 2016 _ Inland waterways_ Mr.Amlan Basu26. NECS 2016 _ Inland waterways_ Mr.Amlan Basu
26. NECS 2016 _ Inland waterways_ Mr.Amlan Basu
 
15. NECS 2016_ Investment opportunities in tourism in NER Mr.Gautam Chintey
15. NECS 2016_   Investment opportunities in tourism in NER Mr.Gautam Chintey15. NECS 2016_   Investment opportunities in tourism in NER Mr.Gautam Chintey
15. NECS 2016_ Investment opportunities in tourism in NER Mr.Gautam Chintey
 
16. NECS 2016 _ Energy - Expanding the oil &; gas potential for north east- M...
16. NECS 2016 _ Energy - Expanding the oil &; gas potential for north east- M...16. NECS 2016 _ Energy - Expanding the oil &; gas potential for north east- M...
16. NECS 2016 _ Energy - Expanding the oil &; gas potential for north east- M...
 
1. NECS 2016 opportunities for investment in bamboo processing Mr.George Jenner
1. NECS 2016  opportunities for investment in bamboo processing Mr.George Jenner1. NECS 2016  opportunities for investment in bamboo processing Mr.George Jenner
1. NECS 2016 opportunities for investment in bamboo processing Mr.George Jenner
 

Similar to 21. NECS 2016 _ Air connectivity Ms.Sangeeta Mahay

Asia days Oslo 2013 - Market opportunities in South & South East Asia - Energy
Asia days Oslo 2013 - Market opportunities in South & South East Asia - EnergyAsia days Oslo 2013 - Market opportunities in South & South East Asia - Energy
Asia days Oslo 2013 - Market opportunities in South & South East Asia - Energy
Innovation Norway
 
Oil & Gas opportunities in Southeast Asia
Oil & Gas opportunities in Southeast AsiaOil & Gas opportunities in Southeast Asia
Oil & Gas opportunities in Southeast Asia
Innovation Norway
 
PPT Aurangabad_Jalgaon
PPT Aurangabad_JalgaonPPT Aurangabad_Jalgaon
PPT Aurangabad_Jalgaon
QuadrisyedQamaruddin
 
Road Construction nhdp 2014
Road Construction nhdp 2014Road Construction nhdp 2014
Road Construction nhdp 2014
Arnaud Renard
 
Aviation assingment frankfinn
Aviation assingment frankfinnAviation assingment frankfinn
Aviation assingment frankfinn
Madhavi Shon
 
Webinar presentation-Planning-7-4-2020.pptx
Webinar presentation-Planning-7-4-2020.pptxWebinar presentation-Planning-7-4-2020.pptx
Webinar presentation-Planning-7-4-2020.pptx
MohammedJazeel2549
 
Adani
AdaniAdani
Improvement of urban transport system
Improvement of urban transport systemImprovement of urban transport system
Improvement of urban transport system
Dr. Zar Rdj
 
TRAFFIC VOLUME STUDY AND DESIGN OF ROUNDABOUT AT PATHANAMTHITTA
TRAFFIC VOLUME STUDY AND DESIGN OF ROUNDABOUT AT PATHANAMTHITTATRAFFIC VOLUME STUDY AND DESIGN OF ROUNDABOUT AT PATHANAMTHITTA
TRAFFIC VOLUME STUDY AND DESIGN OF ROUNDABOUT AT PATHANAMTHITTA
IRJET Journal
 
Impact of Different Types of Land Use on Transportation System of Dhaka City ...
Impact of Different Types of Land Use on Transportation System of Dhaka City ...Impact of Different Types of Land Use on Transportation System of Dhaka City ...
Impact of Different Types of Land Use on Transportation System of Dhaka City ...
Shahadat Hossain Shakil
 
G-K Section PPT .pptx
G-K Section PPT .pptxG-K Section PPT .pptx
G-K Section PPT .pptx
Venkatesh Dontha
 
Smgr corp presentation april 2014
Smgr corp presentation april 2014Smgr corp presentation april 2014
Smgr corp presentation april 2014
Semen Indonesia
 
BEST REAL ESTATE COMPANY IN PATNA
BEST REAL ESTATE COMPANY IN PATNABEST REAL ESTATE COMPANY IN PATNA
BEST REAL ESTATE COMPANY IN PATNA
Saakaar constructions
 
Bapl Presentation
Bapl PresentationBapl Presentation
Bapl Presentation
Airportops
 
Irc.gov.in.sp.063.2004 (1)
Irc.gov.in.sp.063.2004 (1)Irc.gov.in.sp.063.2004 (1)
Irc.gov.in.sp.063.2004 (1)
VinayakaRam
 
Construction Industry Review Issue 22. Year 2013
Construction Industry Review Issue 22. Year 2013Construction Industry Review Issue 22. Year 2013
Construction Industry Review Issue 22. Year 2013
Remona Divekar
 
Sabawon presentation final
Sabawon presentation finalSabawon presentation final
Sabawon presentation final
HazratKhan11
 
Semen Indonesia (SMGR) Corp Presentation April 2014
Semen Indonesia (SMGR) Corp Presentation April 2014Semen Indonesia (SMGR) Corp Presentation April 2014
Semen Indonesia (SMGR) Corp Presentation April 2014
Semen Indonesia
 
Smgr corp presentation may 2014
Smgr corp presentation may 2014Smgr corp presentation may 2014
Smgr corp presentation may 2014
Semen Indonesia
 
5. Updated CV
5. Updated CV 5. Updated CV
5. Updated CV
Kamlesh Patel.
 

Similar to 21. NECS 2016 _ Air connectivity Ms.Sangeeta Mahay (20)

Asia days Oslo 2013 - Market opportunities in South & South East Asia - Energy
Asia days Oslo 2013 - Market opportunities in South & South East Asia - EnergyAsia days Oslo 2013 - Market opportunities in South & South East Asia - Energy
Asia days Oslo 2013 - Market opportunities in South & South East Asia - Energy
 
Oil & Gas opportunities in Southeast Asia
Oil & Gas opportunities in Southeast AsiaOil & Gas opportunities in Southeast Asia
Oil & Gas opportunities in Southeast Asia
 
PPT Aurangabad_Jalgaon
PPT Aurangabad_JalgaonPPT Aurangabad_Jalgaon
PPT Aurangabad_Jalgaon
 
Road Construction nhdp 2014
Road Construction nhdp 2014Road Construction nhdp 2014
Road Construction nhdp 2014
 
Aviation assingment frankfinn
Aviation assingment frankfinnAviation assingment frankfinn
Aviation assingment frankfinn
 
Webinar presentation-Planning-7-4-2020.pptx
Webinar presentation-Planning-7-4-2020.pptxWebinar presentation-Planning-7-4-2020.pptx
Webinar presentation-Planning-7-4-2020.pptx
 
Adani
AdaniAdani
Adani
 
Improvement of urban transport system
Improvement of urban transport systemImprovement of urban transport system
Improvement of urban transport system
 
TRAFFIC VOLUME STUDY AND DESIGN OF ROUNDABOUT AT PATHANAMTHITTA
TRAFFIC VOLUME STUDY AND DESIGN OF ROUNDABOUT AT PATHANAMTHITTATRAFFIC VOLUME STUDY AND DESIGN OF ROUNDABOUT AT PATHANAMTHITTA
TRAFFIC VOLUME STUDY AND DESIGN OF ROUNDABOUT AT PATHANAMTHITTA
 
Impact of Different Types of Land Use on Transportation System of Dhaka City ...
Impact of Different Types of Land Use on Transportation System of Dhaka City ...Impact of Different Types of Land Use on Transportation System of Dhaka City ...
Impact of Different Types of Land Use on Transportation System of Dhaka City ...
 
G-K Section PPT .pptx
G-K Section PPT .pptxG-K Section PPT .pptx
G-K Section PPT .pptx
 
Smgr corp presentation april 2014
Smgr corp presentation april 2014Smgr corp presentation april 2014
Smgr corp presentation april 2014
 
BEST REAL ESTATE COMPANY IN PATNA
BEST REAL ESTATE COMPANY IN PATNABEST REAL ESTATE COMPANY IN PATNA
BEST REAL ESTATE COMPANY IN PATNA
 
Bapl Presentation
Bapl PresentationBapl Presentation
Bapl Presentation
 
Irc.gov.in.sp.063.2004 (1)
Irc.gov.in.sp.063.2004 (1)Irc.gov.in.sp.063.2004 (1)
Irc.gov.in.sp.063.2004 (1)
 
Construction Industry Review Issue 22. Year 2013
Construction Industry Review Issue 22. Year 2013Construction Industry Review Issue 22. Year 2013
Construction Industry Review Issue 22. Year 2013
 
Sabawon presentation final
Sabawon presentation finalSabawon presentation final
Sabawon presentation final
 
Semen Indonesia (SMGR) Corp Presentation April 2014
Semen Indonesia (SMGR) Corp Presentation April 2014Semen Indonesia (SMGR) Corp Presentation April 2014
Semen Indonesia (SMGR) Corp Presentation April 2014
 
Smgr corp presentation may 2014
Smgr corp presentation may 2014Smgr corp presentation may 2014
Smgr corp presentation may 2014
 
5. Updated CV
5. Updated CV 5. Updated CV
5. Updated CV
 

Recently uploaded

一比一原版新西兰奥塔哥大学毕业证(otago毕业证)如何办理
一比一原版新西兰奥塔哥大学毕业证(otago毕业证)如何办理一比一原版新西兰奥塔哥大学毕业证(otago毕业证)如何办理
一比一原版新西兰奥塔哥大学毕业证(otago毕业证)如何办理
taqyea
 
How are Lilac French Bulldogs Beauty Charming the World and Capturing Hearts....
How are Lilac French Bulldogs Beauty Charming the World and Capturing Hearts....How are Lilac French Bulldogs Beauty Charming the World and Capturing Hearts....
How are Lilac French Bulldogs Beauty Charming the World and Capturing Hearts....
Lacey Max
 
The latest Heat Pump Manual from Newentide
The latest Heat Pump Manual from NewentideThe latest Heat Pump Manual from Newentide
The latest Heat Pump Manual from Newentide
JoeYangGreatMachiner
 
AI Transformation Playbook: Thinking AI-First for Your Business
AI Transformation Playbook: Thinking AI-First for Your BusinessAI Transformation Playbook: Thinking AI-First for Your Business
AI Transformation Playbook: Thinking AI-First for Your Business
Arijit Dutta
 
IMG_20240615_091110.pdf dpboss guessing
IMG_20240615_091110.pdf dpboss  guessingIMG_20240615_091110.pdf dpboss  guessing
Prescriptive analytics BA4206 Anna University PPT
Prescriptive analytics BA4206 Anna University PPTPrescriptive analytics BA4206 Anna University PPT
Prescriptive analytics BA4206 Anna University PPT
Freelance
 
2024-6-01-IMPACTSilver-Corp-Presentation.pdf
2024-6-01-IMPACTSilver-Corp-Presentation.pdf2024-6-01-IMPACTSilver-Corp-Presentation.pdf
2024-6-01-IMPACTSilver-Corp-Presentation.pdf
hartfordclub1
 
Pitch Deck Teardown: Kinnect's $250k Angel deck
Pitch Deck Teardown: Kinnect's $250k Angel deckPitch Deck Teardown: Kinnect's $250k Angel deck
Pitch Deck Teardown: Kinnect's $250k Angel deck
HajeJanKamps
 
Ellen Burstyn: From Detroit Dreamer to Hollywood Legend | CIO Women Magazine
Ellen Burstyn: From Detroit Dreamer to Hollywood Legend | CIO Women MagazineEllen Burstyn: From Detroit Dreamer to Hollywood Legend | CIO Women Magazine
Ellen Burstyn: From Detroit Dreamer to Hollywood Legend | CIO Women Magazine
CIOWomenMagazine
 
Cover Story - China's Investment Leader - Dr. Alyce SU
Cover Story - China's Investment Leader - Dr. Alyce SUCover Story - China's Investment Leader - Dr. Alyce SU
Cover Story - China's Investment Leader - Dr. Alyce SU
msthrill
 
Business storytelling: key ingredients to a story
Business storytelling: key ingredients to a storyBusiness storytelling: key ingredients to a story
Business storytelling: key ingredients to a story
Alexandra Fulford
 
Discover the Beauty and Functionality of The Expert Remodeling Service
Discover the Beauty and Functionality of The Expert Remodeling ServiceDiscover the Beauty and Functionality of The Expert Remodeling Service
Discover the Beauty and Functionality of The Expert Remodeling Service
obriengroupinc04
 
Profiles of Iconic Fashion Personalities.pdf
Profiles of Iconic Fashion Personalities.pdfProfiles of Iconic Fashion Personalities.pdf
Profiles of Iconic Fashion Personalities.pdf
TTop Threads
 
Dpboss Matka Guessing Satta Matta Matka Kalyan Chart Indian Matka
Dpboss Matka Guessing Satta Matta Matka Kalyan Chart Indian MatkaDpboss Matka Guessing Satta Matta Matka Kalyan Chart Indian Matka
Dpboss Matka Guessing Satta Matta Matka Kalyan Chart Indian Matka
➒➌➎➏➑➐➋➑➐➐Dpboss Matka Guessing Satta Matka Kalyan Chart Indian Matka
 
Zodiac Signs and Food Preferences_ What Your Sign Says About Your Taste
Zodiac Signs and Food Preferences_ What Your Sign Says About Your TasteZodiac Signs and Food Preferences_ What Your Sign Says About Your Taste
Zodiac Signs and Food Preferences_ What Your Sign Says About Your Taste
my Pandit
 
Science Around Us Module 2 Matter Around Us
Science Around Us Module 2 Matter Around UsScience Around Us Module 2 Matter Around Us
Science Around Us Module 2 Matter Around Us
PennapaKeavsiri
 
The Most Inspiring Entrepreneurs to Follow in 2024.pdf
The Most Inspiring Entrepreneurs to Follow in 2024.pdfThe Most Inspiring Entrepreneurs to Follow in 2024.pdf
The Most Inspiring Entrepreneurs to Follow in 2024.pdf
thesiliconleaders
 
DearbornMusic-KatherineJasperFullSailUni
DearbornMusic-KatherineJasperFullSailUniDearbornMusic-KatherineJasperFullSailUni
DearbornMusic-KatherineJasperFullSailUni
katiejasper96
 
TIMES BPO: Business Plan For Startup Industry
TIMES BPO: Business Plan For Startup IndustryTIMES BPO: Business Plan For Startup Industry
TIMES BPO: Business Plan For Startup Industry
timesbpobusiness
 
Satta Matka Dpboss Matka Guessing Kalyan Chart Indian Matka Kalyan panel Chart
Satta Matka Dpboss Matka Guessing Kalyan Chart Indian Matka Kalyan panel ChartSatta Matka Dpboss Matka Guessing Kalyan Chart Indian Matka Kalyan panel Chart
Satta Matka Dpboss Matka Guessing Kalyan Chart Indian Matka Kalyan panel Chart
➒➌➎➏➑➐➋➑➐➐Dpboss Matka Guessing Satta Matka Kalyan Chart Indian Matka
 

Recently uploaded (20)

一比一原版新西兰奥塔哥大学毕业证(otago毕业证)如何办理
一比一原版新西兰奥塔哥大学毕业证(otago毕业证)如何办理一比一原版新西兰奥塔哥大学毕业证(otago毕业证)如何办理
一比一原版新西兰奥塔哥大学毕业证(otago毕业证)如何办理
 
How are Lilac French Bulldogs Beauty Charming the World and Capturing Hearts....
How are Lilac French Bulldogs Beauty Charming the World and Capturing Hearts....How are Lilac French Bulldogs Beauty Charming the World and Capturing Hearts....
How are Lilac French Bulldogs Beauty Charming the World and Capturing Hearts....
 
The latest Heat Pump Manual from Newentide
The latest Heat Pump Manual from NewentideThe latest Heat Pump Manual from Newentide
The latest Heat Pump Manual from Newentide
 
AI Transformation Playbook: Thinking AI-First for Your Business
AI Transformation Playbook: Thinking AI-First for Your BusinessAI Transformation Playbook: Thinking AI-First for Your Business
AI Transformation Playbook: Thinking AI-First for Your Business
 
IMG_20240615_091110.pdf dpboss guessing
IMG_20240615_091110.pdf dpboss  guessingIMG_20240615_091110.pdf dpboss  guessing
IMG_20240615_091110.pdf dpboss guessing
 
Prescriptive analytics BA4206 Anna University PPT
Prescriptive analytics BA4206 Anna University PPTPrescriptive analytics BA4206 Anna University PPT
Prescriptive analytics BA4206 Anna University PPT
 
2024-6-01-IMPACTSilver-Corp-Presentation.pdf
2024-6-01-IMPACTSilver-Corp-Presentation.pdf2024-6-01-IMPACTSilver-Corp-Presentation.pdf
2024-6-01-IMPACTSilver-Corp-Presentation.pdf
 
Pitch Deck Teardown: Kinnect's $250k Angel deck
Pitch Deck Teardown: Kinnect's $250k Angel deckPitch Deck Teardown: Kinnect's $250k Angel deck
Pitch Deck Teardown: Kinnect's $250k Angel deck
 
Ellen Burstyn: From Detroit Dreamer to Hollywood Legend | CIO Women Magazine
Ellen Burstyn: From Detroit Dreamer to Hollywood Legend | CIO Women MagazineEllen Burstyn: From Detroit Dreamer to Hollywood Legend | CIO Women Magazine
Ellen Burstyn: From Detroit Dreamer to Hollywood Legend | CIO Women Magazine
 
Cover Story - China's Investment Leader - Dr. Alyce SU
Cover Story - China's Investment Leader - Dr. Alyce SUCover Story - China's Investment Leader - Dr. Alyce SU
Cover Story - China's Investment Leader - Dr. Alyce SU
 
Business storytelling: key ingredients to a story
Business storytelling: key ingredients to a storyBusiness storytelling: key ingredients to a story
Business storytelling: key ingredients to a story
 
Discover the Beauty and Functionality of The Expert Remodeling Service
Discover the Beauty and Functionality of The Expert Remodeling ServiceDiscover the Beauty and Functionality of The Expert Remodeling Service
Discover the Beauty and Functionality of The Expert Remodeling Service
 
Profiles of Iconic Fashion Personalities.pdf
Profiles of Iconic Fashion Personalities.pdfProfiles of Iconic Fashion Personalities.pdf
Profiles of Iconic Fashion Personalities.pdf
 
Dpboss Matka Guessing Satta Matta Matka Kalyan Chart Indian Matka
Dpboss Matka Guessing Satta Matta Matka Kalyan Chart Indian MatkaDpboss Matka Guessing Satta Matta Matka Kalyan Chart Indian Matka
Dpboss Matka Guessing Satta Matta Matka Kalyan Chart Indian Matka
 
Zodiac Signs and Food Preferences_ What Your Sign Says About Your Taste
Zodiac Signs and Food Preferences_ What Your Sign Says About Your TasteZodiac Signs and Food Preferences_ What Your Sign Says About Your Taste
Zodiac Signs and Food Preferences_ What Your Sign Says About Your Taste
 
Science Around Us Module 2 Matter Around Us
Science Around Us Module 2 Matter Around UsScience Around Us Module 2 Matter Around Us
Science Around Us Module 2 Matter Around Us
 
The Most Inspiring Entrepreneurs to Follow in 2024.pdf
The Most Inspiring Entrepreneurs to Follow in 2024.pdfThe Most Inspiring Entrepreneurs to Follow in 2024.pdf
The Most Inspiring Entrepreneurs to Follow in 2024.pdf
 
DearbornMusic-KatherineJasperFullSailUni
DearbornMusic-KatherineJasperFullSailUniDearbornMusic-KatherineJasperFullSailUni
DearbornMusic-KatherineJasperFullSailUni
 
TIMES BPO: Business Plan For Startup Industry
TIMES BPO: Business Plan For Startup IndustryTIMES BPO: Business Plan For Startup Industry
TIMES BPO: Business Plan For Startup Industry
 
Satta Matka Dpboss Matka Guessing Kalyan Chart Indian Matka Kalyan panel Chart
Satta Matka Dpboss Matka Guessing Kalyan Chart Indian Matka Kalyan panel ChartSatta Matka Dpboss Matka Guessing Kalyan Chart Indian Matka Kalyan panel Chart
Satta Matka Dpboss Matka Guessing Kalyan Chart Indian Matka Kalyan panel Chart
 

21. NECS 2016 _ Air connectivity Ms.Sangeeta Mahay

  • 1. Airports Authority of India 23rd September, 2016
  • 2. Airports in North Eastern Region Shillong North Lakhimpur (Lilabari) Dibrugargh Dimapur Agartala Guwahati Imphal JorhatTezpur Silchar Tura Kamalpur Kailashahar Ziro Daparizo Along Pasighat Lengpui Tezu LEGEND Operational (11+1) Non-Operational (12) New Greenfield (3) Khowai Rupsi Turial Shella State Operational Non- Operational Assam 6 3 IAF, 3 AAI 2 Arunachal Pradesh - 5 Manipur 1 - Meghalaya 1 1 Mizoram 1 1 Nagaland 1 - Tripura 1 3 Sikkim - - West Bengal 1 - Total 11+1 12 Bagdogra Assam Meghalaya Nagaland Manipur Mizoram Arunachal Pradesh Tripura Pakyong Sikkim West Bengal Greenfield Airport Itanagar
  • 3.  Operational - 12  Agartala,  Dibrugarh,  Dimapur,  Guwahati(Int. Airport),  Imphal,  Jorhat (CE),  Lilabari,  Shillong (Barapani),  Silchar (CE),  Lengpui (SG- Mizoram),  Tezpur (CE),  Bagdogra (CE).  Non-operational – 12 Along(SG- Arunachal Pradesh), Daparizo (SG- Arunachal Pradesh), Kailashahar, Kamalpur, Khowai, Pasighat, Rupsi, Tezu, Tura* (SG-Meghalaya), Turial (Aizwal), Ziro(SG- Arunachal Pradesh), Shella. Airports in the North-East Region  Greenfield Airports – 3 Pakyong (WIP) Nagaland(Proposed) Itanagar (Holongi-PR) * Tura Airport has requisite infrastructure to operate flights of Dornier-228 operations. No operators are presently available
  • 4. PRESENT AIR CONNECTIVITY IN NER (SS-15) (AIRPORT & AIRLINE-WISE) Station AI/9I 9W/S2 UK G8 SG 6E KB I5 A/c Movements /wk Agartala (32) (42) (84) 158 Lengpui (SG) (16) (28) 44 Bagdogra (CE) (28) (28) (14) (28) (28) (56) (8) 190 Dibrugarh (10) (14) (28) 52 Dimapur (10) (14) 24 Guwahati (58) (186) (28) (28) (60) (238) (8) (56) 662 Imphal (30) (20) (56) (14) 120 Jorhat (CE) (14) 14 Lilabari (8) 8 Shillong (12) 12 Silchar (CE) (20) (42) 62 Tezpur (CE) (6) 6 Total 1352 AI-Air India; 9I:Alliance Air; 9W-Jet Airways; S2-JetLite; G8-Go Air; SG-Spicejet; 6E-IndiGo; I5-Air Asia India; UK-Vistara; KB-Druk Air  Jet  ATR42 BG- Blue Dart Cargo Flight at Guwahati Airport ( 04 movements/Wk )
  • 5. 5 Domestic Connectivity- SS 2015  GUWAHATI (Assam) (15 Destinations) • Agartala • Bagdogra • Bangkok • Bengaluru • Delhi • Dibrugarh • Imphal • Jorhat • Kolkata • Lengpui • Lilabari • Mumbai • Paro • Silchar • Chennai  DIBRUGARH (Assam) (04 destinations) • Delhi • Guwahati • Kolkata • Dimapur  AGARTALA (Tripura) (05 destinations) • Guwahati • Imphal • Kolkata • Delhi • Bengaluru  IMPHAL (Manipur) (05 destinations) • Agartala • Delhi • Guwahati • Lengpui • Kolkata  LILABARI(Assam) (01destinations) • Guwahati  Tezpur (Assam) (01 destinations) • Silchar
  • 6. 6 Domestic Connectivity- SS 2015  DIMAPUR (Nagaland) (02) • Dibrugarh • Kolkata  SHILLONG (Meghalaya)(01) • Kolkata  LENGPUI (Mizoram) (03) • Guwahati • Imphal • Kolkata  SILCHAR (Assam) (03 ) • Guwahati • Kolkata • Tezpur  JORHAT (Assam) (02) • Guwahati • Kolkata
  • 7. 7 International Connectivity- At present, Druk Air operating International flights from Guwahati and Bagdogra. Sectors : Paro-Guwahati-Bangkok – 04 days Bangkok-Guwahati-Paro - 04 days Paro-Bagdogra-Bangkok – 04 days Bangkok-Bagdogra-Paro – 04 days
  • 8. 33.02 34.04 42.07 55.47 58.84 62.31 67.40 69.15 64.17 59.84 51.35 56.54 14.47 16.21 22.72 28.62 29.78 36.28 45.90 53.19 49.81 51.15 45.08 53.56 10.30 11.01 9.84 11.26 13.35 18.95 24.09 22.74 18.27 21.60 21.81 26.68 2004-05 2005-06 2006-07 2007-08 2008-09 2009-10 2010-11 2011-12 2012-13 2013-14 2014-15 2015-16 AIRCRAFT MOVEMENT (in '000) PASSENGER ( in lakh) FREIGHT ( in '000) Freight Passenger Aircraft YEAR Aircraft Movements Passengers Freight In Nos. % change In Nos. % change MT % change 2006-07 42069 23.6 % 2272213 40.2 % 9836 -10.6% 2007-08 55471 31.9 % 2861671 25.9 % 11260 14.5% 2008-09 58843 6.1 % 2977703 4.1 % 13346 18.5% 2009-10 62307 5.9% 3628313 21.8% 18947 42.0% 2010-11 67395 8.2% 4590271 26.5% 24087 27.1% 2011-12 69158 2.6% 5319387 15.9% 22749 -5.6% 2012-13 64173 -7.2% 4981659 -6.35% 18270 -19.7% 2013-14 59844 -6.7% 5115567 2.7% 21604 18.2% 2014-15 51353 -14.2% 4508860 -11.9% 21813 1.0% 2015-16 56544 10.1% 5356285 18.8% 26687 22.3% CAGR 6.03 13.76 10.77 Traffic Trends in North East Region
  • 9. NER TRAFFIC DATA AIRPORT WISE FY 2014-15 AND FY 2015-16 Sr. No. Airport A/C Movement ( in Nos) Passengers ( in Nos) Freight ( in MT) 2014-15 2015-16 Growth % 2014-15 2015-16 Growth % 2014-15 2015-16 Growth % 1 GUWAHATI 26871 29425 8.67 2233601 2784315 19.77 10460 15628 33.06 2 Bagdogra 10125 8839 -0.14 1035887 1087239 4.72 2235 4227 47.12 3 IMPHAL 4803 6078 20.97 612188 766877 20.17 4467 4266 -4.71 4 AGARTALA 7612 7158 -6.34 879182 921591 4.60 5681 5456 -4.12 5 DIBRUGARH 3992 3213 -24.24 319260 319646 1.20 336 389 13.62 6 SILCHAR 3110 3586 13.27 189370 200855 5.71 415 443 6.32 7 LENGPUI (AIZWAL) 2899 2839 -2.11 162651 175137 7.12 266 286 6.99 8 JORHAT 702 776 9.53 44989 53224 15.47 14 16 12.5 9 DIMAPUR 598 2307 74.07 52862 111756 52.69 174 203 14.28 10 BARAPANI (SHILLONG) 432 500 13.6 10346 11565 10.54 0 0 0.00 11 TEZPUR 26 286 90.90 354 5063 93.00 0 0 0 12 LAKHIMPUR (LILABARI) 252 334 24.55 4011 6229 35.60 0 0 0 13 TEZU 56 42 -33.33 49 27 -81.48 0 0 0 TOTAL 61478 65383 5.97 5544747 6443524 13.94 24048 30914 22.21 AIRPORT WISE TRAFFIC DATA
  • 10. S.No. State /Airport Name of Project AA&ES amount(Rs. in Crores) PDC Remarks A. Greenfield 1. Sikkim (a) Pakyong (i) C/o Greenfield Airport at Pakyong for ATR-72 operations. 605.59 Dec.2017 91.50% of operational area works completed. 48% Terminal building & other city side works completed. B. 1. Non-Operational to Operational Arunachal Pradesh (a) Tezu (i) Operationalisation / upgradation of Tezu Airport for ATR-72 operations. 96.50 Sept.2017 57% completed. Operational area work almost completed. Terminal building work awarded to MTDC (Deposit Work on 08.04.16 after rescinding original work). C. 1. Operational Airports Assam (a) Guwahati (a) Dibrugarh (i) C/o Integrated Office Complex for AAI/DGCA. (ii) C/o ASR-MSSR building (iii) Extension of terminal building (i) Extn. Of runway from 6000’ to 7500’ 13.16 6.5 10.6 52.3 - Dec., 2017 Dec. 2017 Nov., 2017 Completed in March 16. 72% completed. 67% completed. Work awarded. Mobilization in progress. 5.58% complete. Major/ Important works in progress
  • 11. S.N o. State /Airport Name of Project AA&ES amount( Rs. in Crores) PDC Remarks 2. 3. ( c) Silchar Manipur (a) Imphal Meghalaya (a) Shillong (i) Resurfacing of runway (i) Extension of Apron (ii) C/o Boundary wall for newly acquired land ( i) C/o Boundary Wall for newly acquired land (ii) Installation of ILS (iii) Construction of Perimeter Road (iv) Construction of New ATC Tower cum Fire station 12.98 13.27 15.10 8.57 5.00 7.70 10.02 Nov. 2016 Oct. 2016 Jan.2017 Dec 2017 Dec,2017 May 2017 Work awarded in Nov. 2015. Mobilization in progress. 10% complete. 99% completed.(Apron portion fully completed) Completed in March,2016. Work rescinded earlier due to local disturbances on land compensation issues. (Only 39% done at that time). Resolved by State Govt. AAI given balance work to PWD on deposit basis. Overall 80% work completed. Equipment procured. Civil & Electrical works in progress. 25% complete. Estimate stage. Work awarded in Nov. 2015. Work suspended by Agency. Major/ Important works in progress
  • 12. Airport / S. N0. SCHEME A Operational Airports Guwahati Construction of Cargo complex – ASIDC to construct. AAI had given in-principle approval for providing land. Construction of new Integrated Terminal building of Capacity 3100 php. Tender for Project Management Consultancy called. Construction of Parallel Taxi Track and ancillary works – IAF has agreed in principle to give land and NOC. Extension of runway by 550m (Phase-II) and strengthening of runway, taxiway and apron for operation of Code E aircrafts ( B-747) - State Govt. to provide land for Cat.I Approach Light System. Construction of New control tower cum Technical Block and Construction of Fire station & MT workshop – Design stage. Dibrugarh 1. Construction of new Control Tower cum Technical Block – Design stage. 2. Construction of Hangar for A-321 – Tender Stage. Lilabari 1 Installation of ILS - State Govt. to acquire 84 acres of land. Major Works in Planning Stage
  • 13. Airport / S. N0. SCHEME A Operational Airports (Conti.) Jorhat 1. Construction of New Terminal Building including ancillary buildings – Land to be acquired. Agartala 1. Construction of New Terminal Building for 1200 PAX. – PMC awarded and Consultant submitted Preliminary design and conceptual reports. 2. Construction of Hangar for A-321. NEC not agreed for fund support. 3. Construction of Cargo Complex – Design stage. Barapani 1. Expansion of Apron to park 4 Nos. A-321 aircraft – DPR submitted to NEC 2. Expansion of runway upto 7500’ including ancillary works - DPR submitted to NEC. Imphal 1. Construction of one hangar for A-321 – Tendering stage. 2. Construction of Cargo Complex – Land allotted to MIDC Works in Planning Stage in NER
  • 14. Airport Upgradation of Non-Operational Airports B Non Operational Airports Daparizo Operationalisation of Daparizo Airport for ATR-42 – 34.30 acres of Land to be acquired. DPR submitted to NEC in Nov-2011. State Govt. informed inability to acquire the land and proposed for Greenfield Airport. Ziro Construction of Civil Enclave at Ziro Airport - – 10 acres of Land to be acquired. DPR submitted to NEC in Nov-2011. Along Construction of Civil Enclave at Along Airport - – 7 acres of Land to be acquired. DPR submitted to NEC in Nov-2011. Passighat Construction of Civil Enclave at Passighat Airport - DPR submitted to NEC in Nov-2011. 11.60 acres land to be provided by State Govt. Rupsi Construction of Civil Enclave at Rupsi Airport - De-notification of 517.27 acres of land by Forest Department is in process. Kailashahar Operationalisation of Kailashahar Airport for ATR-72 – 75 acres of Land to be acquired. Tura Operationalisation of Tura Airport for ATR-72 – 56.50 acres of Land to be acquired Works in Planning Stage in NER
  • 15. Greenfield Airport Pakyong (Sikkim)  A new Greenfield airport is under construction at Pakyong (Gangtok) in Sikkim. Anticipated Revised Cost - Rs. 605 crores.  The likely date of completion - December, 2017.  Funding – 90% Govt. grant and 10% by AAI.  Physical progress 86%.  Work got hindered due to intermittent bandhs, heavy rain, earthquake etc. Local residents had stopped the work on compensation issue for the houses adjacent to the boundary stating cracks on the building. Even though work restarted from Nov. 2014, it again got stopped by villagers on the demand of payment of compensation. MoU signed with State Govt on 30.06.2015 and compensation amount has been released by AAI. Work resumed from 1.10.2015.  Critical Issues State Govt i) Vacation/relocation of houses adjacent to AAI boundary. ii) Providing land for AAI residential colony(approx 5 acres). iii) Approach road from Ranipur to Pakyong to be widened. iv) The MoU between Govt. of Sikkim & AAI/MoCA/NITI Ayog has been signed.
  • 16. L2 L4 A4 A3 EARLIER EMBANKMENT TOP EDGE AS PER SITE CONDITION ON 20.09.10 131 J JA 1 6 5 4a 4a NO CONSTRUCION ZONE 50 MTS WIDE CORRIDOR TOWARDS HILLS SLIDE NO CONSTRUCTION ZONE BETWEEN AIRPORT WALL AND APPROCH ROAD AAI BOUNDARY APPROX. 22 KM LONG APPROCH ROAD TO AIPORT TO BE WIDENED FROM NH 31A (RANIPOOL TO PAKYONG) 7a 7 Pakyong Airports in North Eastern Region TERMINAL BUILDING FIRESTATION cum ATC TOWER ISOLATION BAY CAR PARK APRON WATER SUPPLY BUILDING DVOR RUNWAY 02/20 1700 x 30m MASTER PLAN ( DEVELOPMENT WORKS IN PROGRESS ) AAI LAND 198 ACRES
  • 17. HILL CUTTING CHIMNEY DRAIN WORK BOX CULVERT WORK Greenfield Airport at Pakyong Construction Phase CITY SIDE VIEW OF TERMINAL BUILDING
  • 18. PROPOSED NEW INTEGRATED TERMINAL AND ASSOCIATED WORKS AT AGARTALA PMC : ARCHITECTS:06-09-2016 18 MASTER PLAN EXISTING TERMINAL PROPOSED TERMINAL
  • 19. PROPOSED NEW INTEGRATED TERMINAL AND ASSOCIATED WORKS AT AGARTALA PMC : ARCHITECTS:06-09-2016 19 PROPOSED TERMINAL AREA: 30,000 sqm PEAK HOUR CAPACITY: 1200 pax ANNUAL PASSENGER CAPACITY :- SUFFICIENT FOR : 2.5 mmpa APRON CAPACITY: 6 Airbus 321 MASTER PLAN - PROPOSED
  • 20. PROPOSED NEW INTEGRATED TERMINAL AND ASSOCIATED WORKS AT AGARTALA PMC : ARCHITECTS:06-09-2016 20 INTERIOR VIEW VIEW 04 - LOCAL MOTIF DEPICTED IN METAL CLADDING TO CREATE VIBERANCY - USE OF METAL CLADDING AND PERFORATED SCREENS IN INTERIOR AREAS MATERIALS :- 1. RESTAURANT - METAL MESH CLADDING 2. BULKHEAD - ACP PANELS WITH MOTIF INLAY 3. RETAIL BULKHEAD - ACRYLIC SOLID SURFACE TRIPURA TRIBAL ART MOTIFS