DRILLING AND WORKOVER COMPANY
PRESENTER:
AMEN YESSIRKEYEV
GENERAL DIRECTOR OF EXTREME DRILLING LLP
EXTREME DRILLING LLP OVERVIEW
ABOUT COMPANY LOCATIONS
FROM EXTREME DRILLING LLP ARCHIVE
• Extreme Drilling company is working on “turn over” projects
for workover and drilling of vertical and directional wells in
Republic of Kazakhstan
• The Company is working on four main directions:
- Drilling services on “turn over” contracts
- Workover services
- Directional Drilling Services and Well Intersection
services
- Performance drilling by selection right type of drill
bits and right type of positive displacement motor
• Extreme Drilling has latest equipment and assets to make
fast mobilization to any projects in Kazakhstan
EXTREME DRILLING PORTFOLIO
WORKOVER AND WELL TESTING
 Workover
 Fishing jobs (fish retrieving jobs,
milling jobs and others)
 Well bore departure
 Well stimulation
 Well testing
DRILLING SERVICE ON “TURN
OVER” CONTRACT
 Drilling oil and gas wells in time
 Drilling water wells and other type
of wells
 Running casing and tubing
 Engineering solutions
(hydrofracturing, directional
drilling)
 Cementing and well intervention
DIRECTIONAL DRILLING AND WELL
INTERSECTION
 Directional Drilling
 Well bore intersection
 Logging while drilling
 Short radius well drilling
 Sidetrack drilling from cased hole
and open hole
PERFORMANCE DRILLING – PDM,
TURBINES AND BITS SERVICE
 Positive displacement motor
selection for diferent environment:
high speed, high torque, high
temperature and others.
 Drilling with turbines with
impregnated drill bits
 Drill bits selection to achieve
highest drilling mechanical speed
EXTREME DRILLING PORTFOLIO
EXTREME DRILLING LLP PROJECTS
DRILLING ON TALDYKUDUK FIELD
PASSPORT OF THE PROJECT
Project: Taldykuduk field
Operator: Taldykuduk Gas
Project status:
Started in 2009 and ongoing
About project:
• Drilling of directional well Т-1
• Geosteering in coal bed К-12 by staying in the coal in
interval of 400 m
• Resistivity measurement while drilling
• Mud logging service while drilling
• Dog leg severity 12 degree for 30 meters
• After drilling directional 215.9 mm section 168 mm casing
was successfully has been run
Work performed on the project:
• Trajectory, hydraulic and torque and drug calculations
• BHA Selection and usage of BHA components
• Directional drilling of middle radius well
• Logging while drilling – resistivity measurement
• Muddloging while drilling
EXTREME DRILLING LLP PROJECTS
DRILLING ON SHEREBAINURINSKOE FIELD
PASSPORT OF THE PROJECT
Project: Sherebainurinskoe Lycense
block
Operator: Kaztransgas JV
Project status:
Started from 2015 and ongoing
About project:
• Drilling of 3 vertical exploration wells
• Full geophysical analyze: porosity, density, permeability of
coal beds, absorption capacity measurements and others
• Depth of the wells 900 m
• Building of geological model for definition of formation dip
and cleavage direction
• Definition of the most promising coal beds
Fulfilled Operations :
• Drilling of 900m well using UPA-60/80 drilllng rig
• Using URB-3А3 drilling rig for surface and conductor
casing pipe
• Schlumberger company will perform whole wireline
logging job
• Running casing, cementing and conservation
EXTREME DRILLING LLP PROJECTS EXAMPLES
DRILLING OF MDW #8 ON MINE AFTER T. KUZEMBAYEV
PROJECT PASSPORT
Project: Magistral Degassing Well #8
on mine after T.Kuzembayev
Operator: Arselor Mittal Temirtau
Project status:
In progress since 6.10.17 up to
present time
About Project :
• Drilling vertical magistral degassing well from 325mm
production casing
• Deviation survey every 100m
• The task is to drill between 2 mined-out spaces
(haulage gates) at depth 340 and 360m
• Maximum displacement 5 m from vertical
• Cementing up to whole well depth
Fulfilled Operations :
• Overlapping of drain pit and rigsite preparations
• Rig mobilization and supporting equipment
• BHA and drilstring design
• Borehole enlargement in accordance with well
construction
• Casing run and cementing operations
• Deviation survey
• Drilling is in progress
EXTREME DRILLING LLP PROJECTS EXAMPLES
SIDETRACKING IN WELL №222
BOZOBA ZAPADNAYA OILFIELD
PROJECT PASSPORT
Project: Bozoba Zapadnaya Oilfield
Operator: LLP «Geo Guide»
Project status:
Well №222 Bozoba Zapadnaya
Oilfield – provided sidetracking, it is
planned to start a well for production
About project:
• High reservoir pressure – 860 аtm.
• Bottom hole temp – about 90 C.
• Borehole depth 4619 m
• Zenith angle – 70 degree
• Filter part – 150 m
Work performed on the project:
• Tubing extraction 89 mm
• Sidetracking with casing 177,8 mm
• Directional drilling with zenith angle 70 degree
• Lower the shank and filter 127 mm on the non-
cemented suspension
• Lower combined tubing 89 mm и 73 mm
• Circulation and launching the well for production
• Field development
• Coiled tubing works for the well treatment
EXTREME DRILLING LLP PROJECTS EXAMPLES
WORKOVER WELL №1-С
SARKYRAMABAS OILFIELD
PROJECT PASSPORT
Project: Sarkyramabas Oilfield
Operator: LLP AOC Trade Group
Project status:
Drilling started in 2001 y. Workover
and well development works are
underway.
About project:
• A geophysical tool has been lost in 2002.
• It was necessary to catch a geophysical device
• It is necessary to cut off the lower horizons by setting the
bridge plug
• It was necessary to provide additional perforation
• It is necessary to carry out the development of the well by
hydrochloric acid treatment and treatment of the nitrogen
Fulfilled Operations :
• Killing the well
• Lift Tubing 73 мм
• Emergency work on the fishing and milling of the
emergency device
• Installation of burst packer
• Additional perforation
• Lower pipe tubing
• Installation of Christmas tree and delivery the well
Extreme Drilling LLP projects and potentials
Extreme Drilling LLP projects:
• Drilling project for directional well in coal deposits of Karaganda Basin, customer: Industrial Energy Alliance,
general client: Taldykuduk Gas
• Sidetracking from 168 mm Casing, drilling by 139,2 mm bit, running liner 114 mm, well А-121, Amangeldy
oilfield, customer: “AKPAN” LLP, general client: Amangeldy Gas
• Sidetracking from 178 mm Casing, drilling by 152,4 mm bit, well Aiyrshagyl-5, Aiyrshagyl oilfield, customer:
“STK-GEO” general client: BNG
• Sidetracking from 178 mm Casing, drilling by 152,4 mm bit, build 70 degree inclination, well Bozoba-222, West
Bozoba oilfield, customer: “GeoGuide”, Extreme drilling acted as drilling contractor
• Well workover №1-С on the Sarkyramabas Oilfield
• Extreme Drilling LLP has drilling experience in many Kazakhstan oilfields: Amangeldy, Djarkum, Zhanazhol,
North Truva, Atambai, ZakhatSor, South-East Novobogat, Akbulak, Aiyrshagyl
Extreme Drilling Company is ready to submit commercial offer for drilling directional wells and sidetracks
in cased and open hole.
Extreme Drilling LLP projects

More Related Content

What's hot

conversion of UG to OC mine
conversion of UG to OC mineconversion of UG to OC mine
conversion of UG to OC mineSaiMayi
 
practical training ppt
practical training pptpractical training ppt
practical training pptSagar Shah
 
Ready mix concrete
Ready mix concreteReady mix concrete
Ready mix concreteBala murali
 
TOOLS AND MACHINERY USE FOR THE CONCRETE PRODUCTION AND SUPPLY
TOOLS AND MACHINERY USE FOR THE CONCRETE PRODUCTION AND SUPPLYTOOLS AND MACHINERY USE FOR THE CONCRETE PRODUCTION AND SUPPLY
TOOLS AND MACHINERY USE FOR THE CONCRETE PRODUCTION AND SUPPLYVj NiroSh
 
Bayliss Capabilities
Bayliss CapabilitiesBayliss Capabilities
Bayliss CapabilitiesMike Scott
 
Loesche Technology - Always a Step Ahead: Loesche Mills for Cement Raw Material
Loesche Technology - Always a Step Ahead: Loesche Mills for Cement Raw MaterialLoesche Technology - Always a Step Ahead: Loesche Mills for Cement Raw Material
Loesche Technology - Always a Step Ahead: Loesche Mills for Cement Raw MaterialLOESCHE
 
Reverse circulation presentation
Reverse circulation presentationReverse circulation presentation
Reverse circulation presentationAsad Ali
 
Ready Mix Concrete (RMC) Production Efficiency
Ready Mix Concrete (RMC) Production EfficiencyReady Mix Concrete (RMC) Production Efficiency
Ready Mix Concrete (RMC) Production EfficiencyRushikesh Kolhe
 
Managing Downhole Failures in a Rod Pumped Well
Managing Downhole Failures in a Rod Pumped Well Managing Downhole Failures in a Rod Pumped Well
Managing Downhole Failures in a Rod Pumped Well Ramez Abdalla, M.Sc
 
Coiled Tubing Conveyed Perforations
Coiled Tubing Conveyed PerforationsCoiled Tubing Conveyed Perforations
Coiled Tubing Conveyed PerforationsKamel Elsayed
 
Production Optimization: Horizontal Well Analysis Performance
Production Optimization: Horizontal Well Analysis PerformanceProduction Optimization: Horizontal Well Analysis Performance
Production Optimization: Horizontal Well Analysis PerformanceMahmood Ghazi
 
Ready mix concrete (2)
Ready mix concrete (2)Ready mix concrete (2)
Ready mix concrete (2)ARIVU SUDAR
 
Summer training presentation from BRPNNL by Randhir Kumar(1503050)
Summer training presentation from BRPNNL by Randhir Kumar(1503050)Summer training presentation from BRPNNL by Randhir Kumar(1503050)
Summer training presentation from BRPNNL by Randhir Kumar(1503050)RandhirKumar172
 
Large diameter ring manufacturing | Metal Forming Operations
Large diameter ring manufacturing | Metal Forming OperationsLarge diameter ring manufacturing | Metal Forming Operations
Large diameter ring manufacturing | Metal Forming OperationsMohamed Abd El-Moniem
 
What are Highways Works, Street works, Road works and Diversionary Works
What are Highways Works, Street works, Road works and Diversionary WorksWhat are Highways Works, Street works, Road works and Diversionary Works
What are Highways Works, Street works, Road works and Diversionary WorksCarlo Gabriele Borri MACostE AMICE
 

What's hot (20)

SANDEEP PPT
SANDEEP PPTSANDEEP PPT
SANDEEP PPT
 
conversion of UG to OC mine
conversion of UG to OC mineconversion of UG to OC mine
conversion of UG to OC mine
 
Horizontal drilling
Horizontal drillingHorizontal drilling
Horizontal drilling
 
practical training ppt
practical training pptpractical training ppt
practical training ppt
 
Ready mix concrete
Ready mix concreteReady mix concrete
Ready mix concrete
 
TOOLS AND MACHINERY USE FOR THE CONCRETE PRODUCTION AND SUPPLY
TOOLS AND MACHINERY USE FOR THE CONCRETE PRODUCTION AND SUPPLYTOOLS AND MACHINERY USE FOR THE CONCRETE PRODUCTION AND SUPPLY
TOOLS AND MACHINERY USE FOR THE CONCRETE PRODUCTION AND SUPPLY
 
Bayliss Capabilities
Bayliss CapabilitiesBayliss Capabilities
Bayliss Capabilities
 
Loesche Technology - Always a Step Ahead: Loesche Mills for Cement Raw Material
Loesche Technology - Always a Step Ahead: Loesche Mills for Cement Raw MaterialLoesche Technology - Always a Step Ahead: Loesche Mills for Cement Raw Material
Loesche Technology - Always a Step Ahead: Loesche Mills for Cement Raw Material
 
Reverse circulation presentation
Reverse circulation presentationReverse circulation presentation
Reverse circulation presentation
 
Ready Mix Concrete (RMC) Production Efficiency
Ready Mix Concrete (RMC) Production EfficiencyReady Mix Concrete (RMC) Production Efficiency
Ready Mix Concrete (RMC) Production Efficiency
 
Managing Downhole Failures in a Rod Pumped Well
Managing Downhole Failures in a Rod Pumped Well Managing Downhole Failures in a Rod Pumped Well
Managing Downhole Failures in a Rod Pumped Well
 
Coiled Tubing Conveyed Perforations
Coiled Tubing Conveyed PerforationsCoiled Tubing Conveyed Perforations
Coiled Tubing Conveyed Perforations
 
Driconeq
DriconeqDriconeq
Driconeq
 
Production Optimization: Horizontal Well Analysis Performance
Production Optimization: Horizontal Well Analysis PerformanceProduction Optimization: Horizontal Well Analysis Performance
Production Optimization: Horizontal Well Analysis Performance
 
Ready mix concrete (2)
Ready mix concrete (2)Ready mix concrete (2)
Ready mix concrete (2)
 
Summer training presentation from BRPNNL by Randhir Kumar(1503050)
Summer training presentation from BRPNNL by Randhir Kumar(1503050)Summer training presentation from BRPNNL by Randhir Kumar(1503050)
Summer training presentation from BRPNNL by Randhir Kumar(1503050)
 
Seminar-II
Seminar-IISeminar-II
Seminar-II
 
PROJECT PPT. (1)
PROJECT PPT. (1)PROJECT PPT. (1)
PROJECT PPT. (1)
 
Large diameter ring manufacturing | Metal Forming Operations
Large diameter ring manufacturing | Metal Forming OperationsLarge diameter ring manufacturing | Metal Forming Operations
Large diameter ring manufacturing | Metal Forming Operations
 
What are Highways Works, Street works, Road works and Diversionary Works
What are Highways Works, Street works, Road works and Diversionary WorksWhat are Highways Works, Street works, Road works and Diversionary Works
What are Highways Works, Street works, Road works and Diversionary Works
 

Similar to 2018 extreme drilling llp

Case study bridge construction upto pier and road construction
Case study   bridge construction upto pier and road constructionCase study   bridge construction upto pier and road construction
Case study bridge construction upto pier and road constructionSatish Kambaliya
 
Precast Six lane flyover project
Precast Six lane flyover projectPrecast Six lane flyover project
Precast Six lane flyover projectKriShna Sharma
 
Metkon Pipa Bawah Laut.pdf
Metkon Pipa Bawah Laut.pdfMetkon Pipa Bawah Laut.pdf
Metkon Pipa Bawah Laut.pdfMFaridGeonova
 
DSD-NL 2014 - Geo Klantendag - 1. leidinginstallatie met direct pipe
DSD-NL 2014 - Geo Klantendag - 1. leidinginstallatie met direct pipeDSD-NL 2014 - Geo Klantendag - 1. leidinginstallatie met direct pipe
DSD-NL 2014 - Geo Klantendag - 1. leidinginstallatie met direct pipeDeltares
 
Cement Manufacturing Plant Construction
Cement Manufacturing Plant ConstructionCement Manufacturing Plant Construction
Cement Manufacturing Plant ConstructionShyam Anandjiwala
 
Highwall Mining.pptx
Highwall Mining.pptxHighwall Mining.pptx
Highwall Mining.pptxBikramPal13
 
Trenchless technologies comparing thrust boring with horizontal directional ...
Trenchless technologies  comparing thrust boring with horizontal directional ...Trenchless technologies  comparing thrust boring with horizontal directional ...
Trenchless technologies comparing thrust boring with horizontal directional ...Tobiloba Omitola
 
Laying of Sewer Line
Laying of Sewer LineLaying of Sewer Line
Laying of Sewer Linesumitvikram
 
Seminar Underground Construction PPT.pptx
Seminar Underground Construction PPT.pptxSeminar Underground Construction PPT.pptx
Seminar Underground Construction PPT.pptxMansimishra351962
 
Pipe bursting and Pre-chlorination_effectiveness on large scale projects
Pipe bursting and Pre-chlorination_effectiveness on large scale projectsPipe bursting and Pre-chlorination_effectiveness on large scale projects
Pipe bursting and Pre-chlorination_effectiveness on large scale projectsHammerHead Trenchless Equipment
 
Blue mountains cascade dam- Horizontal direction drill
Blue mountains cascade dam- Horizontal direction drillBlue mountains cascade dam- Horizontal direction drill
Blue mountains cascade dam- Horizontal direction drillDeanGarratt
 
Re - Entry Drilling Project
Re - Entry Drilling ProjectRe - Entry Drilling Project
Re - Entry Drilling ProjectAndika Mahardika
 
Advent Portfolio - Presentation - 2022.pptx
Advent Portfolio - Presentation - 2022.pptxAdvent Portfolio - Presentation - 2022.pptx
Advent Portfolio - Presentation - 2022.pptxShyamPrasadThiraviam
 
Patrick Hudd Me Mo October 2010 Raise Boring Presentation Rev 1
Patrick Hudd Me Mo October 2010 Raise Boring Presentation Rev 1Patrick Hudd Me Mo October 2010 Raise Boring Presentation Rev 1
Patrick Hudd Me Mo October 2010 Raise Boring Presentation Rev 1patrickhudd
 

Similar to 2018 extreme drilling llp (20)

Case study bridge construction upto pier and road construction
Case study   bridge construction upto pier and road constructionCase study   bridge construction upto pier and road construction
Case study bridge construction upto pier and road construction
 
Precast Six lane flyover project
Precast Six lane flyover projectPrecast Six lane flyover project
Precast Six lane flyover project
 
Metkon Pipa Bawah Laut.pdf
Metkon Pipa Bawah Laut.pdfMetkon Pipa Bawah Laut.pdf
Metkon Pipa Bawah Laut.pdf
 
SIP- final - LinkedIn
SIP- final - LinkedInSIP- final - LinkedIn
SIP- final - LinkedIn
 
Dariush.resume
Dariush.resumeDariush.resume
Dariush.resume
 
DSD-NL 2014 - Geo Klantendag - 1. leidinginstallatie met direct pipe
DSD-NL 2014 - Geo Klantendag - 1. leidinginstallatie met direct pipeDSD-NL 2014 - Geo Klantendag - 1. leidinginstallatie met direct pipe
DSD-NL 2014 - Geo Klantendag - 1. leidinginstallatie met direct pipe
 
attcofinal
attcofinalattcofinal
attcofinal
 
Trenchless technolgy
Trenchless technolgyTrenchless technolgy
Trenchless technolgy
 
1 sethi
1 sethi1 sethi
1 sethi
 
Cement Manufacturing Plant Construction
Cement Manufacturing Plant ConstructionCement Manufacturing Plant Construction
Cement Manufacturing Plant Construction
 
Highwall Mining.pptx
Highwall Mining.pptxHighwall Mining.pptx
Highwall Mining.pptx
 
Trenchless technologies comparing thrust boring with horizontal directional ...
Trenchless technologies  comparing thrust boring with horizontal directional ...Trenchless technologies  comparing thrust boring with horizontal directional ...
Trenchless technologies comparing thrust boring with horizontal directional ...
 
Laying of Sewer Line
Laying of Sewer LineLaying of Sewer Line
Laying of Sewer Line
 
Seminar Underground Construction PPT.pptx
Seminar Underground Construction PPT.pptxSeminar Underground Construction PPT.pptx
Seminar Underground Construction PPT.pptx
 
Pipe bursting and Pre-chlorination_effectiveness on large scale projects
Pipe bursting and Pre-chlorination_effectiveness on large scale projectsPipe bursting and Pre-chlorination_effectiveness on large scale projects
Pipe bursting and Pre-chlorination_effectiveness on large scale projects
 
Blue mountains cascade dam- Horizontal direction drill
Blue mountains cascade dam- Horizontal direction drillBlue mountains cascade dam- Horizontal direction drill
Blue mountains cascade dam- Horizontal direction drill
 
Re - Entry Drilling Project
Re - Entry Drilling ProjectRe - Entry Drilling Project
Re - Entry Drilling Project
 
Advent Portfolio - Presentation - 2022.pptx
Advent Portfolio - Presentation - 2022.pptxAdvent Portfolio - Presentation - 2022.pptx
Advent Portfolio - Presentation - 2022.pptx
 
Indigenization of Russian Make WHR by Vizag Steel
Indigenization of Russian Make WHR by Vizag SteelIndigenization of Russian Make WHR by Vizag Steel
Indigenization of Russian Make WHR by Vizag Steel
 
Patrick Hudd Me Mo October 2010 Raise Boring Presentation Rev 1
Patrick Hudd Me Mo October 2010 Raise Boring Presentation Rev 1Patrick Hudd Me Mo October 2010 Raise Boring Presentation Rev 1
Patrick Hudd Me Mo October 2010 Raise Boring Presentation Rev 1
 

Recently uploaded

Introduction to Robotics in Mechanical Engineering.pptx
Introduction to Robotics in Mechanical Engineering.pptxIntroduction to Robotics in Mechanical Engineering.pptx
Introduction to Robotics in Mechanical Engineering.pptxhublikarsn
 
PE 459 LECTURE 2- natural gas basic concepts and properties
PE 459 LECTURE 2- natural gas basic concepts and propertiesPE 459 LECTURE 2- natural gas basic concepts and properties
PE 459 LECTURE 2- natural gas basic concepts and propertiessarkmank1
 
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments""Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"mphochane1998
 
8th International Conference on Soft Computing, Mathematics and Control (SMC ...
8th International Conference on Soft Computing, Mathematics and Control (SMC ...8th International Conference on Soft Computing, Mathematics and Control (SMC ...
8th International Conference on Soft Computing, Mathematics and Control (SMC ...josephjonse
 
Hospital management system project report.pdf
Hospital management system project report.pdfHospital management system project report.pdf
Hospital management system project report.pdfKamal Acharya
 
UNIT 4 PTRP final Convergence in probability.pptx
UNIT 4 PTRP final Convergence in probability.pptxUNIT 4 PTRP final Convergence in probability.pptx
UNIT 4 PTRP final Convergence in probability.pptxkalpana413121
 
scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...
scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...
scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...HenryBriggs2
 
Linux Systems Programming: Inter Process Communication (IPC) using Pipes
Linux Systems Programming: Inter Process Communication (IPC) using PipesLinux Systems Programming: Inter Process Communication (IPC) using Pipes
Linux Systems Programming: Inter Process Communication (IPC) using PipesRashidFaridChishti
 
AIRCANVAS[1].pdf mini project for btech students
AIRCANVAS[1].pdf mini project for btech studentsAIRCANVAS[1].pdf mini project for btech students
AIRCANVAS[1].pdf mini project for btech studentsvanyagupta248
 
Employee leave management system project.
Employee leave management system project.Employee leave management system project.
Employee leave management system project.Kamal Acharya
 
Online food ordering system project report.pdf
Online food ordering system project report.pdfOnline food ordering system project report.pdf
Online food ordering system project report.pdfKamal Acharya
 
Standard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power PlayStandard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power PlayEpec Engineered Technologies
 
Memory Interfacing of 8086 with DMA 8257
Memory Interfacing of 8086 with DMA 8257Memory Interfacing of 8086 with DMA 8257
Memory Interfacing of 8086 with DMA 8257subhasishdas79
 
Digital Communication Essentials: DPCM, DM, and ADM .pptx
Digital Communication Essentials: DPCM, DM, and ADM .pptxDigital Communication Essentials: DPCM, DM, and ADM .pptx
Digital Communication Essentials: DPCM, DM, and ADM .pptxpritamlangde
 
School management system project Report.pdf
School management system project Report.pdfSchool management system project Report.pdf
School management system project Report.pdfKamal Acharya
 
NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...
NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...
NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...Amil baba
 
Worksharing and 3D Modeling with Revit.pptx
Worksharing and 3D Modeling with Revit.pptxWorksharing and 3D Modeling with Revit.pptx
Worksharing and 3D Modeling with Revit.pptxMustafa Ahmed
 
Hostel management system project report..pdf
Hostel management system project report..pdfHostel management system project report..pdf
Hostel management system project report..pdfKamal Acharya
 
Introduction to Artificial Intelligence ( AI)
Introduction to Artificial Intelligence ( AI)Introduction to Artificial Intelligence ( AI)
Introduction to Artificial Intelligence ( AI)ChandrakantDivate1
 

Recently uploaded (20)

Introduction to Robotics in Mechanical Engineering.pptx
Introduction to Robotics in Mechanical Engineering.pptxIntroduction to Robotics in Mechanical Engineering.pptx
Introduction to Robotics in Mechanical Engineering.pptx
 
PE 459 LECTURE 2- natural gas basic concepts and properties
PE 459 LECTURE 2- natural gas basic concepts and propertiesPE 459 LECTURE 2- natural gas basic concepts and properties
PE 459 LECTURE 2- natural gas basic concepts and properties
 
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments""Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"
 
8th International Conference on Soft Computing, Mathematics and Control (SMC ...
8th International Conference on Soft Computing, Mathematics and Control (SMC ...8th International Conference on Soft Computing, Mathematics and Control (SMC ...
8th International Conference on Soft Computing, Mathematics and Control (SMC ...
 
Hospital management system project report.pdf
Hospital management system project report.pdfHospital management system project report.pdf
Hospital management system project report.pdf
 
UNIT 4 PTRP final Convergence in probability.pptx
UNIT 4 PTRP final Convergence in probability.pptxUNIT 4 PTRP final Convergence in probability.pptx
UNIT 4 PTRP final Convergence in probability.pptx
 
scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...
scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...
scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...
 
Linux Systems Programming: Inter Process Communication (IPC) using Pipes
Linux Systems Programming: Inter Process Communication (IPC) using PipesLinux Systems Programming: Inter Process Communication (IPC) using Pipes
Linux Systems Programming: Inter Process Communication (IPC) using Pipes
 
AIRCANVAS[1].pdf mini project for btech students
AIRCANVAS[1].pdf mini project for btech studentsAIRCANVAS[1].pdf mini project for btech students
AIRCANVAS[1].pdf mini project for btech students
 
Employee leave management system project.
Employee leave management system project.Employee leave management system project.
Employee leave management system project.
 
Online food ordering system project report.pdf
Online food ordering system project report.pdfOnline food ordering system project report.pdf
Online food ordering system project report.pdf
 
Standard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power PlayStandard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power Play
 
Signal Processing and Linear System Analysis
Signal Processing and Linear System AnalysisSignal Processing and Linear System Analysis
Signal Processing and Linear System Analysis
 
Memory Interfacing of 8086 with DMA 8257
Memory Interfacing of 8086 with DMA 8257Memory Interfacing of 8086 with DMA 8257
Memory Interfacing of 8086 with DMA 8257
 
Digital Communication Essentials: DPCM, DM, and ADM .pptx
Digital Communication Essentials: DPCM, DM, and ADM .pptxDigital Communication Essentials: DPCM, DM, and ADM .pptx
Digital Communication Essentials: DPCM, DM, and ADM .pptx
 
School management system project Report.pdf
School management system project Report.pdfSchool management system project Report.pdf
School management system project Report.pdf
 
NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...
NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...
NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...
 
Worksharing and 3D Modeling with Revit.pptx
Worksharing and 3D Modeling with Revit.pptxWorksharing and 3D Modeling with Revit.pptx
Worksharing and 3D Modeling with Revit.pptx
 
Hostel management system project report..pdf
Hostel management system project report..pdfHostel management system project report..pdf
Hostel management system project report..pdf
 
Introduction to Artificial Intelligence ( AI)
Introduction to Artificial Intelligence ( AI)Introduction to Artificial Intelligence ( AI)
Introduction to Artificial Intelligence ( AI)
 

2018 extreme drilling llp

  • 1. DRILLING AND WORKOVER COMPANY PRESENTER: AMEN YESSIRKEYEV GENERAL DIRECTOR OF EXTREME DRILLING LLP
  • 2. EXTREME DRILLING LLP OVERVIEW ABOUT COMPANY LOCATIONS FROM EXTREME DRILLING LLP ARCHIVE • Extreme Drilling company is working on “turn over” projects for workover and drilling of vertical and directional wells in Republic of Kazakhstan • The Company is working on four main directions: - Drilling services on “turn over” contracts - Workover services - Directional Drilling Services and Well Intersection services - Performance drilling by selection right type of drill bits and right type of positive displacement motor • Extreme Drilling has latest equipment and assets to make fast mobilization to any projects in Kazakhstan
  • 3. EXTREME DRILLING PORTFOLIO WORKOVER AND WELL TESTING  Workover  Fishing jobs (fish retrieving jobs, milling jobs and others)  Well bore departure  Well stimulation  Well testing DRILLING SERVICE ON “TURN OVER” CONTRACT  Drilling oil and gas wells in time  Drilling water wells and other type of wells  Running casing and tubing  Engineering solutions (hydrofracturing, directional drilling)  Cementing and well intervention
  • 4. DIRECTIONAL DRILLING AND WELL INTERSECTION  Directional Drilling  Well bore intersection  Logging while drilling  Short radius well drilling  Sidetrack drilling from cased hole and open hole PERFORMANCE DRILLING – PDM, TURBINES AND BITS SERVICE  Positive displacement motor selection for diferent environment: high speed, high torque, high temperature and others.  Drilling with turbines with impregnated drill bits  Drill bits selection to achieve highest drilling mechanical speed EXTREME DRILLING PORTFOLIO
  • 5. EXTREME DRILLING LLP PROJECTS DRILLING ON TALDYKUDUK FIELD PASSPORT OF THE PROJECT Project: Taldykuduk field Operator: Taldykuduk Gas Project status: Started in 2009 and ongoing About project: • Drilling of directional well Т-1 • Geosteering in coal bed К-12 by staying in the coal in interval of 400 m • Resistivity measurement while drilling • Mud logging service while drilling • Dog leg severity 12 degree for 30 meters • After drilling directional 215.9 mm section 168 mm casing was successfully has been run Work performed on the project: • Trajectory, hydraulic and torque and drug calculations • BHA Selection and usage of BHA components • Directional drilling of middle radius well • Logging while drilling – resistivity measurement • Muddloging while drilling
  • 6. EXTREME DRILLING LLP PROJECTS DRILLING ON SHEREBAINURINSKOE FIELD PASSPORT OF THE PROJECT Project: Sherebainurinskoe Lycense block Operator: Kaztransgas JV Project status: Started from 2015 and ongoing About project: • Drilling of 3 vertical exploration wells • Full geophysical analyze: porosity, density, permeability of coal beds, absorption capacity measurements and others • Depth of the wells 900 m • Building of geological model for definition of formation dip and cleavage direction • Definition of the most promising coal beds Fulfilled Operations : • Drilling of 900m well using UPA-60/80 drilllng rig • Using URB-3А3 drilling rig for surface and conductor casing pipe • Schlumberger company will perform whole wireline logging job • Running casing, cementing and conservation
  • 7. EXTREME DRILLING LLP PROJECTS EXAMPLES DRILLING OF MDW #8 ON MINE AFTER T. KUZEMBAYEV PROJECT PASSPORT Project: Magistral Degassing Well #8 on mine after T.Kuzembayev Operator: Arselor Mittal Temirtau Project status: In progress since 6.10.17 up to present time About Project : • Drilling vertical magistral degassing well from 325mm production casing • Deviation survey every 100m • The task is to drill between 2 mined-out spaces (haulage gates) at depth 340 and 360m • Maximum displacement 5 m from vertical • Cementing up to whole well depth Fulfilled Operations : • Overlapping of drain pit and rigsite preparations • Rig mobilization and supporting equipment • BHA and drilstring design • Borehole enlargement in accordance with well construction • Casing run and cementing operations • Deviation survey • Drilling is in progress
  • 8. EXTREME DRILLING LLP PROJECTS EXAMPLES SIDETRACKING IN WELL №222 BOZOBA ZAPADNAYA OILFIELD PROJECT PASSPORT Project: Bozoba Zapadnaya Oilfield Operator: LLP «Geo Guide» Project status: Well №222 Bozoba Zapadnaya Oilfield – provided sidetracking, it is planned to start a well for production About project: • High reservoir pressure – 860 аtm. • Bottom hole temp – about 90 C. • Borehole depth 4619 m • Zenith angle – 70 degree • Filter part – 150 m Work performed on the project: • Tubing extraction 89 mm • Sidetracking with casing 177,8 mm • Directional drilling with zenith angle 70 degree • Lower the shank and filter 127 mm on the non- cemented suspension • Lower combined tubing 89 mm и 73 mm • Circulation and launching the well for production • Field development • Coiled tubing works for the well treatment
  • 9. EXTREME DRILLING LLP PROJECTS EXAMPLES WORKOVER WELL №1-С SARKYRAMABAS OILFIELD PROJECT PASSPORT Project: Sarkyramabas Oilfield Operator: LLP AOC Trade Group Project status: Drilling started in 2001 y. Workover and well development works are underway. About project: • A geophysical tool has been lost in 2002. • It was necessary to catch a geophysical device • It is necessary to cut off the lower horizons by setting the bridge plug • It was necessary to provide additional perforation • It is necessary to carry out the development of the well by hydrochloric acid treatment and treatment of the nitrogen Fulfilled Operations : • Killing the well • Lift Tubing 73 мм • Emergency work on the fishing and milling of the emergency device • Installation of burst packer • Additional perforation • Lower pipe tubing • Installation of Christmas tree and delivery the well
  • 10. Extreme Drilling LLP projects and potentials Extreme Drilling LLP projects: • Drilling project for directional well in coal deposits of Karaganda Basin, customer: Industrial Energy Alliance, general client: Taldykuduk Gas • Sidetracking from 168 mm Casing, drilling by 139,2 mm bit, running liner 114 mm, well А-121, Amangeldy oilfield, customer: “AKPAN” LLP, general client: Amangeldy Gas • Sidetracking from 178 mm Casing, drilling by 152,4 mm bit, well Aiyrshagyl-5, Aiyrshagyl oilfield, customer: “STK-GEO” general client: BNG • Sidetracking from 178 mm Casing, drilling by 152,4 mm bit, build 70 degree inclination, well Bozoba-222, West Bozoba oilfield, customer: “GeoGuide”, Extreme drilling acted as drilling contractor • Well workover №1-С on the Sarkyramabas Oilfield • Extreme Drilling LLP has drilling experience in many Kazakhstan oilfields: Amangeldy, Djarkum, Zhanazhol, North Truva, Atambai, ZakhatSor, South-East Novobogat, Akbulak, Aiyrshagyl Extreme Drilling Company is ready to submit commercial offer for drilling directional wells and sidetracks in cased and open hole. Extreme Drilling LLP projects