SlideShare a Scribd company logo
1 of 13
Dariush Yaghmai
DETAILS PERSONAL
Address: Unit 13, No 24 Cannington Place
Helensvale, QLD 4212
E-mail: D_yaghmai@hotmail.com
Mobile: 040 964 5001
D.O.B: 31/08/1953
CAREER OBJECTIVES
To obtain work as Mechanical Fitter/ pipe fitter, commissioning fitter or to
take on the challenge of learning new skills in any industry.
SKILLS
• Process plant Commissioning
• Mechanical fitting
• Vibration Analysis of Rotating Equipments
• Pipe fitting
• Hydraulic & diesel fitting
• Alignment of Couplings on Motor/Pumps
• Hydro-testing & commissioning of pressure vessels and pipe works
• Flange management and Torquing Bolts
• Ηydra tight and tensioning bolts
• Use of Bore scope, Stroboscope and laser alignments tools
• Dogging and Rigging (intermediate level), Elevated work platform (EWP)
• Read and understand P & ID and Iso drawings
• Over haul of PSV and Ball Valves
• Alignment and tensioning belts & pollys using laser technique
• Work under permit system
QUALIFICATIONS
1 Trade Qualified Mechanical Fitter
2 Intermediate Rigger and Dogman
3 Construction white Card
4 Confined Space National Training Certificate
5 Forklift Ticket
6 Elevated Working Platform Ticket
7 Coal Mine Generic Induction and Competencies
8 BMA induction
I have worked on the following mobile plants and mining equipment :
Draglines, shovels, diggers, dump trucks, Komatsu drilling rings,
excavators, overhead cranes and container cranes, forklifts and front
end loaders. I also, work on most components of Long walls.
Extensive experience in Coal processing plant including Construction,
Commissioning, maintenance and Rotating Equipments.
Oil & Gas experiences in LNG Compressor stations and LNG refinery,
Oil refineries, Hydro power stations and Chemical processing plants.
EMPLOYMENT HISTORY
Mechanical fitter, Commissioning of APLNG Gas processing plant,
Bechtel Construction, Curtis Island, Feburary 2015-present
• Rectification of Faults and miss alignments in Low pressure and
medium pressure unit
• Nitrogen purging through pipe works to check valves and flanges for
possible leaks.
• Torquing Bolts to required tension.
• Commissioning and start up of Compressor and Turbine units
• Commissioning of gas receiver unit.
• Laser alignment of Belts and pollys on fine fans in propane unit.
Mechanical Fitter, Instrumentation and Control, GE Oil & Gas,
Wivenho Hdyro power station, Oct 2014
• Modification to Governor unit, Exciter and the Turbine Glen
• Instrumentation and Tube Bending
• Pipe fitting
Mechanical Fitter, Downer edi, Nov 2013- 24th
April 2014, Caval Ridge
Mine
• Pre- Commissioning of coal processing plant, Tailing Filters, Rom and Conveyor
• Polly Alignment with laser and belt tension
• Modification to Thickeners
• Installation of secreting rubber to conveyors and adjustment of side rollers for
smooth running of belt.
• Adjustment to various knife gates
• Repair to leaks on flanges and pipe fittings
• Pre-commissioning of LV, HV car wash and Lub & fuel farm
Mechanical fitter, DGH Engineering, Oct 2013, South walker Creek Mine
• De-bottle necking Project at South Walker Creek Mine
• Installation of a new Feed chute and associated conveyor, rollers and polly
• Change out of pumps and pipes
• Commissioning of the new feed chute, conveyor and pumps
Mechanical fitter, United Group, August 2013-present
• Wash plant Shutdown at peak downs mine, Aug 2013
• Numerous wash plant shutdowns at Curragh Mine, Sept 2013- present
Mechanical fitter, Blackwater Mine, Team engineering, June-July 2013
• Lube & Hydraulic piping
• Pipe fitting in a newly built workshop
• Construction of a lubrication Tank farm
• Laying down pipes, pumps, differential pressure gages and flow meters
• Pre-commissioning, Hydro testing of the all the lube pipes
Mechanical fitter, Peak downs Mine, G&S Engineering, Jan 2013
• General Shutdown maintenance in the wash plant
Mechanical fitter, Ensham Mine, G&S Engineering, Jan 2013
• Major breakdown repair Dragline on 2
• Remove the broken Left hand propel pin and replace with a new one
Mechanical fitter, Collinsville Mine, DGH Engineering, Aug-Nov 2012
• Upgrade of CHPP to recover more fines products
• Installation of spirals bundle and associated pipe works
Mechanical fitter, Ensham Mine, G&S Engineering, Feb-July 2012
• Dragline No 4 shutdown
• Maintenance on propels, hoist and drag drums.
• Dragline No 1 shut down
• Major overhaul of Hoist and Darg drums, Bull gears and gear boxes.
• Rebuild of gear boxes on both propels.
• Rebuild of deflection shives, horizontal shives.
• Overhaul of the tub
• Maintenance on the swing shafts
Mechanical Fitter, Rolleston Mine, G&S Engineering, Oct –Dec 2011
• Dragline No1 shutdown
• Worked on right and left shoes and propels
• Worked on swings, hoist and drag drums and drives
• Assist in jacking up the machine and installed the drag gear of the tub
Mechanical fitter, saraji Mine, Dysart, Mcbryde Corporation, July 2011- Oct 2011
• Construction of fire hydrant system in CHPP and all the workshop area
• Laying Galvanised pipes all around the workshops
• Fitting stainless steel pipes in CHPP plant
• Hydro- testing of poly pipes and laying poly pipes in underground tranches
Mechanical fitter, Peak downs mine, C. QLD, Monadelphous Engineering
• Installation of platform on the main conveyor line to replace conveyor belt
• Replace tailing tanks in the micro-cell units
• Replace anodes in the clarifier tanks
• Inspect cyclone feeders for damaged tiles
Mechanical fitter, Roxby down SA, BLH Engineering May 2011
• Installing cooling fan in the cooling tower in the acid plant
• Fitting blanks in various pipe work in acid plant
Mechanical fitter, Yandi mine, BHP RGP5 project, Monadelphous engineering Feb-
May 2011
• Punch listing of the new Ore Handling Plant (OHP)
• Modifications to the new OHP
• Commissioning of the stockyard stackers
Mechanical fitter, curragh Mine, Blackwater, Ludowici, Jan-Feb 2011
• Shutdown Maintenance on vibrating screen
• Installation and commissioning of a Centrifuge classifier
Mechanical fitter, Orica Yarwun Site, Downer EDI, Nov 2010
• 95kt uprate Cyanide plant upgrade project
• Construction of a new absorber column and associated attachments, i.e. pumps
and pipes
Mechanical fitter, Cement Australia, Downer EDI, Oct. 2010
• Overhaul of Reclaimer and stacker and conveyor in row material area
• Change the drag chain, pulley and refurbished all the buckets
• Change wheel and rail guide on the stacker
• Changed bearing on end pulley of various conveyor lines
• Overhaul the conveyor in the tunnel in train load out.
Mechanical fitter, Dawson Mine, Monadelphous, May 2008 – present
• Ongoing casual shutdowns at Dawson mine
• Maintenance on overland conveyor
• Various maintenance in CHPP
• Maintenance on Stackers and reclaimers
Mechanical fitter, Newlands Northern Underground, Aug 2010
• Re-hosing long wall roof supports (chocks)
Mechanical fitter, Peak downs Mine, Transfield Services, July 2010
• Breaking flanges and opening pipes for pipe scan
• Installing Guards on 3D conveyor
Mechanical Fitter, BP Refinery shut, Brisbane, Sulzer Chemtech May-June 2010
• Opening man ways, spading flanges and valves
• Entering columns for tray inspection, maintenance and replacement
• Boxing trays inside the process columns
• Closing man ways using Hi torques and de-spading flange
Diesel Fitter, Liebherr Australia, Mt Arthur Mine March-April 2010
• Building new dump truck, T282-B, Ten cylinder Electrically driven
• Torque the bolts on the chase to 5300 psi
• Various fitting on the superstructure
• Assemble superstructure to the chase
• Fitting the sound suppression around the engine room
• Fitting the turbo bellows
LATEST SHUTDOWNS
Maintenance Fitter, Newlands Coal, Northern Underground, Jan-Feb 2010-02-20
• Rebuilding long wall roof supports
• Replace Relay Bars, Hi-pressure Manifold, Base lift Cylinder
• RE-hosing long wall roof supports
Maintenance fitter, Saraji Mine, McBryde Corporations, 23rd Nov.-7th of Dec2009
• Change wear Plates in feeder Bin at ROM
• Replace some of the return rollers brackets on conveyor 101 and 102
• Modification on the head shut of conveyor 102
• Change some of the old stringers and roller frames in the feeder tunnel
Maintenance fitter, Dawson Company Engineering, June, July 2009fitter, Groote
Eylandt Mining
• Modification to the new up grades
• replacement of various pipe and spools
Maintenance fitter, Howick Mine, Hunter Valley, dragline shutdown Monadelphous,
March 2009- April 2009
• Over haul of R/H and L/H propel
• Rebuild of the tub
• Q/A on the mechanical shafts & gears.
Maintenance fitter, Peak downs Mine, Workpac, Feb 2009
• Poly pipe Cutting and welding
• Repair to de-sliming screens
Maintenance fitter, Qld Cement Gladstone, Downers Edi Engineering, Jan
• Change bearings on the drive roller of Bucket elevator
• Over Haul gear boxes of the conveyors and dust extractors
• Some pipe fitting and PMS
Maintenance fitter, Groote Eylandt Mining Company, Dawson Engineering, Dec 2008
• Major construction shutdown on concentrator, conveyor and transfer stations
Maintenance Fitter, Stanwell power station, Rockhampton, CBH, Sept
• Overhaul of the pulverizing mills, ash plant and conveyor
• Maintenance of hydraulic fittings and hydraulic pumps
• Breakdowns and shutdowns in various section of the power station
MOST RESENT RELEVENT EXPERINCES
CONSTRUCTION
Gold Coast Desalination plant, June – Aug 2008, John Holland construction
Position: Mechanical Fitter/ Pipe Fitter
• Construction of lime storage facilities
• Installation of silo bins, mixer tanks, and various pumps
• Installation of PVC pipes and ABS pipes and complete pipe works in
Lime plant.
Lake Lindsay Alliance Project, May 2007-April 2008, Thiess Construction
Position: Mechanical fitter/Pipe Fitter
• Construction of 2 stackers and 2 reclaimers
• Construction and alignment of rail tracks and conveyor system for the stacker and
re-claimer
• General pipe fitting and some pluming work
• Commissioning of the Coal handling and process plant
Alcan G3 Expansion project, March –May 2007, Thiess construction
Position: Mechanical fitter
• Hydro-testing of the new process facilities
• Pipe fitting various types i.e. steel, pvc
• Pre-commission of the process plant
Curragh Mine Expansion Project, Barclay Mowlem, Jan-Nov 2006
• Construction of a 22km over-land conveyor and screening plant
• Construction of a 500 ton bin and modification to the existing coal washing plant.
• Pipe fitting
Gold Coast waste water treatment plant expansion project, United Group
Resources, Nov 2004-April 2005
Position: Mechanical fitter/ Pipe fitter
• Expansion of the existing water treatment facilities and modification of the
chlorination plant
• Material handling system assembly and alignment
• Installation set up of various mechanical units to the reactor tanks, i.e. mixer, etc.
• General pump set up and alignment
• Pipe fitting, pvc pipe, ABS pipe
MAINTENANCE
Patrick workshop at the port of Brisbane, Skilled Engineering, Nov 2005-Jan 2006
Position: Maintenance fitter
• Maintenance of the strudel cranes and overhead loading cranes, forklifts, etc.
Lead Smelter, Mt. Isa Mines, Monadelphous Engineering, June_Aug 2005
Position: Maintenance fitter
• Overhaul of turbine at the mine power station
• Maintenance of a gas operated turbine at the Mica Creek power station
• Day to day maintenance at the zinc-lead concentrator
• Day to day maintenance at the lead smelter
SHUTDOWN WORK
Position: Maintenance fitter
Stanwell power station, Rockhampton QLD, Sept –Oct 2008, CBH
• Re-build dampers around Boiler No 2
• Change bearings and door seals.
Dawson Mine, Mura QLD, Monadelphous Engineering, May 2008-present
• Overhaul of sump pumps
• Maintenance of the de-sliming screens
• Inspection of various gear boxes and conveyors.
Incitec pivot, Gibson Island, QLD, Feb-March 2007, workpac
• Overhaul of water turbine on cooling tower
• Overhaul of heat exchanger units.
Liddell power station, Muswellbrook, NSW, Sept-Nov 2005, Alstom power.
• Overhaul of a 500 Mw turbine, HP? IP units, Generator, condensation pumps, etc.
Millmerran power station, sept 2005, Alstom power.
• Various maintenance works on a 420 Mw turbine
Comalco Alumina Refinery, Monadelphous Engineering, Aug 2005
• Maintenance on the digestion tanks and the flush tanks.
Incitec, Gibson Island QLD, June 2005
• Maintenance work on the converters, jet engine and urea plant
Lead Smelter Mt Isa Mine, Monadelphous Engineering, May-June 2005
• Maintenance work on the lead smelting furnace and conveyor system
Caltex Refinery, Lytton QLD, Transfield Services, April-May 2005
• Overall maintenance of the Merox plant, heat exchanger bundles
• Examination of various vessels
McArthur River Mine, Monadelphous Engineering, April-July 2005
• General maintenance work on the sag mill
• Replacement of the hydro cyclones classifiers unit
• Replacement of rollers and the belts on the conveyor units
Incitec, Gibson Island, QLD, workpac, April 2005
• General maintenance to granulation plant, in particular to the dryer unit.
2004 SHUTDOWN WORKS
Olympic dam Mine, Roxby down SA, 4 times, broad-spectrum.
BP Refinery, Bulwer Island, QLD McDonald services
Merino pty ltd, Crestmead QLD, workpac
PREVIOUS EMPLOYMENTS
Maintenance Fitter/ Pipe Fitter at various metal workshops in Brisbane, Jan
1996- Jun 2003
Bradken Foundry, as maintenance fitter and NDT technician
Tomilson Boilers, maintenance fitter
Richo Engineering, maintenance fitter
D&R stainless, construction fitter
Duties:
• Magnetic inspection of the foundry products
• Ultra sonic inspection of the foundry products
• Installation of various components, i.e. automatic control units, etc.
• On-site installation of boilers, set up and commissioning.
Instrumentation Technician, WA school of mines and university of QLD, Jan
1985- Jan 1989
Duties:
• Day to day running of the automatic control laboratory (hydraulic & pneumatic
valves)
• Flow transmitters & pressure transmitters
Maintenance fitter/ Pipe fitter, 1982- 1985 for the following mining companies
in WA
Tower Mill Gold mine, CRA mining
Horse shoe Gold, Barrack mines
Maintenance fitter/ Pipe fitter, 1989- 1995, for the following mining companies
Misima mine (placer Dom)
Mt Lyshan mine (pasminco)
Groote Eylandt Mining (BHP Minerals)
Duties:
• Commissioning of process plant (CIP and CIL processing plants)
• Day to day maintenance of the mineral processing plant, crushers and
conveyors
• General pipe fitting around the process plant
• Demolition of process plant.
EDUCATION
Certificate III in Engineering - Mechanical Trade
Tickets OH&S
Dogger, Basic Rigger, Intermediate Rigger, forklift, EWP
White Card Construction Safety
Confined Space
Coal board medical
Generic Induction –standard 11(GIQ)
BMA Core Induction (Standard 11)
Coal Competency
Rigging and Dogging, Work at Heights, Elevated Working Platform and
Confined Space
REFERENCES
Michael Small, Jett Mining, supervisor 0419704034
Tony Van Eldik, DGH Engineering, supervisor 0749682906, 0438525842
Greg Wilson, Bard Engineering, Supervisor 0408730947

More Related Content

What's hot

Manifold design, verification,_and_validation
Manifold design, verification,_and_validationManifold design, verification,_and_validation
Manifold design, verification,_and_validationjpegd
 
Project report on Lakwa Thermal Power Station
Project report on Lakwa Thermal Power StationProject report on Lakwa Thermal Power Station
Project report on Lakwa Thermal Power StationDeepDarsanKalita1
 
RINA - AOG 2017 - Development of Self Installing Deepwater Spar - ARUP - Ashi...
RINA - AOG 2017 - Development of Self Installing Deepwater Spar - ARUP - Ashi...RINA - AOG 2017 - Development of Self Installing Deepwater Spar - ARUP - Ashi...
RINA - AOG 2017 - Development of Self Installing Deepwater Spar - ARUP - Ashi...Nick Bentley
 
Topsides installation options for semi-submersible floating production systems
Topsides installation options for semi-submersible floating production systemsTopsides installation options for semi-submersible floating production systems
Topsides installation options for semi-submersible floating production systemsNiels Haakman
 
FPSO Redeployment
FPSO RedeploymentFPSO Redeployment
FPSO RedeploymentDan Benson
 
Aqeel cv updated
Aqeel cv updatedAqeel cv updated
Aqeel cv updatedaqeel ahmed
 
well pad operations - PCP
well pad operations - PCPwell pad operations - PCP
well pad operations - PCPAfsal Ameen c
 
Basic whp presentation(1)
Basic whp presentation(1)Basic whp presentation(1)
Basic whp presentation(1)nguyen_uptorcem
 
George King: Things to Do Before You Frac that Old Well
George King: Things to Do Before You Frac that Old WellGeorge King: Things to Do Before You Frac that Old Well
George King: Things to Do Before You Frac that Old WellDaniel Matranga
 

What's hot (20)

A SATTAR DC&WI CV-II
A SATTAR DC&WI CV-IIA SATTAR DC&WI CV-II
A SATTAR DC&WI CV-II
 
Manifold design, verification,_and_validation
Manifold design, verification,_and_validationManifold design, verification,_and_validation
Manifold design, verification,_and_validation
 
Project report on Lakwa Thermal Power Station
Project report on Lakwa Thermal Power StationProject report on Lakwa Thermal Power Station
Project report on Lakwa Thermal Power Station
 
Resume 1
Resume 1 Resume 1
Resume 1
 
Resume 2016
Resume 2016Resume 2016
Resume 2016
 
Resume 2016
Resume 2016Resume 2016
Resume 2016
 
RINA - AOG 2017 - Development of Self Installing Deepwater Spar - ARUP - Ashi...
RINA - AOG 2017 - Development of Self Installing Deepwater Spar - ARUP - Ashi...RINA - AOG 2017 - Development of Self Installing Deepwater Spar - ARUP - Ashi...
RINA - AOG 2017 - Development of Self Installing Deepwater Spar - ARUP - Ashi...
 
William Resume 2
William Resume 2William Resume 2
William Resume 2
 
OKEREKE CHISOM CV
OKEREKE CHISOM CVOKEREKE CHISOM CV
OKEREKE CHISOM CV
 
Topsides installation options for semi-submersible floating production systems
Topsides installation options for semi-submersible floating production systemsTopsides installation options for semi-submersible floating production systems
Topsides installation options for semi-submersible floating production systems
 
Artificial Lift Selection Criterion
Artificial Lift Selection CriterionArtificial Lift Selection Criterion
Artificial Lift Selection Criterion
 
ANSYS oil&gas seminar 2013
ANSYS oil&gas seminar 2013ANSYS oil&gas seminar 2013
ANSYS oil&gas seminar 2013
 
FPSO Redeployment
FPSO RedeploymentFPSO Redeployment
FPSO Redeployment
 
Aqeel cv updated
Aqeel cv updatedAqeel cv updated
Aqeel cv updated
 
well pad operations - PCP
well pad operations - PCPwell pad operations - PCP
well pad operations - PCP
 
Artificial Lift Methods
Artificial Lift MethodsArtificial Lift Methods
Artificial Lift Methods
 
Jack Oler 1
Jack Oler 1Jack Oler 1
Jack Oler 1
 
Basic whp presentation(1)
Basic whp presentation(1)Basic whp presentation(1)
Basic whp presentation(1)
 
C489
C489C489
C489
 
George King: Things to Do Before You Frac that Old Well
George King: Things to Do Before You Frac that Old WellGeorge King: Things to Do Before You Frac that Old Well
George King: Things to Do Before You Frac that Old Well
 

Viewers also liked

Viewers also liked (10)

Histoire de rire par Savilius séquence 4
Histoire de rire  par Savilius séquence 4Histoire de rire  par Savilius séquence 4
Histoire de rire par Savilius séquence 4
 
Volante turismo gastronomico 3
Volante turismo gastronomico 3Volante turismo gastronomico 3
Volante turismo gastronomico 3
 
PC16 Stand Plan
PC16 Stand PlanPC16 Stand Plan
PC16 Stand Plan
 
Savilius Hp 01 le rêve russe 1re partie dia
Savilius Hp 01 le rêve russe   1re partie diaSavilius Hp 01 le rêve russe   1re partie dia
Savilius Hp 01 le rêve russe 1re partie dia
 
Page0051
Page0051Page0051
Page0051
 
Histoire d'en rire cahier 7
Histoire d'en rire cahier 7Histoire d'en rire cahier 7
Histoire d'en rire cahier 7
 
mapa cultural del Ecuador
mapa cultural del Ecuadormapa cultural del Ecuador
mapa cultural del Ecuador
 
Romania industrial past en
Romania industrial past enRomania industrial past en
Romania industrial past en
 
Romanian soft skills
Romanian soft skillsRomanian soft skills
Romanian soft skills
 
Ca cu
Ca cuCa cu
Ca cu
 

Similar to Dariush.resume

Similar to Dariush.resume (20)

Cv english
Cv englishCv english
Cv english
 
Resume 2022(1).pdf
Resume 2022(1).pdfResume 2022(1).pdf
Resume 2022(1).pdf
 
PROJECT-List_Attach_A_Jim Benge 6-14
PROJECT-List_Attach_A_Jim Benge 6-14PROJECT-List_Attach_A_Jim Benge 6-14
PROJECT-List_Attach_A_Jim Benge 6-14
 
Tushar resume
Tushar resumeTushar resume
Tushar resume
 
MAN CV ud 1.3.16
MAN CV ud 1.3.16MAN CV ud 1.3.16
MAN CV ud 1.3.16
 
Shawn Witt Portfolio
Shawn Witt PortfolioShawn Witt Portfolio
Shawn Witt Portfolio
 
Bobby's Resume
Bobby's ResumeBobby's Resume
Bobby's Resume
 
Subsea pipelines the remotely welded retrofit tee for hot tap applications ...
Subsea pipelines the remotely welded retrofit tee for hot tap applications   ...Subsea pipelines the remotely welded retrofit tee for hot tap applications   ...
Subsea pipelines the remotely welded retrofit tee for hot tap applications ...
 
Sanitary Pump Station Rehabilitation
Sanitary Pump Station RehabilitationSanitary Pump Station Rehabilitation
Sanitary Pump Station Rehabilitation
 
nasrulla resume
nasrulla resumenasrulla resume
nasrulla resume
 
Resume Hanif Shaikh Update (7)
Resume Hanif Shaikh Update (7)Resume Hanif Shaikh Update (7)
Resume Hanif Shaikh Update (7)
 
Mohamed Ahmed (2008)
Mohamed Ahmed  (2008)Mohamed Ahmed  (2008)
Mohamed Ahmed (2008)
 
newCHris Resume
newCHris ResumenewCHris Resume
newCHris Resume
 
Wiiliam CV update
Wiiliam CV updateWiiliam CV update
Wiiliam CV update
 
2018 extreme drilling llp
2018 extreme drilling llp2018 extreme drilling llp
2018 extreme drilling llp
 
MANOJ RESUME
MANOJ RESUMEMANOJ RESUME
MANOJ RESUME
 
paramasivam resume
paramasivam resume paramasivam resume
paramasivam resume
 
FINAL CV
FINAL CVFINAL CV
FINAL CV
 
Facilities Engineering Presentation
Facilities Engineering PresentationFacilities Engineering Presentation
Facilities Engineering Presentation
 
CAWI resumee
CAWI resumeeCAWI resumee
CAWI resumee
 

Dariush.resume

  • 1. Dariush Yaghmai DETAILS PERSONAL Address: Unit 13, No 24 Cannington Place Helensvale, QLD 4212 E-mail: D_yaghmai@hotmail.com Mobile: 040 964 5001 D.O.B: 31/08/1953 CAREER OBJECTIVES To obtain work as Mechanical Fitter/ pipe fitter, commissioning fitter or to take on the challenge of learning new skills in any industry. SKILLS • Process plant Commissioning • Mechanical fitting • Vibration Analysis of Rotating Equipments • Pipe fitting • Hydraulic & diesel fitting • Alignment of Couplings on Motor/Pumps • Hydro-testing & commissioning of pressure vessels and pipe works • Flange management and Torquing Bolts • Ηydra tight and tensioning bolts • Use of Bore scope, Stroboscope and laser alignments tools • Dogging and Rigging (intermediate level), Elevated work platform (EWP) • Read and understand P & ID and Iso drawings • Over haul of PSV and Ball Valves • Alignment and tensioning belts & pollys using laser technique • Work under permit system QUALIFICATIONS 1 Trade Qualified Mechanical Fitter 2 Intermediate Rigger and Dogman 3 Construction white Card 4 Confined Space National Training Certificate
  • 2. 5 Forklift Ticket 6 Elevated Working Platform Ticket 7 Coal Mine Generic Induction and Competencies 8 BMA induction I have worked on the following mobile plants and mining equipment : Draglines, shovels, diggers, dump trucks, Komatsu drilling rings, excavators, overhead cranes and container cranes, forklifts and front end loaders. I also, work on most components of Long walls. Extensive experience in Coal processing plant including Construction, Commissioning, maintenance and Rotating Equipments. Oil & Gas experiences in LNG Compressor stations and LNG refinery, Oil refineries, Hydro power stations and Chemical processing plants. EMPLOYMENT HISTORY Mechanical fitter, Commissioning of APLNG Gas processing plant, Bechtel Construction, Curtis Island, Feburary 2015-present • Rectification of Faults and miss alignments in Low pressure and medium pressure unit • Nitrogen purging through pipe works to check valves and flanges for possible leaks. • Torquing Bolts to required tension. • Commissioning and start up of Compressor and Turbine units • Commissioning of gas receiver unit. • Laser alignment of Belts and pollys on fine fans in propane unit. Mechanical Fitter, Instrumentation and Control, GE Oil & Gas, Wivenho Hdyro power station, Oct 2014 • Modification to Governor unit, Exciter and the Turbine Glen • Instrumentation and Tube Bending
  • 3. • Pipe fitting Mechanical Fitter, Downer edi, Nov 2013- 24th April 2014, Caval Ridge Mine • Pre- Commissioning of coal processing plant, Tailing Filters, Rom and Conveyor • Polly Alignment with laser and belt tension • Modification to Thickeners • Installation of secreting rubber to conveyors and adjustment of side rollers for smooth running of belt. • Adjustment to various knife gates • Repair to leaks on flanges and pipe fittings • Pre-commissioning of LV, HV car wash and Lub & fuel farm Mechanical fitter, DGH Engineering, Oct 2013, South walker Creek Mine • De-bottle necking Project at South Walker Creek Mine • Installation of a new Feed chute and associated conveyor, rollers and polly • Change out of pumps and pipes • Commissioning of the new feed chute, conveyor and pumps Mechanical fitter, United Group, August 2013-present • Wash plant Shutdown at peak downs mine, Aug 2013 • Numerous wash plant shutdowns at Curragh Mine, Sept 2013- present Mechanical fitter, Blackwater Mine, Team engineering, June-July 2013 • Lube & Hydraulic piping • Pipe fitting in a newly built workshop • Construction of a lubrication Tank farm
  • 4. • Laying down pipes, pumps, differential pressure gages and flow meters • Pre-commissioning, Hydro testing of the all the lube pipes Mechanical fitter, Peak downs Mine, G&S Engineering, Jan 2013 • General Shutdown maintenance in the wash plant Mechanical fitter, Ensham Mine, G&S Engineering, Jan 2013 • Major breakdown repair Dragline on 2 • Remove the broken Left hand propel pin and replace with a new one Mechanical fitter, Collinsville Mine, DGH Engineering, Aug-Nov 2012 • Upgrade of CHPP to recover more fines products • Installation of spirals bundle and associated pipe works Mechanical fitter, Ensham Mine, G&S Engineering, Feb-July 2012 • Dragline No 4 shutdown • Maintenance on propels, hoist and drag drums. • Dragline No 1 shut down • Major overhaul of Hoist and Darg drums, Bull gears and gear boxes. • Rebuild of gear boxes on both propels. • Rebuild of deflection shives, horizontal shives. • Overhaul of the tub • Maintenance on the swing shafts Mechanical Fitter, Rolleston Mine, G&S Engineering, Oct –Dec 2011 • Dragline No1 shutdown • Worked on right and left shoes and propels • Worked on swings, hoist and drag drums and drives • Assist in jacking up the machine and installed the drag gear of the tub Mechanical fitter, saraji Mine, Dysart, Mcbryde Corporation, July 2011- Oct 2011 • Construction of fire hydrant system in CHPP and all the workshop area • Laying Galvanised pipes all around the workshops • Fitting stainless steel pipes in CHPP plant • Hydro- testing of poly pipes and laying poly pipes in underground tranches Mechanical fitter, Peak downs mine, C. QLD, Monadelphous Engineering
  • 5. • Installation of platform on the main conveyor line to replace conveyor belt • Replace tailing tanks in the micro-cell units • Replace anodes in the clarifier tanks • Inspect cyclone feeders for damaged tiles Mechanical fitter, Roxby down SA, BLH Engineering May 2011 • Installing cooling fan in the cooling tower in the acid plant • Fitting blanks in various pipe work in acid plant Mechanical fitter, Yandi mine, BHP RGP5 project, Monadelphous engineering Feb- May 2011 • Punch listing of the new Ore Handling Plant (OHP) • Modifications to the new OHP • Commissioning of the stockyard stackers Mechanical fitter, curragh Mine, Blackwater, Ludowici, Jan-Feb 2011 • Shutdown Maintenance on vibrating screen • Installation and commissioning of a Centrifuge classifier Mechanical fitter, Orica Yarwun Site, Downer EDI, Nov 2010 • 95kt uprate Cyanide plant upgrade project • Construction of a new absorber column and associated attachments, i.e. pumps and pipes Mechanical fitter, Cement Australia, Downer EDI, Oct. 2010 • Overhaul of Reclaimer and stacker and conveyor in row material area • Change the drag chain, pulley and refurbished all the buckets • Change wheel and rail guide on the stacker • Changed bearing on end pulley of various conveyor lines • Overhaul the conveyor in the tunnel in train load out. Mechanical fitter, Dawson Mine, Monadelphous, May 2008 – present • Ongoing casual shutdowns at Dawson mine • Maintenance on overland conveyor • Various maintenance in CHPP • Maintenance on Stackers and reclaimers
  • 6. Mechanical fitter, Newlands Northern Underground, Aug 2010 • Re-hosing long wall roof supports (chocks) Mechanical fitter, Peak downs Mine, Transfield Services, July 2010 • Breaking flanges and opening pipes for pipe scan • Installing Guards on 3D conveyor Mechanical Fitter, BP Refinery shut, Brisbane, Sulzer Chemtech May-June 2010 • Opening man ways, spading flanges and valves • Entering columns for tray inspection, maintenance and replacement • Boxing trays inside the process columns • Closing man ways using Hi torques and de-spading flange Diesel Fitter, Liebherr Australia, Mt Arthur Mine March-April 2010 • Building new dump truck, T282-B, Ten cylinder Electrically driven • Torque the bolts on the chase to 5300 psi • Various fitting on the superstructure • Assemble superstructure to the chase • Fitting the sound suppression around the engine room • Fitting the turbo bellows LATEST SHUTDOWNS Maintenance Fitter, Newlands Coal, Northern Underground, Jan-Feb 2010-02-20 • Rebuilding long wall roof supports • Replace Relay Bars, Hi-pressure Manifold, Base lift Cylinder • RE-hosing long wall roof supports Maintenance fitter, Saraji Mine, McBryde Corporations, 23rd Nov.-7th of Dec2009 • Change wear Plates in feeder Bin at ROM • Replace some of the return rollers brackets on conveyor 101 and 102
  • 7. • Modification on the head shut of conveyor 102 • Change some of the old stringers and roller frames in the feeder tunnel Maintenance fitter, Dawson Company Engineering, June, July 2009fitter, Groote Eylandt Mining • Modification to the new up grades • replacement of various pipe and spools Maintenance fitter, Howick Mine, Hunter Valley, dragline shutdown Monadelphous, March 2009- April 2009 • Over haul of R/H and L/H propel • Rebuild of the tub • Q/A on the mechanical shafts & gears. Maintenance fitter, Peak downs Mine, Workpac, Feb 2009 • Poly pipe Cutting and welding • Repair to de-sliming screens Maintenance fitter, Qld Cement Gladstone, Downers Edi Engineering, Jan • Change bearings on the drive roller of Bucket elevator • Over Haul gear boxes of the conveyors and dust extractors • Some pipe fitting and PMS Maintenance fitter, Groote Eylandt Mining Company, Dawson Engineering, Dec 2008 • Major construction shutdown on concentrator, conveyor and transfer stations Maintenance Fitter, Stanwell power station, Rockhampton, CBH, Sept • Overhaul of the pulverizing mills, ash plant and conveyor • Maintenance of hydraulic fittings and hydraulic pumps • Breakdowns and shutdowns in various section of the power station
  • 8. MOST RESENT RELEVENT EXPERINCES CONSTRUCTION Gold Coast Desalination plant, June – Aug 2008, John Holland construction Position: Mechanical Fitter/ Pipe Fitter • Construction of lime storage facilities • Installation of silo bins, mixer tanks, and various pumps • Installation of PVC pipes and ABS pipes and complete pipe works in Lime plant. Lake Lindsay Alliance Project, May 2007-April 2008, Thiess Construction Position: Mechanical fitter/Pipe Fitter • Construction of 2 stackers and 2 reclaimers • Construction and alignment of rail tracks and conveyor system for the stacker and re-claimer • General pipe fitting and some pluming work • Commissioning of the Coal handling and process plant Alcan G3 Expansion project, March –May 2007, Thiess construction Position: Mechanical fitter • Hydro-testing of the new process facilities • Pipe fitting various types i.e. steel, pvc • Pre-commission of the process plant Curragh Mine Expansion Project, Barclay Mowlem, Jan-Nov 2006 • Construction of a 22km over-land conveyor and screening plant • Construction of a 500 ton bin and modification to the existing coal washing plant. • Pipe fitting Gold Coast waste water treatment plant expansion project, United Group Resources, Nov 2004-April 2005
  • 9. Position: Mechanical fitter/ Pipe fitter • Expansion of the existing water treatment facilities and modification of the chlorination plant • Material handling system assembly and alignment • Installation set up of various mechanical units to the reactor tanks, i.e. mixer, etc. • General pump set up and alignment • Pipe fitting, pvc pipe, ABS pipe MAINTENANCE Patrick workshop at the port of Brisbane, Skilled Engineering, Nov 2005-Jan 2006 Position: Maintenance fitter • Maintenance of the strudel cranes and overhead loading cranes, forklifts, etc. Lead Smelter, Mt. Isa Mines, Monadelphous Engineering, June_Aug 2005 Position: Maintenance fitter • Overhaul of turbine at the mine power station • Maintenance of a gas operated turbine at the Mica Creek power station • Day to day maintenance at the zinc-lead concentrator • Day to day maintenance at the lead smelter SHUTDOWN WORK Position: Maintenance fitter Stanwell power station, Rockhampton QLD, Sept –Oct 2008, CBH • Re-build dampers around Boiler No 2 • Change bearings and door seals. Dawson Mine, Mura QLD, Monadelphous Engineering, May 2008-present • Overhaul of sump pumps • Maintenance of the de-sliming screens • Inspection of various gear boxes and conveyors.
  • 10. Incitec pivot, Gibson Island, QLD, Feb-March 2007, workpac • Overhaul of water turbine on cooling tower • Overhaul of heat exchanger units. Liddell power station, Muswellbrook, NSW, Sept-Nov 2005, Alstom power. • Overhaul of a 500 Mw turbine, HP? IP units, Generator, condensation pumps, etc. Millmerran power station, sept 2005, Alstom power. • Various maintenance works on a 420 Mw turbine Comalco Alumina Refinery, Monadelphous Engineering, Aug 2005 • Maintenance on the digestion tanks and the flush tanks. Incitec, Gibson Island QLD, June 2005 • Maintenance work on the converters, jet engine and urea plant Lead Smelter Mt Isa Mine, Monadelphous Engineering, May-June 2005 • Maintenance work on the lead smelting furnace and conveyor system Caltex Refinery, Lytton QLD, Transfield Services, April-May 2005 • Overall maintenance of the Merox plant, heat exchanger bundles • Examination of various vessels McArthur River Mine, Monadelphous Engineering, April-July 2005 • General maintenance work on the sag mill • Replacement of the hydro cyclones classifiers unit • Replacement of rollers and the belts on the conveyor units Incitec, Gibson Island, QLD, workpac, April 2005
  • 11. • General maintenance to granulation plant, in particular to the dryer unit. 2004 SHUTDOWN WORKS Olympic dam Mine, Roxby down SA, 4 times, broad-spectrum. BP Refinery, Bulwer Island, QLD McDonald services Merino pty ltd, Crestmead QLD, workpac PREVIOUS EMPLOYMENTS Maintenance Fitter/ Pipe Fitter at various metal workshops in Brisbane, Jan 1996- Jun 2003 Bradken Foundry, as maintenance fitter and NDT technician Tomilson Boilers, maintenance fitter Richo Engineering, maintenance fitter D&R stainless, construction fitter Duties: • Magnetic inspection of the foundry products • Ultra sonic inspection of the foundry products • Installation of various components, i.e. automatic control units, etc. • On-site installation of boilers, set up and commissioning. Instrumentation Technician, WA school of mines and university of QLD, Jan 1985- Jan 1989 Duties: • Day to day running of the automatic control laboratory (hydraulic & pneumatic valves) • Flow transmitters & pressure transmitters Maintenance fitter/ Pipe fitter, 1982- 1985 for the following mining companies in WA Tower Mill Gold mine, CRA mining Horse shoe Gold, Barrack mines
  • 12. Maintenance fitter/ Pipe fitter, 1989- 1995, for the following mining companies Misima mine (placer Dom) Mt Lyshan mine (pasminco) Groote Eylandt Mining (BHP Minerals) Duties: • Commissioning of process plant (CIP and CIL processing plants) • Day to day maintenance of the mineral processing plant, crushers and conveyors • General pipe fitting around the process plant • Demolition of process plant. EDUCATION Certificate III in Engineering - Mechanical Trade Tickets OH&S Dogger, Basic Rigger, Intermediate Rigger, forklift, EWP White Card Construction Safety Confined Space Coal board medical Generic Induction –standard 11(GIQ) BMA Core Induction (Standard 11) Coal Competency Rigging and Dogging, Work at Heights, Elevated Working Platform and Confined Space REFERENCES Michael Small, Jett Mining, supervisor 0419704034
  • 13. Tony Van Eldik, DGH Engineering, supervisor 0749682906, 0438525842 Greg Wilson, Bard Engineering, Supervisor 0408730947