SlideShare a Scribd company logo
Information Pack
Trading under AWAY Business Services Pty Ltd
Our Quest
2
Providing cost effective services to small and
medium businesses to work smarter not harder.
What we do
3
 Process Improvement & Maturity
 Lean Six Sigma Methodology & Tools
 Business Analysis
 Process Mapping
 Procedure Writing
 Document Management
 Audits
 Hydraulics
 Pneumatics
 Service and Repairs
 Marine
 Training and Assessing
RendoTech
4
Service Engineering & Training
Mining, Industrial, Marine
Audits
5
 Conduct safety audits to report on equipment
maintenance (specialising in Underground Mining)
 Conduct audits within companies to assess their
stock and needs
 Commission new underground mining equipment
into mines
Hydraulics & Pneumatics
6
 Specialising in repairing complex problems and
breakdowns of Hydraulic and Pneumatic machinery
components
 Ability to comprehend detailed engineering
instructions and plans
 Design, make, service and repair of hydraulic and
pneumatic units and components
Service and Repairs
7
 Technical ability to resolve and repair complex problems and
breakdowns of mechanical and construction problems
 Ability to comprehend detailed engineering instructions and plans
 Fitting, turning, machining and welding skills as required by trade
 Comprehensive knowledge in service and repair of various mining,
manufacturing an other industrial machinery components including
(but not limited to):
Conveyor belts Pumps Valves
Drive shafts Cogs & gears Molding machines
Bending machines Dye cutting machines Printing machines
Chrome dipping
machines
Assembly lines Hoppers
Marine
8
 Development , repair and service of marine:
 Metal components
 Hydraulic components
 Pneumatic components
 Pumps
 Lines
Training and Assessing
9
 We customise to your training needs
 Develop training programs
 Deliver your training material
 Write and deliver training material
 Large or small groups
 Certificate IV Qualified Trainer and Assessor
AWAY Business Services
10
Process Improvement
11
 No problem to big or to small
 Develop process improvement programs
 Lead & deliver improvement initiatives
 Coach your team to deliver improvements
 Lean Six Sigma (LSS) DMAIC process methodology and tools
 D – Define the problem focus on voice of customer/business
 M – Measure the current process and establish a baseline
 A – Analyse the root causes and develop potential solutions
 I – Improve with solution selection and implementation
 C – Control the new process with document and metrics to sustain
improved results
Lean
Six
Sigma
Control
Im
prove Analyse
Measure
Define
Process Maturity
12
 Understand your current state and how to mature your
business processes
Process Maturity Dashboard
13
1
Adhoc
2
Repeatable
3
Defined
4
Managed
5
Optimised
No defined maps, documents or
metrics. Many ways to do a
process
Generic metrics recorded.
Processes not standardised but
concept in operation
Documented processes stored in
shared repository. Process
Owners identified. Roles &
responsibilities defined
Standard processes in place &
managed with metrics by the
Process Owner
Proactively driving
improvements using detailed
metrics
Process mapped & documented  Some   
Process maps meet agreed
standards  Some   
Multiple ways to work the process     
Processes incorporated into end
to end Process Design   Not validated  
Documents are catalogued and
stored centrally  Some   
Process Owner identified  Some
Identified - not actively
managing process
Identified -
actively managing process
Identified -
Global Owner actively
managing process
Roles & responsibilities defined  Some  
Linked to KRA

Revised regularly
Process performances are linked
to staff objectives (KRAs)   Some  
Metrics are clearly defined,
relevant and captured accurately 
Some
Cost FTE Capacity
Some
Cost FTE Capacity
Planning QA & SLA
Some
Cost FTE Capacity QA SLA Rework
Productivity

Cost FTE Capacity QA SLA
Rework Productivity Process
Cycle Effeciency (PCE) Process
Capability Score
Metrics/targets are used to review
process   

Reviewed and assessed
regularly

Continuously monitored to
drive improvement
Risk assessments completed and
documented     
Voice of Customer collected  
Ad-hoc customer feedback /
complaints

Used in root cause analysis

Includes Lead and Lag
indicators
Regular process reviews -
documents and maps continually
improved and maintained
Only if process fails Only if process fails
Some
When business priorities require

Control & Response plan or
mitigation plan in place

Control & Response plan or
mitigation plan in place
ProcessFrameworkProcessOwnershipProcessMetrics
Process&Change
Management
Maturity Dashboard
Business Analysis
14
 Review and document business processes end to end
 Recommend cost/benefits of operational and/or
technology solutions
 Business requirements
 Test Plans and User Acceptance Testing
 Business excellence reporting
 Quality programs
Process Mapping, Procedure
Writing & Document
Management
15
 Understand your processes with high level and detailed
current state and improved state process mapping
 Ensure employees have updated procedures and work
instructions to improve quality
 Develop document management structure linking:
 Process maps
 Procedures
 Work instructions
 Business Controls
 Quality Assurance
 Reporting
Training and Assessing
16
 We customise to your training needs
 Develop training programs
 Deliver your training material
 Write and deliver training material
 Large or small groups
 Certificate IV Qualified Trainer and Assessor
Matt Rendoth
P: 0408 845 450
E: matt@rendotech.com.au
Contact
17
Tracey Rendoth
P: 0414 368 377
E: tracey@rendotech.com.au
PO Box W175
West Cessnock NSW 2325

More Related Content

What's hot

Six sigma green belt project roadmap in 10 deliverables 2013 07
Six sigma green belt project roadmap in 10 deliverables 2013 07Six sigma green belt project roadmap in 10 deliverables 2013 07
Six sigma green belt project roadmap in 10 deliverables 2013 07
Francisco Pulgar-Vidal, MBA, Lean Six Sigma MBB
 
SAP Model -Smarterenergyconsulting.com
SAP Model -Smarterenergyconsulting.comSAP Model -Smarterenergyconsulting.com
SAP Model -Smarterenergyconsulting.com
smarterenergyconsulting.com
 
CMMI Capability Maturity Model Integration
CMMI   Capability Maturity Model Integration CMMI   Capability Maturity Model Integration
CMMI Capability Maturity Model Integration
Anand Subramaniam
 
Project management slide - Introduction
Project management slide - IntroductionProject management slide - Introduction
Project management slide - IntroductionAlbert Poghosyan
 
Sultan AlGhamdi - Resume
Sultan AlGhamdi - ResumeSultan AlGhamdi - Resume
Sultan AlGhamdi - ResumeAlGhamdi Sultan
 
Finance Process Improvement
Finance Process ImprovementFinance Process Improvement
Finance Process Improvement
BCFA Technologies
 
Project Quality Management Plan Checklist PowerPoint Presentation Slides
Project Quality Management Plan Checklist PowerPoint Presentation SlidesProject Quality Management Plan Checklist PowerPoint Presentation Slides
Project Quality Management Plan Checklist PowerPoint Presentation Slides
SlideTeam
 
Dmaic
DmaicDmaic
Six Sigma DMAIC Case Study
Six Sigma DMAIC Case StudySix Sigma DMAIC Case Study
Six Sigma DMAIC Case Study
Body of Knowledge
 
Overview Six sigma by D&H Engineers
Overview Six sigma by D&H EngineersOverview Six sigma by D&H Engineers
Overview Six sigma by D&H Engineers
D&H Engineers
 
Risk Management in QMS Processes - examples
Risk Management in QMS Processes - examplesRisk Management in QMS Processes - examples
Risk Management in QMS Processes - examples
Centauri Business Group Inc.
 
Improving Enterprise Performance using a Business Process Improvement Discipline
Improving Enterprise Performance using a Business Process Improvement DisciplineImproving Enterprise Performance using a Business Process Improvement Discipline
Improving Enterprise Performance using a Business Process Improvement DisciplineNathaniel Palmer
 
Benefits Of Dmaic
Benefits Of DmaicBenefits Of Dmaic
Benefits Of Dmaic
AVN Consulting
 
Six sigma dmaic strategy
Six sigma dmaic strategySix sigma dmaic strategy
Six sigma dmaic strategyMohit Singla
 
Project Quality Management | Project Quality Control | Edureka
Project Quality Management | Project Quality Control | EdurekaProject Quality Management | Project Quality Control | Edureka
Project Quality Management | Project Quality Control | Edureka
Edureka!
 
Project Metrics & Measures
Project Metrics & MeasuresProject Metrics & Measures
Project Metrics & Measures
Anand Subramaniam
 
Business Process Improvement (BPI 7) Process Training Module
Business Process Improvement (BPI 7) Process Training ModuleBusiness Process Improvement (BPI 7) Process Training Module
Business Process Improvement (BPI 7) Process Training Module
Frank-G. Adler
 
Six Sigma DMADV -step-tools-outputs
Six Sigma DMADV -step-tools-outputsSix Sigma DMADV -step-tools-outputs
Six Sigma DMADV -step-tools-outputs
Siti Farida
 

What's hot (20)

Cmmi (2)
Cmmi (2)Cmmi (2)
Cmmi (2)
 
Six sigma green belt project roadmap in 10 deliverables 2013 07
Six sigma green belt project roadmap in 10 deliverables 2013 07Six sigma green belt project roadmap in 10 deliverables 2013 07
Six sigma green belt project roadmap in 10 deliverables 2013 07
 
SAP Model -Smarterenergyconsulting.com
SAP Model -Smarterenergyconsulting.comSAP Model -Smarterenergyconsulting.com
SAP Model -Smarterenergyconsulting.com
 
CMMI Capability Maturity Model Integration
CMMI   Capability Maturity Model Integration CMMI   Capability Maturity Model Integration
CMMI Capability Maturity Model Integration
 
Project management slide - Introduction
Project management slide - IntroductionProject management slide - Introduction
Project management slide - Introduction
 
Sultan AlGhamdi - Resume
Sultan AlGhamdi - ResumeSultan AlGhamdi - Resume
Sultan AlGhamdi - Resume
 
Finance Process Improvement
Finance Process ImprovementFinance Process Improvement
Finance Process Improvement
 
Project Quality Management Plan Checklist PowerPoint Presentation Slides
Project Quality Management Plan Checklist PowerPoint Presentation SlidesProject Quality Management Plan Checklist PowerPoint Presentation Slides
Project Quality Management Plan Checklist PowerPoint Presentation Slides
 
Dmaic
DmaicDmaic
Dmaic
 
Six Sigma DMAIC Case Study
Six Sigma DMAIC Case StudySix Sigma DMAIC Case Study
Six Sigma DMAIC Case Study
 
Overview Six sigma by D&H Engineers
Overview Six sigma by D&H EngineersOverview Six sigma by D&H Engineers
Overview Six sigma by D&H Engineers
 
Risk Management in QMS Processes - examples
Risk Management in QMS Processes - examplesRisk Management in QMS Processes - examples
Risk Management in QMS Processes - examples
 
Improving Enterprise Performance using a Business Process Improvement Discipline
Improving Enterprise Performance using a Business Process Improvement DisciplineImproving Enterprise Performance using a Business Process Improvement Discipline
Improving Enterprise Performance using a Business Process Improvement Discipline
 
Dmaic model
Dmaic modelDmaic model
Dmaic model
 
Benefits Of Dmaic
Benefits Of DmaicBenefits Of Dmaic
Benefits Of Dmaic
 
Six sigma dmaic strategy
Six sigma dmaic strategySix sigma dmaic strategy
Six sigma dmaic strategy
 
Project Quality Management | Project Quality Control | Edureka
Project Quality Management | Project Quality Control | EdurekaProject Quality Management | Project Quality Control | Edureka
Project Quality Management | Project Quality Control | Edureka
 
Project Metrics & Measures
Project Metrics & MeasuresProject Metrics & Measures
Project Metrics & Measures
 
Business Process Improvement (BPI 7) Process Training Module
Business Process Improvement (BPI 7) Process Training ModuleBusiness Process Improvement (BPI 7) Process Training Module
Business Process Improvement (BPI 7) Process Training Module
 
Six Sigma DMADV -step-tools-outputs
Six Sigma DMADV -step-tools-outputsSix Sigma DMADV -step-tools-outputs
Six Sigma DMADV -step-tools-outputs
 

Similar to 2015 - RT & AWAY Intro Pack

QM-029-Six Sigma Overview
QM-029-Six Sigma OverviewQM-029-Six Sigma Overview
QM-029-Six Sigma Overviewhandbook
 
Iso9001 implementation increasing-value_reducing_leadtime
Iso9001 implementation increasing-value_reducing_leadtimeIso9001 implementation increasing-value_reducing_leadtime
Iso9001 implementation increasing-value_reducing_leadtimeOmnex Inc.
 
Reducing timeincreasingvalue0503
Reducing timeincreasingvalue0503Reducing timeincreasingvalue0503
Reducing timeincreasingvalue0503Omnex Inc.
 
Importan refrence of quality
Importan refrence of qualityImportan refrence of quality
Importan refrence of qualityali8055
 
Business Process Management Approach
Business Process Management Approach  Business Process Management Approach
Business Process Management Approach
Navitsumo Consulting Ltd.
 
Six Sigma Exec Overview of project.ppt
Six Sigma Exec Overview of   project.pptSix Sigma Exec Overview of   project.ppt
Six Sigma Exec Overview of project.ppt
Rahulyadav421393
 
Quality Resume
Quality ResumeQuality Resume
Quality Resumevipin rana
 
Quality Resume
Quality ResumeQuality Resume
Quality Resumevipin rana
 
Lean 6 Sigma On Line Training From Searchtec
Lean 6 Sigma  On Line Training From SearchtecLean 6 Sigma  On Line Training From Searchtec
Lean 6 Sigma On Line Training From Searchtec
searchtec
 
Six sigma green belt training (autosaved)
Six sigma green belt training (autosaved)Six sigma green belt training (autosaved)
Six sigma green belt training (autosaved)
Uppiliappan Gopalan
 
Dev3 Presentation (Short)
Dev3 Presentation (Short)Dev3 Presentation (Short)
Dev3 Presentation (Short)
ScottFriends
 
001 a strategy for productivity
001 a strategy for productivity001 a strategy for productivity
001 a strategy for productivity
Dr Fereidoun Dejahang
 
001 a strategy for productivity
001 a strategy for productivity001 a strategy for productivity
001 a strategy for productivity
drdej19
 
001 a strategy for productivity
001 a strategy for productivity001 a strategy for productivity
001 a strategy for productivity
DrFereydounDejahang
 
Sept 2008 Presentation Quality & Project Management
Sept 2008 Presentation Quality & Project ManagementSept 2008 Presentation Quality & Project Management
Sept 2008 Presentation Quality & Project Management
Haroon Abbu
 
Measure Customer and Business Feedback to Drive Improvement
Measure Customer and Business Feedback to Drive ImprovementMeasure Customer and Business Feedback to Drive Improvement
Measure Customer and Business Feedback to Drive Improvement
TechWell
 
CMMI & Six Sigma Integration
CMMI & Six Sigma IntegrationCMMI & Six Sigma Integration
CMMI & Six Sigma Integration
Anand Subramaniam
 
SDLC Process_Document.pptx
SDLC Process_Document.pptxSDLC Process_Document.pptx
SDLC Process_Document.pptx
Sivakumar Pola
 
Yurii Chaika: Delivery Excellence in consulting model - importance, component...
Yurii Chaika: Delivery Excellence in consulting model - importance, component...Yurii Chaika: Delivery Excellence in consulting model - importance, component...
Yurii Chaika: Delivery Excellence in consulting model - importance, component...
Lviv Startup Club
 

Similar to 2015 - RT & AWAY Intro Pack (20)

QM-029-Six Sigma Overview
QM-029-Six Sigma OverviewQM-029-Six Sigma Overview
QM-029-Six Sigma Overview
 
Iso9001 implementation increasing-value_reducing_leadtime
Iso9001 implementation increasing-value_reducing_leadtimeIso9001 implementation increasing-value_reducing_leadtime
Iso9001 implementation increasing-value_reducing_leadtime
 
Reducing timeincreasingvalue0503
Reducing timeincreasingvalue0503Reducing timeincreasingvalue0503
Reducing timeincreasingvalue0503
 
Importan refrence of quality
Importan refrence of qualityImportan refrence of quality
Importan refrence of quality
 
Business Process Management Approach
Business Process Management Approach  Business Process Management Approach
Business Process Management Approach
 
Six Sigma Exec Overview of project.ppt
Six Sigma Exec Overview of   project.pptSix Sigma Exec Overview of   project.ppt
Six Sigma Exec Overview of project.ppt
 
Quality Resume
Quality ResumeQuality Resume
Quality Resume
 
Quality Resume
Quality ResumeQuality Resume
Quality Resume
 
Lean 6 Sigma On Line Training From Searchtec
Lean 6 Sigma  On Line Training From SearchtecLean 6 Sigma  On Line Training From Searchtec
Lean 6 Sigma On Line Training From Searchtec
 
Six sigma green belt training (autosaved)
Six sigma green belt training (autosaved)Six sigma green belt training (autosaved)
Six sigma green belt training (autosaved)
 
Dev3 Presentation (Short)
Dev3 Presentation (Short)Dev3 Presentation (Short)
Dev3 Presentation (Short)
 
001 a strategy for productivity
001 a strategy for productivity001 a strategy for productivity
001 a strategy for productivity
 
001 a strategy for productivity
001 a strategy for productivity001 a strategy for productivity
001 a strategy for productivity
 
001 a strategy for productivity
001 a strategy for productivity001 a strategy for productivity
001 a strategy for productivity
 
Sept 2008 Presentation Quality & Project Management
Sept 2008 Presentation Quality & Project ManagementSept 2008 Presentation Quality & Project Management
Sept 2008 Presentation Quality & Project Management
 
7 itil v3 csi 7 v1.8
7 itil v3 csi 7 v1.87 itil v3 csi 7 v1.8
7 itil v3 csi 7 v1.8
 
Measure Customer and Business Feedback to Drive Improvement
Measure Customer and Business Feedback to Drive ImprovementMeasure Customer and Business Feedback to Drive Improvement
Measure Customer and Business Feedback to Drive Improvement
 
CMMI & Six Sigma Integration
CMMI & Six Sigma IntegrationCMMI & Six Sigma Integration
CMMI & Six Sigma Integration
 
SDLC Process_Document.pptx
SDLC Process_Document.pptxSDLC Process_Document.pptx
SDLC Process_Document.pptx
 
Yurii Chaika: Delivery Excellence in consulting model - importance, component...
Yurii Chaika: Delivery Excellence in consulting model - importance, component...Yurii Chaika: Delivery Excellence in consulting model - importance, component...
Yurii Chaika: Delivery Excellence in consulting model - importance, component...
 

2015 - RT & AWAY Intro Pack

  • 1. Information Pack Trading under AWAY Business Services Pty Ltd
  • 2. Our Quest 2 Providing cost effective services to small and medium businesses to work smarter not harder.
  • 3. What we do 3  Process Improvement & Maturity  Lean Six Sigma Methodology & Tools  Business Analysis  Process Mapping  Procedure Writing  Document Management  Audits  Hydraulics  Pneumatics  Service and Repairs  Marine  Training and Assessing
  • 4. RendoTech 4 Service Engineering & Training Mining, Industrial, Marine
  • 5. Audits 5  Conduct safety audits to report on equipment maintenance (specialising in Underground Mining)  Conduct audits within companies to assess their stock and needs  Commission new underground mining equipment into mines
  • 6. Hydraulics & Pneumatics 6  Specialising in repairing complex problems and breakdowns of Hydraulic and Pneumatic machinery components  Ability to comprehend detailed engineering instructions and plans  Design, make, service and repair of hydraulic and pneumatic units and components
  • 7. Service and Repairs 7  Technical ability to resolve and repair complex problems and breakdowns of mechanical and construction problems  Ability to comprehend detailed engineering instructions and plans  Fitting, turning, machining and welding skills as required by trade  Comprehensive knowledge in service and repair of various mining, manufacturing an other industrial machinery components including (but not limited to): Conveyor belts Pumps Valves Drive shafts Cogs & gears Molding machines Bending machines Dye cutting machines Printing machines Chrome dipping machines Assembly lines Hoppers
  • 8. Marine 8  Development , repair and service of marine:  Metal components  Hydraulic components  Pneumatic components  Pumps  Lines
  • 9. Training and Assessing 9  We customise to your training needs  Develop training programs  Deliver your training material  Write and deliver training material  Large or small groups  Certificate IV Qualified Trainer and Assessor
  • 11. Process Improvement 11  No problem to big or to small  Develop process improvement programs  Lead & deliver improvement initiatives  Coach your team to deliver improvements  Lean Six Sigma (LSS) DMAIC process methodology and tools  D – Define the problem focus on voice of customer/business  M – Measure the current process and establish a baseline  A – Analyse the root causes and develop potential solutions  I – Improve with solution selection and implementation  C – Control the new process with document and metrics to sustain improved results Lean Six Sigma Control Im prove Analyse Measure Define
  • 12. Process Maturity 12  Understand your current state and how to mature your business processes
  • 13. Process Maturity Dashboard 13 1 Adhoc 2 Repeatable 3 Defined 4 Managed 5 Optimised No defined maps, documents or metrics. Many ways to do a process Generic metrics recorded. Processes not standardised but concept in operation Documented processes stored in shared repository. Process Owners identified. Roles & responsibilities defined Standard processes in place & managed with metrics by the Process Owner Proactively driving improvements using detailed metrics Process mapped & documented  Some    Process maps meet agreed standards  Some    Multiple ways to work the process      Processes incorporated into end to end Process Design   Not validated   Documents are catalogued and stored centrally  Some    Process Owner identified  Some Identified - not actively managing process Identified - actively managing process Identified - Global Owner actively managing process Roles & responsibilities defined  Some   Linked to KRA  Revised regularly Process performances are linked to staff objectives (KRAs)   Some   Metrics are clearly defined, relevant and captured accurately  Some Cost FTE Capacity Some Cost FTE Capacity Planning QA & SLA Some Cost FTE Capacity QA SLA Rework Productivity  Cost FTE Capacity QA SLA Rework Productivity Process Cycle Effeciency (PCE) Process Capability Score Metrics/targets are used to review process     Reviewed and assessed regularly  Continuously monitored to drive improvement Risk assessments completed and documented      Voice of Customer collected   Ad-hoc customer feedback / complaints  Used in root cause analysis  Includes Lead and Lag indicators Regular process reviews - documents and maps continually improved and maintained Only if process fails Only if process fails Some When business priorities require  Control & Response plan or mitigation plan in place  Control & Response plan or mitigation plan in place ProcessFrameworkProcessOwnershipProcessMetrics Process&Change Management Maturity Dashboard
  • 14. Business Analysis 14  Review and document business processes end to end  Recommend cost/benefits of operational and/or technology solutions  Business requirements  Test Plans and User Acceptance Testing  Business excellence reporting  Quality programs
  • 15. Process Mapping, Procedure Writing & Document Management 15  Understand your processes with high level and detailed current state and improved state process mapping  Ensure employees have updated procedures and work instructions to improve quality  Develop document management structure linking:  Process maps  Procedures  Work instructions  Business Controls  Quality Assurance  Reporting
  • 16. Training and Assessing 16  We customise to your training needs  Develop training programs  Deliver your training material  Write and deliver training material  Large or small groups  Certificate IV Qualified Trainer and Assessor
  • 17. Matt Rendoth P: 0408 845 450 E: matt@rendotech.com.au Contact 17 Tracey Rendoth P: 0414 368 377 E: tracey@rendotech.com.au PO Box W175 West Cessnock NSW 2325