Managing Information Overload
William Jones
February 26, 2011
2011 NCNMLG/MLGSCA Joint Meeting
Keeping Found Things Found
© copyright, William Jones,
2011
2
The World Is at My Doorstep …
And the House Is a Mess:
Putting our information in its place
in a digital age
2
Keeping Found Things Found
© copyright, William Jones,
2011
3
Everywhere to go but no place to call home:
Building places of our own
for our information
3
Keeping Found Things Found
© copyright, William Jones,
2011
4
About the Instructor
 Research Associate Professor at the University of Washington
 Manages the Keeping Found Things Found project
 Wrote “Keeping Found Things Found: The Study and Practice of Personal
Information Management” (2007).
 Edited (with Jaime Teevan) the book “Personal Information Management” and a
special issue on PIM for the Communications of the ACM (2006).
 Wrote invited chapters on PIM for ARIST and for the Handbook of Applied Cognition.
 Has organized or co-organized numerous workshops, tutorials and courses on PIM
including an invitational workshop sponsored by the National Science Foundation.
 Have 5 patents relating to search and PIM.
 Dr. Jones received a doctorate in Cognitive Psychology a long time ago from
Carnegie-Mellon University for research in human memory
Keeping Found Things Found
© copyright, William Jones,
2011
5
Schedule for today
 1:00 Lecture: An Introduction to PIM
 1:30 Lecture: A framework for PIM
 2:00 Group discussion: Failures and successes
 2:30 …break… and first exercise
 3:00 Group discussion: A Comparison of practices
 3:30 Lecture: Designing your own practice of PIM
 4:00 Second exercise: Building your places
 4:30 Group discussion and review
 5:00 Adjourn
Keeping Found Things Found
© copyright, William Jones,
2011
6
Learning Objectives
1. What personal information management (PIM) is and
how it can be used in everyday life.
2. Six senses in which information is personal.
3. Six activities of personal information management.
4. Key questions to ask whenever considering the use of
new tool or system of PIM.
5. Steps towards designing your own practice of PIM.
Keeping Found Things Found
© copyright, William Jones,
2011
7
This course is not…
 A review of the latest and greatest.
 A step-by-step “how to”.
Keeping Found Things Found
© copyright, William Jones,
2011
8
Requests from you
 “how can we stay organized with no/low-tech
tools if we don't have and don't plan to have
techy tools like smart phones, iPads…”
 “how a Kindle can be used to help organize
and distribute a book collection with the
department he supports”.
 “I hope to learn about new ways to manage
my personal, family, and business
schedules.”
Keeping Found Things Found
© copyright, William Jones,
2011
9
Related Reading
PERSONAL INFORMATION MANAGEMENT
Edited by William Jones and Jaime Teevan
KEEPING FOUND THINGS FOUND: The Study and
Practice of Personal Information Management
By William Jones
Managing Information Overload
An Introduction to PIM
Unit 1
Keeping Found Things Found
© copyright, William Jones,
2011
11
A Definition
Personal Information Management (PIM) refers to both
the practice and the study of the activities a person
performs in order to acquire or create, store, organize,
maintain, retrieve, use and distribute the information
needed to complete tasks (work-related and not) and to
fulfill various roles and responsibilities (as parent,
employee, friend, member of community, etc.). PIM places
special emphasis on the organization and maintenance of
personal information collections (PICs) in which information
items, such as paper documents, electronic documents,
email messages, web references, handwritten notes, etc.,
are stored for later use and repeated re-use.
Keeping Found Things Found
© copyright, William Jones,
2011
12
Personal Information Management
Manage –
to handle, to manipulate.
Management –
“The art of getting things done through people”
– Mary Parker Follett (1868-1933)
PIM –
The art of getting things done in your life
through information
Keeping Found Things Found
© copyright, William Jones,
2011
13
An Ideal of PIM
 … without a lot of fuss or muss.
(We don’t spend a lot of time
filing and organizing).
 We have more time to make
creative, intelligent use of the
information at hand in order
to get things done.
 We have the information we need, when we
need it, where we need it, in the right form,
enough (but not too much)…
Keeping Found Things Found
© copyright, William Jones,
2011
14
The Benefits of Better PIM
 Enough (but not too much) useful information
at the right time, at the right place, in the right
form/format…
 Better management of our resources: time,
money, energy, etc.
 Better productivity
 Better coordination with others
 Better leverage of “me”
Keeping Found Things Found
© copyright, William Jones,
2011
15
What are we really managing?
 When you‟re young, you have time and energy
but no money.
 When you‟re middle-aged, you have energy and
money but no time.
 When you‟re old, you have time and money
but no energy.
Keeping Found Things Found
© copyright, William Jones,
2011
16
Information, the Consumer of…
 Time
 Money
 Energy
 Attention
 Space, digital & physical
 … Well-being?
Keeping Found Things Found
© copyright, William Jones,
2011
17
Personal Information Management
What is information to us?
Keeping Found Things Found
© copyright, William Jones,
2011
18
Information Is…
… what‟s in documents, email messages, web
pages, MP3 files, photographs (digital and
paper-based), videos, etc.
... a drain on our money, energy, attention and
time.
... what we create, change, publish and send to
get things done.
Keeping Found Things Found
© copyright, William Jones,
2011
19
Information Is…
... what we process to “make sense” of our
world (and the raw data we receive through
our senses).
... how other worlds are represented to us:
past and present, possible and pretend.
... how we are represented to the outside
world, accurately or not, for better or worse.
... an extension of us.
Keeping Found Things Found
© copyright, William Jones,
2011
20
Information to Make Things Real
Keeping Found Things Found
© copyright, William Jones,
2011
21
Benjamin Franklin
Keeping Found Things Found
© copyright, William Jones,
2011
22
The Power of Writing It Down
 Gollwitzer & Brandstatter (1997).
 Participants asked to write a report on “How
You Spent Christmas Eve” no later than 48
hours afterward.
 Half wrote down exactly when and where
they would do this; the other half did not.
 3/4 of those who wrote down their intention
completed the task. Only 1/3 of the control
group did.
Keeping Found Things Found
© copyright, William Jones,
2011
23
So… what’s the problem?
Information Overload?
“We have reason to fear that the multitude of books which
grows every day in a prodigious fashion will make the
following centuries fall into a state as barbarous as that of
the centuries that followed the fall of the Roman Empire.
Unless we try to prevent this danger by separating those
books which we must throw out or leave in oblivion from
those which one should save and within the latter between
what is useful and what is not.“
Keeping Found Things Found
© copyright, William Jones,
2011
24
So… what’s the problem?
Information Overload?
“We have reason to fear that the multitude of books which
grows every day in a prodigious fashion will make the
following centuries fall into a state as barbarous as that of
the centuries that followed the fall of the Roman Empire.
Unless we try to prevent this danger by separating those
books which we must throw out or leave in oblivion from
those which one should save and within the latter between
what is useful and what is not.“
– Adrien Baillet in 1685
Keeping Found Things Found
© copyright, William Jones,
2011
25
Information Fragmentation
Keeping Found Things Found
© copyright, William Jones,
2011
26
Some Historical Perspective:
Let’s Go Back 25 years or so …
 PCs were new and expensive. Computer use for
most users meant terminal access to a mini- or
mainframe computer.
 Digital storage was expensive. E-mail was just
beginning to be used and then only for
communication. Messages were rarely archived.
 The Web… not yet.
 Paper was the preferred form for information
storage.
Keeping Found Things Found
© copyright, William Jones,
2011
27
Now in 2011…
 We have desktops, laptops and palmtops…
 Digital storage is cheap and plentiful.
 Email use is widespread and email messages
are archived.
 Everything is moving onto the Web and into
special-purpose Internet-based, mobile-
enabled applications.
 And… we still have paper.
Keeping Found Things Found
© copyright, William Jones,
2011
28
A Web-wide World of Information
It turns out that about 95 percent of what I do on a
computer can now be accomplished through a browser. I
use it for updating Twitter and Facebook and for blogging.
Meebo.com lets me log into several instant-messaging
accounts simultaneously. Last.fm gives me tunes, and
webmail does the email. I use Google Docs for word
processing, and if I need to record video, I can do it directly
from webcam to YouTube…. *
*“The Netbook Effect: How Cheap Little Laptops Hit the Big Time”,
Clive Thompson, Wired Magazine, 02.23.09.
http://www.wired.com/gadgets/wireless/magazine/17-03/mf_netbooks
Keeping Found Things FoundWilliam Jones 29
Individuals collect many different
types of information
radio news &
information 
Email messages
books
newspaper articles 
telephone numbers

budgets 
websites
contact lists
calendar appointments
MAGAZINES &
J OURNALS

graphs & charts
images
bills 
television news & information

accounts
 photographs
signs & instructions


deadlines
schedules 
Keeping Found Things Found
© copyright, William Jones,
2011
30
Many Types of Information Have
Their Own Distinct Form…
 Distinct patterns, methods, habits of use.
 Distinct supporting applications and tools.
 Distinct organizations.
Keeping Found Things Found
© copyright, William Jones,
2011
31
Applications each have their own
separate ways to structure
Application Structuring
Outlook Folders
OneNote Notebooks, Sections (top), Pages (right-hand)
Evernote Notebooks, Tags (in a hierarchy).
Remember The Milk Lists, Tags
facebook Groups, Albums, FriendLists, …
Keeping Found Things Found
© copyright, William Jones,
2011
32
Even Simple Decisions Mean
Checking in Several Places
Keeping Found Things Found
© copyright, William Jones,
2011
33
A Yearning for Integration
 “Ideally I would have like a unified system, I
wouldn‟t have all these different databases
and all these different check lists and
manuals…something that unified all of the
separate tools and databases that I use” –JS-182
 “..maybe go from media to media a little bit
better, …if I store something out on the wiki,
it will also store something on, in the, in the
file structure.” –AP-123
Keeping Found Things Found
© copyright, William Jones,
2011
34
Information Fragmentation Creates
Problems at Several Stages of PIM
 Encountering new information
• Do I keep it? Where? How? In which organization? On which computer?
Do I already have this information (somewhere)?
 Finding old information
• Where to look? Which folder? At home or at work? On which computer?
In which email account?
 Organization and maintenance
• Too many organizations! One (or more) for electronic documents, paper
documents, email, web references (Favorites/Bookmarks).
 Using information to get something done
• We may spend several minutes gather information together to work on a
task – even if we know where it is.
Keeping Found Things Found
© copyright, William Jones,
2011
35
From Many Parts…
 Inderal 1 tablet 3 times a day
 Lanoxin 1 tablet every morning
 Carafate 1 tablet before meals and at bedtime
 Zantac 1 tablet every 12 hours (twice a day)
 Quinaglute 1 tablet 4 times a day
 Coumadin 1 tablet a day
Keeping Found Things Found
© copyright, William Jones,
2011
36
To a More Coherent Whole*
Breakfast
Lunch
Dinner
Bedtime
Lanoxin X
Inderal X X X
Quinaglute X X X X
Carafate X X X X
Zantac X X
Coumadin X
*From Norman (1993), “Things that make us smart”
based on work of Ruth Day
Keeping Found Things Found
© copyright, William Jones,
2011
3737Copyright © 2006 William Jones, Ptarmigan
Tunnel LLC. All rights reserved
Recognize This?
Keeping Found Things Found
© copyright, William Jones,
2011
38
This?
Keeping Found Things Found
© copyright, William Jones,
2011
39
What about This?
*Source: http://www.aip.org/history/curie/periodic.htm
Managing Information Overload
A Framework for PIM
Unit 2
Keeping Found Things Found
© copyright, William Jones,
2011
41
Some Working Definitions
 An information item is a packaging of information.
Examples of information items include: 1. paper
documents; 2. electronic documents and other files;
3. email messages; 4. web pages; or 5. references
(e.g., shortcuts, alias) to any of the above.
 An information item has an associated information
form determined by the tools and applications that
are used to name, move, copy, delete or otherwise
organize or assign properties to an item.
Paper documents, e-documents and other files,
email messages and web bookmarks.
Keeping Found Things Found
© copyright, William Jones,
2011
42
A Mapping Weaving Together
Information and Need
Keeping Found Things Found
© copyright, William Jones,
2011
43
Elements of a Mapping
 Schemes of organization
 Structures that result
 Strategies for managing time, energy, and
information flow
 Supporting tools
 A system that brings these elements together
Keeping Found Things FoundWilliam Jones 44
Finding and Re-finding
Keeping Found Things FoundWilliam Jones 45
Keeping According to
Anticipated Need
Keeping Found Things Found
© copyright, William Jones,
2011
46
Maintaining & Organizing
Keeping Found Things Found
© copyright, William Jones,
2011
47
Managing Privacy and
the Information Flow
Keeping Found Things Found
© copyright, William Jones,
2011
48
Measuring & Evaluating
Keeping Found Things Found
© copyright, William Jones,
2011
49
Making Sense of and
Using Information
Keeping Found Things FoundWilliam Jones 50
6 Senses of Personal Information
Keeping Found Things FoundWilliam Jones 51
The Senses in Which
Information Can Be Personal
Relation to “me” Examples Issues
1 Controlled by,
owned by me
Email messages in our email
accounts; files on our
computer‟s hard drive.
Security against break-ins or theft., backup,
virus protection, etc.
2 About me Credit history, medical, web
browsing, library books
checked out.
Who sees what when (under which
circumstances)? How is information
corrected or updated? Does it ever go
away?
3 Directed towards
me
Phone calls, drop-ins, TV ads,
web ads, pop-ups.
Protection of me and my money, energy,
attention and time.
Keeping Found Things FoundWilliam Jones 52
The Senses in Which
Information Can Be Personal (ctnd.)
Relation to
“me”
Examples Issues
4 Sent (posted,
provided) by
me
Email, personal web sites,
published reports and
articles.
Who sees what when? Did the message
get through?
5 (Already)
experienced
by me
Web pages that remain on the
Web. Books that remain in
a library. TV and radio
programs that remain
somewhere in “broadcast
ether”.
How to get back to information again later?
6 Potentially
relevant
(useful) to
me; about to
be
experienced
by me.
Somewhere “out there” is the
perfect vacation, house,
job, life-long mate. If only I
could find the right
information!
If only I knew (had some idea of) what I
don‟t know. How to filter out or
otherwise avoid information we don‟t
wish to see? (How to do likewise for
our children?)
Keeping Found Things Found
© copyright, William Jones,
2011
53
Support Needed for Each Sense of
Personal Information
1. Controlled by, owned by me. Security against break-ins. Support
for back-ups and updates. Support for organization and
maintenance.
2. About me. Privacy laws. Support for privacy preferences (e.g.
P3P). Ability to correct. How come each doctor runs the same tests?
3. Directed toward me. When can I be interrupted? PDAs that know
where we are and what we‟re doing.
4. Sent (posted, provided) by me. Where does the information go?
How is it used? What impact does it have? Am I getting credit?
5. (Already) experienced by me. What is my information diet? What
biases does it introduce?
6. Relevant (useful) to me (or not…). Anticipatory, adaptive filters
that learn over time?
Keeping Found Things Found
© copyright, William Jones,
2011
54
Tradeoffs for Each Sense
1. Controlled by, owned by me. More time to keep and organize
now or more time to find (and organize) later? Copy or reference?
(Integrity vs. speed & convenience?)
2. About me. Sign? Click “I agree”? Is the risk worth it? Who gets to
know what and when?
3. Directed toward me. Need to know vs. need for privacy. Who gets
through with what information when?
4. Sent (posted, provided) by me. Need to get information out there
but need not to be scooped or plagiarized. The art of email
5. (Already) experienced by me. Need to remember, need to forget
and start from scratch.
6. Relevant (useful) to me (or not…). Filters that work but not too
well. Need for controlled chaos? Not everything we need can be
articulated. We don‟t always know what‟s good for us.
Keeping Found Things Found
© copyright, William Jones,
2011
55
PICing our battles
A personal information
collection (PIC) is a
personally managed
subset of the PSI.
PICs are “islands” of
structure and coherence
in the PSI “sea”.
Keeping Found Things Found
© copyright, William Jones,
2011
56
Reference vs. Project Collections
 Project collections. Items in a project
collection are selected to relate to a particular
project that we are trying to complete
 Reference collections. Items in a reference
collection are selected for repeated use but
usually with no specific use in mind.
1. the books of a personal library
2. digital articles kept in an “articles” folder
3. dinner recipes downloaded from the web
4. paper-backed pictures kept in a photo album
Keeping Found Things FoundWilliam Jones 57
A Personal Reference Collection
of Articles
Keeping Found Things Found
© copyright, William Jones,
2011
58
A Personal Project Collection Near the
Beginning of Efforts to Plan a Wedding
Keeping Found Things Found
© copyright, William Jones,
2011
59
A View of Folders and Subfolders for
the Same Wedding, Six Months Later…
Keeping Found Things Found
© copyright, William Jones,
2011
60
The Tension Between Reference and
Project Collections
Keeping Found Things Found
© copyright, William Jones,
2011
61
Group Discussion
 Reflect on your own management of personal
information (e.g., documents, email
messages, web references, etc). Think about
the tools, techniques, organizations and
strategies that you use to manage your
information.
Keeping Found Things Found
© copyright, William Jones,
2011
62
A. Think of a tool, technique, organizational scheme or
strategy that has worked well for you over the past
few months in your efforts to manage "information
overload".
Keeping Found Things Found
© copyright, William Jones,
2011
63
From you
 “Prioritize, prioritize - consolidating all events
into one gadget, one calendar has been the
most helpful. I like the paper calendar, but it's
not very practical and often gets left behind;
separating a personal calendar from work
calendar also doesn't work for me, especially
when obligating my time with elementary
school functions and work.”
Keeping Found Things Found
© copyright, William Jones,
2011
64
B. think of a tool, technique, organizational
scheme or strategy that you might have
initially embraced with high hopes but that
turned out not to work so well for you.
Keeping Found Things Found
© copyright, William Jones,
2011
65
From you
 I like the idea of having a small notebook; to
document thoughts, notes when attending
meetings or one on one sessions with my
manager; however, using the same notebook for
a variety of things was not practical and when I
tried to separate notebooks, my filing system
was so backed up i wasn't able to locate the
notebook that corresponded with the appropriate
committee, etc. Often meetings are called last
minute and in haste, I grab whatever notebook
or pad and run with it.
Keeping Found Things Found
© copyright, William Jones,
2011
66
Works and doesn’t work?
 “…approach to document management at
work years ago. It works in most cases and
for almost all team members, however, we do
not all agree on the „Filing System”.
Documents get placed in some odd
places. Some documents do not get files at
all and end up mixed up in a huge list of
documents in the main directory. I spend too
much time looking for documents. There has
got to be a better way.”
Keeping Found Things Found
© copyright, William Jones,
2011
67
Exercise: Systems of PIM
 You will pick or be assigned a partner.
 One of you will interview the other for 15
minutes; then switch.
 Please keep track of your time!
 Your objective as interviewer is to understand
as much as you can about your partner‟s
system of PIM.
 You will report back to the group after the break.
Keeping Found Things Found
© copyright, William Jones,
2011
68
Your Approach as Interviewer
 Consider each of three major forms:
 Documents and other files “owned” by your
partner.
 Email, calendars and other forms of
communication and time/task/to-do management.
 Web resources – Facebook, Flickr, gmail,
del.icio.us, RTM, Things, YouTube …
 For each form:
 What is the overriding structure?
 What are the supporting tools?
Keeping Found Things Found
© copyright, William Jones,
2011
69
Group Discussion
 Compare yourself with your partner with
respect to…
 Structures and
 Supporting tools
 for...
 Documents and files
 Email, calendars, communication, task, time and
to-do management.
 Web resources.
Managing Information Overload
Designing Your Own
Practice of PIM
Unit 3
Keeping Found Things Found
© copyright, William Jones,
2011
71
Towards Better Finding & Re-Finding
 Reminding/remembering to look. Look around. What
do you need to remember to find? Look at your
attentional spaces – desktops – physical and digital, your
inbox(es), your calendar(s). What have you forgotten to
look for?
 Recall. Don‟t get stuck. Think broadly about the places
you might look. “Phone a friend” – use your friends and
colleagues as information sources too (and reciprocate).
 Recognition. Look once. Look again. Sort for version.
 Repeat? What else? Where else? Be clear on whether a
complete set is really needed. There is no “complete set”
of information any time the Web is involved.
Keeping Found Things Found
© copyright, William Jones,
2011
72
Different methods depending on
“temperature”
 Hot (immediate) information – just click.
 Links on a home web page, the desktop, papers
on a physical desktop, tabs on a browser.
 Warm (working) information – browse,
navigate
 Paths through a folder hierarchy or a web site.
 Cold (old, archived) information -- search
Keeping Found Things Found
© copyright, William Jones,
2011
73
Towards better keeping & organizing
 Reminding/remembering to look. Watch for overconfidence.
Think specifically about the circumstances of need later on.
Where? When? How (in what form) will you need the information
later. Assess and make use of your attentional surfaces according
to your observation of your own habits. Where does your attention
go in a typical day? Keep important things in more than one place
– but use shortcuts where possible. Send yourself email.
 Recall. Pick a scheme of organization and stick with it.
 Recognition. Don‟t be afraid to use long descriptive names for
files. In email exchanges with others relating to a particular
project, establish conventions for the first part of the subject line
(e.g., all messages relating to “project A” should begin with
“project A”).
 Repeat? Group together (by tag or folder) items you are certain to
need together again later.
Keeping Found Things Found
© copyright, William Jones,
2011
74
New, Old Ways of Keeping
 Make it easy!
 Half the value of notes is in their “keeping” (initial
writing) even if you never look at them again later.
 Examples:
 Send an email to yourself. Start a conversation!
 Keep paper notebook.
 Keep a Word document (if you use MS Word).
Keeping Found Things Found
© copyright, William Jones,
2011
75
Meta-level Activities:
Focus on the Mapping
 Maintaining &
organizing
 Managing
privacy &
information flow
 Measuring &
evaluating
 Making sense
Keeping Found Things Found
© copyright, William Jones,
2011
76
Schemes of Maintenance and
Organization
Keeping Found Things Found
© copyright, William Jones,
2011
77
Towards Better Maintaining &
Organizing
 Offload, delegate, collaborate. Not all the information we need,
needs to be maintained by us.
 Consolidate.
 Back it up! Backup plans should be realistic. If you find yourself
putting off a backup because of the time and trouble, consider an
alternate plan.
 Clean up! But... move, don‟t delete, digital information.
 Scrub. Toss or give a decent burial to old projects you will never do.
Get on with life.
 Anoint the “correct, current” version of a document or
presentation. Make sure there is only one “current” file for this
document on your primary computer and make sure this version is in
fact the latest, greatest version.
 Avoid archival use of exotic, application-specific formats.
Keeping Found Things Found
© copyright, William Jones,
2011
78
Strategies for Information Flow
Keeping Found Things Found
© copyright, William Jones,
2011
79
Establish Policies & Expectations
 A door closed, open or in-between
 Response time for email messages
 Use out-of-office notices.
 Manage your manager.
 Telephone calls, incoming & outgoing.
 Solicited. Unsolicited.
 Xbox? Television?
Keeping Found Things Found
© copyright, William Jones,
2011
80
Supporting Tools
Keeping Found Things Found
© copyright, William Jones,
2011
81
Towards Better Measuring &
Evaluating
 Make the choice real. Be sure to consider real choices rather
than “do you like it, yes or no” questions. The status quo is
always an option.
 Situate. Consider choices with respect to and, preferably in,
real situations in your practice of PIM.
 Sample over two or more days if time permits and under
different situations of information management and use.
 There is no such thing as not deciding. Even a decision to
postpone or not decide – is itself a decision.
 Frame choices in terms of loss as well as benefit.
 For any choice consider its many impacts whether or not
explicitly designed for in the tool.
Keeping Found Things Found
© copyright, William Jones,
2011
82
A Yardstick for PIM Tools &
Techniques
 How does it help me keep,
find & re-find, maintain &
organize, manage privacy &
information flow …?
 How does it help me
manage information owned
by me, about me, directed
towards me, sent by me,
experienced by me, relevant
to me…
Keeping Found Things Found
© copyright, William Jones,
2011
83
Measuring OneNote
Keeping Found Things FoundWilliam Jones 84
By 6 Activities of PIM
Tools:
OneNote
PIM activities:
keep
+meetings
- Other places.
find,
re-find
+ meeting notes
maintain &
organize
+ meeting notes
manage flow
N/A
make sense
?
measure &
assess
Good way to see
where the time
goes & who I
need to meet…
Keeping Found Things Found 85
By 6 Senses of Personal Information
Tools:
OneNote
PIM senses:
owned by me
+ notes
- email, files, web
references
about me
N/A
addressed to
me
N/A
sent by me
no
experienced
by me
+ meeting notes
relevant to
me
N/A
William Jones
Keeping Found Things Found
© copyright, William Jones,
2011
86
Future Directions for Putting more
“Meta” into a Practice of PIM
 Incidental
• Instrumented versions of everything.
• Information fades away with disuse?
• Item event logs.
 Incremental
• Case by case decisions for flow.
 Integrative
• Don‟t organize. Plan do!
• One structure; many supporting tools.
Keeping Found Things Found
© copyright, William Jones,
2011
87
A home re-model as a mind map
Keeping Found Things Found
© copyright, William Jones,
2011
88
A OneNote rendition of the home re-
model.
Keeping Found Things Found
© copyright, William Jones,
2011
89
An Evernote rendition of the home
re-model
Keeping Found Things Found
© copyright, William Jones,
2011
90
Planz
Keeping Found Things Found
© copyright, William Jones,
2011
91
Other Views, in Other Tools…
 Gantt chart visualizations.
 Workflows.
 Decision trees.
 Concept maps.
 Newspaper style or “Box model”.
 Various list and “details” views.
 Many visualizations of a tree.
Keeping Found Things Found
© copyright, William Jones,
2011
92
But what can you do? … right now?
Keeping Found Things Found
© copyright, William Jones,
2011
93
A Personal Unifying Taxonomy (PUT)
 Personal – People own their PUTs. The “P” might also
stand for “Portable”. Or “Persistent”.
 Unifying – All information that relates to a person in one
way or another can be classified and organized into the
PUT no matter what its form (email, e-document, or any
of several kinds of web info
 Taxonomy – as a basis for a classification of personal
information. The structure of the taxonomy is a directed
graph not a strict hierarchy.
93
Keeping Found Things Found
© copyright, William Jones,
2011
94
Example
Keeping Found Things Found
© copyright, William Jones,
2011
95
Another example
Keeping Found Things Found
© copyright, William Jones,
2011
96
Some tips
 Structured names for reference collections.
 Smith, 2010, “As I did think”.
 Universal date encoding for project & task
folders
 “2011-03-15, spring vacation”
 Use a maximum of 3 to 7 subfolders in a
project collection
 Create subfolders for versions and in-place
archival
 zz versions, zz archive
Keeping Found Things Found
© copyright, William Jones,
2011
97
Working with your partner, design
your own PUT
 Where will you use? Which devices? Which
apps?
 For digital files and folders?
 Tags & tabs?
 Paper documents?
 How easy …
 To use consistently for keeping new information?
 To find old information?
 To expand as needed?
Managing Information Overload
Discussion and Review
Keeping Found Things Found
© copyright, William Jones,
2011
99
What Have We Covered Today?
1. What personal information management (PIM)
is and how it can be used in everyday life.
2. Six senses in which information is personal.
3. Six activities of personal information
management.
4. Key questions to ask whenever considering the
use of new tool or system of PIM.
5. Steps towards designing your own practice of
PIM and a PUT.
Keeping Found Things Found
© copyright, William Jones,
2011
100
A Mapping Weaving Together
Information and Need
Keeping Found Things Found
© copyright, William Jones,
2011
101
Meta-level Activities:
Focus on the Mapping
 Maintaining &
organizing
 Managing
privacy &
information flow
 Measuring &
evaluating
 Making sense
Keeping Found Things FoundWilliam Jones 102
6 Senses of Personal Information
Keeping Found Things Found
© copyright, William Jones,
2011
103
A Personal Unifying Taxonomy (PUT)
 Personal – People own their PUTs. The “P” might also
stand for “Portable”. Or “Persistent”.
 Unifying – All information that relates to a person in one
way or another can be classified and organized into the
PUT no matter what its form (email, e-document, or any
of several kinds of web info
 Taxonomy – as a basis for a classification of personal
information. The structure of the taxonomy is a directed
graph not a strict hierarchy.
103
Keeping Found Things Found
© copyright, William Jones,
2011
104
Read On?
PERSONAL INFORMATION MANAGEMENT
Edited by William Jones and Jaime Teevan
KEEPING FOUND THINGS FOUND: The Study and
Practice of Personal Information Management
By William Jones
Keeping Found Things Found
© copyright, William Jones,
2011
105
Follow-on Questions or Comments?
 Please email me:
o williamj@uw.edu
 Visit the Information School web site on PIM:
o http://pim.ischool.washington.edu/
 Visit the Keeping Found Things Found web
site:
o http://kftf.ischool.washington.edu/
o … or simply search for “KFTF” in Google or
another search service.
Keeping Found Things Found
© copyright, William Jones,
2011
106
For “Extra Credit” 
kftf.ischool.washington.edu/planner
_index.htm
(Or just search on
“keeping found things found”)
Keeping Found Things Found
© copyright, William Jones,
2011
107
Thank You!
Keeping Found Things FoundWilliam Jones 108

2011 02-26, managing information overload, slideshare

  • 1.
    Managing Information Overload WilliamJones February 26, 2011 2011 NCNMLG/MLGSCA Joint Meeting
  • 2.
    Keeping Found ThingsFound © copyright, William Jones, 2011 2 The World Is at My Doorstep … And the House Is a Mess: Putting our information in its place in a digital age 2
  • 3.
    Keeping Found ThingsFound © copyright, William Jones, 2011 3 Everywhere to go but no place to call home: Building places of our own for our information 3
  • 4.
    Keeping Found ThingsFound © copyright, William Jones, 2011 4 About the Instructor  Research Associate Professor at the University of Washington  Manages the Keeping Found Things Found project  Wrote “Keeping Found Things Found: The Study and Practice of Personal Information Management” (2007).  Edited (with Jaime Teevan) the book “Personal Information Management” and a special issue on PIM for the Communications of the ACM (2006).  Wrote invited chapters on PIM for ARIST and for the Handbook of Applied Cognition.  Has organized or co-organized numerous workshops, tutorials and courses on PIM including an invitational workshop sponsored by the National Science Foundation.  Have 5 patents relating to search and PIM.  Dr. Jones received a doctorate in Cognitive Psychology a long time ago from Carnegie-Mellon University for research in human memory
  • 5.
    Keeping Found ThingsFound © copyright, William Jones, 2011 5 Schedule for today  1:00 Lecture: An Introduction to PIM  1:30 Lecture: A framework for PIM  2:00 Group discussion: Failures and successes  2:30 …break… and first exercise  3:00 Group discussion: A Comparison of practices  3:30 Lecture: Designing your own practice of PIM  4:00 Second exercise: Building your places  4:30 Group discussion and review  5:00 Adjourn
  • 6.
    Keeping Found ThingsFound © copyright, William Jones, 2011 6 Learning Objectives 1. What personal information management (PIM) is and how it can be used in everyday life. 2. Six senses in which information is personal. 3. Six activities of personal information management. 4. Key questions to ask whenever considering the use of new tool or system of PIM. 5. Steps towards designing your own practice of PIM.
  • 7.
    Keeping Found ThingsFound © copyright, William Jones, 2011 7 This course is not…  A review of the latest and greatest.  A step-by-step “how to”.
  • 8.
    Keeping Found ThingsFound © copyright, William Jones, 2011 8 Requests from you  “how can we stay organized with no/low-tech tools if we don't have and don't plan to have techy tools like smart phones, iPads…”  “how a Kindle can be used to help organize and distribute a book collection with the department he supports”.  “I hope to learn about new ways to manage my personal, family, and business schedules.”
  • 9.
    Keeping Found ThingsFound © copyright, William Jones, 2011 9 Related Reading PERSONAL INFORMATION MANAGEMENT Edited by William Jones and Jaime Teevan KEEPING FOUND THINGS FOUND: The Study and Practice of Personal Information Management By William Jones
  • 10.
    Managing Information Overload AnIntroduction to PIM Unit 1
  • 11.
    Keeping Found ThingsFound © copyright, William Jones, 2011 11 A Definition Personal Information Management (PIM) refers to both the practice and the study of the activities a person performs in order to acquire or create, store, organize, maintain, retrieve, use and distribute the information needed to complete tasks (work-related and not) and to fulfill various roles and responsibilities (as parent, employee, friend, member of community, etc.). PIM places special emphasis on the organization and maintenance of personal information collections (PICs) in which information items, such as paper documents, electronic documents, email messages, web references, handwritten notes, etc., are stored for later use and repeated re-use.
  • 12.
    Keeping Found ThingsFound © copyright, William Jones, 2011 12 Personal Information Management Manage – to handle, to manipulate. Management – “The art of getting things done through people” – Mary Parker Follett (1868-1933) PIM – The art of getting things done in your life through information
  • 13.
    Keeping Found ThingsFound © copyright, William Jones, 2011 13 An Ideal of PIM  … without a lot of fuss or muss. (We don’t spend a lot of time filing and organizing).  We have more time to make creative, intelligent use of the information at hand in order to get things done.  We have the information we need, when we need it, where we need it, in the right form, enough (but not too much)…
  • 14.
    Keeping Found ThingsFound © copyright, William Jones, 2011 14 The Benefits of Better PIM  Enough (but not too much) useful information at the right time, at the right place, in the right form/format…  Better management of our resources: time, money, energy, etc.  Better productivity  Better coordination with others  Better leverage of “me”
  • 15.
    Keeping Found ThingsFound © copyright, William Jones, 2011 15 What are we really managing?  When you‟re young, you have time and energy but no money.  When you‟re middle-aged, you have energy and money but no time.  When you‟re old, you have time and money but no energy.
  • 16.
    Keeping Found ThingsFound © copyright, William Jones, 2011 16 Information, the Consumer of…  Time  Money  Energy  Attention  Space, digital & physical  … Well-being?
  • 17.
    Keeping Found ThingsFound © copyright, William Jones, 2011 17 Personal Information Management What is information to us?
  • 18.
    Keeping Found ThingsFound © copyright, William Jones, 2011 18 Information Is… … what‟s in documents, email messages, web pages, MP3 files, photographs (digital and paper-based), videos, etc. ... a drain on our money, energy, attention and time. ... what we create, change, publish and send to get things done.
  • 19.
    Keeping Found ThingsFound © copyright, William Jones, 2011 19 Information Is… ... what we process to “make sense” of our world (and the raw data we receive through our senses). ... how other worlds are represented to us: past and present, possible and pretend. ... how we are represented to the outside world, accurately or not, for better or worse. ... an extension of us.
  • 20.
    Keeping Found ThingsFound © copyright, William Jones, 2011 20 Information to Make Things Real
  • 21.
    Keeping Found ThingsFound © copyright, William Jones, 2011 21 Benjamin Franklin
  • 22.
    Keeping Found ThingsFound © copyright, William Jones, 2011 22 The Power of Writing It Down  Gollwitzer & Brandstatter (1997).  Participants asked to write a report on “How You Spent Christmas Eve” no later than 48 hours afterward.  Half wrote down exactly when and where they would do this; the other half did not.  3/4 of those who wrote down their intention completed the task. Only 1/3 of the control group did.
  • 23.
    Keeping Found ThingsFound © copyright, William Jones, 2011 23 So… what’s the problem? Information Overload? “We have reason to fear that the multitude of books which grows every day in a prodigious fashion will make the following centuries fall into a state as barbarous as that of the centuries that followed the fall of the Roman Empire. Unless we try to prevent this danger by separating those books which we must throw out or leave in oblivion from those which one should save and within the latter between what is useful and what is not.“
  • 24.
    Keeping Found ThingsFound © copyright, William Jones, 2011 24 So… what’s the problem? Information Overload? “We have reason to fear that the multitude of books which grows every day in a prodigious fashion will make the following centuries fall into a state as barbarous as that of the centuries that followed the fall of the Roman Empire. Unless we try to prevent this danger by separating those books which we must throw out or leave in oblivion from those which one should save and within the latter between what is useful and what is not.“ – Adrien Baillet in 1685
  • 25.
    Keeping Found ThingsFound © copyright, William Jones, 2011 25 Information Fragmentation
  • 26.
    Keeping Found ThingsFound © copyright, William Jones, 2011 26 Some Historical Perspective: Let’s Go Back 25 years or so …  PCs were new and expensive. Computer use for most users meant terminal access to a mini- or mainframe computer.  Digital storage was expensive. E-mail was just beginning to be used and then only for communication. Messages were rarely archived.  The Web… not yet.  Paper was the preferred form for information storage.
  • 27.
    Keeping Found ThingsFound © copyright, William Jones, 2011 27 Now in 2011…  We have desktops, laptops and palmtops…  Digital storage is cheap and plentiful.  Email use is widespread and email messages are archived.  Everything is moving onto the Web and into special-purpose Internet-based, mobile- enabled applications.  And… we still have paper.
  • 28.
    Keeping Found ThingsFound © copyright, William Jones, 2011 28 A Web-wide World of Information It turns out that about 95 percent of what I do on a computer can now be accomplished through a browser. I use it for updating Twitter and Facebook and for blogging. Meebo.com lets me log into several instant-messaging accounts simultaneously. Last.fm gives me tunes, and webmail does the email. I use Google Docs for word processing, and if I need to record video, I can do it directly from webcam to YouTube…. * *“The Netbook Effect: How Cheap Little Laptops Hit the Big Time”, Clive Thompson, Wired Magazine, 02.23.09. http://www.wired.com/gadgets/wireless/magazine/17-03/mf_netbooks
  • 29.
    Keeping Found ThingsFoundWilliam Jones 29 Individuals collect many different types of information radio news & information  Email messages books newspaper articles  telephone numbers  budgets  websites contact lists calendar appointments MAGAZINES & J OURNALS  graphs & charts images bills  television news & information  accounts  photographs signs & instructions   deadlines schedules 
  • 30.
    Keeping Found ThingsFound © copyright, William Jones, 2011 30 Many Types of Information Have Their Own Distinct Form…  Distinct patterns, methods, habits of use.  Distinct supporting applications and tools.  Distinct organizations.
  • 31.
    Keeping Found ThingsFound © copyright, William Jones, 2011 31 Applications each have their own separate ways to structure Application Structuring Outlook Folders OneNote Notebooks, Sections (top), Pages (right-hand) Evernote Notebooks, Tags (in a hierarchy). Remember The Milk Lists, Tags facebook Groups, Albums, FriendLists, …
  • 32.
    Keeping Found ThingsFound © copyright, William Jones, 2011 32 Even Simple Decisions Mean Checking in Several Places
  • 33.
    Keeping Found ThingsFound © copyright, William Jones, 2011 33 A Yearning for Integration  “Ideally I would have like a unified system, I wouldn‟t have all these different databases and all these different check lists and manuals…something that unified all of the separate tools and databases that I use” –JS-182  “..maybe go from media to media a little bit better, …if I store something out on the wiki, it will also store something on, in the, in the file structure.” –AP-123
  • 34.
    Keeping Found ThingsFound © copyright, William Jones, 2011 34 Information Fragmentation Creates Problems at Several Stages of PIM  Encountering new information • Do I keep it? Where? How? In which organization? On which computer? Do I already have this information (somewhere)?  Finding old information • Where to look? Which folder? At home or at work? On which computer? In which email account?  Organization and maintenance • Too many organizations! One (or more) for electronic documents, paper documents, email, web references (Favorites/Bookmarks).  Using information to get something done • We may spend several minutes gather information together to work on a task – even if we know where it is.
  • 35.
    Keeping Found ThingsFound © copyright, William Jones, 2011 35 From Many Parts…  Inderal 1 tablet 3 times a day  Lanoxin 1 tablet every morning  Carafate 1 tablet before meals and at bedtime  Zantac 1 tablet every 12 hours (twice a day)  Quinaglute 1 tablet 4 times a day  Coumadin 1 tablet a day
  • 36.
    Keeping Found ThingsFound © copyright, William Jones, 2011 36 To a More Coherent Whole* Breakfast Lunch Dinner Bedtime Lanoxin X Inderal X X X Quinaglute X X X X Carafate X X X X Zantac X X Coumadin X *From Norman (1993), “Things that make us smart” based on work of Ruth Day
  • 37.
    Keeping Found ThingsFound © copyright, William Jones, 2011 3737Copyright © 2006 William Jones, Ptarmigan Tunnel LLC. All rights reserved Recognize This?
  • 38.
    Keeping Found ThingsFound © copyright, William Jones, 2011 38 This?
  • 39.
    Keeping Found ThingsFound © copyright, William Jones, 2011 39 What about This? *Source: http://www.aip.org/history/curie/periodic.htm
  • 40.
    Managing Information Overload AFramework for PIM Unit 2
  • 41.
    Keeping Found ThingsFound © copyright, William Jones, 2011 41 Some Working Definitions  An information item is a packaging of information. Examples of information items include: 1. paper documents; 2. electronic documents and other files; 3. email messages; 4. web pages; or 5. references (e.g., shortcuts, alias) to any of the above.  An information item has an associated information form determined by the tools and applications that are used to name, move, copy, delete or otherwise organize or assign properties to an item. Paper documents, e-documents and other files, email messages and web bookmarks.
  • 42.
    Keeping Found ThingsFound © copyright, William Jones, 2011 42 A Mapping Weaving Together Information and Need
  • 43.
    Keeping Found ThingsFound © copyright, William Jones, 2011 43 Elements of a Mapping  Schemes of organization  Structures that result  Strategies for managing time, energy, and information flow  Supporting tools  A system that brings these elements together
  • 44.
    Keeping Found ThingsFoundWilliam Jones 44 Finding and Re-finding
  • 45.
    Keeping Found ThingsFoundWilliam Jones 45 Keeping According to Anticipated Need
  • 46.
    Keeping Found ThingsFound © copyright, William Jones, 2011 46 Maintaining & Organizing
  • 47.
    Keeping Found ThingsFound © copyright, William Jones, 2011 47 Managing Privacy and the Information Flow
  • 48.
    Keeping Found ThingsFound © copyright, William Jones, 2011 48 Measuring & Evaluating
  • 49.
    Keeping Found ThingsFound © copyright, William Jones, 2011 49 Making Sense of and Using Information
  • 50.
    Keeping Found ThingsFoundWilliam Jones 50 6 Senses of Personal Information
  • 51.
    Keeping Found ThingsFoundWilliam Jones 51 The Senses in Which Information Can Be Personal Relation to “me” Examples Issues 1 Controlled by, owned by me Email messages in our email accounts; files on our computer‟s hard drive. Security against break-ins or theft., backup, virus protection, etc. 2 About me Credit history, medical, web browsing, library books checked out. Who sees what when (under which circumstances)? How is information corrected or updated? Does it ever go away? 3 Directed towards me Phone calls, drop-ins, TV ads, web ads, pop-ups. Protection of me and my money, energy, attention and time.
  • 52.
    Keeping Found ThingsFoundWilliam Jones 52 The Senses in Which Information Can Be Personal (ctnd.) Relation to “me” Examples Issues 4 Sent (posted, provided) by me Email, personal web sites, published reports and articles. Who sees what when? Did the message get through? 5 (Already) experienced by me Web pages that remain on the Web. Books that remain in a library. TV and radio programs that remain somewhere in “broadcast ether”. How to get back to information again later? 6 Potentially relevant (useful) to me; about to be experienced by me. Somewhere “out there” is the perfect vacation, house, job, life-long mate. If only I could find the right information! If only I knew (had some idea of) what I don‟t know. How to filter out or otherwise avoid information we don‟t wish to see? (How to do likewise for our children?)
  • 53.
    Keeping Found ThingsFound © copyright, William Jones, 2011 53 Support Needed for Each Sense of Personal Information 1. Controlled by, owned by me. Security against break-ins. Support for back-ups and updates. Support for organization and maintenance. 2. About me. Privacy laws. Support for privacy preferences (e.g. P3P). Ability to correct. How come each doctor runs the same tests? 3. Directed toward me. When can I be interrupted? PDAs that know where we are and what we‟re doing. 4. Sent (posted, provided) by me. Where does the information go? How is it used? What impact does it have? Am I getting credit? 5. (Already) experienced by me. What is my information diet? What biases does it introduce? 6. Relevant (useful) to me (or not…). Anticipatory, adaptive filters that learn over time?
  • 54.
    Keeping Found ThingsFound © copyright, William Jones, 2011 54 Tradeoffs for Each Sense 1. Controlled by, owned by me. More time to keep and organize now or more time to find (and organize) later? Copy or reference? (Integrity vs. speed & convenience?) 2. About me. Sign? Click “I agree”? Is the risk worth it? Who gets to know what and when? 3. Directed toward me. Need to know vs. need for privacy. Who gets through with what information when? 4. Sent (posted, provided) by me. Need to get information out there but need not to be scooped or plagiarized. The art of email 5. (Already) experienced by me. Need to remember, need to forget and start from scratch. 6. Relevant (useful) to me (or not…). Filters that work but not too well. Need for controlled chaos? Not everything we need can be articulated. We don‟t always know what‟s good for us.
  • 55.
    Keeping Found ThingsFound © copyright, William Jones, 2011 55 PICing our battles A personal information collection (PIC) is a personally managed subset of the PSI. PICs are “islands” of structure and coherence in the PSI “sea”.
  • 56.
    Keeping Found ThingsFound © copyright, William Jones, 2011 56 Reference vs. Project Collections  Project collections. Items in a project collection are selected to relate to a particular project that we are trying to complete  Reference collections. Items in a reference collection are selected for repeated use but usually with no specific use in mind. 1. the books of a personal library 2. digital articles kept in an “articles” folder 3. dinner recipes downloaded from the web 4. paper-backed pictures kept in a photo album
  • 57.
    Keeping Found ThingsFoundWilliam Jones 57 A Personal Reference Collection of Articles
  • 58.
    Keeping Found ThingsFound © copyright, William Jones, 2011 58 A Personal Project Collection Near the Beginning of Efforts to Plan a Wedding
  • 59.
    Keeping Found ThingsFound © copyright, William Jones, 2011 59 A View of Folders and Subfolders for the Same Wedding, Six Months Later…
  • 60.
    Keeping Found ThingsFound © copyright, William Jones, 2011 60 The Tension Between Reference and Project Collections
  • 61.
    Keeping Found ThingsFound © copyright, William Jones, 2011 61 Group Discussion  Reflect on your own management of personal information (e.g., documents, email messages, web references, etc). Think about the tools, techniques, organizations and strategies that you use to manage your information.
  • 62.
    Keeping Found ThingsFound © copyright, William Jones, 2011 62 A. Think of a tool, technique, organizational scheme or strategy that has worked well for you over the past few months in your efforts to manage "information overload".
  • 63.
    Keeping Found ThingsFound © copyright, William Jones, 2011 63 From you  “Prioritize, prioritize - consolidating all events into one gadget, one calendar has been the most helpful. I like the paper calendar, but it's not very practical and often gets left behind; separating a personal calendar from work calendar also doesn't work for me, especially when obligating my time with elementary school functions and work.”
  • 64.
    Keeping Found ThingsFound © copyright, William Jones, 2011 64 B. think of a tool, technique, organizational scheme or strategy that you might have initially embraced with high hopes but that turned out not to work so well for you.
  • 65.
    Keeping Found ThingsFound © copyright, William Jones, 2011 65 From you  I like the idea of having a small notebook; to document thoughts, notes when attending meetings or one on one sessions with my manager; however, using the same notebook for a variety of things was not practical and when I tried to separate notebooks, my filing system was so backed up i wasn't able to locate the notebook that corresponded with the appropriate committee, etc. Often meetings are called last minute and in haste, I grab whatever notebook or pad and run with it.
  • 66.
    Keeping Found ThingsFound © copyright, William Jones, 2011 66 Works and doesn’t work?  “…approach to document management at work years ago. It works in most cases and for almost all team members, however, we do not all agree on the „Filing System”. Documents get placed in some odd places. Some documents do not get files at all and end up mixed up in a huge list of documents in the main directory. I spend too much time looking for documents. There has got to be a better way.”
  • 67.
    Keeping Found ThingsFound © copyright, William Jones, 2011 67 Exercise: Systems of PIM  You will pick or be assigned a partner.  One of you will interview the other for 15 minutes; then switch.  Please keep track of your time!  Your objective as interviewer is to understand as much as you can about your partner‟s system of PIM.  You will report back to the group after the break.
  • 68.
    Keeping Found ThingsFound © copyright, William Jones, 2011 68 Your Approach as Interviewer  Consider each of three major forms:  Documents and other files “owned” by your partner.  Email, calendars and other forms of communication and time/task/to-do management.  Web resources – Facebook, Flickr, gmail, del.icio.us, RTM, Things, YouTube …  For each form:  What is the overriding structure?  What are the supporting tools?
  • 69.
    Keeping Found ThingsFound © copyright, William Jones, 2011 69 Group Discussion  Compare yourself with your partner with respect to…  Structures and  Supporting tools  for...  Documents and files  Email, calendars, communication, task, time and to-do management.  Web resources.
  • 70.
    Managing Information Overload DesigningYour Own Practice of PIM Unit 3
  • 71.
    Keeping Found ThingsFound © copyright, William Jones, 2011 71 Towards Better Finding & Re-Finding  Reminding/remembering to look. Look around. What do you need to remember to find? Look at your attentional spaces – desktops – physical and digital, your inbox(es), your calendar(s). What have you forgotten to look for?  Recall. Don‟t get stuck. Think broadly about the places you might look. “Phone a friend” – use your friends and colleagues as information sources too (and reciprocate).  Recognition. Look once. Look again. Sort for version.  Repeat? What else? Where else? Be clear on whether a complete set is really needed. There is no “complete set” of information any time the Web is involved.
  • 72.
    Keeping Found ThingsFound © copyright, William Jones, 2011 72 Different methods depending on “temperature”  Hot (immediate) information – just click.  Links on a home web page, the desktop, papers on a physical desktop, tabs on a browser.  Warm (working) information – browse, navigate  Paths through a folder hierarchy or a web site.  Cold (old, archived) information -- search
  • 73.
    Keeping Found ThingsFound © copyright, William Jones, 2011 73 Towards better keeping & organizing  Reminding/remembering to look. Watch for overconfidence. Think specifically about the circumstances of need later on. Where? When? How (in what form) will you need the information later. Assess and make use of your attentional surfaces according to your observation of your own habits. Where does your attention go in a typical day? Keep important things in more than one place – but use shortcuts where possible. Send yourself email.  Recall. Pick a scheme of organization and stick with it.  Recognition. Don‟t be afraid to use long descriptive names for files. In email exchanges with others relating to a particular project, establish conventions for the first part of the subject line (e.g., all messages relating to “project A” should begin with “project A”).  Repeat? Group together (by tag or folder) items you are certain to need together again later.
  • 74.
    Keeping Found ThingsFound © copyright, William Jones, 2011 74 New, Old Ways of Keeping  Make it easy!  Half the value of notes is in their “keeping” (initial writing) even if you never look at them again later.  Examples:  Send an email to yourself. Start a conversation!  Keep paper notebook.  Keep a Word document (if you use MS Word).
  • 75.
    Keeping Found ThingsFound © copyright, William Jones, 2011 75 Meta-level Activities: Focus on the Mapping  Maintaining & organizing  Managing privacy & information flow  Measuring & evaluating  Making sense
  • 76.
    Keeping Found ThingsFound © copyright, William Jones, 2011 76 Schemes of Maintenance and Organization
  • 77.
    Keeping Found ThingsFound © copyright, William Jones, 2011 77 Towards Better Maintaining & Organizing  Offload, delegate, collaborate. Not all the information we need, needs to be maintained by us.  Consolidate.  Back it up! Backup plans should be realistic. If you find yourself putting off a backup because of the time and trouble, consider an alternate plan.  Clean up! But... move, don‟t delete, digital information.  Scrub. Toss or give a decent burial to old projects you will never do. Get on with life.  Anoint the “correct, current” version of a document or presentation. Make sure there is only one “current” file for this document on your primary computer and make sure this version is in fact the latest, greatest version.  Avoid archival use of exotic, application-specific formats.
  • 78.
    Keeping Found ThingsFound © copyright, William Jones, 2011 78 Strategies for Information Flow
  • 79.
    Keeping Found ThingsFound © copyright, William Jones, 2011 79 Establish Policies & Expectations  A door closed, open or in-between  Response time for email messages  Use out-of-office notices.  Manage your manager.  Telephone calls, incoming & outgoing.  Solicited. Unsolicited.  Xbox? Television?
  • 80.
    Keeping Found ThingsFound © copyright, William Jones, 2011 80 Supporting Tools
  • 81.
    Keeping Found ThingsFound © copyright, William Jones, 2011 81 Towards Better Measuring & Evaluating  Make the choice real. Be sure to consider real choices rather than “do you like it, yes or no” questions. The status quo is always an option.  Situate. Consider choices with respect to and, preferably in, real situations in your practice of PIM.  Sample over two or more days if time permits and under different situations of information management and use.  There is no such thing as not deciding. Even a decision to postpone or not decide – is itself a decision.  Frame choices in terms of loss as well as benefit.  For any choice consider its many impacts whether or not explicitly designed for in the tool.
  • 82.
    Keeping Found ThingsFound © copyright, William Jones, 2011 82 A Yardstick for PIM Tools & Techniques  How does it help me keep, find & re-find, maintain & organize, manage privacy & information flow …?  How does it help me manage information owned by me, about me, directed towards me, sent by me, experienced by me, relevant to me…
  • 83.
    Keeping Found ThingsFound © copyright, William Jones, 2011 83 Measuring OneNote
  • 84.
    Keeping Found ThingsFoundWilliam Jones 84 By 6 Activities of PIM Tools: OneNote PIM activities: keep +meetings - Other places. find, re-find + meeting notes maintain & organize + meeting notes manage flow N/A make sense ? measure & assess Good way to see where the time goes & who I need to meet…
  • 85.
    Keeping Found ThingsFound 85 By 6 Senses of Personal Information Tools: OneNote PIM senses: owned by me + notes - email, files, web references about me N/A addressed to me N/A sent by me no experienced by me + meeting notes relevant to me N/A William Jones
  • 86.
    Keeping Found ThingsFound © copyright, William Jones, 2011 86 Future Directions for Putting more “Meta” into a Practice of PIM  Incidental • Instrumented versions of everything. • Information fades away with disuse? • Item event logs.  Incremental • Case by case decisions for flow.  Integrative • Don‟t organize. Plan do! • One structure; many supporting tools.
  • 87.
    Keeping Found ThingsFound © copyright, William Jones, 2011 87 A home re-model as a mind map
  • 88.
    Keeping Found ThingsFound © copyright, William Jones, 2011 88 A OneNote rendition of the home re- model.
  • 89.
    Keeping Found ThingsFound © copyright, William Jones, 2011 89 An Evernote rendition of the home re-model
  • 90.
    Keeping Found ThingsFound © copyright, William Jones, 2011 90 Planz
  • 91.
    Keeping Found ThingsFound © copyright, William Jones, 2011 91 Other Views, in Other Tools…  Gantt chart visualizations.  Workflows.  Decision trees.  Concept maps.  Newspaper style or “Box model”.  Various list and “details” views.  Many visualizations of a tree.
  • 92.
    Keeping Found ThingsFound © copyright, William Jones, 2011 92 But what can you do? … right now?
  • 93.
    Keeping Found ThingsFound © copyright, William Jones, 2011 93 A Personal Unifying Taxonomy (PUT)  Personal – People own their PUTs. The “P” might also stand for “Portable”. Or “Persistent”.  Unifying – All information that relates to a person in one way or another can be classified and organized into the PUT no matter what its form (email, e-document, or any of several kinds of web info  Taxonomy – as a basis for a classification of personal information. The structure of the taxonomy is a directed graph not a strict hierarchy. 93
  • 94.
    Keeping Found ThingsFound © copyright, William Jones, 2011 94 Example
  • 95.
    Keeping Found ThingsFound © copyright, William Jones, 2011 95 Another example
  • 96.
    Keeping Found ThingsFound © copyright, William Jones, 2011 96 Some tips  Structured names for reference collections.  Smith, 2010, “As I did think”.  Universal date encoding for project & task folders  “2011-03-15, spring vacation”  Use a maximum of 3 to 7 subfolders in a project collection  Create subfolders for versions and in-place archival  zz versions, zz archive
  • 97.
    Keeping Found ThingsFound © copyright, William Jones, 2011 97 Working with your partner, design your own PUT  Where will you use? Which devices? Which apps?  For digital files and folders?  Tags & tabs?  Paper documents?  How easy …  To use consistently for keeping new information?  To find old information?  To expand as needed?
  • 98.
  • 99.
    Keeping Found ThingsFound © copyright, William Jones, 2011 99 What Have We Covered Today? 1. What personal information management (PIM) is and how it can be used in everyday life. 2. Six senses in which information is personal. 3. Six activities of personal information management. 4. Key questions to ask whenever considering the use of new tool or system of PIM. 5. Steps towards designing your own practice of PIM and a PUT.
  • 100.
    Keeping Found ThingsFound © copyright, William Jones, 2011 100 A Mapping Weaving Together Information and Need
  • 101.
    Keeping Found ThingsFound © copyright, William Jones, 2011 101 Meta-level Activities: Focus on the Mapping  Maintaining & organizing  Managing privacy & information flow  Measuring & evaluating  Making sense
  • 102.
    Keeping Found ThingsFoundWilliam Jones 102 6 Senses of Personal Information
  • 103.
    Keeping Found ThingsFound © copyright, William Jones, 2011 103 A Personal Unifying Taxonomy (PUT)  Personal – People own their PUTs. The “P” might also stand for “Portable”. Or “Persistent”.  Unifying – All information that relates to a person in one way or another can be classified and organized into the PUT no matter what its form (email, e-document, or any of several kinds of web info  Taxonomy – as a basis for a classification of personal information. The structure of the taxonomy is a directed graph not a strict hierarchy. 103
  • 104.
    Keeping Found ThingsFound © copyright, William Jones, 2011 104 Read On? PERSONAL INFORMATION MANAGEMENT Edited by William Jones and Jaime Teevan KEEPING FOUND THINGS FOUND: The Study and Practice of Personal Information Management By William Jones
  • 105.
    Keeping Found ThingsFound © copyright, William Jones, 2011 105 Follow-on Questions or Comments?  Please email me: o williamj@uw.edu  Visit the Information School web site on PIM: o http://pim.ischool.washington.edu/  Visit the Keeping Found Things Found web site: o http://kftf.ischool.washington.edu/ o … or simply search for “KFTF” in Google or another search service.
  • 106.
    Keeping Found ThingsFound © copyright, William Jones, 2011 106 For “Extra Credit”  kftf.ischool.washington.edu/planner _index.htm (Or just search on “keeping found things found”)
  • 107.
    Keeping Found ThingsFound © copyright, William Jones, 2011 107 Thank You!
  • 108.
    Keeping Found ThingsFoundWilliam Jones 108