SlideShare a Scribd company logo
1 of 23
Vocational Training at 132 kv s/s Gajraula
 Introduction
 Need of substation
 Type of substation
 EQUIPMENTS OF SUBSTATION
 SINGLE LINE DIAGRAM OF 132 KV SUBSTATION
 PRACTICAL CONSIDERATION
 TO SATISFY LOAD GROWTH
 TO ACCOMMODATE NEW GENERATION
 TO MAINTAIN RELIABLITY REQUIREMENT
 TECHNICAL CONSIDERATION
 TO STEP UP AND STEP DOWN AC VOLTAGE
LEVEL
 TO BREAK THE POWER FLOW
 PROVIDE SUPPORT TO THE POWER FLOW
ON THE BASIS OF
SERVICE REQUIRMENT
ON THE BASIS OF
CONSTRUCTIONAL
FEATURES
TRANSFORMER
SUBSTATION
SWITCHING
SUBSTATION
FREQUENCY CHANGER
SUBSTATION
CONVERTING
SUBSTATION
INDUSTRIAL
SUBSTATION
OUTDOOR SUBSTATION
INDOOR SUBSTATION
UNDERGROUND
SUBSTATION
POLE MOUNTED
SUBSTATION
INDOOR
EQUIPMENTS
OUTDOOR
EQUIPMENTS
TRANSFORMERS
CIRCUIT BREAKERS
CURRENT TRANSFORMER
POTENTIAL TRANSFORMERS
ISOLATOR
LIGHTING ARRESTER
CONTROL PANNELS
RELAYS
BATTERY CHARGER
BATTERY bank
D.c.d.b.
ammeter,voltmeter
CAPACITOR bank
A TRANSFORMER IS A STATIC PIECE OF EQUIPMENT USED EITHER OF RAISING OR LOWERING THE VOLTAGE
OF AN A.C. SUPPLY WITH A CORRESPONDING DECCREASE OR INCREASE IN CURRENT.

 CONTROL PANEL IS USED TO
ACCOMMODATE INSRUMENTS FOR
THE PURPOSE OF MEASUREMENT,
MONITORING, PROTECTION,
DETECTION, CONTROL AND
MANAGE THE PROCESSES.THE
CONTROL PANELS ARE DESIGNED
BASED ON THE TYPE OF ENERGY
AND DYNAMICS ASSOCIATED.
A PROTECTIVE RELAY IS A DEVICE THAT DETECTS THE FAULT
AND INITIATES THE OPERATION OF THE CIRCUIT
BREAKER TO ISOLATE THE DEFECTIVE ELEMENT FROM
THE REST OF THE SYSTEM. The principle of protective
relaying is to cause the prompt removal from service of any
element of the power system when it starts to operate in an
abnormal manner or interfere with the effective operation of
the rest of the system.
A BATTERY BANK IS DEFINED
AS THE ASSEMBLY OF ONE OR
MORE INDIVISUAL BATTERIES
IN ORDER TO STORE ENERGY
IN ELECTROCHEMICAL
FROM(HINA &
PALANISAMY,2018). HOMER
SOFTWARE MODELS THE
BATTERY AS AN EQUIPMENT
THAT CAN STORE AN
AMOUNT OF DIRECT
CURRENT(DC) AT A FIXED
ROUND TRIP ENERGY
EFFICIENCY.
 AS THE NAME IMPLIES, A CAPACITOR BANK IS MERELY A GROUPING OF SEVERAL
CAPACITORS OF THE SAME RATING. CAPACITOR BANKS MAY BE CONNECTED IN SERIES
OR PARALLED, DEPENDING UPON THE DESIRED RATING. AS WITH AN INDIVIDUAL
CAPACITOR, BANKS OF CAPACITORS ARE USED TO STORE ELECTRICAL ENERGY AND
CODITION THE FLOW OF THAT ENERGY.
 DC DISTRIBUTION BOX
ISOLATES BATTERY BANK AND
INVERTER FROM ANY
ELECTRIC SURGE WHILE
MAKING MAINTENANCE
EASIER AND ENHANCING
SYSTEM RELIABILITY.
 THE DC DISTRIBUTION UNIT IS
USED TO COLLECT THE DC
OUTPUT FROM ARRAY
JUNCTION BOX (AJB)AND
SUPPLY IT TO THE INVERTER.
AMMETER- A AMMETER IS
A MEASURING INSTRUMENT
USED TO MEASURE THE
CURRENT IN A CIRCUIT.
VOLTMETER –A VOLTMETER
IS AN INSTRUMENT USED FOR
MEASURING ELECTRIC
POTENTIAL DIFFERENCE
BETWEEN TWO POINTS IN AN
ELECTRIC CIRCUIT.
WATTMETER – A WATTMETER IS A
MEASURING INSTRUMENT USED TO MEASURE
THE POWER.
POWER FACTOR METER- A POWER FACTOR
METER IS A MEASURING INSTRUMENT USED
TO MEASURE THE POWER FACTOR.
THANK
YOU

More Related Content

Similar to 132 KV SUBSTATION - Copy.pptx

Mitigation of Power Quality Issues in Distributed Generation Systems
Mitigation of Power Quality Issues in Distributed Generation SystemsMitigation of Power Quality Issues in Distributed Generation Systems
Mitigation of Power Quality Issues in Distributed Generation Systems
ijtsrd
 
powerfactorintroductionanditscorrectionfinalokk-180401111606 (3).pdf
powerfactorintroductionanditscorrectionfinalokk-180401111606 (3).pdfpowerfactorintroductionanditscorrectionfinalokk-180401111606 (3).pdf
powerfactorintroductionanditscorrectionfinalokk-180401111606 (3).pdf
BOOPATHIMADHAIYAN
 
Photo Voltaic Cell Integrated DVR for Power Quality Improvement
Photo Voltaic Cell Integrated DVR for Power Quality ImprovementPhoto Voltaic Cell Integrated DVR for Power Quality Improvement
Photo Voltaic Cell Integrated DVR for Power Quality Improvement
IJMTST Journal
 
A New Structure of Dynamic Voltage Restorer Based on Asymmetrical ī-source In...
A New Structure of Dynamic Voltage Restorer Based on Asymmetrical ī-source In...A New Structure of Dynamic Voltage Restorer Based on Asymmetrical ī-source In...
A New Structure of Dynamic Voltage Restorer Based on Asymmetrical ī-source In...
International Journal of Power Electronics and Drive Systems
 
Concepts and Technology of Flexible Ac Transmission Systems
Concepts and Technology of Flexible Ac Transmission SystemsConcepts and Technology of Flexible Ac Transmission Systems
Concepts and Technology of Flexible Ac Transmission Systems
ijtsrd
 
Implementation of a grid-tied emergency back-up power supply for medium and l...
Implementation of a grid-tied emergency back-up power supply for medium and l...Implementation of a grid-tied emergency back-up power supply for medium and l...
Implementation of a grid-tied emergency back-up power supply for medium and l...
IJECEIAES
 
Simulation of 3 Phase, 24 Pulse GTO Converter for Flow Control of Transmissio...
Simulation of 3 Phase, 24 Pulse GTO Converter for Flow Control of Transmissio...Simulation of 3 Phase, 24 Pulse GTO Converter for Flow Control of Transmissio...
Simulation of 3 Phase, 24 Pulse GTO Converter for Flow Control of Transmissio...
ijtsrd
 

Similar to 132 KV SUBSTATION - Copy.pptx (20)

IRJET- A Novel Modified Switched Capacitor Nine Level Inverter Topology with ...
IRJET- A Novel Modified Switched Capacitor Nine Level Inverter Topology with ...IRJET- A Novel Modified Switched Capacitor Nine Level Inverter Topology with ...
IRJET- A Novel Modified Switched Capacitor Nine Level Inverter Topology with ...
 
Voltage sag mitigation using supercapacitor based dynamic voltage restorer
Voltage sag mitigation using supercapacitor based dynamic voltage restorerVoltage sag mitigation using supercapacitor based dynamic voltage restorer
Voltage sag mitigation using supercapacitor based dynamic voltage restorer
 
Stability Modeling Of Storage Devices In FACTS Applications
Stability Modeling Of Storage Devices In FACTS ApplicationsStability Modeling Of Storage Devices In FACTS Applications
Stability Modeling Of Storage Devices In FACTS Applications
 
Mitigation of Power Quality Issues in Distributed Generation Systems
Mitigation of Power Quality Issues in Distributed Generation SystemsMitigation of Power Quality Issues in Distributed Generation Systems
Mitigation of Power Quality Issues in Distributed Generation Systems
 
IRJET- Voltage Drop Compensation in Distribution System using Cascaded H-Brid...
IRJET- Voltage Drop Compensation in Distribution System using Cascaded H-Brid...IRJET- Voltage Drop Compensation in Distribution System using Cascaded H-Brid...
IRJET- Voltage Drop Compensation in Distribution System using Cascaded H-Brid...
 
Reactive power management in india
Reactive power  management in indiaReactive power  management in india
Reactive power management in india
 
powerfactorintroductionanditscorrectionfinalokk-180401111606 (3).pdf
powerfactorintroductionanditscorrectionfinalokk-180401111606 (3).pdfpowerfactorintroductionanditscorrectionfinalokk-180401111606 (3).pdf
powerfactorintroductionanditscorrectionfinalokk-180401111606 (3).pdf
 
Power factor introduction and its correction final
Power factor introduction and its correction final Power factor introduction and its correction final
Power factor introduction and its correction final
 
Photo Voltaic Cell Integrated DVR for Power Quality Improvement
Photo Voltaic Cell Integrated DVR for Power Quality ImprovementPhoto Voltaic Cell Integrated DVR for Power Quality Improvement
Photo Voltaic Cell Integrated DVR for Power Quality Improvement
 
G046033742
G046033742G046033742
G046033742
 
IRJET- Dynamic Voltage Restorer Frame Work to Improve Power Quality of the Di...
IRJET- Dynamic Voltage Restorer Frame Work to Improve Power Quality of the Di...IRJET- Dynamic Voltage Restorer Frame Work to Improve Power Quality of the Di...
IRJET- Dynamic Voltage Restorer Frame Work to Improve Power Quality of the Di...
 
Iittjr
IittjrIittjr
Iittjr
 
Articulo improve acdc
Articulo improve acdcArticulo improve acdc
Articulo improve acdc
 
POWER QUALITY IMPROVEMENT OF DISTRIBUTION GRID USING ULTRA CAPACITOR INTEGRAT...
POWER QUALITY IMPROVEMENT OF DISTRIBUTION GRID USING ULTRA CAPACITOR INTEGRAT...POWER QUALITY IMPROVEMENT OF DISTRIBUTION GRID USING ULTRA CAPACITOR INTEGRAT...
POWER QUALITY IMPROVEMENT OF DISTRIBUTION GRID USING ULTRA CAPACITOR INTEGRAT...
 
A New Structure of Dynamic Voltage Restorer Based on Asymmetrical ī-source In...
A New Structure of Dynamic Voltage Restorer Based on Asymmetrical ī-source In...A New Structure of Dynamic Voltage Restorer Based on Asymmetrical ī-source In...
A New Structure of Dynamic Voltage Restorer Based on Asymmetrical ī-source In...
 
Applications of Smart Grid through Harmonic Current & Reactive Power Compensa...
Applications of Smart Grid through Harmonic Current & Reactive Power Compensa...Applications of Smart Grid through Harmonic Current & Reactive Power Compensa...
Applications of Smart Grid through Harmonic Current & Reactive Power Compensa...
 
Concepts and Technology of Flexible Ac Transmission Systems
Concepts and Technology of Flexible Ac Transmission SystemsConcepts and Technology of Flexible Ac Transmission Systems
Concepts and Technology of Flexible Ac Transmission Systems
 
Implementation of a grid-tied emergency back-up power supply for medium and l...
Implementation of a grid-tied emergency back-up power supply for medium and l...Implementation of a grid-tied emergency back-up power supply for medium and l...
Implementation of a grid-tied emergency back-up power supply for medium and l...
 
pdf presentation
pdf presentationpdf presentation
pdf presentation
 
Simulation of 3 Phase, 24 Pulse GTO Converter for Flow Control of Transmissio...
Simulation of 3 Phase, 24 Pulse GTO Converter for Flow Control of Transmissio...Simulation of 3 Phase, 24 Pulse GTO Converter for Flow Control of Transmissio...
Simulation of 3 Phase, 24 Pulse GTO Converter for Flow Control of Transmissio...
 

Recently uploaded

ONLINE VEHICLE RENTAL SYSTEM PROJECT REPORT.pdf
ONLINE VEHICLE RENTAL SYSTEM PROJECT REPORT.pdfONLINE VEHICLE RENTAL SYSTEM PROJECT REPORT.pdf
ONLINE VEHICLE RENTAL SYSTEM PROJECT REPORT.pdf
Kamal Acharya
 
Complex plane, Modulus, Argument, Graphical representation of a complex numbe...
Complex plane, Modulus, Argument, Graphical representation of a complex numbe...Complex plane, Modulus, Argument, Graphical representation of a complex numbe...
Complex plane, Modulus, Argument, Graphical representation of a complex numbe...
MohammadAliNayeem
 
Activity Planning: Objectives, Project Schedule, Network Planning Model. Time...
Activity Planning: Objectives, Project Schedule, Network Planning Model. Time...Activity Planning: Objectives, Project Schedule, Network Planning Model. Time...
Activity Planning: Objectives, Project Schedule, Network Planning Model. Time...
Lovely Professional University
 
Teachers record management system project report..pdf
Teachers record management system project report..pdfTeachers record management system project report..pdf
Teachers record management system project report..pdf
Kamal Acharya
 
School management system project report.pdf
School management system project report.pdfSchool management system project report.pdf
School management system project report.pdf
Kamal Acharya
 

Recently uploaded (20)

Furniture showroom management system project.pdf
Furniture showroom management system project.pdfFurniture showroom management system project.pdf
Furniture showroom management system project.pdf
 
ONLINE VEHICLE RENTAL SYSTEM PROJECT REPORT.pdf
ONLINE VEHICLE RENTAL SYSTEM PROJECT REPORT.pdfONLINE VEHICLE RENTAL SYSTEM PROJECT REPORT.pdf
ONLINE VEHICLE RENTAL SYSTEM PROJECT REPORT.pdf
 
Complex plane, Modulus, Argument, Graphical representation of a complex numbe...
Complex plane, Modulus, Argument, Graphical representation of a complex numbe...Complex plane, Modulus, Argument, Graphical representation of a complex numbe...
Complex plane, Modulus, Argument, Graphical representation of a complex numbe...
 
Lect_Z_Transform_Main_digital_image_processing.pptx
Lect_Z_Transform_Main_digital_image_processing.pptxLect_Z_Transform_Main_digital_image_processing.pptx
Lect_Z_Transform_Main_digital_image_processing.pptx
 
Introduction to Artificial Intelligence and History of AI
Introduction to Artificial Intelligence and History of AIIntroduction to Artificial Intelligence and History of AI
Introduction to Artificial Intelligence and History of AI
 
ANSI(ST)-III_Manufacturing-I_05052020.pdf
ANSI(ST)-III_Manufacturing-I_05052020.pdfANSI(ST)-III_Manufacturing-I_05052020.pdf
ANSI(ST)-III_Manufacturing-I_05052020.pdf
 
Research Methodolgy & Intellectual Property Rights Series 2
Research Methodolgy & Intellectual Property Rights Series 2Research Methodolgy & Intellectual Property Rights Series 2
Research Methodolgy & Intellectual Property Rights Series 2
 
RM&IPR M5 notes.pdfResearch Methodolgy & Intellectual Property Rights Series 5
RM&IPR M5 notes.pdfResearch Methodolgy & Intellectual Property Rights Series 5RM&IPR M5 notes.pdfResearch Methodolgy & Intellectual Property Rights Series 5
RM&IPR M5 notes.pdfResearch Methodolgy & Intellectual Property Rights Series 5
 
Activity Planning: Objectives, Project Schedule, Network Planning Model. Time...
Activity Planning: Objectives, Project Schedule, Network Planning Model. Time...Activity Planning: Objectives, Project Schedule, Network Planning Model. Time...
Activity Planning: Objectives, Project Schedule, Network Planning Model. Time...
 
2024 DevOps Pro Europe - Growing at the edge
2024 DevOps Pro Europe - Growing at the edge2024 DevOps Pro Europe - Growing at the edge
2024 DevOps Pro Europe - Growing at the edge
 
Teachers record management system project report..pdf
Teachers record management system project report..pdfTeachers record management system project report..pdf
Teachers record management system project report..pdf
 
Artificial Intelligence Bayesian Reasoning
Artificial Intelligence Bayesian ReasoningArtificial Intelligence Bayesian Reasoning
Artificial Intelligence Bayesian Reasoning
 
Filters for Electromagnetic Compatibility Applications
Filters for Electromagnetic Compatibility ApplicationsFilters for Electromagnetic Compatibility Applications
Filters for Electromagnetic Compatibility Applications
 
ROAD CONSTRUCTION PRESENTATION.PPTX.pptx
ROAD CONSTRUCTION PRESENTATION.PPTX.pptxROAD CONSTRUCTION PRESENTATION.PPTX.pptx
ROAD CONSTRUCTION PRESENTATION.PPTX.pptx
 
Software Engineering - Modelling Concepts + Class Modelling + Building the An...
Software Engineering - Modelling Concepts + Class Modelling + Building the An...Software Engineering - Modelling Concepts + Class Modelling + Building the An...
Software Engineering - Modelling Concepts + Class Modelling + Building the An...
 
School management system project report.pdf
School management system project report.pdfSchool management system project report.pdf
School management system project report.pdf
 
Arduino based vehicle speed tracker project
Arduino based vehicle speed tracker projectArduino based vehicle speed tracker project
Arduino based vehicle speed tracker project
 
Construction method of steel structure space frame .pptx
Construction method of steel structure space frame .pptxConstruction method of steel structure space frame .pptx
Construction method of steel structure space frame .pptx
 
BURGER ORDERING SYSYTEM PROJECT REPORT..pdf
BURGER ORDERING SYSYTEM PROJECT REPORT..pdfBURGER ORDERING SYSYTEM PROJECT REPORT..pdf
BURGER ORDERING SYSYTEM PROJECT REPORT..pdf
 
E-Commerce Shopping using MERN Stack where different modules are present
E-Commerce Shopping using MERN Stack where different modules are presentE-Commerce Shopping using MERN Stack where different modules are present
E-Commerce Shopping using MERN Stack where different modules are present
 

132 KV SUBSTATION - Copy.pptx

  • 1. Vocational Training at 132 kv s/s Gajraula
  • 2.  Introduction  Need of substation  Type of substation  EQUIPMENTS OF SUBSTATION  SINGLE LINE DIAGRAM OF 132 KV SUBSTATION
  • 3.
  • 4.  PRACTICAL CONSIDERATION  TO SATISFY LOAD GROWTH  TO ACCOMMODATE NEW GENERATION  TO MAINTAIN RELIABLITY REQUIREMENT  TECHNICAL CONSIDERATION  TO STEP UP AND STEP DOWN AC VOLTAGE LEVEL  TO BREAK THE POWER FLOW  PROVIDE SUPPORT TO THE POWER FLOW
  • 5. ON THE BASIS OF SERVICE REQUIRMENT ON THE BASIS OF CONSTRUCTIONAL FEATURES TRANSFORMER SUBSTATION SWITCHING SUBSTATION FREQUENCY CHANGER SUBSTATION CONVERTING SUBSTATION INDUSTRIAL SUBSTATION OUTDOOR SUBSTATION INDOOR SUBSTATION UNDERGROUND SUBSTATION POLE MOUNTED SUBSTATION
  • 6. INDOOR EQUIPMENTS OUTDOOR EQUIPMENTS TRANSFORMERS CIRCUIT BREAKERS CURRENT TRANSFORMER POTENTIAL TRANSFORMERS ISOLATOR LIGHTING ARRESTER CONTROL PANNELS RELAYS BATTERY CHARGER BATTERY bank D.c.d.b. ammeter,voltmeter CAPACITOR bank
  • 7. A TRANSFORMER IS A STATIC PIECE OF EQUIPMENT USED EITHER OF RAISING OR LOWERING THE VOLTAGE OF AN A.C. SUPPLY WITH A CORRESPONDING DECCREASE OR INCREASE IN CURRENT.
  • 8.
  • 9.
  • 10.
  • 11.
  • 12.
  • 13.  CONTROL PANEL IS USED TO ACCOMMODATE INSRUMENTS FOR THE PURPOSE OF MEASUREMENT, MONITORING, PROTECTION, DETECTION, CONTROL AND MANAGE THE PROCESSES.THE CONTROL PANELS ARE DESIGNED BASED ON THE TYPE OF ENERGY AND DYNAMICS ASSOCIATED.
  • 14. A PROTECTIVE RELAY IS A DEVICE THAT DETECTS THE FAULT AND INITIATES THE OPERATION OF THE CIRCUIT BREAKER TO ISOLATE THE DEFECTIVE ELEMENT FROM THE REST OF THE SYSTEM. The principle of protective relaying is to cause the prompt removal from service of any element of the power system when it starts to operate in an abnormal manner or interfere with the effective operation of the rest of the system.
  • 15. A BATTERY BANK IS DEFINED AS THE ASSEMBLY OF ONE OR MORE INDIVISUAL BATTERIES IN ORDER TO STORE ENERGY IN ELECTROCHEMICAL FROM(HINA & PALANISAMY,2018). HOMER SOFTWARE MODELS THE BATTERY AS AN EQUIPMENT THAT CAN STORE AN AMOUNT OF DIRECT CURRENT(DC) AT A FIXED ROUND TRIP ENERGY EFFICIENCY.
  • 16.  AS THE NAME IMPLIES, A CAPACITOR BANK IS MERELY A GROUPING OF SEVERAL CAPACITORS OF THE SAME RATING. CAPACITOR BANKS MAY BE CONNECTED IN SERIES OR PARALLED, DEPENDING UPON THE DESIRED RATING. AS WITH AN INDIVIDUAL CAPACITOR, BANKS OF CAPACITORS ARE USED TO STORE ELECTRICAL ENERGY AND CODITION THE FLOW OF THAT ENERGY.
  • 17.
  • 18.  DC DISTRIBUTION BOX ISOLATES BATTERY BANK AND INVERTER FROM ANY ELECTRIC SURGE WHILE MAKING MAINTENANCE EASIER AND ENHANCING SYSTEM RELIABILITY.  THE DC DISTRIBUTION UNIT IS USED TO COLLECT THE DC OUTPUT FROM ARRAY JUNCTION BOX (AJB)AND SUPPLY IT TO THE INVERTER.
  • 19. AMMETER- A AMMETER IS A MEASURING INSTRUMENT USED TO MEASURE THE CURRENT IN A CIRCUIT. VOLTMETER –A VOLTMETER IS AN INSTRUMENT USED FOR MEASURING ELECTRIC POTENTIAL DIFFERENCE BETWEEN TWO POINTS IN AN ELECTRIC CIRCUIT.
  • 20. WATTMETER – A WATTMETER IS A MEASURING INSTRUMENT USED TO MEASURE THE POWER. POWER FACTOR METER- A POWER FACTOR METER IS A MEASURING INSTRUMENT USED TO MEASURE THE POWER FACTOR.
  • 21.
  • 22.