RELIABLE, TIMELY, QUALITY, CONSISTENT, PUBLIC DATA 
Avanish Kant 
Ministry of Water Resources, River Development & Ganga Rejuvenation 
Hydrology Project Phase – III 
Approach towards Integrated Water Resources Management 
“India Water Resources Management Programme: 
Hydrology Project” 
www.indiawrm.org
HYDROLOGY PROJECT – the journey so far 
(1995-2003) Hydrology Project-I (HP-I) was taken up to develop Hydrological Information System (HIS) for collecting hydrological, meteorological, water quality data. 
(2006-2014) HP-II was taken up to extend and promote the use of Hydrological Information system (HIS) developed under HP-I by all potential users concerned with the Water Resources Planning and Management, both in public and private, thereby contributing to improve productivity and cost effectiveness of water related investments. 
INDIA 
HP-1 States 
New States 
Map not to scale
Highlights of Journey From HP-I to HP-II 
From Manual Data Collection ------ Real Time Data Acquisition System 
From Desktop Data Management ------ Web-based Data Management 
Collating Data into Analyzed Information for Decision Making (DSS Planning, HDA, PDS) 
Up gradation to real time flood forecasting and reservoir operation systems (RTDSS & RTSF & ROS )
4 
Hydrological Information System
5 
Key Achievements under HP-II 
1. Upgradation/ strengthening of Hydrological Information System (HIS) 
A.Construction of Data Centres 
B.Strengthening of 
meteorological stations 
Sl No. 
Description 
1 
Manual FCS, Raingauges and SRRG 
2 
Digital Raingauges and AWS without telemetry 
3 
Automatic Weather Station (AWS) with telemetry 
4 
Digital Rain Gauges (DRG) with telemetry
6 
Key Achievements under HP-II 
C. Strengthening of hydrological stations 
D. Strengthening of Groundwater Monitoring 
Water Level Recorder 
Hydrological Equipment 
1 
Automatic water level recorder - shaft encoder type/Bubbler/RADAR 
2 
Current Meter 
3 
ADCP 
Ground Water 
1 
DWLR without telemetry 
2 
DWLR with telemetry 
Digital GW Recorder
7 
Key Achievements under HP-II 
E. Strengthening of Water Quality stations 
Sl. N 
Water Quality monitoring stations 
1 
Real time Water quality Stations in Ganga 
and Yamuna by CPCB (10 Parameters) 
2 
Real time Water quality Stations by CWC 
(6 parameters) 
Construction & establishment of Laboratories 
3 
Level 2+ 
4 
Level 2 
5 
Level 1
Achievements under HP-II 
E. Development of Web-based Data Management System
9 
Key Achievements under HP-II 
A.Hydrological Design Aids (HDA) 
–The tool facilitates and expedites the hydrological design of infrastructure and provides uniform approaches 
2. River Basin Planning and Management Tools 
i.Surface water planning for investments and inter-sectoral water allocation 
ii.Integrated operation of reservoirs for flood and irrigation management. 
iii.Conjunctive water use planning for surface and groundwater use 
iv.Drought monitoring and management 
v.Water quality management 
B. Decision Support System (DSS) for Water Resources Planning and Management
10 
Key Achievements under HP-II 
C. Stream Flow Forecasting and Reservoir Operation 
Systems for Flood Management 
Bhakra – Beas Basin 
Upper Krishna & Bhima Basin
11 
Key Achievements under HP-II 
3. Groundwater Management (Aquifer Mapping) 
Details 
Area (sq km) 
Baswa-Bandikui Watershed, Dausa District, Rajasthan – I – AQRAJ 
598 
Maner-Khagaul Area, Patna Dist, Bihar II – AQBHR 
521 
Watershed Nagpur district, Maharashtra - III – AQMAH 
360 
Parts of Tumkur District, Karnataka - IV – AQKAR 
376 
Lower Vellar, Cuddalore district, Tamil Nadu - V – AQTND 
344 
Part of Thar Desert, Jaisalmar District, Rajasthan. - VI – AQDRT 
675 
•6 pilot projects of aquifer mapping was carried out to develop the framework for large scale mapping. 
•The projects piloted use of advance techniques including heliborne techniques for faster and accurate mapping of aquifers.
12 
Key Achievements under HP-II 
4. Purpose Driven Studies (PDS) 
•39 specific studies have been undertaken across the Hydrology Project implementing agencies (supported by external consultancies or universities where needed) 
•The studies includes: - groundwater management, - water quality issues, - reservoir sedimentation problems, and - improved water management practices to address crop water needs.
13 
India Water Resources Management Programme: 
Hydrology Project 
•9 States 
•6 Central Agencies 
HP-I 
INDIA 
On Going States 
New States 
Map not to scale 
•13 States 
•8 Central Agencies 
HP-II 
HP-III 
Across All Indian States 
and UTs 
HYDROLOGY PROJECT – Journey Ahead
14 
Objectives of India Water Resources Management Programme: Hydrology Project 
Standardize Water Resources monitoring and information system for the country with uniform procedures and database. 
Modernize water resources assessment at spatio- temporal scale for improved planning and management using physical and remote sensing based techniques. 
Introduce country wide generic solutions for flood forecasting and water resources management. 
Introduce site specific solutions for water resources planning and management.
Data 
Repositories 
to store and serve 
both raw feed and 
processed data 
(on Cloud Platform) 
Telemetry 
Dissemination Platforms 
Crowd-sourced / Community 
Surveillance Data 
Earth observation data access 
via suitable mechanisms (e.g. 
Internet, GeoNetCast) 
Web Portals 
(e.g. integrated hydromet 
visualization platforms) 
Stakeholder Alerts 
Soils 
Canals 
Wetlands 
• 
• 
• 
• 
• 
• 
Rivers 
GIS and other datasets 
Data Rescue 
Data Management 
& Modeling 
(for weather, 
hydrological, 
inundation & other 
forecasts – short-term 
and seasonal) Operational 
“Bottom-up” Data Acquisition System Control Rooms 
Manual Monitoring Automated Monitoring Radars 
Interaction with other Knowledge 
Base and Analytical Systems 
“Top-Down” Data Acquisition System 
Satellite Earth Observation 
Vision for National Water information Center
16 
Components under HP-III 
Component 1: Upgrading and extension of Ground based Water Resources Monitoring System (WRMS) 
•Strengthening of National water information center through following. 
•Modernize monitoring (including real time) system of Water resources including: 
•Weather: Automatic Weather Stations , rainfall and Snow gauges. 
•Rivers: Stage/discharge, water quality 
•Groundwater: Water levels, water quality 
•Reservoir/tanks: Water level, gate position, outflow and spillways 
•Water use: irrigation canal system monitoring including canal level, discharge, gate position and canal roster 
•Water quality for both groundwater and surface water in problem areas. 
•Sedimentation load monitoring and sedimentation survey in reservoirs. 
•Introduce Community based and mobile based monitoring in particular for small streams, groundwater and water bodies. 
•Digitize historical water resources information including water quality and water quantity data. 
•Upgrade centralized and web-based data storage management and dissemination system including mobile applications for data entry.
17 
Components under HP-III 
Component 2: Development of spatiotemporal, Information and Knowledge Services and Products 
Upgrade existing IndiaWRIS or National water information centre with following information. 
•Development of DEM for the entire country for improved flood mapping and other planning: 
•High resolution such as LIDAR surveys for floodplains, and flood risk maps. 
•High resolution remote sensing imageries and other supplementary information to develop DEM for other areas. 
•Develop spatial River Basin information system based on historical data/map/imageries including: 
•Existing water bodies and their usage. 
•Canal system network 
•Landuse and performance of irrigation systems 
•Inventories of water pollution.
Khartoum 
Asyut 
Luxor 
Nasir Reservoir 
Kassala 
Kusti Wad Madani 
Malakal 
Tana Lake 
E G Y P T 
S U D A N 
S O U T H S U D A N 
E R I T R E A 
E T H I O P I A 
Addis Ababa 
Asmara 
Cairo 
Juba 
Gonder 
Bahir Dar 
Jimma 
Data source: NOAA, 2006 GDP (million $/sq.km.) 
Country boundary 
Major river 
Capital city 
Lake/Sea 
E N T R O 
Eastern Nile Technical 
Regional Office 
0 - 0.5 
2 - 1 
2 - 3 
4 - 5 
6 - 10 
11 - 25 
26 - 50 
51 - 100 
101 - 150 
151 - 1,194 
Monthly Blue Nile Flows at Khartoum 
Annual Blue Nile Flows at Khartoum 
Blue Nile Sub-Basin 
18 
Components under HP-III 
Component 2: Spatiotemporal, Information and Knowledge 
Services and Products 
• Using temporal remote sensing based information to 
update spatial water resources assessment for entire 
country including: 
• Pattern of water storage in water bodies. 
• Precipitation, snow melt, soil moisture, land use, 
actual evapotranspiration and soil moisture 
• Web-based runoff estimates using various 
procedures/techniques. 
• Monitoring floods, risk and drought. 
• Monitoring performance of canal irrigation 
systems. 
• Water logging and salinity 
• Develop a web-based hydrological modelling system 
for the entire country. 
• Improve or identify sets of climate forecast systems (in 
addition to IMD).
19 
Components under HP-III 
Component 3: Tools for planning, design, operation and Management of Water Resources system 
•Develop generic Flood forecasting models based on rainfall runoff modelling for key locations in entire country. 
•Develop river basin and reservoir operation systems for specific river basins for IWRM: daily and seasonal planning. 
•Develop canal operation and scheduling systems using physical and remote sensing based systems. 
•Issue based studies: Develop detailed information system, models/ assessment tools for site specific issues. 
•Introduce Hydrological Design Aids (HDA) to all State SW agencies in order to improve current design practices of water resources infrastructure. 
•Support the shift from “Groundwater Development” to “Groundwater Management” under the 12th Five Year Plan (2012-2017) 
•Introduce tools for the assessment of potential impacts of future climate changes and land use changes on water resources availability, design floods and droughts through pilot studies.
20 
Components under HP-III 
Component 4: Institutional Strengthening and Capacity Building 
•Establishment of a permanent WRIS Coordination Secretariat. 
•Establishment of the National Water Informatics Center, aimed at generating, organizing and providing an up-to-date water database in the public domain with allied themes, and developing value added Information and Knowledge products and services for Integrated Water Resources Management. 
•Specialized training and international exchange programs for various HIS levels, domestic study tours and international study tours, cross learning from participating States, etc; 
•Provide Training-of-Trainer (ToT) courses and develop training programs for central agencies (NWA, CGWB, CWPRS, IMD and NIH). 
•Protocol in action for data sharing and dissemination, joint data validation by Central and State Agencies, and data utilization for design, planning and management purposes.
21 
Thanks for your kind attention

More Related Content

What's hot

Day 3 sudip pradhan, icimod, arrcc-carissa workshop
Day 3 sudip pradhan, icimod, arrcc-carissa workshopDay 3 sudip pradhan, icimod, arrcc-carissa workshop
Day 3 sudip pradhan, icimod, arrcc-carissa workshop
ICIMOD
 
WATER RESOURCES MODELING OF THE GANGES-BRAHMAPUTRA-MEGHNA RIVER BASINS USING ...
WATER RESOURCES MODELING OF THE GANGES-BRAHMAPUTRA-MEGHNA RIVER BASINS USING ...WATER RESOURCES MODELING OF THE GANGES-BRAHMAPUTRA-MEGHNA RIVER BASINS USING ...
WATER RESOURCES MODELING OF THE GANGES-BRAHMAPUTRA-MEGHNA RIVER BASINS USING ...
Moudud Hasan
 
A case study on GIS application
A case study on GIS applicationA case study on GIS application
A case study on GIS application
Axay Sharma
 
APPLICATIONS OF RS AND GIS FOR DEVELOPMENT OF SMALL HYDROPOWER PLANTS (SHP)
APPLICATIONS OF RS AND GIS  FOR DEVELOPMENT OF SMALL HYDROPOWER PLANTS (SHP)APPLICATIONS OF RS AND GIS  FOR DEVELOPMENT OF SMALL HYDROPOWER PLANTS (SHP)
APPLICATIONS OF RS AND GIS FOR DEVELOPMENT OF SMALL HYDROPOWER PLANTS (SHP)
Abhiram Kanigolla
 
Amaljit - Activities NESAC 2014-2015
Amaljit - Activities NESAC 2014-2015Amaljit - Activities NESAC 2014-2015
Amaljit - Activities NESAC 2014-2015
Amaljit Bharali
 
Mh sw optimisation of g&d stations network of maharashtra
Mh sw optimisation of g&d stations network of maharashtraMh sw optimisation of g&d stations network of maharashtra
Mh sw optimisation of g&d stations network of maharashtra
hydrologyproject0
 
Background Material
Background MaterialBackground Material
Background Material
HydrologyWebsite
 
APPLICABILITY OF WEAP AS WATER MANAGEMENT DECISION
APPLICABILITY OF WEAP AS WATER MANAGEMENT DECISIONAPPLICABILITY OF WEAP AS WATER MANAGEMENT DECISION
APPLICABILITY OF WEAP AS WATER MANAGEMENT DECISION
Marwan Haddad
 
Application of water evaluation and planning (WEAP)
Application of water evaluation and planning (WEAP)Application of water evaluation and planning (WEAP)
Application of water evaluation and planning (WEAP)
oloofrank
 
Weap final
Weap finalWeap final
Weap final
Iqura Malik
 
Assessment of Water Supply–Demand for a Watershed using WEAP Model
Assessment of Water Supply–Demand  for a Watershed using WEAP Model Assessment of Water Supply–Demand  for a Watershed using WEAP Model
Assessment of Water Supply–Demand for a Watershed using WEAP Model
dipesh thakur
 
Cwc
CwcCwc
Karnataka surface water
Karnataka surface waterKarnataka surface water
Karnataka surface water
hydrologyproject0
 
Chittappa
ChittappaChittappa
Chittappa
bharathi0007
 
Water resources planning in hp 1 karnataka surface water
Water resources planning in hp 1 karnataka surface waterWater resources planning in hp 1 karnataka surface water
Water resources planning in hp 1 karnataka surface water
hydrologywebsite1
 
Puducherry
Puducherry Puducherry
Puducherry
hydrologyproject0
 
Real time decision support system krishna and upper bhima river basin system ...
Real time decision support system krishna and upper bhima river basin system ...Real time decision support system krishna and upper bhima river basin system ...
Real time decision support system krishna and upper bhima river basin system ...
HydrologyWebsite
 
GIS Based Semi Automated Extraction of Sites for Artificial Recharge
GIS Based Semi Automated Extraction of Sites for Artificial RechargeGIS Based Semi Automated Extraction of Sites for Artificial Recharge
GIS Based Semi Automated Extraction of Sites for Artificial Recharge
researchinventy
 
2016 GMekong Forum - Session 6 - Intro to SERVIR Mekong and dam inundation pr...
2016 GMekong Forum - Session 6 - Intro to SERVIR Mekong and dam inundation pr...2016 GMekong Forum - Session 6 - Intro to SERVIR Mekong and dam inundation pr...
2016 GMekong Forum - Session 6 - Intro to SERVIR Mekong and dam inundation pr...
Water, Land and Ecosystems (WLE)
 
DSD-SEA 2019 Seasonal drought forecasting using state-of-the-art hydro softwa...
DSD-SEA 2019 Seasonal drought forecasting using state-of-the-art hydro softwa...DSD-SEA 2019 Seasonal drought forecasting using state-of-the-art hydro softwa...
DSD-SEA 2019 Seasonal drought forecasting using state-of-the-art hydro softwa...
Deltares
 

What's hot (20)

Day 3 sudip pradhan, icimod, arrcc-carissa workshop
Day 3 sudip pradhan, icimod, arrcc-carissa workshopDay 3 sudip pradhan, icimod, arrcc-carissa workshop
Day 3 sudip pradhan, icimod, arrcc-carissa workshop
 
WATER RESOURCES MODELING OF THE GANGES-BRAHMAPUTRA-MEGHNA RIVER BASINS USING ...
WATER RESOURCES MODELING OF THE GANGES-BRAHMAPUTRA-MEGHNA RIVER BASINS USING ...WATER RESOURCES MODELING OF THE GANGES-BRAHMAPUTRA-MEGHNA RIVER BASINS USING ...
WATER RESOURCES MODELING OF THE GANGES-BRAHMAPUTRA-MEGHNA RIVER BASINS USING ...
 
A case study on GIS application
A case study on GIS applicationA case study on GIS application
A case study on GIS application
 
APPLICATIONS OF RS AND GIS FOR DEVELOPMENT OF SMALL HYDROPOWER PLANTS (SHP)
APPLICATIONS OF RS AND GIS  FOR DEVELOPMENT OF SMALL HYDROPOWER PLANTS (SHP)APPLICATIONS OF RS AND GIS  FOR DEVELOPMENT OF SMALL HYDROPOWER PLANTS (SHP)
APPLICATIONS OF RS AND GIS FOR DEVELOPMENT OF SMALL HYDROPOWER PLANTS (SHP)
 
Amaljit - Activities NESAC 2014-2015
Amaljit - Activities NESAC 2014-2015Amaljit - Activities NESAC 2014-2015
Amaljit - Activities NESAC 2014-2015
 
Mh sw optimisation of g&d stations network of maharashtra
Mh sw optimisation of g&d stations network of maharashtraMh sw optimisation of g&d stations network of maharashtra
Mh sw optimisation of g&d stations network of maharashtra
 
Background Material
Background MaterialBackground Material
Background Material
 
APPLICABILITY OF WEAP AS WATER MANAGEMENT DECISION
APPLICABILITY OF WEAP AS WATER MANAGEMENT DECISIONAPPLICABILITY OF WEAP AS WATER MANAGEMENT DECISION
APPLICABILITY OF WEAP AS WATER MANAGEMENT DECISION
 
Application of water evaluation and planning (WEAP)
Application of water evaluation and planning (WEAP)Application of water evaluation and planning (WEAP)
Application of water evaluation and planning (WEAP)
 
Weap final
Weap finalWeap final
Weap final
 
Assessment of Water Supply–Demand for a Watershed using WEAP Model
Assessment of Water Supply–Demand  for a Watershed using WEAP Model Assessment of Water Supply–Demand  for a Watershed using WEAP Model
Assessment of Water Supply–Demand for a Watershed using WEAP Model
 
Cwc
CwcCwc
Cwc
 
Karnataka surface water
Karnataka surface waterKarnataka surface water
Karnataka surface water
 
Chittappa
ChittappaChittappa
Chittappa
 
Water resources planning in hp 1 karnataka surface water
Water resources planning in hp 1 karnataka surface waterWater resources planning in hp 1 karnataka surface water
Water resources planning in hp 1 karnataka surface water
 
Puducherry
Puducherry Puducherry
Puducherry
 
Real time decision support system krishna and upper bhima river basin system ...
Real time decision support system krishna and upper bhima river basin system ...Real time decision support system krishna and upper bhima river basin system ...
Real time decision support system krishna and upper bhima river basin system ...
 
GIS Based Semi Automated Extraction of Sites for Artificial Recharge
GIS Based Semi Automated Extraction of Sites for Artificial RechargeGIS Based Semi Automated Extraction of Sites for Artificial Recharge
GIS Based Semi Automated Extraction of Sites for Artificial Recharge
 
2016 GMekong Forum - Session 6 - Intro to SERVIR Mekong and dam inundation pr...
2016 GMekong Forum - Session 6 - Intro to SERVIR Mekong and dam inundation pr...2016 GMekong Forum - Session 6 - Intro to SERVIR Mekong and dam inundation pr...
2016 GMekong Forum - Session 6 - Intro to SERVIR Mekong and dam inundation pr...
 
DSD-SEA 2019 Seasonal drought forecasting using state-of-the-art hydro softwa...
DSD-SEA 2019 Seasonal drought forecasting using state-of-the-art hydro softwa...DSD-SEA 2019 Seasonal drought forecasting using state-of-the-art hydro softwa...
DSD-SEA 2019 Seasonal drought forecasting using state-of-the-art hydro softwa...
 

Similar to 1 - MoWR - Overview of HP-III Workshop-15th Sep 2014

Geospatial data & Web Portals for IWRM:-NRSC Perspective By Dr. J.R. Sharma
Geospatial data &  Web Portals for IWRM:-NRSC Perspective  By Dr. J.R. SharmaGeospatial data &  Web Portals for IWRM:-NRSC Perspective  By Dr. J.R. Sharma
Geospatial data & Web Portals for IWRM:-NRSC Perspective By Dr. J.R. Sharma
indiawrm
 
Vision for ground water management
Vision for ground water managementVision for ground water management
Vision for ground water management
hydrologyproject2
 
Download-manuals-ground water-manual-standardsforg-wmonitoring
 Download-manuals-ground water-manual-standardsforg-wmonitoring Download-manuals-ground water-manual-standardsforg-wmonitoring
Download-manuals-ground water-manual-standardsforg-wmonitoring
hydrologyproject001
 
Final sw handbook 180514
Final sw handbook 180514Final sw handbook 180514
Final sw handbook 180514
hydrologyproject0
 
Haii 2017
Haii 2017 Haii 2017
Haii 2017
Veerachai Tanpipat
 
ccwi2016_IvoSilvestre
ccwi2016_IvoSilvestreccwi2016_IvoSilvestre
ccwi2016_IvoSilvestre
ivo silvestre
 
SWaRMA_IRBM_Module2_#2, Information management in IRBM , Sudip pradhan et al
SWaRMA_IRBM_Module2_#2, Information management in IRBM , Sudip pradhan et alSWaRMA_IRBM_Module2_#2, Information management in IRBM , Sudip pradhan et al
SWaRMA_IRBM_Module2_#2, Information management in IRBM , Sudip pradhan et al
ICIMOD
 
Cpcb hp ii final supervision mission
Cpcb hp ii final supervision mission Cpcb hp ii final supervision mission
Cpcb hp ii final supervision mission
hydrologywebsite1
 
Groundwater management strategy by Dr S K Jain, CGWB
Groundwater management strategy by Dr S K Jain, CGWBGroundwater management strategy by Dr S K Jain, CGWB
Groundwater management strategy by Dr S K Jain, CGWB
India Water Portal
 
Vision for surface water management
Vision for surface water managementVision for surface water management
Vision for surface water management
hydrologywebsite1
 
Final wq handbook 180514
Final wq handbook 180514Final wq handbook 180514
Final wq handbook 180514
hydrologyproject0
 
Final gw handbook 180514
Final gw handbook 180514Final gw handbook 180514
Final gw handbook 180514
hydrologyproject0
 
Upgrading a conventional his an indian example
Upgrading a conventional his   an indian exampleUpgrading a conventional his   an indian example
Upgrading a conventional his an indian example
hydrologywebsite1
 
Download-manuals-surface water-manual-sw-volume1designmanualhis
 Download-manuals-surface water-manual-sw-volume1designmanualhis Download-manuals-surface water-manual-sw-volume1designmanualhis
Download-manuals-surface water-manual-sw-volume1designmanualhis
hydrologyproject001
 
Final gw handbook 190514
Final gw handbook 190514Final gw handbook 190514
Final gw handbook 190514
hydrologyproject0
 
Fairfax County Wastewater Collection Asset Management Program Oct 2020
Fairfax County Wastewater Collection Asset Management Program  Oct 2020Fairfax County Wastewater Collection Asset Management Program  Oct 2020
Fairfax County Wastewater Collection Asset Management Program Oct 2020
Fairfax County
 
22 - CSIRO - Water Data Management-Sep-17
22 - CSIRO - Water Data Management-Sep-1722 - CSIRO - Water Data Management-Sep-17
22 - CSIRO - Water Data Management-Sep-17
indiawrm
 
Smart ICT for Weather and Water
Smart ICT for Weather and WaterSmart ICT for Weather and Water
Smart ICT for Weather and Water
International Water Management Institute (IWMI)
 
Download-manuals-ground water-manual-gw-volume1designmanualhis
 Download-manuals-ground water-manual-gw-volume1designmanualhis Download-manuals-ground water-manual-gw-volume1designmanualhis
Download-manuals-ground water-manual-gw-volume1designmanualhis
hydrologyproject001
 
Download-manuals-ground water-manual-gw-volume1designmanualhis
 Download-manuals-ground water-manual-gw-volume1designmanualhis Download-manuals-ground water-manual-gw-volume1designmanualhis
Download-manuals-ground water-manual-gw-volume1designmanualhis
hydrologyproject001
 

Similar to 1 - MoWR - Overview of HP-III Workshop-15th Sep 2014 (20)

Geospatial data & Web Portals for IWRM:-NRSC Perspective By Dr. J.R. Sharma
Geospatial data &  Web Portals for IWRM:-NRSC Perspective  By Dr. J.R. SharmaGeospatial data &  Web Portals for IWRM:-NRSC Perspective  By Dr. J.R. Sharma
Geospatial data & Web Portals for IWRM:-NRSC Perspective By Dr. J.R. Sharma
 
Vision for ground water management
Vision for ground water managementVision for ground water management
Vision for ground water management
 
Download-manuals-ground water-manual-standardsforg-wmonitoring
 Download-manuals-ground water-manual-standardsforg-wmonitoring Download-manuals-ground water-manual-standardsforg-wmonitoring
Download-manuals-ground water-manual-standardsforg-wmonitoring
 
Final sw handbook 180514
Final sw handbook 180514Final sw handbook 180514
Final sw handbook 180514
 
Haii 2017
Haii 2017 Haii 2017
Haii 2017
 
ccwi2016_IvoSilvestre
ccwi2016_IvoSilvestreccwi2016_IvoSilvestre
ccwi2016_IvoSilvestre
 
SWaRMA_IRBM_Module2_#2, Information management in IRBM , Sudip pradhan et al
SWaRMA_IRBM_Module2_#2, Information management in IRBM , Sudip pradhan et alSWaRMA_IRBM_Module2_#2, Information management in IRBM , Sudip pradhan et al
SWaRMA_IRBM_Module2_#2, Information management in IRBM , Sudip pradhan et al
 
Cpcb hp ii final supervision mission
Cpcb hp ii final supervision mission Cpcb hp ii final supervision mission
Cpcb hp ii final supervision mission
 
Groundwater management strategy by Dr S K Jain, CGWB
Groundwater management strategy by Dr S K Jain, CGWBGroundwater management strategy by Dr S K Jain, CGWB
Groundwater management strategy by Dr S K Jain, CGWB
 
Vision for surface water management
Vision for surface water managementVision for surface water management
Vision for surface water management
 
Final wq handbook 180514
Final wq handbook 180514Final wq handbook 180514
Final wq handbook 180514
 
Final gw handbook 180514
Final gw handbook 180514Final gw handbook 180514
Final gw handbook 180514
 
Upgrading a conventional his an indian example
Upgrading a conventional his   an indian exampleUpgrading a conventional his   an indian example
Upgrading a conventional his an indian example
 
Download-manuals-surface water-manual-sw-volume1designmanualhis
 Download-manuals-surface water-manual-sw-volume1designmanualhis Download-manuals-surface water-manual-sw-volume1designmanualhis
Download-manuals-surface water-manual-sw-volume1designmanualhis
 
Final gw handbook 190514
Final gw handbook 190514Final gw handbook 190514
Final gw handbook 190514
 
Fairfax County Wastewater Collection Asset Management Program Oct 2020
Fairfax County Wastewater Collection Asset Management Program  Oct 2020Fairfax County Wastewater Collection Asset Management Program  Oct 2020
Fairfax County Wastewater Collection Asset Management Program Oct 2020
 
22 - CSIRO - Water Data Management-Sep-17
22 - CSIRO - Water Data Management-Sep-1722 - CSIRO - Water Data Management-Sep-17
22 - CSIRO - Water Data Management-Sep-17
 
Smart ICT for Weather and Water
Smart ICT for Weather and WaterSmart ICT for Weather and Water
Smart ICT for Weather and Water
 
Download-manuals-ground water-manual-gw-volume1designmanualhis
 Download-manuals-ground water-manual-gw-volume1designmanualhis Download-manuals-ground water-manual-gw-volume1designmanualhis
Download-manuals-ground water-manual-gw-volume1designmanualhis
 
Download-manuals-ground water-manual-gw-volume1designmanualhis
 Download-manuals-ground water-manual-gw-volume1designmanualhis Download-manuals-ground water-manual-gw-volume1designmanualhis
Download-manuals-ground water-manual-gw-volume1designmanualhis
 

More from indiawrm

Measurement and Computation of Streamflow: Volume 2 Computation of Discharge ...
Measurement and Computation of Streamflow: Volume 2 Computation of Discharge ...Measurement and Computation of Streamflow: Volume 2 Computation of Discharge ...
Measurement and Computation of Streamflow: Volume 2 Computation of Discharge ...
indiawrm
 
Measurement and Computation of Streamflow: Volume 1 Measurement of Stage and ...
Measurement and Computation of Streamflow: Volume 1 Measurement of Stage and ...Measurement and Computation of Streamflow: Volume 1 Measurement of Stage and ...
Measurement and Computation of Streamflow: Volume 1 Measurement of Stage and ...
indiawrm
 
Guide to Hydrological Practices: Data Acquisition and Processing, Analysis, F...
Guide to Hydrological Practices: Data Acquisition and Processing, Analysis, F...Guide to Hydrological Practices: Data Acquisition and Processing, Analysis, F...
Guide to Hydrological Practices: Data Acquisition and Processing, Analysis, F...
indiawrm
 
Water Measurement Manual 2001
Water Measurement Manual 2001Water Measurement Manual 2001
Water Measurement Manual 2001
indiawrm
 
Hydrometry: Field Manual, Field Application of ADCP Volume-4 Part V 2003
Hydrometry: Field Manual, Field Application of ADCP Volume-4 Part V 2003 Hydrometry: Field Manual, Field Application of ADCP Volume-4 Part V 2003
Hydrometry: Field Manual, Field Application of ADCP Volume-4 Part V 2003
indiawrm
 
Hydrometry: Design Manual Volume-4 2003
Hydrometry: Design Manual Volume-4 2003Hydrometry: Design Manual Volume-4 2003
Hydrometry: Design Manual Volume-4 2003
indiawrm
 
Weather Station Siting and Installation Tools App Note Code 4-S 1997
Weather Station Siting and Installation Tools App Note Code 4-S 1997Weather Station Siting and Installation Tools App Note Code 4-S 1997
Weather Station Siting and Installation Tools App Note Code 4-S 1997
indiawrm
 
Improving Hydrometric Systems: Institutional and Training Assessment for Hydr...
Improving Hydrometric Systems: Institutional and Training Assessment for Hydr...Improving Hydrometric Systems: Institutional and Training Assessment for Hydr...
Improving Hydrometric Systems: Institutional and Training Assessment for Hydr...
indiawrm
 
WMO Field Intercomparison of Rainfall Intensity Gauges WMO/TD-No.1504 2009
WMO Field Intercomparison of Rainfall Intensity Gauges WMO/TD-No.1504 2009WMO Field Intercomparison of Rainfall Intensity Gauges WMO/TD-No.1504 2009
WMO Field Intercomparison of Rainfall Intensity Gauges WMO/TD-No.1504 2009
indiawrm
 
Initial Guidance to Obtain Representative Meteorological Observations at Urba...
Initial Guidance to Obtain Representative Meteorological Observations at Urba...Initial Guidance to Obtain Representative Meteorological Observations at Urba...
Initial Guidance to Obtain Representative Meteorological Observations at Urba...
indiawrm
 
Cooperative Station Observations - 1989
Cooperative Station Observations - 1989Cooperative Station Observations - 1989
Cooperative Station Observations - 1989
indiawrm
 
Guide to Meteorological Instruments and Methods of Observation-Wmo no8-2008
Guide to Meteorological Instruments and Methods of Observation-Wmo no8-2008Guide to Meteorological Instruments and Methods of Observation-Wmo no8-2008
Guide to Meteorological Instruments and Methods of Observation-Wmo no8-2008
indiawrm
 
Hydrological Data Management: Present State and Trends-Wmo no964
Hydrological Data Management: Present State and Trends-Wmo no964Hydrological Data Management: Present State and Trends-Wmo no964
Hydrological Data Management: Present State and Trends-Wmo no964
indiawrm
 
High availability
High availabilityHigh availability
High availability
indiawrm
 
International protection rating
International protection ratingInternational protection rating
International protection rating
indiawrm
 
Vsat Specifications
Vsat SpecificationsVsat Specifications
Vsat Specifications
indiawrm
 
Gsm GPRS Specifications
Gsm GPRS SpecificationsGsm GPRS Specifications
Gsm GPRS Specifications
indiawrm
 
Mixed phase Specifications
Mixed phase SpecificationsMixed phase Specifications
Mixed phase Specifications
indiawrm
 
Liquid Specifications
Liquid SpecificationsLiquid Specifications
Liquid Specifications
indiawrm
 
Acoustic doppler Specifications
Acoustic doppler SpecificationsAcoustic doppler Specifications
Acoustic doppler Specifications
indiawrm
 

More from indiawrm (20)

Measurement and Computation of Streamflow: Volume 2 Computation of Discharge ...
Measurement and Computation of Streamflow: Volume 2 Computation of Discharge ...Measurement and Computation of Streamflow: Volume 2 Computation of Discharge ...
Measurement and Computation of Streamflow: Volume 2 Computation of Discharge ...
 
Measurement and Computation of Streamflow: Volume 1 Measurement of Stage and ...
Measurement and Computation of Streamflow: Volume 1 Measurement of Stage and ...Measurement and Computation of Streamflow: Volume 1 Measurement of Stage and ...
Measurement and Computation of Streamflow: Volume 1 Measurement of Stage and ...
 
Guide to Hydrological Practices: Data Acquisition and Processing, Analysis, F...
Guide to Hydrological Practices: Data Acquisition and Processing, Analysis, F...Guide to Hydrological Practices: Data Acquisition and Processing, Analysis, F...
Guide to Hydrological Practices: Data Acquisition and Processing, Analysis, F...
 
Water Measurement Manual 2001
Water Measurement Manual 2001Water Measurement Manual 2001
Water Measurement Manual 2001
 
Hydrometry: Field Manual, Field Application of ADCP Volume-4 Part V 2003
Hydrometry: Field Manual, Field Application of ADCP Volume-4 Part V 2003 Hydrometry: Field Manual, Field Application of ADCP Volume-4 Part V 2003
Hydrometry: Field Manual, Field Application of ADCP Volume-4 Part V 2003
 
Hydrometry: Design Manual Volume-4 2003
Hydrometry: Design Manual Volume-4 2003Hydrometry: Design Manual Volume-4 2003
Hydrometry: Design Manual Volume-4 2003
 
Weather Station Siting and Installation Tools App Note Code 4-S 1997
Weather Station Siting and Installation Tools App Note Code 4-S 1997Weather Station Siting and Installation Tools App Note Code 4-S 1997
Weather Station Siting and Installation Tools App Note Code 4-S 1997
 
Improving Hydrometric Systems: Institutional and Training Assessment for Hydr...
Improving Hydrometric Systems: Institutional and Training Assessment for Hydr...Improving Hydrometric Systems: Institutional and Training Assessment for Hydr...
Improving Hydrometric Systems: Institutional and Training Assessment for Hydr...
 
WMO Field Intercomparison of Rainfall Intensity Gauges WMO/TD-No.1504 2009
WMO Field Intercomparison of Rainfall Intensity Gauges WMO/TD-No.1504 2009WMO Field Intercomparison of Rainfall Intensity Gauges WMO/TD-No.1504 2009
WMO Field Intercomparison of Rainfall Intensity Gauges WMO/TD-No.1504 2009
 
Initial Guidance to Obtain Representative Meteorological Observations at Urba...
Initial Guidance to Obtain Representative Meteorological Observations at Urba...Initial Guidance to Obtain Representative Meteorological Observations at Urba...
Initial Guidance to Obtain Representative Meteorological Observations at Urba...
 
Cooperative Station Observations - 1989
Cooperative Station Observations - 1989Cooperative Station Observations - 1989
Cooperative Station Observations - 1989
 
Guide to Meteorological Instruments and Methods of Observation-Wmo no8-2008
Guide to Meteorological Instruments and Methods of Observation-Wmo no8-2008Guide to Meteorological Instruments and Methods of Observation-Wmo no8-2008
Guide to Meteorological Instruments and Methods of Observation-Wmo no8-2008
 
Hydrological Data Management: Present State and Trends-Wmo no964
Hydrological Data Management: Present State and Trends-Wmo no964Hydrological Data Management: Present State and Trends-Wmo no964
Hydrological Data Management: Present State and Trends-Wmo no964
 
High availability
High availabilityHigh availability
High availability
 
International protection rating
International protection ratingInternational protection rating
International protection rating
 
Vsat Specifications
Vsat SpecificationsVsat Specifications
Vsat Specifications
 
Gsm GPRS Specifications
Gsm GPRS SpecificationsGsm GPRS Specifications
Gsm GPRS Specifications
 
Mixed phase Specifications
Mixed phase SpecificationsMixed phase Specifications
Mixed phase Specifications
 
Liquid Specifications
Liquid SpecificationsLiquid Specifications
Liquid Specifications
 
Acoustic doppler Specifications
Acoustic doppler SpecificationsAcoustic doppler Specifications
Acoustic doppler Specifications
 

Recently uploaded

Artificial Intelligence, Data and Competition – SCHREPEL – June 2024 OECD dis...
Artificial Intelligence, Data and Competition – SCHREPEL – June 2024 OECD dis...Artificial Intelligence, Data and Competition – SCHREPEL – June 2024 OECD dis...
Artificial Intelligence, Data and Competition – SCHREPEL – June 2024 OECD dis...
OECD Directorate for Financial and Enterprise Affairs
 
原版制作贝德福特大学毕业证(bedfordhire毕业证)硕士文凭原版一模一样
原版制作贝德福特大学毕业证(bedfordhire毕业证)硕士文凭原版一模一样原版制作贝德福特大学毕业证(bedfordhire毕业证)硕士文凭原版一模一样
原版制作贝德福特大学毕业证(bedfordhire毕业证)硕士文凭原版一模一样
gpww3sf4
 
Why Psychological Safety Matters for Software Teams - ACE 2024 - Ben Linders.pdf
Why Psychological Safety Matters for Software Teams - ACE 2024 - Ben Linders.pdfWhy Psychological Safety Matters for Software Teams - ACE 2024 - Ben Linders.pdf
Why Psychological Safety Matters for Software Teams - ACE 2024 - Ben Linders.pdf
Ben Linders
 
Gregory Harris - Cycle 2 - Civics Presentation
Gregory Harris - Cycle 2 - Civics PresentationGregory Harris - Cycle 2 - Civics Presentation
Gregory Harris - Cycle 2 - Civics Presentation
gharris9
 
Carrer goals.pptx and their importance in real life
Carrer goals.pptx  and their importance in real lifeCarrer goals.pptx  and their importance in real life
Carrer goals.pptx and their importance in real life
artemacademy2
 
Pro-competitive Industrial Policy – OECD – June 2024 OECD discussion
Pro-competitive Industrial Policy – OECD – June 2024 OECD discussionPro-competitive Industrial Policy – OECD – June 2024 OECD discussion
Pro-competitive Industrial Policy – OECD – June 2024 OECD discussion
OECD Directorate for Financial and Enterprise Affairs
 
Suzanne Lagerweij - Influence Without Power - Why Empathy is Your Best Friend...
Suzanne Lagerweij - Influence Without Power - Why Empathy is Your Best Friend...Suzanne Lagerweij - Influence Without Power - Why Empathy is Your Best Friend...
Suzanne Lagerweij - Influence Without Power - Why Empathy is Your Best Friend...
Suzanne Lagerweij
 
BRIC_2024_2024-06-06-11:30-haunschild_archival_version.pdf
BRIC_2024_2024-06-06-11:30-haunschild_archival_version.pdfBRIC_2024_2024-06-06-11:30-haunschild_archival_version.pdf
BRIC_2024_2024-06-06-11:30-haunschild_archival_version.pdf
Robin Haunschild
 
Artificial Intelligence, Data and Competition – ČORBA – June 2024 OECD discus...
Artificial Intelligence, Data and Competition – ČORBA – June 2024 OECD discus...Artificial Intelligence, Data and Competition – ČORBA – June 2024 OECD discus...
Artificial Intelligence, Data and Competition – ČORBA – June 2024 OECD discus...
OECD Directorate for Financial and Enterprise Affairs
 
Artificial Intelligence, Data and Competition – LIM – June 2024 OECD discussion
Artificial Intelligence, Data and Competition – LIM – June 2024 OECD discussionArtificial Intelligence, Data and Competition – LIM – June 2024 OECD discussion
Artificial Intelligence, Data and Competition – LIM – June 2024 OECD discussion
OECD Directorate for Financial and Enterprise Affairs
 
Competition and Regulation in Professions and Occupations – ROBSON – June 202...
Competition and Regulation in Professions and Occupations – ROBSON – June 202...Competition and Regulation in Professions and Occupations – ROBSON – June 202...
Competition and Regulation in Professions and Occupations – ROBSON – June 202...
OECD Directorate for Financial and Enterprise Affairs
 
Burning Issue Presentation By Kenmaryon.pdf
Burning Issue Presentation By Kenmaryon.pdfBurning Issue Presentation By Kenmaryon.pdf
Burning Issue Presentation By Kenmaryon.pdf
kkirkland2
 
Artificial Intelligence, Data and Competition – OECD – June 2024 OECD discussion
Artificial Intelligence, Data and Competition – OECD – June 2024 OECD discussionArtificial Intelligence, Data and Competition – OECD – June 2024 OECD discussion
Artificial Intelligence, Data and Competition – OECD – June 2024 OECD discussion
OECD Directorate for Financial and Enterprise Affairs
 
XP 2024 presentation: A New Look to Leadership
XP 2024 presentation: A New Look to LeadershipXP 2024 presentation: A New Look to Leadership
XP 2024 presentation: A New Look to Leadership
samililja
 
2024-05-30_meetup_devops_aix-marseille.pdf
2024-05-30_meetup_devops_aix-marseille.pdf2024-05-30_meetup_devops_aix-marseille.pdf
2024-05-30_meetup_devops_aix-marseille.pdf
Frederic Leger
 
Pro-competitive Industrial Policy – LANE – June 2024 OECD discussion
Pro-competitive Industrial Policy – LANE – June 2024 OECD discussionPro-competitive Industrial Policy – LANE – June 2024 OECD discussion
Pro-competitive Industrial Policy – LANE – June 2024 OECD discussion
OECD Directorate for Financial and Enterprise Affairs
 
ASONAM2023_presection_slide_track-recommendation.pdf
ASONAM2023_presection_slide_track-recommendation.pdfASONAM2023_presection_slide_track-recommendation.pdf
ASONAM2023_presection_slide_track-recommendation.pdf
ToshihiroIto4
 
Mẫu PPT kế hoạch làm việc sáng tạo cho nửa cuối năm PowerPoint
Mẫu PPT kế hoạch làm việc sáng tạo cho nửa cuối năm PowerPointMẫu PPT kế hoạch làm việc sáng tạo cho nửa cuối năm PowerPoint
Mẫu PPT kế hoạch làm việc sáng tạo cho nửa cuối năm PowerPoint
1990 Media
 
Collapsing Narratives: Exploring Non-Linearity • a micro report by Rosie Wells
Collapsing Narratives: Exploring Non-Linearity • a micro report by Rosie WellsCollapsing Narratives: Exploring Non-Linearity • a micro report by Rosie Wells
Collapsing Narratives: Exploring Non-Linearity • a micro report by Rosie Wells
Rosie Wells
 
Tom tresser burning issue.pptx My Burning issue
Tom tresser burning issue.pptx My Burning issueTom tresser burning issue.pptx My Burning issue
Tom tresser burning issue.pptx My Burning issue
amekonnen
 

Recently uploaded (20)

Artificial Intelligence, Data and Competition – SCHREPEL – June 2024 OECD dis...
Artificial Intelligence, Data and Competition – SCHREPEL – June 2024 OECD dis...Artificial Intelligence, Data and Competition – SCHREPEL – June 2024 OECD dis...
Artificial Intelligence, Data and Competition – SCHREPEL – June 2024 OECD dis...
 
原版制作贝德福特大学毕业证(bedfordhire毕业证)硕士文凭原版一模一样
原版制作贝德福特大学毕业证(bedfordhire毕业证)硕士文凭原版一模一样原版制作贝德福特大学毕业证(bedfordhire毕业证)硕士文凭原版一模一样
原版制作贝德福特大学毕业证(bedfordhire毕业证)硕士文凭原版一模一样
 
Why Psychological Safety Matters for Software Teams - ACE 2024 - Ben Linders.pdf
Why Psychological Safety Matters for Software Teams - ACE 2024 - Ben Linders.pdfWhy Psychological Safety Matters for Software Teams - ACE 2024 - Ben Linders.pdf
Why Psychological Safety Matters for Software Teams - ACE 2024 - Ben Linders.pdf
 
Gregory Harris - Cycle 2 - Civics Presentation
Gregory Harris - Cycle 2 - Civics PresentationGregory Harris - Cycle 2 - Civics Presentation
Gregory Harris - Cycle 2 - Civics Presentation
 
Carrer goals.pptx and their importance in real life
Carrer goals.pptx  and their importance in real lifeCarrer goals.pptx  and their importance in real life
Carrer goals.pptx and their importance in real life
 
Pro-competitive Industrial Policy – OECD – June 2024 OECD discussion
Pro-competitive Industrial Policy – OECD – June 2024 OECD discussionPro-competitive Industrial Policy – OECD – June 2024 OECD discussion
Pro-competitive Industrial Policy – OECD – June 2024 OECD discussion
 
Suzanne Lagerweij - Influence Without Power - Why Empathy is Your Best Friend...
Suzanne Lagerweij - Influence Without Power - Why Empathy is Your Best Friend...Suzanne Lagerweij - Influence Without Power - Why Empathy is Your Best Friend...
Suzanne Lagerweij - Influence Without Power - Why Empathy is Your Best Friend...
 
BRIC_2024_2024-06-06-11:30-haunschild_archival_version.pdf
BRIC_2024_2024-06-06-11:30-haunschild_archival_version.pdfBRIC_2024_2024-06-06-11:30-haunschild_archival_version.pdf
BRIC_2024_2024-06-06-11:30-haunschild_archival_version.pdf
 
Artificial Intelligence, Data and Competition – ČORBA – June 2024 OECD discus...
Artificial Intelligence, Data and Competition – ČORBA – June 2024 OECD discus...Artificial Intelligence, Data and Competition – ČORBA – June 2024 OECD discus...
Artificial Intelligence, Data and Competition – ČORBA – June 2024 OECD discus...
 
Artificial Intelligence, Data and Competition – LIM – June 2024 OECD discussion
Artificial Intelligence, Data and Competition – LIM – June 2024 OECD discussionArtificial Intelligence, Data and Competition – LIM – June 2024 OECD discussion
Artificial Intelligence, Data and Competition – LIM – June 2024 OECD discussion
 
Competition and Regulation in Professions and Occupations – ROBSON – June 202...
Competition and Regulation in Professions and Occupations – ROBSON – June 202...Competition and Regulation in Professions and Occupations – ROBSON – June 202...
Competition and Regulation in Professions and Occupations – ROBSON – June 202...
 
Burning Issue Presentation By Kenmaryon.pdf
Burning Issue Presentation By Kenmaryon.pdfBurning Issue Presentation By Kenmaryon.pdf
Burning Issue Presentation By Kenmaryon.pdf
 
Artificial Intelligence, Data and Competition – OECD – June 2024 OECD discussion
Artificial Intelligence, Data and Competition – OECD – June 2024 OECD discussionArtificial Intelligence, Data and Competition – OECD – June 2024 OECD discussion
Artificial Intelligence, Data and Competition – OECD – June 2024 OECD discussion
 
XP 2024 presentation: A New Look to Leadership
XP 2024 presentation: A New Look to LeadershipXP 2024 presentation: A New Look to Leadership
XP 2024 presentation: A New Look to Leadership
 
2024-05-30_meetup_devops_aix-marseille.pdf
2024-05-30_meetup_devops_aix-marseille.pdf2024-05-30_meetup_devops_aix-marseille.pdf
2024-05-30_meetup_devops_aix-marseille.pdf
 
Pro-competitive Industrial Policy – LANE – June 2024 OECD discussion
Pro-competitive Industrial Policy – LANE – June 2024 OECD discussionPro-competitive Industrial Policy – LANE – June 2024 OECD discussion
Pro-competitive Industrial Policy – LANE – June 2024 OECD discussion
 
ASONAM2023_presection_slide_track-recommendation.pdf
ASONAM2023_presection_slide_track-recommendation.pdfASONAM2023_presection_slide_track-recommendation.pdf
ASONAM2023_presection_slide_track-recommendation.pdf
 
Mẫu PPT kế hoạch làm việc sáng tạo cho nửa cuối năm PowerPoint
Mẫu PPT kế hoạch làm việc sáng tạo cho nửa cuối năm PowerPointMẫu PPT kế hoạch làm việc sáng tạo cho nửa cuối năm PowerPoint
Mẫu PPT kế hoạch làm việc sáng tạo cho nửa cuối năm PowerPoint
 
Collapsing Narratives: Exploring Non-Linearity • a micro report by Rosie Wells
Collapsing Narratives: Exploring Non-Linearity • a micro report by Rosie WellsCollapsing Narratives: Exploring Non-Linearity • a micro report by Rosie Wells
Collapsing Narratives: Exploring Non-Linearity • a micro report by Rosie Wells
 
Tom tresser burning issue.pptx My Burning issue
Tom tresser burning issue.pptx My Burning issueTom tresser burning issue.pptx My Burning issue
Tom tresser burning issue.pptx My Burning issue
 

1 - MoWR - Overview of HP-III Workshop-15th Sep 2014

  • 1. RELIABLE, TIMELY, QUALITY, CONSISTENT, PUBLIC DATA Avanish Kant Ministry of Water Resources, River Development & Ganga Rejuvenation Hydrology Project Phase – III Approach towards Integrated Water Resources Management “India Water Resources Management Programme: Hydrology Project” www.indiawrm.org
  • 2. HYDROLOGY PROJECT – the journey so far (1995-2003) Hydrology Project-I (HP-I) was taken up to develop Hydrological Information System (HIS) for collecting hydrological, meteorological, water quality data. (2006-2014) HP-II was taken up to extend and promote the use of Hydrological Information system (HIS) developed under HP-I by all potential users concerned with the Water Resources Planning and Management, both in public and private, thereby contributing to improve productivity and cost effectiveness of water related investments. INDIA HP-1 States New States Map not to scale
  • 3. Highlights of Journey From HP-I to HP-II From Manual Data Collection ------ Real Time Data Acquisition System From Desktop Data Management ------ Web-based Data Management Collating Data into Analyzed Information for Decision Making (DSS Planning, HDA, PDS) Up gradation to real time flood forecasting and reservoir operation systems (RTDSS & RTSF & ROS )
  • 5. 5 Key Achievements under HP-II 1. Upgradation/ strengthening of Hydrological Information System (HIS) A.Construction of Data Centres B.Strengthening of meteorological stations Sl No. Description 1 Manual FCS, Raingauges and SRRG 2 Digital Raingauges and AWS without telemetry 3 Automatic Weather Station (AWS) with telemetry 4 Digital Rain Gauges (DRG) with telemetry
  • 6. 6 Key Achievements under HP-II C. Strengthening of hydrological stations D. Strengthening of Groundwater Monitoring Water Level Recorder Hydrological Equipment 1 Automatic water level recorder - shaft encoder type/Bubbler/RADAR 2 Current Meter 3 ADCP Ground Water 1 DWLR without telemetry 2 DWLR with telemetry Digital GW Recorder
  • 7. 7 Key Achievements under HP-II E. Strengthening of Water Quality stations Sl. N Water Quality monitoring stations 1 Real time Water quality Stations in Ganga and Yamuna by CPCB (10 Parameters) 2 Real time Water quality Stations by CWC (6 parameters) Construction & establishment of Laboratories 3 Level 2+ 4 Level 2 5 Level 1
  • 8. Achievements under HP-II E. Development of Web-based Data Management System
  • 9. 9 Key Achievements under HP-II A.Hydrological Design Aids (HDA) –The tool facilitates and expedites the hydrological design of infrastructure and provides uniform approaches 2. River Basin Planning and Management Tools i.Surface water planning for investments and inter-sectoral water allocation ii.Integrated operation of reservoirs for flood and irrigation management. iii.Conjunctive water use planning for surface and groundwater use iv.Drought monitoring and management v.Water quality management B. Decision Support System (DSS) for Water Resources Planning and Management
  • 10. 10 Key Achievements under HP-II C. Stream Flow Forecasting and Reservoir Operation Systems for Flood Management Bhakra – Beas Basin Upper Krishna & Bhima Basin
  • 11. 11 Key Achievements under HP-II 3. Groundwater Management (Aquifer Mapping) Details Area (sq km) Baswa-Bandikui Watershed, Dausa District, Rajasthan – I – AQRAJ 598 Maner-Khagaul Area, Patna Dist, Bihar II – AQBHR 521 Watershed Nagpur district, Maharashtra - III – AQMAH 360 Parts of Tumkur District, Karnataka - IV – AQKAR 376 Lower Vellar, Cuddalore district, Tamil Nadu - V – AQTND 344 Part of Thar Desert, Jaisalmar District, Rajasthan. - VI – AQDRT 675 •6 pilot projects of aquifer mapping was carried out to develop the framework for large scale mapping. •The projects piloted use of advance techniques including heliborne techniques for faster and accurate mapping of aquifers.
  • 12. 12 Key Achievements under HP-II 4. Purpose Driven Studies (PDS) •39 specific studies have been undertaken across the Hydrology Project implementing agencies (supported by external consultancies or universities where needed) •The studies includes: - groundwater management, - water quality issues, - reservoir sedimentation problems, and - improved water management practices to address crop water needs.
  • 13. 13 India Water Resources Management Programme: Hydrology Project •9 States •6 Central Agencies HP-I INDIA On Going States New States Map not to scale •13 States •8 Central Agencies HP-II HP-III Across All Indian States and UTs HYDROLOGY PROJECT – Journey Ahead
  • 14. 14 Objectives of India Water Resources Management Programme: Hydrology Project Standardize Water Resources monitoring and information system for the country with uniform procedures and database. Modernize water resources assessment at spatio- temporal scale for improved planning and management using physical and remote sensing based techniques. Introduce country wide generic solutions for flood forecasting and water resources management. Introduce site specific solutions for water resources planning and management.
  • 15. Data Repositories to store and serve both raw feed and processed data (on Cloud Platform) Telemetry Dissemination Platforms Crowd-sourced / Community Surveillance Data Earth observation data access via suitable mechanisms (e.g. Internet, GeoNetCast) Web Portals (e.g. integrated hydromet visualization platforms) Stakeholder Alerts Soils Canals Wetlands • • • • • • Rivers GIS and other datasets Data Rescue Data Management & Modeling (for weather, hydrological, inundation & other forecasts – short-term and seasonal) Operational “Bottom-up” Data Acquisition System Control Rooms Manual Monitoring Automated Monitoring Radars Interaction with other Knowledge Base and Analytical Systems “Top-Down” Data Acquisition System Satellite Earth Observation Vision for National Water information Center
  • 16. 16 Components under HP-III Component 1: Upgrading and extension of Ground based Water Resources Monitoring System (WRMS) •Strengthening of National water information center through following. •Modernize monitoring (including real time) system of Water resources including: •Weather: Automatic Weather Stations , rainfall and Snow gauges. •Rivers: Stage/discharge, water quality •Groundwater: Water levels, water quality •Reservoir/tanks: Water level, gate position, outflow and spillways •Water use: irrigation canal system monitoring including canal level, discharge, gate position and canal roster •Water quality for both groundwater and surface water in problem areas. •Sedimentation load monitoring and sedimentation survey in reservoirs. •Introduce Community based and mobile based monitoring in particular for small streams, groundwater and water bodies. •Digitize historical water resources information including water quality and water quantity data. •Upgrade centralized and web-based data storage management and dissemination system including mobile applications for data entry.
  • 17. 17 Components under HP-III Component 2: Development of spatiotemporal, Information and Knowledge Services and Products Upgrade existing IndiaWRIS or National water information centre with following information. •Development of DEM for the entire country for improved flood mapping and other planning: •High resolution such as LIDAR surveys for floodplains, and flood risk maps. •High resolution remote sensing imageries and other supplementary information to develop DEM for other areas. •Develop spatial River Basin information system based on historical data/map/imageries including: •Existing water bodies and their usage. •Canal system network •Landuse and performance of irrigation systems •Inventories of water pollution.
  • 18. Khartoum Asyut Luxor Nasir Reservoir Kassala Kusti Wad Madani Malakal Tana Lake E G Y P T S U D A N S O U T H S U D A N E R I T R E A E T H I O P I A Addis Ababa Asmara Cairo Juba Gonder Bahir Dar Jimma Data source: NOAA, 2006 GDP (million $/sq.km.) Country boundary Major river Capital city Lake/Sea E N T R O Eastern Nile Technical Regional Office 0 - 0.5 2 - 1 2 - 3 4 - 5 6 - 10 11 - 25 26 - 50 51 - 100 101 - 150 151 - 1,194 Monthly Blue Nile Flows at Khartoum Annual Blue Nile Flows at Khartoum Blue Nile Sub-Basin 18 Components under HP-III Component 2: Spatiotemporal, Information and Knowledge Services and Products • Using temporal remote sensing based information to update spatial water resources assessment for entire country including: • Pattern of water storage in water bodies. • Precipitation, snow melt, soil moisture, land use, actual evapotranspiration and soil moisture • Web-based runoff estimates using various procedures/techniques. • Monitoring floods, risk and drought. • Monitoring performance of canal irrigation systems. • Water logging and salinity • Develop a web-based hydrological modelling system for the entire country. • Improve or identify sets of climate forecast systems (in addition to IMD).
  • 19. 19 Components under HP-III Component 3: Tools for planning, design, operation and Management of Water Resources system •Develop generic Flood forecasting models based on rainfall runoff modelling for key locations in entire country. •Develop river basin and reservoir operation systems for specific river basins for IWRM: daily and seasonal planning. •Develop canal operation and scheduling systems using physical and remote sensing based systems. •Issue based studies: Develop detailed information system, models/ assessment tools for site specific issues. •Introduce Hydrological Design Aids (HDA) to all State SW agencies in order to improve current design practices of water resources infrastructure. •Support the shift from “Groundwater Development” to “Groundwater Management” under the 12th Five Year Plan (2012-2017) •Introduce tools for the assessment of potential impacts of future climate changes and land use changes on water resources availability, design floods and droughts through pilot studies.
  • 20. 20 Components under HP-III Component 4: Institutional Strengthening and Capacity Building •Establishment of a permanent WRIS Coordination Secretariat. •Establishment of the National Water Informatics Center, aimed at generating, organizing and providing an up-to-date water database in the public domain with allied themes, and developing value added Information and Knowledge products and services for Integrated Water Resources Management. •Specialized training and international exchange programs for various HIS levels, domestic study tours and international study tours, cross learning from participating States, etc; •Provide Training-of-Trainer (ToT) courses and develop training programs for central agencies (NWA, CGWB, CWPRS, IMD and NIH). •Protocol in action for data sharing and dissemination, joint data validation by Central and State Agencies, and data utilization for design, planning and management purposes.
  • 21. 21 Thanks for your kind attention