CENTRAL WATER COMMISSION
Hydrology Project Phase-I
īƒ˜ To establish a functional hydrological
information system.
īƒ˜ To improve institutional capacity
īƒ˜ Implemented in 9 States viz. Andhra
Pradesh, Chhattisgarh, Gujarat, Karnataka,
Kerala, Madhya
Pradesh, Maharashtra, Orissa, and Tamil
Nadu and 6 Central Agencies viz.
CWC, CGWB, IMD, NIH, CWPRS and MOWR.
īƒ˜ The project started in September, 1995 and
closed on December, 2003.
Hydrology Project
Hydrology Project–II
īƒ˜Cleared by the CCEA in October, 2005.
īƒ˜The agreement was signed on 19th January, 2006
and approved by the GOI in May, 2006.
īƒ˜The overall project objective is to extend and
promote the sustained and effective use of HIS
by all stakeholder.
īƒ˜4 new states (Himachal Pradesh, Punjab Goa &
Pondicherry) & 2 new Central Agencies
(CPCB, BBMB) included in the phase-II of the
project.
īƒ˜The original completion period of HP-II was
June, 2012. The project completion period has
been extended up to May, 2014 by the World
Bank.
Hydrology Project
Institutional Strengthening
īƒ˜Constructed two Lecture halls, one computer lab and
extended Krishna Hostel at NWA, CWC, Pune.
īƒ˜Upgraded Godavari Hostel by installing TV, AC etc in
each room at NWA, CWC, Pune.
īƒ˜Conducted 57 training programmes and trained 1342
officers from Central as well as State official.
īƒ˜19 CWC officials participated in 9 International
Training courses.
Major Activities of CWC
Institutional Strengthening- Contd-
īƒ˜ Development of online Surface Water Information
System (eSWIS) to upgrade the functionality of the
existing SWDES, HYMOS and WISDOM Software(HIS) .
īƒ˜ Installed Real Time Water Quality Monitoring
System(RTWQMS) at three sites namely Agra
(Jawahar Bridge) on river Yamuna, Lucknow on river
Gomti and Moradabad on river Ramganga for
monitoring of 6 parameters The real time water
quality data is available for above sites from 18th
July, 2013 on web site http://cwc.rtwqms.com .
īƒ˜ Three training on e-SWIS was conducted.
Major Activities of CWC
Development of Hydrological Design Aids (Surface
Water”(HDA-SW)
â€ĸ Standardization of Methodologies/protocols for
rational design and analysis and carry out
integrated water resources analysis including
study of hydrology of the complete water system
Components
ī‚§ Assessment of Water Resources Potential -
Availability/yield Assessment (HDA-Y);
ī‚§ Estimation of Design Flood(HDA-F); and
ī‚§ Sediment Rate Estimation(HDA-S)
Vertical Extension
Major Activities of CWC
HDA-SW
īƒ˜ The software is under development .
Following reports have been submitted and accepted:
īƒ˜ State of the Art Report(SAR)
īƒ˜ Inception Reports of all three modules
īƒ˜ Draft Final Report of HDA-F
īƒ˜ Draft Final Report of HDA-S
Financial Component-
Total Cost of the HDA project -- INR 8 Crore (Approx)
Likely booking under HP-II -- INR 3.76 Crore
Balance cost to be booked in other scheme - INR 4.24
Crore.
Vertical Extension – Contd-
īƒ˜ Installed Video-conferencing facilities at
Delhi, Pune, Gandhinagar, Hyderabad, Lucknow, Bhuba
neswar & Coimbatore since October, 2011.
īƒ˜ Lectures on subject matters for training at NWA are
being delivered using Video-conferencing.
īƒ˜ Provided One Atomic Absorption Spectrophotometer
for analysis of trace and toxic metals at National River
Water Quality Laboratory, CWC, New Delhi
īƒ˜ Modernize Hydrological Observation Stations by
installing Acoustic Doppler Current Profilers (ADCP) for
discharge measurement on large rivers at 15 sites
under CWC.
īƒ˜ Procured two set of Arc GIS (Arc Info, Arc 3-D
Analyst, Arc Spatial) software for various application in
water sector.
Other Achievements
Financial Target and Achievement
īƒ˜ Allocation under the Project as per PIP –Rs. 24.90 Crore
īƒ˜ Allocation as per Revised Cost Table, 2013-Rs. 26.73
Crore
īƒ˜ Expenditure upto March 2014- Rs. 17.38Crore
īƒ˜ Reimbursement Claim upto March,2014- Rs.17.38 Crore
īƒ˜ Likely Expenditure by May 31, 2014
ī‚§ On HDA-SW Rs.0.85 Crore
ī‚§ eSWIS Rs.0.73 Crore
ī‚§ Others Rs.0.17 Crore
Total Rs.1.75Crore
But it is very unlikely that payment for above activities
could be made up to May, 2014 due to 1/3 ceiling on the
expenditure imposed by MOWR
īƒ˜ The infrastructure / facility created under HP-II will
be maintained through support provided by the
Government of India under different Plan Schemes.
īƒ˜ Training on the software developed under HP-II will
be provided by trained CWC official as and when
required.
īƒ˜ Dissemination data and application of HIS :
All hydro meteorological data will be entered online
through new eSWIS software and the same will be
disseminated as per Hydro-meteorological Data
Dissemination Policy of MOWR through eSWIS and
www.india-wris.nrsc.gov.in web site.
Post Project Plan for continuation of HP-II
activities
īƒ˜ Hydrology Project has been implemented mainly in
Peninsular India.
īƒ˜ There is need to expand the project in remaining parts
of India also to cover all hydrological basins of India
for better management of water resources.
īƒ˜ The Project should be initiated in the early phase of
starting of Hydrology Project to achieve the target
within stipulated time frame.
īƒ˜ The processes of tender preparation/award also get
delayed due to delay in obtaining clearances from
different authorities. Capacity building as per project
could not achieve because International Training
Courses as stipulated in the project plan could not
materialized.
Lessons Learnt
http://www.cwc.nic.in

More Related Content

What's hot

Social Forestry in India
Social Forestry in IndiaSocial Forestry in India
Social Forestry in India
Priyanka Kureel
 
Disaster management guidelines by NDMA
Disaster management guidelines by NDMADisaster management guidelines by NDMA
Disaster management guidelines by NDMA
Anurag Kolte
 
Disaster management framework in India
Disaster management framework in IndiaDisaster management framework in India
Disaster management framework in India
shrihariprasad2
 
Remote Sensing and GIS in Land Use / Land Cover Mapping
Remote Sensing and GIS in Land Use / Land Cover MappingRemote Sensing and GIS in Land Use / Land Cover Mapping
Remote Sensing and GIS in Land Use / Land Cover Mapping
VenkatKamal1
 
ENVIROMENTAL POLICY OF INDIA
ENVIROMENTAL POLICY OF INDIAENVIROMENTAL POLICY OF INDIA
ENVIROMENTAL POLICY OF INDIA
Ar Naveen Naveen
 
envirinmental policies in india
envirinmental policies in indiaenvirinmental policies in india
envirinmental policies in indiaRorzy Ranji
 
Disaster management ppt
Disaster management pptDisaster management ppt
Disaster management pptAniket Pingale
 
value of biodiversity
  value of biodiversity  value of biodiversity
value of biodiversity
Ghassan Hadi
 
International organizations in disaster management
International organizations in disaster managementInternational organizations in disaster management
International organizations in disaster management
Pramoda Raj
 
Coastal zone manangement & coastal regulation zone
Coastal zone manangement & coastal regulation zoneCoastal zone manangement & coastal regulation zone
Coastal zone manangement & coastal regulation zoneHemant Chandravanshi
 
INtroduction to IPCC
INtroduction to IPCCINtroduction to IPCC
INtroduction to IPCC
ipcc-media
 
Role of GIS and remote sensing in Disaster Management
  Role of GIS and remote sensing in Disaster Management  Role of GIS and remote sensing in Disaster Management
Role of GIS and remote sensing in Disaster Management
Leema Margret A
 
Climate risk management
Climate risk managementClimate risk management
Climate risk management
NAP Events
 
WATER RESOURCE MANAGEMENT FULL NOTES
WATER RESOURCE MANAGEMENT FULL NOTESWATER RESOURCE MANAGEMENT FULL NOTES
WATER RESOURCE MANAGEMENT FULL NOTES
JerinBMonachan
 
National Disaster Response Force & Civil Defence
National Disaster Response Force & Civil DefenceNational Disaster Response Force & Civil Defence
National Disaster Response Force & Civil Defence
NITI Aayog
 
Policy Alignment for Climate Resilient Development in Nepal
Policy Alignment for Climate Resilient Development in NepalPolicy Alignment for Climate Resilient Development in Nepal
Policy Alignment for Climate Resilient Development in Nepal
NAP Global Network
 
Remote sensing & Gis
Remote sensing & GisRemote sensing & Gis
Remote sensing & Gis
gopichand's
 
Disaster Mitigation and Management
Disaster Mitigation and ManagementDisaster Mitigation and Management
Disaster Mitigation and ManagementJNTU
 
EIA
EIAEIA
Chennai flood 2015- causes and effects
Chennai flood 2015- causes and effectsChennai flood 2015- causes and effects
Chennai flood 2015- causes and effects
AbinayaMeenapriya
 

What's hot (20)

Social Forestry in India
Social Forestry in IndiaSocial Forestry in India
Social Forestry in India
 
Disaster management guidelines by NDMA
Disaster management guidelines by NDMADisaster management guidelines by NDMA
Disaster management guidelines by NDMA
 
Disaster management framework in India
Disaster management framework in IndiaDisaster management framework in India
Disaster management framework in India
 
Remote Sensing and GIS in Land Use / Land Cover Mapping
Remote Sensing and GIS in Land Use / Land Cover MappingRemote Sensing and GIS in Land Use / Land Cover Mapping
Remote Sensing and GIS in Land Use / Land Cover Mapping
 
ENVIROMENTAL POLICY OF INDIA
ENVIROMENTAL POLICY OF INDIAENVIROMENTAL POLICY OF INDIA
ENVIROMENTAL POLICY OF INDIA
 
envirinmental policies in india
envirinmental policies in indiaenvirinmental policies in india
envirinmental policies in india
 
Disaster management ppt
Disaster management pptDisaster management ppt
Disaster management ppt
 
value of biodiversity
  value of biodiversity  value of biodiversity
value of biodiversity
 
International organizations in disaster management
International organizations in disaster managementInternational organizations in disaster management
International organizations in disaster management
 
Coastal zone manangement & coastal regulation zone
Coastal zone manangement & coastal regulation zoneCoastal zone manangement & coastal regulation zone
Coastal zone manangement & coastal regulation zone
 
INtroduction to IPCC
INtroduction to IPCCINtroduction to IPCC
INtroduction to IPCC
 
Role of GIS and remote sensing in Disaster Management
  Role of GIS and remote sensing in Disaster Management  Role of GIS and remote sensing in Disaster Management
Role of GIS and remote sensing in Disaster Management
 
Climate risk management
Climate risk managementClimate risk management
Climate risk management
 
WATER RESOURCE MANAGEMENT FULL NOTES
WATER RESOURCE MANAGEMENT FULL NOTESWATER RESOURCE MANAGEMENT FULL NOTES
WATER RESOURCE MANAGEMENT FULL NOTES
 
National Disaster Response Force & Civil Defence
National Disaster Response Force & Civil DefenceNational Disaster Response Force & Civil Defence
National Disaster Response Force & Civil Defence
 
Policy Alignment for Climate Resilient Development in Nepal
Policy Alignment for Climate Resilient Development in NepalPolicy Alignment for Climate Resilient Development in Nepal
Policy Alignment for Climate Resilient Development in Nepal
 
Remote sensing & Gis
Remote sensing & GisRemote sensing & Gis
Remote sensing & Gis
 
Disaster Mitigation and Management
Disaster Mitigation and ManagementDisaster Mitigation and Management
Disaster Mitigation and Management
 
EIA
EIAEIA
EIA
 
Chennai flood 2015- causes and effects
Chennai flood 2015- causes and effectsChennai flood 2015- causes and effects
Chennai flood 2015- causes and effects
 

Similar to Cwc

Andhra pradesh surface water
Andhra pradesh surface waterAndhra pradesh surface water
Andhra pradesh surface waterhydrologywebsite1
 
Wb hydrology project revised (18 09-2014)
Wb hydrology project revised (18 09-2014)Wb hydrology project revised (18 09-2014)
Wb hydrology project revised (18 09-2014)
indiawrm
 
2 - MoWR - HP-III presentation-16th Sep
2 - MoWR - HP-III presentation-16th Sep2 - MoWR - HP-III presentation-16th Sep
2 - MoWR - HP-III presentation-16th Sep
indiawrm
 
Odisha sw wb mission-may14
Odisha sw wb mission-may14Odisha sw wb mission-may14
Odisha sw wb mission-may14hydrologywebsite1
 
Odisha (gw) meeting-07-05-2014
Odisha (gw) meeting-07-05-2014Odisha (gw) meeting-07-05-2014
Odisha (gw) meeting-07-05-2014hydrologyproject0
 
Mh sw optimisation of g&d stations network of maharashtra
Mh sw optimisation of g&d stations network of maharashtraMh sw optimisation of g&d stations network of maharashtra
Mh sw optimisation of g&d stations network of maharashtrahydrologyproject0
 
Tamil nadu wb review tn_hpii_delhi_may2014
Tamil nadu wb review tn_hpii_delhi_may2014Tamil nadu wb review tn_hpii_delhi_may2014
Tamil nadu wb review tn_hpii_delhi_may2014hydrologyproject0
 
Overview of workshop
Overview of workshopOverview of workshop
Overview of workshopHydrologyWebsite
 
Achievement of new state under hp 2 - himachal pradesh in integrated water ma...
Achievement of new state under hp 2 - himachal pradesh in integrated water ma...Achievement of new state under hp 2 - himachal pradesh in integrated water ma...
Achievement of new state under hp 2 - himachal pradesh in integrated water ma...hydrologywebsite1
 
Water resources planning in hp 1 karnataka surface water
Water resources planning in hp 1 karnataka surface waterWater resources planning in hp 1 karnataka surface water
Water resources planning in hp 1 karnataka surface waterhydrologywebsite1
 
1 - MoWR - Overview of HP-III Workshop-15th Sep 2014
1 - MoWR - Overview of HP-III Workshop-15th Sep 20141 - MoWR - Overview of HP-III Workshop-15th Sep 2014
1 - MoWR - Overview of HP-III Workshop-15th Sep 2014
indiawrm
 
Karnataka surface water
Karnataka surface waterKarnataka surface water
Karnataka surface waterhydrologyproject0
 
Upgrading a conventional his an indian example
Upgrading a conventional his   an indian exampleUpgrading a conventional his   an indian example
Upgrading a conventional his an indian examplehydrologywebsite1
 
Download-manuals-general-final report
 Download-manuals-general-final report Download-manuals-general-final report
Download-manuals-general-final reporthydrologywebsite1
 

Similar to Cwc (20)

Andhra pradesh surface water
Andhra pradesh surface waterAndhra pradesh surface water
Andhra pradesh surface water
 
Wb hydrology project revised (18 09-2014)
Wb hydrology project revised (18 09-2014)Wb hydrology project revised (18 09-2014)
Wb hydrology project revised (18 09-2014)
 
2 - MoWR - HP-III presentation-16th Sep
2 - MoWR - HP-III presentation-16th Sep2 - MoWR - HP-III presentation-16th Sep
2 - MoWR - HP-III presentation-16th Sep
 
Odisha sw wb mission-may14
Odisha sw wb mission-may14Odisha sw wb mission-may14
Odisha sw wb mission-may14
 
Background Material
Background MaterialBackground Material
Background Material
 
Odisha (gw) meeting-07-05-2014
Odisha (gw) meeting-07-05-2014Odisha (gw) meeting-07-05-2014
Odisha (gw) meeting-07-05-2014
 
Puducherry
Puducherry Puducherry
Puducherry
 
Mh sw optimisation of g&d stations network of maharashtra
Mh sw optimisation of g&d stations network of maharashtraMh sw optimisation of g&d stations network of maharashtra
Mh sw optimisation of g&d stations network of maharashtra
 
Tamil nadu wb review tn_hpii_delhi_may2014
Tamil nadu wb review tn_hpii_delhi_may2014Tamil nadu wb review tn_hpii_delhi_may2014
Tamil nadu wb review tn_hpii_delhi_may2014
 
Cwprs
CwprsCwprs
Cwprs
 
Kerala ground water
Kerala ground waterKerala ground water
Kerala ground water
 
Overview of workshop
Overview of workshopOverview of workshop
Overview of workshop
 
Achievement of new state under hp 2 - himachal pradesh in integrated water ma...
Achievement of new state under hp 2 - himachal pradesh in integrated water ma...Achievement of new state under hp 2 - himachal pradesh in integrated water ma...
Achievement of new state under hp 2 - himachal pradesh in integrated water ma...
 
Water resources planning in hp 1 karnataka surface water
Water resources planning in hp 1 karnataka surface waterWater resources planning in hp 1 karnataka surface water
Water resources planning in hp 1 karnataka surface water
 
Chhattisgarh
ChhattisgarhChhattisgarh
Chhattisgarh
 
1 - MoWR - Overview of HP-III Workshop-15th Sep 2014
1 - MoWR - Overview of HP-III Workshop-15th Sep 20141 - MoWR - Overview of HP-III Workshop-15th Sep 2014
1 - MoWR - Overview of HP-III Workshop-15th Sep 2014
 
Karnataka surface water
Karnataka surface waterKarnataka surface water
Karnataka surface water
 
Upgrading a conventional his an indian example
Upgrading a conventional his   an indian exampleUpgrading a conventional his   an indian example
Upgrading a conventional his an indian example
 
Pcs 070514
Pcs 070514Pcs 070514
Pcs 070514
 
Download-manuals-general-final report
 Download-manuals-general-final report Download-manuals-general-final report
Download-manuals-general-final report
 

More from hydrologyproject0

Specification purewater
Specification purewaterSpecification purewater
Specification purewaterhydrologyproject0
 
Water purifier ion exchange resin column
Water purifier ion exchange resin columnWater purifier ion exchange resin column
Water purifier ion exchange resin columnhydrologyproject0
 
Water purifier, double distillation unit
Water purifier, double distillation unitWater purifier, double distillation unit
Water purifier, double distillation unithydrologyproject0
 
Water purifier, distillation unit (automatic)
Water purifier, distillation unit (automatic)Water purifier, distillation unit (automatic)
Water purifier, distillation unit (automatic)hydrologyproject0
 
Water bath, general purpose
Water bath, general purposeWater bath, general purpose
Water bath, general purposehydrologyproject0
 
Water bath, bacteriological
Water bath, bacteriologicalWater bath, bacteriological
Water bath, bacteriologicalhydrologyproject0
 
Visual accumulation tube
Visual accumulation tubeVisual accumulation tube
Visual accumulation tubehydrologyproject0
 
Turbidity meter (nephelometer)
Turbidity meter (nephelometer)Turbidity meter (nephelometer)
Turbidity meter (nephelometer)hydrologyproject0
 
Toc analyser, microprocessor controlled
Toc analyser, microprocessor controlledToc analyser, microprocessor controlled
Toc analyser, microprocessor controlledhydrologyproject0
 
Test sieves with shaker
Test sieves with shakerTest sieves with shaker
Test sieves with shakerhydrologyproject0
 
Stirrer, magnetic (with hot plate)
Stirrer, magnetic (with hot plate)Stirrer, magnetic (with hot plate)
Stirrer, magnetic (with hot plate)hydrologyproject0
 

More from hydrologyproject0 (20)

Specification purewater
Specification purewaterSpecification purewater
Specification purewater
 
Water purifier ion exchange resin column
Water purifier ion exchange resin columnWater purifier ion exchange resin column
Water purifier ion exchange resin column
 
Water purifier, double distillation unit
Water purifier, double distillation unitWater purifier, double distillation unit
Water purifier, double distillation unit
 
Water purifier, distillation unit (automatic)
Water purifier, distillation unit (automatic)Water purifier, distillation unit (automatic)
Water purifier, distillation unit (automatic)
 
Water geyser (heater)
Water geyser (heater)Water geyser (heater)
Water geyser (heater)
 
Water bath, general purpose
Water bath, general purposeWater bath, general purpose
Water bath, general purpose
 
Water bath, bacteriological
Water bath, bacteriologicalWater bath, bacteriological
Water bath, bacteriological
 
Wash bottle
Wash bottleWash bottle
Wash bottle
 
Volumetric flask
Volumetric flaskVolumetric flask
Volumetric flask
 
Visual accumulation tube
Visual accumulation tubeVisual accumulation tube
Visual accumulation tube
 
Vacuum pump
Vacuum pumpVacuum pump
Vacuum pump
 
Turbidity meter (nephelometer)
Turbidity meter (nephelometer)Turbidity meter (nephelometer)
Turbidity meter (nephelometer)
 
Tool kit
Tool kitTool kit
Tool kit
 
Toc analyser, microprocessor controlled
Toc analyser, microprocessor controlledToc analyser, microprocessor controlled
Toc analyser, microprocessor controlled
 
Tissue grinder
Tissue grinderTissue grinder
Tissue grinder
 
Thermometers, set of
Thermometers, set ofThermometers, set of
Thermometers, set of
 
Test tubes
Test tubesTest tubes
Test tubes
 
Test sieves with shaker
Test sieves with shakerTest sieves with shaker
Test sieves with shaker
 
Stirrer, magnetic (with hot plate)
Stirrer, magnetic (with hot plate)Stirrer, magnetic (with hot plate)
Stirrer, magnetic (with hot plate)
 
Sterliser, autoclave
Sterliser, autoclaveSterliser, autoclave
Sterliser, autoclave
 

Recently uploaded

Dev Dives: Train smarter, not harder – active learning and UiPath LLMs for do...
Dev Dives: Train smarter, not harder – active learning and UiPath LLMs for do...Dev Dives: Train smarter, not harder – active learning and UiPath LLMs for do...
Dev Dives: Train smarter, not harder – active learning and UiPath LLMs for do...
UiPathCommunity
 
Kubernetes & AI - Beauty and the Beast !?! @KCD Istanbul 2024
Kubernetes & AI - Beauty and the Beast !?! @KCD Istanbul 2024Kubernetes & AI - Beauty and the Beast !?! @KCD Istanbul 2024
Kubernetes & AI - Beauty and the Beast !?! @KCD Istanbul 2024
Tobias Schneck
 
Transcript: Selling digital books in 2024: Insights from industry leaders - T...
Transcript: Selling digital books in 2024: Insights from industry leaders - T...Transcript: Selling digital books in 2024: Insights from industry leaders - T...
Transcript: Selling digital books in 2024: Insights from industry leaders - T...
BookNet Canada
 
The Art of the Pitch: WordPress Relationships and Sales
The Art of the Pitch: WordPress Relationships and SalesThe Art of the Pitch: WordPress Relationships and Sales
The Art of the Pitch: WordPress Relationships and Sales
Laura Byrne
 
Neuro-symbolic is not enough, we need neuro-*semantic*
Neuro-symbolic is not enough, we need neuro-*semantic*Neuro-symbolic is not enough, we need neuro-*semantic*
Neuro-symbolic is not enough, we need neuro-*semantic*
Frank van Harmelen
 
FIDO Alliance Osaka Seminar: Overview.pdf
FIDO Alliance Osaka Seminar: Overview.pdfFIDO Alliance Osaka Seminar: Overview.pdf
FIDO Alliance Osaka Seminar: Overview.pdf
FIDO Alliance
 
How world-class product teams are winning in the AI era by CEO and Founder, P...
How world-class product teams are winning in the AI era by CEO and Founder, P...How world-class product teams are winning in the AI era by CEO and Founder, P...
How world-class product teams are winning in the AI era by CEO and Founder, P...
Product School
 
Assuring Contact Center Experiences for Your Customers With ThousandEyes
Assuring Contact Center Experiences for Your Customers With ThousandEyesAssuring Contact Center Experiences for Your Customers With ThousandEyes
Assuring Contact Center Experiences for Your Customers With ThousandEyes
ThousandEyes
 
LF Energy Webinar: Electrical Grid Modelling and Simulation Through PowSyBl -...
LF Energy Webinar: Electrical Grid Modelling and Simulation Through PowSyBl -...LF Energy Webinar: Electrical Grid Modelling and Simulation Through PowSyBl -...
LF Energy Webinar: Electrical Grid Modelling and Simulation Through PowSyBl -...
DanBrown980551
 
Knowledge engineering: from people to machines and back
Knowledge engineering: from people to machines and backKnowledge engineering: from people to machines and back
Knowledge engineering: from people to machines and back
Elena Simperl
 
Key Trends Shaping the Future of Infrastructure.pdf
Key Trends Shaping the Future of Infrastructure.pdfKey Trends Shaping the Future of Infrastructure.pdf
Key Trends Shaping the Future of Infrastructure.pdf
Cheryl Hung
 
FIDO Alliance Osaka Seminar: FIDO Security Aspects.pdf
FIDO Alliance Osaka Seminar: FIDO Security Aspects.pdfFIDO Alliance Osaka Seminar: FIDO Security Aspects.pdf
FIDO Alliance Osaka Seminar: FIDO Security Aspects.pdf
FIDO Alliance
 
Designing Great Products: The Power of Design and Leadership by Chief Designe...
Designing Great Products: The Power of Design and Leadership by Chief Designe...Designing Great Products: The Power of Design and Leadership by Chief Designe...
Designing Great Products: The Power of Design and Leadership by Chief Designe...
Product School
 
Software Delivery At the Speed of AI: Inflectra Invests In AI-Powered Quality
Software Delivery At the Speed of AI: Inflectra Invests In AI-Powered QualitySoftware Delivery At the Speed of AI: Inflectra Invests In AI-Powered Quality
Software Delivery At the Speed of AI: Inflectra Invests In AI-Powered Quality
Inflectra
 
Builder.ai Founder Sachin Dev Duggal's Strategic Approach to Create an Innova...
Builder.ai Founder Sachin Dev Duggal's Strategic Approach to Create an Innova...Builder.ai Founder Sachin Dev Duggal's Strategic Approach to Create an Innova...
Builder.ai Founder Sachin Dev Duggal's Strategic Approach to Create an Innova...
Ramesh Iyer
 
Empowering NextGen Mobility via Large Action Model Infrastructure (LAMI): pav...
Empowering NextGen Mobility via Large Action Model Infrastructure (LAMI): pav...Empowering NextGen Mobility via Large Action Model Infrastructure (LAMI): pav...
Empowering NextGen Mobility via Large Action Model Infrastructure (LAMI): pav...
Thierry Lestable
 
JMeter webinar - integration with InfluxDB and Grafana
JMeter webinar - integration with InfluxDB and GrafanaJMeter webinar - integration with InfluxDB and Grafana
JMeter webinar - integration with InfluxDB and Grafana
RTTS
 
Securing your Kubernetes cluster_ a step-by-step guide to success !
Securing your Kubernetes cluster_ a step-by-step guide to success !Securing your Kubernetes cluster_ a step-by-step guide to success !
Securing your Kubernetes cluster_ a step-by-step guide to success !
KatiaHIMEUR1
 
UiPath Test Automation using UiPath Test Suite series, part 3
UiPath Test Automation using UiPath Test Suite series, part 3UiPath Test Automation using UiPath Test Suite series, part 3
UiPath Test Automation using UiPath Test Suite series, part 3
DianaGray10
 
To Graph or Not to Graph Knowledge Graph Architectures and LLMs
To Graph or Not to Graph Knowledge Graph Architectures and LLMsTo Graph or Not to Graph Knowledge Graph Architectures and LLMs
To Graph or Not to Graph Knowledge Graph Architectures and LLMs
Paul Groth
 

Recently uploaded (20)

Dev Dives: Train smarter, not harder – active learning and UiPath LLMs for do...
Dev Dives: Train smarter, not harder – active learning and UiPath LLMs for do...Dev Dives: Train smarter, not harder – active learning and UiPath LLMs for do...
Dev Dives: Train smarter, not harder – active learning and UiPath LLMs for do...
 
Kubernetes & AI - Beauty and the Beast !?! @KCD Istanbul 2024
Kubernetes & AI - Beauty and the Beast !?! @KCD Istanbul 2024Kubernetes & AI - Beauty and the Beast !?! @KCD Istanbul 2024
Kubernetes & AI - Beauty and the Beast !?! @KCD Istanbul 2024
 
Transcript: Selling digital books in 2024: Insights from industry leaders - T...
Transcript: Selling digital books in 2024: Insights from industry leaders - T...Transcript: Selling digital books in 2024: Insights from industry leaders - T...
Transcript: Selling digital books in 2024: Insights from industry leaders - T...
 
The Art of the Pitch: WordPress Relationships and Sales
The Art of the Pitch: WordPress Relationships and SalesThe Art of the Pitch: WordPress Relationships and Sales
The Art of the Pitch: WordPress Relationships and Sales
 
Neuro-symbolic is not enough, we need neuro-*semantic*
Neuro-symbolic is not enough, we need neuro-*semantic*Neuro-symbolic is not enough, we need neuro-*semantic*
Neuro-symbolic is not enough, we need neuro-*semantic*
 
FIDO Alliance Osaka Seminar: Overview.pdf
FIDO Alliance Osaka Seminar: Overview.pdfFIDO Alliance Osaka Seminar: Overview.pdf
FIDO Alliance Osaka Seminar: Overview.pdf
 
How world-class product teams are winning in the AI era by CEO and Founder, P...
How world-class product teams are winning in the AI era by CEO and Founder, P...How world-class product teams are winning in the AI era by CEO and Founder, P...
How world-class product teams are winning in the AI era by CEO and Founder, P...
 
Assuring Contact Center Experiences for Your Customers With ThousandEyes
Assuring Contact Center Experiences for Your Customers With ThousandEyesAssuring Contact Center Experiences for Your Customers With ThousandEyes
Assuring Contact Center Experiences for Your Customers With ThousandEyes
 
LF Energy Webinar: Electrical Grid Modelling and Simulation Through PowSyBl -...
LF Energy Webinar: Electrical Grid Modelling and Simulation Through PowSyBl -...LF Energy Webinar: Electrical Grid Modelling and Simulation Through PowSyBl -...
LF Energy Webinar: Electrical Grid Modelling and Simulation Through PowSyBl -...
 
Knowledge engineering: from people to machines and back
Knowledge engineering: from people to machines and backKnowledge engineering: from people to machines and back
Knowledge engineering: from people to machines and back
 
Key Trends Shaping the Future of Infrastructure.pdf
Key Trends Shaping the Future of Infrastructure.pdfKey Trends Shaping the Future of Infrastructure.pdf
Key Trends Shaping the Future of Infrastructure.pdf
 
FIDO Alliance Osaka Seminar: FIDO Security Aspects.pdf
FIDO Alliance Osaka Seminar: FIDO Security Aspects.pdfFIDO Alliance Osaka Seminar: FIDO Security Aspects.pdf
FIDO Alliance Osaka Seminar: FIDO Security Aspects.pdf
 
Designing Great Products: The Power of Design and Leadership by Chief Designe...
Designing Great Products: The Power of Design and Leadership by Chief Designe...Designing Great Products: The Power of Design and Leadership by Chief Designe...
Designing Great Products: The Power of Design and Leadership by Chief Designe...
 
Software Delivery At the Speed of AI: Inflectra Invests In AI-Powered Quality
Software Delivery At the Speed of AI: Inflectra Invests In AI-Powered QualitySoftware Delivery At the Speed of AI: Inflectra Invests In AI-Powered Quality
Software Delivery At the Speed of AI: Inflectra Invests In AI-Powered Quality
 
Builder.ai Founder Sachin Dev Duggal's Strategic Approach to Create an Innova...
Builder.ai Founder Sachin Dev Duggal's Strategic Approach to Create an Innova...Builder.ai Founder Sachin Dev Duggal's Strategic Approach to Create an Innova...
Builder.ai Founder Sachin Dev Duggal's Strategic Approach to Create an Innova...
 
Empowering NextGen Mobility via Large Action Model Infrastructure (LAMI): pav...
Empowering NextGen Mobility via Large Action Model Infrastructure (LAMI): pav...Empowering NextGen Mobility via Large Action Model Infrastructure (LAMI): pav...
Empowering NextGen Mobility via Large Action Model Infrastructure (LAMI): pav...
 
JMeter webinar - integration with InfluxDB and Grafana
JMeter webinar - integration with InfluxDB and GrafanaJMeter webinar - integration with InfluxDB and Grafana
JMeter webinar - integration with InfluxDB and Grafana
 
Securing your Kubernetes cluster_ a step-by-step guide to success !
Securing your Kubernetes cluster_ a step-by-step guide to success !Securing your Kubernetes cluster_ a step-by-step guide to success !
Securing your Kubernetes cluster_ a step-by-step guide to success !
 
UiPath Test Automation using UiPath Test Suite series, part 3
UiPath Test Automation using UiPath Test Suite series, part 3UiPath Test Automation using UiPath Test Suite series, part 3
UiPath Test Automation using UiPath Test Suite series, part 3
 
To Graph or Not to Graph Knowledge Graph Architectures and LLMs
To Graph or Not to Graph Knowledge Graph Architectures and LLMsTo Graph or Not to Graph Knowledge Graph Architectures and LLMs
To Graph or Not to Graph Knowledge Graph Architectures and LLMs
 

Cwc

  • 2. Hydrology Project Phase-I īƒ˜ To establish a functional hydrological information system. īƒ˜ To improve institutional capacity īƒ˜ Implemented in 9 States viz. Andhra Pradesh, Chhattisgarh, Gujarat, Karnataka, Kerala, Madhya Pradesh, Maharashtra, Orissa, and Tamil Nadu and 6 Central Agencies viz. CWC, CGWB, IMD, NIH, CWPRS and MOWR. īƒ˜ The project started in September, 1995 and closed on December, 2003. Hydrology Project
  • 3. Hydrology Project–II īƒ˜Cleared by the CCEA in October, 2005. īƒ˜The agreement was signed on 19th January, 2006 and approved by the GOI in May, 2006. īƒ˜The overall project objective is to extend and promote the sustained and effective use of HIS by all stakeholder. īƒ˜4 new states (Himachal Pradesh, Punjab Goa & Pondicherry) & 2 new Central Agencies (CPCB, BBMB) included in the phase-II of the project. īƒ˜The original completion period of HP-II was June, 2012. The project completion period has been extended up to May, 2014 by the World Bank. Hydrology Project
  • 4. Institutional Strengthening īƒ˜Constructed two Lecture halls, one computer lab and extended Krishna Hostel at NWA, CWC, Pune. īƒ˜Upgraded Godavari Hostel by installing TV, AC etc in each room at NWA, CWC, Pune. īƒ˜Conducted 57 training programmes and trained 1342 officers from Central as well as State official. īƒ˜19 CWC officials participated in 9 International Training courses. Major Activities of CWC
  • 5. Institutional Strengthening- Contd- īƒ˜ Development of online Surface Water Information System (eSWIS) to upgrade the functionality of the existing SWDES, HYMOS and WISDOM Software(HIS) . īƒ˜ Installed Real Time Water Quality Monitoring System(RTWQMS) at three sites namely Agra (Jawahar Bridge) on river Yamuna, Lucknow on river Gomti and Moradabad on river Ramganga for monitoring of 6 parameters The real time water quality data is available for above sites from 18th July, 2013 on web site http://cwc.rtwqms.com . īƒ˜ Three training on e-SWIS was conducted. Major Activities of CWC
  • 6. Development of Hydrological Design Aids (Surface Water”(HDA-SW) â€ĸ Standardization of Methodologies/protocols for rational design and analysis and carry out integrated water resources analysis including study of hydrology of the complete water system Components ī‚§ Assessment of Water Resources Potential - Availability/yield Assessment (HDA-Y); ī‚§ Estimation of Design Flood(HDA-F); and ī‚§ Sediment Rate Estimation(HDA-S) Vertical Extension Major Activities of CWC
  • 7. HDA-SW īƒ˜ The software is under development . Following reports have been submitted and accepted: īƒ˜ State of the Art Report(SAR) īƒ˜ Inception Reports of all three modules īƒ˜ Draft Final Report of HDA-F īƒ˜ Draft Final Report of HDA-S Financial Component- Total Cost of the HDA project -- INR 8 Crore (Approx) Likely booking under HP-II -- INR 3.76 Crore Balance cost to be booked in other scheme - INR 4.24 Crore. Vertical Extension – Contd-
  • 8. īƒ˜ Installed Video-conferencing facilities at Delhi, Pune, Gandhinagar, Hyderabad, Lucknow, Bhuba neswar & Coimbatore since October, 2011. īƒ˜ Lectures on subject matters for training at NWA are being delivered using Video-conferencing. īƒ˜ Provided One Atomic Absorption Spectrophotometer for analysis of trace and toxic metals at National River Water Quality Laboratory, CWC, New Delhi īƒ˜ Modernize Hydrological Observation Stations by installing Acoustic Doppler Current Profilers (ADCP) for discharge measurement on large rivers at 15 sites under CWC. īƒ˜ Procured two set of Arc GIS (Arc Info, Arc 3-D Analyst, Arc Spatial) software for various application in water sector. Other Achievements
  • 9. Financial Target and Achievement īƒ˜ Allocation under the Project as per PIP –Rs. 24.90 Crore īƒ˜ Allocation as per Revised Cost Table, 2013-Rs. 26.73 Crore īƒ˜ Expenditure upto March 2014- Rs. 17.38Crore īƒ˜ Reimbursement Claim upto March,2014- Rs.17.38 Crore īƒ˜ Likely Expenditure by May 31, 2014 ī‚§ On HDA-SW Rs.0.85 Crore ī‚§ eSWIS Rs.0.73 Crore ī‚§ Others Rs.0.17 Crore Total Rs.1.75Crore But it is very unlikely that payment for above activities could be made up to May, 2014 due to 1/3 ceiling on the expenditure imposed by MOWR
  • 10. īƒ˜ The infrastructure / facility created under HP-II will be maintained through support provided by the Government of India under different Plan Schemes. īƒ˜ Training on the software developed under HP-II will be provided by trained CWC official as and when required. īƒ˜ Dissemination data and application of HIS : All hydro meteorological data will be entered online through new eSWIS software and the same will be disseminated as per Hydro-meteorological Data Dissemination Policy of MOWR through eSWIS and www.india-wris.nrsc.gov.in web site. Post Project Plan for continuation of HP-II activities
  • 11. īƒ˜ Hydrology Project has been implemented mainly in Peninsular India. īƒ˜ There is need to expand the project in remaining parts of India also to cover all hydrological basins of India for better management of water resources. īƒ˜ The Project should be initiated in the early phase of starting of Hydrology Project to achieve the target within stipulated time frame. īƒ˜ The processes of tender preparation/award also get delayed due to delay in obtaining clearances from different authorities. Capacity building as per project could not achieve because International Training Courses as stipulated in the project plan could not materialized. Lessons Learnt