BIM Dimensions Explained- 3D, 4D, 5D, 6D and 7D- Definition and BenefitsUnited-BIM
A BIM model can be utilized for pre-defined specific purposes, commonly known as use-cases. According to project stage requirements and project complexity, specific parameters are added to the existing information contained in BIM. These additions of pre-defined used cases can be described as BIM dimensions.
These dimensions enhance the data associated with a model to share a greater level of understanding of a construction project.
In the modern era, BIM technology has evolved from basic 3D & 4D dimensions to more sophisticated 5D, 6D & 7D dimensions that are poised to change the future of the AEC industry.
Guide to Architectural Surveys and the RIBA Digital Plan of WorksC A Design Services
Architects using the RIBA Digital Plan of Works need to know how to use topographic and measured building survey data effectively in the design and construction process. This guide discusses each Stage, the surveys required and important considerations.
Read the full article here:
cadsonline.com/survey-data-and-the-riba-plan-of-works
Building information modelling (BIM) is a process involving the generation and management of digital representations of physical and functional characteristics of places. Building information models (BIMs) are files (often but not always in proprietary formats and containing proprietary data) which can be extracted, exchanged or networked to support decision-making regarding a building or other built asset.
Project Management Methodology for Site LaunchesMichael Eydman
This deck summarizes the approach to project lifecycle methodology used by typical consumer goods or brand site launch initiative. It also includes a recommended process for incremental feature release process. It can be used as a guide for managing projects within this context. I would encourage an operations team to adapt it to your organizational structure and stakeholder's teams.
BIM Dimensions Explained- 3D, 4D, 5D, 6D and 7D- Definition and BenefitsUnited-BIM
A BIM model can be utilized for pre-defined specific purposes, commonly known as use-cases. According to project stage requirements and project complexity, specific parameters are added to the existing information contained in BIM. These additions of pre-defined used cases can be described as BIM dimensions.
These dimensions enhance the data associated with a model to share a greater level of understanding of a construction project.
In the modern era, BIM technology has evolved from basic 3D & 4D dimensions to more sophisticated 5D, 6D & 7D dimensions that are poised to change the future of the AEC industry.
Guide to Architectural Surveys and the RIBA Digital Plan of WorksC A Design Services
Architects using the RIBA Digital Plan of Works need to know how to use topographic and measured building survey data effectively in the design and construction process. This guide discusses each Stage, the surveys required and important considerations.
Read the full article here:
cadsonline.com/survey-data-and-the-riba-plan-of-works
Building information modelling (BIM) is a process involving the generation and management of digital representations of physical and functional characteristics of places. Building information models (BIMs) are files (often but not always in proprietary formats and containing proprietary data) which can be extracted, exchanged or networked to support decision-making regarding a building or other built asset.
Project Management Methodology for Site LaunchesMichael Eydman
This deck summarizes the approach to project lifecycle methodology used by typical consumer goods or brand site launch initiative. It also includes a recommended process for incremental feature release process. It can be used as a guide for managing projects within this context. I would encourage an operations team to adapt it to your organizational structure and stakeholder's teams.
Chat application through client server management system project.pdfKamal Acharya
This project focused on creating a chatting application with communication environment. The objective of our project is to build a chatting system to facilitate the communication between two or more clients to obtain an effective channel among the clients themselves. For the application itself, this system can serve as a link to reach out for all clients. The design of the system depends on socket concept where is a software endpoint that establishes bidirectional communication between a server program and one or more client programs. Languages that will be used for the development of this system: Java Development Kit (JDK): is a development environment for building applications and components using the Java programming language.
Vaccine management system project report documentation..pdfKamal Acharya
The Division of Vaccine and Immunization is facing increasing difficulty monitoring vaccines and other commodities distribution once they have been distributed from the national stores. With the introduction of new vaccines, more challenges have been anticipated with this additions posing serious threat to the already over strained vaccine supply chain system in Kenya.
Final project report on grocery store management system..pdfKamal Acharya
In today’s fast-changing business environment, it’s extremely important to be able to respond to client needs in the most effective and timely manner. If your customers wish to see your business online and have instant access to your products or services.
Online Grocery Store is an e-commerce website, which retails various grocery products. This project allows viewing various products available enables registered users to purchase desired products instantly using Paytm, UPI payment processor (Instant Pay) and also can place order by using Cash on Delivery (Pay Later) option. This project provides an easy access to Administrators and Managers to view orders placed using Pay Later and Instant Pay options.
In order to develop an e-commerce website, a number of Technologies must be studied and understood. These include multi-tiered architecture, server and client-side scripting techniques, implementation technologies, programming language (such as PHP, HTML, CSS, JavaScript) and MySQL relational databases. This is a project with the objective to develop a basic website where a consumer is provided with a shopping cart website and also to know about the technologies used to develop such a website.
This document will discuss each of the underlying technologies to create and implement an e- commerce website.
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)MdTanvirMahtab2
This presentation is about the working procedure of Shahjalal Fertilizer Company Limited (SFCL). A Govt. owned Company of Bangladesh Chemical Industries Corporation under Ministry of Industries.
Welcome to WIPAC Monthly the magazine brought to you by the LinkedIn Group Water Industry Process Automation & Control.
In this month's edition, along with this month's industry news to celebrate the 13 years since the group was created we have articles including
A case study of the used of Advanced Process Control at the Wastewater Treatment works at Lleida in Spain
A look back on an article on smart wastewater networks in order to see how the industry has measured up in the interim around the adoption of Digital Transformation in the Water Industry.
This document is by explosives industry in which document discussed manufacturing process and flow charts details by nitric acid and sulfuric acid and tetra benzene and step by step details of explosive industry explosives industry is produced raw materials and manufacture it by manufacturing process
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...Dr.Costas Sachpazis
Terzaghi's soil bearing capacity theory, developed by Karl Terzaghi, is a fundamental principle in geotechnical engineering used to determine the bearing capacity of shallow foundations. This theory provides a method to calculate the ultimate bearing capacity of soil, which is the maximum load per unit area that the soil can support without undergoing shear failure. The Calculation HTML Code included.
Overview of the fundamental roles in Hydropower generation and the components involved in wider Electrical Engineering.
This paper presents the design and construction of hydroelectric dams from the hydrologist’s survey of the valley before construction, all aspects and involved disciplines, fluid dynamics, structural engineering, generation and mains frequency regulation to the very transmission of power through the network in the United Kingdom.
Author: Robbie Edward Sayers
Collaborators and co editors: Charlie Sims and Connor Healey.
(C) 2024 Robbie E. Sayers
Immunizing Image Classifiers Against Localized Adversary Attacksgerogepatton
This paper addresses the vulnerability of deep learning models, particularly convolutional neural networks
(CNN)s, to adversarial attacks and presents a proactive training technique designed to counter them. We
introduce a novel volumization algorithm, which transforms 2D images into 3D volumetric representations.
When combined with 3D convolution and deep curriculum learning optimization (CLO), itsignificantly improves
the immunity of models against localized universal attacks by up to 40%. We evaluate our proposed approach
using contemporary CNN architectures and the modified Canadian Institute for Advanced Research (CIFAR-10
and CIFAR-100) and ImageNet Large Scale Visual Recognition Challenge (ILSVRC12) datasets, showcasing
accuracy improvements over previous techniques. The results indicate that the combination of the volumetric
input and curriculum learning holds significant promise for mitigating adversarial attacks without necessitating
adversary training.
Toll tax management system project report..pdfKamal Acharya
Toll Tax Management System is a web based application that can provide all the information related to toll plazas and the passenger checks in and pays the amount, then he/she will be provided by a receipt. With this receipt he/she can leave the toll booth without waiting for any verification call.
The information would also cover registration of staff, toll plaza collection, toll plaza collection entry for vehicles, date wise report entry, Vehicle passes and passes reports b/w dates.
Automobile Management System Project Report.pdfKamal Acharya
The proposed project is developed to manage the automobile in the automobile dealer company. The main module in this project is login, automobile management, customer management, sales, complaints and reports. The first module is the login. The automobile showroom owner should login to the project for usage. The username and password are verified and if it is correct, next form opens. If the username and password are not correct, it shows the error message.
When a customer search for a automobile, if the automobile is available, they will be taken to a page that shows the details of the automobile including automobile name, automobile ID, quantity, price etc. “Automobile Management System” is useful for maintaining automobiles, customers effectively and hence helps for establishing good relation between customer and automobile organization. It contains various customized modules for effectively maintaining automobiles and stock information accurately and safely.
When the automobile is sold to the customer, stock will be reduced automatically. When a new purchase is made, stock will be increased automatically. While selecting automobiles for sale, the proposed software will automatically check for total number of available stock of that particular item, if the total stock of that particular item is less than 5, software will notify the user to purchase the particular item.
Also when the user tries to sale items which are not in stock, the system will prompt the user that the stock is not enough. Customers of this system can search for a automobile; can purchase a automobile easily by selecting fast. On the other hand the stock of automobiles can be maintained perfectly by the automobile shop manager overcoming the drawbacks of existing system.
Top 13 Famous Civil Engineering Scientistgettygaming1
List of Best Scientist Who Gives Big Contribution in Civil Engineering Filed, in this we provide how they Contribute in Civil Engineering filed, For Data Collection civilthings.com helps us a lot.
1.01 Introduction from DMRC side for project management information system
1. PROJECT MONITORING IN DMRC
THROUGH
STAMP
SYSTEM FOR TRACKING AND
MONITORING PROJECTS
CGM/Project
DMRC
2. MULTI - DIMENSIONAL Building Information Modeling (BIM)
• 3D - Geometry - Three Dimensional (x, y, z) visualisation of the Project.
• Easy collaboration between multiple teams having different areas of expertise.
• Streamlined communication and sharing of design expectations.
• Reduced instances of rework and revisions due clash detection at planning stage itself.
• Model based Cost Estimation and Value Engineering.
• 4D - Time – Timeline, Scheduling and Duration.
• Seamless coordination among Consultants, Client and Contractors.
• Better preparedness in terms of next steps during every construction stage helping to avoid delays.
• 5D - Cost – Real Time Cost visualisation – Planned vs. Actual.
• 6D - Sustainability – Self-Sustainable & Energy Efficient.
• 7D – Facility Manager – Holistic Facility Management Information for entire Lifecycle.
4. FEATURES :
1) Integration with BIM 360 Design Models.
2) Integration with Primavera schedules.
3) Progress Updation from Site through Mobile App on Real Time basis.
4) Integration with Vendor Payment Portal (VPP).
5) Role based Graphical Dashboards for Project monitoring.
6) Visual Progress on 3D BIM Models.
7) Hosting of software on cloud for easy access.
8) Provision for Backing up of Data on On-Premise Server at Metro Bhawan.
STAMP – System for Tracking And Monitoring Projects
5. 5
STAMP will monitor Progress of all the Contract Packages of Civil & System Works of DMRC Phase-IV Project –
Line 7 (Extn.), Line 8 (Extn.), Line 10, Patna Metro Project (Corridor 1 & 2) and all future Projects of DMRC.
STAMP will also monitor issues of work front availability (pre-construction activities) such as Land availability,
Tree Transplantation, Shifting of Services and Design Status.
Physical Progress – Planned vs Actual - can be viewed as on date, one month before and Forecast for future months.
Past and Present Progress at any stage of the Project/Package can be viewed.
All the above features can be viewed on 3D BIM Models.
Revenue Operation Date (ROD) of each Corridor/Line shall be monitored through Master Primavera Schedule
(MPS). MPS consists of activities for Tender Preparation, Process & Award and Execution of all the Contract
Packages of all disciplines of that Corridor/Line and integrated with all Primavera Schedules of all Contract
Packages of that Corridor.
Financial Progress – Planned vs Actual – can be viewed for each contract package for various disciplines and for
each corridor. (Actual Financial Progress from Vendor Payment Portal)
STAMP (5D BIM) –Visual Project Monitoring on Cloud
6. 6
STAMP - PROCESS FLOW & RESPONSIBILITY MATRIX
S. No Functionality
Primary
Responsibility
Vetting & Approval Action Remarks
1
Preparation of Master Primavera
Schedule of a Line/ Corridor
CGM/Project Director
Uploading in STAMP by
CGM/Project
Primavera Schedules of Civil
Packages will form the
Baseline
2
Primavera Schedule for a
Contract complying with
STAMP Guidelines with Unique
Activity Codes
Contractor
CPM / HOD
(Supported by STAMP
Team)
Uploading in STAMP by
CPM/HOD
• Guidelines for Primavera
schedule & Activity codes
conforming to STAMP
issued.
• Checklist for CPM/HOD
for vetting issued
3 SOQ Contractor
CPM / HOD
(Supported by STAMP
Team)
Linking with Primavera Schedule
by CPM /HOD (Supported by
STAMP Team)
Guidelines for SOQ
preparation issued
4
3D BIM models for a Contract
complying with STAMP
Guidelines . (Task ID of BIM
Element should be Activity
Code of corresponding
Primavera Activity)
DDC/ CA
Contractor
CA/ CPM
(Supported by STAMP
team)
Upload in the folder in BIM 360 for
STAMP use
• Guidelines for BIM
modeling conforming to
STAMP issued
• Checklist for CPM/HOD for
vetting issued
5
Updating Daily Actual Progress
& Status of Issues
JE/ AM CPM / HOD
Updation through Mobile App/
Laptop
-
8. 7. Schedule taken back into
Primavera P6 for re-
planning
[CGM/Project, CPM,
Contractor]
5. Daily updates
from site
[Site Engr.],
Validation
[PM]
5. Daily updates
from site
[Site Engr.],
Validation
[PM]
1. Master Schedule
[CGM/Project],
Contract Schedule,
SOQ Excel
[Contractor/CPM]
Mobile
3. Upload Primavera,
Planned Financial S-curve
and BIM into STAMP [CPM,
CGM/Project]
8. Re-planning in
Primavera, repeat
2. Model from
BIM 360 [Chief
Architect,
Contractor]
6. Dashboards and 5D BIM
[Higher Management,
CPM]
9. Periodic full backup
On-premise Server
Browsers
BIM 360
+
Primavera
Activity ID Mapping
[Contractor/CPM]
DMRC STAMP
STAMP - PROCESS FLOW
4. Administrator sets
up logins, RBAC (one-time)
[CGM/Project] + Integration with
Vendor Payment Portal (ED/IT)
9. • For Unified Scheduling
Oracle Primavera P6 version 17 or later
• For BIM Modelling
Autodesk Revit 2018 or Later
• For Mobile Application
Android OS: Android 12.0 and higher
Apple iOS: Version 9.1 and higher System For Tracking And Monitoring Projects
(STAMP)
STAMP - SOFTWARES