PROJECT MONITORING IN DMRC
THROUGH
STAMP
SYSTEM FOR TRACKING AND
MONITORING PROJECTS
CGM/Project
DMRC
MULTI - DIMENSIONAL Building Information Modeling (BIM)
• 3D - Geometry - Three Dimensional (x, y, z) visualisation of the Project.
• Easy collaboration between multiple teams having different areas of expertise.
• Streamlined communication and sharing of design expectations.
• Reduced instances of rework and revisions due clash detection at planning stage itself.
• Model based Cost Estimation and Value Engineering.
• 4D - Time – Timeline, Scheduling and Duration.
• Seamless coordination among Consultants, Client and Contractors.
• Better preparedness in terms of next steps during every construction stage helping to avoid delays.
• 5D - Cost – Real Time Cost visualisation – Planned vs. Actual.
• 6D - Sustainability – Self-Sustainable & Energy Efficient.
• 7D – Facility Manager – Holistic Facility Management Information for entire Lifecycle.
3D BIM - DESIGN STAGE MODEL - STATION
FEATURES :
1) Integration with BIM 360 Design Models.
2) Integration with Primavera schedules.
3) Progress Updation from Site through Mobile App on Real Time basis.
4) Integration with Vendor Payment Portal (VPP).
5) Role based Graphical Dashboards for Project monitoring.
6) Visual Progress on 3D BIM Models.
7) Hosting of software on cloud for easy access.
8) Provision for Backing up of Data on On-Premise Server at Metro Bhawan.
STAMP – System for Tracking And Monitoring Projects
5
 STAMP will monitor Progress of all the Contract Packages of Civil & System Works of DMRC Phase-IV Project –
Line 7 (Extn.), Line 8 (Extn.), Line 10, Patna Metro Project (Corridor 1 & 2) and all future Projects of DMRC.
 STAMP will also monitor issues of work front availability (pre-construction activities) such as Land availability,
Tree Transplantation, Shifting of Services and Design Status.
 Physical Progress – Planned vs Actual - can be viewed as on date, one month before and Forecast for future months.
Past and Present Progress at any stage of the Project/Package can be viewed.
 All the above features can be viewed on 3D BIM Models.
 Revenue Operation Date (ROD) of each Corridor/Line shall be monitored through Master Primavera Schedule
(MPS). MPS consists of activities for Tender Preparation, Process & Award and Execution of all the Contract
Packages of all disciplines of that Corridor/Line and integrated with all Primavera Schedules of all Contract
Packages of that Corridor.
 Financial Progress – Planned vs Actual – can be viewed for each contract package for various disciplines and for
each corridor. (Actual Financial Progress from Vendor Payment Portal)
STAMP (5D BIM) –Visual Project Monitoring on Cloud
6
STAMP - PROCESS FLOW & RESPONSIBILITY MATRIX
S. No Functionality
Primary
Responsibility
Vetting & Approval Action Remarks
1
Preparation of Master Primavera
Schedule of a Line/ Corridor
CGM/Project Director
Uploading in STAMP by
CGM/Project
Primavera Schedules of Civil
Packages will form the
Baseline
2
Primavera Schedule for a
Contract complying with
STAMP Guidelines with Unique
Activity Codes
Contractor
CPM / HOD
(Supported by STAMP
Team)
Uploading in STAMP by
CPM/HOD
• Guidelines for Primavera
schedule & Activity codes
conforming to STAMP
issued.
• Checklist for CPM/HOD
for vetting issued
3 SOQ Contractor
CPM / HOD
(Supported by STAMP
Team)
Linking with Primavera Schedule
by CPM /HOD (Supported by
STAMP Team)
Guidelines for SOQ
preparation issued
4
3D BIM models for a Contract
complying with STAMP
Guidelines . (Task ID of BIM
Element should be Activity
Code of corresponding
Primavera Activity)
DDC/ CA
Contractor
CA/ CPM
(Supported by STAMP
team)
Upload in the folder in BIM 360 for
STAMP use
• Guidelines for BIM
modeling conforming to
STAMP issued
• Checklist for CPM/HOD for
vetting issued
5
Updating Daily Actual Progress
& Status of Issues
JE/ AM CPM / HOD
Updation through Mobile App/
Laptop
-
THANK YOU
7. Schedule taken back into
Primavera P6 for re-
planning
[CGM/Project, CPM,
Contractor]
5. Daily updates
from site
[Site Engr.],
Validation
[PM]
5. Daily updates
from site
[Site Engr.],
Validation
[PM]
1. Master Schedule
[CGM/Project],
Contract Schedule,
SOQ Excel
[Contractor/CPM]
Mobile
3. Upload Primavera,
Planned Financial S-curve
and BIM into STAMP [CPM,
CGM/Project]
8. Re-planning in
Primavera, repeat
2. Model from
BIM 360 [Chief
Architect,
Contractor]
6. Dashboards and 5D BIM
[Higher Management,
CPM]
9. Periodic full backup
On-premise Server
Browsers
BIM 360
+
Primavera
Activity ID Mapping
[Contractor/CPM]
DMRC STAMP
STAMP - PROCESS FLOW
4. Administrator sets
up logins, RBAC (one-time)
[CGM/Project] + Integration with
Vendor Payment Portal (ED/IT)
• For Unified Scheduling
Oracle Primavera P6 version 17 or later
• For BIM Modelling
Autodesk Revit 2018 or Later
• For Mobile Application
Android OS: Android 12.0 and higher
Apple iOS: Version 9.1 and higher System For Tracking And Monitoring Projects
(STAMP)
STAMP - SOFTWARES

More Related Content

Similar to 1.01 Introduction from DMRC side for project management information system

Software Application Presentation Slide
Software Application Presentation SlideSoftware Application Presentation Slide
Software Application Presentation Slide
Lee Pei Gie
 
Software Applications
Software ApplicationsSoftware Applications
Software Applications
XinYee Khoo
 
Integrated Master Schedule
Integrated Master ScheduleIntegrated Master Schedule
Integrated Master Schedule
ellefsonj
 
PP1 report
PP1 reportPP1 report
PP1 report
Kailyn Lee
 
Software Application Report
Software Application ReportSoftware Application Report
Software Application Report
Shze Hwa Lee
 
Software Application report
Software Application reportSoftware Application report
Software Application report
Kailyn Lee
 
BIM Dimensions Explained- 3D, 4D, 5D, 6D and 7D- Definition and Benefits
BIM Dimensions Explained- 3D, 4D, 5D, 6D and 7D- Definition and BenefitsBIM Dimensions Explained- 3D, 4D, 5D, 6D and 7D- Definition and Benefits
BIM Dimensions Explained- 3D, 4D, 5D, 6D and 7D- Definition and Benefits
United-BIM
 
Guide to Architectural Surveys and the RIBA Digital Plan of Works
Guide to Architectural Surveys and the RIBA Digital Plan of WorksGuide to Architectural Surveys and the RIBA Digital Plan of Works
Guide to Architectural Surveys and the RIBA Digital Plan of Works
C A Design Services
 
Application of Building Information Modelling Software’s for Planning and Sch...
Application of Building Information Modelling Software’s for Planning and Sch...Application of Building Information Modelling Software’s for Planning and Sch...
Application of Building Information Modelling Software’s for Planning and Sch...
IRJET Journal
 
BIM
BIMBIM
Project Profile of Civil engineer Kirshan Kumar
Project Profile of Civil engineer Kirshan KumarProject Profile of Civil engineer Kirshan Kumar
Project Profile of Civil engineer Kirshan Kumar
Kirshan Kumar
 
Project Management Methodology for Site Launches
Project Management Methodology for Site LaunchesProject Management Methodology for Site Launches
Project Management Methodology for Site Launches
Michael Eydman
 
Software
SoftwareSoftware
Software
Pui Chun Shian
 
a clients most influential dimension to make bim fly
a clients most influential dimension to make bim flya clients most influential dimension to make bim fly
a clients most influential dimension to make bim flySimon Richardson
 
BIM_BROCHURE.PDF
BIM_BROCHURE.PDFBIM_BROCHURE.PDF
BIM_BROCHURE.PDFSandy .
 
Software full
Software fullSoftware full
Software full
ahmong4
 
atb-brochure.pdf
atb-brochure.pdfatb-brochure.pdf
atb-brochure.pdf
AllthingsBIM
 
GTB-brochure.pdf
GTB-brochure.pdfGTB-brochure.pdf
GTB-brochure.pdf
Mandeep Singh
 
bim and project controls
 bim and project controls bim and project controls
bim and project controls
Omar Selim
 

Similar to 1.01 Introduction from DMRC side for project management information system (20)

Software Application Presentation Slide
Software Application Presentation SlideSoftware Application Presentation Slide
Software Application Presentation Slide
 
Software Applications
Software ApplicationsSoftware Applications
Software Applications
 
Integrated Master Schedule
Integrated Master ScheduleIntegrated Master Schedule
Integrated Master Schedule
 
PP1 report
PP1 reportPP1 report
PP1 report
 
Software Application Report
Software Application ReportSoftware Application Report
Software Application Report
 
Software Application report
Software Application reportSoftware Application report
Software Application report
 
BIM Dimensions Explained- 3D, 4D, 5D, 6D and 7D- Definition and Benefits
BIM Dimensions Explained- 3D, 4D, 5D, 6D and 7D- Definition and BenefitsBIM Dimensions Explained- 3D, 4D, 5D, 6D and 7D- Definition and Benefits
BIM Dimensions Explained- 3D, 4D, 5D, 6D and 7D- Definition and Benefits
 
Guide to Architectural Surveys and the RIBA Digital Plan of Works
Guide to Architectural Surveys and the RIBA Digital Plan of WorksGuide to Architectural Surveys and the RIBA Digital Plan of Works
Guide to Architectural Surveys and the RIBA Digital Plan of Works
 
Application of Building Information Modelling Software’s for Planning and Sch...
Application of Building Information Modelling Software’s for Planning and Sch...Application of Building Information Modelling Software’s for Planning and Sch...
Application of Building Information Modelling Software’s for Planning and Sch...
 
BIM
BIMBIM
BIM
 
Project Profile of Civil engineer Kirshan Kumar
Project Profile of Civil engineer Kirshan KumarProject Profile of Civil engineer Kirshan Kumar
Project Profile of Civil engineer Kirshan Kumar
 
Project Management Methodology for Site Launches
Project Management Methodology for Site LaunchesProject Management Methodology for Site Launches
Project Management Methodology for Site Launches
 
Vico
VicoVico
Vico
 
Software
SoftwareSoftware
Software
 
a clients most influential dimension to make bim fly
a clients most influential dimension to make bim flya clients most influential dimension to make bim fly
a clients most influential dimension to make bim fly
 
BIM_BROCHURE.PDF
BIM_BROCHURE.PDFBIM_BROCHURE.PDF
BIM_BROCHURE.PDF
 
Software full
Software fullSoftware full
Software full
 
atb-brochure.pdf
atb-brochure.pdfatb-brochure.pdf
atb-brochure.pdf
 
GTB-brochure.pdf
GTB-brochure.pdfGTB-brochure.pdf
GTB-brochure.pdf
 
bim and project controls
 bim and project controls bim and project controls
bim and project controls
 

Recently uploaded

Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
AJAYKUMARPUND1
 
Scaling in conventional MOSFET for constant electric field and constant voltage
Scaling in conventional MOSFET for constant electric field and constant voltageScaling in conventional MOSFET for constant electric field and constant voltage
Scaling in conventional MOSFET for constant electric field and constant voltage
RCC Institute of Information Technology
 
Chat application through client server management system project.pdf
Chat application through client server management system project.pdfChat application through client server management system project.pdf
Chat application through client server management system project.pdf
Kamal Acharya
 
Vaccine management system project report documentation..pdf
Vaccine management system project report documentation..pdfVaccine management system project report documentation..pdf
Vaccine management system project report documentation..pdf
Kamal Acharya
 
Final project report on grocery store management system..pdf
Final project report on grocery store management system..pdfFinal project report on grocery store management system..pdf
Final project report on grocery store management system..pdf
Kamal Acharya
 
The role of big data in decision making.
The role of big data in decision making.The role of big data in decision making.
The role of big data in decision making.
ankuprajapati0525
 
Architectural Portfolio Sean Lockwood
Architectural Portfolio Sean LockwoodArchitectural Portfolio Sean Lockwood
Architectural Portfolio Sean Lockwood
seandesed
 
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
MdTanvirMahtab2
 
road safety engineering r s e unit 3.pdf
road safety engineering  r s e unit 3.pdfroad safety engineering  r s e unit 3.pdf
road safety engineering r s e unit 3.pdf
VENKATESHvenky89705
 
Water Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdfWater Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation & Control
 
CME397 Surface Engineering- Professional Elective
CME397 Surface Engineering- Professional ElectiveCME397 Surface Engineering- Professional Elective
CME397 Surface Engineering- Professional Elective
karthi keyan
 
Explosives Industry manufacturing process.pdf
Explosives Industry manufacturing process.pdfExplosives Industry manufacturing process.pdf
Explosives Industry manufacturing process.pdf
884710SadaqatAli
 
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
ydteq
 
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Dr.Costas Sachpazis
 
NO1 Pandit Amil Baba In Bahawalpur, Sargodha, Sialkot, Sheikhupura, Rahim Yar...
NO1 Pandit Amil Baba In Bahawalpur, Sargodha, Sialkot, Sheikhupura, Rahim Yar...NO1 Pandit Amil Baba In Bahawalpur, Sargodha, Sialkot, Sheikhupura, Rahim Yar...
NO1 Pandit Amil Baba In Bahawalpur, Sargodha, Sialkot, Sheikhupura, Rahim Yar...
Amil baba
 
HYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generationHYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generation
Robbie Edward Sayers
 
Immunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary AttacksImmunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary Attacks
gerogepatton
 
Toll tax management system project report..pdf
Toll tax management system project report..pdfToll tax management system project report..pdf
Toll tax management system project report..pdf
Kamal Acharya
 
Automobile Management System Project Report.pdf
Automobile Management System Project Report.pdfAutomobile Management System Project Report.pdf
Automobile Management System Project Report.pdf
Kamal Acharya
 
Top 13 Famous Civil Engineering Scientist
Top 13 Famous Civil Engineering ScientistTop 13 Famous Civil Engineering Scientist
Top 13 Famous Civil Engineering Scientist
gettygaming1
 

Recently uploaded (20)

Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
 
Scaling in conventional MOSFET for constant electric field and constant voltage
Scaling in conventional MOSFET for constant electric field and constant voltageScaling in conventional MOSFET for constant electric field and constant voltage
Scaling in conventional MOSFET for constant electric field and constant voltage
 
Chat application through client server management system project.pdf
Chat application through client server management system project.pdfChat application through client server management system project.pdf
Chat application through client server management system project.pdf
 
Vaccine management system project report documentation..pdf
Vaccine management system project report documentation..pdfVaccine management system project report documentation..pdf
Vaccine management system project report documentation..pdf
 
Final project report on grocery store management system..pdf
Final project report on grocery store management system..pdfFinal project report on grocery store management system..pdf
Final project report on grocery store management system..pdf
 
The role of big data in decision making.
The role of big data in decision making.The role of big data in decision making.
The role of big data in decision making.
 
Architectural Portfolio Sean Lockwood
Architectural Portfolio Sean LockwoodArchitectural Portfolio Sean Lockwood
Architectural Portfolio Sean Lockwood
 
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
 
road safety engineering r s e unit 3.pdf
road safety engineering  r s e unit 3.pdfroad safety engineering  r s e unit 3.pdf
road safety engineering r s e unit 3.pdf
 
Water Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdfWater Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdf
 
CME397 Surface Engineering- Professional Elective
CME397 Surface Engineering- Professional ElectiveCME397 Surface Engineering- Professional Elective
CME397 Surface Engineering- Professional Elective
 
Explosives Industry manufacturing process.pdf
Explosives Industry manufacturing process.pdfExplosives Industry manufacturing process.pdf
Explosives Industry manufacturing process.pdf
 
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
 
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
 
NO1 Pandit Amil Baba In Bahawalpur, Sargodha, Sialkot, Sheikhupura, Rahim Yar...
NO1 Pandit Amil Baba In Bahawalpur, Sargodha, Sialkot, Sheikhupura, Rahim Yar...NO1 Pandit Amil Baba In Bahawalpur, Sargodha, Sialkot, Sheikhupura, Rahim Yar...
NO1 Pandit Amil Baba In Bahawalpur, Sargodha, Sialkot, Sheikhupura, Rahim Yar...
 
HYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generationHYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generation
 
Immunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary AttacksImmunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary Attacks
 
Toll tax management system project report..pdf
Toll tax management system project report..pdfToll tax management system project report..pdf
Toll tax management system project report..pdf
 
Automobile Management System Project Report.pdf
Automobile Management System Project Report.pdfAutomobile Management System Project Report.pdf
Automobile Management System Project Report.pdf
 
Top 13 Famous Civil Engineering Scientist
Top 13 Famous Civil Engineering ScientistTop 13 Famous Civil Engineering Scientist
Top 13 Famous Civil Engineering Scientist
 

1.01 Introduction from DMRC side for project management information system

  • 1. PROJECT MONITORING IN DMRC THROUGH STAMP SYSTEM FOR TRACKING AND MONITORING PROJECTS CGM/Project DMRC
  • 2. MULTI - DIMENSIONAL Building Information Modeling (BIM) • 3D - Geometry - Three Dimensional (x, y, z) visualisation of the Project. • Easy collaboration between multiple teams having different areas of expertise. • Streamlined communication and sharing of design expectations. • Reduced instances of rework and revisions due clash detection at planning stage itself. • Model based Cost Estimation and Value Engineering. • 4D - Time – Timeline, Scheduling and Duration. • Seamless coordination among Consultants, Client and Contractors. • Better preparedness in terms of next steps during every construction stage helping to avoid delays. • 5D - Cost – Real Time Cost visualisation – Planned vs. Actual. • 6D - Sustainability – Self-Sustainable & Energy Efficient. • 7D – Facility Manager – Holistic Facility Management Information for entire Lifecycle.
  • 3. 3D BIM - DESIGN STAGE MODEL - STATION
  • 4. FEATURES : 1) Integration with BIM 360 Design Models. 2) Integration with Primavera schedules. 3) Progress Updation from Site through Mobile App on Real Time basis. 4) Integration with Vendor Payment Portal (VPP). 5) Role based Graphical Dashboards for Project monitoring. 6) Visual Progress on 3D BIM Models. 7) Hosting of software on cloud for easy access. 8) Provision for Backing up of Data on On-Premise Server at Metro Bhawan. STAMP – System for Tracking And Monitoring Projects
  • 5. 5  STAMP will monitor Progress of all the Contract Packages of Civil & System Works of DMRC Phase-IV Project – Line 7 (Extn.), Line 8 (Extn.), Line 10, Patna Metro Project (Corridor 1 & 2) and all future Projects of DMRC.  STAMP will also monitor issues of work front availability (pre-construction activities) such as Land availability, Tree Transplantation, Shifting of Services and Design Status.  Physical Progress – Planned vs Actual - can be viewed as on date, one month before and Forecast for future months. Past and Present Progress at any stage of the Project/Package can be viewed.  All the above features can be viewed on 3D BIM Models.  Revenue Operation Date (ROD) of each Corridor/Line shall be monitored through Master Primavera Schedule (MPS). MPS consists of activities for Tender Preparation, Process & Award and Execution of all the Contract Packages of all disciplines of that Corridor/Line and integrated with all Primavera Schedules of all Contract Packages of that Corridor.  Financial Progress – Planned vs Actual – can be viewed for each contract package for various disciplines and for each corridor. (Actual Financial Progress from Vendor Payment Portal) STAMP (5D BIM) –Visual Project Monitoring on Cloud
  • 6. 6 STAMP - PROCESS FLOW & RESPONSIBILITY MATRIX S. No Functionality Primary Responsibility Vetting & Approval Action Remarks 1 Preparation of Master Primavera Schedule of a Line/ Corridor CGM/Project Director Uploading in STAMP by CGM/Project Primavera Schedules of Civil Packages will form the Baseline 2 Primavera Schedule for a Contract complying with STAMP Guidelines with Unique Activity Codes Contractor CPM / HOD (Supported by STAMP Team) Uploading in STAMP by CPM/HOD • Guidelines for Primavera schedule & Activity codes conforming to STAMP issued. • Checklist for CPM/HOD for vetting issued 3 SOQ Contractor CPM / HOD (Supported by STAMP Team) Linking with Primavera Schedule by CPM /HOD (Supported by STAMP Team) Guidelines for SOQ preparation issued 4 3D BIM models for a Contract complying with STAMP Guidelines . (Task ID of BIM Element should be Activity Code of corresponding Primavera Activity) DDC/ CA Contractor CA/ CPM (Supported by STAMP team) Upload in the folder in BIM 360 for STAMP use • Guidelines for BIM modeling conforming to STAMP issued • Checklist for CPM/HOD for vetting issued 5 Updating Daily Actual Progress & Status of Issues JE/ AM CPM / HOD Updation through Mobile App/ Laptop -
  • 8. 7. Schedule taken back into Primavera P6 for re- planning [CGM/Project, CPM, Contractor] 5. Daily updates from site [Site Engr.], Validation [PM] 5. Daily updates from site [Site Engr.], Validation [PM] 1. Master Schedule [CGM/Project], Contract Schedule, SOQ Excel [Contractor/CPM] Mobile 3. Upload Primavera, Planned Financial S-curve and BIM into STAMP [CPM, CGM/Project] 8. Re-planning in Primavera, repeat 2. Model from BIM 360 [Chief Architect, Contractor] 6. Dashboards and 5D BIM [Higher Management, CPM] 9. Periodic full backup On-premise Server Browsers BIM 360 + Primavera Activity ID Mapping [Contractor/CPM] DMRC STAMP STAMP - PROCESS FLOW 4. Administrator sets up logins, RBAC (one-time) [CGM/Project] + Integration with Vendor Payment Portal (ED/IT)
  • 9. • For Unified Scheduling Oracle Primavera P6 version 17 or later • For BIM Modelling Autodesk Revit 2018 or Later • For Mobile Application Android OS: Android 12.0 and higher Apple iOS: Version 9.1 and higher System For Tracking And Monitoring Projects (STAMP) STAMP - SOFTWARES