Survey data and the
RIBA Digital Plan of Works
How is survey data
used by architects
within the RIBA
Digital Plan of
Works?
Many of CADS’ clients use RIBA’s Digital
Plan of Works to manage their design &
construction processes.
Here’s our summary of survey data
considerations alongside the RIBA
Digital Plan of Works.
cadsonline.com | 2
Survey data and the RIBA Digital Plan of Works | © CADS
This stage is to ratify that the project is the best means of achieving the client
requirements. It is not about the design or practical details but focuses on making the
right strategic decisions and capturing these in a Business Case which includes
evaluating the pros and cons, the risks and the budget.
Stage zero
Strategic Direction
cadsonline.com | 3
Survey data and the RIBA Digital Plan of Works | © CADS
Discuss your project with us.
Visit https://cadsonline.com
The following site surveys may be required, or alternatively it could
be worth investing in existing geospatial information. There are
multiple sources of data available on the market, that could provide
a good starting point for your project.
•Topographic surveys
•Utilities / underground surveys
•Site visits
•Condition surveys
Stage zero
Strategic Direction
cadsonline.com | 4
Survey data and the RIBA Digital Plan of Works | © CADS
All data captured at this stage informs the development of the project brief seeking to
set the scope and scale of the project and any critical site constraints. The existing
geospatial information obtained at Stage 0 is usually very general therefore, once
planning starts, more detailed resources should be generated to serve as the base for
the design.
Stage one
Preparation & Briefing
cadsonline.com | 5
Survey data and the RIBA Digital Plan of Works | © CADS
Consider appointing a survey firm at this
point, to establish, maintain and update a
survey control network throughout the
lifespan of the project. This will help prevent
coordination issues derived from different
surveys using different coordinate systems,
which usually lead to expensive design
clashes.
Surveys include:
•Topographic surveys
•GPR surveys
•MEP ‘as installed’ surveys
•Verification surveys
•Measured building surveys
•Fire safety plans
Stage one
Preparation & Briefing
Discuss your project with us.
Visit https://cadsonline.com
cadsonline.com | 6
Survey data and the RIBA Digital Plan of Works | © CADS
The architectural concept is prepared incorporating the strategic engineering
requirements, aligned to the cost plan, project strategies and outline
specification.
Stage two
Concept Design
cadsonline.com | 7
Survey data and the RIBA Digital Plan of Works | © CADS
Survey data captured in Stage 1 delivered as a 3D model will inform
the architect’s concept design, as they start to address the form,
scale and general appearance of the building within its location and
context.
If they are adopting a BIM strategy for their project, they will be
planning to integrate and coordinate data from different sources into
one single platform. All aspects of the design should use a common
coordinate system to prevent clashes, which can be managed and
coordinated by the appointed survey firm.
Stage two
Concept Design
cadsonline.com | 8
Survey data and the RIBA Digital Plan of Works | © CADS
Stage two
Concept Design
Additional surveys
More in-depth surveys to capture specific data requirements that
were previously out of scope or to update inconsistent or inaccurate
information.
Other considerations may include large scale topographic
surveys, drone surveys, underground CCTV inspections, laser-
scan surveys of plant rooms etc. may be required.
Discuss your project with us.
Visit https://cadsonline.com
cadsonline.com | 9
Survey data and the RIBA Digital Plan of Works | © CADS
At Stage 3, the architectural and engineering information is spatially coordinated.
Survey data required at this stage ensures the architect’s Concept Design can
become a physical reality. 3D models created at earlier stages are developed into
coordinated BIM with additional data included into the core model enabling clash
detection.
Stage three
Spatial Coordination
cadsonline.com | 10
Survey data and the RIBA Digital Plan of Works | © CADS
Detailed surveys
Detailed surveys of specific areas, structures, or services may be
needed for the clash detection process. These can include intrusive
surveys to expose a building structure, or more detailed building
services surveys where the feasability of any proposed design needs to
be validated to avoid potential costly redesigns at a later stage.
Stage three
Spatial Coordination
Discuss your project with us.
Visit https://cadsonline.com
cadsonline.com | 11
Survey data and the RIBA Digital Plan of Works | © CADS
All design information required to manufacture and construct the project are
completed at this stage, such as specification details of MEP for future planned
maintenance. Surveys are unlikely to be required at this stage.
Stage four
Technical Design
cadsonline.com | 12
Survey data and the RIBA Digital Plan of Works | © CADS
Surveys commissioned at this stage inform the construction process, ensuring
everything is built and installed exactly as designed. This is where most problems
occur from poor coordination of survey data in the previous stages. Most of these
issues can be prevented if a common coordination system is used throughout the
project.
Stage five
Manufacturing & Construction
cadsonline.com | 13
Survey data and the RIBA Digital Plan of Works | © CADS
Stage five
Manufacturing & Construction
Survey
Site control and setting out surveys are a key
part of the construction process and ensure
elements of the project are installed in their
exact positions according to the design. Other
considerations include site engineering
surveys and site control maintenance: Most of
the survey control points get destroyed during
this stage so it’s critical to plan ahead for their
relocation and the recalculation of coordinates.
cadsonline.com | 14
Survey data and the RIBA Digital Plan of Works | © CADS
The building is handed over to the end user, aftercare is initiated, and the
building contract is concluded. Verification surveys may be
commissioned to verify accuracy of construction and conclude the Building Contract.
Data may also be captured on the as-built and as-installed condition and used for
updating the ‘Digital Twin’ models for Facilities Management. Other elements to
consider are as-built topographic surveys and as-built laser-scan surveys.
Stage six
Handover
cadsonline.com | 15
Survey data and the RIBA Digital Plan of Works | © CADS
Stage seven
Use
Once in use the building should be operated and maintained efficiently. Maintaining an
accurate record with ad-hoc surveys to record changes to the structure or layout of the
building is good practice. These include verification survey, measured building survey,
topographic survey, etc.
Remember, it’s always more cost effective to keep records up-to-date with limited-
scope regular surveys as opposed to commissioning a full survey every few years.
cadsonline.com | 16
Survey data and the RIBA Digital Plan of Works | © CADS
Discover more at
cadsonline.com/survey-data-and-the-riba-plan-of-works
Survey data and the
RIBA Digital Plan of Works

More Related Content

Similar to Guide to Architectural Surveys and the RIBA Digital Plan of Works

GTB-brochure.pdf
GTB-brochure.pdfGTB-brochure.pdf
GTB-brochure.pdf
Mandeep Singh
 
BIM Dimensions Explained- 3D, 4D, 5D, 6D and 7D- Definition and Benefits
BIM Dimensions Explained- 3D, 4D, 5D, 6D and 7D- Definition and BenefitsBIM Dimensions Explained- 3D, 4D, 5D, 6D and 7D- Definition and Benefits
BIM Dimensions Explained- 3D, 4D, 5D, 6D and 7D- Definition and Benefits
United-BIM
 
bim and project controls
 bim and project controls bim and project controls
bim and project controls
Omar Selim
 
What are the advantages of using point clouds in construction?
What are the advantages of using point clouds in construction?What are the advantages of using point clouds in construction?
What are the advantages of using point clouds in construction?
Chudasama Outsourcing | AutoCAD Drawing and Drafting Services
 
Software Application Presentation Slide
Software Application Presentation SlideSoftware Application Presentation Slide
Software Application Presentation Slide
Lee Pei Gie
 
Software Applications
Software ApplicationsSoftware Applications
Software Applications
XinYee Khoo
 
Software Presentation Slides
Software Presentation SlidesSoftware Presentation Slides
Software Presentation Slides
Arissa Loh
 
Build Smarter with Scan to BIM Services Silicon Engineering Consultant NZ.pptx
Build Smarter with Scan to BIM Services  Silicon Engineering Consultant NZ.pptxBuild Smarter with Scan to BIM Services  Silicon Engineering Consultant NZ.pptx
Build Smarter with Scan to BIM Services Silicon Engineering Consultant NZ.pptx
Siliconecnewzealand
 
BIM Engineering US., L.L.C. - VDC/BIM Services in US
BIM Engineering US., L.L.C. - VDC/BIM Services in USBIM Engineering US., L.L.C. - VDC/BIM Services in US
BIM Engineering US., L.L.C. - VDC/BIM Services in US
BIM Engineering LLC U.S.
 
Best Technology of Point cloud to Bim and Scan to Revit.pdf
Best Technology of Point cloud to Bim and Scan to Revit.pdfBest Technology of Point cloud to Bim and Scan to Revit.pdf
Best Technology of Point cloud to Bim and Scan to Revit.pdf
Rvtcad
 
Exploring Scan to CAD and BIM services.pdf
Exploring Scan to CAD and BIM services.pdfExploring Scan to CAD and BIM services.pdf
Exploring Scan to CAD and BIM services.pdf
Rvtcad
 
Scan to BIM Overview: Your Complete Guide
Scan to BIM Overview: Your Complete GuideScan to BIM Overview: Your Complete Guide
Scan to BIM Overview: Your Complete Guide
Chandresh Chudasama
 
HVAC CAD Design Services
HVAC CAD Design ServicesHVAC CAD Design Services
HVAC CAD Design Services
Building Information Modelling
 
Point Cloud to BIM Modeling Services Tailored for Your Needs.pdf
Point Cloud to BIM Modeling Services Tailored for Your Needs.pdfPoint Cloud to BIM Modeling Services Tailored for Your Needs.pdf
Point Cloud to BIM Modeling Services Tailored for Your Needs.pdf
Rvtcad
 
5D BIM's Role in Project Cost Estimation.pdf
5D BIM's Role in Project Cost Estimation.pdf5D BIM's Role in Project Cost Estimation.pdf
5D BIM's Role in Project Cost Estimation.pdf
BIM Experts
 
BIM Engineering US., L.L.C. – Top Point Cloud Scanning services in the US
BIM Engineering US., L.L.C. – Top Point Cloud Scanning services in the USBIM Engineering US., L.L.C. – Top Point Cloud Scanning services in the US
BIM Engineering US., L.L.C. – Top Point Cloud Scanning services in the US
BIM Engineering LLC U.S.
 
Scan to BIM Services Silicon Engineering Consultants New Zeland.pptx
Scan to BIM Services  Silicon Engineering Consultants New Zeland.pptxScan to BIM Services  Silicon Engineering Consultants New Zeland.pptx
Scan to BIM Services Silicon Engineering Consultants New Zeland.pptx
Siliconecnewzealand
 
BIM BIM.pdf
BIM BIM.pdfBIM BIM.pdf
BIM BIM.pdf
Toe Myint Naing
 
Connecting As-Built Drawings with Revit Through Scanning.docx
Connecting As-Built Drawings with Revit Through Scanning.docxConnecting As-Built Drawings with Revit Through Scanning.docx
Connecting As-Built Drawings with Revit Through Scanning.docx
Rvtcad
 
As Built to BIM Services | Silicon Engineering Consultants LLC.pptx
As Built to BIM Services | Silicon Engineering Consultants LLC.pptxAs Built to BIM Services | Silicon Engineering Consultants LLC.pptx
As Built to BIM Services | Silicon Engineering Consultants LLC.pptx
Silicon Engineering Consultants LLC
 

Similar to Guide to Architectural Surveys and the RIBA Digital Plan of Works (20)

GTB-brochure.pdf
GTB-brochure.pdfGTB-brochure.pdf
GTB-brochure.pdf
 
BIM Dimensions Explained- 3D, 4D, 5D, 6D and 7D- Definition and Benefits
BIM Dimensions Explained- 3D, 4D, 5D, 6D and 7D- Definition and BenefitsBIM Dimensions Explained- 3D, 4D, 5D, 6D and 7D- Definition and Benefits
BIM Dimensions Explained- 3D, 4D, 5D, 6D and 7D- Definition and Benefits
 
bim and project controls
 bim and project controls bim and project controls
bim and project controls
 
What are the advantages of using point clouds in construction?
What are the advantages of using point clouds in construction?What are the advantages of using point clouds in construction?
What are the advantages of using point clouds in construction?
 
Software Application Presentation Slide
Software Application Presentation SlideSoftware Application Presentation Slide
Software Application Presentation Slide
 
Software Applications
Software ApplicationsSoftware Applications
Software Applications
 
Software Presentation Slides
Software Presentation SlidesSoftware Presentation Slides
Software Presentation Slides
 
Build Smarter with Scan to BIM Services Silicon Engineering Consultant NZ.pptx
Build Smarter with Scan to BIM Services  Silicon Engineering Consultant NZ.pptxBuild Smarter with Scan to BIM Services  Silicon Engineering Consultant NZ.pptx
Build Smarter with Scan to BIM Services Silicon Engineering Consultant NZ.pptx
 
BIM Engineering US., L.L.C. - VDC/BIM Services in US
BIM Engineering US., L.L.C. - VDC/BIM Services in USBIM Engineering US., L.L.C. - VDC/BIM Services in US
BIM Engineering US., L.L.C. - VDC/BIM Services in US
 
Best Technology of Point cloud to Bim and Scan to Revit.pdf
Best Technology of Point cloud to Bim and Scan to Revit.pdfBest Technology of Point cloud to Bim and Scan to Revit.pdf
Best Technology of Point cloud to Bim and Scan to Revit.pdf
 
Exploring Scan to CAD and BIM services.pdf
Exploring Scan to CAD and BIM services.pdfExploring Scan to CAD and BIM services.pdf
Exploring Scan to CAD and BIM services.pdf
 
Scan to BIM Overview: Your Complete Guide
Scan to BIM Overview: Your Complete GuideScan to BIM Overview: Your Complete Guide
Scan to BIM Overview: Your Complete Guide
 
HVAC CAD Design Services
HVAC CAD Design ServicesHVAC CAD Design Services
HVAC CAD Design Services
 
Point Cloud to BIM Modeling Services Tailored for Your Needs.pdf
Point Cloud to BIM Modeling Services Tailored for Your Needs.pdfPoint Cloud to BIM Modeling Services Tailored for Your Needs.pdf
Point Cloud to BIM Modeling Services Tailored for Your Needs.pdf
 
5D BIM's Role in Project Cost Estimation.pdf
5D BIM's Role in Project Cost Estimation.pdf5D BIM's Role in Project Cost Estimation.pdf
5D BIM's Role in Project Cost Estimation.pdf
 
BIM Engineering US., L.L.C. – Top Point Cloud Scanning services in the US
BIM Engineering US., L.L.C. – Top Point Cloud Scanning services in the USBIM Engineering US., L.L.C. – Top Point Cloud Scanning services in the US
BIM Engineering US., L.L.C. – Top Point Cloud Scanning services in the US
 
Scan to BIM Services Silicon Engineering Consultants New Zeland.pptx
Scan to BIM Services  Silicon Engineering Consultants New Zeland.pptxScan to BIM Services  Silicon Engineering Consultants New Zeland.pptx
Scan to BIM Services Silicon Engineering Consultants New Zeland.pptx
 
BIM BIM.pdf
BIM BIM.pdfBIM BIM.pdf
BIM BIM.pdf
 
Connecting As-Built Drawings with Revit Through Scanning.docx
Connecting As-Built Drawings with Revit Through Scanning.docxConnecting As-Built Drawings with Revit Through Scanning.docx
Connecting As-Built Drawings with Revit Through Scanning.docx
 
As Built to BIM Services | Silicon Engineering Consultants LLC.pptx
As Built to BIM Services | Silicon Engineering Consultants LLC.pptxAs Built to BIM Services | Silicon Engineering Consultants LLC.pptx
As Built to BIM Services | Silicon Engineering Consultants LLC.pptx
 

Recently uploaded

CME397 Surface Engineering- Professional Elective
CME397 Surface Engineering- Professional ElectiveCME397 Surface Engineering- Professional Elective
CME397 Surface Engineering- Professional Elective
karthi keyan
 
Cosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdfCosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdf
Kamal Acharya
 
Vaccine management system project report documentation..pdf
Vaccine management system project report documentation..pdfVaccine management system project report documentation..pdf
Vaccine management system project report documentation..pdf
Kamal Acharya
 
weather web application report.pdf
weather web application report.pdfweather web application report.pdf
weather web application report.pdf
Pratik Pawar
 
COLLEGE BUS MANAGEMENT SYSTEM PROJECT REPORT.pdf
COLLEGE BUS MANAGEMENT SYSTEM PROJECT REPORT.pdfCOLLEGE BUS MANAGEMENT SYSTEM PROJECT REPORT.pdf
COLLEGE BUS MANAGEMENT SYSTEM PROJECT REPORT.pdf
Kamal Acharya
 
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
AJAYKUMARPUND1
 
Forklift Classes Overview by Intella Parts
Forklift Classes Overview by Intella PartsForklift Classes Overview by Intella Parts
Forklift Classes Overview by Intella Parts
Intella Parts
 
Courier management system project report.pdf
Courier management system project report.pdfCourier management system project report.pdf
Courier management system project report.pdf
Kamal Acharya
 
The Benefits and Techniques of Trenchless Pipe Repair.pdf
The Benefits and Techniques of Trenchless Pipe Repair.pdfThe Benefits and Techniques of Trenchless Pipe Repair.pdf
The Benefits and Techniques of Trenchless Pipe Repair.pdf
Pipe Restoration Solutions
 
Planning Of Procurement o different goods and services
Planning Of Procurement o different goods and servicesPlanning Of Procurement o different goods and services
Planning Of Procurement o different goods and services
JoytuBarua2
 
J.Yang, ICLR 2024, MLILAB, KAIST AI.pdf
J.Yang,  ICLR 2024, MLILAB, KAIST AI.pdfJ.Yang,  ICLR 2024, MLILAB, KAIST AI.pdf
J.Yang, ICLR 2024, MLILAB, KAIST AI.pdf
MLILAB
 
Quality defects in TMT Bars, Possible causes and Potential Solutions.
Quality defects in TMT Bars, Possible causes and Potential Solutions.Quality defects in TMT Bars, Possible causes and Potential Solutions.
Quality defects in TMT Bars, Possible causes and Potential Solutions.
PrashantGoswami42
 
The role of big data in decision making.
The role of big data in decision making.The role of big data in decision making.
The role of big data in decision making.
ankuprajapati0525
 
DESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docxDESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docx
FluxPrime1
 
Standard Reomte Control Interface - Neometrix
Standard Reomte Control Interface - NeometrixStandard Reomte Control Interface - Neometrix
Standard Reomte Control Interface - Neometrix
Neometrix_Engineering_Pvt_Ltd
 
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
bakpo1
 
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptxCFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
R&R Consult
 
HYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generationHYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generation
Robbie Edward Sayers
 
Immunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary AttacksImmunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary Attacks
gerogepatton
 
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdfAKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
SamSarthak3
 

Recently uploaded (20)

CME397 Surface Engineering- Professional Elective
CME397 Surface Engineering- Professional ElectiveCME397 Surface Engineering- Professional Elective
CME397 Surface Engineering- Professional Elective
 
Cosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdfCosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdf
 
Vaccine management system project report documentation..pdf
Vaccine management system project report documentation..pdfVaccine management system project report documentation..pdf
Vaccine management system project report documentation..pdf
 
weather web application report.pdf
weather web application report.pdfweather web application report.pdf
weather web application report.pdf
 
COLLEGE BUS MANAGEMENT SYSTEM PROJECT REPORT.pdf
COLLEGE BUS MANAGEMENT SYSTEM PROJECT REPORT.pdfCOLLEGE BUS MANAGEMENT SYSTEM PROJECT REPORT.pdf
COLLEGE BUS MANAGEMENT SYSTEM PROJECT REPORT.pdf
 
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
 
Forklift Classes Overview by Intella Parts
Forklift Classes Overview by Intella PartsForklift Classes Overview by Intella Parts
Forklift Classes Overview by Intella Parts
 
Courier management system project report.pdf
Courier management system project report.pdfCourier management system project report.pdf
Courier management system project report.pdf
 
The Benefits and Techniques of Trenchless Pipe Repair.pdf
The Benefits and Techniques of Trenchless Pipe Repair.pdfThe Benefits and Techniques of Trenchless Pipe Repair.pdf
The Benefits and Techniques of Trenchless Pipe Repair.pdf
 
Planning Of Procurement o different goods and services
Planning Of Procurement o different goods and servicesPlanning Of Procurement o different goods and services
Planning Of Procurement o different goods and services
 
J.Yang, ICLR 2024, MLILAB, KAIST AI.pdf
J.Yang,  ICLR 2024, MLILAB, KAIST AI.pdfJ.Yang,  ICLR 2024, MLILAB, KAIST AI.pdf
J.Yang, ICLR 2024, MLILAB, KAIST AI.pdf
 
Quality defects in TMT Bars, Possible causes and Potential Solutions.
Quality defects in TMT Bars, Possible causes and Potential Solutions.Quality defects in TMT Bars, Possible causes and Potential Solutions.
Quality defects in TMT Bars, Possible causes and Potential Solutions.
 
The role of big data in decision making.
The role of big data in decision making.The role of big data in decision making.
The role of big data in decision making.
 
DESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docxDESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docx
 
Standard Reomte Control Interface - Neometrix
Standard Reomte Control Interface - NeometrixStandard Reomte Control Interface - Neometrix
Standard Reomte Control Interface - Neometrix
 
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
 
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptxCFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
 
HYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generationHYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generation
 
Immunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary AttacksImmunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary Attacks
 
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdfAKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
 

Guide to Architectural Surveys and the RIBA Digital Plan of Works

  • 1. Survey data and the RIBA Digital Plan of Works
  • 2. How is survey data used by architects within the RIBA Digital Plan of Works? Many of CADS’ clients use RIBA’s Digital Plan of Works to manage their design & construction processes. Here’s our summary of survey data considerations alongside the RIBA Digital Plan of Works. cadsonline.com | 2 Survey data and the RIBA Digital Plan of Works | © CADS
  • 3. This stage is to ratify that the project is the best means of achieving the client requirements. It is not about the design or practical details but focuses on making the right strategic decisions and capturing these in a Business Case which includes evaluating the pros and cons, the risks and the budget. Stage zero Strategic Direction cadsonline.com | 3 Survey data and the RIBA Digital Plan of Works | © CADS
  • 4. Discuss your project with us. Visit https://cadsonline.com The following site surveys may be required, or alternatively it could be worth investing in existing geospatial information. There are multiple sources of data available on the market, that could provide a good starting point for your project. •Topographic surveys •Utilities / underground surveys •Site visits •Condition surveys Stage zero Strategic Direction cadsonline.com | 4 Survey data and the RIBA Digital Plan of Works | © CADS
  • 5. All data captured at this stage informs the development of the project brief seeking to set the scope and scale of the project and any critical site constraints. The existing geospatial information obtained at Stage 0 is usually very general therefore, once planning starts, more detailed resources should be generated to serve as the base for the design. Stage one Preparation & Briefing cadsonline.com | 5 Survey data and the RIBA Digital Plan of Works | © CADS
  • 6. Consider appointing a survey firm at this point, to establish, maintain and update a survey control network throughout the lifespan of the project. This will help prevent coordination issues derived from different surveys using different coordinate systems, which usually lead to expensive design clashes. Surveys include: •Topographic surveys •GPR surveys •MEP ‘as installed’ surveys •Verification surveys •Measured building surveys •Fire safety plans Stage one Preparation & Briefing Discuss your project with us. Visit https://cadsonline.com cadsonline.com | 6 Survey data and the RIBA Digital Plan of Works | © CADS
  • 7. The architectural concept is prepared incorporating the strategic engineering requirements, aligned to the cost plan, project strategies and outline specification. Stage two Concept Design cadsonline.com | 7 Survey data and the RIBA Digital Plan of Works | © CADS
  • 8. Survey data captured in Stage 1 delivered as a 3D model will inform the architect’s concept design, as they start to address the form, scale and general appearance of the building within its location and context. If they are adopting a BIM strategy for their project, they will be planning to integrate and coordinate data from different sources into one single platform. All aspects of the design should use a common coordinate system to prevent clashes, which can be managed and coordinated by the appointed survey firm. Stage two Concept Design cadsonline.com | 8 Survey data and the RIBA Digital Plan of Works | © CADS
  • 9. Stage two Concept Design Additional surveys More in-depth surveys to capture specific data requirements that were previously out of scope or to update inconsistent or inaccurate information. Other considerations may include large scale topographic surveys, drone surveys, underground CCTV inspections, laser- scan surveys of plant rooms etc. may be required. Discuss your project with us. Visit https://cadsonline.com cadsonline.com | 9 Survey data and the RIBA Digital Plan of Works | © CADS
  • 10. At Stage 3, the architectural and engineering information is spatially coordinated. Survey data required at this stage ensures the architect’s Concept Design can become a physical reality. 3D models created at earlier stages are developed into coordinated BIM with additional data included into the core model enabling clash detection. Stage three Spatial Coordination cadsonline.com | 10 Survey data and the RIBA Digital Plan of Works | © CADS
  • 11. Detailed surveys Detailed surveys of specific areas, structures, or services may be needed for the clash detection process. These can include intrusive surveys to expose a building structure, or more detailed building services surveys where the feasability of any proposed design needs to be validated to avoid potential costly redesigns at a later stage. Stage three Spatial Coordination Discuss your project with us. Visit https://cadsonline.com cadsonline.com | 11 Survey data and the RIBA Digital Plan of Works | © CADS
  • 12. All design information required to manufacture and construct the project are completed at this stage, such as specification details of MEP for future planned maintenance. Surveys are unlikely to be required at this stage. Stage four Technical Design cadsonline.com | 12 Survey data and the RIBA Digital Plan of Works | © CADS
  • 13. Surveys commissioned at this stage inform the construction process, ensuring everything is built and installed exactly as designed. This is where most problems occur from poor coordination of survey data in the previous stages. Most of these issues can be prevented if a common coordination system is used throughout the project. Stage five Manufacturing & Construction cadsonline.com | 13 Survey data and the RIBA Digital Plan of Works | © CADS
  • 14. Stage five Manufacturing & Construction Survey Site control and setting out surveys are a key part of the construction process and ensure elements of the project are installed in their exact positions according to the design. Other considerations include site engineering surveys and site control maintenance: Most of the survey control points get destroyed during this stage so it’s critical to plan ahead for their relocation and the recalculation of coordinates. cadsonline.com | 14 Survey data and the RIBA Digital Plan of Works | © CADS
  • 15. The building is handed over to the end user, aftercare is initiated, and the building contract is concluded. Verification surveys may be commissioned to verify accuracy of construction and conclude the Building Contract. Data may also be captured on the as-built and as-installed condition and used for updating the ‘Digital Twin’ models for Facilities Management. Other elements to consider are as-built topographic surveys and as-built laser-scan surveys. Stage six Handover cadsonline.com | 15 Survey data and the RIBA Digital Plan of Works | © CADS
  • 16. Stage seven Use Once in use the building should be operated and maintained efficiently. Maintaining an accurate record with ad-hoc surveys to record changes to the structure or layout of the building is good practice. These include verification survey, measured building survey, topographic survey, etc. Remember, it’s always more cost effective to keep records up-to-date with limited- scope regular surveys as opposed to commissioning a full survey every few years. cadsonline.com | 16 Survey data and the RIBA Digital Plan of Works | © CADS