SlideShare a Scribd company logo
1 of 4
4
PROJECT PROFILE:
As a seasoned BIM Lead with a civil engineering background, I've managed diverse projects including High-Speed Rail, Roadways,
Rail Systems, Metro, LRT, MRT, Bridges, Airports, Malls, High-rise Buildings, Monuments, Tunnels, Viaducts, Rail Tracks, Abutments,
and Site Works. Proficient in 3D modeling, 2D drawings, 4D, and 5DI bring a comprehensive skill set to ensure the seamless execution
of projects from conception to completion. Led the BIM implementation for the projects, optimizing design coordination and facilitating
seamless collaboration among multi-disciplinary teams, resulting in a 20% reduction in construction errors and a 15% decrease in
project timeline.
HIGH SPEED RAIL
Client and project: MyHSR (High Speed Rail), Location: - Malaysia.
Role: - BIM Manager for BIM management of 327KM Linear and 8
Station including implement, define the key process, workflows,
documentations, Quality Check, Integration/Coordination, closeout etc.
Purpose: Detail Design execution (M2&M3)
Configuration: International station, 28KM Viaduct, 7.1 KM Tunnel, BIM
Management and Coordinate with (8 Jv’s) EDMS
Deliverables: Standard Documents, M3 and M2, Coordination reports
BIM tools used: Revit, Navis works and C3D.
Team Size – 16 (M3), LOD-350
AIRPORT
Project-Jorge Chavez International Airport- Lima
Role: - Team Lead for design production (M3 & M2)
Scope - Provide coordinated 3D images of Revit Model for Structural
elements using architectural geometry.
Configuration- T2 Terminal (International pier+ 2xDomestic pier
+Processor)
Structure- Concrete and Steel Roof Structure
Scope- Revit Structure M3&M2 and Coordination
5
ROAD & TUNNEL
Client: TKA (Tappa Kumangka Alliance) Project (T2D)
Scope of work: BIM Execution of Tunnel Systems Mist, Ventilation, LPS,
MVAC
Purpose of BIM: Tender Design Execution and Coordination, Support
TKA for BIM Documentation for Project Execution process, Team Size –
11
Configuration- 10.5 Km Twin Tunnel Speed 80Km/h
Deliverables: M3 and M2, Space Proofing and design presentation and
support
BIM tools used: Revit, Navis works and Revizto.
Challenges: Untrained resources, Software Limitations, Linear drawings
BRIDGE
Client: Atkins (UK) with Transport Authority of London
Scope of work: Conversion of Handmade 1937 drawing to Model (M2 &
M3). Purpose of BIM: Model for Asset Management and Quantity the
Steel elements, Team Size – 12
Configuration- Existing bridge five-span steel trussed bridge with
longitudinal metal trough decking and concrete topping. Deliverables:
M3 and M2, Asset meta data and report. BIM tools used: Revit, Navis
works and Revizto. Challenges: Untrained resources, Software
Limitations, Linear drawings
6
Building LOD & LOI =L5
Client: PRP Architect (UK) Project- Stockwell Park-2
Scope of work: Construction Design development (M2 & M3) ASMEP of
128 apartments and old age house
Purpose of BIM: Documentation extraction, coordination, Quantity
Team Size – 13
Client: Sahara India, Project- Shipra Indirapuram
Scope of work: Construction Design development (M2 & M3) ASMEP of
128 apartments and old age house
Purpose of BIM: Documentation extraction, coordination, Quantity
Team Size – 13
METRO
Client: Different Clients Gov. Authority Project- 14 Cities Metro
Scope of work: Concept to Construction Design to Asset Management and
Operations for (M2 & M3) ASMEP, Purpose of BIM: Documentation
extraction, coordination, Quantity, Walk Through, Visualization etc.
Team Size – 4 to 40 (Multi discipline and location)
Configuration- Stations, Viaduct, Tunnels, Depot, Abutment work, Site
work
Deliverables: M3 and M2, Report, BOQ, Coordination record,
Integration, 4D&5D, Shop and Fabrication drawings, Time schedule and
Cost extraction
BIM tools used: Revit, Navis works, C3D, Bentley Connect, Open Road,
BIM one click, Bim Collab, BIM Track, and Revizto. CDE & EDMS
platform (Mezzoteam, Projectwise, BIM 360 Forge, One Drive, Acosim,
Google Drive, InEight, Bluebeam, Sharepoint)
7
STATUE
STATUE OF UNITY (Highest Statue of world) Proposed World Highest (180m) (Statue of Unity) situated at Sardar Sarover Dam, Gujrat, India.
Coordination among Structure, Architecture, MEPF, Site Excavation, Earth work Calculation, Quantity of all modeled element, 4D and 5D Simulation
with BIM Software.
HOSPITAL
Special Security Hospital: -SEHA (Obermeyer) (125 Beds, 1B+2Medical floor+ 3Ward Building+ Security Features, AL Shamlkha South, Abu Dhabi.
Software Used: Revit MEP, Navisworks. Modeling of Mechanical duct work, piping work, fixing of mechanical devices Boiler, Chimney Valves, duct
accessories and coordination among Exterior Facade, Furniture, Structural Element, Solar system, and Arch+Str+MEPF elements. I partiality support as
a BIM Manager in absence of actual BIM manger only for Two month at the Design Development stage.
STADIUM AND MISCELLANEOUS
BIM Lead, BIM Head, Digital Engineering Head, automation, modeling and coordination among Architectural, Structure & MEPF service to extract GA’s, Construction Drawings, Detailed Drawings, Shop Drawings, As Built drawings, Piping Drawings, Engineering Drawings, HVAC Drawings, Electrical Drawings, Landscaping Drawings, Structural Drawings, 4D/5D/6D information, Assets management, Modeling Conversion, Clash detection, BIM log, Design Discrepancies ,project design production, coordination, Integration BIM and BIM Implementation, chair project meetings, budgeting, resource planning, Work distribution or work breakdown, work assignment, production overview, Identify and mitigation project risk, Coordination with disciplines project leads, team time management, new resources hiring, project Setup, project phase planning, Component and Template Creation, Setup of detailing, project coordination for all stage, Cost control, Project closing and report the department management or stakeholders , digital engineering and hand on the Autodesk BIM technology ,multi-disciplinary project, started from point to drawing (2D) to model (3D) to schedule (Time planning) 4D to calculation (Cost
planning) 5D to Energy analysis, 6D to sustainability, 7D to Building Operation and 8D to Identify project prone areas , Project Hazards, Project Integration and Multi discipline coordination , project life cycle. Review project compliance requirements of all engineering and architectural specifications or drawing for each type of buildings internal composite coordination, existing as-built verification, site visits, design parameters, standards of work letters, Phasing plans etc.. Deploy, Implement the BIM technology in reputed organizations specialization and disciplines (ASMEPF & Linear) standards developed BIM Standards ISO 19650, BS 1192, AIA, Uni-classification (NBS), Cobie, CIC, LOD &LOI, Cobie and IFC etc. Developed Systra Project BIM standards i.e. multi-disciplinary template, MIDP, MDPT, TIDP, Clash Matrix, BIM Manuals, Clash matrix, Clash log, Naming convention, Folder structure, WBS, Quality check, CDE/EDMS process and Workflows, Project setup, resource/organisation accessibility and competency, project check list, Input/output log, records and closing etc. stakeholder to implement EDMS (Electronic Document Management System) and CDE (Common Data Environment) ,setting up
metadata for the model information system processes, technical standards, libraries and templates specific for programme wide BIM uses in the project such as design authoring, design coordination, review & record and asset management. utility, Storm water, drainage, GIS provide documentation for construction hand-off (As Built) drawings, Letters, lease language and construction. Pre-construction manager, Introduce BIM technology to my employers and Implement technology for design, construction, and preconstruction execution. had played a key role on my assignments to produce the integrated project high profile and complex multi-disciplinary projects coordinated closely with management, in-house architectural, general engineering, civil engineering, and services/system design teams to deliver high quality design deliverables with the use of sophisticated software Architecture, Structure (RCC, Steel and Reinforcement), Services (Mechanical, Public Health, Electrical and Fire Fighting, drainage, Strom Water), Site development (station & Corridor), shop drawings, Quantity Extraction from BIM (Presto), 3D Coordination, Record of coordination, Clash detection, Walkthrough, Animation, and meta data
information etc.

More Related Content

Similar to Project Profile of Civil engineer Kirshan Kumar

Revit_Architecture_Structure_Modelling_C.pptx
Revit_Architecture_Structure_Modelling_C.pptxRevit_Architecture_Structure_Modelling_C.pptx
Revit_Architecture_Structure_Modelling_C.pptx
VandanaBrahmani1
 
MTECH Project Services (EN)
MTECH Project Services (EN)MTECH Project Services (EN)
MTECH Project Services (EN)
Paul Worthington
 
BIM_BROCHURE.PDF
BIM_BROCHURE.PDFBIM_BROCHURE.PDF
BIM_BROCHURE.PDF
Sandy .
 
Hays Highways CV
Hays Highways CVHays Highways CV
Hays Highways CV
Sa Ga
 
Building Information Modelling (BIM)
Building Information Modelling (BIM)Building Information Modelling (BIM)
Building Information Modelling (BIM)
Sara Teymoor
 

Similar to Project Profile of Civil engineer Kirshan Kumar (20)

Building before building autocad lab branding
Building before building autocad lab brandingBuilding before building autocad lab branding
Building before building autocad lab branding
 
Application of BIM and Construction Process Simulation using 5D BIM for Resid...
Application of BIM and Construction Process Simulation using 5D BIM for Resid...Application of BIM and Construction Process Simulation using 5D BIM for Resid...
Application of BIM and Construction Process Simulation using 5D BIM for Resid...
 
BIM Manager_ Mr. Saleel Kundil Kadannalil
BIM Manager_ Mr. Saleel Kundil KadannalilBIM Manager_ Mr. Saleel Kundil Kadannalil
BIM Manager_ Mr. Saleel Kundil Kadannalil
 
IRJET- Digital Engineering & Project Management for AEC Industry using BIM
IRJET- Digital Engineering & Project Management for AEC Industry using BIMIRJET- Digital Engineering & Project Management for AEC Industry using BIM
IRJET- Digital Engineering & Project Management for AEC Industry using BIM
 
Revit_Architecture_Structure_Modelling_C.pptx
Revit_Architecture_Structure_Modelling_C.pptxRevit_Architecture_Structure_Modelling_C.pptx
Revit_Architecture_Structure_Modelling_C.pptx
 
STUDY ON BUILDING INFORMATION MODELING AND IMPLEMENTATION OF CLASH DETECTION ...
STUDY ON BUILDING INFORMATION MODELING AND IMPLEMENTATION OF CLASH DETECTION ...STUDY ON BUILDING INFORMATION MODELING AND IMPLEMENTATION OF CLASH DETECTION ...
STUDY ON BUILDING INFORMATION MODELING AND IMPLEMENTATION OF CLASH DETECTION ...
 
Bim&revit
Bim&revitBim&revit
Bim&revit
 
bim and project controls
 bim and project controls bim and project controls
bim and project controls
 
MTECH Project Services (EN)
MTECH Project Services (EN)MTECH Project Services (EN)
MTECH Project Services (EN)
 
Building information modelling report
Building information modelling reportBuilding information modelling report
Building information modelling report
 
BIM_BROCHURE.PDF
BIM_BROCHURE.PDFBIM_BROCHURE.PDF
BIM_BROCHURE.PDF
 
Hashim Ibnauf Resume
Hashim Ibnauf ResumeHashim Ibnauf Resume
Hashim Ibnauf Resume
 
Bridge Design and Analysis with Civil CAD: A Comprehensive Guide
Bridge Design and Analysis with Civil CAD: A Comprehensive GuideBridge Design and Analysis with Civil CAD: A Comprehensive Guide
Bridge Design and Analysis with Civil CAD: A Comprehensive Guide
 
Bridge Design and Analysis with Civil CAD: A Comprehensive Guide
Bridge Design and Analysis with Civil CAD: A Comprehensive GuideBridge Design and Analysis with Civil CAD: A Comprehensive Guide
Bridge Design and Analysis with Civil CAD: A Comprehensive Guide
 
Viasys VDC City Models
Viasys VDC City Models Viasys VDC City Models
Viasys VDC City Models
 
Hays Highways CV
Hays Highways CVHays Highways CV
Hays Highways CV
 
Building Services & Civil Engineering Quantities (M5) - (Group Assignment) - BIM
Building Services & Civil Engineering Quantities (M5) - (Group Assignment) - BIMBuilding Services & Civil Engineering Quantities (M5) - (Group Assignment) - BIM
Building Services & Civil Engineering Quantities (M5) - (Group Assignment) - BIM
 
Bim lod
Bim lodBim lod
Bim lod
 
Building Information Modelling (BIM)
Building Information Modelling (BIM)Building Information Modelling (BIM)
Building Information Modelling (BIM)
 
BIM and other softwares
BIM and other softwaresBIM and other softwares
BIM and other softwares
 

Recently uploaded

Final DBMS Manual (2).pdf final lab manual
Final DBMS Manual (2).pdf final lab manualFinal DBMS Manual (2).pdf final lab manual
Final DBMS Manual (2).pdf final lab manual
BalamuruganV28
 

Recently uploaded (20)

Raashid final report on Embedded Systems
Raashid final report on Embedded SystemsRaashid final report on Embedded Systems
Raashid final report on Embedded Systems
 
21scheme vtu syllabus of visveraya technological university
21scheme vtu syllabus of visveraya technological university21scheme vtu syllabus of visveraya technological university
21scheme vtu syllabus of visveraya technological university
 
Autodesk Construction Cloud (Autodesk Build).pptx
Autodesk Construction Cloud (Autodesk Build).pptxAutodesk Construction Cloud (Autodesk Build).pptx
Autodesk Construction Cloud (Autodesk Build).pptx
 
Interfacing Analog to Digital Data Converters ee3404.pdf
Interfacing Analog to Digital Data Converters ee3404.pdfInterfacing Analog to Digital Data Converters ee3404.pdf
Interfacing Analog to Digital Data Converters ee3404.pdf
 
Research Methodolgy & Intellectual Property Rights Series 1
Research Methodolgy & Intellectual Property Rights Series 1Research Methodolgy & Intellectual Property Rights Series 1
Research Methodolgy & Intellectual Property Rights Series 1
 
UNIT-2 image enhancement.pdf Image Processing Unit 2 AKTU
UNIT-2 image enhancement.pdf Image Processing Unit 2 AKTUUNIT-2 image enhancement.pdf Image Processing Unit 2 AKTU
UNIT-2 image enhancement.pdf Image Processing Unit 2 AKTU
 
Insurance management system project report.pdf
Insurance management system project report.pdfInsurance management system project report.pdf
Insurance management system project report.pdf
 
Basics of Relay for Engineering Students
Basics of Relay for Engineering StudentsBasics of Relay for Engineering Students
Basics of Relay for Engineering Students
 
CLOUD COMPUTING SERVICES - Cloud Reference Modal
CLOUD COMPUTING SERVICES - Cloud Reference ModalCLOUD COMPUTING SERVICES - Cloud Reference Modal
CLOUD COMPUTING SERVICES - Cloud Reference Modal
 
litvinenko_Henry_Intrusion_Hong-Kong_2024.pdf
litvinenko_Henry_Intrusion_Hong-Kong_2024.pdflitvinenko_Henry_Intrusion_Hong-Kong_2024.pdf
litvinenko_Henry_Intrusion_Hong-Kong_2024.pdf
 
Adsorption (mass transfer operations 2) ppt
Adsorption (mass transfer operations 2) pptAdsorption (mass transfer operations 2) ppt
Adsorption (mass transfer operations 2) ppt
 
Software Engineering Practical File Front Pages.pdf
Software Engineering Practical File Front Pages.pdfSoftware Engineering Practical File Front Pages.pdf
Software Engineering Practical File Front Pages.pdf
 
Involute of a circle,Square, pentagon,HexagonInvolute_Engineering Drawing.pdf
Involute of a circle,Square, pentagon,HexagonInvolute_Engineering Drawing.pdfInvolute of a circle,Square, pentagon,HexagonInvolute_Engineering Drawing.pdf
Involute of a circle,Square, pentagon,HexagonInvolute_Engineering Drawing.pdf
 
Filters for Electromagnetic Compatibility Applications
Filters for Electromagnetic Compatibility ApplicationsFilters for Electromagnetic Compatibility Applications
Filters for Electromagnetic Compatibility Applications
 
Seismic Hazard Assessment Software in Python by Prof. Dr. Costas Sachpazis
Seismic Hazard Assessment Software in Python by Prof. Dr. Costas SachpazisSeismic Hazard Assessment Software in Python by Prof. Dr. Costas Sachpazis
Seismic Hazard Assessment Software in Python by Prof. Dr. Costas Sachpazis
 
Final DBMS Manual (2).pdf final lab manual
Final DBMS Manual (2).pdf final lab manualFinal DBMS Manual (2).pdf final lab manual
Final DBMS Manual (2).pdf final lab manual
 
Independent Solar-Powered Electric Vehicle Charging Station
Independent Solar-Powered Electric Vehicle Charging StationIndependent Solar-Powered Electric Vehicle Charging Station
Independent Solar-Powered Electric Vehicle Charging Station
 
Augmented Reality (AR) with Augin Software.pptx
Augmented Reality (AR) with Augin Software.pptxAugmented Reality (AR) with Augin Software.pptx
Augmented Reality (AR) with Augin Software.pptx
 
Developing a smart system for infant incubators using the internet of things ...
Developing a smart system for infant incubators using the internet of things ...Developing a smart system for infant incubators using the internet of things ...
Developing a smart system for infant incubators using the internet of things ...
 
The Entity-Relationship Model(ER Diagram).pptx
The Entity-Relationship Model(ER Diagram).pptxThe Entity-Relationship Model(ER Diagram).pptx
The Entity-Relationship Model(ER Diagram).pptx
 

Project Profile of Civil engineer Kirshan Kumar

  • 1. 4 PROJECT PROFILE: As a seasoned BIM Lead with a civil engineering background, I've managed diverse projects including High-Speed Rail, Roadways, Rail Systems, Metro, LRT, MRT, Bridges, Airports, Malls, High-rise Buildings, Monuments, Tunnels, Viaducts, Rail Tracks, Abutments, and Site Works. Proficient in 3D modeling, 2D drawings, 4D, and 5DI bring a comprehensive skill set to ensure the seamless execution of projects from conception to completion. Led the BIM implementation for the projects, optimizing design coordination and facilitating seamless collaboration among multi-disciplinary teams, resulting in a 20% reduction in construction errors and a 15% decrease in project timeline. HIGH SPEED RAIL Client and project: MyHSR (High Speed Rail), Location: - Malaysia. Role: - BIM Manager for BIM management of 327KM Linear and 8 Station including implement, define the key process, workflows, documentations, Quality Check, Integration/Coordination, closeout etc. Purpose: Detail Design execution (M2&M3) Configuration: International station, 28KM Viaduct, 7.1 KM Tunnel, BIM Management and Coordinate with (8 Jv’s) EDMS Deliverables: Standard Documents, M3 and M2, Coordination reports BIM tools used: Revit, Navis works and C3D. Team Size – 16 (M3), LOD-350 AIRPORT Project-Jorge Chavez International Airport- Lima Role: - Team Lead for design production (M3 & M2) Scope - Provide coordinated 3D images of Revit Model for Structural elements using architectural geometry. Configuration- T2 Terminal (International pier+ 2xDomestic pier +Processor) Structure- Concrete and Steel Roof Structure Scope- Revit Structure M3&M2 and Coordination
  • 2. 5 ROAD & TUNNEL Client: TKA (Tappa Kumangka Alliance) Project (T2D) Scope of work: BIM Execution of Tunnel Systems Mist, Ventilation, LPS, MVAC Purpose of BIM: Tender Design Execution and Coordination, Support TKA for BIM Documentation for Project Execution process, Team Size – 11 Configuration- 10.5 Km Twin Tunnel Speed 80Km/h Deliverables: M3 and M2, Space Proofing and design presentation and support BIM tools used: Revit, Navis works and Revizto. Challenges: Untrained resources, Software Limitations, Linear drawings BRIDGE Client: Atkins (UK) with Transport Authority of London Scope of work: Conversion of Handmade 1937 drawing to Model (M2 & M3). Purpose of BIM: Model for Asset Management and Quantity the Steel elements, Team Size – 12 Configuration- Existing bridge five-span steel trussed bridge with longitudinal metal trough decking and concrete topping. Deliverables: M3 and M2, Asset meta data and report. BIM tools used: Revit, Navis works and Revizto. Challenges: Untrained resources, Software Limitations, Linear drawings
  • 3. 6 Building LOD & LOI =L5 Client: PRP Architect (UK) Project- Stockwell Park-2 Scope of work: Construction Design development (M2 & M3) ASMEP of 128 apartments and old age house Purpose of BIM: Documentation extraction, coordination, Quantity Team Size – 13 Client: Sahara India, Project- Shipra Indirapuram Scope of work: Construction Design development (M2 & M3) ASMEP of 128 apartments and old age house Purpose of BIM: Documentation extraction, coordination, Quantity Team Size – 13 METRO Client: Different Clients Gov. Authority Project- 14 Cities Metro Scope of work: Concept to Construction Design to Asset Management and Operations for (M2 & M3) ASMEP, Purpose of BIM: Documentation extraction, coordination, Quantity, Walk Through, Visualization etc. Team Size – 4 to 40 (Multi discipline and location) Configuration- Stations, Viaduct, Tunnels, Depot, Abutment work, Site work Deliverables: M3 and M2, Report, BOQ, Coordination record, Integration, 4D&5D, Shop and Fabrication drawings, Time schedule and Cost extraction BIM tools used: Revit, Navis works, C3D, Bentley Connect, Open Road, BIM one click, Bim Collab, BIM Track, and Revizto. CDE & EDMS platform (Mezzoteam, Projectwise, BIM 360 Forge, One Drive, Acosim, Google Drive, InEight, Bluebeam, Sharepoint)
  • 4. 7 STATUE STATUE OF UNITY (Highest Statue of world) Proposed World Highest (180m) (Statue of Unity) situated at Sardar Sarover Dam, Gujrat, India. Coordination among Structure, Architecture, MEPF, Site Excavation, Earth work Calculation, Quantity of all modeled element, 4D and 5D Simulation with BIM Software. HOSPITAL Special Security Hospital: -SEHA (Obermeyer) (125 Beds, 1B+2Medical floor+ 3Ward Building+ Security Features, AL Shamlkha South, Abu Dhabi. Software Used: Revit MEP, Navisworks. Modeling of Mechanical duct work, piping work, fixing of mechanical devices Boiler, Chimney Valves, duct accessories and coordination among Exterior Facade, Furniture, Structural Element, Solar system, and Arch+Str+MEPF elements. I partiality support as a BIM Manager in absence of actual BIM manger only for Two month at the Design Development stage. STADIUM AND MISCELLANEOUS BIM Lead, BIM Head, Digital Engineering Head, automation, modeling and coordination among Architectural, Structure & MEPF service to extract GA’s, Construction Drawings, Detailed Drawings, Shop Drawings, As Built drawings, Piping Drawings, Engineering Drawings, HVAC Drawings, Electrical Drawings, Landscaping Drawings, Structural Drawings, 4D/5D/6D information, Assets management, Modeling Conversion, Clash detection, BIM log, Design Discrepancies ,project design production, coordination, Integration BIM and BIM Implementation, chair project meetings, budgeting, resource planning, Work distribution or work breakdown, work assignment, production overview, Identify and mitigation project risk, Coordination with disciplines project leads, team time management, new resources hiring, project Setup, project phase planning, Component and Template Creation, Setup of detailing, project coordination for all stage, Cost control, Project closing and report the department management or stakeholders , digital engineering and hand on the Autodesk BIM technology ,multi-disciplinary project, started from point to drawing (2D) to model (3D) to schedule (Time planning) 4D to calculation (Cost planning) 5D to Energy analysis, 6D to sustainability, 7D to Building Operation and 8D to Identify project prone areas , Project Hazards, Project Integration and Multi discipline coordination , project life cycle. Review project compliance requirements of all engineering and architectural specifications or drawing for each type of buildings internal composite coordination, existing as-built verification, site visits, design parameters, standards of work letters, Phasing plans etc.. Deploy, Implement the BIM technology in reputed organizations specialization and disciplines (ASMEPF & Linear) standards developed BIM Standards ISO 19650, BS 1192, AIA, Uni-classification (NBS), Cobie, CIC, LOD &LOI, Cobie and IFC etc. Developed Systra Project BIM standards i.e. multi-disciplinary template, MIDP, MDPT, TIDP, Clash Matrix, BIM Manuals, Clash matrix, Clash log, Naming convention, Folder structure, WBS, Quality check, CDE/EDMS process and Workflows, Project setup, resource/organisation accessibility and competency, project check list, Input/output log, records and closing etc. stakeholder to implement EDMS (Electronic Document Management System) and CDE (Common Data Environment) ,setting up metadata for the model information system processes, technical standards, libraries and templates specific for programme wide BIM uses in the project such as design authoring, design coordination, review & record and asset management. utility, Storm water, drainage, GIS provide documentation for construction hand-off (As Built) drawings, Letters, lease language and construction. Pre-construction manager, Introduce BIM technology to my employers and Implement technology for design, construction, and preconstruction execution. had played a key role on my assignments to produce the integrated project high profile and complex multi-disciplinary projects coordinated closely with management, in-house architectural, general engineering, civil engineering, and services/system design teams to deliver high quality design deliverables with the use of sophisticated software Architecture, Structure (RCC, Steel and Reinforcement), Services (Mechanical, Public Health, Electrical and Fire Fighting, drainage, Strom Water), Site development (station & Corridor), shop drawings, Quantity Extraction from BIM (Presto), 3D Coordination, Record of coordination, Clash detection, Walkthrough, Animation, and meta data information etc.