INOVATIVE
CONSTRUCTION
(ZIEGEL SYSTEM)
helpdesk@construction-productivity.co.uk
htt://www.construction-productivity.co.uk
ZIEGEL SYSTEM
 ThermoPlan Ziegel is a honeycomb clay
building block.
 It is faster and simpler to build with, will
out perform other masonry systems and
yet offers similar built costs.
 ThermoPlan (known as Ziegel on the
continent) is proven over hundreds of
years and many thousands of buildings.
ZIEGEL SYSTEM
 Very simple
 quick
 robust construction method.
 Typically aThermoPlan Ziegel build is 3 or 4
times as fast as other masonry systems - with
less potential for problems.
 Excellent thermal insulation :
 good U-Values and very low psi (Y)Values allow
ThermoPlan Ziegel to perform incredibly well,
with no other insulation required.
ZIEGEL SYSTEM
 Good over heating control due to thermal
mass of block.
 Simple route to good, long-lasting
airtightness.
 Breathing construction - improving indoor air
quality.
 Full system including all external and internal
blocks, lintels, mortars, plasters, renders,
fixings etc.
ZIEGEL SYSTEM
 MMC approved system
 Sustainable, achieving BREEAM Green Guide
A rating
 30% less embodied CO2 than comparable
cavity wall
 Non-toxic and sustainable materials.
ZIEGEL SYSTEM
Case Study
 Sure Start Sheerness is one of a
programme of centres being built
across the country under the
Government’s programme to
provide better facilities and
support for preschool age children
and their families.
ZIEGEL SYSTEM
 It comprises 1100 sqm of multi
purpose accommodation in three one
storey blocks and one two storey
block.
 The facilities include the Sure Start
administration offices, a fifty place
day-nursery, a family services unit and
a wing for primary care trust patient
services for the local area.
ZIEGEL SYSTEM
• The architect’s objective was to design a
building with a good ecological profile
• consisting of a single skin of masonry
which provided both the structural shell
and the insulation required to exceed the
current building regulations.
ZIEGEL SYSTEM
• The architect also wished to minimise the
use of cement based materials and utilise a
system which encompassed robust detailing
throughout.
• Natural BuildingTechnologies(NBT) role in
project
ZIEGEL SYSTEM
• NBT provided the system for the structural
shell and external and internal finishes of the
building.
• This necessitated close liaison with the
architect from early on in the design phase of
the project as the system was an innovative
method of construction in the UK.
ZIEGEL SYSTEM
Performance
• The external walls were constructed using 365mm
Plan-Ziegel, fired clay insulating blocks with a thin
joint system, to achieve a U value of 0.30W/m2K.
Internally dense acoustic Ziegel blocks were used.
• Internally lime gypsum and lime plasters were
used, also from Baumi Bayosan.
ZIEGEL SYSTEM
• The blocks are highly vapour permeable with a
very low equilibrium moisture content.
• In conjunction with the Baumit Bayosan
renders and plasters this ensures a
“breathable” and dry construction, providing a
healthy and thermally efficient structure.
ZIEGEL SYSTEM
15mm Mineral Render-System & Mineral Paint
300mmT11 Ziegel Block (thin bed mortar system)
12mm Mineral Plaster NBT BreathableTrade Emulsion 365
The blocks also have good thermal mass, keeping the building
cool in summer and warm in winter.
ZIEGEL SYSTEM
Buildability
The thin bed system means no restriction on the
height of build per day.
Plan Ziegel blocks offer a fast method of
constructing a masonry
shell with robust detailing throughout.
ZIEGEL SYSTEM
All membranes, cold bridging and
damp, cold cavities are eliminated with this
form of construction.
The dry interlocking perps allow fast, easy
building without the risk of
acoustic or thermal leakage.
ZIEGEL SYSTEM
Standard profile blocks were used to
create in-situ cast lintels and vertical
service ducts for soil pipes.
A pre-cast concrete floor with a span of eight metres which
rests directly on the Ziegel blocks was used at first floor level in
one section of the building.
ZIEGEL SYSTEM
Design Issues:
From architect:This method of
construction though standard in
much of Europe did throw up some
design challenges, but none which
could not be satisfactorily
addressed.
ZIEGEL SYSTEM
The system allowed us to
achieve our design
objectives particularly in
respect of:
Ecology
cost and performance.
Build Issues
Progress in constructing
the masonry shell was
fast.
There are clearly
important advantages
to be gained through
single skin construction.
ZIEGEL SYSTEM
Cost:
 Commentary:The project was late in starting
due to unforeseen circumstances at tender
stage.
 A full cost appraisal will be undertaken by the
architect/contactor once the project is
complete.
 Speed of build and robustness give additional
cost benefits
ZIEGEL SYSTEM
 Ziegel Smartwall is suitable for
buildings up to 4 storeys high for
housing and apartment
developments, and can also be
used for basement and cellar
areas.
ZIEGEL SYSTEM
 The system is easy to work with
on site and can easily be cut using
an alligator saw.
 The adhesive layer is applied
using a roller applicator ensuring
that the correct quantity is
delivered onto the block surface.
ZIEGEL SYSTEM
 The product can be finished externally with
any lightweight cladding system such as
render, brick slips or decorative cladding
board.
 Ziegel Smartwall can also be used in
conjunction with external woodfibre
insulation for added thermal performance.

More Related Content

What's hot

EPS (thermocoal ) in construction
EPS (thermocoal ) in construction EPS (thermocoal ) in construction
EPS (thermocoal ) in construction
Hafis Puzhakkal
 
Mohamed Nasreldin - expanded polystyrene from the ground up
Mohamed Nasreldin - expanded polystyrene from the ground upMohamed Nasreldin - expanded polystyrene from the ground up
Mohamed Nasreldin - expanded polystyrene from the ground up
kuwaitinsulation
 
Prefabricated construction systems in India- Precast Status and needed Impetus
Prefabricated construction systems in India- Precast Status and needed ImpetusPrefabricated construction systems in India- Precast Status and needed Impetus
Prefabricated construction systems in India- Precast Status and needed Impetus
IEI GSC
 
Modern Method
Modern MethodModern Method
Modern Method
Shourya Puri
 
Cosmo House
Cosmo HouseCosmo House
Cosmo House
CameronMiller
 
Facades and envelopes
Facades and envelopesFacades and envelopes
Facades and envelopes
DanishPathan7
 
Glass Fiber Reinforced Gypsum (GFRG)
Glass Fiber Reinforced Gypsum (GFRG)Glass Fiber Reinforced Gypsum (GFRG)
Glass Fiber Reinforced Gypsum (GFRG)
Mukul Saini
 
Insulated reinforced concrete built fast v0.1
Insulated reinforced concrete built fast v0.1Insulated reinforced concrete built fast v0.1
Insulated reinforced concrete built fast v0.1
aravindcalpine
 
Glass Fiber Reinforced Gypsum Panel use in Building Construction
Glass Fiber Reinforced Gypsum Panel use in Building ConstructionGlass Fiber Reinforced Gypsum Panel use in Building Construction
Glass Fiber Reinforced Gypsum Panel use in Building Construction
GRD Journals
 
Insulated reinforced concrete built fast
Insulated reinforced concrete built fastInsulated reinforced concrete built fast
Insulated reinforced concrete built fast
aravindcalpine
 
MULTI-UNIT MODULAR CONSTRUCTION - Start to Finish
MULTI-UNIT MODULAR CONSTRUCTION - Start to FinishMULTI-UNIT MODULAR CONSTRUCTION - Start to Finish
MULTI-UNIT MODULAR CONSTRUCTION - Start to Finish
Triumph Modular
 
IRJET- Comparative Study on Cost Estimation of GFRG Wall Panel System wit...
IRJET-  	  Comparative Study on Cost Estimation of GFRG Wall Panel System wit...IRJET-  	  Comparative Study on Cost Estimation of GFRG Wall Panel System wit...
IRJET- Comparative Study on Cost Estimation of GFRG Wall Panel System wit...
IRJET Journal
 
REINFORCED CONCRETE PRECAST TWIN WALLS
REINFORCED CONCRETE PRECAST TWIN WALLSREINFORCED CONCRETE PRECAST TWIN WALLS
REINFORCED CONCRETE PRECAST TWIN WALLS
Guy Pomphrey
 
MODERN CONSTRUCTION METHODS
MODERN CONSTRUCTION METHODSMODERN CONSTRUCTION METHODS
MODERN CONSTRUCTION METHODS
Shourya Puri
 
Towards Sustainable Facade
Towards Sustainable Facade Towards Sustainable Facade
Towards Sustainable Facade
Abhinav Chunchu
 
Prefabrication system
Prefabrication systemPrefabrication system
Prefabrication system
Arun Arun
 
Brochure Greenlinewindows 2
Brochure Greenlinewindows 2Brochure Greenlinewindows 2
Brochure Greenlinewindows 2
Greenlinewindows.com
 
Aerated autoclaved concrete
Aerated autoclaved concreteAerated autoclaved concrete
Aerated autoclaved concrete
Frahim Akhtar
 

What's hot (18)

EPS (thermocoal ) in construction
EPS (thermocoal ) in construction EPS (thermocoal ) in construction
EPS (thermocoal ) in construction
 
Mohamed Nasreldin - expanded polystyrene from the ground up
Mohamed Nasreldin - expanded polystyrene from the ground upMohamed Nasreldin - expanded polystyrene from the ground up
Mohamed Nasreldin - expanded polystyrene from the ground up
 
Prefabricated construction systems in India- Precast Status and needed Impetus
Prefabricated construction systems in India- Precast Status and needed ImpetusPrefabricated construction systems in India- Precast Status and needed Impetus
Prefabricated construction systems in India- Precast Status and needed Impetus
 
Modern Method
Modern MethodModern Method
Modern Method
 
Cosmo House
Cosmo HouseCosmo House
Cosmo House
 
Facades and envelopes
Facades and envelopesFacades and envelopes
Facades and envelopes
 
Glass Fiber Reinforced Gypsum (GFRG)
Glass Fiber Reinforced Gypsum (GFRG)Glass Fiber Reinforced Gypsum (GFRG)
Glass Fiber Reinforced Gypsum (GFRG)
 
Insulated reinforced concrete built fast v0.1
Insulated reinforced concrete built fast v0.1Insulated reinforced concrete built fast v0.1
Insulated reinforced concrete built fast v0.1
 
Glass Fiber Reinforced Gypsum Panel use in Building Construction
Glass Fiber Reinforced Gypsum Panel use in Building ConstructionGlass Fiber Reinforced Gypsum Panel use in Building Construction
Glass Fiber Reinforced Gypsum Panel use in Building Construction
 
Insulated reinforced concrete built fast
Insulated reinforced concrete built fastInsulated reinforced concrete built fast
Insulated reinforced concrete built fast
 
MULTI-UNIT MODULAR CONSTRUCTION - Start to Finish
MULTI-UNIT MODULAR CONSTRUCTION - Start to FinishMULTI-UNIT MODULAR CONSTRUCTION - Start to Finish
MULTI-UNIT MODULAR CONSTRUCTION - Start to Finish
 
IRJET- Comparative Study on Cost Estimation of GFRG Wall Panel System wit...
IRJET-  	  Comparative Study on Cost Estimation of GFRG Wall Panel System wit...IRJET-  	  Comparative Study on Cost Estimation of GFRG Wall Panel System wit...
IRJET- Comparative Study on Cost Estimation of GFRG Wall Panel System wit...
 
REINFORCED CONCRETE PRECAST TWIN WALLS
REINFORCED CONCRETE PRECAST TWIN WALLSREINFORCED CONCRETE PRECAST TWIN WALLS
REINFORCED CONCRETE PRECAST TWIN WALLS
 
MODERN CONSTRUCTION METHODS
MODERN CONSTRUCTION METHODSMODERN CONSTRUCTION METHODS
MODERN CONSTRUCTION METHODS
 
Towards Sustainable Facade
Towards Sustainable Facade Towards Sustainable Facade
Towards Sustainable Facade
 
Prefabrication system
Prefabrication systemPrefabrication system
Prefabrication system
 
Brochure Greenlinewindows 2
Brochure Greenlinewindows 2Brochure Greenlinewindows 2
Brochure Greenlinewindows 2
 
Aerated autoclaved concrete
Aerated autoclaved concreteAerated autoclaved concrete
Aerated autoclaved concrete
 

Similar to 038 innovative construction-ziegel block

Icf presentation english - august 2010
Icf   presentation english - august 2010Icf   presentation english - august 2010
Icf presentation english - august 2010
SERIGNE DIENG
 
Acp and glazing
Acp and glazingAcp and glazing
Acp and glazing
aduiti
 
Modular Volumetric Construction
Modular Volumetric ConstructionModular Volumetric Construction
Modular Volumetric Construction
philwdm
 
Insulation & Airtightness Continuity Report with Shadow Study
Insulation & Airtightness Continuity Report with Shadow Study Insulation & Airtightness Continuity Report with Shadow Study
Insulation & Airtightness Continuity Report with Shadow Study
Jonathan Flanagan
 
Volumetric Construction.pdf
Volumetric  Construction.pdfVolumetric  Construction.pdf
Volumetric Construction.pdf
LovelyLavakumarLK
 
Case study on Leadenhall Building KUET BECM 2k15
Case study on Leadenhall Building KUET BECM 2k15Case study on Leadenhall Building KUET BECM 2k15
Case study on Leadenhall Building KUET BECM 2k15
Arafat Akash
 
LiveIn Quarters
LiveIn QuartersLiveIn Quarters
LiveIn Quarters
clicknow
 
Thermacool Brochure WEB
Thermacool Brochure WEBThermacool Brochure WEB
Thermacool Brochure WEB
Mike Berry
 
Civil Engineering Materiel's 2017
Civil Engineering Materiel's 2017   Civil Engineering Materiel's 2017
Civil Engineering Materiel's 2017
ABIR A HAPZU
 
Greenflex presentation 0117
Greenflex presentation 0117Greenflex presentation 0117
Greenflex presentation 0117
Giulio Zanelli
 
Building Technology 1 "Construction Solutions"
Building Technology 1 "Construction Solutions"Building Technology 1 "Construction Solutions"
Building Technology 1 "Construction Solutions"
Digital Space Consultancy Ltd
 
Vision Building System
Vision Building SystemVision Building System
Vision Building System
Juan Ignacio Bravin Bauco
 
Monolithic concrete construction system
Monolithic concrete construction systemMonolithic concrete construction system
Monolithic concrete construction system
chirag aggarwal
 
Enclosure Systems-Arpitha Prasad-MMBC VIII
Enclosure Systems-Arpitha Prasad-MMBC VIIIEnclosure Systems-Arpitha Prasad-MMBC VIII
Enclosure Systems-Arpitha Prasad-MMBC VIII
ARPITHAPRASAD8
 
Smart eco hub open day 1
Smart eco hub open day 1Smart eco hub open day 1
Smart eco hub open day 1
Conor Annett
 
Enviroform Solutions Open Day
Enviroform Solutions Open DayEnviroform Solutions Open Day
Enviroform Solutions Open Day
Liam Brown
 
Green building materials, tools and appliances
Green building materials, tools and appliancesGreen building materials, tools and appliances
Green building materials, tools and appliances
HARISH J
 
ECONEKT - brochure..
ECONEKT - brochure..ECONEKT - brochure..
ECONEKT - brochure..
Frazer McLachlan
 
VNIT Seminar 2015
VNIT Seminar 2015VNIT Seminar 2015
VNIT Seminar 2015
Sachin Yete
 
Affordable Housing company in India WorldHaus Inc.
Affordable Housing company in India WorldHaus Inc.Affordable Housing company in India WorldHaus Inc.
Affordable Housing company in India WorldHaus Inc.
WorldHaus
 

Similar to 038 innovative construction-ziegel block (20)

Icf presentation english - august 2010
Icf   presentation english - august 2010Icf   presentation english - august 2010
Icf presentation english - august 2010
 
Acp and glazing
Acp and glazingAcp and glazing
Acp and glazing
 
Modular Volumetric Construction
Modular Volumetric ConstructionModular Volumetric Construction
Modular Volumetric Construction
 
Insulation & Airtightness Continuity Report with Shadow Study
Insulation & Airtightness Continuity Report with Shadow Study Insulation & Airtightness Continuity Report with Shadow Study
Insulation & Airtightness Continuity Report with Shadow Study
 
Volumetric Construction.pdf
Volumetric  Construction.pdfVolumetric  Construction.pdf
Volumetric Construction.pdf
 
Case study on Leadenhall Building KUET BECM 2k15
Case study on Leadenhall Building KUET BECM 2k15Case study on Leadenhall Building KUET BECM 2k15
Case study on Leadenhall Building KUET BECM 2k15
 
LiveIn Quarters
LiveIn QuartersLiveIn Quarters
LiveIn Quarters
 
Thermacool Brochure WEB
Thermacool Brochure WEBThermacool Brochure WEB
Thermacool Brochure WEB
 
Civil Engineering Materiel's 2017
Civil Engineering Materiel's 2017   Civil Engineering Materiel's 2017
Civil Engineering Materiel's 2017
 
Greenflex presentation 0117
Greenflex presentation 0117Greenflex presentation 0117
Greenflex presentation 0117
 
Building Technology 1 "Construction Solutions"
Building Technology 1 "Construction Solutions"Building Technology 1 "Construction Solutions"
Building Technology 1 "Construction Solutions"
 
Vision Building System
Vision Building SystemVision Building System
Vision Building System
 
Monolithic concrete construction system
Monolithic concrete construction systemMonolithic concrete construction system
Monolithic concrete construction system
 
Enclosure Systems-Arpitha Prasad-MMBC VIII
Enclosure Systems-Arpitha Prasad-MMBC VIIIEnclosure Systems-Arpitha Prasad-MMBC VIII
Enclosure Systems-Arpitha Prasad-MMBC VIII
 
Smart eco hub open day 1
Smart eco hub open day 1Smart eco hub open day 1
Smart eco hub open day 1
 
Enviroform Solutions Open Day
Enviroform Solutions Open DayEnviroform Solutions Open Day
Enviroform Solutions Open Day
 
Green building materials, tools and appliances
Green building materials, tools and appliancesGreen building materials, tools and appliances
Green building materials, tools and appliances
 
ECONEKT - brochure..
ECONEKT - brochure..ECONEKT - brochure..
ECONEKT - brochure..
 
VNIT Seminar 2015
VNIT Seminar 2015VNIT Seminar 2015
VNIT Seminar 2015
 
Affordable Housing company in India WorldHaus Inc.
Affordable Housing company in India WorldHaus Inc.Affordable Housing company in India WorldHaus Inc.
Affordable Housing company in India WorldHaus Inc.
 

More from drdej19

069 managing people
069 managing people069 managing people
069 managing people
drdej19
 
070 material management
070 material management070 material management
070 material management
drdej19
 
068 managing fundamentals
068 managing fundamentals068 managing fundamentals
068 managing fundamentals
drdej19
 
067 management
067 management067 management
067 management
drdej19
 
066 management structure-the design
066 management structure-the design066 management structure-the design
066 management structure-the design
drdej19
 
062 logistics and productivity
062 logistics and productivity062 logistics and productivity
062 logistics and productivity
drdej19
 
065 management information system
065 management information system065 management information system
065 management information system
drdej19
 
064 management accounting
064 management accounting064 management accounting
064 management accounting
drdej19
 
063 management theory
063 management theory063 management theory
063 management theory
drdej19
 
061 logistics and productivity
061 logistics and productivity061 logistics and productivity
061 logistics and productivity
drdej19
 
059 lean construction
059 lean construction059 lean construction
059 lean construction
drdej19
 
060 lean supply chain
060 lean supply chain060 lean supply chain
060 lean supply chain
drdej19
 
055 kpi's-success factor
055 kpi's-success factor055 kpi's-success factor
055 kpi's-success factor
drdej19
 
057 lean and environment
057 lean and environment057 lean and environment
057 lean and environment
drdej19
 
058 lean construction (2)
058 lean construction (2)058 lean construction (2)
058 lean construction (2)
drdej19
 
056 labour productivity
056 labour productivity056 labour productivity
056 labour productivity
drdej19
 
054 jit and quality management system
054 jit and quality management system054 jit and quality management system
054 jit and quality management system
drdej19
 
050 intergrating constructability
050 intergrating constructability050 intergrating constructability
050 intergrating constructability
drdej19
 
049 integration of constructability
049 integration of constructability049 integration of constructability
049 integration of constructability
drdej19
 
048 integrating workers motivation
048 integrating workers motivation048 integrating workers motivation
048 integrating workers motivation
drdej19
 

More from drdej19 (20)

069 managing people
069 managing people069 managing people
069 managing people
 
070 material management
070 material management070 material management
070 material management
 
068 managing fundamentals
068 managing fundamentals068 managing fundamentals
068 managing fundamentals
 
067 management
067 management067 management
067 management
 
066 management structure-the design
066 management structure-the design066 management structure-the design
066 management structure-the design
 
062 logistics and productivity
062 logistics and productivity062 logistics and productivity
062 logistics and productivity
 
065 management information system
065 management information system065 management information system
065 management information system
 
064 management accounting
064 management accounting064 management accounting
064 management accounting
 
063 management theory
063 management theory063 management theory
063 management theory
 
061 logistics and productivity
061 logistics and productivity061 logistics and productivity
061 logistics and productivity
 
059 lean construction
059 lean construction059 lean construction
059 lean construction
 
060 lean supply chain
060 lean supply chain060 lean supply chain
060 lean supply chain
 
055 kpi's-success factor
055 kpi's-success factor055 kpi's-success factor
055 kpi's-success factor
 
057 lean and environment
057 lean and environment057 lean and environment
057 lean and environment
 
058 lean construction (2)
058 lean construction (2)058 lean construction (2)
058 lean construction (2)
 
056 labour productivity
056 labour productivity056 labour productivity
056 labour productivity
 
054 jit and quality management system
054 jit and quality management system054 jit and quality management system
054 jit and quality management system
 
050 intergrating constructability
050 intergrating constructability050 intergrating constructability
050 intergrating constructability
 
049 integration of constructability
049 integration of constructability049 integration of constructability
049 integration of constructability
 
048 integrating workers motivation
048 integrating workers motivation048 integrating workers motivation
048 integrating workers motivation
 

Recently uploaded

一比一原版南安普顿索伦特大学毕业证Southampton成绩单一模一样
一比一原版南安普顿索伦特大学毕业证Southampton成绩单一模一样一比一原版南安普顿索伦特大学毕业证Southampton成绩单一模一样
一比一原版南安普顿索伦特大学毕业证Southampton成绩单一模一样
3vgr39kx
 
International Upcycling Research Network advisory board meeting 4
International Upcycling Research Network advisory board meeting 4International Upcycling Research Network advisory board meeting 4
International Upcycling Research Network advisory board meeting 4
Kyungeun Sung
 
AHMED TALAAT ARCHITECTURE PORTFOLIO .pdf
AHMED TALAAT ARCHITECTURE PORTFOLIO .pdfAHMED TALAAT ARCHITECTURE PORTFOLIO .pdf
AHMED TALAAT ARCHITECTURE PORTFOLIO .pdf
talaatahm
 
Graphic Design Tools and Software .pptx
Graphic Design Tools and Software   .pptxGraphic Design Tools and Software   .pptx
Graphic Design Tools and Software .pptx
Virtual Real Design
 
CocaCola_Brand_equity_package_2012__.pdf
CocaCola_Brand_equity_package_2012__.pdfCocaCola_Brand_equity_package_2012__.pdf
CocaCola_Brand_equity_package_2012__.pdf
PabloMartelLpez
 
一比一原版阿肯色大学毕业证(UCSF毕业证书)如何办理
一比一原版阿肯色大学毕业证(UCSF毕业证书)如何办理一比一原版阿肯色大学毕业证(UCSF毕业证书)如何办理
一比一原版阿肯色大学毕业证(UCSF毕业证书)如何办理
bo44ban1
 
一比一原版马里兰大学毕业证(UMD毕业证书)如何办理
一比一原版马里兰大学毕业证(UMD毕业证书)如何办理一比一原版马里兰大学毕业证(UMD毕业证书)如何办理
一比一原版马里兰大学毕业证(UMD毕业证书)如何办理
9lq7ultg
 
一比一原版(LSBU毕业证书)伦敦南岸大学毕业证如何办理
一比一原版(LSBU毕业证书)伦敦南岸大学毕业证如何办理一比一原版(LSBU毕业证书)伦敦南岸大学毕业证如何办理
一比一原版(LSBU毕业证书)伦敦南岸大学毕业证如何办理
k7nm6tk
 
一比一原版布兰登大学毕业证(BU毕业证书)如何办理
一比一原版布兰登大学毕业证(BU毕业证书)如何办理一比一原版布兰登大学毕业证(BU毕业证书)如何办理
一比一原版布兰登大学毕业证(BU毕业证书)如何办理
wkip62b
 
Divertidamente SLIDE.pptxufururururuhrurid8dj
Divertidamente SLIDE.pptxufururururuhrurid8djDivertidamente SLIDE.pptxufururururuhrurid8dj
Divertidamente SLIDE.pptxufururururuhrurid8dj
lunaemel03
 
定制美国西雅图城市大学毕业证学历证书原版一模一样
定制美国西雅图城市大学毕业证学历证书原版一模一样定制美国西雅图城市大学毕业证学历证书原版一模一样
定制美国西雅图城市大学毕业证学历证书原版一模一样
qo1as76n
 
一比一原版马来西亚世纪大学毕业证成绩单一模一样
一比一原版马来西亚世纪大学毕业证成绩单一模一样一比一原版马来西亚世纪大学毕业证成绩单一模一样
一比一原版马来西亚世纪大学毕业证成绩单一模一样
k4krdgxx
 
一比一原版亚利桑那大学毕业证(UA毕业证书)如何办理
一比一原版亚利桑那大学毕业证(UA毕业证书)如何办理一比一原版亚利桑那大学毕业证(UA毕业证书)如何办理
一比一原版亚利桑那大学毕业证(UA毕业证书)如何办理
21uul8se
 
哪里办理美国中央华盛顿大学毕业证双学位证书原版一模一样
哪里办理美国中央华盛顿大学毕业证双学位证书原版一模一样哪里办理美国中央华盛顿大学毕业证双学位证书原版一模一样
哪里办理美国中央华盛顿大学毕业证双学位证书原版一模一样
qo1as76n
 
Getting Data Ready for Culture Hack by Neontribe
Getting Data Ready for Culture Hack by NeontribeGetting Data Ready for Culture Hack by Neontribe
Getting Data Ready for Culture Hack by Neontribe
Harry Harrold
 
ARENA - Young adults in the workplace (Knight Moves).pdf
ARENA - Young adults in the workplace (Knight Moves).pdfARENA - Young adults in the workplace (Knight Moves).pdf
ARENA - Young adults in the workplace (Knight Moves).pdf
Knight Moves
 
一比一原版肯特大学毕业证UKC成绩单一模一样
一比一原版肯特大学毕业证UKC成绩单一模一样一比一原版肯特大学毕业证UKC成绩单一模一样
一比一原版肯特大学毕业证UKC成绩单一模一样
tobbk6s8
 
NHR Engineers Portfolio 2023 2024 NISHANT RATHI
NHR Engineers Portfolio 2023 2024 NISHANT RATHINHR Engineers Portfolio 2023 2024 NISHANT RATHI
NHR Engineers Portfolio 2023 2024 NISHANT RATHI
NishantRathi18
 
Manual ISH (International Society of Hypertension)
Manual ISH (International Society of Hypertension)Manual ISH (International Society of Hypertension)
Manual ISH (International Society of Hypertension)
bagmai
 
Practical eLearning Makeovers for Everyone
Practical eLearning Makeovers for EveryonePractical eLearning Makeovers for Everyone
Practical eLearning Makeovers for Everyone
Bianca Woods
 

Recently uploaded (20)

一比一原版南安普顿索伦特大学毕业证Southampton成绩单一模一样
一比一原版南安普顿索伦特大学毕业证Southampton成绩单一模一样一比一原版南安普顿索伦特大学毕业证Southampton成绩单一模一样
一比一原版南安普顿索伦特大学毕业证Southampton成绩单一模一样
 
International Upcycling Research Network advisory board meeting 4
International Upcycling Research Network advisory board meeting 4International Upcycling Research Network advisory board meeting 4
International Upcycling Research Network advisory board meeting 4
 
AHMED TALAAT ARCHITECTURE PORTFOLIO .pdf
AHMED TALAAT ARCHITECTURE PORTFOLIO .pdfAHMED TALAAT ARCHITECTURE PORTFOLIO .pdf
AHMED TALAAT ARCHITECTURE PORTFOLIO .pdf
 
Graphic Design Tools and Software .pptx
Graphic Design Tools and Software   .pptxGraphic Design Tools and Software   .pptx
Graphic Design Tools and Software .pptx
 
CocaCola_Brand_equity_package_2012__.pdf
CocaCola_Brand_equity_package_2012__.pdfCocaCola_Brand_equity_package_2012__.pdf
CocaCola_Brand_equity_package_2012__.pdf
 
一比一原版阿肯色大学毕业证(UCSF毕业证书)如何办理
一比一原版阿肯色大学毕业证(UCSF毕业证书)如何办理一比一原版阿肯色大学毕业证(UCSF毕业证书)如何办理
一比一原版阿肯色大学毕业证(UCSF毕业证书)如何办理
 
一比一原版马里兰大学毕业证(UMD毕业证书)如何办理
一比一原版马里兰大学毕业证(UMD毕业证书)如何办理一比一原版马里兰大学毕业证(UMD毕业证书)如何办理
一比一原版马里兰大学毕业证(UMD毕业证书)如何办理
 
一比一原版(LSBU毕业证书)伦敦南岸大学毕业证如何办理
一比一原版(LSBU毕业证书)伦敦南岸大学毕业证如何办理一比一原版(LSBU毕业证书)伦敦南岸大学毕业证如何办理
一比一原版(LSBU毕业证书)伦敦南岸大学毕业证如何办理
 
一比一原版布兰登大学毕业证(BU毕业证书)如何办理
一比一原版布兰登大学毕业证(BU毕业证书)如何办理一比一原版布兰登大学毕业证(BU毕业证书)如何办理
一比一原版布兰登大学毕业证(BU毕业证书)如何办理
 
Divertidamente SLIDE.pptxufururururuhrurid8dj
Divertidamente SLIDE.pptxufururururuhrurid8djDivertidamente SLIDE.pptxufururururuhrurid8dj
Divertidamente SLIDE.pptxufururururuhrurid8dj
 
定制美国西雅图城市大学毕业证学历证书原版一模一样
定制美国西雅图城市大学毕业证学历证书原版一模一样定制美国西雅图城市大学毕业证学历证书原版一模一样
定制美国西雅图城市大学毕业证学历证书原版一模一样
 
一比一原版马来西亚世纪大学毕业证成绩单一模一样
一比一原版马来西亚世纪大学毕业证成绩单一模一样一比一原版马来西亚世纪大学毕业证成绩单一模一样
一比一原版马来西亚世纪大学毕业证成绩单一模一样
 
一比一原版亚利桑那大学毕业证(UA毕业证书)如何办理
一比一原版亚利桑那大学毕业证(UA毕业证书)如何办理一比一原版亚利桑那大学毕业证(UA毕业证书)如何办理
一比一原版亚利桑那大学毕业证(UA毕业证书)如何办理
 
哪里办理美国中央华盛顿大学毕业证双学位证书原版一模一样
哪里办理美国中央华盛顿大学毕业证双学位证书原版一模一样哪里办理美国中央华盛顿大学毕业证双学位证书原版一模一样
哪里办理美国中央华盛顿大学毕业证双学位证书原版一模一样
 
Getting Data Ready for Culture Hack by Neontribe
Getting Data Ready for Culture Hack by NeontribeGetting Data Ready for Culture Hack by Neontribe
Getting Data Ready for Culture Hack by Neontribe
 
ARENA - Young adults in the workplace (Knight Moves).pdf
ARENA - Young adults in the workplace (Knight Moves).pdfARENA - Young adults in the workplace (Knight Moves).pdf
ARENA - Young adults in the workplace (Knight Moves).pdf
 
一比一原版肯特大学毕业证UKC成绩单一模一样
一比一原版肯特大学毕业证UKC成绩单一模一样一比一原版肯特大学毕业证UKC成绩单一模一样
一比一原版肯特大学毕业证UKC成绩单一模一样
 
NHR Engineers Portfolio 2023 2024 NISHANT RATHI
NHR Engineers Portfolio 2023 2024 NISHANT RATHINHR Engineers Portfolio 2023 2024 NISHANT RATHI
NHR Engineers Portfolio 2023 2024 NISHANT RATHI
 
Manual ISH (International Society of Hypertension)
Manual ISH (International Society of Hypertension)Manual ISH (International Society of Hypertension)
Manual ISH (International Society of Hypertension)
 
Practical eLearning Makeovers for Everyone
Practical eLearning Makeovers for EveryonePractical eLearning Makeovers for Everyone
Practical eLearning Makeovers for Everyone
 

038 innovative construction-ziegel block

  • 2. ZIEGEL SYSTEM  ThermoPlan Ziegel is a honeycomb clay building block.  It is faster and simpler to build with, will out perform other masonry systems and yet offers similar built costs.  ThermoPlan (known as Ziegel on the continent) is proven over hundreds of years and many thousands of buildings.
  • 3. ZIEGEL SYSTEM  Very simple  quick  robust construction method.  Typically aThermoPlan Ziegel build is 3 or 4 times as fast as other masonry systems - with less potential for problems.  Excellent thermal insulation :  good U-Values and very low psi (Y)Values allow ThermoPlan Ziegel to perform incredibly well, with no other insulation required.
  • 4. ZIEGEL SYSTEM  Good over heating control due to thermal mass of block.  Simple route to good, long-lasting airtightness.  Breathing construction - improving indoor air quality.  Full system including all external and internal blocks, lintels, mortars, plasters, renders, fixings etc.
  • 5. ZIEGEL SYSTEM  MMC approved system  Sustainable, achieving BREEAM Green Guide A rating  30% less embodied CO2 than comparable cavity wall  Non-toxic and sustainable materials.
  • 7. Case Study  Sure Start Sheerness is one of a programme of centres being built across the country under the Government’s programme to provide better facilities and support for preschool age children and their families.
  • 8. ZIEGEL SYSTEM  It comprises 1100 sqm of multi purpose accommodation in three one storey blocks and one two storey block.  The facilities include the Sure Start administration offices, a fifty place day-nursery, a family services unit and a wing for primary care trust patient services for the local area.
  • 9. ZIEGEL SYSTEM • The architect’s objective was to design a building with a good ecological profile • consisting of a single skin of masonry which provided both the structural shell and the insulation required to exceed the current building regulations.
  • 10. ZIEGEL SYSTEM • The architect also wished to minimise the use of cement based materials and utilise a system which encompassed robust detailing throughout. • Natural BuildingTechnologies(NBT) role in project
  • 11. ZIEGEL SYSTEM • NBT provided the system for the structural shell and external and internal finishes of the building. • This necessitated close liaison with the architect from early on in the design phase of the project as the system was an innovative method of construction in the UK.
  • 13.
  • 14. Performance • The external walls were constructed using 365mm Plan-Ziegel, fired clay insulating blocks with a thin joint system, to achieve a U value of 0.30W/m2K. Internally dense acoustic Ziegel blocks were used. • Internally lime gypsum and lime plasters were used, also from Baumi Bayosan.
  • 15. ZIEGEL SYSTEM • The blocks are highly vapour permeable with a very low equilibrium moisture content. • In conjunction with the Baumit Bayosan renders and plasters this ensures a “breathable” and dry construction, providing a healthy and thermally efficient structure.
  • 16. ZIEGEL SYSTEM 15mm Mineral Render-System & Mineral Paint 300mmT11 Ziegel Block (thin bed mortar system) 12mm Mineral Plaster NBT BreathableTrade Emulsion 365 The blocks also have good thermal mass, keeping the building cool in summer and warm in winter.
  • 18. Buildability The thin bed system means no restriction on the height of build per day. Plan Ziegel blocks offer a fast method of constructing a masonry shell with robust detailing throughout.
  • 19. ZIEGEL SYSTEM All membranes, cold bridging and damp, cold cavities are eliminated with this form of construction. The dry interlocking perps allow fast, easy building without the risk of acoustic or thermal leakage.
  • 20. ZIEGEL SYSTEM Standard profile blocks were used to create in-situ cast lintels and vertical service ducts for soil pipes. A pre-cast concrete floor with a span of eight metres which rests directly on the Ziegel blocks was used at first floor level in one section of the building.
  • 21. ZIEGEL SYSTEM Design Issues: From architect:This method of construction though standard in much of Europe did throw up some design challenges, but none which could not be satisfactorily addressed.
  • 22. ZIEGEL SYSTEM The system allowed us to achieve our design objectives particularly in respect of: Ecology cost and performance.
  • 23. Build Issues Progress in constructing the masonry shell was fast. There are clearly important advantages to be gained through single skin construction.
  • 24. ZIEGEL SYSTEM Cost:  Commentary:The project was late in starting due to unforeseen circumstances at tender stage.  A full cost appraisal will be undertaken by the architect/contactor once the project is complete.  Speed of build and robustness give additional cost benefits
  • 25. ZIEGEL SYSTEM  Ziegel Smartwall is suitable for buildings up to 4 storeys high for housing and apartment developments, and can also be used for basement and cellar areas.
  • 26. ZIEGEL SYSTEM  The system is easy to work with on site and can easily be cut using an alligator saw.  The adhesive layer is applied using a roller applicator ensuring that the correct quantity is delivered onto the block surface.
  • 27. ZIEGEL SYSTEM  The product can be finished externally with any lightweight cladding system such as render, brick slips or decorative cladding board.  Ziegel Smartwall can also be used in conjunction with external woodfibre insulation for added thermal performance.