Exam Questions
1. You’re a project manager working on a software engineering project. The programmers have
started building the software, and the testers have started to create the test environment. Which
process group includes these activities?
InitiatingA.	
PlanningB.	
ExecutingC.	
ClosingD.	
2. Which of the following is not a stakeholder?
The project manager who is responsible for building the projectA.	
A project team member who will work on the projectB.	
A customer who will use the final productC.	
A competitor whose company will lose business because of the productD.	
3. A project manager runs into a problem with her project’s contractors, and she isn’t sure
if they’re abiding by the terms of the contract. Which knowledge area is the BEST source of
processes to help her deal with this problem?
Cost ManagementA.	
Risk ManagementB.	
Procurement ManagementC.	
Communications ManagementD.	
4. You’re a project manager for a construction project. You’ve just finished creating a list of all of
the people who will be directly affected by the project. What process group are you in?
InitiatingA.	
PlanningB.	
ExecutingC.	
Monitoring & ControllingD.	
5. Which process group contains the Develop Project Charter process and the Identify
Stakeholders process?
InitiatingA.	
ExecutingB.	
Monitoring and ControllingC.	
ClosingD.	
Download at Boykma.Com
82   Chapter 3
Exam Questions
6. Which of the following is NOT a project?
Repairing a carA.	
Building a highway overpassB.	
Running an IT support departmentC.	
Filming a motion pictureD.	
7. A project manager is running a software project that is supposed to be delivered in phases. She was
planning on dividing the resources into two separate teams to do the work for two phases at the same time,
but one of her senior developers suggested that she use an Agile methodology instead, and she agrees. Which
of the following BEST describes the relationship between her project’s phases?
Sequential relationshipA.	
Iterative relationshipB.	
Constrained relationshipC.	
Overlapping relationshipD.	
8. Which of the following is NOT true about overlapping phases?
Each phase is typically done by a separate teamA.	
There’s an increased risk of delays when a later phase can’t start until an earlier one endsB.	
There’s an increased risk to the project due to potential for reworkC.	
Every phase must go through all five process groupsD.	
9. You’re the project manager for an industrial design project. Your team members report to you, and you’re
responsible for creating the budget, building the schedule, and assigning the tasks. When the project is
complete, you release the team so they can work on other projects for the company. What kind of organization
do you work in?
FunctionalA.	
Weak matrixB.	
Strong matrixC.	
ProjectizedD.	
10. You’re a project manager working in a weak matrix organization. Which of the following is NOT true?
Your team members report to functional managersA.	
You are not in directly charge of resourcesB.	
Functional managers make decisions that can affect your projectsC.	
You have sole responsibility for the success or failure of the projectD.	
exam questions
Download at Boykma.Com
you are here 4   83
the process framework
Exam Questions
Answers
1. Answer: C
The Executing process group is the one where the team does all the work. You’ll get a good feel for the
process groups pretty quickly!
2. Answer: D
One of the hardest things that a project manager has to do on a project is figure out who all the
stakeholders are. The project manager, the team, the sponsor (or client), the customers and people who
will use the software, the senior managers at the company—they’re all stakeholders. Competitors aren’t
stakeholders, because even though they’re affected by the project, they don’t actually have any direct
influence over it.
3. Answer: C
The Procurement Management knowledge area deals with contracts, contractors, buyers and sellers. If
you’ve got a question about a type of contract or how to deal with contract problems, you’re being asked
about a Procurement Management process.
4. Answer: A
People who will be directly affected by the project are stakeholders, and when you’re creating a list of
them you’re performing the Identify Stakeholders process. That’s one of the two processes in the Initiating
process group.
5. Answer: A
The first things that are created on a project are the charter (which you create in the Develop Project
Charter process) and the Stakeholder Register (which you create in the Identify Stakeholders process).
You do those things when you’re initiating the project.
Download at Boykma.Com
84   Chapter 3
Exam Questions
Answers
6. Answer: C
The work of an IT support department doesn’t have an end date—it’s not temporary. That’s why it’s
not a project. Now, if that support team had to work over the weekend to move the data center to a
new location, then that would be a project!
I see—so even when
something is a process and
not a project, there could
be projects related to it.
7. Answer: B
Agile development is a really good example of an iterative approach to project phases. In an Agile
project, the team will typically break down the project into phases, where they work on the current
phase while planning out the next one.
exam answers
Download at Boykma.Com
you are here 4   85
the process framework
Exam Questions
Answers
8. Answer: B
If there’s an increased risk of a project because one phase can’t start until another one ends, that means your project
phases aren’t overlapping. When you’ve got overlapping phases, that means that you typically have multiple teams
that start their phases independently of each other.
Also, take another look at answer C, because it’s an important point about overlapping phases. When your
phases have an overlapping relationship, there’s an increased risk of rework. This typically happens when one
team delivers the results of their project, but made assumptions about what another team is doing as part of their
phase. When that other team delivers their work, it turns out that the results that both teams produced aren’t quite
compatible with each other, and now both teams have to go back and rework their designs. This happens a lot
when your phases overlap, which is why overlapping phases have an increased risk of rework.
9. Answer: D
In a projectized organization, the project manager has the power to assign tasks, manage the budget, and release the
team.
10. Answer: D
In a weak matrix, project managers have very limited authority. They have to share a lot of responsibility with
functional managers, and those functional managers have a lot of leeway to make decisions about how the team
members are managed. In an organization like that, the project manager isn’t given a lot of responsibility.
That’s why you’re likely to
find a project expediter
in a weak matrix.
Download at Boykma.Com

More Related Content

What's hot

Pmp2
Pmp2Pmp2
Pmp5
Pmp5Pmp5
07 pmp cost management exam
07 pmp cost management exam07 pmp cost management exam
07 pmp cost management exam
Jamil Faraj , PMP
 
11 pmp risk management exam
11 pmp risk management exam11 pmp risk management exam
11 pmp risk management exam
Jamil Faraj , PMP
 
Pmp3
Pmp3Pmp3
04 pmp integration management exam
04 pmp integration management exam04 pmp integration management exam
04 pmp integration management exam
Jamil Faraj , PMP
 
Pmp6
Pmp6Pmp6
06 pmp time management exam
06 pmp time  management exam06 pmp time  management exam
06 pmp time management exam
Jamil Faraj , PMP
 
01 pmp introduct to project management exam
01 pmp introduct to project management exam01 pmp introduct to project management exam
01 pmp introduct to project management exam
Jamil Faraj , PMP
 
12 pmp procurement management exam
12 pmp procurement management exam12 pmp procurement management exam
12 pmp procurement management exam
Jamil Faraj , PMP
 
13 pmp professional responsibility exam
13 pmp professional responsibility exam13 pmp professional responsibility exam
13 pmp professional responsibility exam
Jamil Faraj , PMP
 
150 PMP Questions
150 PMP Questions 150 PMP Questions
150 PMP Questions
Amina .M.Gidado
 
Pm study project risk management test
Pm study project  risk management testPm study project  risk management test
Pm study project risk management test
Abdullah Ahmed, PMP, RMP
 
02 pmp project life cycle exam
02 pmp project life cycle exam02 pmp project life cycle exam
02 pmp project life cycle exam
Jamil Faraj , PMP
 
Pmp Questions Complete
Pmp Questions CompletePmp Questions Complete
Pmp Questions Complete
KareemBullard1
 
Pmi sp questions with answers
Pmi sp questions with answersPmi sp questions with answers
Pmi sp questions with answers
Mohamed Saeed
 
Pmstudy exam 2
Pmstudy exam 2Pmstudy exam 2
Pmstudy exam 2
Mohamed Saeed
 
Pmp test 02
Pmp test 02Pmp test 02
Pmp test 02
Mohamed Saeed
 

What's hot (20)

Pmp2
Pmp2Pmp2
Pmp2
 
Pmp5
Pmp5Pmp5
Pmp5
 
07 pmp cost management exam
07 pmp cost management exam07 pmp cost management exam
07 pmp cost management exam
 
11 pmp risk management exam
11 pmp risk management exam11 pmp risk management exam
11 pmp risk management exam
 
Pmp3
Pmp3Pmp3
Pmp3
 
04 pmp integration management exam
04 pmp integration management exam04 pmp integration management exam
04 pmp integration management exam
 
Pmp6
Pmp6Pmp6
Pmp6
 
06 pmp time management exam
06 pmp time  management exam06 pmp time  management exam
06 pmp time management exam
 
Pmp1
Pmp1Pmp1
Pmp1
 
Pmp exam q&a
Pmp exam q&aPmp exam q&a
Pmp exam q&a
 
01 pmp introduct to project management exam
01 pmp introduct to project management exam01 pmp introduct to project management exam
01 pmp introduct to project management exam
 
12 pmp procurement management exam
12 pmp procurement management exam12 pmp procurement management exam
12 pmp procurement management exam
 
13 pmp professional responsibility exam
13 pmp professional responsibility exam13 pmp professional responsibility exam
13 pmp professional responsibility exam
 
150 PMP Questions
150 PMP Questions 150 PMP Questions
150 PMP Questions
 
Pm study project risk management test
Pm study project  risk management testPm study project  risk management test
Pm study project risk management test
 
02 pmp project life cycle exam
02 pmp project life cycle exam02 pmp project life cycle exam
02 pmp project life cycle exam
 
Pmp Questions Complete
Pmp Questions CompletePmp Questions Complete
Pmp Questions Complete
 
Pmi sp questions with answers
Pmi sp questions with answersPmi sp questions with answers
Pmi sp questions with answers
 
Pmstudy exam 2
Pmstudy exam 2Pmstudy exam 2
Pmstudy exam 2
 
Pmp test 02
Pmp test 02Pmp test 02
Pmp test 02
 

Viewers also liked

2
22
175 pmp sample_questions
175 pmp sample_questions175 pmp sample_questions
175 pmp sample_questions
Nazakat Hussain
 
Jamil faraj hassan CV
Jamil faraj hassan CVJamil faraj hassan CV
Jamil faraj hassan CV
Jamil Faraj , PMP
 
Jamil Hassan, PMP lessons learned.
Jamil Hassan, PMP lessons learned.Jamil Hassan, PMP lessons learned.
Jamil Hassan, PMP lessons learned.
Jamil Faraj , PMP
 
Jamil pmp Certificate 2020
Jamil pmp Certificate 2020Jamil pmp Certificate 2020
Jamil pmp Certificate 2020
Jamil Faraj , PMP
 

Viewers also liked (6)

2
22
2
 
175 pmp sample_questions
175 pmp sample_questions175 pmp sample_questions
175 pmp sample_questions
 
Jamil faraj hassan CV
Jamil faraj hassan CVJamil faraj hassan CV
Jamil faraj hassan CV
 
Jamil Hassan, PMP lessons learned.
Jamil Hassan, PMP lessons learned.Jamil Hassan, PMP lessons learned.
Jamil Hassan, PMP lessons learned.
 
Capm exam prep-questions_2010_ol
Capm exam prep-questions_2010_olCapm exam prep-questions_2010_ol
Capm exam prep-questions_2010_ol
 
Jamil pmp Certificate 2020
Jamil pmp Certificate 2020Jamil pmp Certificate 2020
Jamil pmp Certificate 2020
 

Similar to 03 pmp project management processes exam

PgMP
PgMP PgMP
Chapter 2 Questionsand Answers1. There is a difference between t.docx
Chapter 2 Questionsand Answers1. There is a difference between t.docxChapter 2 Questionsand Answers1. There is a difference between t.docx
Chapter 2 Questionsand Answers1. There is a difference between t.docx
walterl4
 
PMP Exam Q & A
PMP Exam Q & APMP Exam Q & A
PMP Exam Q & A
OSP International LLC
 
Risk 2 simplelearn-exam1-ans
Risk 2 simplelearn-exam1-ansRisk 2 simplelearn-exam1-ans
Risk 2 simplelearn-exam1-ans
Mohamed Saeed
 
Pmp test 03
Pmp test 03Pmp test 03
Pmp test 03
Mohamed Saeed
 
PMP-Prep-Exam-Test-200_Questions.pdf
PMP-Prep-Exam-Test-200_Questions.pdfPMP-Prep-Exam-Test-200_Questions.pdf
PMP-Prep-Exam-Test-200_Questions.pdf
Project Cubicle
 
2009 Top Ten Obstacles To Project Success
2009 Top Ten Obstacles To Project Success2009 Top Ten Obstacles To Project Success
2009 Top Ten Obstacles To Project Success
Lou Gasco
 
PMP Sample Questions Set 3
PMP Sample Questions Set 3PMP Sample Questions Set 3
PMP Sample Questions Set 3
OSP International LLC
 
PMP® Sample Questions
PMP® Sample QuestionsPMP® Sample Questions
PMP® Sample Questions
OSP International LLC
 
Free PMP Exam Sample Question
Free PMP Exam Sample QuestionFree PMP Exam Sample Question
Free PMP Exam Sample Question
OSP International LLC
 
PMP Five Sample Questions - 3
PMP Five Sample Questions - 3PMP Five Sample Questions - 3
PMP Five Sample Questions - 3
OSP International LLC
 
PMP® Sample Questions 5
PMP® Sample Questions 5PMP® Sample Questions 5
PMP® Sample Questions 5
OSP International LLC
 
questions-just-that.pdf.civil engineering
questions-just-that.pdf.civil engineeringquestions-just-that.pdf.civil engineering
questions-just-that.pdf.civil engineering
mocr84810
 
CAPM Study Session 2
CAPM Study Session 2CAPM Study Session 2
CAPM Study Session 2
Kinetic Potential
 
PMP Certificate- introduction
PMP Certificate- introductionPMP Certificate- introduction
PMP Certificate- introduction
Nour Alsoori, MArch, PMP
 
PMP Certification Training Course Part-64
PMP Certification Training Course Part-64PMP Certification Training Course Part-64
PMP Certification Training Course Part-64
Skillogic Solutions
 
Itpm question bank
Itpm   question bankItpm   question bank
Itpm question bank
Hussain111321
 
PMP® Sample Questions 3
PMP® Sample Questions 3PMP® Sample Questions 3
PMP® Sample Questions 3
OSP International LLC
 
PMP Exam Sample Questions
PMP Exam Sample QuestionsPMP Exam Sample Questions
PMP Exam Sample Questions
OSP International LLC
 

Similar to 03 pmp project management processes exam (20)

PgMP
PgMP PgMP
PgMP
 
Chapter 2 Questionsand Answers1. There is a difference between t.docx
Chapter 2 Questionsand Answers1. There is a difference between t.docxChapter 2 Questionsand Answers1. There is a difference between t.docx
Chapter 2 Questionsand Answers1. There is a difference between t.docx
 
PMP Exam Q & A
PMP Exam Q & APMP Exam Q & A
PMP Exam Q & A
 
Risk 2 simplelearn-exam1-ans
Risk 2 simplelearn-exam1-ansRisk 2 simplelearn-exam1-ans
Risk 2 simplelearn-exam1-ans
 
Pmp test 03
Pmp test 03Pmp test 03
Pmp test 03
 
PMP-Prep-Exam-Test-200_Questions.pdf
PMP-Prep-Exam-Test-200_Questions.pdfPMP-Prep-Exam-Test-200_Questions.pdf
PMP-Prep-Exam-Test-200_Questions.pdf
 
2009 Top Ten Obstacles To Project Success
2009 Top Ten Obstacles To Project Success2009 Top Ten Obstacles To Project Success
2009 Top Ten Obstacles To Project Success
 
PMP Sample Questions Set 3
PMP Sample Questions Set 3PMP Sample Questions Set 3
PMP Sample Questions Set 3
 
PMP® Sample Questions
PMP® Sample QuestionsPMP® Sample Questions
PMP® Sample Questions
 
Free PMP Exam Sample Question
Free PMP Exam Sample QuestionFree PMP Exam Sample Question
Free PMP Exam Sample Question
 
PMP Five Sample Questions - 3
PMP Five Sample Questions - 3PMP Five Sample Questions - 3
PMP Five Sample Questions - 3
 
PMP® Sample Questions 5
PMP® Sample Questions 5PMP® Sample Questions 5
PMP® Sample Questions 5
 
questions-just-that.pdf.civil engineering
questions-just-that.pdf.civil engineeringquestions-just-that.pdf.civil engineering
questions-just-that.pdf.civil engineering
 
CAPM Study Session 2
CAPM Study Session 2CAPM Study Session 2
CAPM Study Session 2
 
PMP Certificate- introduction
PMP Certificate- introductionPMP Certificate- introduction
PMP Certificate- introduction
 
PMP Certification Training Course Part-64
PMP Certification Training Course Part-64PMP Certification Training Course Part-64
PMP Certification Training Course Part-64
 
Itpm question bank
Itpm   question bankItpm   question bank
Itpm question bank
 
PMP® Sample Questions 3
PMP® Sample Questions 3PMP® Sample Questions 3
PMP® Sample Questions 3
 
PMP Exam Sample Questions
PMP Exam Sample QuestionsPMP Exam Sample Questions
PMP Exam Sample Questions
 
15 Free PMP Exam Questions
15 Free PMP Exam Questions15 Free PMP Exam Questions
15 Free PMP Exam Questions
 

More from Jamil Faraj , PMP

Corona-virus PMP study plan
Corona-virus PMP study planCorona-virus PMP study plan
Corona-virus PMP study plan
Jamil Faraj , PMP
 
PMP Study Plan by Jamil Faraj, PMP
PMP Study Plan by Jamil Faraj, PMPPMP Study Plan by Jamil Faraj, PMP
PMP Study Plan by Jamil Faraj, PMP
Jamil Faraj , PMP
 
Jamil Faraj CV 2020
Jamil Faraj CV 2020Jamil Faraj CV 2020
Jamil Faraj CV 2020
Jamil Faraj , PMP
 
PMP ITTOs Quick Review
PMP ITTOs Quick Review PMP ITTOs Quick Review
PMP ITTOs Quick Review
Jamil Faraj , PMP
 
Jamil Faraj CV- English
Jamil Faraj CV- EnglishJamil Faraj CV- English
Jamil Faraj CV- English
Jamil Faraj , PMP
 
Pmp Formula Pocket_Guide
Pmp Formula Pocket_GuidePmp Formula Pocket_Guide
Pmp Formula Pocket_Guide
Jamil Faraj , PMP
 
دورة وظيفة العمر
دورة وظيفة العمردورة وظيفة العمر
دورة وظيفة العمر
Jamil Faraj , PMP
 

More from Jamil Faraj , PMP (7)

Corona-virus PMP study plan
Corona-virus PMP study planCorona-virus PMP study plan
Corona-virus PMP study plan
 
PMP Study Plan by Jamil Faraj, PMP
PMP Study Plan by Jamil Faraj, PMPPMP Study Plan by Jamil Faraj, PMP
PMP Study Plan by Jamil Faraj, PMP
 
Jamil Faraj CV 2020
Jamil Faraj CV 2020Jamil Faraj CV 2020
Jamil Faraj CV 2020
 
PMP ITTOs Quick Review
PMP ITTOs Quick Review PMP ITTOs Quick Review
PMP ITTOs Quick Review
 
Jamil Faraj CV- English
Jamil Faraj CV- EnglishJamil Faraj CV- English
Jamil Faraj CV- English
 
Pmp Formula Pocket_Guide
Pmp Formula Pocket_GuidePmp Formula Pocket_Guide
Pmp Formula Pocket_Guide
 
دورة وظيفة العمر
دورة وظيفة العمردورة وظيفة العمر
دورة وظيفة العمر
 

Recently uploaded

Taurus Zodiac Sign_ Personality Traits and Sign Dates.pptx
Taurus Zodiac Sign_ Personality Traits and Sign Dates.pptxTaurus Zodiac Sign_ Personality Traits and Sign Dates.pptx
Taurus Zodiac Sign_ Personality Traits and Sign Dates.pptx
my Pandit
 
Putting the SPARK into Virtual Training.pptx
Putting the SPARK into Virtual Training.pptxPutting the SPARK into Virtual Training.pptx
Putting the SPARK into Virtual Training.pptx
Cynthia Clay
 
Lookback Analysis
Lookback AnalysisLookback Analysis
Lookback Analysis
Safe PaaS
 
Meas_Dylan_DMBS_PB1_2024-05XX_Revised.pdf
Meas_Dylan_DMBS_PB1_2024-05XX_Revised.pdfMeas_Dylan_DMBS_PB1_2024-05XX_Revised.pdf
Meas_Dylan_DMBS_PB1_2024-05XX_Revised.pdf
dylandmeas
 
Filing Your Delaware Franchise Tax A Detailed Guide
Filing Your Delaware Franchise Tax A Detailed GuideFiling Your Delaware Franchise Tax A Detailed Guide
Filing Your Delaware Franchise Tax A Detailed Guide
YourLegal Accounting
 
April 2024 Nostalgia Products Newsletter
April 2024 Nostalgia Products NewsletterApril 2024 Nostalgia Products Newsletter
April 2024 Nostalgia Products Newsletter
NathanBaughman3
 
Set off and carry forward of losses and assessment of individuals.pptx
Set off and carry forward of losses and assessment of individuals.pptxSet off and carry forward of losses and assessment of individuals.pptx
Set off and carry forward of losses and assessment of individuals.pptx
HARSHITHV26
 
Sustainability: Balancing the Environment, Equity & Economy
Sustainability: Balancing the Environment, Equity & EconomySustainability: Balancing the Environment, Equity & Economy
Sustainability: Balancing the Environment, Equity & Economy
Operational Excellence Consulting
 
5 Things You Need To Know Before Hiring a Videographer
5 Things You Need To Know Before Hiring a Videographer5 Things You Need To Know Before Hiring a Videographer
5 Things You Need To Know Before Hiring a Videographer
ofm712785
 
BeMetals Presentation_May_22_2024 .pdf
BeMetals Presentation_May_22_2024   .pdfBeMetals Presentation_May_22_2024   .pdf
BeMetals Presentation_May_22_2024 .pdf
DerekIwanaka1
 
Unveiling the Secrets How Does Generative AI Work.pdf
Unveiling the Secrets How Does Generative AI Work.pdfUnveiling the Secrets How Does Generative AI Work.pdf
Unveiling the Secrets How Does Generative AI Work.pdf
Sam H
 
Maksym Vyshnivetskyi: PMO Quality Management (UA)
Maksym Vyshnivetskyi: PMO Quality Management (UA)Maksym Vyshnivetskyi: PMO Quality Management (UA)
Maksym Vyshnivetskyi: PMO Quality Management (UA)
Lviv Startup Club
 
Discover the innovative and creative projects that highlight my journey throu...
Discover the innovative and creative projects that highlight my journey throu...Discover the innovative and creative projects that highlight my journey throu...
Discover the innovative and creative projects that highlight my journey throu...
dylandmeas
 
The-McKinsey-7S-Framework. strategic management
The-McKinsey-7S-Framework. strategic managementThe-McKinsey-7S-Framework. strategic management
The-McKinsey-7S-Framework. strategic management
Bojamma2
 
anas about venice for grade 6f about venice
anas about venice for grade 6f about veniceanas about venice for grade 6f about venice
anas about venice for grade 6f about venice
anasabutalha2013
 
Cracking the Workplace Discipline Code Main.pptx
Cracking the Workplace Discipline Code Main.pptxCracking the Workplace Discipline Code Main.pptx
Cracking the Workplace Discipline Code Main.pptx
Workforce Group
 
RMD24 | Debunking the non-endemic revenue myth Marvin Vacquier Droop | First ...
RMD24 | Debunking the non-endemic revenue myth Marvin Vacquier Droop | First ...RMD24 | Debunking the non-endemic revenue myth Marvin Vacquier Droop | First ...
RMD24 | Debunking the non-endemic revenue myth Marvin Vacquier Droop | First ...
BBPMedia1
 
20240425_ TJ Communications Credentials_compressed.pdf
20240425_ TJ Communications Credentials_compressed.pdf20240425_ TJ Communications Credentials_compressed.pdf
20240425_ TJ Communications Credentials_compressed.pdf
tjcomstrang
 
FINAL PRESENTATION.pptx12143241324134134
FINAL PRESENTATION.pptx12143241324134134FINAL PRESENTATION.pptx12143241324134134
FINAL PRESENTATION.pptx12143241324134134
LR1709MUSIC
 
Enterprise Excellence is Inclusive Excellence.pdf
Enterprise Excellence is Inclusive Excellence.pdfEnterprise Excellence is Inclusive Excellence.pdf
Enterprise Excellence is Inclusive Excellence.pdf
KaiNexus
 

Recently uploaded (20)

Taurus Zodiac Sign_ Personality Traits and Sign Dates.pptx
Taurus Zodiac Sign_ Personality Traits and Sign Dates.pptxTaurus Zodiac Sign_ Personality Traits and Sign Dates.pptx
Taurus Zodiac Sign_ Personality Traits and Sign Dates.pptx
 
Putting the SPARK into Virtual Training.pptx
Putting the SPARK into Virtual Training.pptxPutting the SPARK into Virtual Training.pptx
Putting the SPARK into Virtual Training.pptx
 
Lookback Analysis
Lookback AnalysisLookback Analysis
Lookback Analysis
 
Meas_Dylan_DMBS_PB1_2024-05XX_Revised.pdf
Meas_Dylan_DMBS_PB1_2024-05XX_Revised.pdfMeas_Dylan_DMBS_PB1_2024-05XX_Revised.pdf
Meas_Dylan_DMBS_PB1_2024-05XX_Revised.pdf
 
Filing Your Delaware Franchise Tax A Detailed Guide
Filing Your Delaware Franchise Tax A Detailed GuideFiling Your Delaware Franchise Tax A Detailed Guide
Filing Your Delaware Franchise Tax A Detailed Guide
 
April 2024 Nostalgia Products Newsletter
April 2024 Nostalgia Products NewsletterApril 2024 Nostalgia Products Newsletter
April 2024 Nostalgia Products Newsletter
 
Set off and carry forward of losses and assessment of individuals.pptx
Set off and carry forward of losses and assessment of individuals.pptxSet off and carry forward of losses and assessment of individuals.pptx
Set off and carry forward of losses and assessment of individuals.pptx
 
Sustainability: Balancing the Environment, Equity & Economy
Sustainability: Balancing the Environment, Equity & EconomySustainability: Balancing the Environment, Equity & Economy
Sustainability: Balancing the Environment, Equity & Economy
 
5 Things You Need To Know Before Hiring a Videographer
5 Things You Need To Know Before Hiring a Videographer5 Things You Need To Know Before Hiring a Videographer
5 Things You Need To Know Before Hiring a Videographer
 
BeMetals Presentation_May_22_2024 .pdf
BeMetals Presentation_May_22_2024   .pdfBeMetals Presentation_May_22_2024   .pdf
BeMetals Presentation_May_22_2024 .pdf
 
Unveiling the Secrets How Does Generative AI Work.pdf
Unveiling the Secrets How Does Generative AI Work.pdfUnveiling the Secrets How Does Generative AI Work.pdf
Unveiling the Secrets How Does Generative AI Work.pdf
 
Maksym Vyshnivetskyi: PMO Quality Management (UA)
Maksym Vyshnivetskyi: PMO Quality Management (UA)Maksym Vyshnivetskyi: PMO Quality Management (UA)
Maksym Vyshnivetskyi: PMO Quality Management (UA)
 
Discover the innovative and creative projects that highlight my journey throu...
Discover the innovative and creative projects that highlight my journey throu...Discover the innovative and creative projects that highlight my journey throu...
Discover the innovative and creative projects that highlight my journey throu...
 
The-McKinsey-7S-Framework. strategic management
The-McKinsey-7S-Framework. strategic managementThe-McKinsey-7S-Framework. strategic management
The-McKinsey-7S-Framework. strategic management
 
anas about venice for grade 6f about venice
anas about venice for grade 6f about veniceanas about venice for grade 6f about venice
anas about venice for grade 6f about venice
 
Cracking the Workplace Discipline Code Main.pptx
Cracking the Workplace Discipline Code Main.pptxCracking the Workplace Discipline Code Main.pptx
Cracking the Workplace Discipline Code Main.pptx
 
RMD24 | Debunking the non-endemic revenue myth Marvin Vacquier Droop | First ...
RMD24 | Debunking the non-endemic revenue myth Marvin Vacquier Droop | First ...RMD24 | Debunking the non-endemic revenue myth Marvin Vacquier Droop | First ...
RMD24 | Debunking the non-endemic revenue myth Marvin Vacquier Droop | First ...
 
20240425_ TJ Communications Credentials_compressed.pdf
20240425_ TJ Communications Credentials_compressed.pdf20240425_ TJ Communications Credentials_compressed.pdf
20240425_ TJ Communications Credentials_compressed.pdf
 
FINAL PRESENTATION.pptx12143241324134134
FINAL PRESENTATION.pptx12143241324134134FINAL PRESENTATION.pptx12143241324134134
FINAL PRESENTATION.pptx12143241324134134
 
Enterprise Excellence is Inclusive Excellence.pdf
Enterprise Excellence is Inclusive Excellence.pdfEnterprise Excellence is Inclusive Excellence.pdf
Enterprise Excellence is Inclusive Excellence.pdf
 

03 pmp project management processes exam

  • 1. you are here 4   81 the process framework Exam Questions 1. You’re a project manager working on a software engineering project. The programmers have started building the software, and the testers have started to create the test environment. Which process group includes these activities? InitiatingA. PlanningB. ExecutingC. ClosingD. 2. Which of the following is not a stakeholder? The project manager who is responsible for building the projectA. A project team member who will work on the projectB. A customer who will use the final productC. A competitor whose company will lose business because of the productD. 3. A project manager runs into a problem with her project’s contractors, and she isn’t sure if they’re abiding by the terms of the contract. Which knowledge area is the BEST source of processes to help her deal with this problem? Cost ManagementA. Risk ManagementB. Procurement ManagementC. Communications ManagementD. 4. You’re a project manager for a construction project. You’ve just finished creating a list of all of the people who will be directly affected by the project. What process group are you in? InitiatingA. PlanningB. ExecutingC. Monitoring & ControllingD. 5. Which process group contains the Develop Project Charter process and the Identify Stakeholders process? InitiatingA. ExecutingB. Monitoring and ControllingC. ClosingD. Download at Boykma.Com
  • 2. 82   Chapter 3 Exam Questions 6. Which of the following is NOT a project? Repairing a carA. Building a highway overpassB. Running an IT support departmentC. Filming a motion pictureD. 7. A project manager is running a software project that is supposed to be delivered in phases. She was planning on dividing the resources into two separate teams to do the work for two phases at the same time, but one of her senior developers suggested that she use an Agile methodology instead, and she agrees. Which of the following BEST describes the relationship between her project’s phases? Sequential relationshipA. Iterative relationshipB. Constrained relationshipC. Overlapping relationshipD. 8. Which of the following is NOT true about overlapping phases? Each phase is typically done by a separate teamA. There’s an increased risk of delays when a later phase can’t start until an earlier one endsB. There’s an increased risk to the project due to potential for reworkC. Every phase must go through all five process groupsD. 9. You’re the project manager for an industrial design project. Your team members report to you, and you’re responsible for creating the budget, building the schedule, and assigning the tasks. When the project is complete, you release the team so they can work on other projects for the company. What kind of organization do you work in? FunctionalA. Weak matrixB. Strong matrixC. ProjectizedD. 10. You’re a project manager working in a weak matrix organization. Which of the following is NOT true? Your team members report to functional managersA. You are not in directly charge of resourcesB. Functional managers make decisions that can affect your projectsC. You have sole responsibility for the success or failure of the projectD. exam questions Download at Boykma.Com
  • 3. you are here 4   83 the process framework Exam Questions Answers 1. Answer: C The Executing process group is the one where the team does all the work. You’ll get a good feel for the process groups pretty quickly! 2. Answer: D One of the hardest things that a project manager has to do on a project is figure out who all the stakeholders are. The project manager, the team, the sponsor (or client), the customers and people who will use the software, the senior managers at the company—they’re all stakeholders. Competitors aren’t stakeholders, because even though they’re affected by the project, they don’t actually have any direct influence over it. 3. Answer: C The Procurement Management knowledge area deals with contracts, contractors, buyers and sellers. If you’ve got a question about a type of contract or how to deal with contract problems, you’re being asked about a Procurement Management process. 4. Answer: A People who will be directly affected by the project are stakeholders, and when you’re creating a list of them you’re performing the Identify Stakeholders process. That’s one of the two processes in the Initiating process group. 5. Answer: A The first things that are created on a project are the charter (which you create in the Develop Project Charter process) and the Stakeholder Register (which you create in the Identify Stakeholders process). You do those things when you’re initiating the project. Download at Boykma.Com
  • 4. 84   Chapter 3 Exam Questions Answers 6. Answer: C The work of an IT support department doesn’t have an end date—it’s not temporary. That’s why it’s not a project. Now, if that support team had to work over the weekend to move the data center to a new location, then that would be a project! I see—so even when something is a process and not a project, there could be projects related to it. 7. Answer: B Agile development is a really good example of an iterative approach to project phases. In an Agile project, the team will typically break down the project into phases, where they work on the current phase while planning out the next one. exam answers Download at Boykma.Com
  • 5. you are here 4   85 the process framework Exam Questions Answers 8. Answer: B If there’s an increased risk of a project because one phase can’t start until another one ends, that means your project phases aren’t overlapping. When you’ve got overlapping phases, that means that you typically have multiple teams that start their phases independently of each other. Also, take another look at answer C, because it’s an important point about overlapping phases. When your phases have an overlapping relationship, there’s an increased risk of rework. This typically happens when one team delivers the results of their project, but made assumptions about what another team is doing as part of their phase. When that other team delivers their work, it turns out that the results that both teams produced aren’t quite compatible with each other, and now both teams have to go back and rework their designs. This happens a lot when your phases overlap, which is why overlapping phases have an increased risk of rework. 9. Answer: D In a projectized organization, the project manager has the power to assign tasks, manage the budget, and release the team. 10. Answer: D In a weak matrix, project managers have very limited authority. They have to share a lot of responsibility with functional managers, and those functional managers have a lot of leeway to make decisions about how the team members are managed. In an organization like that, the project manager isn’t given a lot of responsibility. That’s why you’re likely to find a project expediter in a weak matrix. Download at Boykma.Com