Chap 3 – Project Management Processes
Initiating Planning Executing Monitoring &
Controlling
Closing
Learn Project Management & prepare for PMP exam:
• Learn visually
• Detailed coverage of all PMP concepts
• Sample Questions
Don’t try to
remember
processes
Try to
understand
each process
Try explain it
to others.. It
will firm your
understanding
By: Anand Bobade (nmbobade@gmail.com)
Project Management Processes
What is Process
Common Project Management processes
Process groups
Initiating Process group
Planning Process group
Executing Process Group
Monitoring & Controlling process group
Closing Process group
Project Information
Role of the Knowledge area
By: Anand Bobade (nmbobade@gmail.com)
What is Process?
A set of interrelated actions & activities performed to
create a pre-specified product, service or result.
Interrelated
actions & activitiesProduct
Service or
Result
Requirements,
Specifications
Company Environment
EEF & OPA should be taken into account as input to
every process even if they are not explicitly listed in
the process specifications.
By: Anand Bobade (nmbobade@gmail.com)
Types of Process
• Ensure effective flow of Project
throughout its life cycle
• Encomposses Tools &
techniques involved in applying
skills & capabilitites
Project Management Processes:
• Specify & create projects
product.
• Defined by product life cycle
and varry by application area as
well as phases of the project
life cycle
Product Oriented Processes:
By: Anand Bobade (nmbobade@gmail.com)
Process group
Initiating Planning Executing
Monitoring &
Controlling
Closing
A logical grouping of project management inputs, tools and techniques,
and outputs.
Not project
Phases
By: Anand Bobade (nmbobade@gmail.com)
Process group
Initiate new Project or Phase
Define Project Objective, Establish scope.
Plan how project will be executed & closed.
Perform the work
Track & review progress. Ensure compliance.
Perform Integrated change management.
Finalize all project activities.
Formally close phase or project.
By: Anand Bobade (nmbobade@gmail.com)
Process group
All process groups can be conducted in a each project phase.
It is not Project life cycle Phases
Has clear dependencies
In-depended of application area or Industry focus.
Large complex projects are split into the phases.
Initiation processes carried out in each phases to validate
decision made in the previous phase.
By: Anand Bobade (nmbobade@gmail.com)
Processes & Project success
For project to be successful, Project team should:
Select appropriate processes as per project objective
Use defined approach that can be adapted to meet requirements
Establish & maintain communication & engagement with stakeholders
Comply with requirement to meet stakeholder needs and expectations
Balance competing constraints
By: Anand Bobade (nmbobade@gmail.com)
Common Process Interactions
Processes Overlap & interact in ways that are not completely detailed.
Application of processes are iterative & many processes are repeated.
By: Anand Bobade (nmbobade@gmail.com)
Common Process Interactions
By: Anand Bobade (nmbobade@gmail.com)
Common Process Interactions
By: Anand Bobade (nmbobade@gmail.com)
Common Process Interactions
Process groups are linked by the output which are produced.
Output of one process generally becomes an input to another process or is deliverable.
By: Anand Bobade (nmbobade@gmail.com)
Common Process Interactions
By: Anand Bobade (nmbobade@gmail.com)
Initiating Process group
It define a new project or a new phase of an existing
project by obtaining authorization to start the project
or phase.
New Project or Project Phase
Project Manager is selected
Project charter is approved
Scope is Defined
Finance /budget is committed
Stakeholders are identified
Stakeholder expectations & understood
By: Anand Bobade (nmbobade@gmail.com)
Planning Process group
It is the place where the PM, project teams decides
what they want, how to do, when to do, who to do,
money needed, time needed and so on.
Establish scope
Refine objectives
Defining products to be produced
Define work required
Sequencing work (schedule)
Estimating the resource( effort) & finalize schedule
Estimating costs (budget)
By: Anand Bobade (nmbobade@gmail.com)
Executing Process group
Processes performed to complete work defined in PMP
to satisfy project specifications.
Directing and managing project execution.
Establishing and manage the project team.
Coordinating people and resources.
Monitoring team performance.
procurements.
Distributing information.
Performing quality assurance activities.
By: Anand Bobade (nmbobade@gmail.com)
Monitoring & Controlling Process group
Those processes required to track, review, and regulate
the progress and performance of the project; identify
any areas in which changes to the plan are required;
and initiate the corresponding changes
Involves tracking, reviewing, and regulating project progress
Includes status reporting, progress measurement, and forecasting
Reports on scope, schedule, cost, resources, quality, and risks
Controls project and project document changes
Includes control of scope, schedule, costs, and risks
Formalizes acceptance of deliverables (called scope verification)
Records quality control results
Track
RegulateReview
By: Anand Bobade (nmbobade@gmail.com)
Closing Process group
Processes performed to terminate formally all activities
of a project or project phase, & transfer of completed
product to others or to close a cancelled project.
Obtaining acceptance by the customer or sponsor (approval to close).
Releasing people and resources.
Reporting on team performance and lessons learned.
Updating or finalizing documents, project records, and results.
Close procurements.
Storing or archiving information.
Formally close project or phase.
By: Anand Bobade (nmbobade@gmail.com)
Project Information
Significant amount of data & information is collected,
analysed, transformed and distributed.
The raw observations and
measurements identified
during activities
performed to carry out
the project work;
e.g. actual cost, actual
duration, and percent of
work physically
completed
Work Performance Data:
The performance data
collected from various
controlling processes,
analysed in context and
integrated based on
relationships across areas;
e.g. status of deliverables,
and forecasted estimates
to complete, etc.
Work performance
information:
A compilation of work
performance information
for consumption purpose
such as status or decision
making.
Work performance Reports:
By: Anand Bobade (nmbobade@gmail.com)
Project Information
Significant amount of data & information is collected,
analysed, transformed and distributed.
By: Anand Bobade (nmbobade@gmail.com)
The Knowledge area
Integration Scope Time Cost Quality
Human
resource
Communication Risk Procurement Stakeholder
Area of project management defined by its knowledge requirements &
described in terms of its component processes, practices, inputs,
outputs, tools, and techniques
By: Anand Bobade (nmbobade@gmail.com)
The Knowledge area & Process groups
By: Anand Bobade (nmbobade@gmail.com)
The Knowledge area & Process groups
By: Anand Bobade (nmbobade@gmail.com)
The Knowledge area & Process groups
By: Anand Bobade (nmbobade@gmail.com)
Common Process Interactions
By: Anand Bobade (nmbobade@gmail.com)
Review
What is Process?
Project Management processes
Common Process Interactions
Process groups
Knowledge Areas
Project Information
By: Anand Bobade (nmbobade@gmail.com)
Thank you!
Learn Project Management & prepare for PMP exam:
• Learn visually
• Detailed coverage of all PMP concepts
• Sample Questions
By: Anand Bobade (nmbobade@gmail.com)
Additional Resources
Visit Slide Share website & you will find other Knowledge area presentation… Please share!!

More Related Content

What's hot

PMI Project Management Principles
PMI Project Management PrinciplesPMI Project Management Principles
PMI Project Management Principlestltiede
 
Pmp chap 11 - project risk management v0.1
Pmp   chap 11 - project risk management v0.1Pmp   chap 11 - project risk management v0.1
Pmp chap 11 - project risk management v0.1Anand Bobade
 
PMP Chap 7 - Project Cost Management - Part 1
PMP Chap 7 - Project Cost Management - Part 1PMP Chap 7 - Project Cost Management - Part 1
PMP Chap 7 - Project Cost Management - Part 1Anand Bobade
 
PMP Chap 2- Org. Influence and Project Life Cycle
PMP Chap 2- Org. Influence and Project Life CyclePMP Chap 2- Org. Influence and Project Life Cycle
PMP Chap 2- Org. Influence and Project Life CycleAnand Bobade
 
PMP Chap 6 - Project Time management - Part2
PMP Chap 6 - Project Time management - Part2PMP Chap 6 - Project Time management - Part2
PMP Chap 6 - Project Time management - Part2Anand Bobade
 
Chap 11.2 Identify Risks
Chap 11.2 Identify RisksChap 11.2 Identify Risks
Chap 11.2 Identify RisksAnand Bobade
 
Chap 4.3 Direct and Manage Project work
Chap 4.3 Direct and Manage Project workChap 4.3 Direct and Manage Project work
Chap 4.3 Direct and Manage Project workAnand Bobade
 
Introduction to Project Management (workshop) - v.1
Introduction to Project Management (workshop) - v.1Introduction to Project Management (workshop) - v.1
Introduction to Project Management (workshop) - v.1Mena M. Eissa
 
Pmp chap 11 - project risk management - Part 2
Pmp   chap 11 - project risk management - Part 2Pmp   chap 11 - project risk management - Part 2
Pmp chap 11 - project risk management - Part 2Anand Bobade
 
Chap 10.2 Manage Communication
Chap 10.2  Manage CommunicationChap 10.2  Manage Communication
Chap 10.2 Manage CommunicationAnand Bobade
 
Chap 4.7 Project or Phase Close
Chap 4.7 Project or Phase CloseChap 4.7 Project or Phase Close
Chap 4.7 Project or Phase CloseAnand Bobade
 
Project Risk Management - PMBOK5
Project Risk Management - PMBOK5Project Risk Management - PMBOK5
Project Risk Management - PMBOK5pankajsh10
 
Chap 8.2 Manage Quality
Chap 8.2 Manage QualityChap 8.2 Manage Quality
Chap 8.2 Manage QualityAnand Bobade
 
PMP Chapter 1 of 6 introduction (Based on PMBOK 6th edition)
PMP Chapter 1 of 6  introduction (Based on PMBOK 6th edition)PMP Chapter 1 of 6  introduction (Based on PMBOK 6th edition)
PMP Chapter 1 of 6 introduction (Based on PMBOK 6th edition)Shamil Habet
 
PMP Chap 6 - Project Time management - Part1
PMP Chap 6 - Project Time management - Part1PMP Chap 6 - Project Time management - Part1
PMP Chap 6 - Project Time management - Part1Anand Bobade
 
Project Management 101
Project Management 101Project Management 101
Project Management 101MurftheSurf
 
Chap 4.2 Develop Project Management plan
Chap 4.2 Develop Project Management planChap 4.2 Develop Project Management plan
Chap 4.2 Develop Project Management planAnand Bobade
 

What's hot (20)

PMI Project Management Principles
PMI Project Management PrinciplesPMI Project Management Principles
PMI Project Management Principles
 
Pmp chap 11 - project risk management v0.1
Pmp   chap 11 - project risk management v0.1Pmp   chap 11 - project risk management v0.1
Pmp chap 11 - project risk management v0.1
 
PMP Chap 7 - Project Cost Management - Part 1
PMP Chap 7 - Project Cost Management - Part 1PMP Chap 7 - Project Cost Management - Part 1
PMP Chap 7 - Project Cost Management - Part 1
 
PMP Chap 2- Org. Influence and Project Life Cycle
PMP Chap 2- Org. Influence and Project Life CyclePMP Chap 2- Org. Influence and Project Life Cycle
PMP Chap 2- Org. Influence and Project Life Cycle
 
PMP PMBOK 6th
PMP PMBOK 6thPMP PMBOK 6th
PMP PMBOK 6th
 
PMP Chap 6 - Project Time management - Part2
PMP Chap 6 - Project Time management - Part2PMP Chap 6 - Project Time management - Part2
PMP Chap 6 - Project Time management - Part2
 
Chap 11.2 Identify Risks
Chap 11.2 Identify RisksChap 11.2 Identify Risks
Chap 11.2 Identify Risks
 
Chap 4.3 Direct and Manage Project work
Chap 4.3 Direct and Manage Project workChap 4.3 Direct and Manage Project work
Chap 4.3 Direct and Manage Project work
 
Introduction to Project Management (workshop) - v.1
Introduction to Project Management (workshop) - v.1Introduction to Project Management (workshop) - v.1
Introduction to Project Management (workshop) - v.1
 
Pmp chap 11 - project risk management - Part 2
Pmp   chap 11 - project risk management - Part 2Pmp   chap 11 - project risk management - Part 2
Pmp chap 11 - project risk management - Part 2
 
Chap 10.2 Manage Communication
Chap 10.2  Manage CommunicationChap 10.2  Manage Communication
Chap 10.2 Manage Communication
 
Chap 4.7 Project or Phase Close
Chap 4.7 Project or Phase CloseChap 4.7 Project or Phase Close
Chap 4.7 Project or Phase Close
 
Project Risk Management - PMBOK5
Project Risk Management - PMBOK5Project Risk Management - PMBOK5
Project Risk Management - PMBOK5
 
Chap 8.2 Manage Quality
Chap 8.2 Manage QualityChap 8.2 Manage Quality
Chap 8.2 Manage Quality
 
PMP Chapter 1 of 6 introduction (Based on PMBOK 6th edition)
PMP Chapter 1 of 6  introduction (Based on PMBOK 6th edition)PMP Chapter 1 of 6  introduction (Based on PMBOK 6th edition)
PMP Chapter 1 of 6 introduction (Based on PMBOK 6th edition)
 
PMP Chap 6 - Project Time management - Part1
PMP Chap 6 - Project Time management - Part1PMP Chap 6 - Project Time management - Part1
PMP Chap 6 - Project Time management - Part1
 
Project Management 101
Project Management 101Project Management 101
Project Management 101
 
Project Management Concepts
Project Management ConceptsProject Management Concepts
Project Management Concepts
 
Chap 4.2 Develop Project Management plan
Chap 4.2 Develop Project Management planChap 4.2 Develop Project Management plan
Chap 4.2 Develop Project Management plan
 
Pmbok6 to 7 transformation
Pmbok6 to 7 transformationPmbok6 to 7 transformation
Pmbok6 to 7 transformation
 

Viewers also liked

PMPProcessGroupTasks
PMPProcessGroupTasksPMPProcessGroupTasks
PMPProcessGroupTasksAnand Bobade
 
PMP 47 process definitions
PMP 47 process definitionsPMP 47 process definitions
PMP 47 process definitionsAnand Bobade
 
Knowledge Area and 47 Processes Chart
Knowledge Area and 47 Processes ChartKnowledge Area and 47 Processes Chart
Knowledge Area and 47 Processes ChartAnand Bobade
 
PMP Chap 7 - Project Cost Management - Part 2
PMP Chap 7 - Project Cost Management - Part 2PMP Chap 7 - Project Cost Management - Part 2
PMP Chap 7 - Project Cost Management - Part 2Anand Bobade
 
PMP Chap 12 - Project Procurement Management Details - Part 1
PMP   Chap 12 - Project Procurement Management Details - Part 1PMP   Chap 12 - Project Procurement Management Details - Part 1
PMP Chap 12 - Project Procurement Management Details - Part 1Anand Bobade
 
PMP Chap9 - Project Human Resource management
PMP Chap9 - Project Human Resource managementPMP Chap9 - Project Human Resource management
PMP Chap9 - Project Human Resource managementAnand Bobade
 
PMP Key Exam Concepts - Formulas
PMP Key Exam Concepts - FormulasPMP Key Exam Concepts - Formulas
PMP Key Exam Concepts - FormulasAnand Bobade
 
PMBOK-5th ed: PMP- Flashcards Part1/5
PMBOK-5th ed: PMP- Flashcards Part1/5PMBOK-5th ed: PMP- Flashcards Part1/5
PMBOK-5th ed: PMP- Flashcards Part1/5Anand Bobade
 
Pmp chap13 - project stakeholder management details
Pmp chap13 - project stakeholder management detailsPmp chap13 - project stakeholder management details
Pmp chap13 - project stakeholder management detailsAnand Bobade
 
Project Management Processes
Project Management ProcessesProject Management Processes
Project Management ProcessesC K Vishwakarma
 
PMP Chap 12 - Project Procurement Management Details - Part2
PMP   Chap 12 - Project Procurement Management Details - Part2PMP   Chap 12 - Project Procurement Management Details - Part2
PMP Chap 12 - Project Procurement Management Details - Part2Anand Bobade
 
PMP Key Exam Concepts WPD, WPI & WPR
PMP Key Exam Concepts WPD, WPI & WPRPMP Key Exam Concepts WPD, WPI & WPR
PMP Key Exam Concepts WPD, WPI & WPRAnand Bobade
 
PMP Key-exam-concepts-QA-QC-VS-VS
PMP Key-exam-concepts-QA-QC-VS-VSPMP Key-exam-concepts-QA-QC-VS-VS
PMP Key-exam-concepts-QA-QC-VS-VSAnand Bobade
 
PMP Application form
PMP Application formPMP Application form
PMP Application formAnand Bobade
 
PMP Chap 8 - Project Quality Management
PMP Chap 8 - Project Quality ManagementPMP Chap 8 - Project Quality Management
PMP Chap 8 - Project Quality ManagementAnand Bobade
 
Free PMP notes,Free PMP Study Material,Free PMP Chapter wise notes,PMP Exam N...
Free PMP notes,Free PMP Study Material,Free PMP Chapter wise notes,PMP Exam N...Free PMP notes,Free PMP Study Material,Free PMP Chapter wise notes,PMP Exam N...
Free PMP notes,Free PMP Study Material,Free PMP Chapter wise notes,PMP Exam N...TURKI , PMP
 
PMBOK® Guide 5th edition Processes Flow in English - Simplified Version
PMBOK® Guide 5th edition Processes Flow in English - Simplified VersionPMBOK® Guide 5th edition Processes Flow in English - Simplified Version
PMBOK® Guide 5th edition Processes Flow in English - Simplified VersionRicardo Viana Vargas
 

Viewers also liked (18)

PMPProcessGroupTasks
PMPProcessGroupTasksPMPProcessGroupTasks
PMPProcessGroupTasks
 
PMP 47 process definitions
PMP 47 process definitionsPMP 47 process definitions
PMP 47 process definitions
 
Knowledge Area and 47 Processes Chart
Knowledge Area and 47 Processes ChartKnowledge Area and 47 Processes Chart
Knowledge Area and 47 Processes Chart
 
PMP Chap 7 - Project Cost Management - Part 2
PMP Chap 7 - Project Cost Management - Part 2PMP Chap 7 - Project Cost Management - Part 2
PMP Chap 7 - Project Cost Management - Part 2
 
PMP Chap 12 - Project Procurement Management Details - Part 1
PMP   Chap 12 - Project Procurement Management Details - Part 1PMP   Chap 12 - Project Procurement Management Details - Part 1
PMP Chap 12 - Project Procurement Management Details - Part 1
 
PMP Chap9 - Project Human Resource management
PMP Chap9 - Project Human Resource managementPMP Chap9 - Project Human Resource management
PMP Chap9 - Project Human Resource management
 
PMP Key Exam Concepts - Formulas
PMP Key Exam Concepts - FormulasPMP Key Exam Concepts - Formulas
PMP Key Exam Concepts - Formulas
 
PMBOK-5th ed: PMP- Flashcards Part1/5
PMBOK-5th ed: PMP- Flashcards Part1/5PMBOK-5th ed: PMP- Flashcards Part1/5
PMBOK-5th ed: PMP- Flashcards Part1/5
 
Pmp chap13 - project stakeholder management details
Pmp chap13 - project stakeholder management detailsPmp chap13 - project stakeholder management details
Pmp chap13 - project stakeholder management details
 
Project Management Processes
Project Management ProcessesProject Management Processes
Project Management Processes
 
PMP Chap 12 - Project Procurement Management Details - Part2
PMP   Chap 12 - Project Procurement Management Details - Part2PMP   Chap 12 - Project Procurement Management Details - Part2
PMP Chap 12 - Project Procurement Management Details - Part2
 
PMP Key Exam Concepts WPD, WPI & WPR
PMP Key Exam Concepts WPD, WPI & WPRPMP Key Exam Concepts WPD, WPI & WPR
PMP Key Exam Concepts WPD, WPI & WPR
 
PMP Key-exam-concepts-QA-QC-VS-VS
PMP Key-exam-concepts-QA-QC-VS-VSPMP Key-exam-concepts-QA-QC-VS-VS
PMP Key-exam-concepts-QA-QC-VS-VS
 
PMP Application form
PMP Application formPMP Application form
PMP Application form
 
PMP Exam Changes
PMP Exam ChangesPMP Exam Changes
PMP Exam Changes
 
PMP Chap 8 - Project Quality Management
PMP Chap 8 - Project Quality ManagementPMP Chap 8 - Project Quality Management
PMP Chap 8 - Project Quality Management
 
Free PMP notes,Free PMP Study Material,Free PMP Chapter wise notes,PMP Exam N...
Free PMP notes,Free PMP Study Material,Free PMP Chapter wise notes,PMP Exam N...Free PMP notes,Free PMP Study Material,Free PMP Chapter wise notes,PMP Exam N...
Free PMP notes,Free PMP Study Material,Free PMP Chapter wise notes,PMP Exam N...
 
PMBOK® Guide 5th edition Processes Flow in English - Simplified Version
PMBOK® Guide 5th edition Processes Flow in English - Simplified VersionPMBOK® Guide 5th edition Processes Flow in English - Simplified Version
PMBOK® Guide 5th edition Processes Flow in English - Simplified Version
 

Similar to PMP Chap 3 - Project Management Processes

Project management processes ch3 (1)
Project management processes ch3 (1)Project management processes ch3 (1)
Project management processes ch3 (1)hinasardar2
 
Final Class Presentation on Project Audit and Closure.ppt
Final Class Presentation on Project Audit and Closure.pptFinal Class Presentation on Project Audit and Closure.ppt
Final Class Presentation on Project Audit and Closure.pptGeorgeKabongah2
 
Introduction To Project Management
Introduction To Project ManagementIntroduction To Project Management
Introduction To Project ManagementUW Madison
 
Introduce Project Management
Introduce Project ManagementIntroduce Project Management
Introduce Project Managementguest90bddb
 
Project Management Cycle and MS Project 2013 By Subodh Kumar PMP
Project Management Cycle and  MS Project 2013  By Subodh Kumar PMPProject Management Cycle and  MS Project 2013  By Subodh Kumar PMP
Project Management Cycle and MS Project 2013 By Subodh Kumar PMPSubodh Kumar
 
Project management slide - Introduction
Project management slide - IntroductionProject management slide - Introduction
Project management slide - IntroductionAlbert Poghosyan
 
Project Integration Management
Project Integration ManagementProject Integration Management
Project Integration Managementpankajsh10
 
Introduction to project management.ppt for
Introduction to project management.ppt  forIntroduction to project management.ppt  for
Introduction to project management.ppt forItcHcm1
 
MDP2206-2217-Lec2.pdf
MDP2206-2217-Lec2.pdfMDP2206-2217-Lec2.pdf
MDP2206-2217-Lec2.pdfamirashraf61
 
x-introduction-to-project-management-110720031057-phpapp01 (1).pdf
x-introduction-to-project-management-110720031057-phpapp01 (1).pdfx-introduction-to-project-management-110720031057-phpapp01 (1).pdf
x-introduction-to-project-management-110720031057-phpapp01 (1).pdfEidTahir
 
Mmi entrepreneurship 6
Mmi entrepreneurship 6Mmi entrepreneurship 6
Mmi entrepreneurship 6gatecomro
 
ICB Competence, Project Standards
ICB Competence, Project StandardsICB Competence, Project Standards
ICB Competence, Project StandardsUjjwal Joshi
 
Project Management Process and Its Phases
Project Management Process and Its PhasesProject Management Process and Its Phases
Project Management Process and Its PhasesGaurav Sukhija
 
Gonzales.matthew
Gonzales.matthewGonzales.matthew
Gonzales.matthewNASAPMC
 
(Fall2016)Lecture1.pptx
(Fall2016)Lecture1.pptx(Fall2016)Lecture1.pptx
(Fall2016)Lecture1.pptxgarkapifye
 
Introduction to project management
Introduction to project managementIntroduction to project management
Introduction to project managementMohamad Ashrafi
 

Similar to PMP Chap 3 - Project Management Processes (20)

Project management processes ch3 (1)
Project management processes ch3 (1)Project management processes ch3 (1)
Project management processes ch3 (1)
 
Final Class Presentation on Project Audit and Closure.ppt
Final Class Presentation on Project Audit and Closure.pptFinal Class Presentation on Project Audit and Closure.ppt
Final Class Presentation on Project Audit and Closure.ppt
 
Introduction To Project Management
Introduction To Project ManagementIntroduction To Project Management
Introduction To Project Management
 
Introduce Project Management
Introduce Project ManagementIntroduce Project Management
Introduce Project Management
 
Project scheduling
Project schedulingProject scheduling
Project scheduling
 
Project lifecycle
Project lifecycleProject lifecycle
Project lifecycle
 
Project Management Cycle and MS Project 2013 By Subodh Kumar PMP
Project Management Cycle and  MS Project 2013  By Subodh Kumar PMPProject Management Cycle and  MS Project 2013  By Subodh Kumar PMP
Project Management Cycle and MS Project 2013 By Subodh Kumar PMP
 
Project management slide - Introduction
Project management slide - IntroductionProject management slide - Introduction
Project management slide - Introduction
 
Project Integration Management
Project Integration ManagementProject Integration Management
Project Integration Management
 
Introduction to project management.ppt for
Introduction to project management.ppt  forIntroduction to project management.ppt  for
Introduction to project management.ppt for
 
MDP2206-2217-Lec2.pdf
MDP2206-2217-Lec2.pdfMDP2206-2217-Lec2.pdf
MDP2206-2217-Lec2.pdf
 
x-introduction-to-project-management-110720031057-phpapp01 (1).pdf
x-introduction-to-project-management-110720031057-phpapp01 (1).pdfx-introduction-to-project-management-110720031057-phpapp01 (1).pdf
x-introduction-to-project-management-110720031057-phpapp01 (1).pdf
 
PPRPreparationGuide
PPRPreparationGuidePPRPreparationGuide
PPRPreparationGuide
 
Mmi entrepreneurship 6
Mmi entrepreneurship 6Mmi entrepreneurship 6
Mmi entrepreneurship 6
 
ICB Competence, Project Standards
ICB Competence, Project StandardsICB Competence, Project Standards
ICB Competence, Project Standards
 
Project Management Process and Its Phases
Project Management Process and Its PhasesProject Management Process and Its Phases
Project Management Process and Its Phases
 
Gonzales.matthew
Gonzales.matthewGonzales.matthew
Gonzales.matthew
 
(Fall2016)Lecture1.pptx
(Fall2016)Lecture1.pptx(Fall2016)Lecture1.pptx
(Fall2016)Lecture1.pptx
 
Introduction to project management
Introduction to project managementIntroduction to project management
Introduction to project management
 
Final Project Closing
Final Project ClosingFinal Project Closing
Final Project Closing
 

More from Anand Bobade

Chap 12.3 Control Procurement
Chap 12.3 Control ProcurementChap 12.3 Control Procurement
Chap 12.3 Control ProcurementAnand Bobade
 
Chap 12.1 Plan Procurement Management
Chap 12.1 Plan Procurement ManagementChap 12.1 Plan Procurement Management
Chap 12.1 Plan Procurement ManagementAnand Bobade
 
Chap 12.0 Procurement Management overview
Chap 12.0   Procurement Management overviewChap 12.0   Procurement Management overview
Chap 12.0 Procurement Management overviewAnand Bobade
 
Chap 11.7 Monitor Risks
Chap 11.7 Monitor RisksChap 11.7 Monitor Risks
Chap 11.7 Monitor RisksAnand Bobade
 
Chap 10.3 Monitor Communication
Chap 10.3 Monitor CommunicationChap 10.3 Monitor Communication
Chap 10.3 Monitor CommunicationAnand Bobade
 
Chap 10.1 Plan Communication Management
Chap 10.1  Plan Communication ManagementChap 10.1  Plan Communication Management
Chap 10.1 Plan Communication ManagementAnand Bobade
 
Chap 9.6 Control Resources
Chap 9.6  Control ResourcesChap 9.6  Control Resources
Chap 9.6 Control ResourcesAnand Bobade
 
Chap 9.5 Manage Team
Chap 9.5  Manage TeamChap 9.5  Manage Team
Chap 9.5 Manage TeamAnand Bobade
 
Chap 9.4 Develop Team
Chap 9.4  Develop TeamChap 9.4  Develop Team
Chap 9.4 Develop TeamAnand Bobade
 
Chap 9.3 Acquire Resources
Chap 9.3   Acquire ResourcesChap 9.3   Acquire Resources
Chap 9.3 Acquire ResourcesAnand Bobade
 
Chap 9.2 Estimate Activity Resource
Chap 9.2   Estimate Activity ResourceChap 9.2   Estimate Activity Resource
Chap 9.2 Estimate Activity ResourceAnand Bobade
 
Chap 9.1 Pan Resource Management
Chap 9.1   Pan Resource ManagementChap 9.1   Pan Resource Management
Chap 9.1 Pan Resource ManagementAnand Bobade
 
Chap 9.0 Project Resource Management overview
Chap 9.0   Project Resource Management overviewChap 9.0   Project Resource Management overview
Chap 9.0 Project Resource Management overviewAnand Bobade
 
Chap 7.4 Control Cost
Chap 7.4   Control CostChap 7.4   Control Cost
Chap 7.4 Control CostAnand Bobade
 
Chap 7.2 Estimate Cost
Chap 7.2 Estimate CostChap 7.2 Estimate Cost
Chap 7.2 Estimate CostAnand Bobade
 
Chap 7.3 Determine budget
Chap 7.3   Determine budgetChap 7.3   Determine budget
Chap 7.3 Determine budgetAnand Bobade
 
Chap 7.1 Plan Cost Management
Chap 7.1  Plan Cost ManagementChap 7.1  Plan Cost Management
Chap 7.1 Plan Cost ManagementAnand Bobade
 
Chap 7.0 Project Cost Management Overview
Chap 7.0 Project Cost Management OverviewChap 7.0 Project Cost Management Overview
Chap 7.0 Project Cost Management OverviewAnand Bobade
 
Chap 6.6 Control Schedule
Chap 6.6 Control ScheduleChap 6.6 Control Schedule
Chap 6.6 Control ScheduleAnand Bobade
 
Chap 6.5 Define Schedule
Chap 6.5 Define ScheduleChap 6.5 Define Schedule
Chap 6.5 Define ScheduleAnand Bobade
 

More from Anand Bobade (20)

Chap 12.3 Control Procurement
Chap 12.3 Control ProcurementChap 12.3 Control Procurement
Chap 12.3 Control Procurement
 
Chap 12.1 Plan Procurement Management
Chap 12.1 Plan Procurement ManagementChap 12.1 Plan Procurement Management
Chap 12.1 Plan Procurement Management
 
Chap 12.0 Procurement Management overview
Chap 12.0   Procurement Management overviewChap 12.0   Procurement Management overview
Chap 12.0 Procurement Management overview
 
Chap 11.7 Monitor Risks
Chap 11.7 Monitor RisksChap 11.7 Monitor Risks
Chap 11.7 Monitor Risks
 
Chap 10.3 Monitor Communication
Chap 10.3 Monitor CommunicationChap 10.3 Monitor Communication
Chap 10.3 Monitor Communication
 
Chap 10.1 Plan Communication Management
Chap 10.1  Plan Communication ManagementChap 10.1  Plan Communication Management
Chap 10.1 Plan Communication Management
 
Chap 9.6 Control Resources
Chap 9.6  Control ResourcesChap 9.6  Control Resources
Chap 9.6 Control Resources
 
Chap 9.5 Manage Team
Chap 9.5  Manage TeamChap 9.5  Manage Team
Chap 9.5 Manage Team
 
Chap 9.4 Develop Team
Chap 9.4  Develop TeamChap 9.4  Develop Team
Chap 9.4 Develop Team
 
Chap 9.3 Acquire Resources
Chap 9.3   Acquire ResourcesChap 9.3   Acquire Resources
Chap 9.3 Acquire Resources
 
Chap 9.2 Estimate Activity Resource
Chap 9.2   Estimate Activity ResourceChap 9.2   Estimate Activity Resource
Chap 9.2 Estimate Activity Resource
 
Chap 9.1 Pan Resource Management
Chap 9.1   Pan Resource ManagementChap 9.1   Pan Resource Management
Chap 9.1 Pan Resource Management
 
Chap 9.0 Project Resource Management overview
Chap 9.0   Project Resource Management overviewChap 9.0   Project Resource Management overview
Chap 9.0 Project Resource Management overview
 
Chap 7.4 Control Cost
Chap 7.4   Control CostChap 7.4   Control Cost
Chap 7.4 Control Cost
 
Chap 7.2 Estimate Cost
Chap 7.2 Estimate CostChap 7.2 Estimate Cost
Chap 7.2 Estimate Cost
 
Chap 7.3 Determine budget
Chap 7.3   Determine budgetChap 7.3   Determine budget
Chap 7.3 Determine budget
 
Chap 7.1 Plan Cost Management
Chap 7.1  Plan Cost ManagementChap 7.1  Plan Cost Management
Chap 7.1 Plan Cost Management
 
Chap 7.0 Project Cost Management Overview
Chap 7.0 Project Cost Management OverviewChap 7.0 Project Cost Management Overview
Chap 7.0 Project Cost Management Overview
 
Chap 6.6 Control Schedule
Chap 6.6 Control ScheduleChap 6.6 Control Schedule
Chap 6.6 Control Schedule
 
Chap 6.5 Define Schedule
Chap 6.5 Define ScheduleChap 6.5 Define Schedule
Chap 6.5 Define Schedule
 

Recently uploaded

VIP Kolkata Call Girl Rajarhat 👉 8250192130 Available With Room
VIP Kolkata Call Girl Rajarhat 👉 8250192130  Available With RoomVIP Kolkata Call Girl Rajarhat 👉 8250192130  Available With Room
VIP Kolkata Call Girl Rajarhat 👉 8250192130 Available With Roomdivyansh0kumar0
 
LPC Warehouse Management System For Clients In The Business Sector
LPC Warehouse Management System For Clients In The Business SectorLPC Warehouse Management System For Clients In The Business Sector
LPC Warehouse Management System For Clients In The Business Sectorthomas851723
 
LPC Facility Design And Re-engineering Presentation
LPC Facility Design And Re-engineering PresentationLPC Facility Design And Re-engineering Presentation
LPC Facility Design And Re-engineering Presentationthomas851723
 
Day 0- Bootcamp Roadmap for PLC Bootcamp
Day 0- Bootcamp Roadmap for PLC BootcampDay 0- Bootcamp Roadmap for PLC Bootcamp
Day 0- Bootcamp Roadmap for PLC BootcampPLCLeadershipDevelop
 
GENUINE Babe,Call Girls IN Badarpur Delhi | +91-8377087607
GENUINE Babe,Call Girls IN Badarpur  Delhi | +91-8377087607GENUINE Babe,Call Girls IN Badarpur  Delhi | +91-8377087607
GENUINE Babe,Call Girls IN Badarpur Delhi | +91-8377087607dollysharma2066
 
Training Methods and Training Objectives
Training Methods and Training ObjectivesTraining Methods and Training Objectives
Training Methods and Training Objectivesmintusiprd
 
VIP 7001035870 Find & Meet Hyderabad Call Girls Ameerpet high-profile Call Girl
VIP 7001035870 Find & Meet Hyderabad Call Girls Ameerpet high-profile Call GirlVIP 7001035870 Find & Meet Hyderabad Call Girls Ameerpet high-profile Call Girl
VIP 7001035870 Find & Meet Hyderabad Call Girls Ameerpet high-profile Call Girladitipandeya
 
{ 9892124323 }} Call Girls & Escorts in Hotel JW Marriott juhu, Mumbai
{ 9892124323 }} Call Girls & Escorts in Hotel JW Marriott juhu, Mumbai{ 9892124323 }} Call Girls & Escorts in Hotel JW Marriott juhu, Mumbai
{ 9892124323 }} Call Girls & Escorts in Hotel JW Marriott juhu, MumbaiPooja Nehwal
 
Introduction to LPC - Facility Design And Re-Engineering
Introduction to LPC - Facility Design And Re-EngineeringIntroduction to LPC - Facility Design And Re-Engineering
Introduction to LPC - Facility Design And Re-Engineeringthomas851723
 
LPC User Requirements for Automated Storage System Presentation
LPC User Requirements for Automated Storage System PresentationLPC User Requirements for Automated Storage System Presentation
LPC User Requirements for Automated Storage System Presentationthomas851723
 
Risk management in surgery (bailey and love).pptx
Risk management in surgery (bailey and love).pptxRisk management in surgery (bailey and love).pptx
Risk management in surgery (bailey and love).pptxSaujanya Jung Pandey
 
CEO of Google, Sunder Pichai's biography
CEO of Google, Sunder Pichai's biographyCEO of Google, Sunder Pichai's biography
CEO of Google, Sunder Pichai's biographyHafizMuhammadAbdulla5
 
CALL ON ➥8923113531 🔝Call Girls Charbagh Lucknow best sexual service
CALL ON ➥8923113531 🔝Call Girls Charbagh Lucknow best sexual serviceCALL ON ➥8923113531 🔝Call Girls Charbagh Lucknow best sexual service
CALL ON ➥8923113531 🔝Call Girls Charbagh Lucknow best sexual serviceanilsa9823
 
Fifteenth Finance Commission Presentation
Fifteenth Finance Commission PresentationFifteenth Finance Commission Presentation
Fifteenth Finance Commission Presentationmintusiprd
 
Call now : 9892124323 Nalasopara Beautiful Call Girls Vasai virar Best Call G...
Call now : 9892124323 Nalasopara Beautiful Call Girls Vasai virar Best Call G...Call now : 9892124323 Nalasopara Beautiful Call Girls Vasai virar Best Call G...
Call now : 9892124323 Nalasopara Beautiful Call Girls Vasai virar Best Call G...Pooja Nehwal
 
Board Diversity Initiaive Launch Presentation
Board Diversity Initiaive Launch PresentationBoard Diversity Initiaive Launch Presentation
Board Diversity Initiaive Launch Presentationcraig524401
 

Recently uploaded (20)

VIP Kolkata Call Girl Rajarhat 👉 8250192130 Available With Room
VIP Kolkata Call Girl Rajarhat 👉 8250192130  Available With RoomVIP Kolkata Call Girl Rajarhat 👉 8250192130  Available With Room
VIP Kolkata Call Girl Rajarhat 👉 8250192130 Available With Room
 
LPC Warehouse Management System For Clients In The Business Sector
LPC Warehouse Management System For Clients In The Business SectorLPC Warehouse Management System For Clients In The Business Sector
LPC Warehouse Management System For Clients In The Business Sector
 
LPC Facility Design And Re-engineering Presentation
LPC Facility Design And Re-engineering PresentationLPC Facility Design And Re-engineering Presentation
LPC Facility Design And Re-engineering Presentation
 
Day 0- Bootcamp Roadmap for PLC Bootcamp
Day 0- Bootcamp Roadmap for PLC BootcampDay 0- Bootcamp Roadmap for PLC Bootcamp
Day 0- Bootcamp Roadmap for PLC Bootcamp
 
GENUINE Babe,Call Girls IN Badarpur Delhi | +91-8377087607
GENUINE Babe,Call Girls IN Badarpur  Delhi | +91-8377087607GENUINE Babe,Call Girls IN Badarpur  Delhi | +91-8377087607
GENUINE Babe,Call Girls IN Badarpur Delhi | +91-8377087607
 
Training Methods and Training Objectives
Training Methods and Training ObjectivesTraining Methods and Training Objectives
Training Methods and Training Objectives
 
VIP 7001035870 Find & Meet Hyderabad Call Girls Ameerpet high-profile Call Girl
VIP 7001035870 Find & Meet Hyderabad Call Girls Ameerpet high-profile Call GirlVIP 7001035870 Find & Meet Hyderabad Call Girls Ameerpet high-profile Call Girl
VIP 7001035870 Find & Meet Hyderabad Call Girls Ameerpet high-profile Call Girl
 
{ 9892124323 }} Call Girls & Escorts in Hotel JW Marriott juhu, Mumbai
{ 9892124323 }} Call Girls & Escorts in Hotel JW Marriott juhu, Mumbai{ 9892124323 }} Call Girls & Escorts in Hotel JW Marriott juhu, Mumbai
{ 9892124323 }} Call Girls & Escorts in Hotel JW Marriott juhu, Mumbai
 
sauth delhi call girls in Defence Colony🔝 9953056974 🔝 escort Service
sauth delhi call girls in Defence Colony🔝 9953056974 🔝 escort Servicesauth delhi call girls in Defence Colony🔝 9953056974 🔝 escort Service
sauth delhi call girls in Defence Colony🔝 9953056974 🔝 escort Service
 
Introduction to LPC - Facility Design And Re-Engineering
Introduction to LPC - Facility Design And Re-EngineeringIntroduction to LPC - Facility Design And Re-Engineering
Introduction to LPC - Facility Design And Re-Engineering
 
LPC User Requirements for Automated Storage System Presentation
LPC User Requirements for Automated Storage System PresentationLPC User Requirements for Automated Storage System Presentation
LPC User Requirements for Automated Storage System Presentation
 
Call Girls Service Tilak Nagar @9999965857 Delhi 🫦 No Advance VVIP 🍎 SERVICE
Call Girls Service Tilak Nagar @9999965857 Delhi 🫦 No Advance  VVIP 🍎 SERVICECall Girls Service Tilak Nagar @9999965857 Delhi 🫦 No Advance  VVIP 🍎 SERVICE
Call Girls Service Tilak Nagar @9999965857 Delhi 🫦 No Advance VVIP 🍎 SERVICE
 
Risk management in surgery (bailey and love).pptx
Risk management in surgery (bailey and love).pptxRisk management in surgery (bailey and love).pptx
Risk management in surgery (bailey and love).pptx
 
CEO of Google, Sunder Pichai's biography
CEO of Google, Sunder Pichai's biographyCEO of Google, Sunder Pichai's biography
CEO of Google, Sunder Pichai's biography
 
CALL ON ➥8923113531 🔝Call Girls Charbagh Lucknow best sexual service
CALL ON ➥8923113531 🔝Call Girls Charbagh Lucknow best sexual serviceCALL ON ➥8923113531 🔝Call Girls Charbagh Lucknow best sexual service
CALL ON ➥8923113531 🔝Call Girls Charbagh Lucknow best sexual service
 
Becoming an Inclusive Leader - Bernadette Thompson
Becoming an Inclusive Leader - Bernadette ThompsonBecoming an Inclusive Leader - Bernadette Thompson
Becoming an Inclusive Leader - Bernadette Thompson
 
Fifteenth Finance Commission Presentation
Fifteenth Finance Commission PresentationFifteenth Finance Commission Presentation
Fifteenth Finance Commission Presentation
 
Rohini Sector 16 Call Girls Delhi 9999965857 @Sabina Saikh No Advance
Rohini Sector 16 Call Girls Delhi 9999965857 @Sabina Saikh No AdvanceRohini Sector 16 Call Girls Delhi 9999965857 @Sabina Saikh No Advance
Rohini Sector 16 Call Girls Delhi 9999965857 @Sabina Saikh No Advance
 
Call now : 9892124323 Nalasopara Beautiful Call Girls Vasai virar Best Call G...
Call now : 9892124323 Nalasopara Beautiful Call Girls Vasai virar Best Call G...Call now : 9892124323 Nalasopara Beautiful Call Girls Vasai virar Best Call G...
Call now : 9892124323 Nalasopara Beautiful Call Girls Vasai virar Best Call G...
 
Board Diversity Initiaive Launch Presentation
Board Diversity Initiaive Launch PresentationBoard Diversity Initiaive Launch Presentation
Board Diversity Initiaive Launch Presentation
 

PMP Chap 3 - Project Management Processes

  • 1. By: Anand Bobade (nmbobade@gmail.com) Chap 3 – Project Management Processes Initiating Planning Executing Monitoring & Controlling Closing Learn Project Management & prepare for PMP exam: • Learn visually • Detailed coverage of all PMP concepts • Sample Questions
  • 2. Don’t try to remember processes Try to understand each process Try explain it to others.. It will firm your understanding
  • 3. By: Anand Bobade (nmbobade@gmail.com) Project Management Processes What is Process Common Project Management processes Process groups Initiating Process group Planning Process group Executing Process Group Monitoring & Controlling process group Closing Process group Project Information Role of the Knowledge area
  • 4. By: Anand Bobade (nmbobade@gmail.com) What is Process? A set of interrelated actions & activities performed to create a pre-specified product, service or result. Interrelated actions & activitiesProduct Service or Result Requirements, Specifications Company Environment EEF & OPA should be taken into account as input to every process even if they are not explicitly listed in the process specifications.
  • 5. By: Anand Bobade (nmbobade@gmail.com) Types of Process • Ensure effective flow of Project throughout its life cycle • Encomposses Tools & techniques involved in applying skills & capabilitites Project Management Processes: • Specify & create projects product. • Defined by product life cycle and varry by application area as well as phases of the project life cycle Product Oriented Processes:
  • 6. By: Anand Bobade (nmbobade@gmail.com) Process group Initiating Planning Executing Monitoring & Controlling Closing A logical grouping of project management inputs, tools and techniques, and outputs. Not project Phases
  • 7. By: Anand Bobade (nmbobade@gmail.com) Process group Initiate new Project or Phase Define Project Objective, Establish scope. Plan how project will be executed & closed. Perform the work Track & review progress. Ensure compliance. Perform Integrated change management. Finalize all project activities. Formally close phase or project.
  • 8. By: Anand Bobade (nmbobade@gmail.com) Process group All process groups can be conducted in a each project phase. It is not Project life cycle Phases Has clear dependencies In-depended of application area or Industry focus. Large complex projects are split into the phases. Initiation processes carried out in each phases to validate decision made in the previous phase.
  • 9. By: Anand Bobade (nmbobade@gmail.com) Processes & Project success For project to be successful, Project team should: Select appropriate processes as per project objective Use defined approach that can be adapted to meet requirements Establish & maintain communication & engagement with stakeholders Comply with requirement to meet stakeholder needs and expectations Balance competing constraints
  • 10. By: Anand Bobade (nmbobade@gmail.com) Common Process Interactions Processes Overlap & interact in ways that are not completely detailed. Application of processes are iterative & many processes are repeated.
  • 11. By: Anand Bobade (nmbobade@gmail.com) Common Process Interactions
  • 12. By: Anand Bobade (nmbobade@gmail.com) Common Process Interactions
  • 13. By: Anand Bobade (nmbobade@gmail.com) Common Process Interactions Process groups are linked by the output which are produced. Output of one process generally becomes an input to another process or is deliverable.
  • 14. By: Anand Bobade (nmbobade@gmail.com) Common Process Interactions
  • 15. By: Anand Bobade (nmbobade@gmail.com) Initiating Process group It define a new project or a new phase of an existing project by obtaining authorization to start the project or phase. New Project or Project Phase Project Manager is selected Project charter is approved Scope is Defined Finance /budget is committed Stakeholders are identified Stakeholder expectations & understood
  • 16. By: Anand Bobade (nmbobade@gmail.com) Planning Process group It is the place where the PM, project teams decides what they want, how to do, when to do, who to do, money needed, time needed and so on. Establish scope Refine objectives Defining products to be produced Define work required Sequencing work (schedule) Estimating the resource( effort) & finalize schedule Estimating costs (budget)
  • 17. By: Anand Bobade (nmbobade@gmail.com) Executing Process group Processes performed to complete work defined in PMP to satisfy project specifications. Directing and managing project execution. Establishing and manage the project team. Coordinating people and resources. Monitoring team performance. procurements. Distributing information. Performing quality assurance activities.
  • 18. By: Anand Bobade (nmbobade@gmail.com) Monitoring & Controlling Process group Those processes required to track, review, and regulate the progress and performance of the project; identify any areas in which changes to the plan are required; and initiate the corresponding changes Involves tracking, reviewing, and regulating project progress Includes status reporting, progress measurement, and forecasting Reports on scope, schedule, cost, resources, quality, and risks Controls project and project document changes Includes control of scope, schedule, costs, and risks Formalizes acceptance of deliverables (called scope verification) Records quality control results Track RegulateReview
  • 19. By: Anand Bobade (nmbobade@gmail.com) Closing Process group Processes performed to terminate formally all activities of a project or project phase, & transfer of completed product to others or to close a cancelled project. Obtaining acceptance by the customer or sponsor (approval to close). Releasing people and resources. Reporting on team performance and lessons learned. Updating or finalizing documents, project records, and results. Close procurements. Storing or archiving information. Formally close project or phase.
  • 20. By: Anand Bobade (nmbobade@gmail.com) Project Information Significant amount of data & information is collected, analysed, transformed and distributed. The raw observations and measurements identified during activities performed to carry out the project work; e.g. actual cost, actual duration, and percent of work physically completed Work Performance Data: The performance data collected from various controlling processes, analysed in context and integrated based on relationships across areas; e.g. status of deliverables, and forecasted estimates to complete, etc. Work performance information: A compilation of work performance information for consumption purpose such as status or decision making. Work performance Reports:
  • 21. By: Anand Bobade (nmbobade@gmail.com) Project Information Significant amount of data & information is collected, analysed, transformed and distributed.
  • 22. By: Anand Bobade (nmbobade@gmail.com) The Knowledge area Integration Scope Time Cost Quality Human resource Communication Risk Procurement Stakeholder Area of project management defined by its knowledge requirements & described in terms of its component processes, practices, inputs, outputs, tools, and techniques
  • 23. By: Anand Bobade (nmbobade@gmail.com) The Knowledge area & Process groups
  • 24. By: Anand Bobade (nmbobade@gmail.com) The Knowledge area & Process groups
  • 25. By: Anand Bobade (nmbobade@gmail.com) The Knowledge area & Process groups
  • 26. By: Anand Bobade (nmbobade@gmail.com) Common Process Interactions
  • 27. By: Anand Bobade (nmbobade@gmail.com) Review What is Process? Project Management processes Common Process Interactions Process groups Knowledge Areas Project Information
  • 28. By: Anand Bobade (nmbobade@gmail.com) Thank you! Learn Project Management & prepare for PMP exam: • Learn visually • Detailed coverage of all PMP concepts • Sample Questions
  • 29. By: Anand Bobade (nmbobade@gmail.com) Additional Resources Visit Slide Share website & you will find other Knowledge area presentation… Please share!!