The document summarizes proposed enhancements to the Harbor Bridge Project in Corpus Christi, Texas. It describes enhancements that will improve mobility and connectivity to areas near the port, SEA district, and downtown, including an emphasis on bicycle and pedestrian access and aesthetic features. Specifically, it notes that the enhancements will eliminate six traffic signals to create free-flowing gateways, improve port and refinery access, and enhance the North Beach area with safer connections and a shared use path. The enhancements are part of an ongoing design-build process to achieve the best results for the community.