Highland Creek Village Transportation Master Plan
HIGHLAND CREEK VILLAGE TRANSPORTATION MASTER PLAN
Format
• Drop-in to view information panels
• Speak with Project staff throughout the evening
• Brief presentation at 6:30 P.M.
• Question and Answer Session following presentation
Feedback
Your feedback is a critical part of this study. We encourage
you to share your thoughts by:
• Speaking directly with staff
• Participating in the Question and Answer Session
• Completing comment forms and submitting them at
the event, by mail, or online
Comments must be received by July 14, 2015
Public Information Materials are available on the project web page: www.toronto.ca/hcvtransportation
Welcome!
Thank you for joining us at this 2nd Public Information
Centre to discuss the progress made to date on the
development of the Highland Creek Village Transportation
Master Plan.
Purpose
Provide update and seek your feedback on:
• Evaluation Process
• Preliminary Recommended Transportation Solution
• Preliminary Recommended Servicing Solution
(Water, Wastewater, Stormwater)
• Preliminary Design
June 2015June 2014
We are here
Public Information Centre #2
June 24, 2015
Highway 2A E
Kingston Rd
Lawson Rd
Lawson Rd
Highway 2A W
Highw
ay
2A
E
Highw
ay
2A
W
MorrishRd
WatsonSt
Military Trl
Old Kingston Rd
BobmarRd
ClydeRd
IvanRd
DeepDeneDr
Bonacres Ave
Bathgate Dr
Colonel Danforth Trl
ChoicelandBlvd
MeadowvaleRd
TanisCres
RamblewoodDr
Camor Crt
MilroyCres
Highland Creek Dr
Glenthorne Dr
Thomas Ave
SatchellBlvd
Wishaw Rd
BushDr
Acland Cres
RomacDr
Bramber Rd
RoydawnCrt
WindingCrt
WindrushTrl
FranklinAve
Bush Gt
HighlandCreekOverpass
Whiteacres Ave
Walding Gt
FalconLane
Scenic Hill Crt
Stagecoach CrclGraphic Crt
Sugarbush Sq
Ruddell Pl
Brigadier Pl
OldSweatsLane
WindrushTrl
MeadowvaleRd
Lawson Rd 2A
Ramp
2A Lawson Rd
Highland Creek Village
Transportation Master Plan
Study Area
0 100 20050 m
Highland Creek Village Transportation Master Plan
Purpose of the Transportation Master Plan (TMP)
Why is this study being undertaken?
• Changes to the transportation network are required to support development and all modes of transportation
• Transportation network changes have been assessed based on their ability to address problems and take
advantage of opportunities described in the Problem & Opportunity Statement (developed for PIC #1):
The City of Toronto has established a vision for the long-term revitalization of the Highland Creek
Village into a vibrant, pedestrian friendly and mixed use community. In order to accommodate all
roadway users, and support this vision, changes are required to the transportation network that
promote redevelopment opportunities and reinvestment in the Village. There are significant
opportunities to improve the public realm and pedestrian environment to encourage the use of
transit, cycling, and walking as viable modes of transportation.
2
WalkShop – June 5, 2014
3Highland Creek Village Transportation Master Plan
What We Have Heard
Public Information Centre #1 – June 25, 2014
• Considerable support for public realm enhancements, including green
space, trees and space for pedestrian traffic
• Potentially impacted residents request no changes to Meadowvale Rd
• Village Plaza businesses strongly support maintaining angled parking
• Strong support for complete sidewalks and bicycle facilities
Parking Consultation Meeting – November 19, 2014
• Discussion of on and off-street parking in the Village with businesses
• Reinforced strong support for angled parking to remain as is
• Additional parking spaces to accommodate weekend and evening demand
Stakeholder Meeting – May 28, 2015
• Positive response to preliminary recommended solution; some expressed
that improvements to connectivity and streetscape are long overdue
• Both support and concern expressed for conversion to parallel parking
• Stakeholder walking tour to document existing transportation problems and
discuss future opportunities
• Common ground on opportunities to support area revitalization through
continuous sidewalks, bike lanes, and enhanced streetscaping
• Parking needs to be safe and convenient with additional new spots
South side of Old Kingston Rd at Morrish Rd (facing east)
Morrish Rd south of Old Kingston Rd (facingsouth)
Highland Creek Village Transportation Master Plan
Future Development and Traffic
AM Peak Hour PM Peak Hour
100 150
Existing Auto Trips to/from the Village
4
How will growth impact the Village transportation system?
• Future development and growth is expected in
the Village
• More people and jobs will lead to more
trips, more pedestrians, and more vehicles
in the Village:
• Hwy 2A and Old Kingston Rd are expected
to experience peak hour congestion in
2031, especially in the AM peak hour
• Vast majority of traffic is from outside of the
study area during peak hours
AM Peak Hour PM Peak Hour
550 700
2031 Auto Trips to/from the Village
Population Employment
Long-Term Growth
(2031 or beyond)
+3,500 +400
Estimated Growth in the Village
(based on Highland Creek Village Area Study)
Existing Population (2011)
Location Population
Surrounding Area
(Morningside Rd – Port Union Rd,
Ellesmere Ave – Highland Creek)
10,000
Highland Creek Village Transportation Master Plan
Menu of Considered Improvements Do Nothing Alternative 1 Alternative 2 Alternative 3 Alternative 4
New Laneway
New “T” intersection at Hwy 2A – Military Trail
Closure of accesses to Hwy 2A (Military Trail)
Realignment of Kingston Rd and Morrish Rd (option 1)
Realignment of Kingston Rd and Morrish Rd (option 2)
Closure of accesses to Hwy 2A (Morrish Rd & Kingston Rd)
New intersection at Hwy 2A– Kingston Rd – Lawson Rd
Conversion of angled/perpendicular parking to parallel
Reconfigure intersection of Old Kingston Rd and Kingston Rd
Roundabout at Kingston Road and Lawson Overpass Removed. Please see panel for Alternative 3 for more details.
New ramp to WB Hwy 2A at Lawson Overpass
New signal at Lawson Overpass and Hwy 2A
Removal of Hwy 2A on and off ramps
New WB access to Hwy 2A at Meadowvale Rd
New signals on Meadowvale Road
Closure of accesses to Hwy 2A (Lawson Rd)
(*) New cycling connection between Lawson Rd and Military Trail
(*) Enhanced streetscape/public realm throughout the Village
(*) Additional on-street parking on improved roadways
2
1
3
4
5
6
7
8
9
10
11
12
13
14
15
16
5
“Menu” of Transportation Improvements
Legend:
New signalized
Intersection
Re-Aligned Or New
Road
Ramp Closure
Parallel Parking
Conversion
Roundabout
1
2
3
4
5
6
7
9
10
11
12
13
14
15
8
16
WatsonSt
MorrishRd
Lawson Rd
MeadowvaleRd
(*) Not shown on map; applies to multiple roadways and areas.
Highland Creek Village Transportation Master Plan 6
Evaluation Criteria and Indicators
• Evaluation criteria and
indicators have been
refined and expanded
since PIC 1
• Each alternative has
been evaluated
against the noted
criteria and indicators
• Structured evaluation
allows for comparison
of each alternative’s
benefits and impacts
Highland Creek Village Transportation Master Plan
Alternative 1 has been selected as the Preliminary Preferred Alternative
Evaluation Summary
7
Evaluation Criteria Do Nothing Alternative 1 Alternative 2 Alternative 3 Alternative 4
Traffic ●●●● ○○●● ○●●● ○○●● ○○●●
Multimodal Transportation
Planning
○○○○ ●●●● ○●●● ○●●● ○●●●
Servicing ○●●● ●●●● ○●●● ○●●● ○●●●
City Building and Social
Environment
○○○○ ●●●● ○○●● ○●●● ○●●●
Cultural Environment ●●●● ○○○● ○○○○ ○○○● ○○○●
Natural Environment ●●●● ○●●● ○○○○ ○○●● ○●●●
Costs ●●●● ○○○○ ○○●● ○○○● ○●●●
Economic Development ○○○○ ●●●● ○●●● ○●●● ○●●●
Overall Evaluation
Least Preferred
○○○○
Most Preferred
●●●●
Less Moderately Preferred
○○●●
Moderately Preferred
○●●●
Moderately Preferred
○●●●
LEGEND
(meaning of dot ranking)
Most Preferred
●●●●
Moderately Preferred
○●●●
Less Moderately Preferred
○○●●
Less Preferred
○○○●
Least Preferred
○○○○
Note: A copy of the detailed evaluation table is
available on the Resource table.
Highland Creek Village Transportation Master Plan
Do Nothing
8
Evaluation Criteria Do Nothing
Traffic ●●●●
Multimodal Transport
Planning ○○○○
Servicing ○●●●
City Building and Social
Environment ○○○○
Cultural Environment ●●●●
Natural Environment ●●●●
Costs ●●●●
Economic Development ○○○○
Overall Evaluation
Least Preferred
○○○○
• Maintains existing road
network and parking
with no changes
Evaluation Summary
Background
• Least delays for auto traffic since Hwy 2A continues
to operate as a highway
• Area transportation network primarily caters to
automobile
• Hwy 2A remains as barrier to pedestrians, cyclists,
and vehicles. Overpass remains as only crossing.
• No improvements to pedestrian environment and
network. Existing gaps in sidewalks remain.
• Limited opportunities to improve public realm
• Does not impact Cultural or Natural Environment
• Does not support development / reinvestment in the
Village and the vision of the Area Study.
• No impacts to existing parking but limited
opportunities to provide new parking
• Lowest capital costs but highest maintenance costs
MorrishRd
WatsonSt
Choiceland
Blvd
MeadowvaleRd
Lawson Rd
Highland Creek Village Transportation Master Plan
Alternative 1
9
Evaluation Criteria Alternative 1
Traffic ○○●●
Multimodal Transport
Planning
●●●●
Servicing ●●●●
City Building and Social
Environment
●●●●
Cultural Environment ○○○●
Natural Environment ○●●●
Costs ○○○○
Economic Development ●●●●
Overall Evaluation
Most Preferred
●●●●
• Based on Highland Creek
Area Study (2012)
Recommended Network
Removed:
• Westbound access to Hwy
2A.
• Provides alternative with no
changes to Meadowvale Rd
• Access remains in Alternative 3
Added:
• Morrish Rd parallel parking
conversion. See board 11
for details.
Evaluation Summary
Background
• New Hwy 2A signals increase auto travel times
compared to Do Nothing
• More vehicles from outside the study area will travel
through the Village (diversion from 2A)
• Two Hwy 2A intersections provide new routing
options for vehicles, pedestrians, and cyclists
• Long-term removal of Overpass allows for
transformation of Hwy 2A into a more pedestrian and
cyclist friendly arterial road
• Significant opportunities to improve the public realm
and pedestrian environment throughout the Village
• Impacts to existing angled parking. New roads
provide more on-street parking. Development to
provide additional internal parking.
• Best supports development / reinvestment in the
Village and the vision of the Area Study
• Highest capital cost but lowest maintenance costs
Updates since PIC#1:
New “T” intersection at
Hwy 2A – Military Trail
Removal of overpass and
ramps. Add new signal.
New laneway
Reconfigure
intersection
Realignment of Kingston
Rd and Morrish Rd
Closure of accesses
to Hwy 2A
New WB access to Hwy 2A
(removed)
MeadowvaleRd
Lawson Rd
Conversion to
parallel parking
Highland Creek Village Transportation Master Plan
Angled vs. Parallel Parking
10
Safety
• Improved visibility for
parking manoeuvers
• Angled parking directly
contributed to 10
collisions between 2009
and 2013
Standards &
Accessibility
• Consistent with City
standards, policies, &
practices
• AODA requirements must
be met (accessible
parking spaces)
Public Realm
• Enables streetscape and
sidewalk improvements
• Economic benefits
associated with
pedestrian friendly
destinations
Benefits of Conversion to Parallel Parking
Benefits and Impacts
• Redevelopment will provide additional parking, relocating spaces from
conversion of angled/perpendicular to parallel:
o Impacted Spaces: 21 angled (Old Kingston Rd), 33 perpendicular (Morrish Rd)
o New On-Street Spaces: Parallel parking on Morrish Rd / Kingston Rd “loop”
and Military Trail (between Old Kingston Rd and Hwy 2A)
o New Off-Street Spaces: Spaces required to support new development.
Recommendation
• Most likely to occur together with development along Old Kingston Rd
• Length of stay time limits may be considered to reserve spaces in high
demand areas for short-term customer use
Due to safety concerns, inconsistency with City standards and best practices,
and resulting improvements to the public realm, it is recommended that
existing angled and perpendicular parking be converted to parallel parking.
North side of Old Kingston Rd at Morrish Rd (facing east)
West side of Morrish Rd at Old Kingston Rd (facing south)
East side of Morrish Rd at Old Kingston Rd (facing south)
Highland Creek Village Transportation Master Plan
Alternative 2
11
Evaluation Criteria Alternative 2
Traffic ○●●●
Multimodal Transport
Planning
○●●●
Servicing ○●●●
City Building and Social
Environment
○○●●
Cultural Environment ○○○○
Natural Environment ○○○○
Costs ○○●●
Economic Development ○●●●
Overall Evaluation
Less Moderately
Preferred
○○●●
• Based on Highland
Creek Functional Study
(1995) Recommended
Plan
Added:
• New laneway
Evaluation Summary
Background
• Hwy 2A signals increase auto travel times compared
to Do Nothing
• Less delays and through traffic in Village than
Alternatives 1, 2, and 4. Meadowvale Rd intersection
diverts some through traffic away from the Village.
• Two Hwy 2A intersections provide new routing
options for vehicles, pedestrians, and cyclists
• Impacts along Meadowvale Rd: cut-through traffic,
cross-section widening with potential expropriation
• Limits accessibility to Lawson Rd and Colonel
Danforth Tr from Hwy 2A eastbound (ramp closures)
• Overpass and new westbound on-ramp limit
transformation of Hwy 2A into a more pedestrian and
cyclist friendly arterial road
• Overpass and new westbound on-ramp significantly
limit opportunities to develop surrounding lands
• Lower capital cost than Alternative 1. Similar
maintenance cost to Do Nothing.
New signals on
Meadowvale Road
New “T” intersection at
Hwy 2A – Military Trail
Reconfigure
intersection
Realignment of Kingston
Rd and Morrish Rd
Closure of accesses
to Hwy 2A
New ramp to
WB Hwy 2A
New laneway
Removal of ramps
MorrishRd
WatsonSt
MeadowvaleRd
Lawson Rd
Updates since PIC#1:
Highland Creek Village Transportation Master Plan
Meadowvale Road Connection
12
Benefits and Impacts
• A right-turn only movement from Meadowvale Rd to Hwy 2A provides
limited benefits to vehicles only
• A full-movement signalized intersection at Meadowvale Rd and Hwy 2A
provides enhanced vehicle network connectivity and an additional
pedestrian/cyclist crossing opportunity
• Forecasts suggest that a full-movement signalized intersection would be
well-utilized; however, limited benefits are expected for the Village itself:
o Only 10% peak hour traffic reduction along Old Kingston Rd
o More Regional benefits (e.g., relief of Port Union Rd)
o Primarily serves longer distance through traffic
• Anticipated impacts along Meadowvale Rd to north and south of Hwy 2A:
– Potential cross-section widening with expropriation
– Increased traffic infiltration (mostly cut-through traffic)
Recommendation
Meadowvale Intersection (including right-turn only) may be further
examined by a future Feasibility Study that includes a wider study area
and considers broad Transportation and City planning policy objectives
Meadowvale Rd facing south toward Hwy 2A
Meadowvale Rd facing north toward Hwy 2A
Highland Creek Village Transportation Master Plan
Alternative 3
13
Evaluation Criteria Alternative 3
Traffic ○○●●
Multimodal Transport
Planning
○●●●
Servicing ○●●●
City Building and Social
Environment
○●●●
Cultural Environment ○○○●
Natural Environment ○○●●
Costs ○○○●
Economic Development ○●●●
Overall Evaluation
Moderately Preferred
○●●●
• New alternative
developed for the TMP
Removed:
• Roundabout Kingston Rd
and Lawson Rd:
• Inconsistent with pedestrian
and cycling friendly Village
• Issues with sizing
• Concerns expressed by
public
Added:
• New laneway
Evaluation Summary
Background
• Hwy 2A signal increases auto travel times compared
to Do Nothing
• More vehicles from outside the study area will travel
through the Village (diversion from 2A). Similar to
Alternative 1.
• Hwy 2A intersection provide new routing option for
vehicles, pedestrians, and cyclists
• A right-turn only movement from Meadowvale Rd to
Hwy 2A provides limited benefits to vehicles only
• Overpass limits transformation of Hwy 2A into a
more pedestrian and cyclist friendly arterial road
• Overpass limits opportunities to develop surrounding
lands
• Proximity of new intersection limits opportunity to
eventually remove the Overpass
• Higher capital cost than Alternative 4 and lower cost
than Alternative 1
Updates since PIC#1:
Highland Creek Village Transportation Master Plan
Alternative 4 (NEW)
14
Evaluation Criteria Alternative 4
Traffic ○○●●
Multimodal Transport
Planning
○●●●
Servicing ○●●●
City Building and Social
Environment
○●●●
Cultural Environment ○○○●
Natural Environment ○●●●
Costs ○●●●
Economic Development ○●●●
Overall Evaluation
Moderately Preferred
○●●●
• New alternative
developed for the TMP
• Same as Alternative 1
but with Overpass in
place
• New alternative (not
previously shown at
PIC #1)
Evaluation Summary
Background
• Hwy 2A signal increases auto travel times compared
to Do Nothing
• More vehicles from outside the study area will travel
through the Village (diversion from 2A). Similar to
Alternative 1.
• Hwy 2A intersection provide new routing option for
vehicles, pedestrians, and cyclists
• Limits accessibility to Lawson Rd and Colonel
Danforth Tr from Hwy 2A eastbound (ramp closures)
• Overpass limits transformation of Hwy 2A into a
more pedestrian and cyclist friendly arterial road
• Overpass limits opportunities to develop surrounding
lands
• Does not preclude possibility of removing Overpass
in the future
• Lower capital cost than Alternatives 1-3
New “T” intersection at
Hwy 2A – Military Trail
Removal of ramps
New laneway
Reconfigure
intersection
Realignment of Kingston
Rd and Morrish Rd
MorrishRd
WatsonSt
MeadowvaleRd
Lawson Rd
Closure of accesses
to Hwy 2A
Updates since PIC#1:
Highland Creek Village Transportation Master Plan
Preliminary Recommended Solution (DRAFT)
15
Note: The Concept Plan shown above is a preliminary draft provided for input and comment.
Proposed Curb
Proposed Right-of-Way
Highland Creek Village Transportation Master Plan
Preferred Alternative - Active Transportation
Cycling
• New bike lanes and off-road trail connect to
planned bike lanes on Military Trail and Lawson Rd
• Provides direct cycling connections to University of
Toronto Scarborough and Rouge Hill GO Station
• Cycling infrastructure design options will be
examined in more detail during detailed design
Walking
• Additional sidewalks to provide continuous
network on both sides of streets
• Pedestrian crossings of Hwy 2A at new
signalized intersections
• Improved public realm, including streetscaping,
widened sidewalks, and landscape elements
Existing Off-Road Proposed Bike Lane
(this TMP)
Planned Bike Lane
(Toronto Bike Plan)
Proposed New Sidewalk Existing Sidewalk Existing Traffic Signal
New Traffic Signal
16
Proposed Pedestrian Network Proposed Cycling Network
Proposed Off-Road Path
Alignment of off-road trail connection between
Military Trail and Lawson Rd to be reviewed as
part of future detailed design activities.
Proposed Off-Road
(this TMP)
WatsonSt
MorrishRd
Lawson Rd
MeadowvaleRd
Highland Creek Village Transportation Master Plan
Preferred Alternative - Transit and Servicing
Transit
• No new dedicated transit infrastructure anticipated in study area
• Increased walkability and public realm supports transit
• TTC is circulated on applications for development and will adjust
service as population in the area increases
• Potential improvements include:
o Hwy 2A intersections require consideration of new routing
o New bus stop locations to serve development
o Improved connections with planned GO Regional Express Rail (RER)
New connections to future Scarborough Subway extension
Existing TTC Routes
Water and Wastewater Servicing
17
• Projected growth and road reconfiguration can be
supported through realignment and upsizing of
sanitary sewers and watermains (where necessary)
• New Military Trail and Lawson Rd intersections
provide opportunity to improve connectivity with
existing water distribution systems on Colonel
Danforth Dr and Lawson Rd south of Hwy 2A
Stormwater Servicing
• Opportunities to achieve stormwater management
design objectives through low-impact development
(LID) measures:
o Bio-engineered swales
o Bio-retention gardens
o Tree pits in boulevards
o Permeable pavements for on-street parking
• Centralized facilities can be considered
o Reduce need for on-site management
o Improve water quality & quantity in municipal right of way
• Controlling peak flows to the Centennial Creek
corridor to reduce downstream flood risk
Note: More detailed information on water, wastewater, and
stormwater servicing is available at the Resource Table.
Highland Creek Village Transportation Master Plan
Projects and Implementation Scenarios
18
Project Included Improvements EA
Sched.
Anticipated
Timing
Develop
-ment
Public
Realm
City
Council
Military Trail
Traffic
Signal
• New Hwy 2A Signalized Intersection
• Closure of Military Tr ramps / accesses
• Conversion of Hwy 2A into arterial near Military Tr
• Streetscape improvements and parking on Military Tr,
• Cycling connections between Military Tr & Lawson Rd
C
Short-Term
(<10 yr)
Old
Kingston Rd
Screetscape
• Streetscape improvements and conversion to parallel
parking on Old Kingston Rd & Morrish Rd
A+
Short-Medium
Term (/w
development)
Re-
Alignment of
Kingston
and Morrish
Rd
• Road re-alignment / “loop” connection
• Streetscape improvements and parking on Kingston Rd
& Morrish Rd
• Closure of Kingston Rd & Morrish Rd ramps / accesses
• Reconfiguration of Kingston Rd & Old Kingston Rd
intersection
B
Medium-Term
(10-20 yr)
New
Laneway
• New laneway between Military Tr and Morrish Rd n/a
Short-Medium
Term (/w
development)
Lawson
Overpass
Removal
• Lawson Overpass and Lawson Hwy 2A ramp closure
• New Hwy 2A Signalized Intersection
• Conversion of Hwy 2A into arterial near Overpass
• Closure of Lawson Rd ramps / accesses
C
Long-Term
(20+ yr)
2
3
1
8
5
6
9
13
12
16
Implementation Scenario
Improvements Key Map
1
2
3
5
6
9
12
13
8
16
WatsonSt
MorrishRd
Implementation Scenarios
• Implementation timelines are uncertain. Possible
scenarios include:
oDevelopment Driven: Triggered by
development proposal.Applications reviewed for
consistency with TMP recommendations.
oPublic Realm Initiative: Advanced through City
Public Realm Initiatives (e.g., Beautiful Streets)
oCity Council: Advanced with Council direction
EA Schedules
• Each project is categorized into one of the
following EA Schedules (by cost and impact):
oSchedule A/A+: Pre-approved. May proceed to
detailed design and construction at any time
oSchedule B: May proceed to detailed design
and construction at end of TMP
oSchedule C: Requires additional investigation
and consultation (Phases 3- 4 of EA process)
HCV TMP Recommended Projects
Highland Creek Village Transportation Master Plan
Study Area Impacts and Mitigation
19
Potential Impacts Mitigation
Archaeological Resources
Locations: i) Future Village Green on west side of Morrish
Rd; ii) Highland Creek Parkette on south-west corner of
Old Kingston Rd and Lawson Overpass; iii) Open grass
area located to south of Woodland Court Plaza
• Properties identified as potentially containing
archaeological resources
• A Stage 2 Archaeological Assessment will be carried out prior to
construction
• Written confirmation from the Ministry of Tourism, Culture and Sport
(MTCS) that all MTCS technical review requirements have been
satisfied will be required prior to construction
Site Contamination
Location: To be determined
• Areas of potential environmental concern identified in
parts of the study area
• Identified areas of potential environmental concern will be further
investigated to confirm or refute the presence of contamination prior
to construction, where required
Private Property
Location: To be determined
• Additional property required in some locations
• Consultation with affected property owners and negotiation of
property acquisition prior to construction; property requirements will
be confirmed during detailed design
Cultural Heritage
Location: 215 Morrish Rd (Morrish Plaza)
• Adjacent improvements to Old Kingston Rd identified
as having potential to impact this property
• Cultural Heritage Evaluation Report will be completed prior to detailed
design in order to identify heritage attributes
Note: Impacts to be confirmed based on grading limits of preliminary design
Highland Creek Village Transportation Master Plan
Thank You!
20
September
2015
October
2015
Please provide comments by July 14, 2015 through one of the following
methods:
• Completing a comment sheet today and placing it in the box provided
• Submitting written comment form via email, mail and/or fax
• Filling out an online feedback form on the study website
How can you share your feedback?
How can you continue to participate?
Please check the study website www.toronto.ca/hcvtransportation to review new information.
Maogosha Pyjor
Senior Public Consultation Coordinator
City of Toronto
Metro Hall, 19th Floor
55 John Street
Toronto, ON M5V 3C6
Tel: 416-338-2850
Fax: 416-392-2974
TTY: 416-397-0831
mpyjor@toronto.caWhat happens next?
City Council
Approval
Notice
of
Completion
30 Day
Public and
Agency
Review
Period
December
2015
Review and
Incorporate
Public
Comments
July - August
2015

More Related Content

What's hot

Hunter Mill District Community Outreach Meeting
Hunter Mill District Community Outreach MeetingHunter Mill District Community Outreach Meeting
Hunter Mill District Community Outreach MeetingFairfax County
 
Tantallon tweaks slideshow nwcc
Tantallon tweaks slideshow nwccTantallon tweaks slideshow nwcc
Tantallon tweaks slideshow nwccMarcus Garnet
 
Point Place Meeting 9-14-05
Point Place Meeting 9-14-05Point Place Meeting 9-14-05
Point Place Meeting 9-14-05HartTWI
 
Waterfront Sanitary Servicing Master Plan Update (Oct. 30 PIE).
Waterfront Sanitary Servicing Master Plan Update (Oct. 30 PIE). Waterfront Sanitary Servicing Master Plan Update (Oct. 30 PIE).
Waterfront Sanitary Servicing Master Plan Update (Oct. 30 PIE). Toronto Public Consultation Unit
 
Huntley Meadows Park Proposed Plan Amendments: Trails and Sidewalks Committee...
Huntley Meadows Park Proposed Plan Amendments: Trails and Sidewalks Committee...Huntley Meadows Park Proposed Plan Amendments: Trails and Sidewalks Committee...
Huntley Meadows Park Proposed Plan Amendments: Trails and Sidewalks Committee...Fairfax County
 
2019 Comprehensive Plan and UDO Annual Review
2019 Comprehensive Plan and UDO Annual Review2019 Comprehensive Plan and UDO Annual Review
2019 Comprehensive Plan and UDO Annual ReviewCity of College Station
 
Central-East Open House - Laird Station to West At-Grade (Sunnybrook - O'Conn...
Central-East Open House - Laird Station to West At-Grade (Sunnybrook - O'Conn...Central-East Open House - Laird Station to West At-Grade (Sunnybrook - O'Conn...
Central-East Open House - Laird Station to West At-Grade (Sunnybrook - O'Conn...Crosstown TO
 
Jefferson Manor Phase IIIA (Albemarle Drive and Portions of Edgehill Drive)
Jefferson Manor Phase IIIA (Albemarle Drive and Portions of Edgehill Drive)Jefferson Manor Phase IIIA (Albemarle Drive and Portions of Edgehill Drive)
Jefferson Manor Phase IIIA (Albemarle Drive and Portions of Edgehill Drive)Fairfax County
 
Conneaut Charrette
Conneaut Charrette Conneaut Charrette
Conneaut Charrette ksuCUDC
 
Orlando Main Streets Bicycle and Pedestrian Study
Orlando Main Streets Bicycle and Pedestrian StudyOrlando Main Streets Bicycle and Pedestrian Study
Orlando Main Streets Bicycle and Pedestrian StudyBrendan O'Connor
 
02 cta yellow line station evanston cc 04.16.12
02   cta yellow line station evanston cc 04.16.1202   cta yellow line station evanston cc 04.16.12
02 cta yellow line station evanston cc 04.16.12cityofevanston
 
Franklin, MA: DPW Upcoming Projects
Franklin, MA: DPW Upcoming ProjectsFranklin, MA: DPW Upcoming Projects
Franklin, MA: DPW Upcoming ProjectsFranklin Matters
 
Reston Town Center North Community Update May 31, 2017
Reston Town Center North Community Update May 31, 2017Reston Town Center North Community Update May 31, 2017
Reston Town Center North Community Update May 31, 2017Fairfax County
 
20120201 061327 multi-use_trail_bid_award
20120201 061327 multi-use_trail_bid_award20120201 061327 multi-use_trail_bid_award
20120201 061327 multi-use_trail_bid_awardSamat Jain
 
Feb215 carrollton cares keynote presentation
Feb215 carrollton cares keynote presentationFeb215 carrollton cares keynote presentation
Feb215 carrollton cares keynote presentationpeterbraster
 
Replace as+gg booklet
Replace as+gg bookletReplace as+gg booklet
Replace as+gg bookletGardinerEast
 
Tucker Avenue Neighborhood Community Meeting, 03-15-2022
Tucker Avenue Neighborhood Community Meeting, 03-15-2022Tucker Avenue Neighborhood Community Meeting, 03-15-2022
Tucker Avenue Neighborhood Community Meeting, 03-15-2022Fairfax County
 
Gather by TinyCamp - Sustainable Conservation Design Tiny House Village
Gather by TinyCamp - Sustainable Conservation Design Tiny House VillageGather by TinyCamp - Sustainable Conservation Design Tiny House Village
Gather by TinyCamp - Sustainable Conservation Design Tiny House VillageDarin Dinsmore
 

What's hot (20)

Hunter Mill District Community Outreach Meeting
Hunter Mill District Community Outreach MeetingHunter Mill District Community Outreach Meeting
Hunter Mill District Community Outreach Meeting
 
Tantallon tweaks slideshow nwcc
Tantallon tweaks slideshow nwccTantallon tweaks slideshow nwcc
Tantallon tweaks slideshow nwcc
 
Point Place Meeting 9-14-05
Point Place Meeting 9-14-05Point Place Meeting 9-14-05
Point Place Meeting 9-14-05
 
Waterfront Sanitary Servicing Master Plan Update (Oct. 30 PIE).
Waterfront Sanitary Servicing Master Plan Update (Oct. 30 PIE). Waterfront Sanitary Servicing Master Plan Update (Oct. 30 PIE).
Waterfront Sanitary Servicing Master Plan Update (Oct. 30 PIE).
 
Huntley Meadows Park Proposed Plan Amendments: Trails and Sidewalks Committee...
Huntley Meadows Park Proposed Plan Amendments: Trails and Sidewalks Committee...Huntley Meadows Park Proposed Plan Amendments: Trails and Sidewalks Committee...
Huntley Meadows Park Proposed Plan Amendments: Trails and Sidewalks Committee...
 
Comprehensive Plan, UDO Annual Review
Comprehensive Plan, UDO Annual ReviewComprehensive Plan, UDO Annual Review
Comprehensive Plan, UDO Annual Review
 
2019 Comprehensive Plan and UDO Annual Review
2019 Comprehensive Plan and UDO Annual Review2019 Comprehensive Plan and UDO Annual Review
2019 Comprehensive Plan and UDO Annual Review
 
Central-East Open House - Laird Station to West At-Grade (Sunnybrook - O'Conn...
Central-East Open House - Laird Station to West At-Grade (Sunnybrook - O'Conn...Central-East Open House - Laird Station to West At-Grade (Sunnybrook - O'Conn...
Central-East Open House - Laird Station to West At-Grade (Sunnybrook - O'Conn...
 
Jefferson Manor Phase IIIA (Albemarle Drive and Portions of Edgehill Drive)
Jefferson Manor Phase IIIA (Albemarle Drive and Portions of Edgehill Drive)Jefferson Manor Phase IIIA (Albemarle Drive and Portions of Edgehill Drive)
Jefferson Manor Phase IIIA (Albemarle Drive and Portions of Edgehill Drive)
 
Conneaut Charrette
Conneaut Charrette Conneaut Charrette
Conneaut Charrette
 
Orlando Main Streets Bicycle and Pedestrian Study
Orlando Main Streets Bicycle and Pedestrian StudyOrlando Main Streets Bicycle and Pedestrian Study
Orlando Main Streets Bicycle and Pedestrian Study
 
02 cta yellow line station evanston cc 04.16.12
02   cta yellow line station evanston cc 04.16.1202   cta yellow line station evanston cc 04.16.12
02 cta yellow line station evanston cc 04.16.12
 
Franklin, MA: DPW Upcoming Projects
Franklin, MA: DPW Upcoming ProjectsFranklin, MA: DPW Upcoming Projects
Franklin, MA: DPW Upcoming Projects
 
Reston Town Center North Community Update May 31, 2017
Reston Town Center North Community Update May 31, 2017Reston Town Center North Community Update May 31, 2017
Reston Town Center North Community Update May 31, 2017
 
20120201 061327 multi-use_trail_bid_award
20120201 061327 multi-use_trail_bid_award20120201 061327 multi-use_trail_bid_award
20120201 061327 multi-use_trail_bid_award
 
Feb215 carrollton cares keynote presentation
Feb215 carrollton cares keynote presentationFeb215 carrollton cares keynote presentation
Feb215 carrollton cares keynote presentation
 
Replace as+gg booklet
Replace as+gg bookletReplace as+gg booklet
Replace as+gg booklet
 
Tucker Avenue Neighborhood Community Meeting, 03-15-2022
Tucker Avenue Neighborhood Community Meeting, 03-15-2022Tucker Avenue Neighborhood Community Meeting, 03-15-2022
Tucker Avenue Neighborhood Community Meeting, 03-15-2022
 
June 16, 2021 TARC Virtual Workshop
June 16, 2021 TARC Virtual WorkshopJune 16, 2021 TARC Virtual Workshop
June 16, 2021 TARC Virtual Workshop
 
Gather by TinyCamp - Sustainable Conservation Design Tiny House Village
Gather by TinyCamp - Sustainable Conservation Design Tiny House VillageGather by TinyCamp - Sustainable Conservation Design Tiny House Village
Gather by TinyCamp - Sustainable Conservation Design Tiny House Village
 

Viewers also liked

Presentacion huerto social albayzin - capi albayzin
Presentacion   huerto social albayzin - capi albayzinPresentacion   huerto social albayzin - capi albayzin
Presentacion huerto social albayzin - capi albayzinGuadalinfo Albayzin
 
EN 50136 Alarmtransmission monitoring with Analytic tools
EN 50136 Alarmtransmission monitoring with Analytic toolsEN 50136 Alarmtransmission monitoring with Analytic tools
EN 50136 Alarmtransmission monitoring with Analytic toolsPeter Monte
 
Gps glonass
Gps glonassGps glonass
Gps glonasssenarap
 
Electro Thermal IC Simulation With Saber
Electro Thermal  IC Simulation  With  SaberElectro Thermal  IC Simulation  With  Saber
Electro Thermal IC Simulation With Saberdomnitei
 
Livre blanc affiliation - Public Idées - 2012
Livre blanc affiliation - Public Idées - 2012Livre blanc affiliation - Public Idées - 2012
Livre blanc affiliation - Public Idées - 2012Romain Fonnier
 
Session 2 maica rubinat (pafes)
Session 2 maica rubinat (pafes)Session 2 maica rubinat (pafes)
Session 2 maica rubinat (pafes)lindsaycess
 
Programma FINALE incontro GIFI 19 febbraio 2013
Programma FINALE incontro GIFI 19 febbraio 2013Programma FINALE incontro GIFI 19 febbraio 2013
Programma FINALE incontro GIFI 19 febbraio 2013GIFI
 
Menschlich, zukunftsweisend, transparent - die GLS Bank
Menschlich, zukunftsweisend, transparent - die GLS BankMenschlich, zukunftsweisend, transparent - die GLS Bank
Menschlich, zukunftsweisend, transparent - die GLS BankGLS Bank
 
El buen humor herramienta que te ayuda a
El buen humor herramienta que te ayuda aEl buen humor herramienta que te ayuda a
El buen humor herramienta que te ayuda aIsabel Ojeda
 
Golden 20’s
Golden 20’sGolden 20’s
Golden 20’sEfi Tirle
 
The monsters university
The monsters universityThe monsters university
The monsters universitymaricagomez15
 
General knowledge[1]
General knowledge[1]General knowledge[1]
General knowledge[1]feca2000
 
Petr Majerik, Zenith OptiMedia, MediaTalk 11th January 2011
Petr Majerik, Zenith OptiMedia, MediaTalk 11th January 2011Petr Majerik, Zenith OptiMedia, MediaTalk 11th January 2011
Petr Majerik, Zenith OptiMedia, MediaTalk 11th January 2011Pavlína Louženská
 
James Rodriguez el ídolo de un país
James Rodriguez el ídolo de un paísJames Rodriguez el ídolo de un país
James Rodriguez el ídolo de un paísalexanderweb
 
Panorama general de la novela 1900.1940
Panorama general de la novela 1900.1940Panorama general de la novela 1900.1940
Panorama general de la novela 1900.1940Endl Félix Muriel
 

Viewers also liked (20)

Coltan3
Coltan3Coltan3
Coltan3
 
Presentacion huerto social albayzin - capi albayzin
Presentacion   huerto social albayzin - capi albayzinPresentacion   huerto social albayzin - capi albayzin
Presentacion huerto social albayzin - capi albayzin
 
Boletin convocatorias empleo 150303
Boletin convocatorias empleo 150303Boletin convocatorias empleo 150303
Boletin convocatorias empleo 150303
 
EN 50136 Alarmtransmission monitoring with Analytic tools
EN 50136 Alarmtransmission monitoring with Analytic toolsEN 50136 Alarmtransmission monitoring with Analytic tools
EN 50136 Alarmtransmission monitoring with Analytic tools
 
Gps glonass
Gps glonassGps glonass
Gps glonass
 
Electro Thermal IC Simulation With Saber
Electro Thermal  IC Simulation  With  SaberElectro Thermal  IC Simulation  With  Saber
Electro Thermal IC Simulation With Saber
 
Livre blanc affiliation - Public Idées - 2012
Livre blanc affiliation - Public Idées - 2012Livre blanc affiliation - Public Idées - 2012
Livre blanc affiliation - Public Idées - 2012
 
Session 2 maica rubinat (pafes)
Session 2 maica rubinat (pafes)Session 2 maica rubinat (pafes)
Session 2 maica rubinat (pafes)
 
Programma FINALE incontro GIFI 19 febbraio 2013
Programma FINALE incontro GIFI 19 febbraio 2013Programma FINALE incontro GIFI 19 febbraio 2013
Programma FINALE incontro GIFI 19 febbraio 2013
 
Semana de la biblia
Semana de la bibliaSemana de la biblia
Semana de la biblia
 
Menschlich, zukunftsweisend, transparent - die GLS Bank
Menschlich, zukunftsweisend, transparent - die GLS BankMenschlich, zukunftsweisend, transparent - die GLS Bank
Menschlich, zukunftsweisend, transparent - die GLS Bank
 
El buen humor herramienta que te ayuda a
El buen humor herramienta que te ayuda aEl buen humor herramienta que te ayuda a
El buen humor herramienta que te ayuda a
 
Golden 20’s
Golden 20’sGolden 20’s
Golden 20’s
 
The monsters university
The monsters universityThe monsters university
The monsters university
 
EMS Holiday 2013 Recap
EMS Holiday 2013 RecapEMS Holiday 2013 Recap
EMS Holiday 2013 Recap
 
General knowledge[1]
General knowledge[1]General knowledge[1]
General knowledge[1]
 
Petr Majerik, Zenith OptiMedia, MediaTalk 11th January 2011
Petr Majerik, Zenith OptiMedia, MediaTalk 11th January 2011Petr Majerik, Zenith OptiMedia, MediaTalk 11th January 2011
Petr Majerik, Zenith OptiMedia, MediaTalk 11th January 2011
 
James Rodriguez el ídolo de un país
James Rodriguez el ídolo de un paísJames Rodriguez el ídolo de un país
James Rodriguez el ídolo de un país
 
Mi-ST
Mi-STMi-ST
Mi-ST
 
Panorama general de la novela 1900.1940
Panorama general de la novela 1900.1940Panorama general de la novela 1900.1940
Panorama general de la novela 1900.1940
 

Similar to Public Meeting #2 Information Materials

Arlington, Virginia's Transportation Future
Arlington, Virginia's Transportation FutureArlington, Virginia's Transportation Future
Arlington, Virginia's Transportation FutureMobility Lab
 
Kingston Greenline & Ulster County Trails Summit - Summit Presentation
Kingston Greenline & Ulster County Trails Summit - Summit PresentationKingston Greenline & Ulster County Trails Summit - Summit Presentation
Kingston Greenline & Ulster County Trails Summit - Summit PresentationThe Kingston Land Trust
 
Public Forum 3 - Presentation (Feb 6_2014)
Public Forum 3 - Presentation (Feb 6_2014)Public Forum 3 - Presentation (Feb 6_2014)
Public Forum 3 - Presentation (Feb 6_2014)GardinerEast
 
State of the Trails 2015
State of the Trails 2015State of the Trails 2015
State of the Trails 2015Paul Schumann
 
Sitka Road System Master Planning & Funding Strategies
Sitka Road System Master Planning & Funding StrategiesSitka Road System Master Planning & Funding Strategies
Sitka Road System Master Planning & Funding StrategiesJustin Otternewzman
 
Charlotte Capital Improvement Program Proposal
Charlotte Capital Improvement Program ProposalCharlotte Capital Improvement Program Proposal
Charlotte Capital Improvement Program ProposalCharlotte Chamber
 
Eastgate Neighborhood Plan Amendment - Developer Presentation
Eastgate Neighborhood Plan Amendment - Developer PresentationEastgate Neighborhood Plan Amendment - Developer Presentation
Eastgate Neighborhood Plan Amendment - Developer PresentationCity of College Station
 
Annual Review of Comprehensive Plan and UDO
Annual Review of Comprehensive Plan and UDOAnnual Review of Comprehensive Plan and UDO
Annual Review of Comprehensive Plan and UDOCity of College Station
 
Gateway ASP_letter_print_Hews.Kalhori.Odogu
Gateway ASP_letter_print_Hews.Kalhori.OdoguGateway ASP_letter_print_Hews.Kalhori.Odogu
Gateway ASP_letter_print_Hews.Kalhori.OdoguTEGA ODOGU
 
BiCounty Parkway Presentation for Congressman Wittman
BiCounty Parkway Presentation for Congressman WittmanBiCounty Parkway Presentation for Congressman Wittman
BiCounty Parkway Presentation for Congressman Wittmanjazztothebone
 
Oxford City Centre Movement and Public Realm Strategy
Oxford City Centre Movement and Public Realm StrategyOxford City Centre Movement and Public Realm Strategy
Oxford City Centre Movement and Public Realm StrategyOxfordshireCC
 
Maumee Valley Planning Organization Regional Transportation Planning Overview
Maumee Valley Planning Organization Regional Transportation Planning OverviewMaumee Valley Planning Organization Regional Transportation Planning Overview
Maumee Valley Planning Organization Regional Transportation Planning OverviewRPO America
 
Huntingburg Stellar projects, budget and timeline
Huntingburg Stellar projects, budget and timelineHuntingburg Stellar projects, budget and timeline
Huntingburg Stellar projects, budget and timelineMatthew Crane
 
Gardiner East EA - Public Forum 5 Panels
Gardiner East EA - Public Forum 5 PanelsGardiner East EA - Public Forum 5 Panels
Gardiner East EA - Public Forum 5 PanelsGardinerEast
 
Embark Richmond Highway Comprehensive Plan Amendment and Transportation Projects
Embark Richmond Highway Comprehensive Plan Amendment and Transportation ProjectsEmbark Richmond Highway Comprehensive Plan Amendment and Transportation Projects
Embark Richmond Highway Comprehensive Plan Amendment and Transportation ProjectsFairfax County
 
Imagine Bickett Boulevard: Louisburg, North Carolina
Imagine Bickett Boulevard: Louisburg, North CarolinaImagine Bickett Boulevard: Louisburg, North Carolina
Imagine Bickett Boulevard: Louisburg, North CarolinaRPO America
 
Peter d - trail presentation
Peter d - trail presentationPeter d - trail presentation
Peter d - trail presentationTrailplan
 

Similar to Public Meeting #2 Information Materials (20)

Highland Creek Village Transportation Master Plan
Highland Creek Village Transportation Master PlanHighland Creek Village Transportation Master Plan
Highland Creek Village Transportation Master Plan
 
Arlington, Virginia's Transportation Future
Arlington, Virginia's Transportation FutureArlington, Virginia's Transportation Future
Arlington, Virginia's Transportation Future
 
Kingston Greenline & Ulster County Trails Summit - Summit Presentation
Kingston Greenline & Ulster County Trails Summit - Summit PresentationKingston Greenline & Ulster County Trails Summit - Summit Presentation
Kingston Greenline & Ulster County Trails Summit - Summit Presentation
 
Waterfront Transit Reset Phase 2 Display Panels
Waterfront Transit Reset Phase 2 Display PanelsWaterfront Transit Reset Phase 2 Display Panels
Waterfront Transit Reset Phase 2 Display Panels
 
Public Forum 3 - Presentation (Feb 6_2014)
Public Forum 3 - Presentation (Feb 6_2014)Public Forum 3 - Presentation (Feb 6_2014)
Public Forum 3 - Presentation (Feb 6_2014)
 
State of the Trails 2015
State of the Trails 2015State of the Trails 2015
State of the Trails 2015
 
Sitka Road System Master Planning & Funding Strategies
Sitka Road System Master Planning & Funding StrategiesSitka Road System Master Planning & Funding Strategies
Sitka Road System Master Planning & Funding Strategies
 
Charlotte Capital Improvement Program Proposal
Charlotte Capital Improvement Program ProposalCharlotte Capital Improvement Program Proposal
Charlotte Capital Improvement Program Proposal
 
Commercial strip4.29.13
Commercial strip4.29.13Commercial strip4.29.13
Commercial strip4.29.13
 
Eastgate Neighborhood Plan Amendment - Developer Presentation
Eastgate Neighborhood Plan Amendment - Developer PresentationEastgate Neighborhood Plan Amendment - Developer Presentation
Eastgate Neighborhood Plan Amendment - Developer Presentation
 
Annual Review of Comprehensive Plan and UDO
Annual Review of Comprehensive Plan and UDOAnnual Review of Comprehensive Plan and UDO
Annual Review of Comprehensive Plan and UDO
 
Gateway ASP_letter_print_Hews.Kalhori.Odogu
Gateway ASP_letter_print_Hews.Kalhori.OdoguGateway ASP_letter_print_Hews.Kalhori.Odogu
Gateway ASP_letter_print_Hews.Kalhori.Odogu
 
BiCounty Parkway Presentation for Congressman Wittman
BiCounty Parkway Presentation for Congressman WittmanBiCounty Parkway Presentation for Congressman Wittman
BiCounty Parkway Presentation for Congressman Wittman
 
Oxford City Centre Movement and Public Realm Strategy
Oxford City Centre Movement and Public Realm StrategyOxford City Centre Movement and Public Realm Strategy
Oxford City Centre Movement and Public Realm Strategy
 
Maumee Valley Planning Organization Regional Transportation Planning Overview
Maumee Valley Planning Organization Regional Transportation Planning OverviewMaumee Valley Planning Organization Regional Transportation Planning Overview
Maumee Valley Planning Organization Regional Transportation Planning Overview
 
Huntingburg Stellar projects, budget and timeline
Huntingburg Stellar projects, budget and timelineHuntingburg Stellar projects, budget and timeline
Huntingburg Stellar projects, budget and timeline
 
Gardiner East EA - Public Forum 5 Panels
Gardiner East EA - Public Forum 5 PanelsGardiner East EA - Public Forum 5 Panels
Gardiner East EA - Public Forum 5 Panels
 
Embark Richmond Highway Comprehensive Plan Amendment and Transportation Projects
Embark Richmond Highway Comprehensive Plan Amendment and Transportation ProjectsEmbark Richmond Highway Comprehensive Plan Amendment and Transportation Projects
Embark Richmond Highway Comprehensive Plan Amendment and Transportation Projects
 
Imagine Bickett Boulevard: Louisburg, North Carolina
Imagine Bickett Boulevard: Louisburg, North CarolinaImagine Bickett Boulevard: Louisburg, North Carolina
Imagine Bickett Boulevard: Louisburg, North Carolina
 
Peter d - trail presentation
Peter d - trail presentationPeter d - trail presentation
Peter d - trail presentation
 

More from Toronto Public Consultation Unit

King-Liberty Pedestrian / Cycling Bridge Project Update - Slides
King-Liberty Pedestrian / Cycling Bridge Project Update - Slides King-Liberty Pedestrian / Cycling Bridge Project Update - Slides
King-Liberty Pedestrian / Cycling Bridge Project Update - Slides Toronto Public Consultation Unit
 
Six Points Interchange Reconfiguration public event display panels, May 11, 2017
Six Points Interchange Reconfiguration public event display panels, May 11, 2017Six Points Interchange Reconfiguration public event display panels, May 11, 2017
Six Points Interchange Reconfiguration public event display panels, May 11, 2017Toronto Public Consultation Unit
 
College Street Promenade BIA Streetscaping Update Public Meeting Feb 28 final
College Street Promenade BIA Streetscaping Update Public Meeting Feb 28  finalCollege Street Promenade BIA Streetscaping Update Public Meeting Feb 28  final
College Street Promenade BIA Streetscaping Update Public Meeting Feb 28 finalToronto Public Consultation Unit
 
King-Liberty Pedestrian / Cycling Bridge (Dec. 8 2016 Information Panels)
King-Liberty Pedestrian / Cycling Bridge (Dec. 8 2016 Information Panels)King-Liberty Pedestrian / Cycling Bridge (Dec. 8 2016 Information Panels)
King-Liberty Pedestrian / Cycling Bridge (Dec. 8 2016 Information Panels)Toronto Public Consultation Unit
 
Presentation - Park Lawn Lake Shore Transportation Master Plan Community Work...
Presentation - Park Lawn Lake Shore Transportation Master Plan Community Work...Presentation - Park Lawn Lake Shore Transportation Master Plan Community Work...
Presentation - Park Lawn Lake Shore Transportation Master Plan Community Work...Toronto Public Consultation Unit
 
Park Lawn Lake Shore Transportation Master Plan Community Workshop 1 Display ...
Park Lawn Lake Shore Transportation Master Plan Community Workshop 1 Display ...Park Lawn Lake Shore Transportation Master Plan Community Workshop 1 Display ...
Park Lawn Lake Shore Transportation Master Plan Community Workshop 1 Display ...Toronto Public Consultation Unit
 

More from Toronto Public Consultation Unit (20)

Waterfront Transit Reset Public Meeting Presentation
Waterfront Transit Reset Public Meeting Presentation Waterfront Transit Reset Public Meeting Presentation
Waterfront Transit Reset Public Meeting Presentation
 
King-Liberty Pedestrian / Cycling Bridge Project Update - Slides
King-Liberty Pedestrian / Cycling Bridge Project Update - Slides King-Liberty Pedestrian / Cycling Bridge Project Update - Slides
King-Liberty Pedestrian / Cycling Bridge Project Update - Slides
 
Sewer Outfall Project
Sewer Outfall ProjectSewer Outfall Project
Sewer Outfall Project
 
General information
General informationGeneral information
General information
 
Disinfection System
Disinfection SystemDisinfection System
Disinfection System
 
2017 Sediment Basin construction updated information
2017 Sediment Basin construction updated information 2017 Sediment Basin construction updated information
2017 Sediment Basin construction updated information
 
Scarborough Subway TPAP Boards
Scarborough Subway TPAP Boards Scarborough Subway TPAP Boards
Scarborough Subway TPAP Boards
 
2017 05-18 Etobicoke Creek Nort Trail panels final
2017 05-18 Etobicoke Creek Nort Trail panels final2017 05-18 Etobicoke Creek Nort Trail panels final
2017 05-18 Etobicoke Creek Nort Trail panels final
 
King Street Phase 2 Slide Deck
King Street Phase 2 Slide Deck King Street Phase 2 Slide Deck
King Street Phase 2 Slide Deck
 
Scarborough Subway TPAP PIC
Scarborough Subway TPAP PICScarborough Subway TPAP PIC
Scarborough Subway TPAP PIC
 
Six Points Interchange Reconfiguration public event display panels, May 11, 2017
Six Points Interchange Reconfiguration public event display panels, May 11, 2017Six Points Interchange Reconfiguration public event display panels, May 11, 2017
Six Points Interchange Reconfiguration public event display panels, May 11, 2017
 
Downsview Area Long Term Water Servicing
Downsview Area Long Term Water Servicing Downsview Area Long Term Water Servicing
Downsview Area Long Term Water Servicing
 
FG Gardiner New Simcoe Ramp - display boards
FG Gardiner   New Simcoe Ramp - display boardsFG Gardiner   New Simcoe Ramp - display boards
FG Gardiner New Simcoe Ramp - display boards
 
College Street Promenade BIA Streetscaping Update Public Meeting Feb 28 final
College Street Promenade BIA Streetscaping Update Public Meeting Feb 28  finalCollege Street Promenade BIA Streetscaping Update Public Meeting Feb 28  final
College Street Promenade BIA Streetscaping Update Public Meeting Feb 28 final
 
Swc public consultation_pres_170307_final
Swc public consultation_pres_170307_finalSwc public consultation_pres_170307_final
Swc public consultation_pres_170307_final
 
King Street Pilot Public Meeting
King Street Pilot Public MeetingKing Street Pilot Public Meeting
King Street Pilot Public Meeting
 
King-Liberty Pedestrian / Cycling Bridge (Dec. 8 2016 Information Panels)
King-Liberty Pedestrian / Cycling Bridge (Dec. 8 2016 Information Panels)King-Liberty Pedestrian / Cycling Bridge (Dec. 8 2016 Information Panels)
King-Liberty Pedestrian / Cycling Bridge (Dec. 8 2016 Information Panels)
 
Presentation - Park Lawn Lake Shore Transportation Master Plan Community Work...
Presentation - Park Lawn Lake Shore Transportation Master Plan Community Work...Presentation - Park Lawn Lake Shore Transportation Master Plan Community Work...
Presentation - Park Lawn Lake Shore Transportation Master Plan Community Work...
 
Park Lawn Lake Shore Transportation Master Plan Community Workshop 1 Display ...
Park Lawn Lake Shore Transportation Master Plan Community Workshop 1 Display ...Park Lawn Lake Shore Transportation Master Plan Community Workshop 1 Display ...
Park Lawn Lake Shore Transportation Master Plan Community Workshop 1 Display ...
 
Downsview Water Service Improvement Study Boards
Downsview Water Service Improvement Study BoardsDownsview Water Service Improvement Study Boards
Downsview Water Service Improvement Study Boards
 

Recently uploaded

原版1:1复刻塔夫斯大学毕业证Tufts毕业证留信学历认证
原版1:1复刻塔夫斯大学毕业证Tufts毕业证留信学历认证原版1:1复刻塔夫斯大学毕业证Tufts毕业证留信学历认证
原版1:1复刻塔夫斯大学毕业证Tufts毕业证留信学历认证jdkhjh
 
(NANDITA) Hadapsar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune ...
(NANDITA) Hadapsar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune ...(NANDITA) Hadapsar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune ...
(NANDITA) Hadapsar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune ...ranjana rawat
 
Species composition, diversity and community structure of mangroves in Barang...
Species composition, diversity and community structure of mangroves in Barang...Species composition, diversity and community structure of mangroves in Barang...
Species composition, diversity and community structure of mangroves in Barang...Open Access Research Paper
 
9873940964 Full Enjoy 24/7 Call Girls Near Shangri La’s Eros Hotel, New Delhi
9873940964 Full Enjoy 24/7 Call Girls Near Shangri La’s Eros Hotel, New Delhi9873940964 Full Enjoy 24/7 Call Girls Near Shangri La’s Eros Hotel, New Delhi
9873940964 Full Enjoy 24/7 Call Girls Near Shangri La’s Eros Hotel, New Delhidelih Escorts
 
Call Girls South Delhi Delhi reach out to us at ☎ 9711199012
Call Girls South Delhi Delhi reach out to us at ☎ 9711199012Call Girls South Delhi Delhi reach out to us at ☎ 9711199012
Call Girls South Delhi Delhi reach out to us at ☎ 9711199012sapnasaifi408
 
Joint GBIF Biodiversa+ symposium in Helsinki on 2024-04-16
Joint GBIF Biodiversa+ symposium in  Helsinki on 2024-04-16Joint GBIF Biodiversa+ symposium in  Helsinki on 2024-04-16
Joint GBIF Biodiversa+ symposium in Helsinki on 2024-04-16Dag Endresen
 
Freegle User Survey as visual display - BH
Freegle User Survey as visual display - BHFreegle User Survey as visual display - BH
Freegle User Survey as visual display - BHbill846304
 
办理(Victoria毕业证书)维多利亚大学毕业证成绩单原版一比一
办理(Victoria毕业证书)维多利亚大学毕业证成绩单原版一比一办理(Victoria毕业证书)维多利亚大学毕业证成绩单原版一比一
办理(Victoria毕业证书)维多利亚大学毕业证成绩单原版一比一z xss
 
Dwarka Call Girls 9643097474 Phone Number 24x7 Best Services
Dwarka Call Girls 9643097474 Phone Number 24x7 Best ServicesDwarka Call Girls 9643097474 Phone Number 24x7 Best Services
Dwarka Call Girls 9643097474 Phone Number 24x7 Best Servicesnajka9823
 
VIP Call Girls Service Bandlaguda Hyderabad Call +91-8250192130
VIP Call Girls Service Bandlaguda Hyderabad Call +91-8250192130VIP Call Girls Service Bandlaguda Hyderabad Call +91-8250192130
VIP Call Girls Service Bandlaguda Hyderabad Call +91-8250192130Suhani Kapoor
 
Low Rate Call Girls Bikaner Anika 8250192130 Independent Escort Service Bikaner
Low Rate Call Girls Bikaner Anika 8250192130 Independent Escort Service BikanerLow Rate Call Girls Bikaner Anika 8250192130 Independent Escort Service Bikaner
Low Rate Call Girls Bikaner Anika 8250192130 Independent Escort Service BikanerSuhani Kapoor
 
Green Marketing Strategies and Challenges
Green Marketing Strategies and ChallengesGreen Marketing Strategies and Challenges
Green Marketing Strategies and ChallengesDr. Salem Baidas
 
Sustainable Clothing Strategies and Challenges
Sustainable Clothing Strategies and ChallengesSustainable Clothing Strategies and Challenges
Sustainable Clothing Strategies and ChallengesDr. Salem Baidas
 
Philippines-Native-Chicken.pptx file copy
Philippines-Native-Chicken.pptx file copyPhilippines-Native-Chicken.pptx file copy
Philippines-Native-Chicken.pptx file copyKristineRoseCorrales
 
(RIYA) Kalyani Nagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(RIYA) Kalyani Nagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(RIYA) Kalyani Nagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(RIYA) Kalyani Nagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
Call Girls Sarovar Portico Naraina Hotel, New Delhi 9873777170
Call Girls Sarovar Portico Naraina Hotel, New Delhi 9873777170Call Girls Sarovar Portico Naraina Hotel, New Delhi 9873777170
Call Girls Sarovar Portico Naraina Hotel, New Delhi 9873777170simranguptaxx69
 
Poly-film-Prefab cover agricultural greenhouse-polyhouse structure.pptx
Poly-film-Prefab cover agricultural greenhouse-polyhouse structure.pptxPoly-film-Prefab cover agricultural greenhouse-polyhouse structure.pptx
Poly-film-Prefab cover agricultural greenhouse-polyhouse structure.pptxAgrodome projects LLP
 
Call In girls Connaught Place (DELHI)⇛9711147426🔝Delhi NCR
Call In girls Connaught Place (DELHI)⇛9711147426🔝Delhi NCRCall In girls Connaught Place (DELHI)⇛9711147426🔝Delhi NCR
Call In girls Connaught Place (DELHI)⇛9711147426🔝Delhi NCRjennyeacort
 
9873940964 High Profile Call Girls Delhi |Defence Colony ( MAYA CHOPRA ) DE...
9873940964 High Profile  Call Girls  Delhi |Defence Colony ( MAYA CHOPRA ) DE...9873940964 High Profile  Call Girls  Delhi |Defence Colony ( MAYA CHOPRA ) DE...
9873940964 High Profile Call Girls Delhi |Defence Colony ( MAYA CHOPRA ) DE...Delhi Escorts
 

Recently uploaded (20)

原版1:1复刻塔夫斯大学毕业证Tufts毕业证留信学历认证
原版1:1复刻塔夫斯大学毕业证Tufts毕业证留信学历认证原版1:1复刻塔夫斯大学毕业证Tufts毕业证留信学历认证
原版1:1复刻塔夫斯大学毕业证Tufts毕业证留信学历认证
 
(NANDITA) Hadapsar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune ...
(NANDITA) Hadapsar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune ...(NANDITA) Hadapsar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune ...
(NANDITA) Hadapsar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune ...
 
Species composition, diversity and community structure of mangroves in Barang...
Species composition, diversity and community structure of mangroves in Barang...Species composition, diversity and community structure of mangroves in Barang...
Species composition, diversity and community structure of mangroves in Barang...
 
9873940964 Full Enjoy 24/7 Call Girls Near Shangri La’s Eros Hotel, New Delhi
9873940964 Full Enjoy 24/7 Call Girls Near Shangri La’s Eros Hotel, New Delhi9873940964 Full Enjoy 24/7 Call Girls Near Shangri La’s Eros Hotel, New Delhi
9873940964 Full Enjoy 24/7 Call Girls Near Shangri La’s Eros Hotel, New Delhi
 
Call Girls South Delhi Delhi reach out to us at ☎ 9711199012
Call Girls South Delhi Delhi reach out to us at ☎ 9711199012Call Girls South Delhi Delhi reach out to us at ☎ 9711199012
Call Girls South Delhi Delhi reach out to us at ☎ 9711199012
 
Joint GBIF Biodiversa+ symposium in Helsinki on 2024-04-16
Joint GBIF Biodiversa+ symposium in  Helsinki on 2024-04-16Joint GBIF Biodiversa+ symposium in  Helsinki on 2024-04-16
Joint GBIF Biodiversa+ symposium in Helsinki on 2024-04-16
 
Freegle User Survey as visual display - BH
Freegle User Survey as visual display - BHFreegle User Survey as visual display - BH
Freegle User Survey as visual display - BH
 
办理(Victoria毕业证书)维多利亚大学毕业证成绩单原版一比一
办理(Victoria毕业证书)维多利亚大学毕业证成绩单原版一比一办理(Victoria毕业证书)维多利亚大学毕业证成绩单原版一比一
办理(Victoria毕业证书)维多利亚大学毕业证成绩单原版一比一
 
Dwarka Call Girls 9643097474 Phone Number 24x7 Best Services
Dwarka Call Girls 9643097474 Phone Number 24x7 Best ServicesDwarka Call Girls 9643097474 Phone Number 24x7 Best Services
Dwarka Call Girls 9643097474 Phone Number 24x7 Best Services
 
VIP Call Girls Service Bandlaguda Hyderabad Call +91-8250192130
VIP Call Girls Service Bandlaguda Hyderabad Call +91-8250192130VIP Call Girls Service Bandlaguda Hyderabad Call +91-8250192130
VIP Call Girls Service Bandlaguda Hyderabad Call +91-8250192130
 
Low Rate Call Girls Bikaner Anika 8250192130 Independent Escort Service Bikaner
Low Rate Call Girls Bikaner Anika 8250192130 Independent Escort Service BikanerLow Rate Call Girls Bikaner Anika 8250192130 Independent Escort Service Bikaner
Low Rate Call Girls Bikaner Anika 8250192130 Independent Escort Service Bikaner
 
Green Marketing Strategies and Challenges
Green Marketing Strategies and ChallengesGreen Marketing Strategies and Challenges
Green Marketing Strategies and Challenges
 
Sustainable Clothing Strategies and Challenges
Sustainable Clothing Strategies and ChallengesSustainable Clothing Strategies and Challenges
Sustainable Clothing Strategies and Challenges
 
Philippines-Native-Chicken.pptx file copy
Philippines-Native-Chicken.pptx file copyPhilippines-Native-Chicken.pptx file copy
Philippines-Native-Chicken.pptx file copy
 
(RIYA) Kalyani Nagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(RIYA) Kalyani Nagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(RIYA) Kalyani Nagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(RIYA) Kalyani Nagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
Call Girls Sarovar Portico Naraina Hotel, New Delhi 9873777170
Call Girls Sarovar Portico Naraina Hotel, New Delhi 9873777170Call Girls Sarovar Portico Naraina Hotel, New Delhi 9873777170
Call Girls Sarovar Portico Naraina Hotel, New Delhi 9873777170
 
Poly-film-Prefab cover agricultural greenhouse-polyhouse structure.pptx
Poly-film-Prefab cover agricultural greenhouse-polyhouse structure.pptxPoly-film-Prefab cover agricultural greenhouse-polyhouse structure.pptx
Poly-film-Prefab cover agricultural greenhouse-polyhouse structure.pptx
 
Call In girls Connaught Place (DELHI)⇛9711147426🔝Delhi NCR
Call In girls Connaught Place (DELHI)⇛9711147426🔝Delhi NCRCall In girls Connaught Place (DELHI)⇛9711147426🔝Delhi NCR
Call In girls Connaught Place (DELHI)⇛9711147426🔝Delhi NCR
 
Call Girls In { Delhi } South Extension Whatsup 9873940964 Enjoy Unlimited Pl...
Call Girls In { Delhi } South Extension Whatsup 9873940964 Enjoy Unlimited Pl...Call Girls In { Delhi } South Extension Whatsup 9873940964 Enjoy Unlimited Pl...
Call Girls In { Delhi } South Extension Whatsup 9873940964 Enjoy Unlimited Pl...
 
9873940964 High Profile Call Girls Delhi |Defence Colony ( MAYA CHOPRA ) DE...
9873940964 High Profile  Call Girls  Delhi |Defence Colony ( MAYA CHOPRA ) DE...9873940964 High Profile  Call Girls  Delhi |Defence Colony ( MAYA CHOPRA ) DE...
9873940964 High Profile Call Girls Delhi |Defence Colony ( MAYA CHOPRA ) DE...
 

Public Meeting #2 Information Materials

  • 1. Highland Creek Village Transportation Master Plan HIGHLAND CREEK VILLAGE TRANSPORTATION MASTER PLAN Format • Drop-in to view information panels • Speak with Project staff throughout the evening • Brief presentation at 6:30 P.M. • Question and Answer Session following presentation Feedback Your feedback is a critical part of this study. We encourage you to share your thoughts by: • Speaking directly with staff • Participating in the Question and Answer Session • Completing comment forms and submitting them at the event, by mail, or online Comments must be received by July 14, 2015 Public Information Materials are available on the project web page: www.toronto.ca/hcvtransportation Welcome! Thank you for joining us at this 2nd Public Information Centre to discuss the progress made to date on the development of the Highland Creek Village Transportation Master Plan. Purpose Provide update and seek your feedback on: • Evaluation Process • Preliminary Recommended Transportation Solution • Preliminary Recommended Servicing Solution (Water, Wastewater, Stormwater) • Preliminary Design June 2015June 2014 We are here Public Information Centre #2 June 24, 2015
  • 2. Highway 2A E Kingston Rd Lawson Rd Lawson Rd Highway 2A W Highw ay 2A E Highw ay 2A W MorrishRd WatsonSt Military Trl Old Kingston Rd BobmarRd ClydeRd IvanRd DeepDeneDr Bonacres Ave Bathgate Dr Colonel Danforth Trl ChoicelandBlvd MeadowvaleRd TanisCres RamblewoodDr Camor Crt MilroyCres Highland Creek Dr Glenthorne Dr Thomas Ave SatchellBlvd Wishaw Rd BushDr Acland Cres RomacDr Bramber Rd RoydawnCrt WindingCrt WindrushTrl FranklinAve Bush Gt HighlandCreekOverpass Whiteacres Ave Walding Gt FalconLane Scenic Hill Crt Stagecoach CrclGraphic Crt Sugarbush Sq Ruddell Pl Brigadier Pl OldSweatsLane WindrushTrl MeadowvaleRd Lawson Rd 2A Ramp 2A Lawson Rd Highland Creek Village Transportation Master Plan Study Area 0 100 20050 m
  • 3. Highland Creek Village Transportation Master Plan Purpose of the Transportation Master Plan (TMP) Why is this study being undertaken? • Changes to the transportation network are required to support development and all modes of transportation • Transportation network changes have been assessed based on their ability to address problems and take advantage of opportunities described in the Problem & Opportunity Statement (developed for PIC #1): The City of Toronto has established a vision for the long-term revitalization of the Highland Creek Village into a vibrant, pedestrian friendly and mixed use community. In order to accommodate all roadway users, and support this vision, changes are required to the transportation network that promote redevelopment opportunities and reinvestment in the Village. There are significant opportunities to improve the public realm and pedestrian environment to encourage the use of transit, cycling, and walking as viable modes of transportation. 2
  • 4. WalkShop – June 5, 2014 3Highland Creek Village Transportation Master Plan What We Have Heard Public Information Centre #1 – June 25, 2014 • Considerable support for public realm enhancements, including green space, trees and space for pedestrian traffic • Potentially impacted residents request no changes to Meadowvale Rd • Village Plaza businesses strongly support maintaining angled parking • Strong support for complete sidewalks and bicycle facilities Parking Consultation Meeting – November 19, 2014 • Discussion of on and off-street parking in the Village with businesses • Reinforced strong support for angled parking to remain as is • Additional parking spaces to accommodate weekend and evening demand Stakeholder Meeting – May 28, 2015 • Positive response to preliminary recommended solution; some expressed that improvements to connectivity and streetscape are long overdue • Both support and concern expressed for conversion to parallel parking • Stakeholder walking tour to document existing transportation problems and discuss future opportunities • Common ground on opportunities to support area revitalization through continuous sidewalks, bike lanes, and enhanced streetscaping • Parking needs to be safe and convenient with additional new spots South side of Old Kingston Rd at Morrish Rd (facing east) Morrish Rd south of Old Kingston Rd (facingsouth)
  • 5. Highland Creek Village Transportation Master Plan Future Development and Traffic AM Peak Hour PM Peak Hour 100 150 Existing Auto Trips to/from the Village 4 How will growth impact the Village transportation system? • Future development and growth is expected in the Village • More people and jobs will lead to more trips, more pedestrians, and more vehicles in the Village: • Hwy 2A and Old Kingston Rd are expected to experience peak hour congestion in 2031, especially in the AM peak hour • Vast majority of traffic is from outside of the study area during peak hours AM Peak Hour PM Peak Hour 550 700 2031 Auto Trips to/from the Village Population Employment Long-Term Growth (2031 or beyond) +3,500 +400 Estimated Growth in the Village (based on Highland Creek Village Area Study) Existing Population (2011) Location Population Surrounding Area (Morningside Rd – Port Union Rd, Ellesmere Ave – Highland Creek) 10,000
  • 6. Highland Creek Village Transportation Master Plan Menu of Considered Improvements Do Nothing Alternative 1 Alternative 2 Alternative 3 Alternative 4 New Laneway New “T” intersection at Hwy 2A – Military Trail Closure of accesses to Hwy 2A (Military Trail) Realignment of Kingston Rd and Morrish Rd (option 1) Realignment of Kingston Rd and Morrish Rd (option 2) Closure of accesses to Hwy 2A (Morrish Rd & Kingston Rd) New intersection at Hwy 2A– Kingston Rd – Lawson Rd Conversion of angled/perpendicular parking to parallel Reconfigure intersection of Old Kingston Rd and Kingston Rd Roundabout at Kingston Road and Lawson Overpass Removed. Please see panel for Alternative 3 for more details. New ramp to WB Hwy 2A at Lawson Overpass New signal at Lawson Overpass and Hwy 2A Removal of Hwy 2A on and off ramps New WB access to Hwy 2A at Meadowvale Rd New signals on Meadowvale Road Closure of accesses to Hwy 2A (Lawson Rd) (*) New cycling connection between Lawson Rd and Military Trail (*) Enhanced streetscape/public realm throughout the Village (*) Additional on-street parking on improved roadways 2 1 3 4 5 6 7 8 9 10 11 12 13 14 15 16 5 “Menu” of Transportation Improvements Legend: New signalized Intersection Re-Aligned Or New Road Ramp Closure Parallel Parking Conversion Roundabout 1 2 3 4 5 6 7 9 10 11 12 13 14 15 8 16 WatsonSt MorrishRd Lawson Rd MeadowvaleRd (*) Not shown on map; applies to multiple roadways and areas.
  • 7. Highland Creek Village Transportation Master Plan 6 Evaluation Criteria and Indicators • Evaluation criteria and indicators have been refined and expanded since PIC 1 • Each alternative has been evaluated against the noted criteria and indicators • Structured evaluation allows for comparison of each alternative’s benefits and impacts
  • 8. Highland Creek Village Transportation Master Plan Alternative 1 has been selected as the Preliminary Preferred Alternative Evaluation Summary 7 Evaluation Criteria Do Nothing Alternative 1 Alternative 2 Alternative 3 Alternative 4 Traffic ●●●● ○○●● ○●●● ○○●● ○○●● Multimodal Transportation Planning ○○○○ ●●●● ○●●● ○●●● ○●●● Servicing ○●●● ●●●● ○●●● ○●●● ○●●● City Building and Social Environment ○○○○ ●●●● ○○●● ○●●● ○●●● Cultural Environment ●●●● ○○○● ○○○○ ○○○● ○○○● Natural Environment ●●●● ○●●● ○○○○ ○○●● ○●●● Costs ●●●● ○○○○ ○○●● ○○○● ○●●● Economic Development ○○○○ ●●●● ○●●● ○●●● ○●●● Overall Evaluation Least Preferred ○○○○ Most Preferred ●●●● Less Moderately Preferred ○○●● Moderately Preferred ○●●● Moderately Preferred ○●●● LEGEND (meaning of dot ranking) Most Preferred ●●●● Moderately Preferred ○●●● Less Moderately Preferred ○○●● Less Preferred ○○○● Least Preferred ○○○○ Note: A copy of the detailed evaluation table is available on the Resource table.
  • 9. Highland Creek Village Transportation Master Plan Do Nothing 8 Evaluation Criteria Do Nothing Traffic ●●●● Multimodal Transport Planning ○○○○ Servicing ○●●● City Building and Social Environment ○○○○ Cultural Environment ●●●● Natural Environment ●●●● Costs ●●●● Economic Development ○○○○ Overall Evaluation Least Preferred ○○○○ • Maintains existing road network and parking with no changes Evaluation Summary Background • Least delays for auto traffic since Hwy 2A continues to operate as a highway • Area transportation network primarily caters to automobile • Hwy 2A remains as barrier to pedestrians, cyclists, and vehicles. Overpass remains as only crossing. • No improvements to pedestrian environment and network. Existing gaps in sidewalks remain. • Limited opportunities to improve public realm • Does not impact Cultural or Natural Environment • Does not support development / reinvestment in the Village and the vision of the Area Study. • No impacts to existing parking but limited opportunities to provide new parking • Lowest capital costs but highest maintenance costs MorrishRd WatsonSt Choiceland Blvd MeadowvaleRd Lawson Rd
  • 10. Highland Creek Village Transportation Master Plan Alternative 1 9 Evaluation Criteria Alternative 1 Traffic ○○●● Multimodal Transport Planning ●●●● Servicing ●●●● City Building and Social Environment ●●●● Cultural Environment ○○○● Natural Environment ○●●● Costs ○○○○ Economic Development ●●●● Overall Evaluation Most Preferred ●●●● • Based on Highland Creek Area Study (2012) Recommended Network Removed: • Westbound access to Hwy 2A. • Provides alternative with no changes to Meadowvale Rd • Access remains in Alternative 3 Added: • Morrish Rd parallel parking conversion. See board 11 for details. Evaluation Summary Background • New Hwy 2A signals increase auto travel times compared to Do Nothing • More vehicles from outside the study area will travel through the Village (diversion from 2A) • Two Hwy 2A intersections provide new routing options for vehicles, pedestrians, and cyclists • Long-term removal of Overpass allows for transformation of Hwy 2A into a more pedestrian and cyclist friendly arterial road • Significant opportunities to improve the public realm and pedestrian environment throughout the Village • Impacts to existing angled parking. New roads provide more on-street parking. Development to provide additional internal parking. • Best supports development / reinvestment in the Village and the vision of the Area Study • Highest capital cost but lowest maintenance costs Updates since PIC#1: New “T” intersection at Hwy 2A – Military Trail Removal of overpass and ramps. Add new signal. New laneway Reconfigure intersection Realignment of Kingston Rd and Morrish Rd Closure of accesses to Hwy 2A New WB access to Hwy 2A (removed) MeadowvaleRd Lawson Rd Conversion to parallel parking
  • 11. Highland Creek Village Transportation Master Plan Angled vs. Parallel Parking 10 Safety • Improved visibility for parking manoeuvers • Angled parking directly contributed to 10 collisions between 2009 and 2013 Standards & Accessibility • Consistent with City standards, policies, & practices • AODA requirements must be met (accessible parking spaces) Public Realm • Enables streetscape and sidewalk improvements • Economic benefits associated with pedestrian friendly destinations Benefits of Conversion to Parallel Parking Benefits and Impacts • Redevelopment will provide additional parking, relocating spaces from conversion of angled/perpendicular to parallel: o Impacted Spaces: 21 angled (Old Kingston Rd), 33 perpendicular (Morrish Rd) o New On-Street Spaces: Parallel parking on Morrish Rd / Kingston Rd “loop” and Military Trail (between Old Kingston Rd and Hwy 2A) o New Off-Street Spaces: Spaces required to support new development. Recommendation • Most likely to occur together with development along Old Kingston Rd • Length of stay time limits may be considered to reserve spaces in high demand areas for short-term customer use Due to safety concerns, inconsistency with City standards and best practices, and resulting improvements to the public realm, it is recommended that existing angled and perpendicular parking be converted to parallel parking. North side of Old Kingston Rd at Morrish Rd (facing east) West side of Morrish Rd at Old Kingston Rd (facing south) East side of Morrish Rd at Old Kingston Rd (facing south)
  • 12. Highland Creek Village Transportation Master Plan Alternative 2 11 Evaluation Criteria Alternative 2 Traffic ○●●● Multimodal Transport Planning ○●●● Servicing ○●●● City Building and Social Environment ○○●● Cultural Environment ○○○○ Natural Environment ○○○○ Costs ○○●● Economic Development ○●●● Overall Evaluation Less Moderately Preferred ○○●● • Based on Highland Creek Functional Study (1995) Recommended Plan Added: • New laneway Evaluation Summary Background • Hwy 2A signals increase auto travel times compared to Do Nothing • Less delays and through traffic in Village than Alternatives 1, 2, and 4. Meadowvale Rd intersection diverts some through traffic away from the Village. • Two Hwy 2A intersections provide new routing options for vehicles, pedestrians, and cyclists • Impacts along Meadowvale Rd: cut-through traffic, cross-section widening with potential expropriation • Limits accessibility to Lawson Rd and Colonel Danforth Tr from Hwy 2A eastbound (ramp closures) • Overpass and new westbound on-ramp limit transformation of Hwy 2A into a more pedestrian and cyclist friendly arterial road • Overpass and new westbound on-ramp significantly limit opportunities to develop surrounding lands • Lower capital cost than Alternative 1. Similar maintenance cost to Do Nothing. New signals on Meadowvale Road New “T” intersection at Hwy 2A – Military Trail Reconfigure intersection Realignment of Kingston Rd and Morrish Rd Closure of accesses to Hwy 2A New ramp to WB Hwy 2A New laneway Removal of ramps MorrishRd WatsonSt MeadowvaleRd Lawson Rd Updates since PIC#1:
  • 13. Highland Creek Village Transportation Master Plan Meadowvale Road Connection 12 Benefits and Impacts • A right-turn only movement from Meadowvale Rd to Hwy 2A provides limited benefits to vehicles only • A full-movement signalized intersection at Meadowvale Rd and Hwy 2A provides enhanced vehicle network connectivity and an additional pedestrian/cyclist crossing opportunity • Forecasts suggest that a full-movement signalized intersection would be well-utilized; however, limited benefits are expected for the Village itself: o Only 10% peak hour traffic reduction along Old Kingston Rd o More Regional benefits (e.g., relief of Port Union Rd) o Primarily serves longer distance through traffic • Anticipated impacts along Meadowvale Rd to north and south of Hwy 2A: – Potential cross-section widening with expropriation – Increased traffic infiltration (mostly cut-through traffic) Recommendation Meadowvale Intersection (including right-turn only) may be further examined by a future Feasibility Study that includes a wider study area and considers broad Transportation and City planning policy objectives Meadowvale Rd facing south toward Hwy 2A Meadowvale Rd facing north toward Hwy 2A
  • 14. Highland Creek Village Transportation Master Plan Alternative 3 13 Evaluation Criteria Alternative 3 Traffic ○○●● Multimodal Transport Planning ○●●● Servicing ○●●● City Building and Social Environment ○●●● Cultural Environment ○○○● Natural Environment ○○●● Costs ○○○● Economic Development ○●●● Overall Evaluation Moderately Preferred ○●●● • New alternative developed for the TMP Removed: • Roundabout Kingston Rd and Lawson Rd: • Inconsistent with pedestrian and cycling friendly Village • Issues with sizing • Concerns expressed by public Added: • New laneway Evaluation Summary Background • Hwy 2A signal increases auto travel times compared to Do Nothing • More vehicles from outside the study area will travel through the Village (diversion from 2A). Similar to Alternative 1. • Hwy 2A intersection provide new routing option for vehicles, pedestrians, and cyclists • A right-turn only movement from Meadowvale Rd to Hwy 2A provides limited benefits to vehicles only • Overpass limits transformation of Hwy 2A into a more pedestrian and cyclist friendly arterial road • Overpass limits opportunities to develop surrounding lands • Proximity of new intersection limits opportunity to eventually remove the Overpass • Higher capital cost than Alternative 4 and lower cost than Alternative 1 Updates since PIC#1:
  • 15. Highland Creek Village Transportation Master Plan Alternative 4 (NEW) 14 Evaluation Criteria Alternative 4 Traffic ○○●● Multimodal Transport Planning ○●●● Servicing ○●●● City Building and Social Environment ○●●● Cultural Environment ○○○● Natural Environment ○●●● Costs ○●●● Economic Development ○●●● Overall Evaluation Moderately Preferred ○●●● • New alternative developed for the TMP • Same as Alternative 1 but with Overpass in place • New alternative (not previously shown at PIC #1) Evaluation Summary Background • Hwy 2A signal increases auto travel times compared to Do Nothing • More vehicles from outside the study area will travel through the Village (diversion from 2A). Similar to Alternative 1. • Hwy 2A intersection provide new routing option for vehicles, pedestrians, and cyclists • Limits accessibility to Lawson Rd and Colonel Danforth Tr from Hwy 2A eastbound (ramp closures) • Overpass limits transformation of Hwy 2A into a more pedestrian and cyclist friendly arterial road • Overpass limits opportunities to develop surrounding lands • Does not preclude possibility of removing Overpass in the future • Lower capital cost than Alternatives 1-3 New “T” intersection at Hwy 2A – Military Trail Removal of ramps New laneway Reconfigure intersection Realignment of Kingston Rd and Morrish Rd MorrishRd WatsonSt MeadowvaleRd Lawson Rd Closure of accesses to Hwy 2A Updates since PIC#1:
  • 16. Highland Creek Village Transportation Master Plan Preliminary Recommended Solution (DRAFT) 15 Note: The Concept Plan shown above is a preliminary draft provided for input and comment. Proposed Curb Proposed Right-of-Way
  • 17. Highland Creek Village Transportation Master Plan Preferred Alternative - Active Transportation Cycling • New bike lanes and off-road trail connect to planned bike lanes on Military Trail and Lawson Rd • Provides direct cycling connections to University of Toronto Scarborough and Rouge Hill GO Station • Cycling infrastructure design options will be examined in more detail during detailed design Walking • Additional sidewalks to provide continuous network on both sides of streets • Pedestrian crossings of Hwy 2A at new signalized intersections • Improved public realm, including streetscaping, widened sidewalks, and landscape elements Existing Off-Road Proposed Bike Lane (this TMP) Planned Bike Lane (Toronto Bike Plan) Proposed New Sidewalk Existing Sidewalk Existing Traffic Signal New Traffic Signal 16 Proposed Pedestrian Network Proposed Cycling Network Proposed Off-Road Path Alignment of off-road trail connection between Military Trail and Lawson Rd to be reviewed as part of future detailed design activities. Proposed Off-Road (this TMP) WatsonSt MorrishRd Lawson Rd MeadowvaleRd
  • 18. Highland Creek Village Transportation Master Plan Preferred Alternative - Transit and Servicing Transit • No new dedicated transit infrastructure anticipated in study area • Increased walkability and public realm supports transit • TTC is circulated on applications for development and will adjust service as population in the area increases • Potential improvements include: o Hwy 2A intersections require consideration of new routing o New bus stop locations to serve development o Improved connections with planned GO Regional Express Rail (RER) New connections to future Scarborough Subway extension Existing TTC Routes Water and Wastewater Servicing 17 • Projected growth and road reconfiguration can be supported through realignment and upsizing of sanitary sewers and watermains (where necessary) • New Military Trail and Lawson Rd intersections provide opportunity to improve connectivity with existing water distribution systems on Colonel Danforth Dr and Lawson Rd south of Hwy 2A Stormwater Servicing • Opportunities to achieve stormwater management design objectives through low-impact development (LID) measures: o Bio-engineered swales o Bio-retention gardens o Tree pits in boulevards o Permeable pavements for on-street parking • Centralized facilities can be considered o Reduce need for on-site management o Improve water quality & quantity in municipal right of way • Controlling peak flows to the Centennial Creek corridor to reduce downstream flood risk Note: More detailed information on water, wastewater, and stormwater servicing is available at the Resource Table.
  • 19. Highland Creek Village Transportation Master Plan Projects and Implementation Scenarios 18 Project Included Improvements EA Sched. Anticipated Timing Develop -ment Public Realm City Council Military Trail Traffic Signal • New Hwy 2A Signalized Intersection • Closure of Military Tr ramps / accesses • Conversion of Hwy 2A into arterial near Military Tr • Streetscape improvements and parking on Military Tr, • Cycling connections between Military Tr & Lawson Rd C Short-Term (<10 yr) Old Kingston Rd Screetscape • Streetscape improvements and conversion to parallel parking on Old Kingston Rd & Morrish Rd A+ Short-Medium Term (/w development) Re- Alignment of Kingston and Morrish Rd • Road re-alignment / “loop” connection • Streetscape improvements and parking on Kingston Rd & Morrish Rd • Closure of Kingston Rd & Morrish Rd ramps / accesses • Reconfiguration of Kingston Rd & Old Kingston Rd intersection B Medium-Term (10-20 yr) New Laneway • New laneway between Military Tr and Morrish Rd n/a Short-Medium Term (/w development) Lawson Overpass Removal • Lawson Overpass and Lawson Hwy 2A ramp closure • New Hwy 2A Signalized Intersection • Conversion of Hwy 2A into arterial near Overpass • Closure of Lawson Rd ramps / accesses C Long-Term (20+ yr) 2 3 1 8 5 6 9 13 12 16 Implementation Scenario Improvements Key Map 1 2 3 5 6 9 12 13 8 16 WatsonSt MorrishRd Implementation Scenarios • Implementation timelines are uncertain. Possible scenarios include: oDevelopment Driven: Triggered by development proposal.Applications reviewed for consistency with TMP recommendations. oPublic Realm Initiative: Advanced through City Public Realm Initiatives (e.g., Beautiful Streets) oCity Council: Advanced with Council direction EA Schedules • Each project is categorized into one of the following EA Schedules (by cost and impact): oSchedule A/A+: Pre-approved. May proceed to detailed design and construction at any time oSchedule B: May proceed to detailed design and construction at end of TMP oSchedule C: Requires additional investigation and consultation (Phases 3- 4 of EA process) HCV TMP Recommended Projects
  • 20. Highland Creek Village Transportation Master Plan Study Area Impacts and Mitigation 19 Potential Impacts Mitigation Archaeological Resources Locations: i) Future Village Green on west side of Morrish Rd; ii) Highland Creek Parkette on south-west corner of Old Kingston Rd and Lawson Overpass; iii) Open grass area located to south of Woodland Court Plaza • Properties identified as potentially containing archaeological resources • A Stage 2 Archaeological Assessment will be carried out prior to construction • Written confirmation from the Ministry of Tourism, Culture and Sport (MTCS) that all MTCS technical review requirements have been satisfied will be required prior to construction Site Contamination Location: To be determined • Areas of potential environmental concern identified in parts of the study area • Identified areas of potential environmental concern will be further investigated to confirm or refute the presence of contamination prior to construction, where required Private Property Location: To be determined • Additional property required in some locations • Consultation with affected property owners and negotiation of property acquisition prior to construction; property requirements will be confirmed during detailed design Cultural Heritage Location: 215 Morrish Rd (Morrish Plaza) • Adjacent improvements to Old Kingston Rd identified as having potential to impact this property • Cultural Heritage Evaluation Report will be completed prior to detailed design in order to identify heritage attributes Note: Impacts to be confirmed based on grading limits of preliminary design
  • 21. Highland Creek Village Transportation Master Plan Thank You! 20 September 2015 October 2015 Please provide comments by July 14, 2015 through one of the following methods: • Completing a comment sheet today and placing it in the box provided • Submitting written comment form via email, mail and/or fax • Filling out an online feedback form on the study website How can you share your feedback? How can you continue to participate? Please check the study website www.toronto.ca/hcvtransportation to review new information. Maogosha Pyjor Senior Public Consultation Coordinator City of Toronto Metro Hall, 19th Floor 55 John Street Toronto, ON M5V 3C6 Tel: 416-338-2850 Fax: 416-392-2974 TTY: 416-397-0831 mpyjor@toronto.caWhat happens next? City Council Approval Notice of Completion 30 Day Public and Agency Review Period December 2015 Review and Incorporate Public Comments July - August 2015