Lindsay Zefting, planner and engineer at Alta Planning + Design, presented the final report of the Kingston Point Rail Trail Feasibility Study, which reviewed a proposed trail from midtown Kingston to the Rondout Creek.

Published in: Technology, Business
0 Comments
0 Likes
Statistics
Notes
  • Be the first to comment

  • Be the first to like this

No Downloads
Views
Total views
442
On SlideShare
0
From Embeds
0
Number of Embeds
2
Actions
Shares
0
Downloads
8
Comments
0
Likes
0
Embeds 0
No embeds

No notes for slide

Kingston Greenline & Ulster County Trails Summit - KPRT Feasibility Study

  1. 1. KINGSTON POINT RAIL TRAIL FEASIBILITY STUDY
  2. 2. Kingston Point Rail Trail Engineering and Environmental Assessment Kingston Point Rail Trail
  3. 3. Kingston Point Rail Trail Engineering and Environmental Assessment Existing Planning Documents • Ulster County Non-Motorized Plan • Ulster-Delaware Rail Trail Feasibility Study • Management Plan for the Kingston Point Rail Trail • City of Kingston Action Plan • Kingston Local Waterfront Revitalization Program and Implementation Plan • City of Kingston Comprehensive Plan • Kingston Urban Cultural Park • Complete Streets SWOT Analysis
  4. 4. Kingston Point Rail Trail Engineering and Environmental Assessment Opportunities and Constraints
  5. 5. Kingston Point Rail Trail Engineering and Environmental Assessment Opportunities and Constraints
  6. 6. Kingston Point Rail Trail Engineering and Environmental Assessment Opportunities and Constraints
  7. 7. Kingston Point Rail Trail Engineering and Environmental Assessment Engineering & Environmental Assessment • Existing right-of-way encroachments are minimal • Minimal environmental impacts and no remediation necessary • Stormwater is a concern since the corridor is the low point; can be addressed with natural swales along the trail • Structures along the corridor remain in good condition • There are several at-grade crossings where improvements will be needed to ensure safe conditions • Safety concerns include the length of the tunnel, some steep slopes and some crossings • Vegetative barriers provide screening for the trail
  8. 8. Kingston Point Rail Trail Engineering and Environmental Assessment Conceptual Trail Design
  9. 9. Kingston Point Rail Trail Engineering and Environmental Assessment Conceptual Trail Design
  10. 10. Kingston Point Rail Trail Engineering and Environmental Assessment Conceptual Trail Design
  11. 11. Kingston Point Rail Trail Engineering and Environmental Assessment Conceptual Trail Design
  12. 12. Kingston Point Rail Trail Engineering and Environmental Assessment Conceptual Trail Design
  13. 13. Kingston Point Rail Trail Engineering and Environmental Assessment Conceptual Trail Design
  14. 14. Kingston Point Rail Trail Engineering and Environmental Assessment Conceptual Trail Design
  15. 15. Kingston Point Rail Trail Engineering and Environmental Assessment Conceptual Trail Design
  16. 16. Kingston Point Rail Trail Engineering and Environmental Assessment Conceptual Trail Design
  17. 17. Kingston Point Rail Trail Engineering and Environmental Assessment Trail Conceptual Design
  18. 18. Kingston Point Rail Trail Engineering and Environmental Assessment Trail Section • 10’ wide asphalt path • 2’ shoulders • 8-10’ vertical clearance • 14’ horizontal clearance Figure courtesy of Iowa DOT
  19. 19. Kingston Point Rail Trail Engineering and Environmental Assessment Rail with Trail Alternatives
  20. 20. Kingston Point Rail Trail Engineering and Environmental Assessment Rail with Trail Alternatives
  21. 21. Kingston Point Rail Trail Engineering and Environmental Assessment Implementation Steps • Public Support – committee and community engagement • Funding – Federal, state, and local funding sources, grant applications • Detailed Design – Construction documents • Permits – Erosion and Sediment Control Plan – NYSDOT Use and Occupancy Permit • Construction – Grading, compaction, paving / structural repairs as needed • Performance Measures – User counts, area economic improvements, and land uses Total Cost ~ $1.6 Million - Trail, trailheads, and structural repairs included
  22. 22. Kingston Point Rail Trail Engineering and Environmental Assessment THANK YOU www.altaplanning.com

×