INTRODUCTION
• Power system is subjected to fault & transients. These will result in over
current & over voltages that can causes damages to conductor or
insulation. That result in equipment damages & system failure.
• Most electrical power distribution systems are not planned with protective
device coordination in mind, and can fail miserably in the proper
coordination of the protective devices.
• In distribution system Fuse & Circuit breaker are the main device for fault
current or over current protection. They pay a very important role in the
system design for good quality & reliability.
What is Protective device co-ordination
• If a failure occurs, it would be desirable that a short circuit would affect
only the portion of the electrical system where the failure occurs, instead
of the entire system. A circuit breaker coordination study is used to
analyse the tripping times for the series of overcurrent devices being
compared.
• The methodology is to optimize the selectivity of the devices. Selectivity
is the isolation of a faulted circuit to the point of fault without disturbing
any of the other protective devices in the system. A properly coordinated
system has each of its protective devices adjusted as to minimize the
negative impact of equipment failures.
E-tap simulation for Protective device
Sequence-of-operation
Star Sequence-of-
Operation (SQOP)
verifies, and confirms
the operation and
selectivity of the
protective devices for
various types of faults
for any location directly
from the one-line
diagram and via
normalized Time
Current Characteristic
Curve (TCC) views.
Time Current Characteristic Curve (TCC)
• If a fuse or CB has
been selected, the
designer can use the
curve for that fuse or
CB to check its
opening time versus a
given overcurrent or
fault current.
Devices for co-ordination
FUSE
• A fuse is a type of low resistance resistor that act
as a sacrificial device to provide over current
protection of either the load or the source circuit.
• Its essential components is a metallic wire or strip
that melts when too much current flows through it,
interrupting the circuit that it connects.
• The fuse elements is generally made of material
having low melting point, high conductivity and least
deterioration due to oxidation. E.g. Silver, Copper
etc.
MCB(miniature circuit breaker)
• Nowadays we use more commonly
miniature circuit breaker or MCB in low
voltage electrical network instead of fuse.
• It automatically switches off the electrical
circuit during abnormal condition of the
network means in over load condition as
well as faulty condition. MCB is much
more sensitive to over current than fuse.
• The ratings usually end up to 100. A
miniature circuit breaker which is used to
break small currents. Like in domestic LT
circuits.
MCCB(Molded case circuit breaker)
• A moulded case circuit breaker, abbreviated
MCCB, is a type of electrical protection device
that can be used for a wide range of voltages,
and frequencies of both 50 Hz and 60 Hz. The
main distinctions between moulded-case and
miniature circuit breaker are that the MCCB can
have current ratings of up to 2,500 amperes,
and its trip settings are normally adjustable.
• MCCB has two main functions:
Protection against overload & electrical fault –
currents above the rated value can’t last longer
than what is normal for the application.
During a fault such as a short circuit or line fault,
there are extremely high currents that must be
interrupted immediately.
Objectives of co-ordination
• Minimize the extent of fault in order to reduce the number of customer
affected.
• Minimize the service interruption due to fault.
• Minimize the duration of the service outages to identify the location of the
fault.
Thank you

More Related Content

What's hot

Relays and its types - complete guide
Relays and its types - complete guideRelays and its types - complete guide
Relays and its types - complete guideSlides Hub
 
Over current Relays
Over current RelaysOver current Relays
Over current RelaysASWANTH6270
 
Protection of alternator(encrypted)
Protection of alternator(encrypted)Protection of alternator(encrypted)
Protection of alternator(encrypted)Rohini Haridas
 
Power system protection
Power system protectionPower system protection
Power system protectionAnu Priya
 
Switchgear - complete guide
Switchgear - complete guideSwitchgear - complete guide
Switchgear - complete guideSlides Hub
 
Protection of power transformer
Protection of power transformerProtection of power transformer
Protection of power transformerRitesh Verma
 
Switchgear presentation
Switchgear presentationSwitchgear presentation
Switchgear presentationNikhil Kachare
 
Switchgear and protection lecture 1
Switchgear and protection lecture 1Switchgear and protection lecture 1
Switchgear and protection lecture 1anuphowlader1
 
Ppt on protection of power transformers
Ppt on protection of power transformersPpt on protection of power transformers
Ppt on protection of power transformerssiddharam kantoli
 
Electrical protective devices ec
Electrical protective devices ecElectrical protective devices ec
Electrical protective devices ectrg12345
 
Basics of overcurrent protection
Basics of overcurrent protectionBasics of overcurrent protection
Basics of overcurrent protectionSalim Palayi
 
Transformer design and protection
Transformer design and protectionTransformer design and protection
Transformer design and protectionashwin fcc
 
transformer protection
transformer protection transformer protection
transformer protection jason adidela
 

What's hot (20)

SWITCHGEAR
SWITCHGEARSWITCHGEAR
SWITCHGEAR
 
Switchgear
Switchgear Switchgear
Switchgear
 
Types of relay
Types of relayTypes of relay
Types of relay
 
Relays and its types - complete guide
Relays and its types - complete guideRelays and its types - complete guide
Relays and its types - complete guide
 
Over current Relays
Over current RelaysOver current Relays
Over current Relays
 
Protection of alternator(encrypted)
Protection of alternator(encrypted)Protection of alternator(encrypted)
Protection of alternator(encrypted)
 
Protection and Switchgear
Protection and SwitchgearProtection and Switchgear
Protection and Switchgear
 
Relay coordination
Relay coordinationRelay coordination
Relay coordination
 
Power system protection
Power system protectionPower system protection
Power system protection
 
Switchgear - complete guide
Switchgear - complete guideSwitchgear - complete guide
Switchgear - complete guide
 
Protection of power transformer
Protection of power transformerProtection of power transformer
Protection of power transformer
 
Protective relaying
Protective relayingProtective relaying
Protective relaying
 
Switchgear presentation
Switchgear presentationSwitchgear presentation
Switchgear presentation
 
Switchgear and protection lecture 1
Switchgear and protection lecture 1Switchgear and protection lecture 1
Switchgear and protection lecture 1
 
7SR10 Overcurrent Relay
7SR10 Overcurrent Relay7SR10 Overcurrent Relay
7SR10 Overcurrent Relay
 
Ppt on protection of power transformers
Ppt on protection of power transformersPpt on protection of power transformers
Ppt on protection of power transformers
 
Electrical protective devices ec
Electrical protective devices ecElectrical protective devices ec
Electrical protective devices ec
 
Basics of overcurrent protection
Basics of overcurrent protectionBasics of overcurrent protection
Basics of overcurrent protection
 
Transformer design and protection
Transformer design and protectionTransformer design and protection
Transformer design and protection
 
transformer protection
transformer protection transformer protection
transformer protection
 

Similar to Protective device co ordination with etap

Power system protection devices
Power system protection devicesPower system protection devices
Power system protection devicesPrakash_13209
 
powersystemprotectiondevices-161120193617 (1).pdf
powersystemprotectiondevices-161120193617 (1).pdfpowersystemprotectiondevices-161120193617 (1).pdf
powersystemprotectiondevices-161120193617 (1).pdfMonalPandey1
 
installing-electrical-protective-devices-for-distribution-power-lightning-pro...
installing-electrical-protective-devices-for-distribution-power-lightning-pro...installing-electrical-protective-devices-for-distribution-power-lightning-pro...
installing-electrical-protective-devices-for-distribution-power-lightning-pro...franciscomacatugob1
 
lecture1423723756.pdf
lecture1423723756.pdflecture1423723756.pdf
lecture1423723756.pdfssuser564db8
 
Selective Coordination "The Rest of the Story"
Selective Coordination "The Rest of the Story"Selective Coordination "The Rest of the Story"
Selective Coordination "The Rest of the Story"michaeljmack
 
Unit IV.pptx
Unit IV.pptxUnit IV.pptx
Unit IV.pptxpmaheshh
 
Components of LT Switchgear.pptx
Components of LT Switchgear.pptxComponents of LT Switchgear.pptx
Components of LT Switchgear.pptxSwaroopMallick2
 
Introduction to switchgear
Introduction to switchgearIntroduction to switchgear
Introduction to switchgearAdnan Sayed
 
Module 3-electrical
Module  3-electricalModule  3-electrical
Module 3-electricalManojkarader
 
Power_System_Protection Lecture-1.pdf
Power_System_Protection Lecture-1.pdfPower_System_Protection Lecture-1.pdf
Power_System_Protection Lecture-1.pdfYogeshGairola2
 
Switchgears and protection devices
Switchgears and protection devicesSwitchgears and protection devices
Switchgears and protection devicesManojkarader
 
Electrical Installations, MCB, MCCB, ELCB
Electrical Installations, MCB, MCCB, ELCBElectrical Installations, MCB, MCCB, ELCB
Electrical Installations, MCB, MCCB, ELCBMANOJ964697
 
errahulsharmafeederprotection-141017104620-conversion-gate02.pdf
errahulsharmafeederprotection-141017104620-conversion-gate02.pdferrahulsharmafeederprotection-141017104620-conversion-gate02.pdf
errahulsharmafeederprotection-141017104620-conversion-gate02.pdfAbhishekYadav177511
 
Switchgear and protection engineering Lecture 02.pptx
Switchgear and protection engineering Lecture 02.pptxSwitchgear and protection engineering Lecture 02.pptx
Switchgear and protection engineering Lecture 02.pptxLoitaFredy
 
Circuit breaker
Circuit breakerCircuit breaker
Circuit breakerdipak doud
 
Chapter 3 electrical-protection_system (hat, trafo, generatör, bara koruma)
Chapter 3 electrical-protection_system (hat, trafo, generatör, bara koruma)Chapter 3 electrical-protection_system (hat, trafo, generatör, bara koruma)
Chapter 3 electrical-protection_system (hat, trafo, generatör, bara koruma)Oktay Yaman
 

Similar to Protective device co ordination with etap (20)

Power system protection devices
Power system protection devicesPower system protection devices
Power system protection devices
 
powersystemprotectiondevices-161120193617 (1).pdf
powersystemprotectiondevices-161120193617 (1).pdfpowersystemprotectiondevices-161120193617 (1).pdf
powersystemprotectiondevices-161120193617 (1).pdf
 
installing-electrical-protective-devices-for-distribution-power-lightning-pro...
installing-electrical-protective-devices-for-distribution-power-lightning-pro...installing-electrical-protective-devices-for-distribution-power-lightning-pro...
installing-electrical-protective-devices-for-distribution-power-lightning-pro...
 
lecture1423723756.pdf
lecture1423723756.pdflecture1423723756.pdf
lecture1423723756.pdf
 
Selective Coordination "The Rest of the Story"
Selective Coordination "The Rest of the Story"Selective Coordination "The Rest of the Story"
Selective Coordination "The Rest of the Story"
 
Unit IV.pptx
Unit IV.pptxUnit IV.pptx
Unit IV.pptx
 
LV switchgear FINAL.pptx
LV switchgear FINAL.pptxLV switchgear FINAL.pptx
LV switchgear FINAL.pptx
 
Components of LT Switchgear.pptx
Components of LT Switchgear.pptxComponents of LT Switchgear.pptx
Components of LT Switchgear.pptx
 
Introduction to switchgear
Introduction to switchgearIntroduction to switchgear
Introduction to switchgear
 
Module 3-electrical
Module  3-electricalModule  3-electrical
Module 3-electrical
 
Power_System_Protection Lecture-1.pdf
Power_System_Protection Lecture-1.pdfPower_System_Protection Lecture-1.pdf
Power_System_Protection Lecture-1.pdf
 
Switchgears and protection devices
Switchgears and protection devicesSwitchgears and protection devices
Switchgears and protection devices
 
Electrical System.ppsx
Electrical System.ppsxElectrical System.ppsx
Electrical System.ppsx
 
Electrical Installations, MCB, MCCB, ELCB
Electrical Installations, MCB, MCCB, ELCBElectrical Installations, MCB, MCCB, ELCB
Electrical Installations, MCB, MCCB, ELCB
 
errahulsharmafeederprotection-141017104620-conversion-gate02.pdf
errahulsharmafeederprotection-141017104620-conversion-gate02.pdferrahulsharmafeederprotection-141017104620-conversion-gate02.pdf
errahulsharmafeederprotection-141017104620-conversion-gate02.pdf
 
Switchgear presentation
Switchgear presentationSwitchgear presentation
Switchgear presentation
 
What's short circuit level
What's short circuit levelWhat's short circuit level
What's short circuit level
 
Switchgear and protection engineering Lecture 02.pptx
Switchgear and protection engineering Lecture 02.pptxSwitchgear and protection engineering Lecture 02.pptx
Switchgear and protection engineering Lecture 02.pptx
 
Circuit breaker
Circuit breakerCircuit breaker
Circuit breaker
 
Chapter 3 electrical-protection_system (hat, trafo, generatör, bara koruma)
Chapter 3 electrical-protection_system (hat, trafo, generatör, bara koruma)Chapter 3 electrical-protection_system (hat, trafo, generatör, bara koruma)
Chapter 3 electrical-protection_system (hat, trafo, generatör, bara koruma)
 

Recently uploaded

Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxAsutosh Ranjan
 
MANUFACTURING PROCESS-II UNIT-1 THEORY OF METAL CUTTING
MANUFACTURING PROCESS-II UNIT-1 THEORY OF METAL CUTTINGMANUFACTURING PROCESS-II UNIT-1 THEORY OF METAL CUTTING
MANUFACTURING PROCESS-II UNIT-1 THEORY OF METAL CUTTINGSIVASHANKAR N
 
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...roncy bisnoi
 
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service NashikCall Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service NashikCall Girls in Nagpur High Profile
 
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...ranjana rawat
 
University management System project report..pdf
University management System project report..pdfUniversity management System project report..pdf
University management System project report..pdfKamal Acharya
 
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINEMANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINESIVASHANKAR N
 
Introduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxIntroduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxupamatechverse
 
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCollege Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCall Girls in Nagpur High Profile
 
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSMANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSSIVASHANKAR N
 
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Bookingdharasingh5698
 
UNIT-III FMM. DIMENSIONAL ANALYSIS
UNIT-III FMM.        DIMENSIONAL ANALYSISUNIT-III FMM.        DIMENSIONAL ANALYSIS
UNIT-III FMM. DIMENSIONAL ANALYSISrknatarajan
 
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Christo Ananth
 
UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its PerformanceUNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performancesivaprakash250
 
result management system report for college project
result management system report for college projectresult management system report for college project
result management system report for college projectTonystark477637
 
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...Call Girls in Nagpur High Profile
 
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfKamal Acharya
 

Recently uploaded (20)

Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptx
 
MANUFACTURING PROCESS-II UNIT-1 THEORY OF METAL CUTTING
MANUFACTURING PROCESS-II UNIT-1 THEORY OF METAL CUTTINGMANUFACTURING PROCESS-II UNIT-1 THEORY OF METAL CUTTING
MANUFACTURING PROCESS-II UNIT-1 THEORY OF METAL CUTTING
 
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
 
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service NashikCall Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
 
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINEDJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
 
Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024
 
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
 
University management System project report..pdf
University management System project report..pdfUniversity management System project report..pdf
University management System project report..pdf
 
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINEMANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
 
Introduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxIntroduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptx
 
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCollege Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
 
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSMANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
 
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
 
UNIT-III FMM. DIMENSIONAL ANALYSIS
UNIT-III FMM.        DIMENSIONAL ANALYSISUNIT-III FMM.        DIMENSIONAL ANALYSIS
UNIT-III FMM. DIMENSIONAL ANALYSIS
 
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
 
UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its PerformanceUNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performance
 
result management system report for college project
result management system report for college projectresult management system report for college project
result management system report for college project
 
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
 
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
 

Protective device co ordination with etap

  • 2. INTRODUCTION • Power system is subjected to fault & transients. These will result in over current & over voltages that can causes damages to conductor or insulation. That result in equipment damages & system failure. • Most electrical power distribution systems are not planned with protective device coordination in mind, and can fail miserably in the proper coordination of the protective devices. • In distribution system Fuse & Circuit breaker are the main device for fault current or over current protection. They pay a very important role in the system design for good quality & reliability.
  • 3. What is Protective device co-ordination • If a failure occurs, it would be desirable that a short circuit would affect only the portion of the electrical system where the failure occurs, instead of the entire system. A circuit breaker coordination study is used to analyse the tripping times for the series of overcurrent devices being compared. • The methodology is to optimize the selectivity of the devices. Selectivity is the isolation of a faulted circuit to the point of fault without disturbing any of the other protective devices in the system. A properly coordinated system has each of its protective devices adjusted as to minimize the negative impact of equipment failures.
  • 4. E-tap simulation for Protective device Sequence-of-operation Star Sequence-of- Operation (SQOP) verifies, and confirms the operation and selectivity of the protective devices for various types of faults for any location directly from the one-line diagram and via normalized Time Current Characteristic Curve (TCC) views.
  • 5. Time Current Characteristic Curve (TCC) • If a fuse or CB has been selected, the designer can use the curve for that fuse or CB to check its opening time versus a given overcurrent or fault current.
  • 6. Devices for co-ordination FUSE • A fuse is a type of low resistance resistor that act as a sacrificial device to provide over current protection of either the load or the source circuit. • Its essential components is a metallic wire or strip that melts when too much current flows through it, interrupting the circuit that it connects. • The fuse elements is generally made of material having low melting point, high conductivity and least deterioration due to oxidation. E.g. Silver, Copper etc.
  • 7. MCB(miniature circuit breaker) • Nowadays we use more commonly miniature circuit breaker or MCB in low voltage electrical network instead of fuse. • It automatically switches off the electrical circuit during abnormal condition of the network means in over load condition as well as faulty condition. MCB is much more sensitive to over current than fuse. • The ratings usually end up to 100. A miniature circuit breaker which is used to break small currents. Like in domestic LT circuits.
  • 8. MCCB(Molded case circuit breaker) • A moulded case circuit breaker, abbreviated MCCB, is a type of electrical protection device that can be used for a wide range of voltages, and frequencies of both 50 Hz and 60 Hz. The main distinctions between moulded-case and miniature circuit breaker are that the MCCB can have current ratings of up to 2,500 amperes, and its trip settings are normally adjustable. • MCCB has two main functions: Protection against overload & electrical fault – currents above the rated value can’t last longer than what is normal for the application. During a fault such as a short circuit or line fault, there are extremely high currents that must be interrupted immediately.
  • 9. Objectives of co-ordination • Minimize the extent of fault in order to reduce the number of customer affected. • Minimize the service interruption due to fault. • Minimize the duration of the service outages to identify the location of the fault.