INSTITUTION OF SURVEYORS MALAYSIA
BUILDING COST INFORMATION CENTER
ELEMENTAL COST ANALYSIS - Form 3 8 - Residential Buildings
A - 24 - 16439
BRIEF SPECIFICATION
Gross Floor Area : 16,422 M2 Tender date : 9th June 2011
ELEMENT SPECIFICATION
1 Substructure
1A Piling separate contract.
1B Work Below Lowest Floor Finishes separate building.
2 Superstructure
2A Frame
2B Upper Floor In-situ reinforced concret suspended slabs.
2C Roof
2D Stairs
2E External Walls
2F Windows & External Doors Proprietary fire doors
2G Internal Walls & Partitions 150mm thick common clay brickwall.
2H Internals Doors
3 Finishes
3A Internal Wall Finishes
3B Internal Floor Finishes
3C Internal Ceiling Finishes
3D External Finishes
4 Fittings and Furnishings
5 Services
5A Sanitary appliances
5B Plumbing Installation
5C Refuse Disposal Nil
5D
5E Electrical Installation
5F Fire Protection Installation
5G Lift & Conveyor Installation Lift installation (Prime Cost Sum of RM 257,796.00)
5H Communication Installation SMATV system (Prime Cost Sum of RM 39,157.65)
5J Special Installation
5K Builder's Profit & Attendance on
Services
5L Builder's Work in Connection
with Services
6 External Works
6A Site Works
6B Drainage
6C External Services Water storage and reticulation system
6D Ancillary Buildings TNB substation and guard house.
6E Recreational Facilities
Cold water, sanitary and hot water plumbing installation to relevant Malaysian and British standards.
In-situ reinforced concrete isolated columns, walls, lift walls, shear walls, floor beams and roof beams.
In-situ reinforced concrete flat roof slab with waterproofing; roof drainage, rainwater downpipe, siphonic roof outlet,
anti-backflow fittings, and UPVC pressure pipes.
In-situ reinforced concrete staircase with cement and sand pavings and ceramic nosing tiles; cement skim coat to
other parts of stairs; mild steel handrail and balustrades.
150mm and 200mm thick common clay brickwall for walls and panels; in-situ reinforced concrete parapet walls;
curtain walling, aluminium and glazing works (PC Sum of RM 2,962,688.53 which includes aluminium and glazing
for windows element)
Generally cement skim coat and cement and sand plaster to walls and columns. Polished homogeneous tiles,
porcelain tiles and painting to internal wall.
Air-Conditioning & Ventilation
System
Electrical and telephone distribution system (Prime Cost Sum of RM 1,674,067.50 which includes the cost from the
communication installation element)
Fire protection services (Prime Cost Sum of RM 381,937), Alarm and CMS system (Prime Cost Sum of RM 139,860)
Cement and sand pavings, pebble washed flooring, block, parquet and strip flooring, porcelain and homogeneous
tiles,and carpet.
Generally cement skim coat and painting and fibrous plaster boards to internal ceiling.
Cement skim coat, cement and sand plaster and painting works (PC Sum of RM3852200.00) to external walls,
columns, ceilings and floor finish
Reinforced in-situ concrete and marble counter tops to wash basin and silvered float glass mirrors; Signage (PC
Sum of RM42665.18) and Indoor Facilities of (PC Sum of RM146164.73)
WC, accessories comprising of floor traps, PVC bottle traps, stopcock, , vanity basin, wash basin, kitchen sink, taps,
shower fittings, bidet, tub, soap holder and toilet roll holder.
Swimming Pool Equipment (Prime Cost Sum of RM 128,157.75). Tennis court (Provisional sum of RM21,262.50).
Sandy Beach (Provisional sum of RM 171.360)
Generally honeycomb flush door; fire-rated doors.
Electronic keycard system (Prime Cost Sum of RM 58,297.05) , CCTV system (Prime Cost Sum of RM 26,375),
Intercom (Prime Cost Sum of RM 32,224.50)
Builder's profit and allowance of 3% to all Prime Cost Sums of RM 83,515.75)
Builder's works in connection with mechanical and electrical services (Prime Cost Sum of RM 102,847.50)
Excavate, fillings, kerbs, road signages, external painting and guard rails. Hard landscaping works (PC Sum of RM
606,559). Soft landscaping works (PC Sum of RM 346,837.05). Anti-termite treatment (PC Sum of 20,440.35).
Security gate and fencing (Provisional Sum of RM 43,627.50). External concrete features (Provisional Sum of
RM179,550). Cribwall landscaping works (Provisional Sum of RM 47,250)
Primary stormwater drainage system, sewerage system and primary soil drainage system
Air-conditioning and mechanical ventilation installation (PC Sum of RM 1,052,100)

More Related Content

Similar to Form 3

Building Schedule Rates - 2019 N.P
Building Schedule Rates - 2019 N.PBuilding Schedule Rates - 2019 N.P
Building Schedule Rates - 2019 N.PVj NiroSh
 
Portfolio 2019
Portfolio 2019Portfolio 2019
Portfolio 2019Ali Belal
 
Typical Project Format.pptx
Typical Project Format.pptxTypical Project Format.pptx
Typical Project Format.pptxLokeswarSaha1
 
Building Economics Group Presentation Slides
Building Economics Group Presentation SlidesBuilding Economics Group Presentation Slides
Building Economics Group Presentation SlidesMelvin Lim
 
School Buildings of the Future
School Buildings of the FutureSchool Buildings of the Future
School Buildings of the FutureEdel Fox
 
Measurement Presentation
Measurement PresentationMeasurement Presentation
Measurement Presentationseenyeeyong
 
New Persentation
New PersentationNew Persentation
New PersentationTarek Fagal
 
Architect Sample
Architect SampleArchitect Sample
Architect SampleHai Nguyen
 
ECA Workshop - ECA Form
ECA Workshop - ECA FormECA Workshop - ECA Form
ECA Workshop - ECA FormKai Yun Pang
 
Ascent 456 Floorplans Download. Sales hotline 6100 9300
Ascent 456 Floorplans Download. Sales hotline 6100 9300Ascent 456 Floorplans Download. Sales hotline 6100 9300
Ascent 456 Floorplans Download. Sales hotline 6100 9300Dave Teu
 
Dda training presentation
Dda training presentationDda training presentation
Dda training presentationAKASHGARG131
 
Chapter 6 Environmental Management Plan EIA Report - La Cambuse Hotel
Chapter 6 Environmental Management Plan   EIA Report - La Cambuse HotelChapter 6 Environmental Management Plan   EIA Report - La Cambuse Hotel
Chapter 6 Environmental Management Plan EIA Report - La Cambuse Hotelaknl-mauritius
 
Telecommunication for high rise building
Telecommunication for high rise buildingTelecommunication for high rise building
Telecommunication for high rise buildingJäkê Čhŷį Śêrñ
 
Engineering Final Year Project Report on "Electrical Safety and Protection of...
Engineering Final Year Project Report on "Electrical Safety and Protection of...Engineering Final Year Project Report on "Electrical Safety and Protection of...
Engineering Final Year Project Report on "Electrical Safety and Protection of...Pratap Bhunia
 
S-LINE Pipe Suppliers Sharjah.pptx
S-LINE Pipe Suppliers Sharjah.pptxS-LINE Pipe Suppliers Sharjah.pptx
S-LINE Pipe Suppliers Sharjah.pptxJinoVarghese14
 
Clear-Construction-QLD-SAMPLE-Initial-Cost-Plan-Budget
Clear-Construction-QLD-SAMPLE-Initial-Cost-Plan-BudgetClear-Construction-QLD-SAMPLE-Initial-Cost-Plan-Budget
Clear-Construction-QLD-SAMPLE-Initial-Cost-Plan-BudgetBenjamin Leavy
 
Leisure Center. Part 2
Leisure Center. Part 2Leisure Center. Part 2
Leisure Center. Part 2Tej Raj Upreti
 

Similar to Form 3 (20)

Building Schedule Rates - 2019 N.P
Building Schedule Rates - 2019 N.PBuilding Schedule Rates - 2019 N.P
Building Schedule Rates - 2019 N.P
 
Portfolio 2019
Portfolio 2019Portfolio 2019
Portfolio 2019
 
Typical Project Format.pptx
Typical Project Format.pptxTypical Project Format.pptx
Typical Project Format.pptx
 
Building Economics Group Presentation Slides
Building Economics Group Presentation SlidesBuilding Economics Group Presentation Slides
Building Economics Group Presentation Slides
 
C.V
C.VC.V
C.V
 
School Buildings of the Future
School Buildings of the FutureSchool Buildings of the Future
School Buildings of the Future
 
Measurement Presentation
Measurement PresentationMeasurement Presentation
Measurement Presentation
 
New Persentation
New PersentationNew Persentation
New Persentation
 
Architect Sample
Architect SampleArchitect Sample
Architect Sample
 
Car park bq
Car park bqCar park bq
Car park bq
 
ECA Workshop - ECA Form
ECA Workshop - ECA FormECA Workshop - ECA Form
ECA Workshop - ECA Form
 
Ascent 456 Floorplans Download. Sales hotline 6100 9300
Ascent 456 Floorplans Download. Sales hotline 6100 9300Ascent 456 Floorplans Download. Sales hotline 6100 9300
Ascent 456 Floorplans Download. Sales hotline 6100 9300
 
Dda training presentation
Dda training presentationDda training presentation
Dda training presentation
 
Chapter 6 Environmental Management Plan EIA Report - La Cambuse Hotel
Chapter 6 Environmental Management Plan   EIA Report - La Cambuse HotelChapter 6 Environmental Management Plan   EIA Report - La Cambuse Hotel
Chapter 6 Environmental Management Plan EIA Report - La Cambuse Hotel
 
Telecommunication for high rise building
Telecommunication for high rise buildingTelecommunication for high rise building
Telecommunication for high rise building
 
Engineering Final Year Project Report on "Electrical Safety and Protection of...
Engineering Final Year Project Report on "Electrical Safety and Protection of...Engineering Final Year Project Report on "Electrical Safety and Protection of...
Engineering Final Year Project Report on "Electrical Safety and Protection of...
 
S-LINE Pipe Suppliers Sharjah.pptx
S-LINE Pipe Suppliers Sharjah.pptxS-LINE Pipe Suppliers Sharjah.pptx
S-LINE Pipe Suppliers Sharjah.pptx
 
Clear-Construction-QLD-SAMPLE-Initial-Cost-Plan-Budget
Clear-Construction-QLD-SAMPLE-Initial-Cost-Plan-BudgetClear-Construction-QLD-SAMPLE-Initial-Cost-Plan-Budget
Clear-Construction-QLD-SAMPLE-Initial-Cost-Plan-Budget
 
Sreekumar_bms
Sreekumar_bmsSreekumar_bms
Sreekumar_bms
 
Leisure Center. Part 2
Leisure Center. Part 2Leisure Center. Part 2
Leisure Center. Part 2
 

Recently uploaded

FICTIONAL SALESMAN/SALESMAN SNSW 2024.pdf
FICTIONAL SALESMAN/SALESMAN SNSW 2024.pdfFICTIONAL SALESMAN/SALESMAN SNSW 2024.pdf
FICTIONAL SALESMAN/SALESMAN SNSW 2024.pdfPondicherry University
 
PSYPACT- Practicing Over State Lines May 2024.pptx
PSYPACT- Practicing Over State Lines May 2024.pptxPSYPACT- Practicing Over State Lines May 2024.pptx
PSYPACT- Practicing Over State Lines May 2024.pptxMarlene Maheu
 
An overview of the various scriptures in Hinduism
An overview of the various scriptures in HinduismAn overview of the various scriptures in Hinduism
An overview of the various scriptures in HinduismDabee Kamal
 
Spellings Wk 4 and Wk 5 for Grade 4 at CAPS
Spellings Wk 4 and Wk 5 for Grade 4 at CAPSSpellings Wk 4 and Wk 5 for Grade 4 at CAPS
Spellings Wk 4 and Wk 5 for Grade 4 at CAPSAnaAcapella
 
Major project report on Tata Motors and its marketing strategies
Major project report on Tata Motors and its marketing strategiesMajor project report on Tata Motors and its marketing strategies
Major project report on Tata Motors and its marketing strategiesAmanpreetKaur157993
 
How To Create Editable Tree View in Odoo 17
How To Create Editable Tree View in Odoo 17How To Create Editable Tree View in Odoo 17
How To Create Editable Tree View in Odoo 17Celine George
 
SPLICE Working Group: Reusable Code Examples
SPLICE Working Group:Reusable Code ExamplesSPLICE Working Group:Reusable Code Examples
SPLICE Working Group: Reusable Code ExamplesPeter Brusilovsky
 
Basic Civil Engineering notes on Transportation Engineering & Modes of Transport
Basic Civil Engineering notes on Transportation Engineering & Modes of TransportBasic Civil Engineering notes on Transportation Engineering & Modes of Transport
Basic Civil Engineering notes on Transportation Engineering & Modes of TransportDenish Jangid
 
Stl Algorithms in C++ jjjjjjjjjjjjjjjjjj
Stl Algorithms in C++ jjjjjjjjjjjjjjjjjjStl Algorithms in C++ jjjjjjjjjjjjjjjjjj
Stl Algorithms in C++ jjjjjjjjjjjjjjjjjjMohammed Sikander
 
How to Send Pro Forma Invoice to Your Customers in Odoo 17
How to Send Pro Forma Invoice to Your Customers in Odoo 17How to Send Pro Forma Invoice to Your Customers in Odoo 17
How to Send Pro Forma Invoice to Your Customers in Odoo 17Celine George
 
OSCM Unit 2_Operations Processes & Systems
OSCM Unit 2_Operations Processes & SystemsOSCM Unit 2_Operations Processes & Systems
OSCM Unit 2_Operations Processes & SystemsSandeep D Chaudhary
 
TỔNG HỢP HƠN 100 ĐỀ THI THỬ TỐT NGHIỆP THPT TOÁN 2024 - TỪ CÁC TRƯỜNG, TRƯỜNG...
TỔNG HỢP HƠN 100 ĐỀ THI THỬ TỐT NGHIỆP THPT TOÁN 2024 - TỪ CÁC TRƯỜNG, TRƯỜNG...TỔNG HỢP HƠN 100 ĐỀ THI THỬ TỐT NGHIỆP THPT TOÁN 2024 - TỪ CÁC TRƯỜNG, TRƯỜNG...
TỔNG HỢP HƠN 100 ĐỀ THI THỬ TỐT NGHIỆP THPT TOÁN 2024 - TỪ CÁC TRƯỜNG, TRƯỜNG...Nguyen Thanh Tu Collection
 
The Story of Village Palampur Class 9 Free Study Material PDF
The Story of Village Palampur Class 9 Free Study Material PDFThe Story of Village Palampur Class 9 Free Study Material PDF
The Story of Village Palampur Class 9 Free Study Material PDFVivekanand Anglo Vedic Academy
 
male presentation...pdf.................
male presentation...pdf.................male presentation...pdf.................
male presentation...pdf.................MirzaAbrarBaig5
 
An Overview of the Odoo 17 Knowledge App
An Overview of the Odoo 17 Knowledge AppAn Overview of the Odoo 17 Knowledge App
An Overview of the Odoo 17 Knowledge AppCeline George
 
SURVEY I created for uni project research
SURVEY I created for uni project researchSURVEY I created for uni project research
SURVEY I created for uni project researchCaitlinCummins3
 
24 ĐỀ THAM KHẢO KÌ THI TUYỂN SINH VÀO LỚP 10 MÔN TIẾNG ANH SỞ GIÁO DỤC HẢI DƯ...
24 ĐỀ THAM KHẢO KÌ THI TUYỂN SINH VÀO LỚP 10 MÔN TIẾNG ANH SỞ GIÁO DỤC HẢI DƯ...24 ĐỀ THAM KHẢO KÌ THI TUYỂN SINH VÀO LỚP 10 MÔN TIẾNG ANH SỞ GIÁO DỤC HẢI DƯ...
24 ĐỀ THAM KHẢO KÌ THI TUYỂN SINH VÀO LỚP 10 MÔN TIẾNG ANH SỞ GIÁO DỤC HẢI DƯ...Nguyen Thanh Tu Collection
 
Analyzing and resolving a communication crisis in Dhaka textiles LTD.pptx
Analyzing and resolving a communication crisis in Dhaka textiles LTD.pptxAnalyzing and resolving a communication crisis in Dhaka textiles LTD.pptx
Analyzing and resolving a communication crisis in Dhaka textiles LTD.pptxLimon Prince
 

Recently uploaded (20)

FICTIONAL SALESMAN/SALESMAN SNSW 2024.pdf
FICTIONAL SALESMAN/SALESMAN SNSW 2024.pdfFICTIONAL SALESMAN/SALESMAN SNSW 2024.pdf
FICTIONAL SALESMAN/SALESMAN SNSW 2024.pdf
 
PSYPACT- Practicing Over State Lines May 2024.pptx
PSYPACT- Practicing Over State Lines May 2024.pptxPSYPACT- Practicing Over State Lines May 2024.pptx
PSYPACT- Practicing Over State Lines May 2024.pptx
 
An overview of the various scriptures in Hinduism
An overview of the various scriptures in HinduismAn overview of the various scriptures in Hinduism
An overview of the various scriptures in Hinduism
 
Spellings Wk 4 and Wk 5 for Grade 4 at CAPS
Spellings Wk 4 and Wk 5 for Grade 4 at CAPSSpellings Wk 4 and Wk 5 for Grade 4 at CAPS
Spellings Wk 4 and Wk 5 for Grade 4 at CAPS
 
Mattingly "AI and Prompt Design: LLMs with NER"
Mattingly "AI and Prompt Design: LLMs with NER"Mattingly "AI and Prompt Design: LLMs with NER"
Mattingly "AI and Prompt Design: LLMs with NER"
 
Major project report on Tata Motors and its marketing strategies
Major project report on Tata Motors and its marketing strategiesMajor project report on Tata Motors and its marketing strategies
Major project report on Tata Motors and its marketing strategies
 
How To Create Editable Tree View in Odoo 17
How To Create Editable Tree View in Odoo 17How To Create Editable Tree View in Odoo 17
How To Create Editable Tree View in Odoo 17
 
SPLICE Working Group: Reusable Code Examples
SPLICE Working Group:Reusable Code ExamplesSPLICE Working Group:Reusable Code Examples
SPLICE Working Group: Reusable Code Examples
 
Basic Civil Engineering notes on Transportation Engineering & Modes of Transport
Basic Civil Engineering notes on Transportation Engineering & Modes of TransportBasic Civil Engineering notes on Transportation Engineering & Modes of Transport
Basic Civil Engineering notes on Transportation Engineering & Modes of Transport
 
Stl Algorithms in C++ jjjjjjjjjjjjjjjjjj
Stl Algorithms in C++ jjjjjjjjjjjjjjjjjjStl Algorithms in C++ jjjjjjjjjjjjjjjjjj
Stl Algorithms in C++ jjjjjjjjjjjjjjjjjj
 
How to Send Pro Forma Invoice to Your Customers in Odoo 17
How to Send Pro Forma Invoice to Your Customers in Odoo 17How to Send Pro Forma Invoice to Your Customers in Odoo 17
How to Send Pro Forma Invoice to Your Customers in Odoo 17
 
OSCM Unit 2_Operations Processes & Systems
OSCM Unit 2_Operations Processes & SystemsOSCM Unit 2_Operations Processes & Systems
OSCM Unit 2_Operations Processes & Systems
 
TỔNG HỢP HƠN 100 ĐỀ THI THỬ TỐT NGHIỆP THPT TOÁN 2024 - TỪ CÁC TRƯỜNG, TRƯỜNG...
TỔNG HỢP HƠN 100 ĐỀ THI THỬ TỐT NGHIỆP THPT TOÁN 2024 - TỪ CÁC TRƯỜNG, TRƯỜNG...TỔNG HỢP HƠN 100 ĐỀ THI THỬ TỐT NGHIỆP THPT TOÁN 2024 - TỪ CÁC TRƯỜNG, TRƯỜNG...
TỔNG HỢP HƠN 100 ĐỀ THI THỬ TỐT NGHIỆP THPT TOÁN 2024 - TỪ CÁC TRƯỜNG, TRƯỜNG...
 
The Story of Village Palampur Class 9 Free Study Material PDF
The Story of Village Palampur Class 9 Free Study Material PDFThe Story of Village Palampur Class 9 Free Study Material PDF
The Story of Village Palampur Class 9 Free Study Material PDF
 
ESSENTIAL of (CS/IT/IS) class 07 (Networks)
ESSENTIAL of (CS/IT/IS) class 07 (Networks)ESSENTIAL of (CS/IT/IS) class 07 (Networks)
ESSENTIAL of (CS/IT/IS) class 07 (Networks)
 
male presentation...pdf.................
male presentation...pdf.................male presentation...pdf.................
male presentation...pdf.................
 
An Overview of the Odoo 17 Knowledge App
An Overview of the Odoo 17 Knowledge AppAn Overview of the Odoo 17 Knowledge App
An Overview of the Odoo 17 Knowledge App
 
SURVEY I created for uni project research
SURVEY I created for uni project researchSURVEY I created for uni project research
SURVEY I created for uni project research
 
24 ĐỀ THAM KHẢO KÌ THI TUYỂN SINH VÀO LỚP 10 MÔN TIẾNG ANH SỞ GIÁO DỤC HẢI DƯ...
24 ĐỀ THAM KHẢO KÌ THI TUYỂN SINH VÀO LỚP 10 MÔN TIẾNG ANH SỞ GIÁO DỤC HẢI DƯ...24 ĐỀ THAM KHẢO KÌ THI TUYỂN SINH VÀO LỚP 10 MÔN TIẾNG ANH SỞ GIÁO DỤC HẢI DƯ...
24 ĐỀ THAM KHẢO KÌ THI TUYỂN SINH VÀO LỚP 10 MÔN TIẾNG ANH SỞ GIÁO DỤC HẢI DƯ...
 
Analyzing and resolving a communication crisis in Dhaka textiles LTD.pptx
Analyzing and resolving a communication crisis in Dhaka textiles LTD.pptxAnalyzing and resolving a communication crisis in Dhaka textiles LTD.pptx
Analyzing and resolving a communication crisis in Dhaka textiles LTD.pptx
 

Form 3

  • 1. INSTITUTION OF SURVEYORS MALAYSIA BUILDING COST INFORMATION CENTER ELEMENTAL COST ANALYSIS - Form 3 8 - Residential Buildings A - 24 - 16439 BRIEF SPECIFICATION Gross Floor Area : 16,422 M2 Tender date : 9th June 2011 ELEMENT SPECIFICATION 1 Substructure 1A Piling separate contract. 1B Work Below Lowest Floor Finishes separate building. 2 Superstructure 2A Frame 2B Upper Floor In-situ reinforced concret suspended slabs. 2C Roof 2D Stairs 2E External Walls 2F Windows & External Doors Proprietary fire doors 2G Internal Walls & Partitions 150mm thick common clay brickwall. 2H Internals Doors 3 Finishes 3A Internal Wall Finishes 3B Internal Floor Finishes 3C Internal Ceiling Finishes 3D External Finishes 4 Fittings and Furnishings 5 Services 5A Sanitary appliances 5B Plumbing Installation 5C Refuse Disposal Nil 5D 5E Electrical Installation 5F Fire Protection Installation 5G Lift & Conveyor Installation Lift installation (Prime Cost Sum of RM 257,796.00) 5H Communication Installation SMATV system (Prime Cost Sum of RM 39,157.65) 5J Special Installation 5K Builder's Profit & Attendance on Services 5L Builder's Work in Connection with Services 6 External Works 6A Site Works 6B Drainage 6C External Services Water storage and reticulation system 6D Ancillary Buildings TNB substation and guard house. 6E Recreational Facilities Cold water, sanitary and hot water plumbing installation to relevant Malaysian and British standards. In-situ reinforced concrete isolated columns, walls, lift walls, shear walls, floor beams and roof beams. In-situ reinforced concrete flat roof slab with waterproofing; roof drainage, rainwater downpipe, siphonic roof outlet, anti-backflow fittings, and UPVC pressure pipes. In-situ reinforced concrete staircase with cement and sand pavings and ceramic nosing tiles; cement skim coat to other parts of stairs; mild steel handrail and balustrades. 150mm and 200mm thick common clay brickwall for walls and panels; in-situ reinforced concrete parapet walls; curtain walling, aluminium and glazing works (PC Sum of RM 2,962,688.53 which includes aluminium and glazing for windows element) Generally cement skim coat and cement and sand plaster to walls and columns. Polished homogeneous tiles, porcelain tiles and painting to internal wall. Air-Conditioning & Ventilation System Electrical and telephone distribution system (Prime Cost Sum of RM 1,674,067.50 which includes the cost from the communication installation element) Fire protection services (Prime Cost Sum of RM 381,937), Alarm and CMS system (Prime Cost Sum of RM 139,860) Cement and sand pavings, pebble washed flooring, block, parquet and strip flooring, porcelain and homogeneous tiles,and carpet. Generally cement skim coat and painting and fibrous plaster boards to internal ceiling. Cement skim coat, cement and sand plaster and painting works (PC Sum of RM3852200.00) to external walls, columns, ceilings and floor finish Reinforced in-situ concrete and marble counter tops to wash basin and silvered float glass mirrors; Signage (PC Sum of RM42665.18) and Indoor Facilities of (PC Sum of RM146164.73) WC, accessories comprising of floor traps, PVC bottle traps, stopcock, , vanity basin, wash basin, kitchen sink, taps, shower fittings, bidet, tub, soap holder and toilet roll holder. Swimming Pool Equipment (Prime Cost Sum of RM 128,157.75). Tennis court (Provisional sum of RM21,262.50). Sandy Beach (Provisional sum of RM 171.360) Generally honeycomb flush door; fire-rated doors. Electronic keycard system (Prime Cost Sum of RM 58,297.05) , CCTV system (Prime Cost Sum of RM 26,375), Intercom (Prime Cost Sum of RM 32,224.50) Builder's profit and allowance of 3% to all Prime Cost Sums of RM 83,515.75) Builder's works in connection with mechanical and electrical services (Prime Cost Sum of RM 102,847.50) Excavate, fillings, kerbs, road signages, external painting and guard rails. Hard landscaping works (PC Sum of RM 606,559). Soft landscaping works (PC Sum of RM 346,837.05). Anti-termite treatment (PC Sum of 20,440.35). Security gate and fencing (Provisional Sum of RM 43,627.50). External concrete features (Provisional Sum of RM179,550). Cribwall landscaping works (Provisional Sum of RM 47,250) Primary stormwater drainage system, sewerage system and primary soil drainage system Air-conditioning and mechanical ventilation installation (PC Sum of RM 1,052,100)