1. LIAISING WITH DIFFERENT GOVERNMENT AUTHORITIES FOR
VARIOUS MATTERS SUCH AS PROJECT INSURANCE POLICIES,
BUILDING PERMITS, NOCS, DEMARCATIONS, FINAL SURVEY
CERTIFICATES, APPROVALS ETC.
2. DEALING WITH ALL SECURITY MATTERS OF THE DIVISION,
ARRANGING/DEALING/CONTROLLING ACCOMMODATION AND
TRANSPORTATION ISSUES AND MATTERS
3. RECRUITING/HIRING STAFF/MANPOWER AS PER THE
PROJECTS REQUIREMENT IN COORDINATION WITH HEAD
OFFICE.
3
4. PROJECT-WISE DAILY/WEEKLY AND MONTHLY
RECORDING/UPDATING OF TOTAL MANPOWER AND
CALCULATION OF TOTAL MAN-HOURS/TOTAL WAGES/TOTAL
OVERTIME AND KEEPING PERCENTAGEWISE RECORDS OF THE
SAME FOR THE COST CONTROL PURPOSE.
5. OVERALL CONTROL OF ADMINISTRATION AND HR MATTERS
OF THE ALD1 PROJECTS/DEPARTMENT AND OFFICES AND
WELLBEING OF STAFF AND LABOURS
6. ARRANGING WORK PERMIT CARDS/EMIRATES ID CARDS/
INSURANCE CARDS/VISA RENEWALS/VISA MEDICALS FOR ALL
THE EMPLOYEES IN COORDINATION WITH HEAD OFFICE.
QA/QC OFFICE
4. INSPECTION & TESTING OF MATERIALS AS
PER ITP
2. PREPARATION OF METHOD STATEMENT & ITP
SCHEDULE
3. METHOD STATEMENT & ITP PREPARATION AS
PER SCHEDULE
PROJECT LEVEL QA/QC PROGRAMME
1. PREPARATION OF PROJECT SPECIFIC QUALITY
PLAN
4
8. ISSUE SITE OBSERVATION REPORT/ NON-
CONFORMANCE REPORT FOR NON-COMPLIANCE
OF WORK DURING EXECUTION (IF ANY)
9. PERIODIC INTERNAL AUDIT AS PER
INTERGATED MANAGEMENT SYSTEM
6. QA/QC VERIFICATION OF WORKS AS PER
QUALITY CONTROL CHECKLIST
7. SITE INSPECTION REQUEST SUBMISSION TO
CONSULTANT FOR INSPECTION & APPROVAL
PROJECT LEVEL QA/QC PROGRAMME
5. WORK START NOTIFICATION PRIOR TO
COMMENCEMENT OF EACH ACTIVITY
5
13. HANDING OVER
12. PREPARE & SUBMIT THE CLOSE-OUT
DOCUMENTS
11. CARRY OUT THE SNAGGING & DE-SNAGGING
PROCESS
PROJECT LEVEL QA/QC PROGRAMME
10. CARRY OUT THE TESTING &
COMMISSIONING OF ALL INSTALLED ITEMS
6
VILLAS CONSTRUCTION SEQUENCE SUMMERY
(TUNNEL FORM WORKS )
7
First Stage Second Stage Third Stage
Substructure Superstructure Finishing
1
Excavation & Earth
Works
Including leveling and
compaction
1
RCC Columns & Walls Kickers
Kicker: like the column necks
to facilitate tunnel form
installation
1
First Fix for MEP Works
All embedded conduits
and pipes to be installed
in block walls
2
Anti-termite (chemical
spray)
2
Tunnels Forms Installation
Using mobile cranes cranes
2
Wooden Doors Subframes
12mm plywood
3
PCC & Blinding
50mm plain concrete
below foundation
3
RCC Works for Columns,
Walls & Slab (GF, FF, etc.)
3
Plaster Works
Plaster preparation
including rush coat, fiber
mesh, angle beads ..etc.
Then filling by cement
sand plaster
4
RCC Foundation
Reinforced Strip
Foundation
4
Roof Parapet, Staircase &
Miscellaneous RCC Works as
per architectural shop
drawings
4
Roof Waterproofing Works
Getting the slope by foam
concrete then using
membrane system and
polystyrene for heat
insulation and finally
protected by natural
gravel and concrete tiles
8
First Stage Second Stage Third Stage
Substructure Superstructure Finishing
5
Stub Walls
All around the center
line of the strip
foundation to suit the
tunnel design
5
Block Works (Insulation)
50 mm polystyrene is used
between two block walls
(100mm & 200mm)
Total wall thickness is 350
mm
5
Tile & Marble Works
Including floor and wet
area walls and staircase
step and vanities and
kitchen tops
6
Damp Proofing
Bitumen Paint
6
Second Fix MEP (A/C
System, High level
Drainage) especially
above false ceiling
survices
7
Backfilling
(Compaction on
Layers)
Including underground
drainage and MEP
services
7
External Works:
Precast, Boundary Walls,
External Drainage, Paving
& landscaping.
8 Anti-termite 8
False Ceiling Works
Suspension & Gypsum
board installation.
9
First Stage Second Stage Third Stage
Substructure Superstructure Finishing
9
Slab on grade
100mm reinforced
concrete
9
Painting Works
Internal & External
1
0
UPVC & Aluminum Works
Including doors, windows
and railings and other
decorative items
1
1
Doors & Joinery Works
Including wardrobes and
kitchen cabinets, wooden
handrail and pergolas
1
2
MEP Final Fix (Electrical
Accessories, Light
Fittings, Sanitary Wares
…etc.
1
3
Testing & Commissioning
1
4
Snagging & Handing over
Special team for clearance
and preparing the villas
for final handing over to
the end user.
EXCAVATION & LEVELING
1240 Villas Progress Photos
10
PCC 11
CASTED STRIP FOOTING 12
CASTED STRIP FOOTING 13
CASTED GROUND SLAB 14
GROUND FLOOR TUNNEL 15
GROUND FLOOR TUNNEL 16
FIRST FLOOR TUNNEL
REINFORCEMENT WORKS 17
FIRST FLOOR TUNNEL WORKS 18
PARAPET WORKS 19
BLOCK WORKS 20
PLASTER WORKS 21
BOUNDARY WALL PCC 22
BOUNDARY WALL INSTALLATION 23
CLAY ROOF TILES 24
ROOF WATER PROOFING 25
GRC WORKS 26
TILING WORKS 27
DRAINAGE WORKS 28
SWEET SOIL FILLING 29
ELECTRIC PANEL BOARD 30
INTERNAL PAINTING OF WALL
FINAL COAT 31
TILE GROUT WORKS 32
GARAGE GRAVEL FILLING 33
MARBLE VANITY TOP 34
WARDROBE SHUTTER FIXING
(JOINERY WORKS) 35
JOINERY WORKS
36
JOINERY WORKS
37
FALSE CEILING WORKS
38
UPVC WORKS - AREA 03
39
CAST ALUMINIUM WORKS – AREA 03
40
STAIRCASE RAILING WORKS – AREA 03
41
GARAGE PAVING BLOCKS WORKS 42
ROOF AC MACHINE INSTALLATION43
HEEL KERB FIXING 44
EXTERNAL WALL PRIMER PAINT 45
EXTERNAL WALL FINAL PAINTING WORKS 46
MEP SERVICES ABOVE FALSE CEILING WORKS47
MEP SERVICES ABOVE KITCHEN FALSE
CEILING WORKS 48
FALSE CEILING WORKS 49
FALSE CEILING GYPSUM BOARD
FIXING 50
PAINTING OF GARAGE WALL 51
GARAGE PAVING BLOCKS 52
KITCHEN CABINET SHUTTER
FIXING 53
KITCHEN COOKER HOOD FIXING 54
SANITARY FIXTURE INSTALLATION 55
MANHOLE COVER PAINTING 56
HEEL KERB FIXING 57
SWEET SOIL FILLING 58
GARAGE ROAD BASE FOR
COMPACTION 59
EXTERNAL ELECTRICAL OUTLET
INSTALLATION 60
ALUMINUM MAIN ENTRANCE GATE
FIXING 61
ROOF A/C MACHINE
INSTALLATION 62
ROOF A/C MACHINE INSTALLATION 63
ROOF SLAB PAVING BLOCKS AND
GRAVEL 64
ROOF WATERPROOFING LEAKAGE
TEST 65
ATTACHED VILLA GAS ENCLOSURE
INSTALLATION 66

More Related Content

What's hot

Architectural Professional Practice - Fees
Architectural Professional Practice - FeesArchitectural Professional Practice - Fees
Architectural Professional Practice - FeesGalala University
 
Planning of residential buildings
Planning of residential buildingsPlanning of residential buildings
Planning of residential buildingsShashiraj Chougule
 
FACTORY BUILDINGS- ROOFS PART 1.pptx
FACTORY BUILDINGS- ROOFS PART 1.pptxFACTORY BUILDINGS- ROOFS PART 1.pptx
FACTORY BUILDINGS- ROOFS PART 1.pptxKeemeTathego
 
Dampness in buildings
Dampness in buildingsDampness in buildings
Dampness in buildingsAshar Gill
 
Detailed specifications
Detailed specificationsDetailed specifications
Detailed specificationsSimran Vats
 
Defects in construction
Defects in constructionDefects in construction
Defects in constructionShivangi Saini
 
Specifications of excavation and foundation
Specifications of excavation and foundationSpecifications of excavation and foundation
Specifications of excavation and foundationPrabhat chhirolya
 
Rates Analysis For Calculating Material and Labour for building works
Rates Analysis For Calculating Material and Labour for building works  Rates Analysis For Calculating Material and Labour for building works
Rates Analysis For Calculating Material and Labour for building works ALI HYDER GADHI
 
Deterioration in building
Deterioration in buildingDeterioration in building
Deterioration in buildingRumi Tamakhu
 
Timber, its use and conections
Timber, its use and conectionsTimber, its use and conections
Timber, its use and conectionsRajat Nainwal
 
Causes and prevention of cracks in buildings
Causes and prevention of cracks in buildingsCauses and prevention of cracks in buildings
Causes and prevention of cracks in buildingsSUPREETH Suppi
 
Types of Tender and their Process
Types of Tender and their ProcessTypes of Tender and their Process
Types of Tender and their Processarpantripathi2
 

What's hot (20)

Architectural Professional Practice - Fees
Architectural Professional Practice - FeesArchitectural Professional Practice - Fees
Architectural Professional Practice - Fees
 
Planning of residential buildings
Planning of residential buildingsPlanning of residential buildings
Planning of residential buildings
 
FACTORY BUILDINGS- ROOFS PART 1.pptx
FACTORY BUILDINGS- ROOFS PART 1.pptxFACTORY BUILDINGS- ROOFS PART 1.pptx
FACTORY BUILDINGS- ROOFS PART 1.pptx
 
Dampness in buildings
Dampness in buildingsDampness in buildings
Dampness in buildings
 
Finishing work,Construction workshop.
Finishing work,Construction workshop.Finishing work,Construction workshop.
Finishing work,Construction workshop.
 
Detailed specifications
Detailed specificationsDetailed specifications
Detailed specifications
 
Damp proofing
Damp proofingDamp proofing
Damp proofing
 
SPA Professional Practice II
SPA Professional Practice IISPA Professional Practice II
SPA Professional Practice II
 
Defects in construction
Defects in constructionDefects in construction
Defects in construction
 
Valuation(1)
Valuation(1)Valuation(1)
Valuation(1)
 
Specifications of excavation and foundation
Specifications of excavation and foundationSpecifications of excavation and foundation
Specifications of excavation and foundation
 
Rates Analysis For Calculating Material and Labour for building works
Rates Analysis For Calculating Material and Labour for building works  Rates Analysis For Calculating Material and Labour for building works
Rates Analysis For Calculating Material and Labour for building works
 
Valuation part of Building
Valuation part of Building Valuation part of Building
Valuation part of Building
 
Deterioration in building
Deterioration in buildingDeterioration in building
Deterioration in building
 
My portfolio
My portfolioMy portfolio
My portfolio
 
Timber, its use and conections
Timber, its use and conectionsTimber, its use and conections
Timber, its use and conections
 
Causes and prevention of cracks in buildings
Causes and prevention of cracks in buildingsCauses and prevention of cracks in buildings
Causes and prevention of cracks in buildings
 
Types of Tender and their Process
Types of Tender and their ProcessTypes of Tender and their Process
Types of Tender and their Process
 
Valuation
ValuationValuation
Valuation
 
03 anti-termite treatment
03 anti-termite treatment03 anti-termite treatment
03 anti-termite treatment
 

Similar to Presentation - 1240 Villas

Construction report (boq, wbs, reports, evm)
Construction report (boq, wbs, reports, evm)Construction report (boq, wbs, reports, evm)
Construction report (boq, wbs, reports, evm)Hamza Waheed
 
Dda training presentation
Dda training presentationDda training presentation
Dda training presentationAKASHGARG131
 
Prima Vera Final Project PPT.pptx
Prima Vera Final Project PPT.pptxPrima Vera Final Project PPT.pptx
Prima Vera Final Project PPT.pptxZiyad Zaidi
 
Airport Buildings & Structures Construction
Airport Buildings & Structures ConstructionAirport Buildings & Structures Construction
Airport Buildings & Structures ConstructionDavid H Moloney
 
internship review .pdf
internship review .pdfinternship review .pdf
internship review .pdfPAYALINAMDAR
 
Assignment (1)
Assignment (1)Assignment (1)
Assignment (1)Lwj Welson
 
Assignment (1)
Assignment (1)Assignment (1)
Assignment (1)Lwj Welson
 
JIPMER Phase II Project
JIPMER Phase II ProjectJIPMER Phase II Project
JIPMER Phase II ProjectSupraja Mohan
 
CE1 - Final Reviewed - 10 Feb 2016
CE1 - Final Reviewed - 10 Feb 2016CE1 - Final Reviewed - 10 Feb 2016
CE1 - Final Reviewed - 10 Feb 2016Ali Issa
 
Deep basement excavation
Deep basement excavation Deep basement excavation
Deep basement excavation Davis Ciprikis
 
EDUARDO H. PARE SPECS & SW_BUILDING & UNDERGROUND CABLES CIVIL WORKS
EDUARDO H. PARE SPECS & SW_BUILDING & UNDERGROUND CABLES CIVIL WORKSEDUARDO H. PARE SPECS & SW_BUILDING & UNDERGROUND CABLES CIVIL WORKS
EDUARDO H. PARE SPECS & SW_BUILDING & UNDERGROUND CABLES CIVIL WORKSEduardo H. Pare
 
SPECS & SW_BUILDING & UNDERGROUND CABLES CIVIL WORKS
SPECS & SW_BUILDING & UNDERGROUND CABLES CIVIL WORKSSPECS & SW_BUILDING & UNDERGROUND CABLES CIVIL WORKS
SPECS & SW_BUILDING & UNDERGROUND CABLES CIVIL WORKSEduardo H. Pare
 
EDUARDO H. PARE CIVIL, STRUCTURAL AND ARCHITECTURAL SPECIFICATIONS
EDUARDO H. PARE CIVIL, STRUCTURAL AND ARCHITECTURAL SPECIFICATIONSEDUARDO H. PARE CIVIL, STRUCTURAL AND ARCHITECTURAL SPECIFICATIONS
EDUARDO H. PARE CIVIL, STRUCTURAL AND ARCHITECTURAL SPECIFICATIONSEduardo H. Pare
 
Torino Metro Experience
Torino Metro ExperienceTorino Metro Experience
Torino Metro Experiencegifanta
 
Re development works at east kidwai nagar, New Delhi
Re development works at east kidwai nagar, New DelhiRe development works at east kidwai nagar, New Delhi
Re development works at east kidwai nagar, New DelhiJaspreet singh
 
estimation,costingandvaluation.pdf
estimation,costingandvaluation.pdfestimation,costingandvaluation.pdf
estimation,costingandvaluation.pdfIctsol
 

Similar to Presentation - 1240 Villas (20)

Construction report (boq, wbs, reports, evm)
Construction report (boq, wbs, reports, evm)Construction report (boq, wbs, reports, evm)
Construction report (boq, wbs, reports, evm)
 
Dda training presentation
Dda training presentationDda training presentation
Dda training presentation
 
Prima Vera Final Project PPT.pptx
Prima Vera Final Project PPT.pptxPrima Vera Final Project PPT.pptx
Prima Vera Final Project PPT.pptx
 
Airport Buildings & Structures Construction
Airport Buildings & Structures ConstructionAirport Buildings & Structures Construction
Airport Buildings & Structures Construction
 
Training Report
Training ReportTraining Report
Training Report
 
internship review .pdf
internship review .pdfinternship review .pdf
internship review .pdf
 
Assignment (1)
Assignment (1)Assignment (1)
Assignment (1)
 
Assignment (1)
Assignment (1)Assignment (1)
Assignment (1)
 
Monthly Progress Report - September 2014
Monthly Progress Report - September 2014Monthly Progress Report - September 2014
Monthly Progress Report - September 2014
 
JIPMER Phase II Project
JIPMER Phase II ProjectJIPMER Phase II Project
JIPMER Phase II Project
 
CE1 - Final Reviewed - 10 Feb 2016
CE1 - Final Reviewed - 10 Feb 2016CE1 - Final Reviewed - 10 Feb 2016
CE1 - Final Reviewed - 10 Feb 2016
 
Deep basement excavation
Deep basement excavation Deep basement excavation
Deep basement excavation
 
EDUARDO H. PARE SPECS & SW_BUILDING & UNDERGROUND CABLES CIVIL WORKS
EDUARDO H. PARE SPECS & SW_BUILDING & UNDERGROUND CABLES CIVIL WORKSEDUARDO H. PARE SPECS & SW_BUILDING & UNDERGROUND CABLES CIVIL WORKS
EDUARDO H. PARE SPECS & SW_BUILDING & UNDERGROUND CABLES CIVIL WORKS
 
SPECS & SW_BUILDING & UNDERGROUND CABLES CIVIL WORKS
SPECS & SW_BUILDING & UNDERGROUND CABLES CIVIL WORKSSPECS & SW_BUILDING & UNDERGROUND CABLES CIVIL WORKS
SPECS & SW_BUILDING & UNDERGROUND CABLES CIVIL WORKS
 
EDUARDO H. PARE CIVIL, STRUCTURAL AND ARCHITECTURAL SPECIFICATIONS
EDUARDO H. PARE CIVIL, STRUCTURAL AND ARCHITECTURAL SPECIFICATIONSEDUARDO H. PARE CIVIL, STRUCTURAL AND ARCHITECTURAL SPECIFICATIONS
EDUARDO H. PARE CIVIL, STRUCTURAL AND ARCHITECTURAL SPECIFICATIONS
 
Torino Metro Experience
Torino Metro ExperienceTorino Metro Experience
Torino Metro Experience
 
Re development works at east kidwai nagar, New Delhi
Re development works at east kidwai nagar, New DelhiRe development works at east kidwai nagar, New Delhi
Re development works at east kidwai nagar, New Delhi
 
Speci vol1
Speci vol1Speci vol1
Speci vol1
 
Water leakage problem
Water leakage problem Water leakage problem
Water leakage problem
 
estimation,costingandvaluation.pdf
estimation,costingandvaluation.pdfestimation,costingandvaluation.pdf
estimation,costingandvaluation.pdf
 

Presentation - 1240 Villas