SlideShare a Scribd company logo
1 of 8
Page 1 of 8
To, Date:17/07/2016
The Manager
Human Resource Department
SUB: Application For The Post Of Rigging & Lifting Supervisor
Respected Sir,
With reference to the above subject, I enclose my resume for your kind perusal.
I am working as a “Rigging & Lifting Supervisor” with YAMGAZ Technip CHINA .
( YAMAL LNG PROJECT CHINA). I have successfully TILL DATE of service on the
current project prior to safely project.
Overall having completed 20 years of proven hands-on experience in my chosen field where
my work involved in assisting with construction, pre-commissioning and commissioning in
Oil,Gas,Power&ChemicalIndustry.steemproject,MOUDEL
FABRICATION,TRANSEPORTING,LIFTING.
Further, attached is my detailed resume which illustrates my strengths.
Given an opportunity I shall be thankful and will discharge my duties to the utmost
satisfaction of the management.
Yours Sincerely,
Amod Kumar Puri
Page 2 of 8
AMOD KUMAR PURI
LIFTING & RIGGING SUPERVISOR
Amod Kumar Puri India : +91-9934277981
S/o: Mr.Parmanand Puri china:+86-13816410836
Village: Machhagar Jagadish
Post : Machhagar Lachhiram
Distt: Gopalganj
State: Bihar
INDIA - 841436
Email : amodkumarpuri@gmail.com
amod_puri2009@rediffmail.com
amodpuri@yahoo.com
Seeking challenging assignments in Project Management / Erection &
Commissioning with a growth oriented organization.
Professional Synopsis
 A dynamic professional with over 20 years of rich experience in Project
Erection.
 Presently working with Penglai Jutal Offshore Engineering Heavy
Industries
 CO.[PJOE]
No.5 Harbin Road, Economic Development Zone, Penglai, Shandong,
P,R.ofChina.265607
 Christmas Party
Feb-2015~ Present : YAMGAZ (Technip) China
Project : YAMAL LNG Project (Penglai China)
Designation : Rigging & Lifting Supervisor
Page 3 of 8
Page 4 of 8
Page 5 of 8
Page 6 of 8
 Assisting the sub-contractor in preparation of Heavy Lifts / Jack-down /
 Transportation of heavy equipment’s at laydown areas.
 Inspecting all lifting tackles and accessories as per the approved project, standard
procedures.
 Ensuring that all rigging & lifting crews are provided with PPE and uses the same.
 Communication with multi-national workforce in pro-active manner to ensure that
daily rigging & lifting task are carried out safely and as per guidelines & project
polices. Updating the same to management from time to time.
 Assisting in project skill competency assessment of rigging crews.
 Responsible for supervision of sub-contractors at pre-fabrication, fabrication and
laydown areas with regard to rigging and lifting, The equipment consist of cranes
from 50T Mobile telescopic cranes up to 1,250T lattice boom crawler cranes. Daily
work tasks are carried out by over 100 rigging & lifting crew.
 Supervision of steel structure loading/offloading, assembly & erection for LNG
modules up to 6,000T and there load-out.
 Daily coordinating with lifting equipment operators and ensuring that the lifting task
are carried out safely and all equipment’s are in good working condition such as:
Mobile cranes, crawlers cranes, EOT cranes, Forklifts.
 EXPERIENCEPROFILE
Page 7 of 8
 Name of Company : Technip
 Project : QG-PMP – Qatargas Plateau Maintenance Project
 Position : Supervisor - Rigging and Lifting
 Duration : 01 April 2012 ~ 31st August 2014.
 Name of Company : Dodsal Engineering & Construction LLC
 Project : New Skikda LNG Project(client Sonatrach /KBR Algeria
 Position : Supervisor - Rigging and Lifting
 Duration : 21 September 2010 to 07 January 2012
 Name of Company : Dodsal Engineering & Construction LLC
 Project : Qarn Alam Steam Project PDO ( Oman)
 Position : Supervisor - Rigging and Lifting
 Duration : December-2009 to 20 September 2010.
 Name of Company : Dodsal Engineering & Construction LLC
 Project : Ras Gas-2 Expansion Project Doha ( Qatar)
 Position : Supervisor - Rigging and Lifting
 Duration : July-2007 to May -2009.
 Name of Company : Nasar Al- Hajri Doha Qatar
 Project : Dolphin Onshore Facilities Project Doha Qatar.
 Position : Foreman - Rigging and Lifting
 Duration : February -2006 to March 2007.
 Name of Company : Nasar Al- Hajri Doha Qatar
 Project : Gas Liquid Project Qatar Ras-Laffan Industrial City
 Position : Foreman - Rigging and Lifting
 Duration : March 2005 to Feb 2006.
 Name of Company : ELCO Co. LLC ( Oman)
 Project : IHI Workshop Fabrication work for Sharjan Cement
Factory Kiln No. 2.
 Position : Foreman - Rigging and Lifting
 Duration : Jan 2001 to Dec 2001.
 Name of Company : ELCO Co. LLC ( Oman)
 Project : Saffa, Yibal, Saihrawl, Salalah Port Pipe Line,
Storage Tank, Vessel, Structure Fab.& Erection.
 Position : Foreman - Rigging and Lifting
Page 8 of 8
 Duration : Oct 1996 to Aug-2004.
 Name of Company : Royal Engineering Ltd.
 Project : IOCL BXP Barauni ( Begusarai) India
 Position : Rigging tools inspector
 Duration : Jan 1995 to Aug-1996.
Computer proficiency
 MS Word
 MS Excel
 MS PowerPoint
 MS outlook (internet knowledge)
 ACADEMIC PROFILE / SKILLS
ACADEMIC QUALIFICATION : 12th PASSED(1988 to1990)
TECHNICAL QUALIFICATION : Diploma in (Mechanical)1990to1993)
LANGUAGE KNOWN : English /Hindi/Arabic,
CERTIFICATES / TRAININGS :
•Scaffolding Inspector & Rigging : Velosi
•Permit to Work Receiver ( Ras Gas / KBR and Chiyoda Technip Joint Venture)
•Safety Training for Task Instructions ( KBR)
Declaration:
All the above mentioned statements are true and correct to the best of my knowledge; any reference if
required shall be furnished.
Amod Kumar Puri
Date : 17 __/_07__/2016

More Related Content

What's hot (20)

Nadeem Afzal cv
Nadeem Afzal cvNadeem Afzal cv
Nadeem Afzal cv
 
Ronald Smith resume Queensland.doc (2)
Ronald Smith resume Queensland.doc (2)Ronald Smith resume Queensland.doc (2)
Ronald Smith resume Queensland.doc (2)
 
CV -Nadeem chishti surveyor
CV -Nadeem chishti surveyorCV -Nadeem chishti surveyor
CV -Nadeem chishti surveyor
 
Syed Sufyan Ahmed CV
Syed Sufyan Ahmed  CVSyed Sufyan Ahmed  CV
Syed Sufyan Ahmed CV
 
CV_Ramesh Chander
CV_Ramesh ChanderCV_Ramesh Chander
CV_Ramesh Chander
 
MOHD.J.ALAM CURRICULUM-VITAE
MOHD.J.ALAM CURRICULUM-VITAEMOHD.J.ALAM CURRICULUM-VITAE
MOHD.J.ALAM CURRICULUM-VITAE
 
MUHAMMAD CV-1
MUHAMMAD CV-1MUHAMMAD CV-1
MUHAMMAD CV-1
 
Kumaravel_Ramachandran-Resume
Kumaravel_Ramachandran-ResumeKumaravel_Ramachandran-Resume
Kumaravel_Ramachandran-Resume
 
Vegi Bala (International) - Final
Vegi Bala  (International) - FinalVegi Bala  (International) - Final
Vegi Bala (International) - Final
 
My CV
My CVMy CV
My CV
 
Ramy Mohsen CV - Copy
Ramy Mohsen CV - CopyRamy Mohsen CV - Copy
Ramy Mohsen CV - Copy
 
Gurunathan resume
Gurunathan resumeGurunathan resume
Gurunathan resume
 
Murukesh CV
Murukesh CVMurukesh CV
Murukesh CV
 
Rigging supervisor / Rigging and Lifting Trainer
Rigging supervisor / Rigging and Lifting TrainerRigging supervisor / Rigging and Lifting Trainer
Rigging supervisor / Rigging and Lifting Trainer
 
Nirav v
Nirav vNirav v
Nirav v
 
Mps resume
Mps resume Mps resume
Mps resume
 
Presentation DOBE 2016
Presentation DOBE 2016Presentation DOBE 2016
Presentation DOBE 2016
 
Resume - Ramkumar Rajendran
Resume - Ramkumar RajendranResume - Ramkumar Rajendran
Resume - Ramkumar Rajendran
 
Shabeeb rigging supervisor c.v.
Shabeeb  rigging supervisor c.v.Shabeeb  rigging supervisor c.v.
Shabeeb rigging supervisor c.v.
 
Zahoor Khan New
Zahoor Khan NewZahoor Khan New
Zahoor Khan New
 

Viewers also liked

Asp net whitepaper
Asp net whitepaperAsp net whitepaper
Asp net whitepaperZayar Shwe
 
Sean Murphy CV[1][1]
Sean Murphy CV[1][1]Sean Murphy CV[1][1]
Sean Murphy CV[1][1]Sean Murphy
 
Updated Resume 2016
Updated Resume 2016Updated Resume 2016
Updated Resume 2016Michelle Lee
 
Michael Martinez Resume_Rev2 (3)
Michael Martinez Resume_Rev2 (3)Michael Martinez Resume_Rev2 (3)
Michael Martinez Resume_Rev2 (3)Michael Martinez
 
brian cv march 2014.
brian cv march 2014.brian cv march 2014.
brian cv march 2014.brian timpson
 
Higher Education CRM Presentation
Higher Education CRM PresentationHigher Education CRM Presentation
Higher Education CRM PresentationMike Reardon
 
아바타배팅ロ↗CACA2쩜CΟM↖ロ온라인카지노
아바타배팅ロ↗CACA2쩜CΟM↖ロ온라인카지노아바타배팅ロ↗CACA2쩜CΟM↖ロ온라인카지노
아바타배팅ロ↗CACA2쩜CΟM↖ロ온라인카지노바카라 하이
 
Setting & Achieving Goals
Setting & Achieving GoalsSetting & Achieving Goals
Setting & Achieving GoalsLean In
 
2017 Silicon Valley Investment Trends by Edith Yeung
2017 Silicon Valley Investment Trends by Edith Yeung 2017 Silicon Valley Investment Trends by Edith Yeung
2017 Silicon Valley Investment Trends by Edith Yeung Edith Yeung
 

Viewers also liked (20)

Asp net whitepaper
Asp net whitepaperAsp net whitepaper
Asp net whitepaper
 
CV2017
CV2017CV2017
CV2017
 
Marc BaylissCV
Marc BaylissCVMarc BaylissCV
Marc BaylissCV
 
Sean Murphy CV[1][1]
Sean Murphy CV[1][1]Sean Murphy CV[1][1]
Sean Murphy CV[1][1]
 
ERNEST HODGINS CV
ERNEST HODGINS CVERNEST HODGINS CV
ERNEST HODGINS CV
 
Updated Resume 2016
Updated Resume 2016Updated Resume 2016
Updated Resume 2016
 
fredCVnew
fredCVnewfredCVnew
fredCVnew
 
michael 2016
michael 2016michael 2016
michael 2016
 
Michael Martinez Resume_Rev2 (3)
Michael Martinez Resume_Rev2 (3)Michael Martinez Resume_Rev2 (3)
Michael Martinez Resume_Rev2 (3)
 
documents 2015 RESUME
documents 2015 RESUMEdocuments 2015 RESUME
documents 2015 RESUME
 
AMOD RESUME
AMOD RESUMEAMOD RESUME
AMOD RESUME
 
Carl Hinds CV
Carl Hinds CVCarl Hinds CV
Carl Hinds CV
 
brian cv march 2014.
brian cv march 2014.brian cv march 2014.
brian cv march 2014.
 
Len Kingi Resume 1
Len Kingi Resume 1Len Kingi Resume 1
Len Kingi Resume 1
 
Higher Education CRM Presentation
Higher Education CRM PresentationHigher Education CRM Presentation
Higher Education CRM Presentation
 
아바타배팅ロ↗CACA2쩜CΟM↖ロ온라인카지노
아바타배팅ロ↗CACA2쩜CΟM↖ロ온라인카지노아바타배팅ロ↗CACA2쩜CΟM↖ロ온라인카지노
아바타배팅ロ↗CACA2쩜CΟM↖ロ온라인카지노
 
Fevereiro jardim
Fevereiro jardimFevereiro jardim
Fevereiro jardim
 
Setting & Achieving Goals
Setting & Achieving GoalsSetting & Achieving Goals
Setting & Achieving Goals
 
Peter Gostling CV
Peter Gostling CV Peter Gostling CV
Peter Gostling CV
 
2017 Silicon Valley Investment Trends by Edith Yeung
2017 Silicon Valley Investment Trends by Edith Yeung 2017 Silicon Valley Investment Trends by Edith Yeung
2017 Silicon Valley Investment Trends by Edith Yeung
 

Similar to AMOD CV CHINA 2017 - Copy

Similar to AMOD CV CHINA 2017 - Copy (20)

Resume 2016 Update
Resume 2016 UpdateResume 2016 Update
Resume 2016 Update
 
AMOD RESUME
AMOD RESUMEAMOD RESUME
AMOD RESUME
 
Dipanjan Sikidar-CV
Dipanjan Sikidar-CVDipanjan Sikidar-CV
Dipanjan Sikidar-CV
 
wilfredo guila resume crane operator
wilfredo guila resume crane operatorwilfredo guila resume crane operator
wilfredo guila resume crane operator
 
RESUME FEB 20 2017
RESUME FEB 20 2017RESUME FEB 20 2017
RESUME FEB 20 2017
 
Ronald smith resume queensland.doc (2)
Ronald smith resume queensland.doc (2)Ronald smith resume queensland.doc (2)
Ronald smith resume queensland.doc (2)
 
WAQAR ZEB CV
WAQAR ZEB CVWAQAR ZEB CV
WAQAR ZEB CV
 
CV Muhammad Nazir Crane Operator NEW CV
CV Muhammad Nazir Crane Operator  NEW  CVCV Muhammad Nazir Crane Operator  NEW  CV
CV Muhammad Nazir Crane Operator NEW CV
 
CURRICULUM VITAE - 21 02 2016
CURRICULUM VITAE - 21 02 2016CURRICULUM VITAE - 21 02 2016
CURRICULUM VITAE - 21 02 2016
 
Dutta Resume
Dutta ResumeDutta Resume
Dutta Resume
 
Waqar zeb cv
Waqar zeb cvWaqar zeb cv
Waqar zeb cv
 
Resume jeyakkumar.CRANE OPERATION
Resume jeyakkumar.CRANE OPERATIONResume jeyakkumar.CRANE OPERATION
Resume jeyakkumar.CRANE OPERATION
 
updated CV
updated CVupdated CV
updated CV
 
Nadeem cv n
Nadeem cv nNadeem cv n
Nadeem cv n
 
Nadeem cv n
Nadeem cv nNadeem cv n
Nadeem cv n
 
resume new2016
resume new2016resume new2016
resume new2016
 
World Welding Company Profile Feb 15
World Welding Company Profile Feb 15World Welding Company Profile Feb 15
World Welding Company Profile Feb 15
 
CV Updated - Copy (3)
CV Updated - Copy (3)CV Updated - Copy (3)
CV Updated - Copy (3)
 
Sreejith_2484_b (2).doc
Sreejith_2484_b (2).docSreejith_2484_b (2).doc
Sreejith_2484_b (2).doc
 
Azhar bajwa
Azhar bajwaAzhar bajwa
Azhar bajwa
 

AMOD CV CHINA 2017 - Copy

  • 1. Page 1 of 8 To, Date:17/07/2016 The Manager Human Resource Department SUB: Application For The Post Of Rigging & Lifting Supervisor Respected Sir, With reference to the above subject, I enclose my resume for your kind perusal. I am working as a “Rigging & Lifting Supervisor” with YAMGAZ Technip CHINA . ( YAMAL LNG PROJECT CHINA). I have successfully TILL DATE of service on the current project prior to safely project. Overall having completed 20 years of proven hands-on experience in my chosen field where my work involved in assisting with construction, pre-commissioning and commissioning in Oil,Gas,Power&ChemicalIndustry.steemproject,MOUDEL FABRICATION,TRANSEPORTING,LIFTING. Further, attached is my detailed resume which illustrates my strengths. Given an opportunity I shall be thankful and will discharge my duties to the utmost satisfaction of the management. Yours Sincerely, Amod Kumar Puri
  • 2. Page 2 of 8 AMOD KUMAR PURI LIFTING & RIGGING SUPERVISOR Amod Kumar Puri India : +91-9934277981 S/o: Mr.Parmanand Puri china:+86-13816410836 Village: Machhagar Jagadish Post : Machhagar Lachhiram Distt: Gopalganj State: Bihar INDIA - 841436 Email : amodkumarpuri@gmail.com amod_puri2009@rediffmail.com amodpuri@yahoo.com Seeking challenging assignments in Project Management / Erection & Commissioning with a growth oriented organization. Professional Synopsis  A dynamic professional with over 20 years of rich experience in Project Erection.  Presently working with Penglai Jutal Offshore Engineering Heavy Industries  CO.[PJOE] No.5 Harbin Road, Economic Development Zone, Penglai, Shandong, P,R.ofChina.265607  Christmas Party Feb-2015~ Present : YAMGAZ (Technip) China Project : YAMAL LNG Project (Penglai China) Designation : Rigging & Lifting Supervisor
  • 6. Page 6 of 8  Assisting the sub-contractor in preparation of Heavy Lifts / Jack-down /  Transportation of heavy equipment’s at laydown areas.  Inspecting all lifting tackles and accessories as per the approved project, standard procedures.  Ensuring that all rigging & lifting crews are provided with PPE and uses the same.  Communication with multi-national workforce in pro-active manner to ensure that daily rigging & lifting task are carried out safely and as per guidelines & project polices. Updating the same to management from time to time.  Assisting in project skill competency assessment of rigging crews.  Responsible for supervision of sub-contractors at pre-fabrication, fabrication and laydown areas with regard to rigging and lifting, The equipment consist of cranes from 50T Mobile telescopic cranes up to 1,250T lattice boom crawler cranes. Daily work tasks are carried out by over 100 rigging & lifting crew.  Supervision of steel structure loading/offloading, assembly & erection for LNG modules up to 6,000T and there load-out.  Daily coordinating with lifting equipment operators and ensuring that the lifting task are carried out safely and all equipment’s are in good working condition such as: Mobile cranes, crawlers cranes, EOT cranes, Forklifts.  EXPERIENCEPROFILE
  • 7. Page 7 of 8  Name of Company : Technip  Project : QG-PMP – Qatargas Plateau Maintenance Project  Position : Supervisor - Rigging and Lifting  Duration : 01 April 2012 ~ 31st August 2014.  Name of Company : Dodsal Engineering & Construction LLC  Project : New Skikda LNG Project(client Sonatrach /KBR Algeria  Position : Supervisor - Rigging and Lifting  Duration : 21 September 2010 to 07 January 2012  Name of Company : Dodsal Engineering & Construction LLC  Project : Qarn Alam Steam Project PDO ( Oman)  Position : Supervisor - Rigging and Lifting  Duration : December-2009 to 20 September 2010.  Name of Company : Dodsal Engineering & Construction LLC  Project : Ras Gas-2 Expansion Project Doha ( Qatar)  Position : Supervisor - Rigging and Lifting  Duration : July-2007 to May -2009.  Name of Company : Nasar Al- Hajri Doha Qatar  Project : Dolphin Onshore Facilities Project Doha Qatar.  Position : Foreman - Rigging and Lifting  Duration : February -2006 to March 2007.  Name of Company : Nasar Al- Hajri Doha Qatar  Project : Gas Liquid Project Qatar Ras-Laffan Industrial City  Position : Foreman - Rigging and Lifting  Duration : March 2005 to Feb 2006.  Name of Company : ELCO Co. LLC ( Oman)  Project : IHI Workshop Fabrication work for Sharjan Cement Factory Kiln No. 2.  Position : Foreman - Rigging and Lifting  Duration : Jan 2001 to Dec 2001.  Name of Company : ELCO Co. LLC ( Oman)  Project : Saffa, Yibal, Saihrawl, Salalah Port Pipe Line, Storage Tank, Vessel, Structure Fab.& Erection.  Position : Foreman - Rigging and Lifting
  • 8. Page 8 of 8  Duration : Oct 1996 to Aug-2004.  Name of Company : Royal Engineering Ltd.  Project : IOCL BXP Barauni ( Begusarai) India  Position : Rigging tools inspector  Duration : Jan 1995 to Aug-1996. Computer proficiency  MS Word  MS Excel  MS PowerPoint  MS outlook (internet knowledge)  ACADEMIC PROFILE / SKILLS ACADEMIC QUALIFICATION : 12th PASSED(1988 to1990) TECHNICAL QUALIFICATION : Diploma in (Mechanical)1990to1993) LANGUAGE KNOWN : English /Hindi/Arabic, CERTIFICATES / TRAININGS : •Scaffolding Inspector & Rigging : Velosi •Permit to Work Receiver ( Ras Gas / KBR and Chiyoda Technip Joint Venture) •Safety Training for Task Instructions ( KBR) Declaration: All the above mentioned statements are true and correct to the best of my knowledge; any reference if required shall be furnished. Amod Kumar Puri Date : 17 __/_07__/2016