SlideShare a Scribd company logo
1 of 6
Tivra Tarun
(B.E –Power Engineering)
Mobile No. : + 91-9748845410,9051455900
MailID : tivra.tarun111@gmail.com,tarun_aryan1@yahoo.co.in
Objective: -
Seeking challenging assignments in Project Procurement &
Management (Techno-Commercial), commercial & Contract Management.
Executive Synopsis
 Bachelor of Engineering in Power from National Power Training Institute, Nagpur with 9 year
varied experience in the Power Projects in both mode i.e. as a client or EPC Contractor:
 Working for India Power Corporation Ltd, Kolkata (Group Company of SREI Infrastructure
Finance Ltd.) in the post of manager and acting as Dy. Project Manager in the domain of Project
Procurement & Management (Techno-Commercial), Contract Management of 3x150 MW TPP
Project since 30th Nov.2013.
 Worked for Shristi Infrastructure Development Corporation Ltd, Kolkata (Group Company of
SREI Infrastructure Finance Ltd.) in the post of manager and acted as Dy. Project Manager in the
domain of Project Procurement & Management (Techno-Commercial), Contract Management from
Oct, 2010 to 30th Nov.13.
 Handled Project 3x150 MW Haldia TPP(ongoing), 2 x 270 MW Raghunathpur TPP (upcoming)
and 1 X 12 MW Dishergarh TPP (completed) as Manager -Project (Commercial & Contract
Management Domain) in various Group Company of SREI Infrastructure Finance Ltd
 Worked in Adhunik Power & Natural Resources Limited (APNRL), as Asst. Manager- Projects for
the Greenfield Thermal power plant project of capacity 540MW (2X270MW) TPP from June 2009 to
Oct, 2010.
 Worked with Manikgarh Cement a B.K Birla Group of company as Asst Manager- in the domain
of Operation & Maintenance since .6th Dec 2006.to Ist April 2009.
Organisation Experience:
Current Experience
1) From 30th
Nov. 2013 associated with India Power Corporation Ltd as Manager-Project & working
in the domain of Project Procurement & Management (Techno-Commercial), Contract
Management and Business Development:-
Job Description
• Preparation of Tender documents (technical and commercial) for BTG & BOP package, finalized scope of work
with technical departments. Issued requests for quotations to qualified vendors & Techno-commercial
evaluation of Bids of BTG & BOP packages
• Review all techno- commercial offers comprising BOQ (Bill of Quantity) and drawings of bidders and prepared
comparative analysis to determine compliance with technical specs, best price and delivery conditions and find
suitable vendors and suppliers
• Preparation of NFA (Note for Approval), Preparation & placement of order on the successful bidder
• Exposure to handle major Mechanical Packages specially of BTG & BOP from Tendering, Internal estimate,
Techno-commercial Discussions, Negotiation, Order Finalization, Post Order Issues
• Conducting progress review meetings, coordination meetings, reports, analysis of all components of project
management that are part of Project and product scope. The review is completely focused on target V/s
achievement.
• Developing and implementing strategic plans, risk monitoring, business development & schedules for project
execution with focus on optimum utilization of manpower and material.
• Providing site team with the required look ahead schedule and progress update in order to meet the project
schedule and planned progress milestones.
• Material dispatch & Manufacturing follow-up.
• Material tracking for ensuring timely availability of material at site before start of erection with proper co-
ordination with the vendors
• Coordination with Client , Technical Consultant and Vendors of BTG & BOP packages
• Preparation of periodic progress reports for Customer / Internal Management
• Manage the team in charge of the engineering scope of supply and/or services assigned to him/her. Also
responsible for continuous personnel development by identifying the need for training of the engineers for the
efficient and effective application of Engineering Methods
• Team lead for making all local procurement to support erection team at site.
Lenders engineering works
• Preparing of Monthly Progress Report, Quarterly Progress report for lenders engineers on regular basis.
• Preparing of Exceptional report for lenders engineers.
• Preparing of Complete Project Budget for lenders engineers on regular basis.
• Preparing of S curve
• Preparing presentation for lenders engineers.
Engineering Management
• Review and approval of basic detailed design documents of BTG & BOP (Mechanical Package) and other
mechanical packages
• Perform and check design calculations and drawings, prepare equipment datasheets, requisitions, carry out
technical bid evaluations and review vendor documents
• Ensuring engineering quality in the projects, limiting the number of revisions of drawings and strictly applying
the QA/QC process, design freeze process and change control process.
• Engineering Co-ordination between client, vendor and engineering consultant for timely release, bottlenecks &
approval of drawing & documents so as to meet manufacturing & project completion schedule.
Past Experience
2) From 20th Oct.2010 to 30th Nov.13. associated with SIDCL as Manager-Project & working in the
domain of Project Procurement & Management (Techno-Commercial), Contract Management
Job Responsibility:-
™ 1X12 MW TPP:
• Finalized Boiler, TG & BOP (Mechanical) Packages- Releasing enquiry, discussion pre-bid &
post bid, negotiation, preparation of NFA (Note for Approval), Preparation & placement of
order on the successful bidder.
• Coordination with Client (DPSCL), Technical Consultant (AKBPCPL) and Vendors of BTG & BOP
packages.
• Material dispatch & Manufacturing follow-up.
• Preparation of periodic progress reports for Customer / Internal Management.
• Mechanical Procurement pertaining to Power Plant Projects for Finalization of BTG & BOP
(Mechanical) Packages- Releasing enquiry, discussion pre-bid & post bid, negotiation,
preparation of NFA (Note for Approval), Preparation & placement of order on the successful
bidder of 1X 12 MW TPP
• Preparation of periodic progress reports for Customer / Internal Management. (Prepared
Executive Summary of all projects (both ongoing and upcoming) for CEO, SIDCL & IPCL for
onward submission to Board comprising Managing Director and Chairman.
• Prepare Monthly & Weekly Project Progress Report of various ongoing project.
• Providing continuous support to sites during execution in liaison with the Project Engineering
& construction.
• Resolving all technical problem / issue (all Mechanical packages for Power Block & BOP
including piping) at site during Erection phase in minimum time with co-ordination of
engineering team & supplier.
• Validating Erection document files for both Power Block & Balance of Plant for executing
erection at site.
• Co-ordination with engineering team / suppliers for all technical issue.
• Material tracking for ensuring timely availability of material at site before start of erection
with proper co-ordination with the vendors.
• Making local procurement at site for shortfall of erection material after validation to support
site erection.
• Responsible for contract closure of the packages ensuring delay analysis , material and
financial reconciliation and completion of scope as per contract. Ensured projects are
delivered on time, within budget and to the approved quality and advocating best safety
practices
™
™ 2X270 MW TPP:
• Project Management, Floating tenders for BOP Packages( EOT Crane, Cooling Tower,
Compressed Air System, CHP, AHP, CW & ACW Pumps, WTP & ETP etc.).
• Evaluating the offers (Technical & Commercial).
• Coordination with BHEL for submission of drawings/documents.
• Arbitration between SIDCL & BHEL
3) Since 2nd June 2009. To 15th
Oct.2010 associated with Adhunik Power & Natural Resources
Limited
Asst manager – Engineering & Contract Power Plant Project
Chief Tasks Handled
 Previously worked as a Assistant Manager-Project Procurement in the capacity of
power plant project of 1080MW (4X270MW) Thermal Power Plant of APNRL.
• One of the members of the Project Procurement Team for the Power Plant.
• Responsible for the release of enquiries, follow-up for offer submission and offer
evaluation of the tender-bids in stipulated time.
• Co-ordination with BHEL (BTG Supplier), BoP (Balance of Plant) vendors and DCPL
(Technical Consultant) in expediting clearance of drawing, document etc in
stipulated timeframe to meet the deadlines of the project
• Processing & Verification of BHEL Billing Breakup for different BHEL-Units and Bank
Guarantees (ABG, CPBG & PBG) for BOP packages
• Fair exposure in dealing with the financial and commercial aspects of Contract
Management of different packages.
• Project Management, Floating tenders for BTG & BOP Packages. BOP Packages
consist of EOT Crane, Cooling Tower, Compressed Air System, CHP, AHP, CW &
ACW Pumps, WTP & ETP, Air Conditioning& Ventilation System, Fire Detection &
Protection System, and Miscellaneous Pumps etc
• Engineering & Erection activity of Cooling Tower,CW & ACW system (Pump &
Pipeline)
• Involved in the overall approval of Mechanical drawings/document pertaining to
BTG as well as BOP packages.
4) Since .6th Dec 2006.to Ist April 2009 associated with Manikgarh Cement, a B.K Birla Group of
Company- Asst. Manager – Mechanical Operations & Maintenance
Chief Tasks Handled
• Managing the functions of troubleshooting and predictive/preventive/shutdown
maintenance for reducing machinery downtime to minimum.
• Conducting process audits; reviewing existing processes and re-designing the same for
enhancing operational efficacy and achieving maximum cost savings.
• Formulating maintenance budgets and conducting variance analysis to determine
difference between projected & actual results and implementing corrective actions.
• Developing and implementing plans & schedules for maintenance operations and
annual turn around with focus on optimum utilisation of manpower and material.
• Foreseeing performance bottlenecks and taking corrective measures to avoid the
same.
• Erection, commissioning of equipments, providing utility services to the equipments.
• Managing overall safety of plant operations and building a safe working culture.
Achievements
• Exposure from concept to commissioning of 1X12MW DPSCL Thermal Power Project viz PFR,
DPR, analyzing competent vendors of respective packages, release of enquiry, bid submission
and management, bid evaluation-commercial and technical, pre-bid and post-bid discussions,
negotiation and finalization of packages, Preparation of monthly &weekly report of project
status, Project Planning & Co-ordination with Client, Technical Consultant and bidders for
submission of drawings/documents, Material inspection & follow-up and Material dispatch in
sequence.
• Successfully completed ordering of BTG & BOP Packages (Mechanical) for 2X270MW Thermal
Power Project of APNRL within stipulated time frame.
• Getting a Reward from CEO i.e. “Project Trouble shooter Manager”
• Handled the operations of the 15MW Manikgarh Captive Power Plant.
• Oversaw the operation and maintenance of wide range of Mechanical systems and
equipments:
• Introduced Fly ash draining arrangement in ESP hopper.
• Separated the instrument air line from service air line of 15 MW TPP Plant.
• Provided suggestions to the HOD to arrange meeting during any breakdown in the shift with
the Shift Incharge and Shift Fitter.
• Received appreciation from Plant Head about fly ash draining system providing work in ESP
hopper.
Educational Credentials
• Graduation in Power Engineering from National Power Training Institute, Nagpur with 64.54%
marks in 2006
• XII-CBSE-54.4% from DAV, BSEB, Patna, Bihar in the year 2001.
• X- CBSE-64.5% from DAV, BSEB, Patna, Bihar in the year 1999.
Industrial Training
Organisation : Tata Power Company Ltd., Jamshedpur
Duration : One month
Description : Gone through the study of power plant familiarisation.
Organisation : NPTI, Nagpur (which is an exact replica of Khaperkheda Thermal Power Station)
Description : Undergone the Simulator Training on Fossil Fuel Fired Power Plant based Control
Room simulator and pulverized the Fuel Fired Boiler & KWU Steam Turbine.
Interest
 Looking forward to dynamic and challenging opportunity in the Middle Management Role for
Greenfield Power Plant Projects, rendering support and services in the domain of various aspects
of Projects from Optimum Design, Engineering, Operation, Strategy making, Project
Management and Construction of Power Plant Projects.
 Energy management & Energy Efficiency.
 Watching Movies & Listening Songs.
 Playing Cricket.
Computer-IT Exposure
Operating systems: Well versed with MS Office, Power point, Auto cad and C
Personal Details
Date of Birth : 9th
Oct.
Address : 3/D Tirath Mansion, Main Road Ranchi, Jharkhand-834001
Languages Known : English and Hindi
Declaration
I hereby declare that the above information is true and correct to the best of my knowledge.
Dated :- 9th
Oct. (Tivra Tarun)
Place:- Kolkata
• Graduation in Power Engineering from National Power Training Institute, Nagpur with 64.54%
marks in 2006
• XII-CBSE-54.4% from DAV, BSEB, Patna, Bihar in the year 2001.
• X- CBSE-64.5% from DAV, BSEB, Patna, Bihar in the year 1999.
Industrial Training
Organisation : Tata Power Company Ltd., Jamshedpur
Duration : One month
Description : Gone through the study of power plant familiarisation.
Organisation : NPTI, Nagpur (which is an exact replica of Khaperkheda Thermal Power Station)
Description : Undergone the Simulator Training on Fossil Fuel Fired Power Plant based Control
Room simulator and pulverized the Fuel Fired Boiler & KWU Steam Turbine.
Interest
 Looking forward to dynamic and challenging opportunity in the Middle Management Role for
Greenfield Power Plant Projects, rendering support and services in the domain of various aspects
of Projects from Optimum Design, Engineering, Operation, Strategy making, Project
Management and Construction of Power Plant Projects.
 Energy management & Energy Efficiency.
 Watching Movies & Listening Songs.
 Playing Cricket.
Computer-IT Exposure
Operating systems: Well versed with MS Office, Power point, Auto cad and C
Personal Details
Date of Birth : 9th
Oct.
Address : 3/D Tirath Mansion, Main Road Ranchi, Jharkhand-834001
Languages Known : English and Hindi
Declaration
I hereby declare that the above information is true and correct to the best of my knowledge.
Dated :- 9th
Oct. (Tivra Tarun)
Place:- Kolkata

More Related Content

What's hot

Khoirul Amal Mohd Hanafiah Piping Engineering Aug 2016
Khoirul Amal Mohd Hanafiah Piping Engineering Aug 2016Khoirul Amal Mohd Hanafiah Piping Engineering Aug 2016
Khoirul Amal Mohd Hanafiah Piping Engineering Aug 2016
Khoirul A'mal Mohd Hanafiah
 
Ali Abbas - Premises Engineer
Ali Abbas - Premises EngineerAli Abbas - Premises Engineer
Ali Abbas - Premises Engineer
Ali Abbas
 
Resume- Project Management Analyst
Resume- Project Management AnalystResume- Project Management Analyst
Resume- Project Management Analyst
Amol Gaikwad
 
Resume - Mrinal Thakur
Resume - Mrinal ThakurResume - Mrinal Thakur
Resume - Mrinal Thakur
Mrinal Thakur
 

What's hot (20)

Resume of Hariom
Resume of HariomResume of Hariom
Resume of Hariom
 
sounder
soundersounder
sounder
 
Sr.Mech.Design Engr. 30.03.15
Sr.Mech.Design Engr. 30.03.15Sr.Mech.Design Engr. 30.03.15
Sr.Mech.Design Engr. 30.03.15
 
CV Shreenivash Chandra
CV Shreenivash ChandraCV Shreenivash Chandra
CV Shreenivash Chandra
 
CV-Sidharth Sunny- Project Engineer
CV-Sidharth Sunny- Project EngineerCV-Sidharth Sunny- Project Engineer
CV-Sidharth Sunny- Project Engineer
 
CV
CVCV
CV
 
SANPPT
SANPPTSANPPT
SANPPT
 
Khoirul Amal Mohd Hanafiah Piping Engineering Aug 2016
Khoirul Amal Mohd Hanafiah Piping Engineering Aug 2016Khoirul Amal Mohd Hanafiah Piping Engineering Aug 2016
Khoirul Amal Mohd Hanafiah Piping Engineering Aug 2016
 
Sagar_cv
Sagar_cv Sagar_cv
Sagar_cv
 
Sachin Mohelay
Sachin MohelaySachin Mohelay
Sachin Mohelay
 
Subhash CV Dec 2016
Subhash CV Dec 2016Subhash CV Dec 2016
Subhash CV Dec 2016
 
Ali Abbas - Premises Engineer
Ali Abbas - Premises EngineerAli Abbas - Premises Engineer
Ali Abbas - Premises Engineer
 
Pradeep-CV
Pradeep-CVPradeep-CV
Pradeep-CV
 
Resume- Project Management Analyst
Resume- Project Management AnalystResume- Project Management Analyst
Resume- Project Management Analyst
 
CV Pholapatra Latest Rev 05
CV Pholapatra Latest Rev 05CV Pholapatra Latest Rev 05
CV Pholapatra Latest Rev 05
 
Imteyaz ahmad 12 yrs exp in MEP (Site / Project Management)
Imteyaz ahmad   12 yrs exp in MEP (Site / Project Management)Imteyaz ahmad   12 yrs exp in MEP (Site / Project Management)
Imteyaz ahmad 12 yrs exp in MEP (Site / Project Management)
 
Kristina M Klingler Resume
Kristina M Klingler ResumeKristina M Klingler Resume
Kristina M Klingler Resume
 
Resume - Mrinal Thakur
Resume - Mrinal ThakurResume - Mrinal Thakur
Resume - Mrinal Thakur
 
Amol-KulkarniResume
Amol-KulkarniResumeAmol-KulkarniResume
Amol-KulkarniResume
 
CV _ Azhar Ansari
CV _ Azhar AnsariCV _ Azhar Ansari
CV _ Azhar Ansari
 

Viewers also liked

Researching genres1
Researching genres1Researching genres1
Researching genres1
TCH4LK
 
中國最北村落北極村
中國最北村落北極村中國最北村落北極村
中國最北村落北極村
lys167
 
Radio ad conventions and codes
Radio ad conventions and codesRadio ad conventions and codes
Radio ad conventions and codes
krisleonard
 
美麗的俄羅斯
美麗的俄羅斯美麗的俄羅斯
美麗的俄羅斯
lys167
 
14283508 slides rese e apelacao
14283508 slides rese e apelacao14283508 slides rese e apelacao
14283508 slides rese e apelacao
edivanvc
 

Viewers also liked (20)

Researching genres1
Researching genres1Researching genres1
Researching genres1
 
Grupo 5
Grupo 5Grupo 5
Grupo 5
 
2016AcademicTranscript
2016AcademicTranscript2016AcademicTranscript
2016AcademicTranscript
 
中國最北村落北極村
中國最北村落北極村中國最北村落北極村
中國最北村落北極村
 
Lugares turísticos de ecuador
Lugares turísticos de ecuadorLugares turísticos de ecuador
Lugares turísticos de ecuador
 
Radio ad conventions and codes
Radio ad conventions and codesRadio ad conventions and codes
Radio ad conventions and codes
 
Docu questions
Docu questionsDocu questions
Docu questions
 
DEPORTE ARTE Y RECREACIÓN
DEPORTE ARTE Y RECREACIÓNDEPORTE ARTE Y RECREACIÓN
DEPORTE ARTE Y RECREACIÓN
 
美麗的俄羅斯
美麗的俄羅斯美麗的俄羅斯
美麗的俄羅斯
 
Trabajo en equipo nuevo
Trabajo en equipo  nuevoTrabajo en equipo  nuevo
Trabajo en equipo nuevo
 
Trabajo en equipo nuevo
Trabajo en equipo  nuevoTrabajo en equipo  nuevo
Trabajo en equipo nuevo
 
La Civilització Romana
La Civilització RomanaLa Civilització Romana
La Civilització Romana
 
14283508 slides rese e apelacao
14283508 slides rese e apelacao14283508 slides rese e apelacao
14283508 slides rese e apelacao
 
Net Neutrality
Net NeutralityNet Neutrality
Net Neutrality
 
B.ed
B.edB.ed
B.ed
 
Simplicity is called Dada.
Simplicity is called Dada.Simplicity is called Dada.
Simplicity is called Dada.
 
Thanksgiving
ThanksgivingThanksgiving
Thanksgiving
 
Guia empleo fmp97
Guia empleo fmp97Guia empleo fmp97
Guia empleo fmp97
 
La psicología forense.
La psicología forense.La psicología forense.
La psicología forense.
 
8 ноября 2015. Воскресное собрание Санкт-Петербургской церкви Христа
8 ноября 2015. Воскресное собрание Санкт-Петербургской церкви Христа8 ноября 2015. Воскресное собрание Санкт-Петербургской церкви Христа
8 ноября 2015. Воскресное собрание Санкт-Петербургской церкви Христа
 

Similar to TIVRA TARUN -Commercial & Contract

Resume_Lead Mechanical Engineer - Static Equipment and Package Units
Resume_Lead Mechanical Engineer - Static Equipment and Package UnitsResume_Lead Mechanical Engineer - Static Equipment and Package Units
Resume_Lead Mechanical Engineer - Static Equipment and Package Units
Nirav Mistry
 
raghavendra _CO-ORDINATOR(MEP)
raghavendra _CO-ORDINATOR(MEP)raghavendra _CO-ORDINATOR(MEP)
raghavendra _CO-ORDINATOR(MEP)
raghushashi tr
 
CV Planning Manager (Sundeep Khare)
CV Planning Manager (Sundeep Khare)CV Planning Manager (Sundeep Khare)
CV Planning Manager (Sundeep Khare)
sundeep khare
 
CV-Sidharth Sunny Project Engineer
CV-Sidharth Sunny Project EngineerCV-Sidharth Sunny Project Engineer
CV-Sidharth Sunny Project Engineer
Sidharth Sunny
 
Resume_Lead Mechanical Engineer - Static Equipment and Package Units
Resume_Lead Mechanical Engineer - Static Equipment and Package UnitsResume_Lead Mechanical Engineer - Static Equipment and Package Units
Resume_Lead Mechanical Engineer - Static Equipment and Package Units
Nirav Mistry
 
Suvajit_Resume
Suvajit_ResumeSuvajit_Resume
Suvajit_Resume
Jit Roy
 
BCA resume - Admin Cum Doc Cont (red1)
BCA resume - Admin Cum Doc Cont (red1)BCA resume - Admin Cum Doc Cont (red1)
BCA resume - Admin Cum Doc Cont (red1)
Benjan Amtipuesto
 
Resume - MOSTAFA SAYED (C.V)
Resume - MOSTAFA SAYED (C.V)Resume - MOSTAFA SAYED (C.V)
Resume - MOSTAFA SAYED (C.V)
Mostafa Sayed
 
ABDUL HAKEEM_PROJECT ENGINEER_RESUME
ABDUL HAKEEM_PROJECT ENGINEER_RESUMEABDUL HAKEEM_PROJECT ENGINEER_RESUME
ABDUL HAKEEM_PROJECT ENGINEER_RESUME
Abdul Hakeem
 
CURRICULUM VITAE-1 (2)
CURRICULUM VITAE-1 (2)CURRICULUM VITAE-1 (2)
CURRICULUM VITAE-1 (2)
Puneet Dogra
 

Similar to TIVRA TARUN -Commercial & Contract (20)

Sachin Mohelay
Sachin MohelaySachin Mohelay
Sachin Mohelay
 
Resume_Lead Mechanical Engineer - Static Equipment and Package Units
Resume_Lead Mechanical Engineer - Static Equipment and Package UnitsResume_Lead Mechanical Engineer - Static Equipment and Package Units
Resume_Lead Mechanical Engineer - Static Equipment and Package Units
 
raghavendra _CO-ORDINATOR(MEP)
raghavendra _CO-ORDINATOR(MEP)raghavendra _CO-ORDINATOR(MEP)
raghavendra _CO-ORDINATOR(MEP)
 
CV Planning Manager (Sundeep Khare)
CV Planning Manager (Sundeep Khare)CV Planning Manager (Sundeep Khare)
CV Planning Manager (Sundeep Khare)
 
CV hmsnegi
CV hmsnegiCV hmsnegi
CV hmsnegi
 
CV-Sidharth Sunny Project Engineer
CV-Sidharth Sunny Project EngineerCV-Sidharth Sunny Project Engineer
CV-Sidharth Sunny Project Engineer
 
Resume_Lead Mechanical Engineer - Static Equipment and Package Units
Resume_Lead Mechanical Engineer - Static Equipment and Package UnitsResume_Lead Mechanical Engineer - Static Equipment and Package Units
Resume_Lead Mechanical Engineer - Static Equipment and Package Units
 
Suvajit_Resume
Suvajit_ResumeSuvajit_Resume
Suvajit_Resume
 
BCA resume - Admin Cum Doc Cont (red1)
BCA resume - Admin Cum Doc Cont (red1)BCA resume - Admin Cum Doc Cont (red1)
BCA resume - Admin Cum Doc Cont (red1)
 
CV_Gaurav Mohite
CV_Gaurav MohiteCV_Gaurav Mohite
CV_Gaurav Mohite
 
RESUME_25_09_16
RESUME_25_09_16RESUME_25_09_16
RESUME_25_09_16
 
Resume - MOSTAFA SAYED (C.V)
Resume - MOSTAFA SAYED (C.V)Resume - MOSTAFA SAYED (C.V)
Resume - MOSTAFA SAYED (C.V)
 
Sathishkumar mechanical engineer - 2016
Sathishkumar   mechanical engineer - 2016Sathishkumar   mechanical engineer - 2016
Sathishkumar mechanical engineer - 2016
 
ABDUL HAKEEM_PROJECT ENGINEER_RESUME
ABDUL HAKEEM_PROJECT ENGINEER_RESUMEABDUL HAKEEM_PROJECT ENGINEER_RESUME
ABDUL HAKEEM_PROJECT ENGINEER_RESUME
 
CURRICULUM VITAE-1 (2)
CURRICULUM VITAE-1 (2)CURRICULUM VITAE-1 (2)
CURRICULUM VITAE-1 (2)
 
CV _ Md Badruddoza Biswas
CV _ Md Badruddoza BiswasCV _ Md Badruddoza Biswas
CV _ Md Badruddoza Biswas
 
Shiva-CV
Shiva-CVShiva-CV
Shiva-CV
 
Project Engineer
Project EngineerProject Engineer
Project Engineer
 
resume
resumeresume
resume
 
SANTHOSH KUMAR UP RCV
SANTHOSH KUMAR UP RCVSANTHOSH KUMAR UP RCV
SANTHOSH KUMAR UP RCV
 

TIVRA TARUN -Commercial & Contract

  • 1. Tivra Tarun (B.E –Power Engineering) Mobile No. : + 91-9748845410,9051455900 MailID : tivra.tarun111@gmail.com,tarun_aryan1@yahoo.co.in Objective: - Seeking challenging assignments in Project Procurement & Management (Techno-Commercial), commercial & Contract Management. Executive Synopsis  Bachelor of Engineering in Power from National Power Training Institute, Nagpur with 9 year varied experience in the Power Projects in both mode i.e. as a client or EPC Contractor:  Working for India Power Corporation Ltd, Kolkata (Group Company of SREI Infrastructure Finance Ltd.) in the post of manager and acting as Dy. Project Manager in the domain of Project Procurement & Management (Techno-Commercial), Contract Management of 3x150 MW TPP Project since 30th Nov.2013.  Worked for Shristi Infrastructure Development Corporation Ltd, Kolkata (Group Company of SREI Infrastructure Finance Ltd.) in the post of manager and acted as Dy. Project Manager in the domain of Project Procurement & Management (Techno-Commercial), Contract Management from Oct, 2010 to 30th Nov.13.  Handled Project 3x150 MW Haldia TPP(ongoing), 2 x 270 MW Raghunathpur TPP (upcoming) and 1 X 12 MW Dishergarh TPP (completed) as Manager -Project (Commercial & Contract Management Domain) in various Group Company of SREI Infrastructure Finance Ltd  Worked in Adhunik Power & Natural Resources Limited (APNRL), as Asst. Manager- Projects for the Greenfield Thermal power plant project of capacity 540MW (2X270MW) TPP from June 2009 to Oct, 2010.  Worked with Manikgarh Cement a B.K Birla Group of company as Asst Manager- in the domain of Operation & Maintenance since .6th Dec 2006.to Ist April 2009. Organisation Experience: Current Experience 1) From 30th Nov. 2013 associated with India Power Corporation Ltd as Manager-Project & working in the domain of Project Procurement & Management (Techno-Commercial), Contract Management and Business Development:- Job Description • Preparation of Tender documents (technical and commercial) for BTG & BOP package, finalized scope of work with technical departments. Issued requests for quotations to qualified vendors & Techno-commercial evaluation of Bids of BTG & BOP packages • Review all techno- commercial offers comprising BOQ (Bill of Quantity) and drawings of bidders and prepared comparative analysis to determine compliance with technical specs, best price and delivery conditions and find suitable vendors and suppliers • Preparation of NFA (Note for Approval), Preparation & placement of order on the successful bidder • Exposure to handle major Mechanical Packages specially of BTG & BOP from Tendering, Internal estimate, Techno-commercial Discussions, Negotiation, Order Finalization, Post Order Issues
  • 2. • Conducting progress review meetings, coordination meetings, reports, analysis of all components of project management that are part of Project and product scope. The review is completely focused on target V/s achievement. • Developing and implementing strategic plans, risk monitoring, business development & schedules for project execution with focus on optimum utilization of manpower and material. • Providing site team with the required look ahead schedule and progress update in order to meet the project schedule and planned progress milestones. • Material dispatch & Manufacturing follow-up. • Material tracking for ensuring timely availability of material at site before start of erection with proper co- ordination with the vendors • Coordination with Client , Technical Consultant and Vendors of BTG & BOP packages • Preparation of periodic progress reports for Customer / Internal Management • Manage the team in charge of the engineering scope of supply and/or services assigned to him/her. Also responsible for continuous personnel development by identifying the need for training of the engineers for the efficient and effective application of Engineering Methods • Team lead for making all local procurement to support erection team at site. Lenders engineering works • Preparing of Monthly Progress Report, Quarterly Progress report for lenders engineers on regular basis. • Preparing of Exceptional report for lenders engineers. • Preparing of Complete Project Budget for lenders engineers on regular basis. • Preparing of S curve • Preparing presentation for lenders engineers. Engineering Management • Review and approval of basic detailed design documents of BTG & BOP (Mechanical Package) and other mechanical packages • Perform and check design calculations and drawings, prepare equipment datasheets, requisitions, carry out technical bid evaluations and review vendor documents • Ensuring engineering quality in the projects, limiting the number of revisions of drawings and strictly applying the QA/QC process, design freeze process and change control process. • Engineering Co-ordination between client, vendor and engineering consultant for timely release, bottlenecks & approval of drawing & documents so as to meet manufacturing & project completion schedule. Past Experience 2) From 20th Oct.2010 to 30th Nov.13. associated with SIDCL as Manager-Project & working in the domain of Project Procurement & Management (Techno-Commercial), Contract Management Job Responsibility:- ™ 1X12 MW TPP: • Finalized Boiler, TG & BOP (Mechanical) Packages- Releasing enquiry, discussion pre-bid & post bid, negotiation, preparation of NFA (Note for Approval), Preparation & placement of order on the successful bidder. • Coordination with Client (DPSCL), Technical Consultant (AKBPCPL) and Vendors of BTG & BOP packages. • Material dispatch & Manufacturing follow-up. • Preparation of periodic progress reports for Customer / Internal Management. • Mechanical Procurement pertaining to Power Plant Projects for Finalization of BTG & BOP
  • 3. (Mechanical) Packages- Releasing enquiry, discussion pre-bid & post bid, negotiation, preparation of NFA (Note for Approval), Preparation & placement of order on the successful bidder of 1X 12 MW TPP • Preparation of periodic progress reports for Customer / Internal Management. (Prepared Executive Summary of all projects (both ongoing and upcoming) for CEO, SIDCL & IPCL for onward submission to Board comprising Managing Director and Chairman. • Prepare Monthly & Weekly Project Progress Report of various ongoing project. • Providing continuous support to sites during execution in liaison with the Project Engineering & construction. • Resolving all technical problem / issue (all Mechanical packages for Power Block & BOP including piping) at site during Erection phase in minimum time with co-ordination of engineering team & supplier. • Validating Erection document files for both Power Block & Balance of Plant for executing erection at site. • Co-ordination with engineering team / suppliers for all technical issue. • Material tracking for ensuring timely availability of material at site before start of erection with proper co-ordination with the vendors. • Making local procurement at site for shortfall of erection material after validation to support site erection. • Responsible for contract closure of the packages ensuring delay analysis , material and financial reconciliation and completion of scope as per contract. Ensured projects are delivered on time, within budget and to the approved quality and advocating best safety practices ™ ™ 2X270 MW TPP: • Project Management, Floating tenders for BOP Packages( EOT Crane, Cooling Tower, Compressed Air System, CHP, AHP, CW & ACW Pumps, WTP & ETP etc.). • Evaluating the offers (Technical & Commercial). • Coordination with BHEL for submission of drawings/documents. • Arbitration between SIDCL & BHEL 3) Since 2nd June 2009. To 15th Oct.2010 associated with Adhunik Power & Natural Resources Limited Asst manager – Engineering & Contract Power Plant Project Chief Tasks Handled  Previously worked as a Assistant Manager-Project Procurement in the capacity of power plant project of 1080MW (4X270MW) Thermal Power Plant of APNRL. • One of the members of the Project Procurement Team for the Power Plant. • Responsible for the release of enquiries, follow-up for offer submission and offer evaluation of the tender-bids in stipulated time. • Co-ordination with BHEL (BTG Supplier), BoP (Balance of Plant) vendors and DCPL (Technical Consultant) in expediting clearance of drawing, document etc in stipulated timeframe to meet the deadlines of the project • Processing & Verification of BHEL Billing Breakup for different BHEL-Units and Bank Guarantees (ABG, CPBG & PBG) for BOP packages • Fair exposure in dealing with the financial and commercial aspects of Contract Management of different packages. • Project Management, Floating tenders for BTG & BOP Packages. BOP Packages consist of EOT Crane, Cooling Tower, Compressed Air System, CHP, AHP, CW &
  • 4. ACW Pumps, WTP & ETP, Air Conditioning& Ventilation System, Fire Detection & Protection System, and Miscellaneous Pumps etc • Engineering & Erection activity of Cooling Tower,CW & ACW system (Pump & Pipeline) • Involved in the overall approval of Mechanical drawings/document pertaining to BTG as well as BOP packages. 4) Since .6th Dec 2006.to Ist April 2009 associated with Manikgarh Cement, a B.K Birla Group of Company- Asst. Manager – Mechanical Operations & Maintenance Chief Tasks Handled • Managing the functions of troubleshooting and predictive/preventive/shutdown maintenance for reducing machinery downtime to minimum. • Conducting process audits; reviewing existing processes and re-designing the same for enhancing operational efficacy and achieving maximum cost savings. • Formulating maintenance budgets and conducting variance analysis to determine difference between projected & actual results and implementing corrective actions. • Developing and implementing plans & schedules for maintenance operations and annual turn around with focus on optimum utilisation of manpower and material. • Foreseeing performance bottlenecks and taking corrective measures to avoid the same. • Erection, commissioning of equipments, providing utility services to the equipments. • Managing overall safety of plant operations and building a safe working culture. Achievements • Exposure from concept to commissioning of 1X12MW DPSCL Thermal Power Project viz PFR, DPR, analyzing competent vendors of respective packages, release of enquiry, bid submission and management, bid evaluation-commercial and technical, pre-bid and post-bid discussions, negotiation and finalization of packages, Preparation of monthly &weekly report of project status, Project Planning & Co-ordination with Client, Technical Consultant and bidders for submission of drawings/documents, Material inspection & follow-up and Material dispatch in sequence. • Successfully completed ordering of BTG & BOP Packages (Mechanical) for 2X270MW Thermal Power Project of APNRL within stipulated time frame. • Getting a Reward from CEO i.e. “Project Trouble shooter Manager” • Handled the operations of the 15MW Manikgarh Captive Power Plant. • Oversaw the operation and maintenance of wide range of Mechanical systems and equipments: • Introduced Fly ash draining arrangement in ESP hopper. • Separated the instrument air line from service air line of 15 MW TPP Plant. • Provided suggestions to the HOD to arrange meeting during any breakdown in the shift with the Shift Incharge and Shift Fitter. • Received appreciation from Plant Head about fly ash draining system providing work in ESP hopper. Educational Credentials
  • 5. • Graduation in Power Engineering from National Power Training Institute, Nagpur with 64.54% marks in 2006 • XII-CBSE-54.4% from DAV, BSEB, Patna, Bihar in the year 2001. • X- CBSE-64.5% from DAV, BSEB, Patna, Bihar in the year 1999. Industrial Training Organisation : Tata Power Company Ltd., Jamshedpur Duration : One month Description : Gone through the study of power plant familiarisation. Organisation : NPTI, Nagpur (which is an exact replica of Khaperkheda Thermal Power Station) Description : Undergone the Simulator Training on Fossil Fuel Fired Power Plant based Control Room simulator and pulverized the Fuel Fired Boiler & KWU Steam Turbine. Interest  Looking forward to dynamic and challenging opportunity in the Middle Management Role for Greenfield Power Plant Projects, rendering support and services in the domain of various aspects of Projects from Optimum Design, Engineering, Operation, Strategy making, Project Management and Construction of Power Plant Projects.  Energy management & Energy Efficiency.  Watching Movies & Listening Songs.  Playing Cricket. Computer-IT Exposure Operating systems: Well versed with MS Office, Power point, Auto cad and C Personal Details Date of Birth : 9th Oct. Address : 3/D Tirath Mansion, Main Road Ranchi, Jharkhand-834001 Languages Known : English and Hindi Declaration I hereby declare that the above information is true and correct to the best of my knowledge. Dated :- 9th Oct. (Tivra Tarun) Place:- Kolkata
  • 6. • Graduation in Power Engineering from National Power Training Institute, Nagpur with 64.54% marks in 2006 • XII-CBSE-54.4% from DAV, BSEB, Patna, Bihar in the year 2001. • X- CBSE-64.5% from DAV, BSEB, Patna, Bihar in the year 1999. Industrial Training Organisation : Tata Power Company Ltd., Jamshedpur Duration : One month Description : Gone through the study of power plant familiarisation. Organisation : NPTI, Nagpur (which is an exact replica of Khaperkheda Thermal Power Station) Description : Undergone the Simulator Training on Fossil Fuel Fired Power Plant based Control Room simulator and pulverized the Fuel Fired Boiler & KWU Steam Turbine. Interest  Looking forward to dynamic and challenging opportunity in the Middle Management Role for Greenfield Power Plant Projects, rendering support and services in the domain of various aspects of Projects from Optimum Design, Engineering, Operation, Strategy making, Project Management and Construction of Power Plant Projects.  Energy management & Energy Efficiency.  Watching Movies & Listening Songs.  Playing Cricket. Computer-IT Exposure Operating systems: Well versed with MS Office, Power point, Auto cad and C Personal Details Date of Birth : 9th Oct. Address : 3/D Tirath Mansion, Main Road Ranchi, Jharkhand-834001 Languages Known : English and Hindi Declaration I hereby declare that the above information is true and correct to the best of my knowledge. Dated :- 9th Oct. (Tivra Tarun) Place:- Kolkata