Bandra Worli Sea Link(BWSL) is the civil engineering
marvel spanning across the arc of Mumbai coastline .
•Started in 2000
•Opened in 2009
Reduces time
Regulation of traffic
Stress free driving
Reduces accidents and noise pollution
Use of M60 grade concrete
Largest span for cable stayed bridge
Dimensions
Material used
India’s first bridge in open sea conditions
An intelligent bridge management system (IBS)
provides traffic information, surveillance, monitoring
and control systems.
Partners involved were ultratech, TATA steel, VSL
Singapore, SPCC etc.
 The entire project was originally conceived as one large
project comprising, different components, but in order to
accelerate the overall construction schedule, the project
has been divided into five construction packages.
 Package I: Construction of flyover over Love Grove
junction at Worli.
 Package II: Construction of cloverleaf interchange at
Mahim intersection.
 Package III: Construction of solid approach road from the
Mahim intersection up to the start of the Toll Plaza on the
Bandra side.
 Package IV: Construction of Cable-Stayed Bridges
together with viaduct approaches extending from
Worli up to the Toll Plaza at Bandra end, Intelligent
Bridge System (IBS).
 Package V: Improvement to Khan Abdul Gaffar Khan
Road.
 Package IV is the largest and main phase of Bandra-
Worli Sea Link Project. Main features of this
technically challenging package are :
 Cable-Stayed Bridge including viaduct approaches
extending from Worli up to Toll Plaza at Bandra end.
 Modern Toll Plaza.
 The work order for work of construction of BWSL
bridge was issued to HCC for Rs.400.23 crore. The
completion time was stated as 30 months from the
date of notice to proceed with the work.
 The bridge layout is categorized into three different
parts:
 Part 1 - North-end approach structure.
 Part 2 - Cable-Stayed Bridge.
 Part 3 - South end approach structure.
 A modern toll plaza with 16 lanes is provided at the
Bandra end. The toll plaza is equipped with a state-
of-the-art toll collection system. A structure is
provided at this location to house the control system
for the ITS.
 Engineering Challenges
1) Laying of foundation
2) Heavy spans
3) Design of concrete tower
4) ground stabilization
Working during monsoon
Logistics
Psychological conditioning
 Change in design of the bridge
 Change in the contractors and the delay caused by
them.
 Estimated savings in Vehicle Operating Costs (VOC):
Rs. 100 Crores per annum.
 Considerable savings in travel time (20 to 30
minutes) due to increased speed and reduced delays
(23 signals avoided).
 Stress free driving.
 Reduced accidents.
 Reduction in traffic on existing roads because of
traffic diversion to the Sea Link.
 Reduction in Carbon Monoxide and Nitrogen Oxide
Levels in Mahim, Dadar, Prabhadevi and Worli along
existing roads.
 Reduced noise pollution in Mahim, Dadar,
Prabhadevi and Worli along existing roads.
 No adverse effect on fisheries, marine life and
livelihood of fisherman.
 Landscaping along the approaches and waterfront
promenade enhance the environment and add green
spots to the city.
 The cost of the Bandra-Worli Sea Link Project
originally (July 1999) estimated at Rs.665.81 crore
was revised (August 2004) to Rs.1,306.25 crore.
 Though the project was originally expected to be
completed by March 2003, the expected date of
completion is now stated to be April 2008.Delay were
mainly due technical changes brought up by new
consultants .
 The Company changed the design of the Worli bridge
to “Cable stay” from “Arch bridge” to align with the
bridge at Bandra, a decision, which could have been
taken at the initial stages itself.
 Against a commitment of Rs.580 crore by way of
grants, the State Government had provided only
Rs.100 crore till June 2007.
 The selection process of Consultant for the design
and project management work was defective, as the
Company did not verify the technical parameters as
projected by the Consultant.
 The Company did not levy Liquidated Damages
amounting to Rs.12.80 crore on the Contractor
(HCC) as per conditions of the contract despite
wrongful stoppage of work by them for 18 months
and non-achievement of milestones due to poor
progress of work.
Bandra worli sea link,Mumbai,Maharashtra,India

More Related Content

What's hot

Hyderabad metro rail – for a better livable city
Hyderabad metro rail – for a better livable cityHyderabad metro rail – for a better livable city
Hyderabad metro rail – for a better livable cityPramod Kumar
 
Presentation On Bandra Worli Sealink
Presentation On Bandra Worli SealinkPresentation On Bandra Worli Sealink
Presentation On Bandra Worli Sealinkpriyank123
 
Spaces below flyovers
Spaces below flyoversSpaces below flyovers
Spaces below flyoversAshok Datar
 
Charles correa - housing projects
Charles correa - housing projectsCharles correa - housing projects
Charles correa - housing projectsAarti Rani
 
Case study on steel structure Shrikant
Case study on steel structure  ShrikantCase study on steel structure  Shrikant
Case study on steel structure ShrikantShriKant49
 
Housing form transformation Pune
Housing form transformation PuneHousing form transformation Pune
Housing form transformation PuneRishikesh Kalal
 
Kochi Metro Rail Project.doc
Kochi Metro Rail Project.docKochi Metro Rail Project.doc
Kochi Metro Rail Project.docSuryadev Maity
 
Intermodal Passenger Station (IMPS)
Intermodal Passenger Station (IMPS)Intermodal Passenger Station (IMPS)
Intermodal Passenger Station (IMPS)Sayali Kargaonkar
 
Howrah bridge ppt
Howrah bridge pptHowrah bridge ppt
Howrah bridge pptSourav Roy
 
GATED COMMUNITY ARCHITECTURE THESIS CASE STUDY
GATED COMMUNITY ARCHITECTURE THESIS CASE STUDYGATED COMMUNITY ARCHITECTURE THESIS CASE STUDY
GATED COMMUNITY ARCHITECTURE THESIS CASE STUDYGeeva Chandana
 
Chenab Bridge, Jammu and Kashmir - Railway Technology
Chenab Bridge, Jammu and Kashmir - Railway TechnologyChenab Bridge, Jammu and Kashmir - Railway Technology
Chenab Bridge, Jammu and Kashmir - Railway TechnologyPradeep Kumar
 
Ulwe navi mumbai report 21257-22206-8979
Ulwe navi mumbai report 21257-22206-8979Ulwe navi mumbai report 21257-22206-8979
Ulwe navi mumbai report 21257-22206-8979Pradeep Methakar
 

What's hot (20)

Hyderabad metro rail – for a better livable city
Hyderabad metro rail – for a better livable cityHyderabad metro rail – for a better livable city
Hyderabad metro rail – for a better livable city
 
Presentation On Bandra Worli Sealink
Presentation On Bandra Worli SealinkPresentation On Bandra Worli Sealink
Presentation On Bandra Worli Sealink
 
L&T
L&TL&T
L&T
 
CHENAB BRIDGE
CHENAB BRIDGECHENAB BRIDGE
CHENAB BRIDGE
 
Geeta mandir bus port
Geeta mandir bus portGeeta mandir bus port
Geeta mandir bus port
 
Statue of unity case study
Statue of unity case studyStatue of unity case study
Statue of unity case study
 
Spaces below flyovers
Spaces below flyoversSpaces below flyovers
Spaces below flyovers
 
Charles correa - housing projects
Charles correa - housing projectsCharles correa - housing projects
Charles correa - housing projects
 
Bandra Worli Sealink
Bandra Worli SealinkBandra Worli Sealink
Bandra Worli Sealink
 
Case study on steel structure Shrikant
Case study on steel structure  ShrikantCase study on steel structure  Shrikant
Case study on steel structure Shrikant
 
Housing form transformation Pune
Housing form transformation PuneHousing form transformation Pune
Housing form transformation Pune
 
Kochi Metro Rail Project.doc
Kochi Metro Rail Project.docKochi Metro Rail Project.doc
Kochi Metro Rail Project.doc
 
Intermodal Passenger Station (IMPS)
Intermodal Passenger Station (IMPS)Intermodal Passenger Station (IMPS)
Intermodal Passenger Station (IMPS)
 
Howrah bridge ppt
Howrah bridge pptHowrah bridge ppt
Howrah bridge ppt
 
Signature bridge
Signature bridgeSignature bridge
Signature bridge
 
National rail museum
National rail museumNational rail museum
National rail museum
 
Pune Inner City
Pune Inner CityPune Inner City
Pune Inner City
 
GATED COMMUNITY ARCHITECTURE THESIS CASE STUDY
GATED COMMUNITY ARCHITECTURE THESIS CASE STUDYGATED COMMUNITY ARCHITECTURE THESIS CASE STUDY
GATED COMMUNITY ARCHITECTURE THESIS CASE STUDY
 
Chenab Bridge, Jammu and Kashmir - Railway Technology
Chenab Bridge, Jammu and Kashmir - Railway TechnologyChenab Bridge, Jammu and Kashmir - Railway Technology
Chenab Bridge, Jammu and Kashmir - Railway Technology
 
Ulwe navi mumbai report 21257-22206-8979
Ulwe navi mumbai report 21257-22206-8979Ulwe navi mumbai report 21257-22206-8979
Ulwe navi mumbai report 21257-22206-8979
 

Viewers also liked

Bandra Worli Bridge
Bandra Worli BridgeBandra Worli Bridge
Bandra Worli Bridgederebail2008
 
Bandra Worli Sea Link #BWSL
Bandra Worli Sea Link #BWSLBandra Worli Sea Link #BWSL
Bandra Worli Sea Link #BWSLPriyanka Dalal
 
incentives given by Maharastra govt to Enterpeneurs
incentives given by Maharastra govt to Enterpeneursincentives given by Maharastra govt to Enterpeneurs
incentives given by Maharastra govt to EnterpeneursJayendra Krishna
 
Bandra Worli Sealink
Bandra Worli SealinkBandra Worli Sealink
Bandra Worli SealinkDesignTeja
 
Blaise Diagne Airport
Blaise Diagne AirportBlaise Diagne Airport
Blaise Diagne Airportcgla
 
Solar Energy Presentation - OPEX / RESCO / BOOT with 100% Funding
Solar Energy Presentation -  OPEX / RESCO / BOOT with 100% FundingSolar Energy Presentation -  OPEX / RESCO / BOOT with 100% Funding
Solar Energy Presentation - OPEX / RESCO / BOOT with 100% FundingEnerco Energy Solutions LLP
 
Build,Operate,Own,Transfer (BOOT)
Build,Operate,Own,Transfer (BOOT)Build,Operate,Own,Transfer (BOOT)
Build,Operate,Own,Transfer (BOOT)Mohd. Ikhwan
 
Worldhighestrailwaybridge
Worldhighestrailwaybridge Worldhighestrailwaybridge
Worldhighestrailwaybridge Hakkim Shajahan
 
Tunnel T80 across Pir Panjal Mountain Range: The Longest Transportation Tunne...
Tunnel T80 across Pir Panjal Mountain Range: The Longest Transportation Tunne...Tunnel T80 across Pir Panjal Mountain Range: The Longest Transportation Tunne...
Tunnel T80 across Pir Panjal Mountain Range: The Longest Transportation Tunne...Hitesh Khanna
 

Viewers also liked (20)

Bandra worli sealink pdf
Bandra worli sealink pdfBandra worli sealink pdf
Bandra worli sealink pdf
 
Bandra Worli Bridge
Bandra Worli BridgeBandra Worli Bridge
Bandra Worli Bridge
 
Bandra Worli Sea Link #BWSL
Bandra Worli Sea Link #BWSLBandra Worli Sea Link #BWSL
Bandra Worli Sea Link #BWSL
 
Mumbai
MumbaiMumbai
Mumbai
 
Mmmodified copy
Mmmodified   copyMmmodified   copy
Mmmodified copy
 
B w sealink
B w sealinkB w sealink
B w sealink
 
incentives given by Maharastra govt to Enterpeneurs
incentives given by Maharastra govt to Enterpeneursincentives given by Maharastra govt to Enterpeneurs
incentives given by Maharastra govt to Enterpeneurs
 
Mirage - Rohan Lifescapes
Mirage - Rohan LifescapesMirage - Rohan Lifescapes
Mirage - Rohan Lifescapes
 
Vidhi seminar
Vidhi seminar Vidhi seminar
Vidhi seminar
 
Bandra Worli Sealink
Bandra Worli SealinkBandra Worli Sealink
Bandra Worli Sealink
 
Blaise Diagne Airport
Blaise Diagne AirportBlaise Diagne Airport
Blaise Diagne Airport
 
Solar Energy Presentation - OPEX / RESCO / BOOT with 100% Funding
Solar Energy Presentation -  OPEX / RESCO / BOOT with 100% FundingSolar Energy Presentation -  OPEX / RESCO / BOOT with 100% Funding
Solar Energy Presentation - OPEX / RESCO / BOOT with 100% Funding
 
Route Survey
Route SurveyRoute Survey
Route Survey
 
Build,Operate,Own,Transfer (BOOT)
Build,Operate,Own,Transfer (BOOT)Build,Operate,Own,Transfer (BOOT)
Build,Operate,Own,Transfer (BOOT)
 
Worldhighestrailwaybridge
Worldhighestrailwaybridge Worldhighestrailwaybridge
Worldhighestrailwaybridge
 
Kashmir rail project
Kashmir rail projectKashmir rail project
Kashmir rail project
 
Tunnel T80 across Pir Panjal Mountain Range: The Longest Transportation Tunne...
Tunnel T80 across Pir Panjal Mountain Range: The Longest Transportation Tunne...Tunnel T80 across Pir Panjal Mountain Range: The Longest Transportation Tunne...
Tunnel T80 across Pir Panjal Mountain Range: The Longest Transportation Tunne...
 
Handling of Concrete
Handling of ConcreteHandling of Concrete
Handling of Concrete
 
ADMIXTURE
ADMIXTUREADMIXTURE
ADMIXTURE
 
Riyadh Metro Presentation ADA
Riyadh Metro Presentation ADARiyadh Metro Presentation ADA
Riyadh Metro Presentation ADA
 

Similar to Bandra worli sea link,Mumbai,Maharashtra,India

Bandra worli sea link case study
Bandra worli sea link  case studyBandra worli sea link  case study
Bandra worli sea link case studyAKSHAY CHATURVEDI
 
Analysis and Review of EIA of Padma Multipurpose Bridge Project in Bangladesh
Analysis and Review of EIA of Padma Multipurpose Bridge Project in BangladeshAnalysis and Review of EIA of Padma Multipurpose Bridge Project in Bangladesh
Analysis and Review of EIA of Padma Multipurpose Bridge Project in BangladeshRituSaha3
 
Case Study on Mumbai Trans Harbor link
Case Study on Mumbai Trans Harbor linkCase Study on Mumbai Trans Harbor link
Case Study on Mumbai Trans Harbor linkAbhijeetTambade3
 
Training report done on Bridge Construction
Training report done on Bridge ConstructionTraining report done on Bridge Construction
Training report done on Bridge ConstructionSukhdeep Jat
 
Padma Brige Project 2017
Padma Brige Project 2017Padma Brige Project 2017
Padma Brige Project 2017RJ Sajeeb
 
Padma bridge
Padma bridgePadma bridge
Padma bridgemsnsela
 
electronic city elevated highway project.
electronic city elevated highway project. electronic city elevated highway project.
electronic city elevated highway project. MILAN JOSEPH
 
EASTERN PERIPHERAL EXPRESSWAY REPORT
EASTERN PERIPHERAL EXPRESSWAY REPORTEASTERN PERIPHERAL EXPRESSWAY REPORT
EASTERN PERIPHERAL EXPRESSWAY REPORTATUL SHUKLA
 
Status of roads in nairobi by ps mo r 2nd august 2012
Status of roads in nairobi  by ps mo r 2nd august 2012Status of roads in nairobi  by ps mo r 2nd august 2012
Status of roads in nairobi by ps mo r 2nd august 2012Functional Eco
 
General Project report standing abrevation stock fy mou rt if olc hgf hhb h ...
General Project report standing abrevation stock fy mou rt if olc hgf  hhb h ...General Project report standing abrevation stock fy mou rt if olc hgf  hhb h ...
General Project report standing abrevation stock fy mou rt if olc hgf hhb h ...r66025007
 
AjayasankarK M _ Engineer
AjayasankarK M _ EngineerAjayasankarK M _ Engineer
AjayasankarK M _ EngineerAjay Sankar
 
gammon report by priyanshu kumar, 9608684800
gammon report by priyanshu kumar, 9608684800gammon report by priyanshu kumar, 9608684800
gammon report by priyanshu kumar, 9608684800PRIYANSHU KUMAR
 
PM Project group 4.pptx
PM Project group 4.pptxPM Project group 4.pptx
PM Project group 4.pptxKumarAnand99
 
IRJET- Analysis of Construction in Terms of Sustainability in Sagar City Ring...
IRJET- Analysis of Construction in Terms of Sustainability in Sagar City Ring...IRJET- Analysis of Construction in Terms of Sustainability in Sagar City Ring...
IRJET- Analysis of Construction in Terms of Sustainability in Sagar City Ring...IRJET Journal
 

Similar to Bandra worli sea link,Mumbai,Maharashtra,India (20)

Bandra worli sea link case study
Bandra worli sea link  case studyBandra worli sea link  case study
Bandra worli sea link case study
 
Analysis and Review of EIA of Padma Multipurpose Bridge Project in Bangladesh
Analysis and Review of EIA of Padma Multipurpose Bridge Project in BangladeshAnalysis and Review of EIA of Padma Multipurpose Bridge Project in Bangladesh
Analysis and Review of EIA of Padma Multipurpose Bridge Project in Bangladesh
 
Case Study on Mumbai Trans Harbor link
Case Study on Mumbai Trans Harbor linkCase Study on Mumbai Trans Harbor link
Case Study on Mumbai Trans Harbor link
 
Paper
PaperPaper
Paper
 
Training report done on Bridge Construction
Training report done on Bridge ConstructionTraining report done on Bridge Construction
Training report done on Bridge Construction
 
Padma Brige Project 2017
Padma Brige Project 2017Padma Brige Project 2017
Padma Brige Project 2017
 
CV Sriinivas 1i doc
CV Sriinivas 1i docCV Sriinivas 1i doc
CV Sriinivas 1i doc
 
Padma bridge
Padma bridgePadma bridge
Padma bridge
 
VCS Resume_May 2015
VCS Resume_May 2015VCS Resume_May 2015
VCS Resume_May 2015
 
electronic city elevated highway project.
electronic city elevated highway project. electronic city elevated highway project.
electronic city elevated highway project.
 
EASTERN PERIPHERAL EXPRESSWAY REPORT
EASTERN PERIPHERAL EXPRESSWAY REPORTEASTERN PERIPHERAL EXPRESSWAY REPORT
EASTERN PERIPHERAL EXPRESSWAY REPORT
 
CAREER LAND MARKS
CAREER LAND MARKSCAREER LAND MARKS
CAREER LAND MARKS
 
Status of roads in nairobi by ps mo r 2nd august 2012
Status of roads in nairobi  by ps mo r 2nd august 2012Status of roads in nairobi  by ps mo r 2nd august 2012
Status of roads in nairobi by ps mo r 2nd august 2012
 
BMRCL In-Plant Training Report
BMRCL In-Plant Training ReportBMRCL In-Plant Training Report
BMRCL In-Plant Training Report
 
General Project report standing abrevation stock fy mou rt if olc hgf hhb h ...
General Project report standing abrevation stock fy mou rt if olc hgf  hhb h ...General Project report standing abrevation stock fy mou rt if olc hgf  hhb h ...
General Project report standing abrevation stock fy mou rt if olc hgf hhb h ...
 
AjayasankarK M _ Engineer
AjayasankarK M _ EngineerAjayasankarK M _ Engineer
AjayasankarK M _ Engineer
 
Nl infrastructure oct 3 - oct 9, 2015
Nl infrastructure oct 3 - oct 9, 2015Nl infrastructure oct 3 - oct 9, 2015
Nl infrastructure oct 3 - oct 9, 2015
 
gammon report by priyanshu kumar, 9608684800
gammon report by priyanshu kumar, 9608684800gammon report by priyanshu kumar, 9608684800
gammon report by priyanshu kumar, 9608684800
 
PM Project group 4.pptx
PM Project group 4.pptxPM Project group 4.pptx
PM Project group 4.pptx
 
IRJET- Analysis of Construction in Terms of Sustainability in Sagar City Ring...
IRJET- Analysis of Construction in Terms of Sustainability in Sagar City Ring...IRJET- Analysis of Construction in Terms of Sustainability in Sagar City Ring...
IRJET- Analysis of Construction in Terms of Sustainability in Sagar City Ring...
 

Recently uploaded

Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Christo Ananth
 
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).pptssuser5c9d4b1
 
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...RajaP95
 
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Serviceranjana rawat
 
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130Suhani Kapoor
 
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and workingUNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and workingrknatarajan
 
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICSHARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICSRajkumarAkumalla
 
Introduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxIntroduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxupamatechverse
 
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxDecoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxJoão Esperancinha
 
SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )Tsuyoshi Horigome
 
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCollege Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCall Girls in Nagpur High Profile
 
the ladakh protest in leh ladakh 2024 sonam wangchuk.pptx
the ladakh protest in leh ladakh 2024 sonam wangchuk.pptxthe ladakh protest in leh ladakh 2024 sonam wangchuk.pptx
the ladakh protest in leh ladakh 2024 sonam wangchuk.pptxhumanexperienceaaa
 
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...Soham Mondal
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Dr.Costas Sachpazis
 
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)Suman Mia
 
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service NashikCall Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service NashikCall Girls in Nagpur High Profile
 
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escortsranjana rawat
 
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...ranjana rawat
 

Recently uploaded (20)

Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
 
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
 
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...
 
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
 
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
 
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and workingUNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
 
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICSHARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
 
Introduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxIntroduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptx
 
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxDecoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
 
SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )
 
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCollege Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
 
the ladakh protest in leh ladakh 2024 sonam wangchuk.pptx
the ladakh protest in leh ladakh 2024 sonam wangchuk.pptxthe ladakh protest in leh ladakh 2024 sonam wangchuk.pptx
the ladakh protest in leh ladakh 2024 sonam wangchuk.pptx
 
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
 
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
 
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
 
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service NashikCall Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
 
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
 
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
 

Bandra worli sea link,Mumbai,Maharashtra,India

  • 1. Submitted By: Sulakshya Gaur(121684) Aayush Mittal(121685) Harshit Thakur(121689) Rajat Bhardwaj(121696) Puneet Goyal(121699)
  • 2. Bandra Worli Sea Link(BWSL) is the civil engineering marvel spanning across the arc of Mumbai coastline . •Started in 2000 •Opened in 2009
  • 3. Reduces time Regulation of traffic Stress free driving Reduces accidents and noise pollution
  • 4. Use of M60 grade concrete Largest span for cable stayed bridge Dimensions Material used India’s first bridge in open sea conditions An intelligent bridge management system (IBS) provides traffic information, surveillance, monitoring and control systems. Partners involved were ultratech, TATA steel, VSL Singapore, SPCC etc.
  • 5.
  • 6.  The entire project was originally conceived as one large project comprising, different components, but in order to accelerate the overall construction schedule, the project has been divided into five construction packages.  Package I: Construction of flyover over Love Grove junction at Worli.  Package II: Construction of cloverleaf interchange at Mahim intersection.  Package III: Construction of solid approach road from the Mahim intersection up to the start of the Toll Plaza on the Bandra side.
  • 7.  Package IV: Construction of Cable-Stayed Bridges together with viaduct approaches extending from Worli up to the Toll Plaza at Bandra end, Intelligent Bridge System (IBS).  Package V: Improvement to Khan Abdul Gaffar Khan Road.
  • 8.  Package IV is the largest and main phase of Bandra- Worli Sea Link Project. Main features of this technically challenging package are :  Cable-Stayed Bridge including viaduct approaches extending from Worli up to Toll Plaza at Bandra end.  Modern Toll Plaza.
  • 9.  The work order for work of construction of BWSL bridge was issued to HCC for Rs.400.23 crore. The completion time was stated as 30 months from the date of notice to proceed with the work.  The bridge layout is categorized into three different parts:  Part 1 - North-end approach structure.  Part 2 - Cable-Stayed Bridge.  Part 3 - South end approach structure.
  • 10.  A modern toll plaza with 16 lanes is provided at the Bandra end. The toll plaza is equipped with a state- of-the-art toll collection system. A structure is provided at this location to house the control system for the ITS.
  • 11.  Engineering Challenges 1) Laying of foundation 2) Heavy spans 3) Design of concrete tower 4) ground stabilization
  • 13.  Change in design of the bridge  Change in the contractors and the delay caused by them.
  • 14.
  • 15.  Estimated savings in Vehicle Operating Costs (VOC): Rs. 100 Crores per annum.  Considerable savings in travel time (20 to 30 minutes) due to increased speed and reduced delays (23 signals avoided).  Stress free driving.  Reduced accidents.  Reduction in traffic on existing roads because of traffic diversion to the Sea Link.
  • 16.  Reduction in Carbon Monoxide and Nitrogen Oxide Levels in Mahim, Dadar, Prabhadevi and Worli along existing roads.  Reduced noise pollution in Mahim, Dadar, Prabhadevi and Worli along existing roads.  No adverse effect on fisheries, marine life and livelihood of fisherman.  Landscaping along the approaches and waterfront promenade enhance the environment and add green spots to the city.
  • 17.
  • 18.  The cost of the Bandra-Worli Sea Link Project originally (July 1999) estimated at Rs.665.81 crore was revised (August 2004) to Rs.1,306.25 crore.  Though the project was originally expected to be completed by March 2003, the expected date of completion is now stated to be April 2008.Delay were mainly due technical changes brought up by new consultants .
  • 19.  The Company changed the design of the Worli bridge to “Cable stay” from “Arch bridge” to align with the bridge at Bandra, a decision, which could have been taken at the initial stages itself.  Against a commitment of Rs.580 crore by way of grants, the State Government had provided only Rs.100 crore till June 2007.
  • 20.  The selection process of Consultant for the design and project management work was defective, as the Company did not verify the technical parameters as projected by the Consultant.  The Company did not levy Liquidated Damages amounting to Rs.12.80 crore on the Contractor (HCC) as per conditions of the contract despite wrongful stoppage of work by them for 18 months and non-achievement of milestones due to poor progress of work.

Editor's Notes

  1. Though Packages-I, II and III i.e. flyover at Worli, Mahim Intersection, Solid approach road up to the start of toll plaza and a public promenade were completed (February 2003), the crucial Package-IV i.e. the main cable stayed bridge across the sea was delayed. The increase in project cost was mainly due to payments of escalation (Rs.213 crore) to Contractors on account of inordinate delay in completion (61 months), introduction of new technical changes in the bridge at the behest of the new Consultant (Rs.70 crore), provision for additional claims made by the Contractor for delay in award of work etc. (Rs.125 crore) and increase in interest liability due to delayed completion (Rs.230 crore).
  2. . This not only increased the cost by Rs.70 crore but also delayed completion of the works of Package-IV. Further, the Consultant was wrongly paid Rs.2.50 crore on account of deleted work.