INTRODUCTION
• Narendra Modi first announced the project to Sardar Vallabhbhai Patel on
7 October 2010 at a press conference.
• The Statue of Unity India’s first deputy prime minister Sardar Vallabhbhai Patel.
• It is situated near the Sardar Sarovar dam in the state of Gujarat.
• The Statue of Unity, a statue of Sardar Vallabhbhai Patel, is the world’s tallest
statue at 182 meters in height.
• It will be constructed at the Sadhu-Bet Island, 3.5 kilometers south of Sardar
sarovar Dam at Kevadia in the Narmada district of Gujarat, India.
• To initiate the design and construction,
a joint venture (JV) - 2011 for combined design, and project and construction
management (PM-CM) services.
• The main contractor bid process was completed on October 27, 2014, contract was awarded to L&T Ltd.
Chennai.
• As of the writing of this paper, additional geotechnical testing of the hillock has been completed and the
leveling of the hillock has started in March of 2015.
• The construction of the Statue of Unity was completed in 2018.
• The structure has an irregular curved form that is larger at the top than at the base, requiring a unique but
simple and constructible structural system.
• The statue is a structural system comprising of two semi-elliptical reinforced concrete cores.
• It also has a reinforced concrete podium that acts as a base for the statue clad in bronze, supported by
structural steelwork fixed on to the concrete cores.
The Tallest statue in the World:
• Sculptor Ram Suthar, made a few replicas of the Sardar Vallabhbhai Patel statue and created a 30-feet bronze
one that was scanned into electronic data to make the 59.7-feet (182 meters) Sardar Patel statue.
• Statue of Unity’ (SOU) is dedicated to the Iron Man of India, Sardar Vallabhbhai Patel. Sardar Patel is widely
considered to be the architect of modern India.
• The SoU will stand tall as an inspiration to future generations, a reminder of Sardar Patel’s sterling
contribution. At 182 meters from the road entry and 208.5 meters from the river entry, the SoU will be the
tallest statue in the world; taller than the 153 m tall Spring Temple Buddha in China and almost twice as tall
as the world famous Statue of Liberty in New York.
1. Site Location:
• The Statue of Unity is situated on a strong rock on the banks of the river Narmada in Gujarat, India. It is 90
kilometers south of the city of Vadodara and around 3 kilometers downstream of the Sardar Sarovar dam.
Features of Sardar Patel Statue:
• A 320 m long designer bridge connecting Sadhu Hill to the mainland
• A memorial and visitors’ centre
• 4-lane approach road
• An administrative complex, 3-star hotel and conference centre
• A 40-m suspended fabric roof structure for the visitors’ centre
• Shrestha Bharat bhavan – conference centre
Escalators at the base of Statue of Unity
Travellators at Statue of Unity and Bridge
connecting SoU to the main road.
Contemplative Memorial Garden on Gallery
Base roof and road
Sardar’s sculpture at SoU Exhibition
Gallery
Viewing gallery and road from
Kevadiya.
Main bridge connecting Memorial &
Visiting Centre and Sadhu Bet Island
Engineering Challenges:
• Statue of Unity does not have a wider base. wider base is required to structure stable. Patel wore a dhoti, the
statue is thick the top & thinner at bottom. This challenge was overcome by keeping the slenderness ratio
between the width of the statue and its height to 16:19, significantly higher than the 8:14 ratio rule that is
followed in the construction of high-rise structures.
• Speed of wind, and the possibility of earthquakes and flood. built on island in the middle of Narmada, the
statue face the tunnel effect of winds blowing down the river.
• The walking pose of the statue opened a gap of 6.4 meters between the two feet. the cladding used in the
statue has overlapping panels, which allow it to move vertically and horizontally, to resist earthquake
and wind forces.
• Two 250-tonne mass dampers, which are installed in structures to reduce the amplitude of vibrations,
have been used. As a result, the statue is capable of withstanding wind blowing at almost 220 km per
hour.
• The statue’s location between mountainous terrain made transportation of equipment and material
difficult. A rock bridge was built over shallow water and a temporary Bailey bridge was constructed for
the monsoon.
2.Geology of the Site:
• Team of engineers is conducting a geological survey of the site of the Statue of Unity after a detailed report of
the geological survey, the work on laying the foundation.
• A team of engineers of the Turner Construction, Michael Graves and Associates and the Meinhardt Group
geological soil survey.
• The nature of the strata of the soil where the raft foundation of the statue will be constructed.
• At the site said that the quartzite hillock will see a foundation of about 52 meters for which the geological
tests are being carried out.
• According to the data available with the SVPRET, for the raft foundation for the monument, the
recommended safe bearing capacity is 2,300 KPa. The site has already been termed safe from seismic
hazards.
• Advanced slicing technology will be used to shape the base so as to prevent any disturbance to the base of the
hillock due to blasting.
• Primarily, a built-up rock bridge which is constructed at the normal flood level, and then a Bailey bridge that
is built above the high flood levels.
• The Bailey bridge has two lanes, one dedicated to vehicle and material movement, and the second one for
access to workers.
3.Material required for construction:
• The statue is located at a remote location, therefore, the material delivery, staging, and erection posed unique
challenges for the project.
• The ordinary portland cement used is of the grade 53.
• The concrete was supplied by two batching plants of 56 m3 per hour capacity.
• The structural steel was supplied by Tata Steel and SAIL.
• Additionally, the composite cores of statue, suspended space frame, cladding substructure, and podium
framing required 6500 tonnes of structural steel with a minimum grade of 355 MPa.
• The structural steel in the cores and space frame of the statue is comprised of W-360 I-shaped sections.
• As a part of the ‘Loha’ campaign, iron tools were collected from farmers across the country with the intent of
it being melted and converted into rebars for use in the foundation.
4. Structural system of statue of unity:-
The main structural components of the statue of unity consist of the base and the core walls.
 Base Of The Statue:-
• The base of the statue was constructed on shallow foundation(i.e. raft foundation) supported over a strong
rock.
• The level of base differs from +45 m to +52.5 m.
• The ground floor is at +58 m level.it is made of structural slabs supported by columns and walls.
• Both concrete and steel were used thoroughly from +58 m level to +83 m level.
• The slab at +78 m, +83 m and inclined roofings are made of composite deck slab resting on structural beam
and trusses.
 Core Walls:
• Two primary vertical core walls of the statue are elliptical in shape. The dimension
of the core walls are 11.30 x 8.40 m .
• The elliptical core walls basically starts from +56.575 m level and continues up to
+209.50 m level.
• The coupling wall is linked to the core walls from +115 m level to +193 m level.
• Core walls confined by an external oval concrete wall up to the podium level +83 m.
• Above the podium level, where the faced geometry statue appears, the core are
coupled together with two R.C wall known as coupling wall up to the entire heights of
core walls.
• The thickness of core wall is continuous throughout the height , the thickness of
the coupling wall waries from 0.55 m and 1.33 m.
5. construction:
• A Consortium comprising Turner Construction, Michael Graves and Associates and the Meinhardt Group
supervised the project. It took 56 months to complete – 15 months for planning, 40 months for construction
and two months for handing over by the consortium.
• The total cost of the project was estimated to be about 20.63 billion (US$290 million) by the government. The
tender bids for the first phase were invited in October 2013 and were closed in November 2013.
• Indian infrastructure company Larsen & Toubro won the contract on 27 October 2014 for its lowest bid of
29.89 billion (US$420 million) for the design, construction and maintenance. They commenced the
construction on 31 October 2014.
• In the first phase of the project, 13.47 billion were for the main statue, 2.35 billion for the exhibition hall and
convention centre, 830 million for the bridge connecting the memorial to the mainland and 6.57 billion for the
maintenance of the structure for 15 years after its completion.
• The bronze panels were cast in Jiangxi Tongqing Metal Handicrafts Co. Ltd (the TQ Art foundry) in China as
suitable facilities were unavailable in India.
• The bronze panels were transported over sea and then by road to the workshop near the construction site
where they were assembled.
• The outer façade is made up of 1700 tonnes of bronze plates and 1850 tonnes of bronze cladding which in
turn comprise 565 macro and 6000 micro panels.
THANK YOU

More Related Content

What's hot

Case Study Of Haridwar
Case Study Of HaridwarCase Study Of Haridwar
Case Study Of HaridwarAnshSharma106
 
1.4 town planning ancient india vedic buddha period
1.4 town planning ancient india vedic buddha period1.4 town planning ancient india vedic buddha period
1.4 town planning ancient india vedic buddha periodSachin PatiL
 
Architecture history of the parliament house
Architecture history of the parliament houseArchitecture history of the parliament house
Architecture history of the parliament houseSAYED HARUN
 
Belapur Incremental housing - A case study
Belapur Incremental housing - A case studyBelapur Incremental housing - A case study
Belapur Incremental housing - A case studyRithika Ravishankar
 
A study report on Kutch-Bhuj
A study report on Kutch-BhujA study report on Kutch-Bhuj
A study report on Kutch-BhujYajush Sonar
 
Howrah bridge ppt
Howrah bridge pptHowrah bridge ppt
Howrah bridge pptSourav Roy
 
LAURIE BAKER CENTER FOR HABITAT STUDIES, DESIGN ANALYSIS
LAURIE BAKER CENTER FOR HABITAT STUDIES, DESIGN ANALYSISLAURIE BAKER CENTER FOR HABITAT STUDIES, DESIGN ANALYSIS
LAURIE BAKER CENTER FOR HABITAT STUDIES, DESIGN ANALYSISSHASHWATSHARMA57
 
Case study hastha shilpa heritage village
Case study hastha shilpa heritage villageCase study hastha shilpa heritage village
Case study hastha shilpa heritage villagemichellesahay
 
KINGDOM TOWER JEDDAH TOWER
KINGDOM TOWER JEDDAH TOWERKINGDOM TOWER JEDDAH TOWER
KINGDOM TOWER JEDDAH TOWERMOHAMMED JIRUWALA
 
INTACH.pptx
INTACH.pptxINTACH.pptx
INTACH.pptxnamePPS
 
Beijing railway railway atation
Beijing railway railway atationBeijing railway railway atation
Beijing railway railway atationSneha Lata
 
IT parks in india
IT parks in indiaIT parks in india
IT parks in indiaankur bhalla
 
Site Visit Report
Site Visit ReportSite Visit Report
Site Visit ReportXinYee Khoo
 

What's hot (20)

Case Study Of Haridwar
Case Study Of HaridwarCase Study Of Haridwar
Case Study Of Haridwar
 
1.4 town planning ancient india vedic buddha period
1.4 town planning ancient india vedic buddha period1.4 town planning ancient india vedic buddha period
1.4 town planning ancient india vedic buddha period
 
Udcpr Maharashtra
Udcpr  MaharashtraUdcpr  Maharashtra
Udcpr Maharashtra
 
Architecture history of the parliament house
Architecture history of the parliament houseArchitecture history of the parliament house
Architecture history of the parliament house
 
Petronas towers
Petronas towersPetronas towers
Petronas towers
 
Belapur Incremental housing - A case study
Belapur Incremental housing - A case studyBelapur Incremental housing - A case study
Belapur Incremental housing - A case study
 
GRIHA
GRIHAGRIHA
GRIHA
 
A study report on Kutch-Bhuj
A study report on Kutch-BhujA study report on Kutch-Bhuj
A study report on Kutch-Bhuj
 
Howrah bridge ppt
Howrah bridge pptHowrah bridge ppt
Howrah bridge ppt
 
LAURIE BAKER CENTER FOR HABITAT STUDIES, DESIGN ANALYSIS
LAURIE BAKER CENTER FOR HABITAT STUDIES, DESIGN ANALYSISLAURIE BAKER CENTER FOR HABITAT STUDIES, DESIGN ANALYSIS
LAURIE BAKER CENTER FOR HABITAT STUDIES, DESIGN ANALYSIS
 
Case study hastha shilpa heritage village
Case study hastha shilpa heritage villageCase study hastha shilpa heritage village
Case study hastha shilpa heritage village
 
KINGDOM TOWER JEDDAH TOWER
KINGDOM TOWER JEDDAH TOWERKINGDOM TOWER JEDDAH TOWER
KINGDOM TOWER JEDDAH TOWER
 
INTACH.pptx
INTACH.pptxINTACH.pptx
INTACH.pptx
 
Beijing railway railway atation
Beijing railway railway atationBeijing railway railway atation
Beijing railway railway atation
 
IT parks in india
IT parks in indiaIT parks in india
IT parks in india
 
Site Visit Report
Site Visit ReportSite Visit Report
Site Visit Report
 
B.v doshi
B.v doshiB.v doshi
B.v doshi
 
Tokyo Sky Tree
Tokyo Sky TreeTokyo Sky Tree
Tokyo Sky Tree
 
Matrimandir final
Matrimandir finalMatrimandir final
Matrimandir final
 
Agraharam
AgraharamAgraharam
Agraharam
 

Similar to Statue of unity case study

Geology applied to engineering reference to india
Geology applied to engineering reference to indiaGeology applied to engineering reference to india
Geology applied to engineering reference to indiaDarshan Darji
 
Karcham wangtoo
Karcham wangtooKarcham wangtoo
Karcham wangtooAbhay Bhuva
 
BHUSAN GEOJE FIXED LINK presentation
BHUSAN GEOJE FIXED LINK presentationBHUSAN GEOJE FIXED LINK presentation
BHUSAN GEOJE FIXED LINK presentationAmir Amdani
 
The petronas twin towers
The petronas twin towersThe petronas twin towers
The petronas twin towersaman shukla
 
Busan geoje fixed link
Busan   geoje fixed linkBusan   geoje fixed link
Busan geoje fixed linkVicky Matwan
 
Chenab Bridge.pdf
Chenab Bridge.pdfChenab Bridge.pdf
Chenab Bridge.pdfPpt Creater
 
Suspension bridge (modern const. tech)
Suspension bridge (modern const. tech)Suspension bridge (modern const. tech)
Suspension bridge (modern const. tech)Vivek Chauhan
 
Petronas Twin Towers
Petronas Twin TowersPetronas Twin Towers
Petronas Twin Towersmatsrock
 
Bhupen hazarika setu
Bhupen hazarika setuBhupen hazarika setu
Bhupen hazarika setuRatulDas36
 
Cast in situ bridge superstracture
Cast in situ bridge superstractureCast in situ bridge superstracture
Cast in situ bridge superstracturekhushal tadas
 
Presentation on chenab bridge by Aamir Khan
Presentation on chenab bridge by Aamir KhanPresentation on chenab bridge by Aamir Khan
Presentation on chenab bridge by Aamir KhanAamir Rajput Khan
 
Megastructures design pdf
Megastructures design pdfMegastructures design pdf
Megastructures design pdfSaqib Imran
 

Similar to Statue of unity case study (20)

Geology applied to engineering reference to india
Geology applied to engineering reference to indiaGeology applied to engineering reference to india
Geology applied to engineering reference to india
 
Burj Al Arab
Burj Al ArabBurj Al Arab
Burj Al Arab
 
Karcham wangtoo
Karcham wangtooKarcham wangtoo
Karcham wangtoo
 
BHUSAN GEOJE FIXED LINK presentation
BHUSAN GEOJE FIXED LINK presentationBHUSAN GEOJE FIXED LINK presentation
BHUSAN GEOJE FIXED LINK presentation
 
Well foundation pdf
Well foundation pdfWell foundation pdf
Well foundation pdf
 
Tunneling
TunnelingTunneling
Tunneling
 
The petronas twin towers
The petronas twin towersThe petronas twin towers
The petronas twin towers
 
Busan geoje fixed link
Busan   geoje fixed linkBusan   geoje fixed link
Busan geoje fixed link
 
Chenab Bridge.pdf
Chenab Bridge.pdfChenab Bridge.pdf
Chenab Bridge.pdf
 
Suspension bridge (modern const. tech)
Suspension bridge (modern const. tech)Suspension bridge (modern const. tech)
Suspension bridge (modern const. tech)
 
Soil.pptx
Soil.pptxSoil.pptx
Soil.pptx
 
Burj al Arab Constuction
Burj al Arab ConstuctionBurj al Arab Constuction
Burj al Arab Constuction
 
BURJ AL ARAB
BURJ AL ARABBURJ AL ARAB
BURJ AL ARAB
 
Petronas Twin Towers
Petronas Twin TowersPetronas Twin Towers
Petronas Twin Towers
 
Bhupen hazarika setu
Bhupen hazarika setuBhupen hazarika setu
Bhupen hazarika setu
 
Cast in situ bridge superstracture
Cast in situ bridge superstractureCast in situ bridge superstracture
Cast in situ bridge superstracture
 
Presentation on chenab bridge by Aamir Khan
Presentation on chenab bridge by Aamir KhanPresentation on chenab bridge by Aamir Khan
Presentation on chenab bridge by Aamir Khan
 
Signature bridge
Signature bridgeSignature bridge
Signature bridge
 
BurjAlArab.pdf
BurjAlArab.pdfBurjAlArab.pdf
BurjAlArab.pdf
 
Megastructures design pdf
Megastructures design pdfMegastructures design pdf
Megastructures design pdf
 

Recently uploaded

microprocessor 8085 and its interfacing
microprocessor 8085  and its interfacingmicroprocessor 8085  and its interfacing
microprocessor 8085 and its interfacingjaychoudhary37
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Dr.Costas Sachpazis
 
IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024Mark Billinghurst
 
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdfCCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdfAsst.prof M.Gokilavani
 
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escortsranjana rawat
 
Application of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptxApplication of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptx959SahilShah
 
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...VICTOR MAESTRE RAMIREZ
 
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝soniya singh
 
Introduction to Microprocesso programming and interfacing.pptx
Introduction to Microprocesso programming and interfacing.pptxIntroduction to Microprocesso programming and interfacing.pptx
Introduction to Microprocesso programming and interfacing.pptxvipinkmenon1
 
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...srsj9000
 
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdfCCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdfAsst.prof M.Gokilavani
 
Call Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile serviceCall Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile servicerehmti665
 
GDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentationGDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentationGDSCAESB
 
Study on Air-Water & Water-Water Heat Exchange in a Finned ďťżTube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned ďťżTube ExchangerStudy on Air-Water & Water-Water Heat Exchange in a Finned ďťżTube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned ďťżTube ExchangerAnamika Sarkar
 
HARMONY IN THE HUMAN BEING - Unit-II UHV-2
HARMONY IN THE HUMAN BEING - Unit-II UHV-2HARMONY IN THE HUMAN BEING - Unit-II UHV-2
HARMONY IN THE HUMAN BEING - Unit-II UHV-2RajaP95
 
🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...
🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...
🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...9953056974 Low Rate Call Girls In Saket, Delhi NCR
 
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSAPPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSKurinjimalarL3
 

Recently uploaded (20)

microprocessor 8085 and its interfacing
microprocessor 8085  and its interfacingmicroprocessor 8085  and its interfacing
microprocessor 8085 and its interfacing
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
 
IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024
 
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdfCCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
 
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
 
Application of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptxApplication of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptx
 
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...
 
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptxExploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
 
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
 
Introduction to Microprocesso programming and interfacing.pptx
Introduction to Microprocesso programming and interfacing.pptxIntroduction to Microprocesso programming and interfacing.pptx
Introduction to Microprocesso programming and interfacing.pptx
 
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
 
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdfCCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
 
Call Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile serviceCall Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile service
 
GDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentationGDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentation
 
Study on Air-Water & Water-Water Heat Exchange in a Finned ďťżTube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned ďťżTube ExchangerStudy on Air-Water & Water-Water Heat Exchange in a Finned ďťżTube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned ďťżTube Exchanger
 
HARMONY IN THE HUMAN BEING - Unit-II UHV-2
HARMONY IN THE HUMAN BEING - Unit-II UHV-2HARMONY IN THE HUMAN BEING - Unit-II UHV-2
HARMONY IN THE HUMAN BEING - Unit-II UHV-2
 
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCRCall Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
 
🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...
🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...
🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...
 
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
 
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSAPPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
 

Statue of unity case study

  • 1. Case Study - Statue Of Unity Presented by: Bhagyshree kandoi M.tech - Structural Engineer Enrollment no: 20030329008
  • 2. INTRODUCTION • Narendra Modi first announced the project to Sardar Vallabhbhai Patel on 7 October 2010 at a press conference. • The Statue of Unity India’s first deputy prime minister Sardar Vallabhbhai Patel. • It is situated near the Sardar Sarovar dam in the state of Gujarat. • The Statue of Unity, a statue of Sardar Vallabhbhai Patel, is the world’s tallest statue at 182 meters in height. • It will be constructed at the Sadhu-Bet Island, 3.5 kilometers south of Sardar sarovar Dam at Kevadia in the Narmada district of Gujarat, India. • To initiate the design and construction, a joint venture (JV) - 2011 for combined design, and project and construction management (PM-CM) services.
  • 3. • The main contractor bid process was completed on October 27, 2014, contract was awarded to L&T Ltd. Chennai. • As of the writing of this paper, additional geotechnical testing of the hillock has been completed and the leveling of the hillock has started in March of 2015. • The construction of the Statue of Unity was completed in 2018. • The structure has an irregular curved form that is larger at the top than at the base, requiring a unique but simple and constructible structural system. • The statue is a structural system comprising of two semi-elliptical reinforced concrete cores. • It also has a reinforced concrete podium that acts as a base for the statue clad in bronze, supported by structural steelwork fixed on to the concrete cores.
  • 4. The Tallest statue in the World: • Sculptor Ram Suthar, made a few replicas of the Sardar Vallabhbhai Patel statue and created a 30-feet bronze one that was scanned into electronic data to make the 59.7-feet (182 meters) Sardar Patel statue. • Statue of Unity’ (SOU) is dedicated to the Iron Man of India, Sardar Vallabhbhai Patel. Sardar Patel is widely considered to be the architect of modern India. • The SoU will stand tall as an inspiration to future generations, a reminder of Sardar Patel’s sterling contribution. At 182 meters from the road entry and 208.5 meters from the river entry, the SoU will be the tallest statue in the world; taller than the 153 m tall Spring Temple Buddha in China and almost twice as tall as the world famous Statue of Liberty in New York.
  • 5. 1. Site Location: • The Statue of Unity is situated on a strong rock on the banks of the river Narmada in Gujarat, India. It is 90 kilometers south of the city of Vadodara and around 3 kilometers downstream of the Sardar Sarovar dam.
  • 6. Features of Sardar Patel Statue: • A 320 m long designer bridge connecting Sadhu Hill to the mainland • A memorial and visitors’ centre • 4-lane approach road • An administrative complex, 3-star hotel and conference centre • A 40-m suspended fabric roof structure for the visitors’ centre • Shrestha Bharat bhavan – conference centre
  • 7. Escalators at the base of Statue of Unity Travellators at Statue of Unity and Bridge connecting SoU to the main road. Contemplative Memorial Garden on Gallery Base roof and road
  • 8. Sardar’s sculpture at SoU Exhibition Gallery Viewing gallery and road from Kevadiya. Main bridge connecting Memorial & Visiting Centre and Sadhu Bet Island
  • 9. Engineering Challenges: • Statue of Unity does not have a wider base. wider base is required to structure stable. Patel wore a dhoti, the statue is thick the top & thinner at bottom. This challenge was overcome by keeping the slenderness ratio between the width of the statue and its height to 16:19, significantly higher than the 8:14 ratio rule that is followed in the construction of high-rise structures. • Speed of wind, and the possibility of earthquakes and flood. built on island in the middle of Narmada, the statue face the tunnel effect of winds blowing down the river.
  • 10. • The walking pose of the statue opened a gap of 6.4 meters between the two feet. the cladding used in the statue has overlapping panels, which allow it to move vertically and horizontally, to resist earthquake and wind forces. • Two 250-tonne mass dampers, which are installed in structures to reduce the amplitude of vibrations, have been used. As a result, the statue is capable of withstanding wind blowing at almost 220 km per hour. • The statue’s location between mountainous terrain made transportation of equipment and material difficult. A rock bridge was built over shallow water and a temporary Bailey bridge was constructed for the monsoon.
  • 11. 2.Geology of the Site: • Team of engineers is conducting a geological survey of the site of the Statue of Unity after a detailed report of the geological survey, the work on laying the foundation. • A team of engineers of the Turner Construction, Michael Graves and Associates and the Meinhardt Group geological soil survey. • The nature of the strata of the soil where the raft foundation of the statue will be constructed. • At the site said that the quartzite hillock will see a foundation of about 52 meters for which the geological tests are being carried out.
  • 12. • According to the data available with the SVPRET, for the raft foundation for the monument, the recommended safe bearing capacity is 2,300 KPa. The site has already been termed safe from seismic hazards. • Advanced slicing technology will be used to shape the base so as to prevent any disturbance to the base of the hillock due to blasting. • Primarily, a built-up rock bridge which is constructed at the normal flood level, and then a Bailey bridge that is built above the high flood levels. • The Bailey bridge has two lanes, one dedicated to vehicle and material movement, and the second one for access to workers.
  • 13. 3.Material required for construction: • The statue is located at a remote location, therefore, the material delivery, staging, and erection posed unique challenges for the project. • The ordinary portland cement used is of the grade 53. • The concrete was supplied by two batching plants of 56 m3 per hour capacity. • The structural steel was supplied by Tata Steel and SAIL.
  • 14. • Additionally, the composite cores of statue, suspended space frame, cladding substructure, and podium framing required 6500 tonnes of structural steel with a minimum grade of 355 MPa. • The structural steel in the cores and space frame of the statue is comprised of W-360 I-shaped sections. • As a part of the ‘Loha’ campaign, iron tools were collected from farmers across the country with the intent of it being melted and converted into rebars for use in the foundation.
  • 15. 4. Structural system of statue of unity:- The main structural components of the statue of unity consist of the base and the core walls.  Base Of The Statue:- • The base of the statue was constructed on shallow foundation(i.e. raft foundation) supported over a strong rock. • The level of base differs from +45 m to +52.5 m. • The ground floor is at +58 m level.it is made of structural slabs supported by columns and walls. • Both concrete and steel were used thoroughly from +58 m level to +83 m level. • The slab at +78 m, +83 m and inclined roofings are made of composite deck slab resting on structural beam and trusses.
  • 16.  Core Walls: • Two primary vertical core walls of the statue are elliptical in shape. The dimension of the core walls are 11.30 x 8.40 m . • The elliptical core walls basically starts from +56.575 m level and continues up to +209.50 m level. • The coupling wall is linked to the core walls from +115 m level to +193 m level. • Core walls confined by an external oval concrete wall up to the podium level +83 m. • Above the podium level, where the faced geometry statue appears, the core are coupled together with two R.C wall known as coupling wall up to the entire heights of core walls. • The thickness of core wall is continuous throughout the height , the thickness of the coupling wall waries from 0.55 m and 1.33 m.
  • 17. 5. construction: • A Consortium comprising Turner Construction, Michael Graves and Associates and the Meinhardt Group supervised the project. It took 56 months to complete – 15 months for planning, 40 months for construction and two months for handing over by the consortium. • The total cost of the project was estimated to be about 20.63 billion (US$290 million) by the government. The tender bids for the first phase were invited in October 2013 and were closed in November 2013. • Indian infrastructure company Larsen & Toubro won the contract on 27 October 2014 for its lowest bid of 29.89 billion (US$420 million) for the design, construction and maintenance. They commenced the construction on 31 October 2014. • In the first phase of the project, 13.47 billion were for the main statue, 2.35 billion for the exhibition hall and convention centre, 830 million for the bridge connecting the memorial to the mainland and 6.57 billion for the maintenance of the structure for 15 years after its completion.
  • 18. • The bronze panels were cast in Jiangxi Tongqing Metal Handicrafts Co. Ltd (the TQ Art foundry) in China as suitable facilities were unavailable in India. • The bronze panels were transported over sea and then by road to the workshop near the construction site where they were assembled. • The outer façade is made up of 1700 tonnes of bronze plates and 1850 tonnes of bronze cladding which in turn comprise 565 macro and 6000 micro panels.