SlideShare a Scribd company logo
1 of 4
M. BALA MURALI KRISHNA
House No, 1-163, Gudem Post & Village, Srikakulam District – 532 484
Contact: +91 9011226025  E-mail: muralikrishnak8@gmail.com
Date:
M. Bala Murali Krishna
M/S sine wave biomass power plant Sangli, Maharashtra since 2012
Deputy manager – Operation and Maintenance
Sub: Forwarding of resume for the post of “……any suitable……….”
Dear Sir,
This is with reference to the advertisement / publication / telephonic conversation; I wish to express my interest in joining your
team as a (Name of the Position).
Review of credentials would confirm my association as Senior Engineer, and offering performance driven experience of over
13+ years’ in the areas of Project Management, Operations Management, Maintenance Management, Quality Control, Erection/
Fault Analysis, Planning & Scheduling etc.
I have successfully managed erection, operation & maintenance of low & high pressure boilers of both AFBC and TRAVELL GRATE
types. I have liaised with clients, architects, consultants, contractors & external agencies for determining technical specifications,
approvals and obtaining statutory clearances. I have also been involved in erection & commissioning of IBR pipeline, condensate,
recovery system, pumps and cooling tower, heat exchange, ETP related mechanical equipments and pipeline and respective
pipelines.
With an innate sense of task prioritization, managerial aptitude, training & development and result oriented attitude towards
accelerating organizational growth and that too in a high pressured, time bound and competitive environment, I reckon that my
grooming level is apt to look outward for a challenging senior level position, requiring complete grasp & grip of Operations,
Maintenance Management and Project Management in Power Plant of repute and high level of professional loyalty, integrity
and maturity.
A glance through my resume, attached along, shall familiarize you with my credentials. I am confident of fitting in the slot as well
as in the team. However, should you desire personal interaction; I may be called upon where the possibility of our association
could be explored further.
Sincerely,
M. Bala Murali Krishna
M.BALA MURALI KRISHNA
House No, 1-163, Gudem Post & Village, Srikakulam District – 532 484
Contact: +91 9011226025  E-mail: muralikrishnak8@gmail.com
DY. MANAGER – POWER PLANT
13+ years’ rich experience in delivering optimal results & business value in high-growth environments in the areas of
Operations, Maintenance Management and Project Management in Power Plant industry of repute
PROFILE
• Core strengths in Power Distribution, defining scope of project and awarding work contracts to qualified
professionals/contractors. Possesses rich qualitative experience in Construction, Operation, Commissioning, Quality
Assurance and Maintenance Operations in Power Generation & Distribution sector
• Established performance benchmarks in implementation of planned preventive/predictive maintenance practices to
optimize machines availability with constant endeavors to realize ZERO downtime. Capable of leading a team of design
professionals and achieving time bound work accomplishment thru' monitoring and motivational inputs
• Proven dexterity in planning, vendor development, procurement, logistics, and management of inventory of critical
spares to manage maintenance calls expeditiously. Demonstrated professional excellence in project planning, scheduling,
monitoring, Site Supervision, and execution of projects without incidences of time/cost overruns
• Adept at designing & implementing quality systems and procedures to ensure strict adherence to quality parameters.
Key competencies in operations, preparation of SOP, designing & implementing quality control systems & procedures to
achieve highest quality standards
• Strong background in enforcing budgetary controls and implementing cost rationalization measures to achieve projects'
implementation within agreed time/cost parameters. Excellent man-management, time management, leadership skills;
Computer literate
Key Competencies
 Project Management  Operations Management  Maintenance Management  Quality Control  Erection/Fault Analysis
 Planning & Scheduling  Distribution/Transmission  Troubleshooting  Safety/Energy Management  Manpower
Management  Vendor Development  Crisis Management  Cross Functional Coordination  Analytical Skills
PROFESSIONAL HIGHLIGHTS
M/S SINEWAVE BIIOMASS POWER PVT LTD since 2012
Deputy Manager – Operation and Maintenance
Project: 10 MW Biomass plant
• Accomplish responsibility for erection, operation & maintenance of low & high pressure boilers of both AFBC and
TRAVELL GRATE types
• Actively involve in erection & commissioning of IBR pipeline, condensate, recovery system, pumps and cooling tower,
heat exchange, ETP related mechanical equipments and pipeline and respective pipelines
• Accountable for erection, operation and maintenance of Steam Turbines like Triveni, HTC, GPM, Kaluga etc.
• Contribute significantly in fabrication & erection of all types of Mechanical equipments as per Drawing that included
Condensers, Dust collectors, Cyclones, Blowers, Screw, Redler, Belt and Slat chain Conveyors, RAV”s, Modulators, Bucket
elevators, Drum feeders, Storage tanks, Bunkers, shed, Trusses and other structural, Cold & Hot Air Ducting, Flue gas
ducting, Expansion Bellows, Bag Filters, Priming vessels, Inspection, Balancing & Alignments of all fans like PA, FD, CT and ID,
Pumps like Feed, CEP, RCW, and ACW. etc.
• Provide on-site Management and quality control to ensure projects met time and budget requirements, and were built
in accordance with contract documents
• Establish plan and execute Energy, Technical, Quality, HSE audits/management reviews and applied corrections to
realign the reported deviations
• Develop Vendors and negotiated with them to supply the best qualitative products on most competitive prices
• Meticulously implement safety/environment systems/procedures with periodic reviews
Key Achievements
• Titled as an “Incident Controller” to respond to the crises within the shortest possible time and guide the staff to handle the
crises in safe and effective manner
• Introduced the concept of MIS reporting to update the Management on regular basis
M/S VAYUNANDANA POWER LIMITED, CHANDRAPUR 2009 to 2012
Sr. Engineer
(Plant cap was 10 MW 45tph by drum TG boiler of TTPL. Extraction cum-condensing turbine of TIL with 505 Woodward systems)
Formulated plan for documentation of delivery material and DPR
• Devised effective strategies for operation & maintenance of R.O. Plant, D.M. Plant and ETP. Inc.sand filters, Carbon
filters, multigrade filters, Softeners, Degassifier, clarifiers, Clariflocculators Cooling towers etc.
• Deftly handled the complete plant operations with a work force of 78 direct permanent employees and 190+ indirect
work force, controlling and monitoring other peripheral activities
• Geared the activities for fabrication, erection & commissioning of ESP, Ash handling system, Fuel
• Independently handled wood chippers and feeding systems as per drawing & design
• Propagated Quality Circle movement and developed quality culture in the work force to achieve quality leadership in
the industry
• Proactively worked on communication and power supply
Key Achievements
• Credited for implementing ISO in various depts. and maintaining its documentations
• Structured annual operational budget and implemented control measures to contain expenses within defined limits
M/S BASE POWER LIMITED, RAICHUR, KARNATAKA 2008 to 2009
Shift in Charge
(Plant cap was 10.5 MW, 40tph AFBC double drum boiler of cvpl. Extraction cum-condensing turbine of Kaluga-eme-raishia with plc system)
• Drawn up project plans, schedule of activities, budget, & cost estimates, planned, procured, mobilized, and deployed
resources to deliver the project within defined time and costliness
• Geared the activities for preparing tenders, inviting proposal, opening, & finalizing the Vendor based on quality standards
complying with the international/co. norms
• Ensured maintenance of clean & green work ambience for hygiene and aesthetic appeals
• Prepared detailed engineering drawings and working drawings of various components precisely depicting all dimensions,
specifications etc. and furnishing clarifications detail drawing etc.
Key Achievements
• Established plan for ensuring compliance to all HSE activities and practices
• Periodically conducted condition monitoring and initiated advance action to prevent major breakdowns
M/S SHYAM CENTURY FERROUS LIMITED, MEGHALAYA 2006 to 2008
Shift in Charge
(Plant cap. is 13.8MW, CVPL make AFBC boiler and single extraction HTC turbine with 505. Wood ward governor controls)
• Guided a team of draughts men and technical assistants in the design office to ensure accomplishment of assigned work
within defined time schedules
• Planned, arranged, and supervised rework groups, which traveled to on-site locations to perform engineering repairs and
other problem-solving activities
• Formulated plan for inspection, shutdown jobs preparation & execution, Breakdown analysis & action plans and Preparation
of annual maintenance plans
• Mapped instrumentation needs of the company and defined technical parameters to facilitate procurement of right quality
instruments
Key Achievements
• Designed & developed SOP’s & SMP’S and ensured its implementation
• Pioneer in erection, commissioning, inspection tests of various plants/equipments
M/S. AUROBINDO PHARMA LIMITED 2004 to 2006
Shift in Charge
M/S GMR BEVERAGES INDUSTRIES LIMITED, RANASTHALAM, SRIKAKULAM DISTRICT, A.P 1999 to 2004
Shift Supervisor / Sr. Technician
M/S GMR VASAVI INDUSTRIES LIMITED RAVIVALASA, TEKKALI MANDAL, SRIKAKULAM DISTRICT, A.P 1997 to 1999
Mechanical Technician
EDUCATIONAL CREDENTIALS
B.Tech
Rajasthan University
IInd class Boiler Attendant
Date of Birth: 10th
Jul 1977
Languages Known: English, Hindi and Telugu
References: Available on Request
M. Bala Murali Krishna
As a project engineer (reading isometric drawings,P&ID,protocol preparation )
Checked all supports as per isometric drawings.
Perform inspection of incoming material as per project requirement.
Erection execution of boilers.
Erection and execution of structures.
Carry out of inspection of structural fabrication work according codes and standards.
Performing welding inspection activity.
Performed inspection of fabrication work according codes and as per standard
Material Planning & scheduling.
Performed the material verification.
Planning and executing of the work so as to achieve the
Target as planned.
Allotting works to efficient contractors.
Preparing the protocols for completion of fabrication work.
Getting the customer satisfaction on the job and
Thereby making Smooth and quick progress.
Erection, fabrication and Commissioning of Boiler, storage tanks, piping& valves.
Performed pre-commissioning and commissioning activity and prepare document.
Performed leak test of in presence of client. And perform hydro test at site.
Prepare reports for day to day results and present them in weekly review meetings of both the
Company and client.

More Related Content

What's hot

What's hot (19)

Updated resume
Updated resumeUpdated resume
Updated resume
 
pradeep~Rsume (1)
pradeep~Rsume (1)pradeep~Rsume (1)
pradeep~Rsume (1)
 
DUSTIN SHANE ROBINSON
DUSTIN SHANE ROBINSONDUSTIN SHANE ROBINSON
DUSTIN SHANE ROBINSON
 
Resume_Ravindra
Resume_RavindraResume_Ravindra
Resume_Ravindra
 
Gregory Sam professional_profile
Gregory Sam professional_profileGregory Sam professional_profile
Gregory Sam professional_profile
 
shashank Resume - - Copy
shashank Resume -  - Copyshashank Resume -  - Copy
shashank Resume - - Copy
 
updated_resume_280815
updated_resume_280815updated_resume_280815
updated_resume_280815
 
Nilanjan das Resume - Copy
Nilanjan das  Resume - CopyNilanjan das  Resume - Copy
Nilanjan das Resume - Copy
 
Resume-Srikanta Rath
Resume-Srikanta RathResume-Srikanta Rath
Resume-Srikanta Rath
 
Brian Palmer 2014 Resume
Brian Palmer 2014 ResumeBrian Palmer 2014 Resume
Brian Palmer 2014 Resume
 
090424 C S306554(2)
090424 C S306554(2)090424 C S306554(2)
090424 C S306554(2)
 
Sushil podia Ahm
Sushil podia AhmSushil podia Ahm
Sushil podia Ahm
 
Shahid attar chemical_engr2[1]
Shahid attar chemical_engr2[1]Shahid attar chemical_engr2[1]
Shahid attar chemical_engr2[1]
 
greg1 cv
greg1 cvgreg1 cv
greg1 cv
 
Resume - Kishor Kumar Jalori new
Resume - Kishor Kumar Jalori newResume - Kishor Kumar Jalori new
Resume - Kishor Kumar Jalori new
 
SARDI SITEPU CV
SARDI SITEPU CVSARDI SITEPU CV
SARDI SITEPU CV
 
William Cooper Resume Rev
William Cooper Resume RevWilliam Cooper Resume Rev
William Cooper Resume Rev
 
Service & O&M Engineer
Service & O&M EngineerService & O&M Engineer
Service & O&M Engineer
 
R.V.resume
R.V.resumeR.V.resume
R.V.resume
 

Viewers also liked

!!Press queen rock_in_montreal
!!Press queen rock_in_montreal!!Press queen rock_in_montreal
!!Press queen rock_in_montrealvirtualtaganrog
 
العقيده المسيحيه يسوع المسيح
العقيده المسيحيه   يسوع المسيحالعقيده المسيحيه   يسوع المسيح
العقيده المسيحيه يسوع المسيحIbrahimia Church Ftriends
 
لجنة 20 اولى علمي
لجنة 20 اولى علميلجنة 20 اولى علمي
لجنة 20 اولى علميAhmed Farouk
 
План воспитательной работы ГБОУ СПО КАС № 7 на 2014–2015 учебный год
План воспитательной работы ГБОУ СПО КАС № 7 на 2014–2015 учебный годПлан воспитательной работы ГБОУ СПО КАС № 7 на 2014–2015 учебный год
План воспитательной работы ГБОУ СПО КАС № 7 на 2014–2015 учебный годСайт Кас
 
25 prophecies of Christ's first advent
25 prophecies of Christ's first advent25 prophecies of Christ's first advent
25 prophecies of Christ's first adventTrinityonline
 

Viewers also liked (10)

لجنة 21
لجنة 21لجنة 21
لجنة 21
 
لجنة 24
لجنة 24لجنة 24
لجنة 24
 
!!Press queen rock_in_montreal
!!Press queen rock_in_montreal!!Press queen rock_in_montreal
!!Press queen rock_in_montreal
 
لجنة 23
لجنة 23لجنة 23
لجنة 23
 
العقيده المسيحيه يسوع المسيح
العقيده المسيحيه   يسوع المسيحالعقيده المسيحيه   يسوع المسيح
العقيده المسيحيه يسوع المسيح
 
لجنة 22
لجنة 22لجنة 22
لجنة 22
 
لجنة 20 اولى علمي
لجنة 20 اولى علميلجنة 20 اولى علمي
لجنة 20 اولى علمي
 
لجنة 25
لجنة 25لجنة 25
لجنة 25
 
План воспитательной работы ГБОУ СПО КАС № 7 на 2014–2015 учебный год
План воспитательной работы ГБОУ СПО КАС № 7 на 2014–2015 учебный годПлан воспитательной работы ГБОУ СПО КАС № 7 на 2014–2015 учебный год
План воспитательной работы ГБОУ СПО КАС № 7 на 2014–2015 учебный год
 
25 prophecies of Christ's first advent
25 prophecies of Christ's first advent25 prophecies of Christ's first advent
25 prophecies of Christ's first advent
 

Similar to MURALIKRISHNA m (20)

Zaheer-CV- 2015
Zaheer-CV- 2015Zaheer-CV- 2015
Zaheer-CV- 2015
 
JackmcdowellCV
JackmcdowellCVJackmcdowellCV
JackmcdowellCV
 
head thermal power
head thermal powerhead thermal power
head thermal power
 
090424 C S306554(2)
090424 C S306554(2)090424 C S306554(2)
090424 C S306554(2)
 
Resume
ResumeResume
Resume
 
Bharat Verma (Electrical engineer)
Bharat Verma (Electrical  engineer)Bharat Verma (Electrical  engineer)
Bharat Verma (Electrical engineer)
 
Wellington Shumba CV projects
Wellington Shumba CV projectsWellington Shumba CV projects
Wellington Shumba CV projects
 
Girish Mishra-R
Girish Mishra-RGirish Mishra-R
Girish Mishra-R
 
apsingh resume
apsingh resume apsingh resume
apsingh resume
 
surya's resume
surya's resumesurya's resume
surya's resume
 
CV.
CV.CV.
CV.
 
amit
amitamit
amit
 
Cv partha
Cv parthaCv partha
Cv partha
 
Brajesh Resume
Brajesh ResumeBrajesh Resume
Brajesh Resume
 
Resume avinash 142015
Resume avinash 142015Resume avinash 142015
Resume avinash 142015
 
Aravind resume
Aravind resumeAravind resume
Aravind resume
 
Naushad Bhatti (CV) (1)
Naushad Bhatti (CV) (1)Naushad Bhatti (CV) (1)
Naushad Bhatti (CV) (1)
 
Shailendra_Kumar_Resume_V01__1_
Shailendra_Kumar_Resume_V01__1_Shailendra_Kumar_Resume_V01__1_
Shailendra_Kumar_Resume_V01__1_
 
Hari Prasath _N
Hari Prasath _NHari Prasath _N
Hari Prasath _N
 
Joseph A K Effah Resume -rev2
Joseph A K Effah Resume -rev2Joseph A K Effah Resume -rev2
Joseph A K Effah Resume -rev2
 

MURALIKRISHNA m

  • 1. M. BALA MURALI KRISHNA House No, 1-163, Gudem Post & Village, Srikakulam District – 532 484 Contact: +91 9011226025  E-mail: muralikrishnak8@gmail.com Date: M. Bala Murali Krishna M/S sine wave biomass power plant Sangli, Maharashtra since 2012 Deputy manager – Operation and Maintenance Sub: Forwarding of resume for the post of “……any suitable……….” Dear Sir, This is with reference to the advertisement / publication / telephonic conversation; I wish to express my interest in joining your team as a (Name of the Position). Review of credentials would confirm my association as Senior Engineer, and offering performance driven experience of over 13+ years’ in the areas of Project Management, Operations Management, Maintenance Management, Quality Control, Erection/ Fault Analysis, Planning & Scheduling etc. I have successfully managed erection, operation & maintenance of low & high pressure boilers of both AFBC and TRAVELL GRATE types. I have liaised with clients, architects, consultants, contractors & external agencies for determining technical specifications, approvals and obtaining statutory clearances. I have also been involved in erection & commissioning of IBR pipeline, condensate, recovery system, pumps and cooling tower, heat exchange, ETP related mechanical equipments and pipeline and respective pipelines. With an innate sense of task prioritization, managerial aptitude, training & development and result oriented attitude towards accelerating organizational growth and that too in a high pressured, time bound and competitive environment, I reckon that my grooming level is apt to look outward for a challenging senior level position, requiring complete grasp & grip of Operations, Maintenance Management and Project Management in Power Plant of repute and high level of professional loyalty, integrity and maturity. A glance through my resume, attached along, shall familiarize you with my credentials. I am confident of fitting in the slot as well as in the team. However, should you desire personal interaction; I may be called upon where the possibility of our association could be explored further. Sincerely, M. Bala Murali Krishna
  • 2. M.BALA MURALI KRISHNA House No, 1-163, Gudem Post & Village, Srikakulam District – 532 484 Contact: +91 9011226025  E-mail: muralikrishnak8@gmail.com DY. MANAGER – POWER PLANT 13+ years’ rich experience in delivering optimal results & business value in high-growth environments in the areas of Operations, Maintenance Management and Project Management in Power Plant industry of repute PROFILE • Core strengths in Power Distribution, defining scope of project and awarding work contracts to qualified professionals/contractors. Possesses rich qualitative experience in Construction, Operation, Commissioning, Quality Assurance and Maintenance Operations in Power Generation & Distribution sector • Established performance benchmarks in implementation of planned preventive/predictive maintenance practices to optimize machines availability with constant endeavors to realize ZERO downtime. Capable of leading a team of design professionals and achieving time bound work accomplishment thru' monitoring and motivational inputs • Proven dexterity in planning, vendor development, procurement, logistics, and management of inventory of critical spares to manage maintenance calls expeditiously. Demonstrated professional excellence in project planning, scheduling, monitoring, Site Supervision, and execution of projects without incidences of time/cost overruns • Adept at designing & implementing quality systems and procedures to ensure strict adherence to quality parameters. Key competencies in operations, preparation of SOP, designing & implementing quality control systems & procedures to achieve highest quality standards • Strong background in enforcing budgetary controls and implementing cost rationalization measures to achieve projects' implementation within agreed time/cost parameters. Excellent man-management, time management, leadership skills; Computer literate Key Competencies  Project Management  Operations Management  Maintenance Management  Quality Control  Erection/Fault Analysis  Planning & Scheduling  Distribution/Transmission  Troubleshooting  Safety/Energy Management  Manpower Management  Vendor Development  Crisis Management  Cross Functional Coordination  Analytical Skills PROFESSIONAL HIGHLIGHTS M/S SINEWAVE BIIOMASS POWER PVT LTD since 2012 Deputy Manager – Operation and Maintenance Project: 10 MW Biomass plant • Accomplish responsibility for erection, operation & maintenance of low & high pressure boilers of both AFBC and TRAVELL GRATE types • Actively involve in erection & commissioning of IBR pipeline, condensate, recovery system, pumps and cooling tower, heat exchange, ETP related mechanical equipments and pipeline and respective pipelines • Accountable for erection, operation and maintenance of Steam Turbines like Triveni, HTC, GPM, Kaluga etc. • Contribute significantly in fabrication & erection of all types of Mechanical equipments as per Drawing that included Condensers, Dust collectors, Cyclones, Blowers, Screw, Redler, Belt and Slat chain Conveyors, RAV”s, Modulators, Bucket elevators, Drum feeders, Storage tanks, Bunkers, shed, Trusses and other structural, Cold & Hot Air Ducting, Flue gas ducting, Expansion Bellows, Bag Filters, Priming vessels, Inspection, Balancing & Alignments of all fans like PA, FD, CT and ID, Pumps like Feed, CEP, RCW, and ACW. etc. • Provide on-site Management and quality control to ensure projects met time and budget requirements, and were built in accordance with contract documents • Establish plan and execute Energy, Technical, Quality, HSE audits/management reviews and applied corrections to realign the reported deviations • Develop Vendors and negotiated with them to supply the best qualitative products on most competitive prices • Meticulously implement safety/environment systems/procedures with periodic reviews Key Achievements • Titled as an “Incident Controller” to respond to the crises within the shortest possible time and guide the staff to handle the crises in safe and effective manner • Introduced the concept of MIS reporting to update the Management on regular basis M/S VAYUNANDANA POWER LIMITED, CHANDRAPUR 2009 to 2012 Sr. Engineer (Plant cap was 10 MW 45tph by drum TG boiler of TTPL. Extraction cum-condensing turbine of TIL with 505 Woodward systems) Formulated plan for documentation of delivery material and DPR
  • 3. • Devised effective strategies for operation & maintenance of R.O. Plant, D.M. Plant and ETP. Inc.sand filters, Carbon filters, multigrade filters, Softeners, Degassifier, clarifiers, Clariflocculators Cooling towers etc. • Deftly handled the complete plant operations with a work force of 78 direct permanent employees and 190+ indirect work force, controlling and monitoring other peripheral activities • Geared the activities for fabrication, erection & commissioning of ESP, Ash handling system, Fuel • Independently handled wood chippers and feeding systems as per drawing & design • Propagated Quality Circle movement and developed quality culture in the work force to achieve quality leadership in the industry • Proactively worked on communication and power supply Key Achievements • Credited for implementing ISO in various depts. and maintaining its documentations • Structured annual operational budget and implemented control measures to contain expenses within defined limits M/S BASE POWER LIMITED, RAICHUR, KARNATAKA 2008 to 2009 Shift in Charge (Plant cap was 10.5 MW, 40tph AFBC double drum boiler of cvpl. Extraction cum-condensing turbine of Kaluga-eme-raishia with plc system) • Drawn up project plans, schedule of activities, budget, & cost estimates, planned, procured, mobilized, and deployed resources to deliver the project within defined time and costliness • Geared the activities for preparing tenders, inviting proposal, opening, & finalizing the Vendor based on quality standards complying with the international/co. norms • Ensured maintenance of clean & green work ambience for hygiene and aesthetic appeals • Prepared detailed engineering drawings and working drawings of various components precisely depicting all dimensions, specifications etc. and furnishing clarifications detail drawing etc. Key Achievements • Established plan for ensuring compliance to all HSE activities and practices • Periodically conducted condition monitoring and initiated advance action to prevent major breakdowns M/S SHYAM CENTURY FERROUS LIMITED, MEGHALAYA 2006 to 2008 Shift in Charge (Plant cap. is 13.8MW, CVPL make AFBC boiler and single extraction HTC turbine with 505. Wood ward governor controls) • Guided a team of draughts men and technical assistants in the design office to ensure accomplishment of assigned work within defined time schedules • Planned, arranged, and supervised rework groups, which traveled to on-site locations to perform engineering repairs and other problem-solving activities • Formulated plan for inspection, shutdown jobs preparation & execution, Breakdown analysis & action plans and Preparation of annual maintenance plans • Mapped instrumentation needs of the company and defined technical parameters to facilitate procurement of right quality instruments Key Achievements • Designed & developed SOP’s & SMP’S and ensured its implementation • Pioneer in erection, commissioning, inspection tests of various plants/equipments M/S. AUROBINDO PHARMA LIMITED 2004 to 2006 Shift in Charge M/S GMR BEVERAGES INDUSTRIES LIMITED, RANASTHALAM, SRIKAKULAM DISTRICT, A.P 1999 to 2004 Shift Supervisor / Sr. Technician M/S GMR VASAVI INDUSTRIES LIMITED RAVIVALASA, TEKKALI MANDAL, SRIKAKULAM DISTRICT, A.P 1997 to 1999 Mechanical Technician EDUCATIONAL CREDENTIALS B.Tech Rajasthan University IInd class Boiler Attendant Date of Birth: 10th Jul 1977 Languages Known: English, Hindi and Telugu References: Available on Request M. Bala Murali Krishna
  • 4. As a project engineer (reading isometric drawings,P&ID,protocol preparation ) Checked all supports as per isometric drawings. Perform inspection of incoming material as per project requirement. Erection execution of boilers. Erection and execution of structures. Carry out of inspection of structural fabrication work according codes and standards. Performing welding inspection activity. Performed inspection of fabrication work according codes and as per standard Material Planning & scheduling. Performed the material verification. Planning and executing of the work so as to achieve the Target as planned. Allotting works to efficient contractors. Preparing the protocols for completion of fabrication work. Getting the customer satisfaction on the job and Thereby making Smooth and quick progress. Erection, fabrication and Commissioning of Boiler, storage tanks, piping& valves. Performed pre-commissioning and commissioning activity and prepare document. Performed leak test of in presence of client. And perform hydro test at site. Prepare reports for day to day results and present them in weekly review meetings of both the Company and client.