GIRISH MISHRA
Contact: 09323784799,girishm@alkem.com,shv_786@yahoo.co.in
Senior level assignments in Project/Procurement Management / Operations & Maintenance with an
organization of high repute
CAREER CONSPECTUS
EMPLOYMENT
DETAILS
Since Feb 2005: Alkem Laboratories Ltd.
Joined as Project Engineer & rose to the post of Asst. General Manager – Project
Nov 96 –Fab 05 :Zenith Ltd (Chemical Divn)MIDC Tarapur
Joined as production Engineer and worked as various dept of company
Jan 93 TO Nov 96: Rajprakash Chemicals Ltd MIDC Tarapur.
Trainee Engineer to Production officer
Key Result Areas:
• Spearheading activities involving working out various requirements & monitoring overall project
procurement operations for ensuring timely completion.
• Administering the site activities and reviewing the project schedule, ensuring cost control within budget,
planning for cash flow requirements, etc.
• Accountable for executing cost saving techniques, measures and modifications to achieve substantial
reduction in Operations & Maintenance expenditures work within the budget.
• Finalisation of Consultant,Civil contract,Piping,Electrical,Instrumentation contract etc.
• Managing the negotiations and finalization of the contracts with Suppliers and Contractors.
• Ascertaining timely supply from the Vendors, Suppliers, Contractors and Logistic Operators and dealing
with the Consultants, Licensors and Statutory Bodies for the compliance of local requirements.
• Developing MIS and various other reports to apprise top management of the routine profitability and
overheads in operations and assisting in critical decision-making.
 Seasoned professional with 21 years of rich experience in the areas
of Project Management, Project Procurement management.Capex
Procurement, Operations & Erection & Commissioning.
 Presently associated with Alkem Laboratories Ltd., Corporate
office(Lower Parel) as AGM(Project Procurement).
 Proficient in handling Projects and accountable for quality service &
timely completion of the projects.
 Rich exposure in civil, electrical and instrumentations.
 Adept at basic and detail Engineering of API Projects.
 Conversant with land acquisition/purchasing procedures for green
field or expansion of any project in.
 An enterprising leader with proven dexterity in leading and directing
personnel towards accomplishment of a common goal.
 Talent for proactively identifying & resolving problems, ramping up
project activities on time and maximizing productivity.
 An effective communicator with excellent relationship management
skills and strong analytical, leadership, decision-making, problem
solving & organizational abilities.
Plant Operations
Project Management
Production Planning
Installation &
Commissioning
Instrumentations
Acquisition/Purchasing
Operations &
Team Management
• Responsible for installation & commissioning as well as conducting tests/validations & inspections to
ensure operational effectiveness of process equipments, utilities as per Cgmp.
• Leading, mentoring & monitoring the performance of team members to ensure efficiency in process
operations and meeting of project targets.
Significant Highlights:
• Administered the Energy Conservation Cross Functional Team.
• Played an active role in working for the solvent recovery which made product compatible in China and other
manufacturer.
Alkem Laboratories Ltd.
• Develop Project Charter and present to Management to ensure project objectives
and targets are aligned and signed off
• Formulate implementation strategy including scope, timelines, budget and facilitate
Management approval
• Ensure setting up of site infrastructure facilities
• Ensure deployment of required resources and team in line with Project Organization
structure
• Review and finalize project concept design,basic and detailed engineering in coordination
with design consultants
• Review and finalize scope documents for all the work packages in consultation with
design consultants and internal project team
• Drive the vendor identification and selection process,
• Review Technical qualification documents prepared by the team /
consultants
• Participate in the Technical meetings with Vendor and conduct
Commercial Negotiation with the Vendor and provide recommendations
• Conduct project kickoff meetings with all the major contractors and ensure project
objectives, timelines and scope definition is clear before start of work
• Monitor Contractor mobilization at site in line with agreed terms & conditions
• Review and sign off on the project master schedule ensuring integration of all the
work packages
• Proactive risk identification, monitoring and mitigation
• Review and approve design & scope changes as per authority matrix and ensure
compliance to change management process
• Review and devise action plan based on progress reports received from contractor /
project team
• Conduct project review meetings on fortnightly / monthly basis with all the contractors
and project team
• Review project performance in terms of adherence to time schedule, cost & variance,
procurement and delivery
• Ensure timely review of bills of Vendors / Contractor and release of payments
• Ensure adherence to Quality and Safety protocols
• Ensure preparation of testing & Commissioning Plan
• Ensure adherence to Project closure formalities
• Completion of Project within Baseline Schedule and Approved Project Cost
• 100% adherence to project procurement procedures and policies
• Availability of skilled personnel for handling project activities at all the time
• 100% compliance to production user requirements in the design and execution
• Procurement/Installation/commissioning of GLR,SSR,MEE,Distillation plant,Extration plant,powder
processing equipment,boilers, chilling plant, AHU, purified water system, Air compressors,DCS
Plant,cooling towers,Brine plant,ETP,
Report to the Sr GM Projects and manage all project procurement and implementation.
.
• Procured and coordinated for installation of various QC
instrument(HPLC,GC,Balances,Titrators,UV,FTIR,NMR,Stirrers,Prep HPLC,Particle counter and
many others to meet the growing requirements of the company.
• Independently managed the Rs100 cr project procurement for establishing sucralose
manufacturing plant at Mandva, completing the project in 8 months.-2005
• Completed a Rs10 cr project procurement for FOS in 4 months.-2006
• Executed two projects for establishing R&D facilities for APIs, at Bangalore (Rs5 cr) and Taloja
(Rs3 cr) completing each in 2 months.-2006/2008
• formulation plant project at Sikkim-200cr.-2007
• 150cr Formulation project in Sikkim-2012
• Completed a Glucagel project coordinating with a New Zealand based consultant.
ZENITH LTD, CHEMICAL DIVISION, MIDC Tarapur
Project Engineer, Nov 1996 to Feb 2005
• Reported to the Vice President Operation and looked after execution of projects including project
purchase, and handling of projects from inception to commissioning. Installed and commissioned a
plant for the production of Glauber’s salt using bye-products of the plant as input.
• Worked in the production department for 3 years, delivering highest production with improved yield
and quality.
• Looked after the installation and commissioning of equipment, reactors, autoclaves, triple effect
evaporators, distillation columns, crystallizers, centrifuges and pumps coordinating with the suppliers
and meeting all end user and management expectations.
• Implemented projects for installation of utilities like boiler, air compressor, water chiller, water
purification system and cooling tower.
• Completed all documentation, developed SOPs and validated all equipment through IQ and OQ.
• Led the initiatives for achieving ISO 9001-2000 certification in 2 months.
RAJPRAKASH CHEMICALS LTD, MIDC Tarapur
Production Officer, Jan 1993 to Nov 1996
• Handled production in shifts, looking after production planning, work allocation to operators and
fitters,coordinating with maintenance and controlling process parameters to meet all production and
quality standards.
• Production of Ethyl acrylate through hydrolysis and esterification of Acrylonitrile followed by
Purification by extractive distillation and vacuum distillation.
• Continuously delivered Good yield and Production in shift.
SCHOLASTICS
 B.E. (CHEMICAL) from University of Ranchi, BIT SINDRI in 1992.
PERSONAL DOSSIER
Date of Birth 18/12/1969
Address 603/604,Bld no 10,sector-3,Shanti garden Mira Road(E)Thane-401107
Languages Known Hindi, English.
Current CTC 24lacs
Toatal years of experience 20yrs
Current location Mumbai
Notice Period 3 Months.
References:Mr.Chandrashekhar Lohani
Plant Head (Alkem Laboratories ltd Ankleshwar and Mandva)
Mo No.09099036410
Email ID.:lohani@alkem.com

More Related Content

What's hot (20)

David Lawrence11
David Lawrence11David Lawrence11
David Lawrence11
 
Resume_Supply chain Specialist
Resume_Supply chain SpecialistResume_Supply chain Specialist
Resume_Supply chain Specialist
 
Sandeep RESUME new
Sandeep RESUME newSandeep RESUME new
Sandeep RESUME new
 
CV_SUMAN MUKHERJEE- JULY-16
CV_SUMAN MUKHERJEE- JULY-16CV_SUMAN MUKHERJEE- JULY-16
CV_SUMAN MUKHERJEE- JULY-16
 
Resume - Khalid Hussain Project
Resume - Khalid Hussain ProjectResume - Khalid Hussain Project
Resume - Khalid Hussain Project
 
dipankar bandyopadhyay_6787_GR_A
dipankar bandyopadhyay_6787_GR_Adipankar bandyopadhyay_6787_GR_A
dipankar bandyopadhyay_6787_GR_A
 
William Baxter Professional Resume
William Baxter Professional ResumeWilliam Baxter Professional Resume
William Baxter Professional Resume
 
Arun Goyle resume
Arun Goyle resumeArun Goyle resume
Arun Goyle resume
 
CV@JOMY NEW
CV@JOMY NEWCV@JOMY NEW
CV@JOMY NEW
 
Qaqc in civil construction
Qaqc in civil constructionQaqc in civil construction
Qaqc in civil construction
 
Hariprasad K V R
Hariprasad K V RHariprasad K V R
Hariprasad K V R
 
Sharath-Resume
Sharath-ResumeSharath-Resume
Sharath-Resume
 
Quality plan
Quality planQuality plan
Quality plan
 
Allen Schmitgen pushkar resume'
Allen Schmitgen pushkar resume'Allen Schmitgen pushkar resume'
Allen Schmitgen pushkar resume'
 
Resume
ResumeResume
Resume
 
Ajay_CV_SQA
Ajay_CV_SQAAjay_CV_SQA
Ajay_CV_SQA
 
Resume
ResumeResume
Resume
 
MukailaAbiodunAlimiCQE
MukailaAbiodunAlimiCQEMukailaAbiodunAlimiCQE
MukailaAbiodunAlimiCQE
 
David c brooks resume 06 2018
David c brooks resume 06 2018David c brooks resume 06 2018
David c brooks resume 06 2018
 
Steve Anderson 2016
Steve Anderson 2016Steve Anderson 2016
Steve Anderson 2016
 

Similar to Girish Mishra-R

Similar to Girish Mishra-R (20)

SANTHOSH KUMAR UP RCV
SANTHOSH KUMAR UP RCVSANTHOSH KUMAR UP RCV
SANTHOSH KUMAR UP RCV
 
Sachin be mech_8_yrs_exp
Sachin be mech_8_yrs_expSachin be mech_8_yrs_exp
Sachin be mech_8_yrs_exp
 
Anuraj Panicker
Anuraj PanickerAnuraj Panicker
Anuraj Panicker
 
Anuraj panicker
Anuraj panickerAnuraj panicker
Anuraj panicker
 
Raghu CV 30_12_15
Raghu CV 30_12_15Raghu CV 30_12_15
Raghu CV 30_12_15
 
Vignesh Kumar C- TPI Coordinator
Vignesh Kumar C- TPI CoordinatorVignesh Kumar C- TPI Coordinator
Vignesh Kumar C- TPI Coordinator
 
Lukas CV
Lukas CVLukas CV
Lukas CV
 
CV
CVCV
CV
 
MDK Maintenance Manager 1 7+Year Experience
MDK Maintenance Manager 1 7+Year ExperienceMDK Maintenance Manager 1 7+Year Experience
MDK Maintenance Manager 1 7+Year Experience
 
Resume jaseem
Resume jaseemResume jaseem
Resume jaseem
 
Saqib Shahzad CV updated
Saqib Shahzad CV updatedSaqib Shahzad CV updated
Saqib Shahzad CV updated
 
Zaheer-CV- 2015
Zaheer-CV- 2015Zaheer-CV- 2015
Zaheer-CV- 2015
 
CV Jochen Krick 2015_1
CV Jochen Krick 2015_1CV Jochen Krick 2015_1
CV Jochen Krick 2015_1
 
CV Jochen Krick 2015_1
CV Jochen Krick 2015_1CV Jochen Krick 2015_1
CV Jochen Krick 2015_1
 
CV Pholapatra Latest Rev 05
CV Pholapatra Latest Rev 05CV Pholapatra Latest Rev 05
CV Pholapatra Latest Rev 05
 
TCF Resume UPDATED 05 APRIL, 2015
TCF Resume UPDATED 05 APRIL, 2015TCF Resume UPDATED 05 APRIL, 2015
TCF Resume UPDATED 05 APRIL, 2015
 
vijins new-11-2016
vijins new-11-2016vijins new-11-2016
vijins new-11-2016
 
Andrew taylor cv march 2016.doc
Andrew taylor cv march 2016.docAndrew taylor cv march 2016.doc
Andrew taylor cv march 2016.doc
 
SANPPT
SANPPTSANPPT
SANPPT
 
Aamir CV (1)
Aamir CV (1)Aamir CV (1)
Aamir CV (1)
 

Girish Mishra-R

  • 1. GIRISH MISHRA Contact: 09323784799,girishm@alkem.com,shv_786@yahoo.co.in Senior level assignments in Project/Procurement Management / Operations & Maintenance with an organization of high repute CAREER CONSPECTUS EMPLOYMENT DETAILS Since Feb 2005: Alkem Laboratories Ltd. Joined as Project Engineer & rose to the post of Asst. General Manager – Project Nov 96 –Fab 05 :Zenith Ltd (Chemical Divn)MIDC Tarapur Joined as production Engineer and worked as various dept of company Jan 93 TO Nov 96: Rajprakash Chemicals Ltd MIDC Tarapur. Trainee Engineer to Production officer Key Result Areas: • Spearheading activities involving working out various requirements & monitoring overall project procurement operations for ensuring timely completion. • Administering the site activities and reviewing the project schedule, ensuring cost control within budget, planning for cash flow requirements, etc. • Accountable for executing cost saving techniques, measures and modifications to achieve substantial reduction in Operations & Maintenance expenditures work within the budget. • Finalisation of Consultant,Civil contract,Piping,Electrical,Instrumentation contract etc. • Managing the negotiations and finalization of the contracts with Suppliers and Contractors. • Ascertaining timely supply from the Vendors, Suppliers, Contractors and Logistic Operators and dealing with the Consultants, Licensors and Statutory Bodies for the compliance of local requirements. • Developing MIS and various other reports to apprise top management of the routine profitability and overheads in operations and assisting in critical decision-making.  Seasoned professional with 21 years of rich experience in the areas of Project Management, Project Procurement management.Capex Procurement, Operations & Erection & Commissioning.  Presently associated with Alkem Laboratories Ltd., Corporate office(Lower Parel) as AGM(Project Procurement).  Proficient in handling Projects and accountable for quality service & timely completion of the projects.  Rich exposure in civil, electrical and instrumentations.  Adept at basic and detail Engineering of API Projects.  Conversant with land acquisition/purchasing procedures for green field or expansion of any project in.  An enterprising leader with proven dexterity in leading and directing personnel towards accomplishment of a common goal.  Talent for proactively identifying & resolving problems, ramping up project activities on time and maximizing productivity.  An effective communicator with excellent relationship management skills and strong analytical, leadership, decision-making, problem solving & organizational abilities. Plant Operations Project Management Production Planning Installation & Commissioning Instrumentations Acquisition/Purchasing Operations & Team Management
  • 2. • Responsible for installation & commissioning as well as conducting tests/validations & inspections to ensure operational effectiveness of process equipments, utilities as per Cgmp. • Leading, mentoring & monitoring the performance of team members to ensure efficiency in process operations and meeting of project targets. Significant Highlights: • Administered the Energy Conservation Cross Functional Team. • Played an active role in working for the solvent recovery which made product compatible in China and other manufacturer. Alkem Laboratories Ltd. • Develop Project Charter and present to Management to ensure project objectives and targets are aligned and signed off • Formulate implementation strategy including scope, timelines, budget and facilitate Management approval • Ensure setting up of site infrastructure facilities • Ensure deployment of required resources and team in line with Project Organization structure • Review and finalize project concept design,basic and detailed engineering in coordination with design consultants • Review and finalize scope documents for all the work packages in consultation with design consultants and internal project team • Drive the vendor identification and selection process, • Review Technical qualification documents prepared by the team / consultants • Participate in the Technical meetings with Vendor and conduct Commercial Negotiation with the Vendor and provide recommendations • Conduct project kickoff meetings with all the major contractors and ensure project objectives, timelines and scope definition is clear before start of work • Monitor Contractor mobilization at site in line with agreed terms & conditions • Review and sign off on the project master schedule ensuring integration of all the work packages • Proactive risk identification, monitoring and mitigation • Review and approve design & scope changes as per authority matrix and ensure compliance to change management process • Review and devise action plan based on progress reports received from contractor / project team • Conduct project review meetings on fortnightly / monthly basis with all the contractors and project team • Review project performance in terms of adherence to time schedule, cost & variance, procurement and delivery • Ensure timely review of bills of Vendors / Contractor and release of payments • Ensure adherence to Quality and Safety protocols • Ensure preparation of testing & Commissioning Plan • Ensure adherence to Project closure formalities • Completion of Project within Baseline Schedule and Approved Project Cost • 100% adherence to project procurement procedures and policies • Availability of skilled personnel for handling project activities at all the time • 100% compliance to production user requirements in the design and execution • Procurement/Installation/commissioning of GLR,SSR,MEE,Distillation plant,Extration plant,powder processing equipment,boilers, chilling plant, AHU, purified water system, Air compressors,DCS Plant,cooling towers,Brine plant,ETP, Report to the Sr GM Projects and manage all project procurement and implementation. . • Procured and coordinated for installation of various QC instrument(HPLC,GC,Balances,Titrators,UV,FTIR,NMR,Stirrers,Prep HPLC,Particle counter and many others to meet the growing requirements of the company. • Independently managed the Rs100 cr project procurement for establishing sucralose
  • 3. manufacturing plant at Mandva, completing the project in 8 months.-2005 • Completed a Rs10 cr project procurement for FOS in 4 months.-2006 • Executed two projects for establishing R&D facilities for APIs, at Bangalore (Rs5 cr) and Taloja (Rs3 cr) completing each in 2 months.-2006/2008 • formulation plant project at Sikkim-200cr.-2007 • 150cr Formulation project in Sikkim-2012 • Completed a Glucagel project coordinating with a New Zealand based consultant. ZENITH LTD, CHEMICAL DIVISION, MIDC Tarapur Project Engineer, Nov 1996 to Feb 2005 • Reported to the Vice President Operation and looked after execution of projects including project purchase, and handling of projects from inception to commissioning. Installed and commissioned a plant for the production of Glauber’s salt using bye-products of the plant as input. • Worked in the production department for 3 years, delivering highest production with improved yield and quality. • Looked after the installation and commissioning of equipment, reactors, autoclaves, triple effect evaporators, distillation columns, crystallizers, centrifuges and pumps coordinating with the suppliers and meeting all end user and management expectations. • Implemented projects for installation of utilities like boiler, air compressor, water chiller, water purification system and cooling tower. • Completed all documentation, developed SOPs and validated all equipment through IQ and OQ. • Led the initiatives for achieving ISO 9001-2000 certification in 2 months. RAJPRAKASH CHEMICALS LTD, MIDC Tarapur Production Officer, Jan 1993 to Nov 1996 • Handled production in shifts, looking after production planning, work allocation to operators and fitters,coordinating with maintenance and controlling process parameters to meet all production and quality standards. • Production of Ethyl acrylate through hydrolysis and esterification of Acrylonitrile followed by Purification by extractive distillation and vacuum distillation. • Continuously delivered Good yield and Production in shift. SCHOLASTICS  B.E. (CHEMICAL) from University of Ranchi, BIT SINDRI in 1992. PERSONAL DOSSIER Date of Birth 18/12/1969 Address 603/604,Bld no 10,sector-3,Shanti garden Mira Road(E)Thane-401107 Languages Known Hindi, English. Current CTC 24lacs Toatal years of experience 20yrs Current location Mumbai Notice Period 3 Months. References:Mr.Chandrashekhar Lohani Plant Head (Alkem Laboratories ltd Ankleshwar and Mandva) Mo No.09099036410 Email ID.:lohani@alkem.com